Document zQRGMa3Zvje3ya647wVx0Gry3
SUMMARY JOB COSTS
PROJECT. Blast Furnace Baghouse Flue
El Paso Plant
ENR INDEX 2593
ASARCO
C.E. PROJECT NO. N.Y. APPRO. NO.
EA-33-EP
PLAINTIFF'S EXHIBIT..
EST. BY DESIGN SECTION FLB
PLANT NO. _____
C'KD by AO Marsh, Jr. DATE Aug. 1, 1977
ACCT. NO. 1000 2000
3000 4000 5000 6000 7000 8000 9000
DIRECT COSTS DESCRIPTION DEMOLITION & EARTHWORK CONCRETE PROCESS STRUCTURES GENERAL EQUIPMENT PROCESS EQUIPMENT PIPING ELECTRICAL INSTRUMENTATION PAINTING TOTAL ESTIMATED DIRECT COSTS INDIRECT COSTS ENGINEERING
ESTIMATED COSTS
$ 31/000 11.000
539.200
3.000 2/000 5,000 13,000 20,000 $624,200
% OF TOTAL CAPITAL-------COSTS
DESIGN & SPECIFICATIONS PROCUREMENT FIELD SUPERVISION CONTRACTORS FIELD DISTRIBUTABLES
ESCALATION ENGINEERING SERVICES PROJECT EQUIPMENT BULK MATERIALS - CONSTRUCTION PROJECT LABOR CONTRACTORS FIELD DISTRIBUTABLES
TOTAL FIELD & ENGINEERING EXPENSE CONTINGENCIES
FEES: CONTRACTORS FEE OR PROFIT LICENSES AND/OR ROYALTIES
62,000 8,000 8,000
90,000
3,000 8.000 40,000 18,000 5,800 $867,000 87,000
43,000
TOTAL ESTIMATED CAPITAL COSTS APPLICABLE TAXES - MATERIALS, EQUIPMENT
400.000_____ a __________5 %
TOTAL ESTIMATED PROJECT COSTS
ESTIMATED LIFE OF PROJECT
18
$997,000
w
p,
20,000
$101 *7 nnn
mo.
- HER 0001017
sg. 1 Of 11
N OE A . -p3C.E. PROJECTNO
N.^cAPPRO.
r* > 2 2 O
OIV. NO.
ITEM DESCRIPTION
3n - Tm C Op
DEMO. 0 EARTHWORK
1000
Sr TT ESTIMATE SUMMARY DIRECT LABOR & MATERIALS B la s t Furnace Baahouse F lu e date Aug. 1 , 1977 E l P a s o P la n ten r in d e x 2 5 9 3
| CONCRETE
1 PROCESS STRUCT.
GENERAL EQUIP.
PROCESS EQUIP.
PIPING
0oe
000*
|
\
3000
||
4000
| 1
sooo
I
* ee
ELECT.
oe
o o
U1
o
o o
to
UJ o o o
1 1
01 F lu e to 6 1 0 * S ta c k 3 1 ,0 0 0 0 2 _ l S ta c k M o d ific a tio n s
H' H O O O v- O O O O
3 8 9 ,2 0 0
m2
e o
O C O 'E T
P A IN T
2 0 ,0 0 0
1I p* 1) O l
c/
a
inf
H
o
TO TAL EST.
fk kl c
oO
pc
Wl
0 0 0 '0 S T
1 1 H W % 1^ 5
X
m
73 o o o o
__>. 03
to ta l discipline costs
3 1 ,0 0 0 1 1 ,0 0 0 5 3 9 ,2 0 0
3 ,0 0 0
2 ,0 0 0
5 ,0 0 0
TOTAL ESTIMATED DIRECT LABOR & MATERIA!S
2 0 ,0 0 0
1
$ 6 2 4 ,2 0 0
COST ESTIMATE DE7 .S / CONSTRUCTION ESTIMATE DIRECT LABOR AND MATERIAL
ASARCO
PROJE pt
Blast Furnace Baahouse Flue El Paso Plant
C.E.PF^O.IFCTNO
EA-33-EP
N.Y. A PPRO. NO.
PLANT NO.
firrj mh 1000
titi p Demolition & Earthwork
DIV. NO.
01
DESCRIPTION
QUANTITY
Flue to 610* Stack
UNIT COSTS
MATL. EQUIP.
EST. BY DESIGN SECTION FLB p'k'n rv A. O. Marsh, Jr date Aug. 1, 1977
ENR INDEX 2593
LABOR OTHER
TOTAL COST
PROPERTY VRS CODE
Remove existing stc icks (6)
Steel Transite
100T 200/T 7000SF 1/SF
$20,000 20 0783 7,000 20 0783
Concrete
20cy 30/cy
600 20 0783
Excavation
lOOcy 10/cy
1,000 20 0783
Backfill
30cy 10/cy
300 20 0783
Temporary bulkhead 1
2,100 20 0783
''l V
TOTAL
HER 0001019
$81,000. Pg. 3 of 11
COST ESTIMATE DET '-S / CONSTRUCTION ESTIMATE DIRECT LABOR AND MATERIAL
ASARCO
PROJE pT
Blast Furnace Baqhouse Flue El Paso Plant
C.E. PF^OIFfTNn EA-33--EP
N.Y. A ppnn wn
plant no
Arrvr no 2000
titi p
Concrete
DIV. NO.
DESCRIPTION
QUANTITY
01 Flue to 610' Stack
UNIT COSTS
MATL. EQUIP.
EST. E Y DESIGN SECTION FLB P'lfn rv A.O. Marsh, Jr. DATE Aug. lr 1377 ENR INDEX 2593
LABOR OTHER
TOTAL COST
PROPERTY YRS CODE
Flue support fnd s 50cy 200/cy
$10,000 20 3783
EPA sampling platform
5cy
200/cv
1.000 20 3783
"I L TOTAL
HER 0001020
$11,000. Pg. 4 of * 11
A i.', D 0 0
I1 o,0 0 0
+t *5,0 0 0*
7 Vu T
A 1,C` J 0 .
r> oj o c-
2 -g ^ u o i Jj i? u i>
+
+ +
2 2 2,2 On* 1
-
-S / CONSTRUCTION ESTIMATE ABOR AND MATERIAL
ASARCO
Baahouse Flue PI ANT NO.
EST. BY DESIGN SECTION FLB cifn pv A.O. Marsh, Jr. date Aug. 1, 1977
ACCT. NO__ 30-Q.Q
titi f Process Structures
ENR INDEX 2593
DIV. NO.
DESCRIPTION
QUANTITY
UNIT COSTS
MATL. EQUIP.
LABOR OTHER
TOTAL COST
PROPERTY YRS CODE
01 Flue to 610* Stack
110" I.D. flue
70T
2000/T
$140,000 10 3329
Breeching
8T 2000/T
16,000 10 3329
Baghouse connectior s 12T 2000/T
24,000 10 3329
Support steel
40T
L800/T
72,000 10 3329
Platforms & ladders
Insulation
2T 2200/T 12000SF 5/SF
44.000 10 3329 60,000 15 3367
Expansion joint 110" I.D.
4
Additional platform for EPA SAMPLING
6T
16,000 4,000
20,000 15 3375
2200/T
13,200 10 3329
--------" i ' TOTAL
HER 0001021
$349,600. Pg. 5 of 11
COST ESTIMATE DE7 .S / CONSTRUCTION ESTIMATE DIRECT LABOR AND MATERIAL
ASARCO
PROJE r-r
Blast Furnace Baqhouse Flue El Paso Plant
C.E. PF^OJpf'-TNn
EA-33-EP
N.Y. A PPPfl NO
PI ANT NO
hrrj wn 5000
jiti f Process Ecruipment
DIV. NO.
01
DESCRIPTION
QUANTITY
Flue to 610' Stack
Hoist, sheeves/ rack, etc. for EPA sampler
Lot
UNIT COSTS
MATL. EQUIP.
(
2100
EST. EIY DESIGN SECTION FLB r.'*n ry A.O. Marsh, Jr. DATF Aua. 1, 1977
ENR INDEX 2593
LABOR OTHER
TOTAL COST
PROPERTY YRS CODE
900
$3,000 10 3604
[
"1 l- TOTAL
HER 0001022
$3,000. Pg. 6 of 11
COST ESTIMATE DET -S / CONSTRUCTION ESTIMATE DIRECT LABOR AND MATERIAL
ASARCO
pan ifpt Blast Furnace Baghouse Flue
___________ El Paso Plant_____________________
C.E. PROJECT NO..
EA-33-EP
N.Y. APPRO. NO--
PLANT NO..
ACCT. NO___ 600Q- TITLE Piping
DIV. NO.
DESCRIPTION
QUANTITY
01 Flue to 610' Stack
UNIT COSTS
MATL. EQUIP.
EST. BY DESIGN SECTION FLB C'KD. rv A.O. Marsh, Jr.
date Aug. 1, 1977 ENR INDEX. 2593
LABOR OTHER
TOTAL COST
PROPERTY YRS CODE
Purge air for ooacitv meter
Lot
S2.000 10 3407
(> l' \` TOTAL
HER 0001023
$2,000.
Pg. 7
.
of 11
COST ESTIMATE DE7 .S / CONSTRUCTION ESTIMATE DIRECT LABOR AND MATERIAL
ASARCO
ppniPPT Blast Furnace Baghouse Flue
___________ El Paso Pi ant-________________________ ___
C.E. PROJECT NO..
EA-33-EP
N.Y. APPRO. NO__
PLANT NO-
ACCT. ND 7000
title Electrical
DIV. NO.
01
DESCRIPTION
QUANTITY
Flue to 610' Stack
UNIT COSTS
MATL. EQUIP.
EST. BY DESIGN SECTION
FLB____________________ _ C'kd rvAO. Marsh, Jr. date Aug. 1. 1977 ENR INDEX. 2593
LABOR OTHER
TOTAL COST
PROPERTY YRS CODE
Power wiring for Lear Sieqler opacity meter
Lot
Power wiring for EPA sample hoist
Lot
$3,000 30 3536 2,000 30 3536
H { TOTAL
HER 0001024
$5,000. Pg. 8 of 11
COST ESTIMATE DE' _S / CONSTRUCTION ESTIMATE DIRECT LABOR AND MATERIAL
ASARCO
PROJE r.T
Rlasf Furnace Baghouse Flue El Paso Plant
C.E. PF
no
N.Y. Appro wn
FA_RT_KP PI ANT NO
ACCT. NO. ROOD TITLE Tnsf-nimentation
DIV. NO.
DESCRIPTION
QUANTITY
UNIT COSTS
01 Flue to 610' Stack
MATL. EQUIP.
EST. G Y DESIGN SECTION FLB p'k-n rv A.O. Marsh, Jr. date Auq. 1, 1977
ENR INDEX 2593
LABOR OTHER
TOTAL COST
PROPERTY YRS CODE
Lear Siegler opacity meter
1
11,000 2,000 $13,000 10 D370
.
-------- ~*'T TOTAL
HER 0001025
$13,000. Pg. 9 of 11
COST ESTIMATE DE" -S / CONSTRUCTION ESTIMATE DIRECT LABOR AND MATERIAL
ASARCO
PROJE pt Blast Furnace Baohouse Flue El Paso Plant
EST.EIY DESIGN SECTION FLB
C.E. PF^OJFCTMn N.Y. A PPRO. NO.
EA-- 33-EP PLANT NO.
r-k-n ry A.O. Marsh, Jr. DATF Aua. 1, 1977
ACCT. Nn 9000___ TITLE___ Pointing--------------------------------- ENR INDEX 2593
DIV. NO.
DESCRIPTION
QUANTITY
UNIT COSTS
MATL. EQUIP.
LABOR OTHER
TOTAL COST
PROPERTY YRS CODE
01 Flue to 610' Stack
Flue supports & platforms
40000SF .50/SF
$20,000 10 D329
-
H t TOTAL
HER 0001026
$20,000. Pg. 10 of 'll
COST ESTIMATE DET .S / CONSTRUCTION ESTIMATE DIRECT LABOR AND MATERIAL
ASARCO
PROJE rrr
Blast Furnace Baahouse Flue El Paso Plant
C.E. PF^O.IFOT NO
EA-33-EP
N.Y. A PPRO. NO.
PLANT NO.
appt no 3000
titi p Process Structures
OIV. NO.
DESCRIPTION
QUANTITY
02 Stack Modifications
UNIT COSTS
MATL. EQUIP.
EST. E Y DESIGN SECTION FLB r'lfn ry A. O. Marsh, Jr. DATE Aug. 1, 1977
ENR INDEX
2593
LABOR OTHER
TOTAL COST
PROPERTY YRS CODE
Stack opening & framing
1
$150,000 50 0678
(TOTAL
HER 0001027
$150,000.
*g. 11
of 11