SUMMARY JOB COSTS PROJECT. Blast Furnace Baghouse Flue El Paso Plant ENR INDEX 2593 ASARCO C.E. PROJECT NO. N.Y. APPRO. NO. EA-33-EP PLAINTIFF'S EXHIBIT.. EST. BY DESIGN SECTION FLB PLANT NO. _____ C'KD by AO Marsh, Jr. DATE Aug. 1, 1977 ACCT. NO. 1000 2000 3000 4000 5000 6000 7000 8000 9000 DIRECT COSTS DESCRIPTION DEMOLITION & EARTHWORK CONCRETE PROCESS STRUCTURES GENERAL EQUIPMENT PROCESS EQUIPMENT PIPING ELECTRICAL INSTRUMENTATION PAINTING TOTAL ESTIMATED DIRECT COSTS INDIRECT COSTS ENGINEERING ESTIMATED COSTS $ 31/000 11.000 539.200 3.000 2/000 5,000 13,000 20,000 $624,200 % OF TOTAL CAPITAL-------COSTS DESIGN & SPECIFICATIONS PROCUREMENT FIELD SUPERVISION CONTRACTORS FIELD DISTRIBUTABLES ESCALATION ENGINEERING SERVICES PROJECT EQUIPMENT BULK MATERIALS - CONSTRUCTION PROJECT LABOR CONTRACTORS FIELD DISTRIBUTABLES TOTAL FIELD & ENGINEERING EXPENSE CONTINGENCIES FEES: CONTRACTORS FEE OR PROFIT LICENSES AND/OR ROYALTIES 62,000 8,000 8,000 90,000 3,000 8.000 40,000 18,000 5,800 $867,000 87,000 43,000 TOTAL ESTIMATED CAPITAL COSTS APPLICABLE TAXES - MATERIALS, EQUIPMENT 400.000_____ a __________5 % TOTAL ESTIMATED PROJECT COSTS ESTIMATED LIFE OF PROJECT 18 $997,000 w p, 20,000 $101 *7 nnn mo. - HER 0001017 sg. 1 Of 11 N OE A . -p3C.E. PROJECTNO N.^cAPPRO. r* > 2 2 O OIV. NO. ITEM DESCRIPTION 3n - Tm C Op DEMO. 0 EARTHWORK 1000 Sr TT ESTIMATE SUMMARY DIRECT LABOR & MATERIALS B la s t Furnace Baahouse F lu e date Aug. 1 , 1977 E l P a s o P la n ten r in d e x 2 5 9 3 | CONCRETE 1 PROCESS STRUCT. GENERAL EQUIP. PROCESS EQUIP. PIPING 0oe 000* | \ 3000 || 4000 | 1 sooo I * ee ELECT. oe o o U1 o o o to UJ o o o 1 1 01 F lu e to 6 1 0 * S ta c k 3 1 ,0 0 0 0 2 _ l S ta c k M o d ific a tio n s H' H O O O v- O O O O 3 8 9 ,2 0 0 m2 e o O C O 'E T P A IN T 2 0 ,0 0 0 1I p* 1) O l c/ a inf H o TO TAL EST. fk kl c oO pc Wl 0 0 0 '0 S T 1 1 H W % 1^ 5 X m 73 o o o o __>. 03 to ta l discipline costs 3 1 ,0 0 0 1 1 ,0 0 0 5 3 9 ,2 0 0 3 ,0 0 0 2 ,0 0 0 5 ,0 0 0 TOTAL ESTIMATED DIRECT LABOR & MATERIA!S 2 0 ,0 0 0 1 $ 6 2 4 ,2 0 0 COST ESTIMATE DE7 .S / CONSTRUCTION ESTIMATE DIRECT LABOR AND MATERIAL ASARCO PROJE pt Blast Furnace Baahouse Flue El Paso Plant C.E.PF^O.IFCTNO EA-33-EP N.Y. A PPRO. NO. PLANT NO. firrj mh 1000 titi p Demolition & Earthwork DIV. NO. 01 DESCRIPTION QUANTITY Flue to 610* Stack UNIT COSTS MATL. EQUIP. EST. BY DESIGN SECTION FLB p'k'n rv A. O. Marsh, Jr date Aug. 1, 1977 ENR INDEX 2593 LABOR OTHER TOTAL COST PROPERTY VRS CODE Remove existing stc icks (6) Steel Transite 100T 200/T 7000SF 1/SF $20,000 20 0783 7,000 20 0783 Concrete 20cy 30/cy 600 20 0783 Excavation lOOcy 10/cy 1,000 20 0783 Backfill 30cy 10/cy 300 20 0783 Temporary bulkhead 1 2,100 20 0783 ''l V TOTAL HER 0001019 $81,000. Pg. 3 of 11 COST ESTIMATE DET '-S / CONSTRUCTION ESTIMATE DIRECT LABOR AND MATERIAL ASARCO PROJE pT Blast Furnace Baqhouse Flue El Paso Plant C.E. PF^OIFfTNn EA-33--EP N.Y. A ppnn wn plant no Arrvr no 2000 titi p Concrete DIV. NO. DESCRIPTION QUANTITY 01 Flue to 610' Stack UNIT COSTS MATL. EQUIP. EST. E Y DESIGN SECTION FLB P'lfn rv A.O. Marsh, Jr. DATE Aug. lr 1377 ENR INDEX 2593 LABOR OTHER TOTAL COST PROPERTY YRS CODE Flue support fnd s 50cy 200/cy $10,000 20 3783 EPA sampling platform 5cy 200/cv 1.000 20 3783 "I L TOTAL HER 0001020 $11,000. Pg. 4 of * 11 A i.', D 0 0 I1 o,0 0 0 +t *5,0 0 0* 7 Vu T A 1,C` J 0 . r> oj o c- 2 -g ^ u o i Jj i? u i> + + + 2 2 2,2 On* 1 - -S / CONSTRUCTION ESTIMATE ABOR AND MATERIAL ASARCO Baahouse Flue PI ANT NO. EST. BY DESIGN SECTION FLB cifn pv A.O. Marsh, Jr. date Aug. 1, 1977 ACCT. NO__ 30-Q.Q titi f Process Structures ENR INDEX 2593 DIV. NO. DESCRIPTION QUANTITY UNIT COSTS MATL. EQUIP. LABOR OTHER TOTAL COST PROPERTY YRS CODE 01 Flue to 610* Stack 110" I.D. flue 70T 2000/T $140,000 10 3329 Breeching 8T 2000/T 16,000 10 3329 Baghouse connectior s 12T 2000/T 24,000 10 3329 Support steel 40T L800/T 72,000 10 3329 Platforms & ladders Insulation 2T 2200/T 12000SF 5/SF 44.000 10 3329 60,000 15 3367 Expansion joint 110" I.D. 4 Additional platform for EPA SAMPLING 6T 16,000 4,000 20,000 15 3375 2200/T 13,200 10 3329 --------" i ' TOTAL HER 0001021 $349,600. Pg. 5 of 11 COST ESTIMATE DE7 .S / CONSTRUCTION ESTIMATE DIRECT LABOR AND MATERIAL ASARCO PROJE r-r Blast Furnace Baqhouse Flue El Paso Plant C.E. PF^OJpf'-TNn EA-33-EP N.Y. A PPPfl NO PI ANT NO hrrj wn 5000 jiti f Process Ecruipment DIV. NO. 01 DESCRIPTION QUANTITY Flue to 610' Stack Hoist, sheeves/ rack, etc. for EPA sampler Lot UNIT COSTS MATL. EQUIP. ( 2100 EST. EIY DESIGN SECTION FLB r.'*n ry A.O. Marsh, Jr. DATF Aua. 1, 1977 ENR INDEX 2593 LABOR OTHER TOTAL COST PROPERTY YRS CODE 900 $3,000 10 3604 [ "1 l- TOTAL HER 0001022 $3,000. Pg. 6 of 11 COST ESTIMATE DET -S / CONSTRUCTION ESTIMATE DIRECT LABOR AND MATERIAL ASARCO pan ifpt Blast Furnace Baghouse Flue ___________ El Paso Plant_____________________ C.E. PROJECT NO.. EA-33-EP N.Y. APPRO. NO-- PLANT NO.. ACCT. NO___ 600Q- TITLE Piping DIV. NO. DESCRIPTION QUANTITY 01 Flue to 610' Stack UNIT COSTS MATL. EQUIP. EST. BY DESIGN SECTION FLB C'KD. rv A.O. Marsh, Jr. date Aug. 1, 1977 ENR INDEX. 2593 LABOR OTHER TOTAL COST PROPERTY YRS CODE Purge air for ooacitv meter Lot S2.000 10 3407 (> l' \` TOTAL HER 0001023 $2,000. Pg. 7 . of 11 COST ESTIMATE DE7 .S / CONSTRUCTION ESTIMATE DIRECT LABOR AND MATERIAL ASARCO ppniPPT Blast Furnace Baghouse Flue ___________ El Paso Pi ant-________________________ ___ C.E. PROJECT NO.. EA-33-EP N.Y. APPRO. NO__ PLANT NO- ACCT. ND 7000 title Electrical DIV. NO. 01 DESCRIPTION QUANTITY Flue to 610' Stack UNIT COSTS MATL. EQUIP. EST. BY DESIGN SECTION FLB____________________ _ C'kd rvAO. Marsh, Jr. date Aug. 1. 1977 ENR INDEX. 2593 LABOR OTHER TOTAL COST PROPERTY YRS CODE Power wiring for Lear Sieqler opacity meter Lot Power wiring for EPA sample hoist Lot $3,000 30 3536 2,000 30 3536 H { TOTAL HER 0001024 $5,000. Pg. 8 of 11 COST ESTIMATE DE' _S / CONSTRUCTION ESTIMATE DIRECT LABOR AND MATERIAL ASARCO PROJE r.T Rlasf Furnace Baghouse Flue El Paso Plant C.E. PF no N.Y. Appro wn FA_RT_KP PI ANT NO ACCT. NO. ROOD TITLE Tnsf-nimentation DIV. NO. DESCRIPTION QUANTITY UNIT COSTS 01 Flue to 610' Stack MATL. EQUIP. EST. G Y DESIGN SECTION FLB p'k-n rv A.O. Marsh, Jr. date Auq. 1, 1977 ENR INDEX 2593 LABOR OTHER TOTAL COST PROPERTY YRS CODE Lear Siegler opacity meter 1 11,000 2,000 $13,000 10 D370 . -------- ~*'T TOTAL HER 0001025 $13,000. Pg. 9 of 11 COST ESTIMATE DE" -S / CONSTRUCTION ESTIMATE DIRECT LABOR AND MATERIAL ASARCO PROJE pt Blast Furnace Baohouse Flue El Paso Plant EST.EIY DESIGN SECTION FLB C.E. PF^OJFCTMn N.Y. A PPRO. NO. EA-- 33-EP PLANT NO. r-k-n ry A.O. Marsh, Jr. DATF Aua. 1, 1977 ACCT. Nn 9000___ TITLE___ Pointing--------------------------------- ENR INDEX 2593 DIV. NO. DESCRIPTION QUANTITY UNIT COSTS MATL. EQUIP. LABOR OTHER TOTAL COST PROPERTY YRS CODE 01 Flue to 610' Stack Flue supports & platforms 40000SF .50/SF $20,000 10 D329 - H t TOTAL HER 0001026 $20,000. Pg. 10 of 'll COST ESTIMATE DET .S / CONSTRUCTION ESTIMATE DIRECT LABOR AND MATERIAL ASARCO PROJE rrr Blast Furnace Baahouse Flue El Paso Plant C.E. PF^O.IFOT NO EA-33-EP N.Y. A PPRO. NO. PLANT NO. appt no 3000 titi p Process Structures OIV. NO. DESCRIPTION QUANTITY 02 Stack Modifications UNIT COSTS MATL. EQUIP. EST. E Y DESIGN SECTION FLB r'lfn ry A. O. Marsh, Jr. DATE Aug. 1, 1977 ENR INDEX 2593 LABOR OTHER TOTAL COST PROPERTY YRS CODE Stack opening & framing 1 $150,000 50 0678 (TOTAL HER 0001027 $150,000. *g. 11 of 11