PPG INDUSTRIES. INC. INDUSTRIAL CHEMICAL DIVISION P. 0. BOX 1000 LAKE CHARLES, LA. 70601
J. R. FARST Assistant Works Manager
November 17, 1977
Mr. Gus Von Bodungen Louisiana Air Control Commission P.O. Sox6C620 New Orleans, LA 70160
Re: Permit Application - No. 3 Process Waste Incinerator
Dear Mr. Von Bodungen;
PPG is presently operating two permitted high tempercture process waste Incinerators for the thermal destruction of liquid and gaseous chlorohydrocarbon waste. PPG plans to install a third incinerator for the purpose of thermal incineration of vinyl chloride monomer (VCM) from the present manufacturing unit and the VCM tank car loading facilities.
o The incinerator combustion chamber will operate at 2 200 F. The combustion gases will pass through the heat recovery boiler system for energy conservation. The heat recovery boiler system will produce 50,000 Ibs/hr of 185 psig steam. The No. 3 Incinerator will operate parallel to the two existing incinerators. Liquid organic waste and gaseous vents from existing operating units will be integrated into the feed system of the new incinerator system.
The i ncinerator is designed with a primary and secondary scrubbers with adequate column design end packing for gas distribution for scrubbing. The incinerator scrubber system is designed to meet the VCM Federal emissions standards. PPG is installing VCM and chlorohydrocarbon analytical instrumentation for monitor g the secondary scrubber stacks from the No. 3 Incinerator and the No. I and 2 incinerators.
SL 071740
Mr. Gus Von Bodungen November 17, 1977 Page 2
J
Our proposed application for the No. 3 Incinerator is attached. We are sending only two copies and one EIQ for you and your staff to review. We realize additional copies will be needed for the Commission members as the proposed permit is finalized. C. A. Burns, at 318-882-1200, ext. 2370, will assist you and your staff.
Please be assured of our continued cooperation with your staff and the Commission.
Very truly yours,
JAMES R. FARST
/as Attachment cc: C. A. Burns
W. J. Peard J. E. Wyche III
bcc: T. G. Taylor (letter only)
G. K. Jordan II
J. Arendt
II
T. Zlehler
tl
L, Joiner T. C. Jeffery
If
II
SL 071741
*J
application
for
A ? P R.0 V A L OF EMISSIONS
For: Installation of T'ird Process Wests
Incinerator
(Revised Apn I 1, 1975)
Send 14 copies to:
Louisiana Air Control Commission P, 0. Bex 6C530
New Orleans, Louisiana 70160 Attention: Technical Assistance
Name of person or company reccesting permit:
PPG industries, Inc., Chemical Division, U.S.___________________
Address: P.O. Box 1C00, Lake Charles, LA 70c0!
__________
Responsible person and his Title C. A. Burns
Environmental Control Specialist___________________________________
Date submitted: November, 1977Telephone No.2iS-SE2-l2Q0
2. GEOGRAPHICAL LOCATION OF PLANT Description of location of plant or establishment and/or map section showing same: ________
_____Chemical Plant, Calcasieu Parish, Louisiana
Section 3 and 4 Township IQ-S, Range 9-W Southwest District, Louisiana
=1
SL 071742
_ . oujo.mng property on map senior** or list bo low.
rfi(y residential arse ^ar the plant cr estab11shmer, afid give distance from
plant or establishment;
- -- ------ - -- - --
See Exhibit1 I - PPG Area Land Allotment
- Drawin- ^32 A-cC-2.7
-------
5. LOUISIANA AIR CONTROL COW!SS!ON EMISSION INVENTORY QUESTIONNAIRE.
A ccmpln+nd Emission Inventory Cuosrrcmaire (copy attached) is required. If a now 6 pag= questionnaire for This location has been previously submitted, give dole of Submission June 10, 1977, A cemointod "rev J .nod" Enlsslcn Inventory Ouesrionnaira must o.so jo si:omitted with this application. The Emission Inventc-v Quo s'*-ion-'3 I re meet be cam;! -fed shewing the entire missions of the facMity ofrer motif teat ions and/cr od 1 ?tiens.
Cstira+ed starting d3te
'Of construction:
March, 1975
Estimated date opera-. t tior. will begin: October 21, I97S
r.^cllltv: Yes
Addition: Yes
"Clvo a brief description of proposed action and attach such Information as flow diagrams, schematic diagrams, drawings, etc. needed *0 convey an understanding of tho processes involved in n-he plant or establishment." PPG is instollinc a third process waste incinerator to be operated parallel with the existing two
Bermitted incinerators. The No. 3 incinerator will rive PPG' ?r.-.prnvorl flexibility in the thermal decomposition cf cnlcrohydrocorbcns from the several operating units; however, the third incinerator
system will be the control device for the present vinyl chloride monomer rr.qnufacturin;; and tank car leading facilities. See Exhibit II - Schematic Flow Sheet from the present VCM facility and Exhibit III Schematic flowsheet for the VCM tank car loading facility. The No. 3 incinerator
syst^rp will hove a waste heat boiler for energy conservation. The combustion peses from the
iacinsrator coss through the heat recovery boiler (50 M 16/nr of IE5 psjg steam )s'/sterr. and exits through a priu-.ary (ccid ausorucr) scruooer ana1 thence through the seconder/ scrubber system.
*2=
SL 071743
tDEKTIRCATlQN
LOCATION OF EMISSION SOURCES
Enclose a sketch shewing specific location of point or points of emission. She* coproxlmafa distance (In feet) of all such points
from property lira. (Eacn emission soura* shall bo numbered con secutive l y In The year of norm It Truest. For example, the first
for trhlch a permit Is roquestbd In 1973 would bo designated as 1-73. See Exhibit IV - Stack Location from property line.
IdontlficatIon Number
1-77
Name and Description of Scurco No. 3 Incinerator Secondary Scrubber Stack
-
Idontlflection Number
1-77
-EMISSION |.
[re
SCf/
jsmp.f
> Diem,
r j Velocity } Fes*t
SEC ______ Ft./Sac.
265 160
50.9
^1*
V
STACK
biov. Can be
Above Sam;_______ 3 led
Prado \v. c
No
100 Yes
*
3*
SL 071744
SUMMARY OF FfllSSI^MS AN'O TH- 4 EFFECTS- M A'^IE'IT AIR
dculate Matter MZ IS CO
rp5*>C__________________Ol0x PI Other HCI & CI2 (Check One)
/
Point Source (indicate f on map)
1-77
EMISSIONS 7bs/hr
With
Mithout
Control Contra 1
ApBjtfatus Apparatus
(Max)
Process Wcight4
tons/hr
Concentration of
Pollutant Cases in Heat^
Discharge Oas
Input
Pfr'l] ug/nri
"UTU
Ringelmann Number
or Opacity
Particulat CO NO,, HCI
12.4 4.0 26.3 3.0
NA
NA
/
NA
NA
NA 150* 19.4 x I04 NA
*
NA .50 6.3 x I04 NA NA .
NA 200 41.1 x I04 NA NA
NA
32.5 5.3 x I04
NA
NA
Oo - 3i
Hydrocarbon *0Dr' O.. ...i. MJ l
5.0
1.0
kj*j. -- _ 1 r -
NA NA
NA
25.4 8.0 x I04
NA'
4
NA
5.5 1.5 x 10
NA
** Unabl l-o estimate
EFFECT ON AMSIt'uT AIR=
TiiTarnir -n engineer ng esnmari on
u UlluCfl U i n l 1 uii - no ur Mv^ragc
Property Stability Wind Speed Max. (iround Level Stability
Line Maximum
Class
and Locations **
Class
PPi-i ug/m3
m/sec
PPM ug/m3 D-i st- Wind
Dir.
Part
_CQ_ ---- jte*_ 1*
mm
4lka* mm mm
0.08
200j} | 38 W
A'
2000 E
0.009 12
0S W A
1 xuuu t
mm 0.17 345 I OS W A
00
! HCI
1
La*_ mi*
mm,
HC___
mm mm
0.002 3
WA
ow
mm 0.001 4 0 s. W A
2000 v>
--
0.23 517 2000 N SE
D
NA NA
Wind Speed m/sec
4 4 4 1 1 1
---- ---------------
r............
--
** Coordinates referenced to plant origin. All plants as required by LACC.
i
.
Dispersion calculations by Briggs~Tumer Equations.
*-4. =
*\)l Kn * m -
SL 071745
Br rtCPOSED AIR POLLin'^^mTROL
'*>
List tha air pollution abatement measures that rrrf I bo utlHzod to I ^ntrot tho emissions from the sources for tho plant or establishment. If no facilities are conTemplated, Met the steps which will bo taken to prevent tho emission of sufficient qucntffles of pollutants to result In undesirable lov3ls. Give the source and Then tho aba+emnnt nolhca for each courca. Please Include Information such as drawings, manufacturer lltaraturo, spedfJcatlon, caoacItlos and efficiencies needed for evaluation of such control equ(p<33nt and tech niques usod In controlling each sourco, rlcr.so Include date that osch estimated date operation cl II begin. Any inforwatlcn about tho mathod used for sbafelng the source rill fee Mi fata tho evaluation of The application.
Stock No. 1-77 - Process Wosfe Incinerator. The No. 3 Incinerator will be the Control device for the present vinyl chloride monomer (VCM) plant and present VCM tank cor loading
facilities. The No. 3 Incinerator system will operate parallel to the two existing incinerators.
Liquid organic waste from the Bottoms Plant and gaseous waste from the liquid-phase EDC,
OHC-EDC, Per/Trichloroethylene, "Tri-Ethane" II, end the VCM Will be incinerated. The
incinerator unit is being manufactured by Trane Thermal Company, Conchohacken, Pennsylvania.
The No. 3 Incinerator operating temperature of the combustion chamber will be 2200 F.
and retention time will be a minimum of 0.75 seconds. The combustion air capacity is
designed at 750,000 scfh. The No. 3 Incinerator will be equipped with an cuxiliorv burner for added flexibility In operating the system. The combustion gases from the incinerator pass
through the hect recovery boiler system and thence to the scrubbers. The incinerator will have
c primary (acid absorber) scrubber and a secondary scrubber. Each of the scrubbers is designed
for adequate gas distribution for scrubbing. Details are shown on Exhibit V, attached. The
secondary scrubber will be monitored from the stack with analytical instrumentation for VCM
end chlorohydroccrbons and in accordance with requirements of EPA regulations.
Exhibit V - Schematic of No. 3 Process Waste I ncinerotor System. The combustion of the vent gases from the present VCM facility, i.e., manufacturing unit and VCM tank car loading, is
_shown cs Exhibit VI. The No. 3 Incinerator vent gas flow rate is shown as Exhibit VII,