Document zR982adMRGyeR0V0XoqX4ZjB
FOR APPROVAL ONLY
Westinghouse Statement on Asbeatoa Contam at the tva Gallatin Plant
on complaint
povar plan 19S9 and 19
is refurbishing four com^ ^ion tu&binea at tha TVA
Tann. Tha coabustioi gbahes vara built during
ouaa began refurbisl
vo*k> in October of 1990.
There have
site. Westingb hazards.
tion at tha empoaod to asbastos
Prior to Tannasaaa SPA sampled strands of asbastos identified/ isolatad and than.
icuss/ TVA and tha ation products/ with
iffad. Tha aatarials vara ktruetad to not work on
TVA employed an aba sits. Tha contractor/ Global
Tannasaaa SPA* Throughout asbastos abatanant company* vblcb is wall within OSHA 1 Tannasaaa SPA visltad tha s in tha plant, and found applicable Tannasaaa s
to ranova aatarials froa vaa cartiflad by tha saaplas vara taken by tha floated a minimal presence,
saapling periods. Tha took aatarials saaplas in compliance vith
| PLAINTIFF'S i EXHIBIT
Q0KST20MS AWD AtfSttns
.1 We understand that 08HA has lodged complaints against Wastinghouse Shat is your ccnmant?
We taka issue with the health violations alleged in the OSBA
complaints. Veetinghouee encapsulated the insulation aaterials as an
additional health precaution for on-site personnel. This process is
over and above the required OSHA health standardj^.OSEAaileges that
during the 15 to 30 alnutes it took to encapsulaS^the^gpuiatlon
materials, Wastinghouse should have taken air mvLmdL Meetinghouse
takes issue with this position. We believe thffp$hdr*Wloyees vere
protected during this process. They wore prgCreii&jcXothing and
respirators throughout the process.
.2 Employ
Standards on the
site
cosmsnt?
TVA, West!
investigated found. West and we will
health and safet.
.3 Bow many Meetinghouse-
independently , no problems vere
further allegations, to protect worker
Approximately 30 craft project management empl
4 administrative end
4. when wee the asbestos aba
The process was begun in
leted in mid-July.
5. Employees say that they equipment containing '
were working on
An evaluation of manager indicates
process. On boards on-site,
stewards. Zn in communicat not adequate!
aafcmatsa*
, by a have ions, we
ions, we now recognise personnel. The
about the areas . the situation.
health and safety ' the communication
te on bulletin
..with union urn wdrsn't successful
did
During Jul explained, work that expressed contaminated case, it was
several meetings with allnmgfloyaaa. We and their frequency. Wsf^wiewed all the
________During these meetings, aan^psplyeea that they had been working with asbestos lals. Although they had the impression this wee the
####
7-24-Sl