Document z8wp0xEO4Q9E45MyZa244QNR

Region 6 Compliance Assurance and Enforcement Division INSPECTION REPORT Inspection Date(s): Media: Regulatory Program(s) Company Name: Facility Name: Facility Physical Location: (city, state, zip code) Mailing address: (city, state, zip code) County/Parish: Facility Contact: FRS Number: Identification/Permit Number: Media Number: NAICS: SIC Facility Representatives: 03/22/2018 Water (CWA) NPDE5 Cannon Air Force Base, NM Wastewater Treatment facility at Cannan Air Force Base, NM 100 South D.l. Ingram Blvd, Cannon Air Force Base, in Curry County, NM Cannon Air Force Base, NM 88103 S06 D.L. Ingram Blvd, Cannon Air Force Base, NM 88103 Cannon Air Force Base, NM 88103 Curry County lylya Granfield I Environmental Protection Specialist 575 904 3233 110042049262 NMD030236 4952- Sewerage Systems Norman Boyce Contract Officer Representative 575 784 2105 EPA Inspectors: State lnspector(s): Other lnspector(s): Title: m Author: m -"C Subject: m -w :;; Keywords: EPA Lead Inspector Signature/Date Supervisor Signature/Date Ted Palit, P.E. David Esparza, P.E. 214 665 8061 505 366 8402 Cannon Air Force Base, New Mexico US EPA Region 6 Compliance Assurance and Enforcement Division Dallas TX Inspection Report, Clean Water Act {CWA), National Pollutant Discharge Elimination System(NPDES) Wastewater Treatment Plant, Sludge disposal, Publicly Owned Treatment Works (P.!JTW) 7,_).' ~~ Ted Palit (,/11(18 Date ( '.4u/~ f/L I/_ Carol Peters-Wagnon &~/;/i Date Cannon Air Force Base, Curry County, NM Inspection Date {03/22/2018} Section I- INTRODUCTION PURPOSE OF THE INSPECTION On May 22, 2018, I, Ted Pal it and David Esparza arrived at the wastewater treatment facilities owned and operated by the Cannon Air Force Base (Base) in the State of New Mexico. The plant facilities are located at 100 South D.L. Ingram Blvd, Cannon Air Force Base, in Curry County, New Mexico. Ted Palit and David Esparza arrived at the plant facilities at about 9 AM and met with Lylya Granfield, Environmental Protection Specialist and Norman Boyce, contract Officer representative. Upon arrival we presented our credentials and explained the purpose and the extent of our inspection activities. The Base's current NPDES permit allows it to discharge treated effluent to receiving waters named North Playa Lake (Outfall 001) and Golf Course Pond (Outfall 002). On October 18, 2017, the Permittee wrote to EPA that discharge from the waste water treatment plant of the Base to the North playa Lake and the Golf Course pond are isolated and are not part of the waters of the United States. On February 02, 2018, based on all available information reviewed, EPA Region 6 concurred that the above referenced water bodies are isolated, intrastate waters with no known nexus to interstate commerce. As such, Base's NPDES permit has been declared discontinued and void. A copy if Region 6's letter is attached in Appendix 1. However, since the Base prepares sewage sludge generated during the treatment of domestic sewage in a treatment works which must be managed and disposed, the base is subject to the provisions in Part 503. We explained to the Base personnel that the purpose of our inspection is to evaluate the compliance status of the requirements of 40 CFR Part 503- Standards for the Use or Disposal of Sewage Sludge. FACILITY DESCRIPTION The wastewater treatment plant (WWTP) is a sequencing batch reactor (SBR) type activated sludge process with preliminary treatment facilities including raw waste water screw pumps, mechanical bar screen, auger monster screen, packaged headworks unit and influent pump station. The SBR consist of three 55ft x 55ft reactor basins with side water depths of 13ft minimum to 18ft maximum. Components of SBR include an aeration system, mixing system, decanter, and sludge wasting pumps. Disinfection is achieved by effluent dechlorinating. Waste sludge Is aerobically digested and dried in beds. Dried sludge is com posted and disposed either in a municipal solid waste landfill or land applied. A topographic map ofthe WWTP site is attached in Appendix 2 and a process flow diagram is attached in Appendix 3. 2