Document zQKg4gvRa1dm46qNKzajnKz06
FROM ROBERT P. CARTER 'HEALTH & ENVIRONMENT DEPARTMENT PITTSBURGH OFFICE, 7 AB
19Nov75
RE: INDUSTRIAL HYGIENE NEWSLETTER Proposed Revision to OSHA Worker Exposure to Asbestos
In the FEDERAL REGISTER for Thursday, October 9, 1975, OSHA published a proposed revision to its standard for worker exposure to asbestos, Regulation 1910.1001. We recommend strongly that all locations obtain a copy of this proposed standard to determine its effect on their operations. If you are unable to obtain a copy of the proposed standard from your subscription to the FEDERAL REGISTER, please contact our office. The proposed standard is found on pages 47652 - 47665 of the October 9, 1975 FEDERAL REGISTER.
The Worker Exposure Standard for Asbestos currently in effect which was issued on June 7, 1972, established an 8-hour TWA worker exposure limit of 5 fibers per milliliter of air effective July 7, 1972, with that TWA limit to drop to 2 fibers per milliliter effective July 1, 1976. The new OSHA proposal will change that TWA limit to 0.5 fibers per milliliter, to become effective with the promulgation of the final revised standard.
There are many other changes in the proposed standard, the most important of which are covered in the following paragraph-by paragraph analysis of the October 9, 1975 proposal:
(a) Scope and application. This section is entirely new. The exclusion of construction work will probably be the only significant effect on Alcoa. However, until a separate asbestos standard for construction is issued, we recommend that the general industry standard be applied to Alcoa construction people. Also, since the definition of construction under Regulation 1910.12 is not clear with respect to its application to our repair and maintenance people, we should apply that standard to their work which provides the greater degree of protection.
(b) Definitions. No significant changes.
(c) Permissible exposure to airborne concentrations of asbestos fibers. As stated in our introduction, this contains important changes. The standard presently in effect specifies that, as of July 1, 1976, the 8-hour TWA worker exposure drops from 5 fibers per milliliter to 2 fibers per milliliter. The proposed standard would reduce the 8-hour TWA to 0.5 fibers per milliliter.
GJ ALCOA
Industrial Hygienists 19Nov75 Page 2
The present standard calls for a ceiling concentration of 10 fibers per milliliter measured for 15 minutes. The proposed standard would reduce this to 5 fibers per milliliter for a period of "u to 15 minutes (emphasis ours)." Even the preamble or background material published with this standard does not clarify the meaning of the "up to." It is our intention to seek clarification of this so that it can be clearly defined in the final revised standard. As the proposal is presently written, it appears to allow for the interpretation that a worker exposure in excess of 5 fibers per milliliter for any period less than 15 minutes would be considered a violation even if the worker's exposure averaged over the worst 15-minute period did not exceed 5 fibers per milliliter.
(d) Regulated areas. This section is new with "regulated area" being defined as one where a person may be exposed to an airborne asbestos fiber concentration in excess of either the TWA or ceiling limit. A daily roster of all persons entering a regulated area is to be made and retained.
(e) Monitoring. This paragraph is expanded and revised. It allows for the selection of representative employees for monitoring to determine the exposures of a particular job occupation group. Area monitoring has been eliminated.
If either the TWA or ceiling exposure limit is exceeded, a compliance program and monthly monitoring survey are to be undertaken. If neither exposure limit is exceeded for two surveys at least 5 days apart, but not more than three months apart, no further monitoring is required unless there is reason to believe that an employee's exposure has increased. Each employee is to be notified within 5 working days of the results of tests representing the exposures of his job classification even if another worker was actually monitored. If either exposure limit is exceeded, each affected employee is also to be notified what corrective action is being taken.
(f) Method of compliance. Where worker exposures exceed either the TWA or ceiling limit, feasible engineering controls are to be used to reduce the exposures with appropriate respirators being worn until exposures are brought within limits. If needed to meet the exposure limits, work practice controls are also to be used. If airborne fiber levels after the institution of feasible engineering and work practice controls still exceed either exposure limit, respirators must be used to protect the employees.
A new provision requires measurements such as capture velocity, duct velocity or static pressure every three months in each exhaust system used for fiber level control to demonstrate continued exhaust effectiveness.
Industrial Hygienists 19Nov75 Page 3
Another new requirement when any employee's exposure exceeds either limit is the establishment and implementation of a detailed written program to reduce the fiber levels within limits "solely by means of engineering and work practice controls." This, to us, implies that control of fiber levels to less than the exposure limits by engineering and work practice controls will always be interpreted by OSHA as feasible. We intend to comment to OSHA on this provision also since, in our judgment, reduction of fiber levels to 0.5 fibers per milliliter may not always be feasible by engineering and work practice controls.
(g) Respiratory Protection. This is new as a separate paragraph of the standard and has been expanded from the coverage in the present standard with the only major change for us being in the permissible type of respirator in the fiber range of 10 - 50X the exposure limits.
(h) Personal protective clothing. A major change has been made in this paragraph, requiring the providing by the employer daily of clean full-body protective clothing for all employees whose exposures exceed either the ceiling or TWA limit. The present standard requires such clothing only if the ceiling limit is exceeded.
(i) Hygiene facilities and practices. This is a new paragraph containing a considerably expanded requirement. The major change involved is the requirement for "clean change rooms" and showers for all workers wearing protective clothing. Another new requirement is that lavatory and toilet facilities located in regulated areas shall not be accessible from uncontaminated areas.
The effect of this for us is that, if we have any workers with exposures exceeding either limit, thus requiring wearing of protective clothing, two locker rooms will be required, separated by the showers, with the "contaminated" locker room not to be used by any workers not exposed to asbestos. It would also mean that these employees having excessive exposures would have to be provided separate lavatory and toilet facilities from those used by employees not exposed to asbestos.
(j) Medical surveillance. A major change in this requirement provides for informing an employee who refuses a medical examination of the possible health consequences and obtaining a signed statement from him that he has been so informed and refuses to be examined. A serious defect in this proposed revision is that it fails to correct a problem inherent in the present standard; namely, the failure to establish some lower, limit of fiber exposure below which medical surveillance will not be required.
Industrial Hygienists 19Nov75 Page 4
Another major change in the medical surveillance is the requirement to obtain from the examining physician a written opinion, a copy of which is to be given to the employee, containing the physician's judgment "as to whether the examined employee has any medical conditions which would place the employee at increased risk of impairment of his health from exposure to asbestos fibers, or which would, directly or indirectly, be aggravated by such exposure." The written opinion also is to contain a physician's recommendation as to any "limitations upon the employee's exposure to asbestos fibers or upon the use of protective clothing and equipment such as respirators." It is also to include a statement that the employee has been informed by the physician of any medical conditions which require further examination or treatment, but with the written opinion not revealing special findings or diagnoses unrelated to occupational exposure to asbestos fibers.
The medical surveillance paragraph also stipulates that no employee shall be exposed to asbestos fibers in such a way as would put the employee at increased risk of material impairment of his health from such exposure and that this determination may be based on the physician's written opinion.
(k) Employee information and training. This is a new paragraph which requires detailed training for employees assigned to regulated areas including:
(1) The nature of operations causing fiber exposures and the necessary protective steps;
(2) The engineering controls and work practices associated with the job assignment;
(3) Full instructions for appropriate respirators;
(4) The purpose for and description of the medical surveillance program; and
(5) A review of the standard.
Copies of the standard and appendices A, B, and C are to be readily available to these employees.
(l) Danger signs and labels. This section was formerly titled "Caution signs and labels." The changes proposed would require the use of the words "Cancer Hazard" to replace "Dust Hazard" on signs for regulated areas and "Danger Cancer Hazard" to replace "Caution - Breathing asbestos dust may cause serious bodily harm" on labels for raw materials and scrap materials.
Industrial Hygienists 19Nov75 Page 5
(m) Housekeeping. This paragraph is essentially unchanged.
(n) Recordkeeping. This paragraph has been greatly expanded to require specific details of monitoring tests, employee exposures and rosters, employee training, ventilation measurements, and medical records, with the ventilation measurement and employee training records to be maintained three years and all others for at least 40 years or for the duration of employment plus 20 years, whichever is longer.
(o) Observation of monitoring. This is a new paragraph expanding the content of (f)(4) of the present regulation to require the employer to provide the necessary personal protective equipment, where required, for observers and to require explanation of the methods of measurement, including sampling and analysis, as well as allowing the observer to record the results obtained.
(p) Appendices. This is a new paragraph which provides the material which is to be used for the training of employees and to be maintained accessible to exposed employees.
At this time it is impossible to predict when this revised standard will be promulgated or what it will look like in final form. However, we feel that the likelihood of any major changes from what is proposed is very small. Therefore, the provisions of this proposed revision to the standard and their related cost impact should serve as a further incentive for every location to discontinue the use of asbestos of all forms to the fullest extent functionally feasible even at somewhat higher cost for the replacement material.
A major development effort is underway to try to replace completely the use of molten metal marinite in ingot operations with non asbestos-containing alternates. The complete success of this program for all such applications, particularly the very large ingot sizes, is by no means certain. Your regular monitoring of the marinite cutting operations will be invaluable in establishing whether present practices and control equipment are capable of meeting the proposed 0.5 fiber/ml standard.
Another area that probably warrants attention by all locations is that of pipe lagging. The Construction Engineering Division has developed Alcoa Engineering Standards for non-asbestos-containing pipe lagging which are functionally equivalent to asbestos. These, of course, will now be specified on all major construction projects, but also should be required on all local construction projects and for all repair and maintenance activity.
Industrial Hygienists 19Nov75 Page 6
Shortly after the institution of the asbestos standard in 1972, we recommended that all locations having furnaces of any kind or melting pots in which asbestos had been used as a backing material to any significant extent begin records of the repair and replacement of the linings of these vessels with non-asbestos backing material so that they would know when all of the old asbestos-containing lining had been removed. This was for the purpose of establishing an end point to the necessity of the required provisions of the asbestos standard for the maintenance people involved. These records for any vessels for which this transition has not been completed should certainly be continued till this has been accomplished.
If we can be of any help in interpreting the provisions of this proposed standard or any related matter, please do not hesitate to contact us.
ROBERT P. CARTER
RPC:1ms
cc: Company Physicians Environmental Steering Committee Chairmen & Environmental Managers
Note: Information relative to health standards proposed or promulgated under authority of the U.S. Occupational Safety and Health Act is sent to overseas locations for informational purposes only.
INDUSTRIAL HYGIENE NEWSLETTER MAILING LIST
Arkansas - J. L. Laudenberg Badin - Earl M. Morgan Chillicothe - J. Schachtele Cleveland - L. L. Grubb Corona - J. W. Mitchell Cressona - C. A. Artz Davenport - K. W. Williams Lafayette - John Castor Lancaster - J. K. Sellers Lebanon - R. Andrew Logans Ferry - W. D. Helmick Marshall - T. N. Wagner Massena - G. D. Hicks
COPIES TO:
Company Physicians
Mobile - W. J. Boutreis
Point Comfort - R. E. Podhora
Richmond - J. D. Gibbs
__
Rockdale - A. G. Clayton
--
Tennessee - J. C. Vergho
Vancouver - L. L. Haisch
Vernon - D. P. Hooghkirk
Warrick - W. E. Willett
Wenatchee - A. B. Piecka
Elkem,Farsund,Norway - 0. A. Grytting
Fort Wayne, Ind., Rea - Ms. Nancy William
Paramaribo, Suriname - A. T. Jondro
Point Henry, Geelong - J.H.J.Erkins
Sao Paulo, Brazil - M. C. Perry
Environmental Health Steering Committee Chairmen & Environmental Manager^
Alcoa Technical Center- Frank Pessolano Anderson County - L. R. Mathis Arkansas - V. H. Barbour Badin - Wm. H. Freeman Chillicothe - D. L. Berling Cleveland - A. Puleo Cressona - Herbert Rubright Davenport - Emil Stimac Lafayette - J.M.Pickerill Lancaster - T. C . Amend Lebanon - W. M. Klatchko Marshall - Jack Cash Massena - M. J. Elder Mobile - Howard Walker, Jr./
Rhett P. Walker Oslo, Norway - Thorstein Guthe Perth, Australia - L.H.D.Pearcy Point Comfort - M.F. Jones Pt.Henry,Geelong,Australia -
Robert Oliphant Richmond - P. W. Blossom Rockdale - Evan Goltra Paramaribo, Suriname - L.E.Olmtak
Tennessee - C.L.Kamperman/C.D.Wohlwend Vancouver - W. J. Bovard Vernon - R. R. Suntay
Warrick - T. C. Burger Wenatchee - R. T. Bunker
Arkansas - J. W. Wells Badin - R. C. Hinkle Chillicothe - J. S. Wood Cleveland - L. J. O'Connell Corona - R. H. Allen Cressona - N. 0. Kraft Davenport - R. J. Reitz Cressona - E. J. Schafer Davenport - J. D. Breazeal Lafayette - H. R. Porter Lancaster - R. S. Howell Logans Ferry - J. Hicks Marshall, Texas - L. E. Norris Massena - R. W. Knapp Mobile - R. V. Newsome Point Comfort - C. L. Green Richmond - G. S. Graves Rockdale - E. B. Parker Tifton - H. E. Chandler Vancouver - D. L. Werner Vernon - J. R. Jones, H. L. Chandler Warrick - R. L. Parsons Wenatchee - J. A. Thompson
Copies to:
R. P. Carter, Pittsburgh 7 M. 0. Colwell - Pittsburgh 29 J. M. Cohen - Pittsburgh 7 Duckworth Daley - Jamaica B. D. Dinman - Pittsburgh 7 G. H. Farrah - Alcoa Technical Center W. B. Garyotis - Pittsburgh 2 J. M. Plunkett - Alcoa Technical Center V. W. Rieke - Pittsburgh 2 S. I. Roth - Pittsburgh 9 R. H. Watson - Pittsburgh 7 W. W. Williams - Fort Meade, Florida
Copy routed to PRA, GCH, RS G.R.Hartnett/Albert Lee, HC Products Co.
f
FILES SENT TO ARCHIVES
(Sent May, 1989)
General Files: 1975-1983
Alcoa Bldg. Air Studies Acquisition/Pre-Acquisition Checklist Loss Control (Alum. Assoc.) OSHCOM Committee (Alum. Assoc.) Aluminum-Lithium Castings Alzheimer's Disease ANSI Applicants Plant Auditing Business Roundtable Chlorine Chlorine - Sound-on-slide College Recruiting Program College Recruiting Program Indiana University of PA Texas ASM & U. of Michigan West Virginia U. Construction Safety Cranes Crane Committee Crane Safety-Radio Interference Bridge
Cranes Employee Assistance Programs Ergonomics/Human Factors Engineering Fire Brigades Haz. Mat. Control Committee Industrial Hygiene Correspondence Lead Lockout/Tagout Location Managers Survey (Statistics) Location Managers Responses
1978-1983 1982 1983 1981-1983 1983 1980-1983 1981-1983 1982 1982 1982-1983 1979-1982 1975-1980 1982 1981 1981-1982 1981-1982 1981-1984 1981-1983 1979-1982 1978-1983 1982
1981-1983 1977-1983 1979-1981 1981-1982 1980-1983 1979-1982 1978-1983 1982-1983 1982
FROM ROBERT P. CARTER PITTSBURGH OFFICE
TO WORKS INDUSTRIAL HYGIENISTS
February 13, 1973
RE: NIOSH TRAINING COURSES ------ SAMPLING AND EVALUATING AIRBORNE ASBESTOS DUST
We recently became aware that the National Institute for Occupational Safety and Health (NIOSH) has scheduled in 1973 a number of additional presentations of their training course on the sampling and evaluating airborne asbestos dust such as the one which was presented at Cincinnati, October 31 - November 2, 1972. A copy of the significant pages of the brochure for this October 31 - November 2, 1972 course is attached for your examination.
As you may know, some of our operating locations have encountered difficulties in making asbestos fiber count determinations as required under the provisions of the worker exposure standard for asbestos issued by OSHA in June, 1972. Since we have significant asbestos fiber exposures at a number of our operating locations, it is im portant that each affected location be able to make accurate asbestos counts to assure compliance with the very restrictive OSHA standard.
We have just learned from NIOSH that there will be two regional sessions of this same training course conducted in April of this year on April 10, 11 & 12 in Salt Lake City, and April 16, 17 & 18 at a location in Missouri not yet established (probably in Warrensburg in central Missouri). These two offerings of the training course are aimed primarily to serve the general areas in which they are being held, with the Salt Lake City session being related to OSHA regions 8, 9 and 10 and that in Missouri to OSHA region 6. However, these geographical boundries will probably not be rigidly held to for attendees for the two sessions. There are still a small number of vacancies in each of the two sessions. In addition to these two regional meetings, there is also one scheduled at the NIOSH facility in Cincinnati, Ohio on May 15, 16 and 17 which presently is full and has a small waiting list. However, NIOSH has indicated that there is at least a possibility of additional registrants being admitted in the event of cancellations. Even if a late applicant is denied entry, he will be notified when the next class will be held.
If you and your management decide it is to your advantage to send one of your people to either of these regional meetings, we would recommend that you fill out very promptly the registration form portion of the attached copy of the NIOSH brochure, marking out the original 1972 course date and location, and typing in the date and location of the training course in which you are interested (using merely "Missouri" as the location of that conference). For the Salt Lake City and Missouri courses, these should be mailed promptly to Mr. James S. Ferguson changing the title the Deputy
ALCOA
sr*4969 (rkv ti-es)
Director, Division of Training, and for the Cincinnati course, as addressed, attention Mrs. Breeden. Would you please also at the same time send to me a copy of the registration form so that we may have some idea of the number of people Alcoa is registering i total for these sessions.
It is desirable that you act as promptly as possible if you are interested in having someone attend. It is quite likely that there will be considerable interest in attending these sessions scheduled before July 1st when it becomes generally known that there will be a charge of $50-$70 per man per day for courses offered after that date .
If I can be of assistance in answering any questions concerning this training course, please let me know promptly.
ROBERT P. CARTER
RPC/map Attachments
cc: Messrs. T. B. Bonney, Pittsburgh G. H. Farrah, EHL, ATC A. Rambikur, Pt. Comfort R. S. Adams/R. Kohler - Alcas Cutlery Corporation F. D. Koran/E. A. Moats - Tifton Aluminum Co., Inc. E. G. Dud ley/J. A. Elliott - H C Products Company J. L. McKinley/R. B. Kempton/M. L. Bookout - Rea Magne^^ Wire Co., Inc. R. F. Butler/D. Trudel - Permanent Mold Division J. W. Anderson, ABP, Inc. A. C. Sheldon/W. J. Koopman - Alcoa Conductor Products Co. J. W. Warnock. - ACPC J. S. Hamilton/J. J. Thimons - Wear-Ever Aluminum, Inc. R. C. Wilson - Alcoa Sports Products D. D. Rhoads/W. A. Coward - Lincoln Manufacturing Co., Inc. K. K. Reid - Frigidome Division J. C. Bates - Pittsburgh, 22 F. C. Irving - Pittsburgh, 29