Port St. Lucie Florida Water and Sediment
Resample for the Empirical Human
Exposure Assessment Multi-
City Study
1
Port St. Lucie, Florida July 18-19, 2000
I
Prepared under contract with:
I
1 Prepared by:
1 Pace Analytical Services, Inc. Minnesota Field Services
1
1700 Elm Street, Suite 200 Minneapolis, MN 55414
I
Bradley G. Jacobson Project Manager
3'MET&SS Field Analytical Services and
Technologies
Client Coordinator: Jess Eldridge 3M Lab Request: E00-2003 3M Department: 502180
Pace F'roject No.: 1034438 (Field)
1
August 15,2000
I
1
I
BACK TO MAIN
I
I
1
Introduction
I
Sampling Protocols
Table of Contents
Pasle 1
2
I
Field Observations
3-5
I
Deviations from the GPO
6
1
Contacts for Municipal Sites
7
- Table 1 Field Summary
8
1 - Table 2 Garmin GPS12 Coordinates
9
I - Table 3 -Abbreviations
10
Table 4 Samples Collected
11
I
- Figure 1 Surface Water Collection (Quiet Water) - Figure 2 Sediment Sampling
12 13
Figure 3 - WWTP Injection Well
14
1 - Figure 4 W P Chlorine Contact Chamber
15
Figure 5 - WWTP Injection Well Pond
16
1 - Figure 6 Quiet Surface Water
17
Figure 7 - Quiet Surface Water Shoreline I
18
I - Figure 8 Quiet Surface Water Shoreline I I
19
i Appendix A General Project Outline (GPO)
A- 1
Appendix B Field Data Log Sheets
B- 1
I
Appendix C Chain of Custody Forms
c-I
I
I
BACK TO MAIN
I
Introduction
I Pace Analytical Services, Inc. was contracted by ithe 3M Company to recollect
1 samples for the Port St. Lucie Multi-City Study. The sampling was originally conducted in July 1999 by Battelle. The resamplirng was conducted to confirm
1
baseline information obtained during the July 1999 event. Target analytes for this
event are PFOS, PFOSA, POAA, PFHS, and TFA (fluorochemicals). Surface
I
water samples were also analyzed for metals. The area of greatest interest was
I the quiet surface water located near Martin County Marina (Mapp Rd and SW Chapman Way).
1
Emphasis was placed on quality control measures such as extensive field matrix
1
spiking at multiple concentration levels, duplicate samples, and procedures to reduce possible contamination during field collection. The sampling was
I conducted according to the specifications set forth in the 3M General Project Outline (GPO), except as noted in the report sectioii "Deviations to the GPO". A
1 summary of the field observations can be found in Table 1. Sampling locations were located for future reference with GPS longitude and latitude coordinates
1
and are listed in Table 2.
I
1
1
I
1
1
Pace Analytical
I
Page 1
BACK TO MAIN
I
SampIing ProtocoIs
Equipment Preparation: The 1 liter Nalgene" sample containers used for
sampling were rinsed with "Optima" grade methanol and DI (Type I water) prior
to use. Transfer devices, such as the stainless steel bucket, were field
decontaminated between samples by mechalnical removal of visible
contaminants followed by a thorough rinsing with methanol and Type I DI water.
New nitrile gloves were worn at all times during the equipment preparation,
sample collection and handling procedures. New gloves were donned with every
change of sample location and/or sample matrix.
Surface Water Samples: Samples were collected approximately 15 cm below
the surface of the water by first submersing the sample container into the water.
Then the container was uncapped, filled and recapped while continually
submerged (Figure 1). This procedure was used to avoid capturing a possible
concentrated surface film layer.
I Sediment Samples: Samples were collected using a stainless steel scoop. The sediment samples were collected at the corresponding subsurface water sample
location. Approximately the top 2 centimeters of sediment were collected into
the scoop. The scoop was then raised slowly to the surface to avoid loss of top
I
sediment layer (Figure 2).
Tap Water Samples: Samples were collected directly into the sample container
I
via the cold water tap.
I Wastewater Treatment Sludqe: This sample was collected using a stainless steel bucket and a nylon rope. The first two feet of inylon rope above the point of
I
attachment to the bucket was rinsed with methanol and Type Iwater in the field prior to use.
Pace Analytical Page 2
BACK TO MAIN
Field Observations
0 A summary of the field observations can be found in Table 1.
0 Municipal Drinking Water Plant: The drinking water plant has added a deep aquifer (approximately 1350 feet) to the plant intake source. This water is treated via reverse osmosis and is referred to as the RO water. This site was not available for collection during the 1999 Battlelle sampling event, per site contact Brad Macek. The RO site was collected in addition to the original shallow aquifer (approximately 100 feet). The shallow aquifer undergoes lime-softening treatment. The oufflow from the plant is a blend of the RO and lime softened waters. The plant refers to the plant oufflow asl the "point of entry" because this water enters the city water system.
0 North Port Wastewater Treatment Plant (WWI'P): The final effluent for the
WWTP is at the Injection Well (Figure 3). This is the point where the effluent is injected into the ground. Samples were collected at this point, but after further discussions with site contact Carl Norton, it was determined this water would not be representative of the effluent collected by Battelle in 1999. This sampling point is now a blend of the WVVTP effluent and waste reverse osmosis (RO) water from the drinking water plant. The samples were submitted to the laboratory, but effluent samples were also collected at the chlorine contact chamber (Figure 4). Per Carl Norton, the chlorine contact chamber effluent would be representative of the discharge collected in 1999. Chlorination was not occurring in the chlorine contact chamber at the time of sampling. Note Figure 5, which shows the algae-like film on the surface of the pond leading to the injection well.
0 Port St. Lucie Landfill: There were two leachate ponds in use. The operators were currently pumping into Pond #3 and pumping out of Pond M.
Pace Analytical Page 3
-
I BACK TO MAIN
I
Samples were collected from Pond #4 using a pond sampler. The sample
1
container was inverted as it was submerged into the leachate pond to minimize the entry of surface leachate into the container.
- 0 Fire Department Station #5: The cold water tap to the kitchen sink was
I purged for approximately 5 minutes and the sample was collected. No
I abnormalities noted. 0 Stuart Harbor: This site is located just off the NW corner of Jefferson
I Bridge. The sediment appeared to be relatively (cleansand. There appeared to be some landscaping activities occurring approximately 100 yards to the
1 west. 0 Pendarvis Park: The cold water tap samples were collected from the
1
women's restroom. The surface water samples were collected by walking out
on the concrete boat landing to avoid stirrinlg up sediment. Sediment
1
samples were collected approximately 20 yards to the right of the landing. A
1 light rain started during the surface sampling and the 3M project coordinator Jess Eldridge was contacted. Per that first phone conversation, as long as
1
the rain remained light, finish Pendarvis Park sampling. A second phone call was made to Jess Eldridge after collecting Pendarvis Park. The rain had
I become heavier and outside sampling activities were halted for the day to allow the surface water systems to settle. Total rainfall for the event was
1 0.23 inches and lasted approximately one hour. 0 Holiday Inn: Samples were collected in rooni 413 after purging the cold
I water line for ten minutes. The water remaineld near ambient temperature. Nothing abnonnal noted.
I 0 Martin County Marina: GPS coordinates from the 1999 sampling event indicated the sampling location to be within the boat docking area. This area
I
of the marina was littered and had several boats in dock, so a sampling point
1 was selected just outside the boat docks. 0 Quite Surface Water: The pond was relatively small (approximately 200 feet
1 X 200 feet) see Figure 6. The water was fairly clear with some minnows Pace Analytical
I
Page 4
BACK TO MAIN
present. Styrofoam, plastic bags, a can and a bottle were some of the litter noted in the water (Figures 7 and 8). Sampling was conducted approximately 45 feet away from visible litter. The technician waited approximately five minutes after stepping into the water to allow bottom sediment to settle prior to collecting the water sample.
Pace Analytical
Page 5
I BACK TO MAIN
1
I
Deviations from the GPO
- Addition of the deep aquifer reverse osmosis sampling point at the drinking
I water plant.
I Addition of the chlorine contact chamber sampling point due to changes at the wastewater treatment plant.
1 Pendarvis Park samples were collected during light to moderate rainfall. Sampling at Martin County Marina and the Quiet Surface water occurred with
I 24 hours of a rain event. GPO requested'dry conditions for a 24 hour period prior to sampling.
I
Per the July 11, 2000 phone conversation with Jess Eldridge, use of the
subsurface water sampler would be needed only if a sampling configuration
1
required its use. The surface water samples were collected manually by
1 hand. 0 Benchmark locations for GPS accuracy confirmation were not located due to
1 construction activities. 0 As mentioned in the "Special Precautions, QNCZC"section of the GPO, Zip
1
Lock bags and aluminum foil were to be tested for background levels of fluorochemicals. The Zip Lock bag was clean but the aluminum foil had
1 some positive results. As a precaution, after this information was made known, the sediment scoops which had been cleaned and wrapped in foil,
I were rinsed with "Optima" grade methanol and Type I water in the field prior to use. The data regarding the aluminum foil will be evaluated and re-
1
analyzed if necessary.
1
Pace Analytical Page 6
BACK TO MAIN
I
I
Contacts for Municipal Sites
i
I 0 Permissions Granted by Municipal Officiials: Full cooperation was received from the respective officials of the municipal drinking water plant,
I municipal wastewater treatment plant, municipal1 landfill and Station #5 fire department. Following are the names and phone numbers of the 'site
I
contacts:
I
Municipal Drinking Water Plant 1. Wes Upham - 5611873-6400
2. Brad Macek - 561/343-2373
1
Wes Upham made the arrangements for Brad Macek to show the Pace technicians the monitoring points.
1 - Wastewater Treatment Plant
1. Wes Upham 5611873-6400 2. Carl Norton (onsite)
I 3. Mark Rowen (onsite) Wes Upham made the arrangements for Carl Norton to show the Pace
I
technicians the monitoring points.
1
Municipal Landfill,
1. Ron Roberts - 561/462-1768
2. Chuck Laimb (onsite)
I
Fire Station #5
1. Chief Vaughn - 561/462-2312
1
I
1
M
il Pace Analytical
i
Page 7
BACK TO MAIN
Port St. Lucie Resampling Lab Request: E00-2003 July 2000 Event Field Summary Table
Location Name
Municipal DW Plant In- RO
Municipal WV Plant IntakeLIME Municipal DW Plant OufflQw
TapWater site ti Hdiday Inn Tap Water Site #2 Fire dept
Tap Water Site #3 Pendarvis Park
surf. water s i t i PendanrisPark
S e d i i Sitetl PedanrisPark
Surf. Water Site #2 Mattin Cty Marina S e d i i Site#2 Martin Cty Marina
Surf. Water Site #3 Stuart Harbor W i t S i#3 Stuart Hahx North POrtWWTP Effluent
....NorthPOrtW W T P ChlorineContact Chamber
` A n A mIP S M g e (p:e&&d)
PortSt Lucie LF Leachate Quiet SurfaceWater PalmC i
Fekf Blank Control Sample Filled
Field Blank Control Sample Empty
Fekf Spike control Sample (FSCS)
Table 1
Field Summary
Comments
Cameon-line July 1999. Deepaquifer - mwse osmosis tmbnent. Not cdlected by Battelle.
This is theoriginal site cdlectedby Battellein 1999. Blend ofthe ReversedOsmosis and limesoftenedwater intakes.
Hotel R a m413.
Fire Station #5 - Kitchen sink.
collected f m w m s rest roan. Raining quite hard by end of sampling. Sampling halted for the day after Pendarvis Park.
Raining quitehad by end of sampling. Sampling hattedfor th;,day after Pendarvis Park.
Moved out dthe boat docking area to reduce possible contamination from boat mdors etc. Movedout dthe boat doclong area to reduce possiblecontamination iromboat morsetc.
- Sandyshoreline very l i i silt like material
RebbLelydean sand, not much silt Collectedfrom valve as itenters the injection well. Blend of W W T P effluent and waste DW RO water Representah of what Battelle collected in 1999 per site contact. Chlorine not being added here at this time. S L r m i a cdcr,!!?ida!!d black
Dark b M - l i i odor.
Small pond- Some slyrofoam, bags, battles,cans etc. inwater. Minnrrwspresent.
Labeledand filled at Paceand transported with the sample bottles forthe duration dthe project Lebeled at Paceand transportedwiththe sanpk boWesfortheduradiondthe project Wles filledwith Type Iwater at Paceand spiked in thefekf -with the dher samples.
Pace Analytical Page 8
BACK TO MAIN
Port St. Lucie Resampling Lab Request: E00-2003 July 2000 Event Gamin GPSl2 Coordinates
Table 2
Jury x"l event
Instrument reading t
July'RnTt) event
Corrversion t
I Sampling Location Municipal DW Plant 1001S.Prinville Road
I North Port WWTP 281 St. James Ave.
Position
(deg. and mln.)
Latitude
N27" 18.521'
Longitude W080" 20 .484'
Latitude
N27" 20 .17S
Longitude W080" 21 .070'
(deg., mln. and sec.)
N27" 18'31.3'
W080" 20' 29.0
N27" 20' 10.5" W080" 21' 04.2"
I Port St. Lucie Landfill 6120 Glades Cutoff Rd
Latitude
N27" 23.362'
Longitude W080" 23 .912'
N27" 23' 21.7" W080" 23' 54.7"
~
1
Fire Station 5 16W Port St. Lucie Blvd
Latitude
N27" 16 .246'
Longitude W080" 18 . 195'
N27" 16' 14.8 W080" 18' 11.7"
I
Stuart Harbor
Latitude
N27" 12 . I 9 7
N. side of Roosevelt Bridge Longitude W080" 15 .693'
N27" 12' 11.8 W080" 15' 41.6
July 1999 event Battelle Measurements
(deg., mln. and sec.)
N27" 18' 32.1" W080" 20' 37.8
N27" 20' 10.7" W080" 21' 08.7"
N27" 23' 21.4" W080" 23' 53.1"
N27" 16'21.8l W080" 18' 14.6
N27" 12' 13.6 W080" 15' 43.0
1
Pendarvis Park Pendawis Cove Park
Latitude
N27" 11 .251'
Longitude W080" 16.213'
N27" 11' 15.1" W080" 16' 12.8
N27" 11' 15.2" W080" 16' 12.9
I
Holiday Inn 1012!0 S Highway 1
Latitude
N27" 16 .748'
Longitude W080" 17 .494'
I
Martin County Manna
Latitude
N27" 10 .997'
Mapp RdlSW Chapman Wa Longitude W080" 16 . I 18'
I Quiet Surface Water
Latitude
N27" 10.991'
Mapp Rd/SW Chapman Wa Longitude W080" 16.344'
N27" 16'44.9 W080" 17' 29.6l
N27" 10' 5 9 . 8
W080" 16' 07.1"
N27" 10' 59.5" W080" 16' 20.6
N27" 16'46.2" W080" 17' 30.1"
N27" 11' 00.1"
W080" 16' 08.7''
N27" 11' 00.1'' W080" 16' 20.4"
I t 'The Garmin GPS12 used for this project displays the position in degrees and minutes. Previousdata was reported in degrees, minutes and seconds. For comparison to previous dlata, the fractional incrementof the minute was multiplied by 60 to convert to seconds.
I
1
a Pace Analytical
1
Page 9
I BACK TO MAIN
I Port St. Lucie Resampling Lab Request: E00-2003 July 2000 Event Abbreviations
I
Table 3
Abbreviation
C
dUP F B-E m pty
FB-Filled
FMS
FSCS (D1 and D2)
K
MDWPIN-LIME
MDWPIN-RO
MDWP-OUT
NPWWTP-CC
NPWWTP-EFF
NPWWTP-SLUDGE PSLLF-LEACH
QSWPALM CITY
SED#I PEN PK
SED SED
#2 #3
-MCM
SH
SW#1 PEN PK
SWa-MCM
SW#3-SH
TW#l HOLIDAY INN
TW#2 FIRE DEPT TW#3 PEN PK
FulI Description
Sample for Centre Laboratory Duplicate sample collected same as original sample Field Blank Control Sample Empty Field Blank Control Sample Filled Field Matrix Spike (either 200 pptl 1 ppb,or 25 ppb) Field Spike Control Sample (Day 1 and Day 2) Sample for Kris Hansen
- Municipal Drinking Water Plant Intake LIME - Municipal DrinkingWater Plant Intake Reverse Osmosis
Municipal Drinking Water Plant Outflow North Port Wastewater Treatment Plant Chlorine Contact Chamber North Port Wastewater Treatment Plant Effluent Wastewater Treatment Plant Sludge (pretreated) Port St. Lucie LF Leachate Quiet Surface Water Palm City Sediment Site #1 Pedarvis Park Sediment Site #2 Martin Colunty Marina Sediment Site #3 Stuart Harbor Surface Water Site # I Pentlawis Park Surface Water Site #2 Martin Cty Marina Surface Water Site #3 Stuart Harbor Tap Water site #1 Holiday Inn Tap Water Site #2 Fire Department Tap Water Site #3 PendarvisPark
Pace Analytical Page 10
BACK TO MAIN
Port St. Lucie Resampling Lab Request E00-2003 Listing of Samples Collected July 2000
Table 4
SampleDatelTime Location
7/18/00 09:00 MuniciDal DW Plant Intake RO 7/18/00 09:25 MunicipalDW Plant IntakeLime 7/18/00 09:40 Municipal DW Plant Outflw
7/18/00 17:45 Tao Water siteW l HolMay Inn 7/18/00 13:40 Tap Water S i #2 Firedept
7/18/00 15:00 Tap Water Sitef l Pendanris Park 7/18/001510 Surf. Water Site#PlendarvisPark 7/18/00 1520 Sediment SiteX i Ped& Park
7/19/00 07:lO Surf. Water Site #2 Martin Cty Marina 7119/00 07:20 Sediment Site#2 MartinCty Marina
7/18/00 14:15 Surf. Water S i #3 Stuart Harbor 7/18/00 14:25 Sediment S L # 3 Stuart Harbor 7/18/00 10:20 N. Port WWTP Eff lniectionWell 7/18/00 10:45 N. PortW W T P Eff Chlorine Chamber 7/18/00 11:05 W W T P Sludge(pretreated)
dup K dupC
11111 1 1 1 1 1 1
L 1 1 1 1 1 1 1 1 1
Blind dup K
1
Blind dup C K-FMS-200 ppt
I 1 I
1
I
1
1
1
1
I 1
K-FMS-lppb
1 1 1 1
1 1
C-FMS-200 ppt
I 1 I
1 1 1
CFMSlppb
1 1 I 1
Metals Scan
I
1
1
1
1I 1 I
S a m p l e D a t ~ i mLocation
7/18/00 12:15 Port St. Luck LF Leachate
SampleDate/Tii Location
7/19/00 0755 Quiet Surface Water Palm City
dup K dupC K-FMS-200 ppt-A K-FMS-1p p M
I 1 ' 1 1 1 I 1
1
C-FMS-200 Ppt-A C F M S l p p M
I
1
I
1
I
I
I
I
K-FMS-25ppbA K-FMS-200 ppt-B K-FMS-1ppbB K-FMS-25ppbB
1
CFMS-25-
1
I I I I 1
1
I
CFMs-mOppt-B C-FMS-lppb-B C-FMS-25p~b-B
I
1
I
1 I
I
I
I
1
1
I
Metals Scan 1
dup K dup C K-FMS-200 ppt-A K-FMS-1ppb-A K-FMS-25ppb-A K-FMS-200 ppt-B K-FMS-lppb-B K-FMS-25ppb-B
I 1 l 1 1 I I I I I 1 1
I
1
1
1
1
C-FMS-200 PPt-A C F M S lpPM CFMS-25ppb4 CFMS-200 wt-B CFMS-1ppbB CFMS-2-8
I
1
I 1 I
1
I
1
I1I 1 I
SampleDate/Tii Location 7118/00 18:42 FW Spike 7/19/00 08:25
(FSCS)
SampleDatsrrMe LocatiOn 7/19/00 0820 RinsemathanoVbdtleblank
FSCS-200 ppt D1 FSCS-lppbD l FSCS-200 ppt D2 FSCS-lppb D2
I
1
I 1 I
1
I
1
1
I
I
Pace Analytical Page 11