ABERDEEN MONTHLY PROGRESS REPORT NOVEMBER, 1990
VISIA
Safety
There were six injuries reported during November; three of these recordable cases. The recordable cases were a lower back
strain suffered by a mechanic, a mechanic sprained an ankle, and a compound operator who fractured a finger. At month's end the plant's employees have worked 4,166 days (5,562,227 manhours) since the last lost time injury.
FY 1990 Kev Statistical Information
November
Y .T.D.
PVC Production, MM Lbs. Reactor Stream Factor, % Resin Quality, % Prime VCM Efficiency, Lbs./Lb. Flexible Compound Production, MM Lbs. Flexible Compound Quality, % Prime Rigid Compound Production, MM Lbs. Rigid Compound Quality, % Prime Plasticizer Production, MM Lbs. Plasticizer Quality, % Prime Energy Use, (EUI, %) Fixed Cost Variance, $M Variable Cost Efficiency Variance, $M
42.6 91.4 98.0 1.0212
5.5 96.9
5.2 99.9
1.6 88.1
.< 3 3>
4.0 154.9
83.5 88.6 98.4
.1 0217
11.0 96.9 10.3 99.6
3.4 90.1
.< 3 1> ,< 3 1>
< 63.1>
Operations
November's PVC production set an all time monthly production record.
In the flexible compound unit, there was planned downtime on all lines to control inventories. A trial run of Vistel 9102 was completed on Line V. This material was produced for U-Brand, an injection molding fittings customer.
Costs
Fixed costs were essentially at budget.
Variable costs were favorable due to product mix in the compound departments and correction of October's variable costs.
VAB.0001189877
T. H. Huffman 12/20/90 Aberdeen Monthly Progress Report - lovaaber, 1990 Page 2
OMP
All of the plant's natural teams met during the month.
The Warehouse Natural Team made their presentation to management. Their project, extending the roof over the loading dock, will improve safety and reduce product loss.
FY1990 Gainsharing results were presented to all employees.
D. C. Skokna Plant Superintendent
tjs
VAB.0001189878
t
Houston
J. D. Bums
X
R. T. Ferrell
X
T. H. Huffman
C. J. Matson
D. F. Harman
H. R. Flammer
R. R. Smith
B. J. Bean
R. H. Gerlach
R. D. Gamblin
D. L. Cohen
J. F. Stokes
Austin
R. L. Foe
X
H. J. Hall
H. D. Garrison
Lssai mm*
LSfif
R. A. Conrad J. Friend
LCLAB Plant
J. V. Ware
X
L. R. Bauer
X
HanffQ9n4
J. Pavao
X
C. R. Miller
Pyegigir?
P. L. Foote
Aberdeen RVS/DCS (File Copy), TJA, JBA, JEB, JME, SCH, MRK, DAB, DAM, RBN, JEN, JDO, REP, BLT
X X X X X X X X X X
X X X X
X X
VAB.0001189879
SAFETY - B. L. Trego
Fiscal Y.T.D. 1991
Fiscal
y,T,P, ^990
First Aid OSHA Recordable
Total Injuries
3 6
4
2 6
Number of RestrictedWorkday Cases
3
3
1
Number of Lost Workday Cases
0
0
0
it
Vinyl Operations Compound Operations Maintenance Laboratory Receiving/Warehouse Office
Totals
010
221
344
000
000
X1 1
686
Injuries bv Type
Cuts and Abrasions Eye Injuries Burns Bruises S trains/Sprains Stings Other
Totals
130
001
001
221
220
00 1
1 -1 _2
686
Non-Occupational Injuries
Lost Workday Cases Days Lost
Safety Record
Last lost time injury - 7/5/79
Days since -
4,166
Employee hours since - 5,562,227
On November 30, 1990, the employees of the Aberdeen plant completed 4166 days with no lost time injury.
Topics for the plant safety meetings during the month included: Earthquake Preparedness, Slipping/Tripping Hazards, and Contractor Safety.
Special emphasis was given to earthquake training and preparations this month due to predictions of an earthquake in early December.
A
VAB.0001189880
*
SAFETY - Continued
Routine dosimetry results for the month were:
Chemical
<
Number
Percent
Lilt
Percent
VCM Lead Total Particulates
79
98.75
1
9 100.0
0
3 100.0
0
1.25 0 0
The single overexposure was with benefit of respiratory protection
Monthly In-jury Summary
rv Class
Department
Description
RWC
Maintenance
Lower back strain
FA
Compound
Lower back bruise
RWC
Maintenance
Right ankle sprain
FA
Maintenance
Puncture of right palm
FA
Adm. Services
Left knee bruise
RWC
Compound
Fracture of left index finger
VAB.0001189881
T. J. Arbeiter
All of the plant's natural teams met during the month of November. Some of the team highlights for the month were:
The Senior Mechanical Engineer's Natural Team reviewed the proposed scope of their project to improve operations and maintenance involvement in capital projects.
The Warehouse Natural Team made their presentation
to management recommending the extension of the
roof over the loading dock.
The team's
presentation detailed how their recommendation will
improve safety and reduce product loss by keeping
the loading dock dry.
m The Vinyl Operations Superintendent's Natural Team began RVCM Cpk improvement planning and data collection to reduce VGM switching costs.
The Safety Supervisor's Natural Team continued work on their project to establish guidelines for Security Guard responses to unusual events.
Informational meetings were held for all plant personnel on November 8th and 12th to present 1990 Gainsharing results.
Presentations from Executive Management were held on November 28th and 29th. Many thanks to Jim Ball and John Weidner for taking the time to travel to Aberdeen and for fielding our questions.
A
VAB.0001189882
Total
FVC Flexible Compound Rigid Compound Plasticizer
Total
$ 54.4 < 57.8>
113.5 44.8
$154.9
<$1522.9> < 97.1> < 144.5>
5.9 <$1758.6>
<$1468.4> < 154.9> < 31.0>
50.3 <$1604.0>
FVC;
Favorable VCH use, utility consumption, packaging usage, and a
favorable product mix were partially offset by producing less
than budgeted amounts of offgrade resin.
(NOTE:
Offgrade
production was 0.0208 pounds per pounds of FVC versus a 0.0232
standard. Because "debox" resin is credited at 26.0 cents per
pound versus the 21.8 cents per pound standard cost of
production, the plant was "penalized" $83.1M for making less than
budgeted amounts of debox.)
Flexible Compound: The unfavorable variance was essentially all due to product mix.
Ridgid Compound:
The favorable variance was essentially all due to product mix.
Plasticizer:
Favorable raw material use (an offset of last month's unfavorable variance) was the primary reason for the November variance.
Price Variances
Variance - $M
VCM
<$1522.8>
Resin to Ridgid Compound
< 147.1>
Resin to Flexible Compound
< 91.5>
Phthalic Anhydride
< 31.4>
Color Concentrates
< 30.1>
Natural Gas Alfol 610
< 15.6> 26.8
610P to Flexible Compound
28.0
Other Price Variances
_______25.1
Total <$1758.6>
VAB.0001189883
Continued
Variances
H Payroll and Benefits MM&C i Miscellaneous TI&D m Clearances
Total
<$ 21.0>
61.5 < 16.9> < 17.7>
< l-9> $ 4.0
PgytQll and The unfavorable variance was primarily due to the holidays.
M, M. & C.
This category was favorable due to less than budgeted activity Miscellaneous
Outside Professional Services - $10.4M favorable
Warehouse G/L - $26.2M unfavorable
The warehouse loss was due to the write-off of safety supplies, which will be put on a consignment basis. An offsetting credit will appear in December's fixed costs.
XI&2
Local taxes were budgeted too low.
VAB.0001189884
VINYL - J. D. Olson, J. M. Vinoski
Safety
The Vinyl Department had no first aid case or OSHA recordable injuries during November.
The monthly safety meeting topic was "Earthquake Awareness".
general
1. November resin production, at 42.6MM pounds, is an all-time
Aberdeen monthly production record.
This is even more
significant considering the thirty-day month.
2. Steam stripping optimization work was completed in November. Residual VCM figures have shown dramatic improvement.
3. The resin raw materials in the 744 account were valued at $283.1M.
Production, MM Lbs. Daily Rate, M Lbs./C.D. Capacity Utilization Factor, % Total Reactor Charges Charges/C.D. Reactor Stream Factor, % Rotary Dryer Stream Factor (#4-#8), Fluid Bed Dryer Stream Factor, % Resin Quality, % Prime
%
Nov.
42.6 1418.5
111.2 981.0
32.7 91.4 95.2 95.3 98.0
m
83.5 1368.8
107.3 1937.0
31.8 88.6 93.7 95.8 98.4
Reactor Downtime
Hours
Operational downtime (recovery scheduling conflicts, New Module rinse/charge water conflicts, waiting for Q.C. data before charging, 0-ring leaks, no place to dump).
453.0
Maintenance downtime (sewer valve removal on all reactors, Old Module VCM charge pump valve replacement, hydroblasting on D745, safety disc maintenance on D300, Old Module VCM charge line plugged, cleanwall system repairs, and mis cellaneous valve and instrument repairs).
169.0
Drver Downtime
Reactor limited production.
10.0
Operational downtime (centrifuge plugs, dryer cleaning, and flameouts).
41.7
Maintenance downtime (screw conveyor repairs, centrifuge and activator main tenance, and blower repairs).
48.3
VAB.
1i
VlWti. - Continued
Key Maintenance Work - J. B. Autrey, S. A. Truitt
One to three mechanics were kept working full time on steam tracing in the vinyl units.
The centrate heat exchanger bundles were pulled and acid cleaned. All gaskets were replaced.
The 903 recovery compressor was changed out due to wear.
Reactor 745 was prepared for hydroblast to aid in contami nation control.
All sewer valves in the new unit were removed.
The #4 cooling tower pump motor was repaired. due to bad windings.
Failure was
One major valve was changed in the vinyl unit.
A
VAB.0001189886
COMPOUND - J.S. Nickerson, K.G. Akins
The Compound Department had one OSHA recordable injury in November. A compound operator suffered a contusion and fracture of the distal portion of his left index finger while cleaning a piece of equip ment.
The topic of the monthly safety meeting was "Earthquake Preparedness".
The three flexible compound lines and the dry blend unit were
scheduled down for the two-day Thanksgiving holiday.
The
plasticizer unit operated all thirty days this month due to the
continued strong external demand for plasticizer.
Line I roll mill cooling channels were acid-cleaned to increase heat transfer through the mill. This will facilitate the production of PLENEX polymers by preventing the buildup of heat on the roll mill surfaces which causes excessive sticking.
A production trial of VISTEL 9102 was completed November 7th on Line
V. The material was produced for U-Brand, an injection molding
fittings customer. This compound, if successful, would replace the
90172D dry blend we currently produce for U-Brand.
Customer
evaluation is scheduled for early December.
Operating
Production M (Lbs.) Mon& AlEt/PT Fiscal Y.T.P.
Line I
27
Line III
28
Line V
9.5
Total
% Prime
Capacity Utilization Factor,
1875 3327
265 5467
96.9 67.9
69 119
28 195
3830 6717
413 10960
96.9 68.7
Downtime
Hwfb
- Product Changes - Acid Cleaning Roll Mill - PLENEX Polymers Production - Probatcher Maintenance - Quality Problems & Control - Miscellaneous Maintenance
76 24
22
13
11
7
VAB.0001189887
COMPOUND - Continued
*
Product Changes - Miscellaneous Maintenance - Quality Problems & Control
62 30
7
Mtw V
- Product Changes - Start Up\Shut Down - Miscellaneous Maintenance - Quality Problems & Control
28 7 4 3
Operating
____Pays___
Month
Rigid Compound
27 5205
% Prime
99.9
Capacity Utilization Factor, % 88.3
193
PgynElmg
Hours
- Product Changes - Miscellaneous Maintenance - Quality Problems & Control - Screener Maintenance
51 42 18 13
Operating
Y.T.P.
10313 99.6 87.3
Plasticizer
30
% Prime
Capacity Utilization Factor, %
1577
88.1
83.8
3439 90.1 91.3
Key Maintenance Work - J. B. Autrey, S. A. Truitt
The "C" blender star valve was replaced due to wear.
The high side of the #7 air compressor was reworked due to a worn cylinder.
Vacuum jets on P-1 reactors #1 and #2 were pulled and cleaned because of calcium carbonate buildup.
The spindle assembly on #5 dicer was changed out and the old one rebuilt.
The Line III "A" feeder gearbox was changed out and the old one rebuilt.
The motor on "D" blender was replaced and repaired. The motor had bad windings.
The memory control card on the Line I Probatcher was replaced.
VAB.0001189888
ENglHEERING - R. E. Polk, S. C. Hillman. M. R. Kane
An environmental consulting firm, Clements and Associates, has been hired to evaluate ways to address the risks calculated from the model of plant emissions done by Scott Environmental.
Plant engineering has obtained the EPA approved air dispersion model and local area meteorological data to evaluate concentrations of VCM emissions at and beyond plant boundaries. This model is being used to evaluate the effect of various emissions sources on the total plant emissions.
Rigid Vistel 9102 pellets from the preliminary trial on Line V ran well when tested at U-Brand in early December. A longer Line V run is being planned for late December to make a 20,000-pound sample for U-Brand to trial. This trial run will allow the plant to get additional experience running 9102 on Line V and further evaluate the capacity of Line V to accurately weighup and compound the UBrand material.
A design is being prepared to modify the bottom dump/charge manifold for reactors D400, D700 and all the New Module reactors. The elimination of the rinse-to-sewer step by the cleanwall project has resulted in an increase in hard particles for resin made in these reactors due to the holdup of resin in the bottom dump/charge manifold. Before the implementation of BUS-80, this resin was rinsed to the sewer, but now it is held up in the manifold and is flushed back into the reactor on the next charge to be double poly merized.
An outline was developed for Klockner concerning preliminary commit ments they would need to make for us to successfully evaluate the manufacture of an Ultraclean 5305 resin. This commitment would need to include their providing samples of good and bad calendered sheets and resin, and provide lines of communication for feedback on trials.
HAZOPs were completed on the New Water Plant and Incinerator Replacement projects in November and early December. In both cases, several items were identified to improve safe operation of the projects.
vmmm
mmm
i
mmwmmm
VAB.0001189889
t S
siii
i/a ua
&
e
*1S|
53 * U *?
VAB. OOO1189890
W
EN6INEEHN6 - R.E. POLK, S.C. HILLHAtt, H.R, KANE
ENVIRONMENTAL - F. 6. Jeanson
Water
All wastewater discharge parameters were met for the month of November.
The draft NPDES operating permit is expected in the first part of December from the State.
Waste
Shipments for the month included:
One bulk load of separator oil to M&K Chemical in Gadsden, AL.
One bulk shipment of floor sweepings to CWM in Lake Charles, LA.
m One bulk shipment of lead bags to CWM in Emelle, AL.
m One drum shipment of stabilizer spill to TES in LaPorte, TX.
RCRA/TC training was completed for the compound and maintenance personnel. All of the engineering personnel also attended these training sessions.
Superfimd
The remedial investigation (RI) continued this month. The deep wells were drilled and some sampling was completed. The remaining samples will be taken in December. Results from the samples should be received in January. The final report is scheduled to be complete the first part of February.
The State approved 480MM pounds of PVC production for this year. They did not see anything in our permit that would limit us. Our previous operating permit application had stated 460MM pounds as capacity.
1 attended the Mississippi Manufacturers Association Environmental Committee Meeting in Jackson. Five applications have been submitted to locate hazardous waste treatment facilities in MississioDi.
Two shipments of pond #2 resin were made this month as a trial with Sun Polymers/Royal Plastics. If the material is acceptable, they plan to recover the full 20MM pounds during 1991.
KHKRGT CONSERVATION - J. R. Ganc
November. 1990
I. Energy Conservation Data
Unadjusted EUI
<2.8%>
B. Adjusted EUI
<3.3%>
C. BTU/Lb. Product
2558.8
D. Total Energy Consumption MMM BTU 139.76
Fiscal Y.T.D.
< 2.8%> < 3.1%>
2577.8 274.39
Plant Energy
A. Maintenance
There were thirty energy related Items completed In November, 1990. Twenty-eight of these items were steam leak repairs. The remaining two were steam trap repairs.
III. Boiler Operation
Boiler
November. 90 Fiscal Y.T.D.
No. 1 No. 2 No. 3
82.9% 83.0% 82.8%
82.9% 83.0% 82.8%
Boilers #1 and #2 were operated fifteen days during the month.
h
VAB.0001189892
E. Beall None None J. C. Lockhart 25 vears None James O. Howell - Compound Department - Military Leave of Absence to Persian Gulf.
VAB.0001189893
4
%
0
Ui
CO <c UI in
LU
LU
CJ L0U wtou
co
<cto
r-j co CM
co^
oatn
CCi u. co LU i--:
t
ocn t o
mo: 1 00
I 00
I
io Io LU I I I
4 o
in o* 'C
0 > 4
CM
-o
CM CM
nj -O
QI0 I I I I CM I
1 I
in i co
i -o
CK< i| o-
'O
ro
CM
LU LU
0
i t
Ii r-4
0
cm
in CM in
r-i i o
io
i
o- r-J i 0 0
0I
> 4
0*
ro
I4
CM 10
CO 1-0
CM 1-0
ICM
I
I
4~
sO LPi 1-0
t-
HO
I
I
J
\
Mr-O4
i r-4 1-0
I4
in HO
I
i
l 0\
\ U\ 0 i
0 i 4^' 1 0 1 -o 1 in 1 0 1 cm 1 0 1 ro t 0 1 V- 1 r**- 1 0 1 0
i cm <r t 4
1 0 1 CK 1 *r 4
1 I
o- 1 0 1
1o 10 11
1 010 I i4
1 -o 1 11
CO 4
1 1
010 41
t 0 1 o i 4-- 1 0 1 0 1 CM 1
1 010 1 01 0 1 01o
1 HO ic* 1H
to
LU CO
cm
in
oi0
ro
r-4 0
4
I
I
iro
0 i -t
o
Ui
CO CO I
axCO I
I I I CJ i --* I CO I
i in
LU CO I I i cm
11 * i COCO i
-O
in tn in in -O
CM cm
i
Lx--U:*
O
m
Lxi--U*riIi~fO--
i0
-o -o -o 0
in
to to
i
i
1
1 1 0 i in i o i
1 - i 1 0 r Is-- * 0 i in
1
O i*
i 4i 4 i 4
ICO 1 CO oc 1 i i CO l 0
leaf 1 ac*-- t IZD 1 X3 31 l
i in i in i in i i ro i
O
0\ ui Q\
H
xa i
LU
OO cm
LU LU 0 I CM
ro
O
in
O-
UI A
CO CO
0 i 0 * tn 0 i in i CM
-Cl i
i CO
ro i
i o-
-o i -o 1 -o
i <r \ CM
0 M3
LU
CO
ui
CJ
0I0 0 1O
<I 0 I0
O I0 in i 0
i
c-om ii ton4| *
O- I 0 i I
t0
in 1 in
4I
4
CO 1 CM
1
1
1
t
t i0
i0
i0 i
i i
t i
r i0
i0
t t -o i CM i i
i i i i i
tr
i l
Ui 1 CO 1
r l0 \ LU i cn fo i J*-- i0
i
o iun
0 ro itn
4 4 i
-O ICM
i
i
i
i
in CM
0in4 ro C-oM
l1l1llil
tCnM m Cror-
1I1 1l1 11
004 0
111 11111
04 0
i
1iitn0u14n1t 0 i
o-
cm
0
4 "O
r--4 *>
!111 11
ro CM4 CM
1111 11
O-*4--4 4--
1111 11
004 O
ii un IiCM< no
0 i in i in 1 0 i m i
in * CM 4i 4
i CM i4
1 in 14
i i
CM i o 4i 4
i i 0 1 r- I ro i o
'O r ro i 0 1 -o i
i
* *--
r 4" 1
CK
i
i
i 11 ii 0i0 101 i 0i0 0iO 1 01 O l 0i0
CM i 0 t
1 CM I -Cl i 0
ro i
1 CM 1 m 1 ro t
i 1 1 ro i t
i 1 1 ti
un 1Ct HO itn
ICM r i 1 10 10 14 14" 14(M3 1
1i in 0 1 0 i in
0 1 in i r-o 1 0 i 4o- 1 -O i 4* 0 I CM i
1 in i in 1!
LU UI
LU D* ui
i
i
On
O
4
iir---
0 <ir-0-
r*- IIO
HO
ICM
f
f
i
0
i
p
i
i
ri
Ui LU i
ru
0
0
+t
Us i
in 00
CM 00
44
tOCM-O
ui LU 0 LU
urii.
o <r ui
to toco
wm
VAB.0001189894
mtmm
m
A
Ui
' n1*r-:.ir
CO
UJ
Ui
CL. Ui
<c a.
>-H cocj J--(U
ac 0"3 >- O
Ui _U -On 00^
re Z3oj
CO Ci ID CO UJ
Io
ck
jj r>
to
X 10
K0* 0OC
1 1
0-1
U0* IOD
1 1
NO ro
ux 1 ro
i i i i i
0 io
04
t i
<D4
ie
r**o
t i
^(T
i i i i i i
0 04 N O' ro
<M
Io i i i
CM I
ro i
! i
0 >4
CM
I I I 0I nO I I I
CM
LU
i i0
ou-ui
t i
04
1 H- i
oCc O<c
j i
ui i
1 0 1 CO
1 I
04
1 1
O4
1 0 1 CM
11
1I
11
j -- i eg 1J 4#*4. 1 1 l
sO 4
J 1
irn4
1 ro
t 1
N4
1 J 1
NO eg4
4- i
10 1 0
jl r
i1 \
II i
0
0 I OO
so- ii cI NO I l
m
O- I ooo CM
in i co o
no
CM 0
00 in4
!
\
in
4
in
C-J
(3
4* r no
CM in in
ro
in4
ro
h--
to
UJ CO
cm
wO
in
CM4
ro i 00
-
*o CM
--io
| eg 0
0 t 0 1 0 1 0 1 0 1 0 1 0 1 0 On
oo CM
t 1 01O i
1
0
1 1
4
1 1
04
1| 04
0 1 0 1 0 1 0 i 0 1 0 t 0 1 0 10
IUJ KO
m to
to
UJ
o CK
CM
I
ro i
i
o
ro i 0
ro i in
ro
4 eg
to
UCJJ too
UJ coco
LeT-i 4
CM
m
in
ifNn. 4
101
1 1
04
1 t
in4
i i i
0F0
04
1 I
04
1 J 1
0 i in
in4
i i
e4
1 in 1 CM F4
r
i i
04
iin ie |4
ro
in
in CM
1 CO 1 *tr 101
* i
in 1 1
O
1 1
ro i 0 NO * 4--
F nO i 0 F CM i
CM
1 CM J i 1L. 1 in i 00 1 \
ICK
UI O UJ
--I ** *--t
Ui to to
rH ON
CO
On
rH
CO O
ICO
ro ro
md
in 4
ro
ro
in
in
in
no 00
oo in ro
in
in
CM 4
ck ro
in
CM
00
i
iijiI
rcoo-
I
t
I
I
0I0
O t Ln I
MD i in i i i
in
in CM
i i ro t
oo iiti eog t i i ITi i in
cm ii eg-
0l f rg
Ui UI
<t 04 4gy eg
i 0 10
i i
04
1i*
0
i CO 1 CM
i 4* 1 ro
i i i i
010 010 NO 1 0 On 1
f0l0 1010 1010 11
1 1 1 1
i0 0i0 CM 0 ro i
1 1 ! 1
0 0 rg
i i i i
CM
in
o ro
O CO
Fg F 1 l 1 \i* l
UJ A 1
ac -- Q
I 1
0<
r r i
0 04
1 1 1
0 4
1 0 i in
1 l
in4
i i
r*j 4
f-- ra 1 0 r CM 1 eg 1 CM i CO
at to -- ac to IT
1 CO 1 NO i eg
i i i
On ro *--
1 1 1
NVO`4'--
1 1 1
in eg nO
i i
f
in in
in i in
-i -
CM I O'
ro i in t >o
cm i
i
in
4 -o
in
eg
i
i in
in i eg
4 t
CM
On
ii
i0n
CM i <r
eg \ eg
CM 04 NO
in i i^i CM i 0
4i 4 CM i 0 CO i
i i f
i 0I0 0i0
- i 0 ro i
i
10 un \4
ICO ICK InO in i i * 10 10 J4
1414InO
in in
ro
ro ro eg
in in
0
UJ
1 i Ul i
UJ 1 A ! I i IMJ
t to 1 to i
X1
tA1
i
tJ5UJ
j
UJ
1 ac
OCl 1 o
<_ r*
1
\
h--
J
CJ 1 <L
CD ( 3
12r I 0 r to I X t UJ l UJ i ac l ac 1 CD 1 <r i 1 t to
I UJ 1 1 i o
o J
UJ ^>-
1 f Xi
1*
1 1
\ t
o*
ac
11B
1 1
-T- -|f
>-
X
* i i
Hto <L
UI t ac \ 0 1
i
a 1 A t LJ i r> i
SjJ
UJ
i____
ieng 00 444
roesicg
N-fO
.-j -A 4 LU <UJ -to -UJ -a; -S - <r - ID
ou
<tuj
U_ U.U 000
W4 wOTumH
T
VAB.0001189895
mmm
EMPLOYMENT Salaried
NOVEMBER. 1990
MEN HIRES Salaried/Transfer
14 12 41 24 41 33
5
170 77
80 50 90 62 25 1 10 1 20
65 4 6 18
53% 42% 22% 25% 61% 30% 40%
38% 7.8%
0 0 0 8.3% 2.4% 3.0% 0
1 0 0 0 0 0 0
2.4% 23.4%
1 4 1 1 1 1 1
VAB.0001189896
D. A. Barclay
There were no reportable safety Instances this month. 1 attended an earthquake preparedness on November 27, conducted by Bruce Trego. On November 29, Don Barclay and Hike Swlerc reviewed communications setup in the guardhouse (disaster preparedness).
On November 15, the Warehouse Natural Team made a management presentation on the shipping dock safety problem.
Processed Invoices Working Fund Checks Written Cost Savings Through Bid Process
Month
1105 17
$2293
TiTiPr
2050 32
$5409
Negotiated cost savings of $17M due to placing existing safety stock supplies on a consignment basis.
(Decrease)
Compound HA" Grade Compound Off-Grade (BC) Compound Off-Grade (H) Compound MSP - 90 Killscrap Dry Blend "AH Grade Dry Blend Offgrade Resin Type I Resin Type "BC" Vacuum Dust
Total Packaged Warehouse
4,368,118 634,030 64,755 95,276 170,691 377,526 17,729 497,400 36,950
6,519,354
4,183,774 573,177 64,755 89,576 165,786 453,257 21,199 644,320 36,950
6,534,697
<184,344> < 60,853>
0 < 5,700> < 4,905>
75,731 3,470
146,920 0
45.024 15,343
FLEXIBLE & RIGID OFF-GRADE
NOV.*88 THRU NOV.'OO
A
12/89 np/on na/on na*m rwn mnn
VAB.0001189897
IBimil CUBICAL PLAIT SIIPPIK HALTSIS iOTinil 1999
-UIPIIITS BY PBODICTSv
PBBLIC
108T8 IPT/ITC 1ICI/TOLL
RISII-BOLI itsii-ncutti
17,894,290 14,III,111 161,114 181,000
0 0
ruiitu cwroin-NU 728,790 1,277,450 UUIBL! COIPOIII-PACIAGID 2,980,19$ 2,200
0 0
in B8S1IISS
5,950 0 0
RIGID COBPOBID-BOLI
2,079,970 705,950
HID COOPOfll-PKIUlD 211,501 291,200
0 0
TOLLISG - BBLI T0LLII6 - PACIAGRD
0 00 0 0 33,600
pusTicmi
188,380 0 516,640
TOTAL 24,222,140 17,443,110 550,240
-SIIPMTS 8! 1088-
BOLL *10211111*
IISII tuinu coupons RIGID COMPOBID PLASTICIZER
RAILCAR
175 11 14 0
COSTOIIR COMMOfl PICROP CARRIER
24 17 01 3 10 12 3
TOTAL R0YBBB8B
200 39 31
*YTB* mn FLI2IBLI COBPOOID RIGID COMPOBID
PLASTICIZER
337 70 67 27 0 3 37 3 31 1 25 10
TOTAL YTD
402 98 111
TIB
PUBLIC IPT/ITC IICI/TOLI
44,556,050 21,283,188 188,211
352,976 488,181
0
1,476,430 3,226,200 8,881,114 86,237
0 0
16,773 0 0
5,236,480 691,950 634,860 281,210
0 0
0 0 1,401,881 0 0 33,600
340,420 162,650 1,079,780
58,213,103 26,677,767 2,705,040
TOTAL 216 12 27 15 270
474
30
71 36 611
*
PACKAGED:
*I07E8BER* RISII tuiiiu moon iigis moon PLASTICIZER
tom IOTHU1
*YTD* RISII 1LIII8LI C08P09ID RIGID COUP00ID PUSTICIIII
TOTAL YTD
custom PIC10P
3 21 1 0
25
COMBO! CARRIER
8 82 17 0
107
T02C COMA I HER AIR/OPS
00 00
00
00
3 14 1
0
00
18
7 25 0 0 34 154 0 0 2 31 0 0 0 0 00
43 210 0 0
5 28 1 0
34
TOTAL
14 117 19
0
! 150
.1........................................... 11
37 216 34
0
---------------------->VrAa Bn .A00n0n1i 1io8n9o8n9o8
28?
o CM
c>
i
oI
oi
**
t i
i
CM i
iii
i
i
o o
r->1*
fSs CM
41 D
CO
Crid ho O*
1 o1o <D 1 o
1 1 1 1
*i1t
1 * ID CO
ro
-O O
m CD IO lO
t
cm cm
CO
CM M
o
CD 1
<D I
r*o
1 1
CwOf
*** i
1<
a
o
Pi
CO
D
CO
CM CM W
*C5*
o
I 1
uo 1
*o 1 ** 1
1m*s^
1 1
1
1
1
1
1
-O ms
(X*%
44 co
O' o
CD r>
4o4*
ro
>c >c CD
h** r CU CD
o
i <c CD
CM T*
mTj
1 CD cu ho ce iCj
11
ID** 44* CO
hO CM CM r*o
O
1
Ss I o 1 CD
ho4vc
1 t
h*A
QO o*o-
1 1
r--
)1 CM
11I
D
CO
oo O CO
uni
r** *o
>nt fX>Iwat
IT>
fa
ui Hi
--t CM
oair.
in
aFoo
si s ii CO u"j cm ro Ml IO
O -o r*o
o
t
M3 I Ml
<D
i 1
Oo
I
t
I
I
1
i
I
i
D
CO
ijn uXu
CD ca
CD CM OWO
i
CM --a N -i
O 1
r*o CM In
II
H Ml
II WO
11 11
r^O **
i ho
II It
^u4*>*
II
il
it
D
CO
co
%
CD CO
-- + mmmmm
PRMMi
VAB.0001189899
(Mt*
umwATOBT - J. M. Edwards, Jr.
A. Safety
There were no safety incidents in the Laboratory during November. The monthly safety meeting topic was "Earthquake Preparedness".
B. Customer Contacts
Jim Edwards accompanied John Olson to Southwire in Carrollton, GA for Vendor Appreciation Day.
Carolyn Vaughan, Jill Tompkins and Jeffery Schense with United Technologies Automotive made an audit of the Aberdeen Plant. The audit included accounting, shipping and receiving, production, quality control and other quality processes in the plant.
C. Customer Q.C. Problem Reports and CNR'a
11/01
Dayton reported finding 0.13% oversized material (>40 mesh) in "A" compartment of RP-151 WHT 145 railcar VIPX 45718. Aberdeen Process Engineering, Quality Control, R&D Technical Services Lab and Production are all working to reduce line and blender scale formation in dry blend.
11m AT&T Technologies. Omaha. BE
The customer reported significant degrada tion of product in one compartment of 34862 GRY 546 compound in railcar VIPX 45745. Samples of the problem material were sent to Aberdeen and Austin for analysis. The samples showed some glowing pellets under an ultraviolet light. The glowing pellets were analyzed in Austin as fused and degraded resin sandwiched to the compound pellets. Production will respond to the complaint.
11/20
The customer reported a problem with contam
ination in a car of 5385. Contamination
resembled the black nylon seals used for the
railcar hatches.
The samples sent to
Aberdeen from Eagle were confirmed to be
Vista's seals. All Vista Yard Operators
were told about the problem and Eagle
personnel were warned about the possibility
of the seals springing into the car when the
hatches are forced open.
Continued
The customer reported that the second truck of 5265 In a two-truck order processed with considerable difficulty. Retains show both trucks were 5265 with similar physical properties. The certificate of analysis of the second truck was reported on a 5305 form which added to the suspicion that something was different about the second truck.
14/3Q Obforaysl
, PlaiiMtvfoUa. OP
The customer reported that shipping informa tion was not faxed from Aberdeen to Uniroyal on a 5305 railcar PLCX 43415. Arrangements were made to have fax instructions typed on the bill of lading so that this would not be forgotten again.
D. Product Waivers
Customer
Product
Reason
Ho.
Chelsea
e. &y<ai snag
RP-169 WHT 144 Long stability
1 R/C
RVCH of In-Process Samples
The following is a summary of residual VCM results on in-
process samples.
None of the reactor daily averages
exceeded 400 ppm RVCM during the month of November, 1990.
mi 535Reactor
Slurries
Drier
Number of Samples Average RVCM, ppm
980 124
25 0.721
68 0.416
VAB.0001189901
i
i
TAequatorY - Continued
RVCM of gbiPffiftDt SftJBPigg
The following is a summary of the residual VCM analysis of shipment samples for the month of November, 1990.
Product
Number of Samples
Average RVCM. ppm
5265 5305 5325 5385 5395 5415 Dry Blend Debox Pond
24 98
1 67 12 63 46 12
8
0.456 0.093 0.093 0.356 0.426 0.066 0.051 0.504 10.963
(based on dryer "regulars")
5265
Bulk Density Inherent Viscosity
(vs. 0.715 - 0.744) L Color A Color B Color % on Pan
(vs. 2%, max.) % thru 140 Mesh Mets I.R.
(vs. 95% of control) Hard Particles, (% > 10) Average particle size,
microns
1.33 1.06
5.58 8.33 3.33 0.78
--
0.31
--
-- **
137
0.90 1.44 0.72 2.07 9.00 3.33 1.89
--
0.59
-- --
****
138
mi
1.31 0.72
3.33
2.00 1.89
--
1.72
-- --
19.1
166
CO
00
5395
1.36 0.08
5.67
4.33 1.72
--
0.88 3.04
--
147
1.11 0.59
2.92
6.00 4.22 0.89 4.33 1.56 0.81 8.1
172
Hardness Specific Gravity Color Hard Particles Heat Stability Contamination Dispersion Dicing Cross Contamination Streamers
Total
M Lbs. XU
63.0 317.0
-------- --
-------- -- --
<0.91> <4.59>
-------- -- -------- --
380.0 <5.50>
Rejections M Lbs.
----
25.9 188.5
6.0 14.7 10.5
3.2 20.7 1.0 270.5
<0.38> <2.73> <0.09> <0.21> <0.15> <0.05> <0.30> <0.01> <3.92>
VAB.0001189902
TAliQBATORY - Continued
H. Rigid
Re ^ ections
Color
Total
2.5 <0.29> 2.5 <0.29>
1. All six natural teams met during the month.
2. Dave Cox spent most of his time preparing a database program on PC to create the plant 1PA report.
3. All laboratory testing equipment was entered into the VMS preventative maintenance schedule. Now all lab equipment is on a schedule for recalibration. This was necessary to complete recommendation by AT&T to become a "Certified Quality Vendor".
VAB.0001189903
RESIN Ship Date 11/02/90
11/05/90 11/06/90
11/20/90 11/28/90 11/29/90
SAMPLE SHIPMENTS NOVEMBER 90
Product 5415
Pond Resin 5225
Pond Resin 5385 Pond Resin
Amount
Customer
50 lbs.
Rubbermaid Commercial Products
100 lbs.
IGNACIO ALCOCER VEGA
10 lbs.
Royalite Thermoplastics Div. Polycast Technology Corp.
50 lbs.
TRANSWORLD INDUSTRIES
100 lbs.
Henkel Corp.
50 lbs.
PANIMEX (CHILE)
COMPOUND Ship Date 11/01/90 11/01/90 11/01/90 11/01/90
11/06/90 11/08/90 11/12/90 11/12/90 11/16/90 11/19/90
11/20/90
Product
38551 BLK
34642 NAT
38931 WHT 810
38525 BLK 06 34862 GRY 546 OG
35031 NAT
35851 NAT
27251 WHT 366 OG
h
461-147 NAT
34501 BLK
16841 17462 18162 48451
NAT GRY GRY BLK
(OG) (OG) (OG) (OG)
16851 CB 50 48562 BLK
Amount
50 lbs.
100 lbs.
100 lbs.
200 lbs. 200 lbs.
100 lbs.
200 lbs.
50 lbs.
2000 lbs.
1500 lbs.
50 lbs. 50 lbs. 50 lbs. 50 lbs.
50 lbs. 50 lbs.
Customer Northwire Inc. Polychem Hemisphere Plastics Polychem
Prestolite Wire Corp. INDUSTRIA DE COBRE DEL SUR Gentry Management Southwire Company Complex Corporation Prototype Plastic
Extrusion Co.,Inc.
Vista - Austin
VAB.0001189904
COMPOUND (Cont)
Ship Date
Product
11/21/90
48451 BLK 48562 BLK
11/27/90
48451 BLK 48562 BLK
Sample Shipments/November 1990 Page 2
Amount
50 lbs. 50 lbs.
50 lbs. 50 lbs.
Customer
I TW
Vista - Austin
DRYBLEND
Ship Date 11/08/90 11/15/90 11/21/90
Product
Amount
RP-91 WHT 110
1300 lbs.
RP-28 WHT 122 (OG) 1360 lbs.
426-90 WHT 110
50 lbs.
Customer Available Plastics Western Ag. Sales Co. Inc. IFER DOMINICANA C. A.
i
..........................................................................................................................................................
!,iin w.--.................................. .........................
i .............................
j
VAB.0001189905
*
- --- -------
mi
NUMBER OF INJURIES
TOTAL INJURIES
OSHA RECORDABLE
VAB.0001189906
Ql/fUB
ABERDEEN ENERGY CONSUMPTION
12 MONTH AVERAGE
VAB.0001189907
h
MoiiLonaoHd art rc/axsirM. sari
VAB.0001189908