SUBCONTRACT
P. o. Sox 3, Mourtcxv. Tim 77001
J[AGE 1 OF
EFFECTIVE DATE
3 JUNE 7, 1979
REQUISITION NUMBER
27-14 4526
SUBCONTRACT NUMBER
27-4060-5031
TH 1. ROOT JOB NUMBER/ACCOUNT IMG CODE
.<7-4060
44161 - 9455003
PROJECT NAME
ETHYL CORPORATION
HATE CONTRACTOR'S LICENSE NUMBER (If R*qulr*d)
HOT APPLICABLE
STATE
NOT APPLICABLE
DATE OF ISSUE
NOT APPLICABLE
7SUBCONTRACTOR*
' 03866134 CONSTRUCTION SERVICES, INC. P.0. BOX 96407
L HOUSTON, TEXAS 77013
THE SUBCONTRACT TERMS APPEARING BELOW TOI GETHER WITH THE ATTACHMENTS HERETO FORM THE
PROVISIONS OF THE ENTIRE SUBCONTRACT.
AS OF THE EFFECTIVE DATE OF THIS SUBCONTRACT. FAYMENT AND PERFORMANCE BONDS ARE NOT REI OUIRED BUT MAY BE REQUIRED PURSUANT TO GEN-1 ERAL CONDITIONS.
I subcontract terms
1. SUBLET WORK
1.1 The Sublet Work, In general, is to fumiBh, deliver and install insulation for HA-3 Area for Job 44161 at the Ethyl Corporation Plant located in Pasadena, Texas.
1.2 More specifically, the Subcontractor agrees to perform the Sublet Work which consists of furnishing all labor, saterials, tools, equipment, scaffolding, supervision, taxes. Insurance and all other things necessary to furnish, deliver and install
r insulation on Job 44161 at the above described location, all of vhich work shall be performed in accordance vith and pursuant to the dravinge and specifications listed in Subcontract Tern No. 2 hereunder.
1.3 Subcontractor shall perform all vork described herein in accordance vith the directions of the Ceneral Contractor's Project Manager, or his duly authorized representative.
2. DRAV.'INCS AND SPECIFICATIONS
The Sublet Vork shall be performed in accordance vith the Ethyl Corporation drevings, and specifications therein contained or related thereto, listed below, all of vhich documents are hereby made a part of this Subcontract by reference. The Scope of the Sublet l.'ork is described in said documents aDd must be performed In accordance therewith.
2.1 Drawings ED-30535 ED-30536 ED-30537
2.2 Specification No. SP-92-1 dated April, 1976. Ethyl Corp. Eng. Dept. Spec, for Hot Insulation
ATTACHMENTS (as checked)
EZ) OTHERi
JX! p-50 general conditions
I 1 special conditions
0 P-7 AFFIDAVIT (2)
f /}
SUBCONTRACTOR
/1 /)
AUTHORIZED representative /
WKmkhuuIhJ-
milOfeTt SIGNED
BROWN & ROOT. INC. - GENERAL CONTRACTOR
SIGNATURE
AUTHORIZED REPRESENTATIVE DATE SIGNED
i? JA.r ;/' J J la r/uf; // / f.. f 7fon'r"
Ml |OS-7t)
00442
r*
PAOt HUMS**
SUBCONTRACT NUM&ER
2 OF 3
SUBCONTRACT/CHANGE ORDER CONTINUATION
oesciumoN
3. TIME OF PERFORMANCE
27-4060-5031
3.1 Subcontractor aha11 perform the Sublet Work Is accordance with the ahcedule of the General Contractor'a Project Man ager or his duly authorized representative. The current construction schedule is shown hereunder in Subcontract Tera 3.2 ,
3.2 Subcontractor shall commence with all activities related to perfornance of the Sublet Work as of the effective date of this Subcontract. That portion of the Sublet Work which is to be performed by the Subcontractor at the jobsite shall eoaaence on or about June 8. 1979 and all aspects of the Sublet Work shall be completed on or about June 15. 1979.
3.3 Subcontractor shall maintain contact with the General Con tractor's Project Manager for the purpose of scheduling and coordinating this Subcontract.
n
r
4. SUBCONTRACT PRICE
General Contractor agrees to pay Subcontractor for complete, satisfactory and timely perfornance of the Sublet Work in accordance with all provisions of the Subcontract Documents the following firm lump sun price, which includes all appli cable sales/use taxes:
POUR THOUSAND ONE KITORED FIFTY AKD HO/100 (Words)
$ 4,150.00 (Figures)
5. PAYKDT AND PERFORMANCE BONDS
As of the effective date of this Subcontract, there is no require ment to furnish separate 100Z Payment and Performance Eonds. How ever, at General Contractor's option, this requirement nay at any tine be reinstated in accordance vith the provisions of General Condition 19 herein. Subcontractor shall be reimbursed the bond premium, as shovn on Surety invoice, for said bonds.
6. AFFIDAVITS
Two copies of the General Contractor's "Affidavit for Subcontractor" (Form P-7) are attached for use in implementing the provisions of -Ceneral Condition 32. Subcontractor shall execute and return one copy vith hia final invoice to the address shown in Subcontract Term No. 8.
.7, PAYHDn
The following paragraph supplements Paragraph Number 32 of the Gen eral Conditions.
THIS SUBCONTRACT/CHANGE ORDER CONSISTS OF FAGE 1 BEARING SIGNATURES AND AS MANY ADDITIONAL NUMBERED FAGES AS SHOWN ABOVE. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
00443
,\s;
page ******
3 OF 3
. SUBCONTRACT/CHANGE ORDER CONTINUATION
. SUBCONTRACT NUMBER
27-4060-5031
7. PAYMENT (Continued)
Subcontractor she 11 be paid the full amount above is Subcontract Tens Bo. 4 within thirty (30) days from receipt of irroiee, upon final completion and acceptance of the Sublet Work by General Contractor, and when the affidavit called for in Subcontract Tent Bo. 6 haa been properly executed and received at the address ahovn in Subcontract Tern Bo. 8.
8. INVOICES
Subcontractor eball render all invoices to the following address:
Brovn t Soot, Inc. 209 K. Kain St. Pasadena, Texas 77506
Attn: Johnny Morrow
In order for Invoices to be properly processed, Subcontractor shall
execute this Subcontract and retain the copy marked *5ubcontrector
Copy" for hie files. All other copies are to be sigxsd and returned
to General Contractor at the exact address shown in
Tern No. 9
no later than August 14, 1979.
9. INSURANCE
Subcontractor shall forward bis Certificate of Insurance stating the names of its Insurance Carriers and certifying that its insurance coverages meet the requirements set forth tn General Condition No. 21 herein to the following address:
Brovn 6 Root, Inc. P. 0. Box 3 Bouston, Texas 77001
Attn: David R. Knox (01-129G)
10. LABOR RELATIONS
The following supplements Paragraph 14 of the General Conditions:
The Subcontractor represents that its pre--hiring collective bar gaining agreements, if any, contain or will contain provisions that, or Subcontractor has entered into or will enter into * project agreement modifying such collective bargaining agreement to provide that, there shall be no strikes, slowdowns, picketing, secondary boycotts, or work stoppages during the performance of the Sublet Work. Subcontractor will further subcontract only to lower-tier subcontractors having similar provisions in their collective bargaining agreements, if any.
THIS SUBCONTRACT/CHANGE ORDER CONSISTS of PAGE 1 BEARING SIGNATURES AND AS MANY ADDITIONAL NUMBERED PAGES AS SHOWN ABOVE. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
00444