Document yv0qgNZ52EEgmOkbq5zgkgO2

PROGRESS REPORT / TECHNICAL SERVICES DEPT. - W.G. KRUMMRICH PLANT JOB NO. REPORT NO. W.G. KRUMMRICH PLANT RESEARCH |^ H.C. CARDER Qj.m. connaughton <Q T.W. DALTON '0 P*E* heisler * **. papageorge O D.R.Middleton *0 R.M.Scott 8 D.E.Harris L 53-V. Brawl ey D.O.Watson Q C.E. AN AGNOSTOPOlfUS (3 H.B. PATRICK gj R.E. SO DEN Ot J.J.Pappert " * Sj.A. Morgan * TO RECEIVE DETAIL SECTION (CONFIDENTIAL) GENERAL OFFICE 30D. DANNA ( ) P.W. EDWARDS jjjj D.B. HOSMER g H.L. MINCKLER * J.A. MULLENDORE Q L.E. KLEIN DATE 4 / 6 ' 65 OTHERS SO. 2ND. *[x| L.L. FELLINGER Q J-E. SMITH NITRO * W.R. KELLOGG ANNISTON L.C. FUHRMEISTER * K. ELLINGSON Anniston 2 W.F.Taffee . title: personnel: Dept. 246 - Aroclor - Project 1046 Install Permanent Product Filtration at Aroclor Storage Tanks, j)^ r, Middleton, M. Magnetti (J. R. Savage) problem: SUMMARY: A small amount of earth collects in the new finished product storage tanks and without final filtration it finds its way to our customers, resulting in customer complaints. Two 3>l6S.S. Alsop Filters will be installed on this project. One filter will serve the two north storage tanks, #9 & #11 for 1242 Aroclor. The other will serve the south storage tank, #10 for 1254 Aroclor, These filters will be duplicates of the present filter which is temporarily In use for the two north storage tanks. This type of filter has proven very satisfactory for the service. Estimate for "project was completed 11/25/64. Work Proposal was issued on 12/7/64. Project was approved on l/H/65 for $6000 (all capital). All engineering work Is complete and complete design package was issued on 4/6/65. Construction is scheduled for completion by June 1, 1965. M. Magnetti Technical Services Department DSW 311673 CONFIDENTIAL INFORMATION This document is the property of Monsanto Company and the recipient is responsible for its safekeeping and disposition. It contains confidential information of Monsanto Company which must not be reproduced, revealed to unauthorized persons or sent outside the company without proper authorization. Either retain in secure files or destroy. FORM WGK 500 REV-l/55 STLCOPCB4071659 91570:3563 2 April 6, 1965 Details Background Recently three new aluminum storage tanks were added to the Aroclor Dept. Filters were not included in the projects for the three new storage tanks. However, connections for filters were provided at the three storage tank pump discharges for future filter installation if needed. Customer complaints of a slight amount of s-ediment in the bottom of tank cars, identified as earth, made it necessary to provide final filtration from the storage tanks before shipping. This project covers the installation of the filters, piping, etc. Project Description* This project covers installation of two Alsop Model No. PAK-12S-4-, 316 S.S. filters, extension to concrete pump pad, 2" 316 S.S. piping and steam tracing and insulation. One filter will serve the two north storage tanks, #9 and #11 for 1242 Aroclor. Piping will provide circulation of filtered Aroclor back into tanks for sampling. Also a pipe connection will provide for pumping the Aroclor from one tank to the other after being filtered. The other filter will serve the south storage tank #10, for 125^ Aroclor. Piping will be the same as for #9 and #11 storage tanks except pipe connections will be provided for a future storage tank and pump. These Alsop Filters will be duplicates of the present filter which was borrowed from TPP Service and temporarily installed at #9 and #11 storage tanks and has proven very satisfactory for the service. These filters have 6000 square inches of filtering surface and a sludge volume of 84o cubic inches. The filtering surface is about 4 times that of a Cuno or a Fulflo unit of similar size and the filtering rate is about double. At present, in the temporary filter. No. 96, 0-3 micron asbestos filter discs are being used with excellent results. - The temporary Alsop Filter will be returned to Dept. E-254 when the permanent filters are installed. List of Drawings Dwg. No. Description TS-D-5882 Location Plan & Foundations for Alsop Filters (Nos. 15-0633 and 15-0634) TS-D-5883 Piping Plan & Elevation for Alsop Filters (Nos. 15-0633 and 15-0634) Dimension sheet for Model No. PAK 12S-4 316 S.S. Alsop Filter DSW 311674 STLCOPCB4071660 91370:5565 -3- Aprll 6,1965 Safety No additional safety hazard will be introduced in the Department by this project. Procurement The two Alsop Filters were placed on order 3/12/65. The supplier has promised shipment of filters during week of 4/5/65 from Milldale, Conn. Price of filters are $700.00 each F.O.B. Milldale, Conn. Present Status All engineering work is complete. All prints, material list and con struction write-up were issued on 4/6/65. Present Construction Schedule Shop fabrication to start in April and field construction in May. Completion of project by June 1, 1965. Future Work Follow installation of project and provide assistance if required for placing filters in service. M. Magnetti Technical Services Department DSW 311675 STLCOPCB4071661