Document yw44EvmpE6y95O0peONgjvN2
^7/f
JARD Company Inc.
Bennington, Vermont 05201
(802) 442-3173
TO: EIA PCB Ad Hoc Committee FROM: Richard L. Rollins SUBJECT: STATUS REFORT RECARDING PCB HEARINGS
DATE: 21 September 1976
Hearings on Che recently proposed Toxic Pollutant Effluent standard for PCBs Will begin at 9:30 a.a. Sept. 27, 1976 In conference room 2409 of the US EPA Waterside Mall located at 401M Street, Washington, D.C. Procedure will be that the seven EPA witnesses who have submitted affidavits are available for cross-examination. The objectors decide which. If any, of these witnesses desired to be cross-examined and submit the names to EPA on September 20, 1976.
The hearings will continue cross-examination of witnesses who are available until they sre completed. Suspension of hearings will then occur until additional affidavits have been submitted and appropriate time for subsequent evaluation of these by objectors.
Finally, the objectors affidavits will become due and the EPA will review all testimony followed by request to cross-examine some or all of the submlttors.
The EIA PCB Ad Hoc Committee objections to the standards Is as generally outlined by our counsel, a copy of which has been previously distributed.
Our esse Is to critically examine the EPA testimony in the following six areas:
1. Criteria 2. PCB toxicity to fish and other aquatic organisms 3. PCB toxicity to birds and mammals 4. Treatment of discharges containing PCBs 5. Economic Impact of industry meeting regulations and/or ' substituting for PCBs 6. Capability of analytical techniques to quantify PCBs in
industrial efflusnte
The EIA is striving to have an expert(s) available for each area during cross-examination. As final comsltments have been made with each expert, you will be appraised of them.
MOMS 093403
EIA PCB Ad Hoc Committee
-2-
21 September 1976
A further up date will probably be at a meeting held sometime after the first week of hearings.
RLR:m Attachment
Richard L. Rollins
MONS 09 Hb**