Shimizu C8 Modeling Results -10/4/04
Scenario
PlanB-1 (w/oDBS) Plan B-2(w/o DBS) Plan B-3, DBS @95% Plan B-3, DBS @96% Plan B-3, DBS @98% Plan B-4, DBS @95% Plan B-4, DBS @96% Plan B-4, DBS @98%
Maximum Annual Average
(all concentrations in ug/m3)
1997
0.836 0.637 0.283 0.234 0.099 0.191 0.161 0.076
1998
0.992 0.762 0.338 0.279 0.118 0.233 0.196 0.092
1999
0.824 0.622 0.276 0.228 0.097 0.184 0.154 0.074
Note: All maximum predicted annual average concentrations occur on the plant fenceline.
Shimizu, Plan B-1 w/o DBS 1998 met data
-150
-100
-50
0
50
100
150
200
250
300
Contour Interval O.I ug/m3
Shimizu, Plan B-2 w/o DBS 1998 met data
-150
-100
-50
0
50
100
150
200
250
300
Contour Interval O.I ug/m3
Shimizu, Plan B-3 w/ DBS @ 95%
1998 met data
-150
-100
-50
0
50
100
150
200
250
300
Contour Interval 0.05 ug/m3
Shimizu, Plan B-3 w/ DBS @ 96%
1998 Meteorological Data
-150
-100
-50
0
50
100
150
200
250
300
Contour Interval 0.05 ug/m3
Shimizu, Plan B-3 w/ DBS @ 98%
1998 Meteorological Data
Contour Interval 0.02 ug/m3
Shimizu, Plan B-4 w/ DBS @ 95% 1998 Meteorological Data
Contour Interval 0.05 ug/m3
Shimizu, Plan B-4 w/ DBS @ 96%
1998 Meteorological Data
Contour Interval 0.05 ug/m3
Shimizu, Plan B-4 w/ DBS @ 98%
1998 Meteorological Data
200-
50-
-150
-100
-50
0
50
100
150
200
250
300
Contour Interval 0.02 ug/m3
Shimizu C8 Modeling Results -10/4/04
Scenario
Plan B-l(w/o DBS) Plan B-2(w/o DBS)
Plan B-3, DBS @95% Plan B-3, DBS @96% Plan B-3, DBS @98% Plan B-4, DBS @95% Plan B-4, DBS @96% Plan B-4, DBS @98%
Maximum Annual Average
(all concentrations in ug/m3)
1997
0.836 0.637 0.283 0.234 0.099 0.191 0.161 0.076
1998
0.992 0.762 0.338 0.279 0.118 0.233 0.196 0.092
1999
0.824 0.622 0.276 0.228 0.097 0.184 0.154 0.074
Note: All maximum predicted annual average concentrations occur on the plant fenceline.