Enclosed are copies of Task Order No. 3 and Task Order No. 7 issued by OSHA in connection with the proposed revision of the Asbestos Standard and a copy of a petition from the IAM requesting an ETS of 0.1 for asbestos.
Attached to the IAM petition is a report by Dr. Mancuso. Note the misleading reference to the Manheim plant on page 509.
Sincerely,
Enclosures
eg
H. Marsh
UCC 015233
TASK ORDER ND.3 HEALTH EFFECTS RISK ASSESSMENT
FOR EXPOSURE TO ASBESTOS
Contract SJ-9-F-2-0074
Energy Resources Co. Inc. One Alewife Place
Cambridge, MA 02140
UCC 015234
HEALTH EFFECTS RISK ASSESSMENT FOR EXPOSURE TO ASBESTOS
I. INTRODUCTION
*
OSHA is required by law to estimate the extent of expected benefits
that an OSHA standard will produce. The Agency must determine that a
significant risk exists and that a standard is reasonably necessary or
appropriate to provide safe and healthful employment.
Risks associated with exposure to carcinogens are expressed in
terms of years of foregone life expectancy or of material impairment.
To produce these estimates, OSHA requires data and assumptions about
probable dose/response, latency after initial exposure, adverse affects
of cumulative exposure, effects of high exposure levels of brief duration,
and a number of other factors Which may significantly influence health
outcomes.
Although it is obvious that precise scientific knowledge about the
effects of many of these factors is not currently available, the Agency
has a burden of proof to demonstrate that further regulation is reason
ably necessary and appropriate. Accordingly, it is requested that data,
reasonable assumptions and expert opinion be used to ocrrplete the follow
ing tasks.
UCC 015235
II. PERFORMANCE MEASUREMENT CRITERIA The contractor will provide professional services and technical
assistance in developing and completing this study. Contract performance will be measured against the requirements in this statement of work and in detailed work plan to be submitted by the contractor. Due to the nature of work inherent in this type of study, OSHA will not provide exact instructions concerning how the contractor will accomplish the task. The contractor's response will be' critical in satisfactory performance of the task. In addition, the quality of work will be judged upon the complete ness of the collected data, the validity of the data sources used, the assumptions and model used, and the general management of resources within established time and budget constraints.
III. SCOPE OF WORK Environmental Sciences Laboratory of Mount Sinai School of Medicine
shall provide general assistance to OSHA regarding analysis of health data pertaining to asbestos. These efforts are for the purpose of helping OSHA to develop a revised regulation for asbestiform fibers. Tasks 1, 2, 3a, 3b, and 6 necessitate preparation of brief reports. Task 3c necessitates pre paration of an outline for a scientific paper, and Task 4 and 5 necessitate provision of written comments. The expiration date for this particular contract shall be May 25, 1983. The due dates for tasks as listed below, are May 9, 20, and 25, except for the requirement that Task 5 be ccnpleted within 5 days of receipt of materials from OSHA. Specific tasks include, but are not limited to, the following:
UCC 015236
<
1. (a) Critical analysis and discussion of current dose-extrapolation
models for prediction of excess mortality frcm pleural and peritoneal
mesothelioma; selection of most reasonable model(s) for prediction of
mesotheliara risk, with acacmpanying discussion of basis for selection;
generation of estimates of excess mortality frcm mesothelioma frcm exposures
of: .
0.1 f/ml - years 0.2 f/ml - years 0.5 f/ml - years 2.0 f/ml - years
'
4.5 f/ml - years 9.0 f/ml - years 22.5 f/ml - years 90 f/ml - years
*
.
(Note: All estimates shall be acccnpanied by documentation, including potency coefficients, such that OSHA can reproduce the estimates).
Due Date: May 20, 1983
(b) Critical analysis and discussion of current dose-extrapolation
models for prediction of excess mortality from lung cancer and other
asbestos-related malignancies; selection of most reasonable model(s) for
prediction of lung cancer risk and risk of other asbestos-related malig
nancies, with accompanying discussion of basis for selection; generation
of estimates of excess mortality frcm lung cancer and from other asbestos-
related malignancies frcm exposures of same cumulative exposures as listed
above.
(Note: All estimates shall be accaipanied by documentation, including potency coefficients, such that OSHA can reproduce the estimates).
Due Date: May 20, 1983
UCC 015237
. I ' -4 . )
2. Critical analysis and discussion of current dose-extrapolation
models for prediction of excess mortality fran asbestosis; selection
of most reasonable model(s) for prediction of mortality from asbes
tosis, with acocxnpanying discussion of basis for selection; generation
of estimates of excess mortality fran asbestosis from exposures of:
0.1 f/ml - years 0.2 f/ml - years 0.5 f/ml - years 2.0 f/ml - years
4.5 f/ml - years 9.0 f/ml - years 22.5 f/ml - years 90 f/ml - years *
(Note: All estimates shall be accompanied by documentation, including potency coefficients, such that OSHA can reproduce the estimates).
Due Date: May 20, 1983
3. Critical analysis and discussion of risk of asbestos-induced diseases
from short-term and intermittent exposures to asbestos, including the
following tasks:
(a) Selection of most reasonable dose-extrapolation model(s) for
prediction of excess mortality from asbestos-induced diseases due to
short-term and intermittent exposures, with acccnpanying discussion of
basis for selection.
(Note: OSHA. understands that predicting morbidity is considerably more complicated than predicting mortality, such that selection of a model for morbidity and generating estimates for excess morbidity may not be possible by the expiration date of this contract).
Due Date: May 25, 1983
UCC 015238
-1-
(b) Generation of estimates of excess mortality from asbestos-induced diseases due to short-term and intermittent exposures, such as those experienced in the construction industry and automotive aftermarket. (Note: All estimates shall be accompanied by documentation, including potency coefficients, such that OSHA can reproduce the estimates.) Due Date: May 25, 1983
(c) Prepare outline for article, suitable for publication in a scientific journal, consisting of a review of the evidence for the pro duction of early asbestosis, asbestosis, and cancers by short-term and intermittent exposures to asbestos. This article would also review cases of asbestos diseases induced by short-term and intermittent exposures that are presently in the files of Mt. Sinai, as well as pertinent epidemiologic studies contained therein. (Note: OSHA does not expect this paper to be completed by the expiration date of this contract). Due Date: May 25, 1983
4. Providing critical ocmments on the draft preamble section on health effects prepared by OSHA for a Notice of Proposed Rulemaking on asbestos; reviewing the preamble for carpleteness and accuracy of the health infor mation and risk analyses. Due Date: Within 5 days of receipt of draft section(s) frcm OSHA.
UCC 015239
r.? v-
5. In the evaluation of illnesses that may be averted if an OSHA standard on asbestos which lowere the PEL from 2 f/cc to 0.5 f/cc or 0.1 f/cc (ceiling from 10 f/cc to 5 f/cc) is promulgated, OSHA must determine the appropriate values for several key parameters:
* age at first exposure * latency associated with asbestosis, mesothelioma,
lung cancers, and other cancers * smoking rates for the affected population. (a) At this time, OSHA expected to set the parameter for the age at first exposure at 25 years. Do you perceive any problems with this assumption given the context in which it will be used? If so, what are those problems and what is the appropriate setting for this parameter? (Please provide documentation for any proposed changes). Due Date; May 9, 1983 (b) The latency periods for the illnesses associated with asbestos exposure must also be determined. At this time, the latency associated with lung cancer ranges from 20-40 years, with a peak at 30-35 years. Do you perceive any prolens with these assumed latencies? If so, what are those problems and what is the appropriate setting for these para meters? (Please provide documentation for any proposed changes). (c) At this time, OSHA intends to assume that the smoking rates for the affected population mirror the rates for the general working popula tion. Do you perceive any problems with this assumption given the context in which it will be used? If so, what are those problems and what is the appropriate assumption? (Please provide documentation for any proposed changes). Due Date: May 9, 1983
UCC 015240
6. Critical analysis and discussion of mineralogy of talc, including talcs which contain asbestos and talcs which don't contain asbestos; discussion of issues and mineralogy/industrial hygiene studies regarding asbestos contained in talc; drawing conclusions on most reasonable position to take on issues of talc mineralogy relating to asbestos regulation. Due Date: May 20, 1983
IV. CONFIDENTIALITY The contractor agrees not to release to the public the draft
proposed standard or any analysis conducted or data collected during the performance of the Task Order unless directed to do so by QSHA. It is understood, however, that it will be necessary for the contractor to discuss the contents of the proposed standard in sufficient detail to develop cost estimates. Such discussions will be approved by the COTR prior to any disclosure. All data used in the development of the economic impact studies will be made available to OSHA on request. No premise of confidentiality shall be made by the contractor to its data sources. The sources for all factual information will be referenced in the report. A bibliography will be provided.
UCC 015241
(
V. LABOR & ESTIMATED COST FOR TASKS #1, 2, 3a & b fyj. J
NAME
CATEGORY
RATE
HOURS
AMOUNT
Dr. Nicholson Dr. Selikoff Mr. Henneberger Ms. Tarr
Project Director Sr. Tech. Specialist Analyst Jr. Analyst Clerical
$54.23 48.85 28.36 23.72 21.10
130 60 30 50
120
$ 7,049.00 2,931.00 850.80 1,185.00 2,532.00
TOTAL ESTIMATED COST
$14,549.70
LABOR & ESTIMATED COST FOR TASKS 3c, 4 & 5
NAME
CATEGORY
RATE
HOURS
Dr. Selikoff Dr. Nicholson Dr. Lilis Dr. Langer Mr. Henneberger
Project Director Sr. Tech Specialist Sr. Tech Specialist Sr. Tech Specialist Analyst Clerical
$54.23 48.85 48.85 48.85 28.36 21.10
30 25 20 10 10 60
TOTAL ESTIMATED COST
AMOUNT
$ 1,626.90 1,221.25
. 977.00 488.50 283.60
1,266.00
$ 5,863.25
NAME
Dr. Langer Dr. Selikoff
LABOR & ESTIMATED COST FOR TASK 6
CATEGORY
RATE
HOURS
Project Director Sr. Tech Specialist Clerical
$54.23 48.85 21.10
20 5
20
TOTAL ESTIMATED COST
AMOUNT
$ 1,034.60 244.25 422.00
$ 1,750.85
TOTAL ESTIMATED LABOR & GOST SUMMARY
RATE
HOURS
Project Director Sr. Tech Specialist Analyst Jr. Analyst Clerical
$54.23 48.85 28.36 23.72 21.10
180 120
40 50 200
AMOUNT
$ 9,761.40 5,862.00 1,134.40 1,186.00 4,220.00
TOTAL ESTIMATED COST FOR TASKS #1, 2, 3, (a,b. c), 4 & 5
$22,163.80
UCC 015242
inreRnPiTionnL
nssociFiTion of mncHimsTS nno R0RO5PRCE UJORWeRS
MACHINISTS BUILDING, 1300 CONNECTICUT AVENUE, WASHINGTON, D. C. 20036 Area Code 202--657*5200
GL15 - Asbestos
May 31, 1983
035135;-.
Mr. Raymond J. Donovan Secretary of Labor U. S. Department of Labor Washington, DC 20210
'
` OFFICIAL CORRESPONDENCE ft&ASE RETURN TO ROOii S-2
Dear Secretary Donovan:
On behalf of our 900,000 members, the International Associ ation of Machinists and Aerospace Workers requests an Emergenc Temporary Standard to reduce the permissible exposure level fo asbestos to 100,000 fibers per cubic meter air. This unusua response of an Emergency Temporary Standard is necessary to mee the exceptional circumstances presented by continued vorke exposure to asbestos.
Assistant Secretary Thorne Auchter has been sitting on Risk Assessment for Asbestos and the recommendations of a join OSHA/NIOSH committee since he took office. The time for actic is long overdue.
It is our understanding that Assistant Secretary Auchter i
planning to propose a reduction in the permissible exposure limi
to 500,000 fibers per cubic meter, as an eight hour time-weightt
average. We know that Doctor Irving Selikoff has told him tha
this level of asbestos exposure is dangerously high--indefensibl
high. The only exposure level that can be honestly supported is
the lowest detectable level.
- - _
We request the 100,000 fiber level on an emergency basis
not because it is "safe"... no asbestos exposure is safe... but
because it represents the lowest reliably detectable level using
current measurement techniques. In the rulemaking hearings whic^
will follow the issuance of the Emergency Temporary Standard pu-
suant to Section 6(c) of the Act, OSHA should give very carefi
consideration to requiring measurement technology which permi
reliable detection of asbestos concentrations below 100,0<
fibers per cubic meter.
_
From .pu.r experience, we believe that for the majority
work settings an exposure limit of 100,000 fibers per cubic met
can be me t;'Ai S i n;g; a - p.oinbinat ion of engineering and work practi
control measures.
'
tY-. *: .
UCC 015243
Health Act by developing no new standards, weakening existing standards, and destroying enforcement. This neglect of Congres sional intent of the law dealing with worker health and safety must stop. The 1AM demands that the Occupational Safety and Health Administration move in this direction by issuing an Eraer-
Dr. Irving Selikoff AFL-CIO IUD Thorne Auchter
UCC 015244
r?
Attachment
(2) Work practices--(1) Wet methods. Insofar as practicable, asbestos
shall be handled, mixed, applied, removed, cut, scored, or otherwise
worked in a wet state sufficient to prevent the emission of airborne
fibers.
.
(ii) Particular products and operations. No asbestos cement, mortar, coating, grout, plaster, or similar material containing asbestos shall be removed from bags,, cartons, or other containers in which they are ' shipped, without being either wetted, or enclosed, or ventilated so as
to prevent effectively the release of airborne asbestos fibers.
(iii) Spraying, demolition, or removal. Employees engaged in the spraying of asbestos, the removal, or demolition of pipes, structures, or equipment covered or insulated with asbestos, and in the removal or demolition of asbestos insulation or coverings shall be provided with respiratory equipment in accordance with paragraph (d)(2) (iii) of this
section and with special clothing in accordance with paragraph (d)(3) of
this section.
, /
(3) Special clothing. The employer shall provide, and require the use of, special clothing, such as coveralls or similar whole body clothing, head coverings, gloves, and foot coverings for any employee exposed to airborne concentrations of asbestos fibers.
(4) Change rooms: (i) At any place of employment exposed to airborne concentrations of asbestos fibers the employer shall provide change rooms for employees.
(ii) Clothes lockers: The employer shall provide two separate lockers or containers for each employee, separated or isolated as to prevent contamination of the employee's street clothes from his work clothes.