Document zJJ9b8OoaoNM46p2beNkgoQ6

UNION INTERNAL CORRESPONDENCE CARBIDE CHEMICALS AND PLASTICS south charleston plant o. egx :harlesto\. v to (Name) DlVlSlOr Location Mr. J. L. Worstell Building 406-2 South Charleston Plant Mr. W. D. Bradbury Mr. T. D. Epps Mr. R. E. George Mr. W. T. Gray Mr. L. R. Hart Mr. G. D. Hutcheson Mr. R. T. Kramer Mr. G. E. Lewi s Dr. W. R. Manning Mr. R. E. McE1downey Mr. J. C. Nelson Mr. L. W. Phai r Mr. J. M. Smith Mr. P. B. Smi th Mr. D. C. Vickery Mr. R. N. Wheeler Mr. H. L. Wise otc June 6, 1977 originating Dept. Environmental Protection Answering letter date Sudiect Dear` Jack: Attached are minutes of the Plant Vinyl Chloride Compliance Schedule Monitoring Team Meeting, held June 1, 1977. Very truly yours, WCY/nm Attachment fW. C. ng UCC 105009 PLANT VINYL CHLORIDE COMPtlANCE STATUS MONITORING TEAM MEETING MINUTES Date: June 1, 1977 Present R. E. George G. D. Hutcheson J. L. Worstel1 W. C. Young Absent L. R. Hart D. C. Vickery 1. A compliance schedule progress report was provided by G. D. Hutcheson. Con trary to what we have been telling the EPA, i.e., no action to be taken where relief values are concerned pending their ruling on UCC's equivalency proposal, purchase orders have been issued for safety valves and rupture discs to be installed on autoclaves in vinyl chloride service. (Source #'s OlA, 015, 016 and 017). To report this to the EPA now would,of course,be awkward and, furthermore, may jeopardize a favorable ruling by EPA on the equivalency matter. Hence, it is recommended that we withold any relief value-related correspondence with EPA until U/A is obtained with the Managerial, Production and Engineering Departments on this matter. A meeting will be held on June 7 to re-establish U/A on our course of action. 2. R. E. George reported that due to failure of receipt of timely, necessary information by the Engineering Department we are unable to meet the first compliance schedule date, 6/1/77, for Source #001 (rectifiying column modifi cations). As a consequence, we are at this time uncertain how this will affect intermediate, incremental progress dates of the compliance schedule. EPA will be notified of the delay in progress. It appears that the "end date" will still be met, and the EPA will be so notified. 3. R. E. George reported that plans are progressing to revise an existing flowmeter in the SVR Unit which will enable measurement and recording VC1 vent emission flow rates ducted to the IPH for incineration. A. G. D. Hutcheson reiterated the scope of the emission control project for ducting storage sphere/refrigeration vent emissions from North Charleston to the IPH boiler. It includes a similar flow meter and will be installed in the main line leading from the SVR Unit, downstream from that unit. This will provide a means of checking the SVR Unit flowmeter during no-flow condi tions at North Charleston as well as providing atota1 flow rate from both sources. 5. No discussion was held regarding check gas preparation and other analytical matters as planned, because laboratory personnel were unable to attend this meeting. NEXT MEETING Date: July 1, 1977 Time: 1:30 p.m. Place: Bldg. A06-1 UCC 105010 iifl^ronwontal Protection Department South Charleston Plant July 7, 1977 To: cc: From: Mr. J. 1. Worsts11 Mr. T. 0. Epps Mr. C. E. Fry Mr. R. . Gsorgs Mr. U.'T.'Gcpy Mr. El R. Hart Mr. G. 0. Hutcheson Mr. R. T. Kroner Mr. R. E. McEldowney Mr. J. C. Nelson Mr. L. V. Phalr Mr. P. B. Smith Mr. D. C. Vickery Mr. R. N. Wheeler Mr. H. L. Wise W. C. Young Attabhed ate minutes of the Plant Vinyl Chloride Compliance Schedule Monitoring Team Meeting, held July 1, 1977. /nb UCC 105011 PLANT VINYL CHLORIDE COMPLIANCE STATUS HONITORINGTEAM MEETING MINUTES Date: July 1, 1977 Present L. R. Hart G. 0. Hutchason P. B. Smith D. C* Vickery R. N. Wheeler W. C. Young AbseM R. E. George Discussion Items: 1. Purchase orders have been Issued for all component parts to accomplish emission control In accordance with the plant compliance schedule. 2. Three (3) project Job packages have tieen cftapleted by the Plant Engineering Dept, and Issued to the Maintenance Dept* One project has been eomplet d mod final compliance has been achieved on Source #003* continuous Emission Monitoring of staamplant boiler exhaust gas (secondary control device). 3. The Importance of written documentation of an active emissions control pro gram which "commenced" prior to proposed amendments by EPA to their Vinyl Chloride Standard was discussed. Proposals appeared In the Federal Register, June 2, 1977* and any emission control projects started after this date would be subject to an amended standard which In effect Is more stringent. 4. Next Meeting Date: August 12, 1977 Time: 1:30p.m. Place: Bldg. 406 UCC 105012