Document zQEeq1vy6aNqeNm3oJkj8kK37
UNITED STATESUNITED STATES ENVIRONMENTAL PROTECTION AGENCY
REGION 1
AGENCY
ENVIPRORNOMTEENCTTI5O PNOSBTO SOTFOFNIC,E MSAQ U0A2R1E,0 9S-U3I9T1E2
100
Date:Dated as shown on electronic signature(s)
Subj:Inspection Report
Clean Water Act - National Pollutant Discharge Elimination System
(" NPDES ")
Route 111 Auto
From:Damian Bednarz, EPA InspectorDigitally signed by DAMIAN
DAMIAN BEDNARZ BEDNARZ
Date: 2024.06.25 18:19:46 -04'00 '
Thru:Alex Rosenberg, EPA Inspector
To:File
I. Facility Information
A. Facility Name:Route 111 Auto
B. Facility Location:415 Emerson Avenue
Hampstead, NH 03841
C. Facility Contacts:Joe Gerraughty, Owner / operator
(781) 367-7011, joegerraughty@yahoo.com
D. NPDES ID No (s).: NHR1001JF
II. Background Information
A. Date(s) of inspection: April 17th, 2024
B. Weather Conditions: Approx 50 F
C. US EPA Representative(s):
Damian Bednarz, US EPA
Eleanor Horvath, US EPA
Karissa Oakes, US EPA
D. State / Local Representative(s):
N / A
ED_019088A_00004368-00001
E. Federally Enforceable Requirements Covered During the Inspection:
National Pollutant Discharge Elimination System Construction General Permit
Effective February 17th, 2022
F. Previous Enforcement Actions:
No previous enforcement actions by the EPA, but the site was inspected for
compliance with the CGP on August 30th, 2024.
III. Type and Purpose of Inspection
On April 17th, 2024, the EPA conducted a compliance evaluation inspection at Route 111
Auto Sales (the " Site " or " Development "). The inspection's purpose was to determine
compliance regarding conditions and requirements set within the Construction General
Permit (' CGP ").
IV. Facility Description
The 409 Emerson Avenue, Hampstead, New Hampshire Site is the construction of a new
car dealership, including a dealership showroom / office building and multiple parking
lots. A newly constructed office building, and surrounding parking infrastructure, was
complete at the time of the inspection. Multiple functioning catch basins and
stormwater structures are present on the Site and serve to divert stormwater into a
detention and percolation basin in the southwestern corner of the project footprint.
According to the facility's design engineer, Millenium Engineering, Inc., the design
infiltration rate of the basin is 0.3 inches per hour.
V. Inspection
I arrived at Route 111 Auto Sales at approximately 9 a.m.
A. Opening Conference
Upon arrival at the Site entrance, I placed a phone call to Mr. Gerraughty, who is listed
as the owner on the Site's Notice of Intent to discharge under the CGP. Mr. Gerraughty
explained that he was not present at the time of the inspection and could not attend
due to travel plans. I asked Mr. Gerraughty if I could be granted access to the Site,
despite his absence. Mr. Gerraughty agreed.
B. Facility Tour
Eleanor Horvath, Karissa Oakes, and I (" EPA Inspectors ") entered the Site by passing
under a rope barrier and proceeded to take photos of the conditions of the Site. I noted
that one area, marked in the photo album as " A " on the southern perimeter of the Site,
was un - stabilized and had saplings planted at the shoulder of the parking lot (slide 1-2).
2
ED_019088A_00004368-00002
During the previous inspection on August 30th, 2023, this area " A " held numerous
stockpiles of soil with varying levels of stabilization and construction activity.
Within this area I observed a downed silt fence with accumulated fine and course
sediment (slide 3) on both the upgradient and downgradient side of the fence. I
observed another downed silt fence farther along the silt fence perimeter (slide 4). The
slopes bordering a recently paved area west of the office building were mostly stabilized
(slides 5-6). The EPA Inspectors continued to walk the perimeter of the Site, observing
the condition of stormwater control measures and general site stabilization. Steep
slopes on the northwestern portion of the Site had rip - rap installed and was seeded. The
perimeter of this slope featured a silt sock in addition to a mulch berm where the pitch
levels with a forested area (slide 7-8).
D. Closing Conference
The EPA Inspectors departed at approximately 9:45 AM.
Unless otherwise noted, this report describes conditions at the facility / property as
observed by EPA inspector(s), and / or through records provided to and / or information
reported to EPA inspector(s) by facility representatives and as understood by the
inspector(s). This report may not capture all operations or activities ongoing at the time
of the inspection. This report does not make final determinations on potential areas of
concern. Nothing in this report affects EPA's authorities under federal statutes and
regulations to pursue further investigation or action.
3
ED_019088A_00004368-00003