Document yrJznZb3xr5526xwkd7YOOe5V

T. H. Huffman From: Dote: Sufaiech R. V. Seymour June 24, 1991 Ainmni MONTHLY PROGRESS REPORT MAY, 1991 There Hvfa Ln May. At: month's end, employees have worke<M#M*days (5,816,091 manhours) ist lost time injury. PVC Production, MM Lbs. Reactor Stream Factor, % Resin Quality, % Prime VCM Efficiency, Lbs./Lb. Flexible Compound Production, MM Lbs. Flexible Compound Quality, % Prime Rigid Compound Production, MM Lbs. Rigid Compound Quality, % Prime Plasticizer Production, MM Lbs. Plasticizer Quality, % Prime Energy Use, (EUl, %) Fixed Cost Variance, $M Variable Cost Efficiency Variance, $ft 40.3 91.3 96.5 1.0390 6.1 99.0 4.5 99.0 1.6 81.8 6.6> 57.8 38.1 UEtPr 318.3 88.2 98.2 1.0241 36.3 97.4 38.4 99.5 12.6 84.0 < 8.1> 222.3 < 47.7> The resin units ran well during the month. The first phase of reactor VCSM training was completed. Converting the New Module reactors to the VCSM is scheduled to begin July 5, 1991. Both rigid and flexible compound production rates continued to be high as orders remain tight. Downtime due to maintenance was low. Conversion to OASIS began June 1. Variable efficiency costs were near budget in all units. Fixed costs were $57.8M favorable due primarily to low payroll and low MM&C costs during the month. VAB.0001189672 TUtt# fufaiLaftfmmiumi 6/24/91 Aberdeen Monthly Progress Report - Hay, 1991 Pass 2 OMP All plant natural teams met In May. m The Compound C-Shift Natural Team made a presenta tion on their project to improve safety and reduce transfer line length on dry blend by rerouting transfer lines. m The Maintenance Area 11 Natural Team made a presentation on their project to improve the safety and efficiency of their work in the dry blend base ment. i Customer visits this month were Inter Plastics (Corinth, MS) and Dayton Extruded Plastics. i The first in-plant environmental newsletter was published. m We sent the first load of office paper for recycle, consisting of ten thousand pounds of office paper and two thousand pounds of computer paper. R. W. 'Seymour Plant Manager rah ........mmwmm** VAB.0001189673 F1 Hews ton J. D. Burns X R. T. Ferrell X T. H. Huffman C. J. Matson D. F. Harman H. R. Flammer R. R. Smith B. J. Bean R. H. Gerlach R. D. Gamblin Austin R. L. Poe X H. J. Hall I H. D. Garrison ysyot ..Elfflfr P. D. Carrico J. Friend J. V. Hare X Baltimore Hammond Blane L. R. Bauer J. Pavao C. R. Miller X X P. L. Foote RVS/DCS (Pile Copy), TJA, JBA, JEB, JME DAB. DAM. RBN. JEN. JDO. BLT 'l X X X X X X X X X X X X X X VAB.0001189674 B. L. Trego First Aid OSHA Recordable Total Injuries Number of Restricted Workday Cases Number of Lost Workday Cases Mav 1 1 0 0 Fiscal Y.T.D. 1991 10 _6 16 4 0 Fiscal Y.T.D. 1990 13 _4 17 3 0 Vinyl Operations Compound Operations Maintenance Laboratory Rece iving/Warehouse Office Totals 02 05 17 00 00 1 Cuts and Abrasions Eye Injuries Bums Bruises Strains/Sprains Stings Other Totals 036 011 13 3 032 03 1 00 2 -2 1 17 Lost Workday Cases Days Lost 06 0 127 6 119 First Aid Cases Medical Treatment Cases Lost Workday Cases Safety Record 13 01 01 Last lost time injury - 7/5/79 Days since - 4,348 Employee hours since > 5,816,091 On May 31, 1991, the employees of the Aberdeen plant completed 4348 days with no lost time injury. VAB.0001189675 a^suTT - Continued during the month included Annual Awareness and Forklift Safety. dosimetry results for the month VCM Lead Total Particulates ...., .<;....fL .. Number Percent 78 100.0 5 100.0 2 100.0 WvnjKfr 0 0 0 0 0 0 Injury Class FA Compound First degree bums to both forearms. VAB.0001189676 All of the plant's natural teams met during Hay. Some of the natural team highlights for the month were: m The Senior Mechanical Engineer's Natural Team worked on the documentation/quantification of their contractor evaluation project. m The Maintenance Superintendent's Natural Team has reduced spare parts inventory by over $30M. Work continues to identify further reductions. The Maintenance Area II Natural Team made a presentation to management on their latest project - dry blend basement improvements. The team identified several solutions to the safety and productivity problems associated with the cramped working conditions and poor access in this area of the plant. A monorail and hoist will be installed to lift equipment into and out of the basement, eliminating the carrying of heavy valves, etc. on the stairway. A scissor-type hydraulic lift table will also be purchased to facilitate the maneuvering of equip ment in the confined work areas present in the bas ement. The Safety Supervisor' s Natural Team began documen tation of their latest project - rewriting the laintenance call-in procedure. m The Compound C-Shift Natural Team made a presenta tion to management on 5/31. The team justified re routing the dry blend boxing hopper lines based upon safety and efficiency considerations. The boxing lines currently run across the silo deck walkway creating a tripping hazard. The team also estimates the lines can be shortened 70 to 80 feet as a result of their proposed re-route. Intex Plastics (Corinth, MS) visited the plant on May 21. The Intex visitors included Terry Emmons - Quality Control Manager; Sherry Parikh - Process Development Manager; and Jerry Hight - Resource Manager. The purpose of the Intex visit was to review specifications, discuss unloading problems at Intex, review laboratory procedures and give Intex an overview of our safety programs. Intex was also given general plant, operations and QMP overviews, as well as a plant tour. an*#** mmm pph wmmmm****m Continued Dayton Bxtruded Plastics (Springboro, OH) visited the plant on May 21 & 22. Dan Preston - Material Manager, represented Dayton. Hie agenda for the Dayton visit included discussion of dry blend formulation and current and proposed specifications for resin and ry en . Dan was also treated to our usual dose of overview and tours. VAB.0001189678 - D. C. Skokna Product PVC Flexible Compound Rigid Compound Plasticizer Total $ 55.8 132.5 15.9 < 0.5> $204.7 $40.9 < 7.6> < 12.7> 17.5 $38.1 variable CQgfrg; Operation of all units was near budgeted levels. Price Variances: $520.2 < 300.6> < 105.9> < 81.3> $ 32.4 Total $616.8 < 175.7> < 102.6> VCM m Natural Gas m Phthalic Anhydride Pigments, Colors Plasticizers Resin to Flexible Compound m AlfolR Alcohols m Resin to Rigid Compound m Other Price Variances Total $465.3 34.3 < 18.4> < 20.7> < 38.8> < 62.2> < 68.6> < 74.5> $ 32.4 Fixed Cost Variances Payroll and Benefits MM&C Miscellaneous TI&D m Clearances Total $ 22.0 33.0 < 12.7> 7.1 < $ 57.8 unfavorable variance MM&C - Activity continues below budgeted levels to conserve cash. Miscellaneous - Contract cost-operating, an unfavorable $33.9M variance, appears to be due to incorrect entry items not in this category. However, there is $11M in software maintenance for the VCSM project. s I -ft VAB.0001189679 VINYL - J. D. Olson, D. E. Knittlg SifetY The Vinyl Department had no first aid case or OSHA recordable Injuries during May. The monthly safety meeting topic was "Fire Training." 1. Phase 1 of VCSM reactor training was completed. This training focused on the complete system. Phase 2 will emphasize specific reactor programs. 2. The resin raw materials in the 744 account were valued at $303M. 3. OASIS training was completed and all production models modified as needed to open the month of June. 4. A new rinse nozzle was installed in D700 on May 2. The nozzle in D745 was replaced due to a construction defect. The reactors remain clean. Mav Production, MM Lbs. - Daily Rate, M Lbs./C.D. - Capacity Utilization Factor, % - Total Reactor Charges Charges/C.D. - Reactor Stream Factor, % - Rotary Dryer Stream Factor (#4-#8), - Fluid Bed Dryer Stream Factor, % - Resin Quality, % Prime % 40.3 1300.4 101.9 948.0 30.6 91.3 90.9 96.0 96.5 m 318.3 1310.0 102.7 7444.0 30.8 88.2 92.4 94.4 98.2 Operational downtime (recovery scheduling conflicts, charge/rinse water conflicts, Q.C. data delays, dump conflicts and inventory control). Hours 449 Maintenance downtime (repair steam valve on D741, D745 condenser cleaning, D700 rinse nozzle, gearbox maintenance D741, D744 seal, VC valve OM, D743 main charge, valve, D700 condenser cleaning.) 195.5 VINYL - Continued Drver Downtime % of Total Operational downtime (centrifuge plugs, dryer cleaning, flameouts). Maintenance downtime (centrifuge maintenance, dryer PM, #5 baghouse screwfeeder motor). Reactor limited production. 24.5 22.3 26.3 y ifaintMatiea Wofft - J. B. Autrey, S. A. Truitt 1. The fluid bed dryer wetcake feed screws were changed out when one end of a screw broke off. 2. A VC compressor in the old unit was replaced due to wear. The old compressor is being rebuilt for a spare and will be completed in June. 3. Reactor 744 seal failed due to normal wear after being in service for twenty-seven months. The old seal has been rebuilt for a spare. 4. A defective gasket (reactor 700 seal) was replaced. 5. The screw and bearings on the #7 dryer inlet screw feeder were worn and had to be replaced. The old screw is repair able and will be reinstalled in June. 6. Reactors 700 and 745 condenser tubes were hydroblasted to aid in contamination control. 7. Two major valves were changed out in the Vinyl unit this month. f GQMPOOHD - J.E. Nickerson, If. R. Kan The Compound Department had no OSHA recordable injuries in Hay. The topic of the monthly safety meeting was "Fire Training". Control of costs and inventories continued to be a high priority during May. Lines were operated only on an as-needed basis and operators from shutdown lines were utilized to cover vacations and other absences to reduce overtime A test was run to determine the feasibility of producing a natural rigid compound (without titanium dioxide) . The entire dryblend system was cleaned thoroughly prior to production. Although the results are not conclusive, the initial feedback from the customer is that the compound still contained too much pigment. The business is being evaluated to determine future direction. High priority was placed on producing rigid profile compounds that would meet the 40 mesh spec. Procedures were established to help prevent off spec material due to 40 mesh. Included in the procedures are Items such as inspection of the screeners once per shift and loading and testing of each railcar compartment as it is produced. Of particular importance has been RP"151 for Dayton Extruded Plastics. The extra precautions have caused a reduction in rates, but they are considered absolutely necessary. Operating Month Avg./Dav Line I Line III Line V Total 31 31 11 % Prime Capacity Utilization Factor 1894 3805 -Ml 6088 99.0 73.5 61 123 -11 196 12625 21574 2124 36322 97. 58. Dpvmtlms Line I - Product Changes - Quality Problems & Control - One Dicer Offline - Miscellaneous Maintenance - Waiting on Raw Materials - Mill Maintenance Hours 102 28 21 13 12 7 VAB.0001189682 COMPOPHD - Continued Line III - Product Changes - Waiting on Raw Materials - One Dicer Offline - Quality Problems & Control - Miscellaneous Maintenance 68 20 20 9 7 - Product Changes - Miscellaneous Maintenance - Waiting on Raw Materials Orbitran Problems 39 6 3 2 Operating Para Month Awe./Daw Rigid Compound 31 % Prime Capacity Utilization Factor 4523 99.0 68.5 146 38438 99.5 79.6 Hours - Product Changes - Quality Problems & Control Miscellaneous Maintenance - Waiting on Raw Materials 130 74 35 9 Operating Month Plasticizer 31 % Prime Capacity Utilization Factor 1644 81.8 71.3 12552 84.0 81.3 Kew Malpt?lp|>rfr? WffTfr - J. B. Autrey, S. A. Truitt m The #5 air compressor is being reworked. It locked up while in service and when disassembled it was found that the head and cylinder needed to be reworked and some bearings replaced. The expected completion of rebuild is July when the last parts arrive. The #3 air compressor head and cylinder are also being reworked. Expected completion is July. VAB.0001189683 mm 1 COMPOUND - Continued continued The "A" blender gearbox was replaced due to bad bearings The motor on #9 dicer was replaced due to bad bearings. The auto greaser on Line I Banbury was installed. The old greaser only lubricated when the gate opened, but the new greaser is on a timer and is much more reliable. A VAB.0001189684 S. C. Hillaan, M. L. Career VCSH Operator training on reactor software programs was conducted in late May and early June. The turnaround for conversion of the new reactor module has been rescheduled to begin July 5 due to resin production demands. The old and new reactor module systems were put into service in early May and mid-June, respectively. In April, there were problems with ion exchange resin contamination of low mole products from the temporary system. A change order has been issued to install an additional filter downstream of the decalcifier vessel in each module for the permanent systems. Ultraclear 5305 The plant and FED are working on ways to improve 5305 quality for our rigid calendaring customers. The focus of efforts has been on reducing black/brown contamination, fibers, and streamers. Investi gative work is being done to identify and classify sources of these contaminants. Several projects are being evaluated for debottlenecking the PVC One project will be to eliminate the evacuation step by enclosing the dump systems to prevent air from entering the reactor. Slurry culls were sampled to determine the capacity requirements of basket strainers for replacing the dump Sweco. A test of enclosed dumping is being planned for July or August. Performance testing of the cooling towers will be conducted in July to help determine ways to increase cooling capacity. Summertime cooling capabilities are marginal now with production improvements due to cleanwall. ENGINEERING - H.L. CARTER. S.C. HILLMAN * I ABERDEEN CHEMICAL PLANT APPROVED CAPITAL PROJECTS A AFE NUMBER A519 A449 A909 D5U D550 DS70 D5B0 mo D749 D849 D859 D899 F551 F650 F440 F499 F779 6340 6341 6410 6430 6459 6839 H500 H501 H510 H531 H571 H420 PROJECT DESCRIPTION PLANT ELECTRICAL UPORABE VINYL CONTROL SYSTEM MODERNIZATION INERTS REMOVAL MODIFICATIONS VCN UNLOADING MODIFICATIONS RAILCAR ACCESS PLATFORMS OLD HODOLE RECOVERY SYSTEM ACCESS RECOVERY VACUUM PUMP PRESSURE REL. PLASTICIZER LOADING, t UNLOADING. HOD. LEAD HANDLING AND EXPOSURE REDUCTION COMPOUND LINE 3 SOW-BULK LEAD HANDLING CQNPOUNO SILO BRIM BREAKING RAILCAR CLEANING RACK BRY BLEND SCRE8KR REPLACEMENT 5305 RESIDUAL VCM REDNCTION DECALCIFIED NAUR LON NOLECULAR HEIGHT RESIN EXPANSION ORVERS NO.4 4 5 CONTAMINATION REDUCTION TC SPILL CQMTAXNHEKT HASTEHATER INFLUENT EQUALIZATION TC COMPLIANCE PROJECT REACTOR SLURRY STRIPPING OPTIMIZATION NED DRYER 8A6HQUSES PLANT HATER RECYCLE PLANT HATER SYSTEM MISCELLANEOUS CAPITAL PROJECTS < *13H VEST IMCIHERATOR REPLACEMENT BOILER FEEDWATER TANK REPLACEMENT d-745 rx Drive shaft repl EAST INCINERATOR REPLACEMENT STATUS PROJECT NAS CLOSED TO FIELD CHARGES IN HAY FY 91. FINAL REPORT MEN NODULE CONVERSION PLANKS FOR JULY T/A. PROJECT IS OPERATIONAL. TARGETED FIELD CLOSURE 4TH QTR.91 A PRELIMINARY DESIGN REVIEN NEETIMG IS SCHEDUUD FOR JUNE WORKING ON PUNCHLIST ITEMS, TARGETED COMPLETION JULY FY91. OESION IS CONPLETE, INSTALLATION PUUNEI FOR OLD NODULE OUTAGE 00# IS PLANNED FOR JULY T/A PUNCH LIST ITEK REMAINING. TAfHETED CDNPLETIDN 4TH 0TR.FY91 PROCESS ENGINEERING IS NMITORIK MODIFICATIONS. MODIFICATIONS AMD TEST RON IS SCHEDULED FOR JUNE COMPLETED. HILL BE CLOSES TO FI&D CHARGES IN JUNE. CQNRTRUCTlON CONTINUES. CDNPLETIDN PLUMED IN JUNE. SCREMERS WILL BE PLACED ON MIM IN JOK. DESIGN HILL BE6IN IN JUNE PROJECT MILL K CLOSM TO FIELD CHARGES IN 4TH OTR. FY91. OLD NODULE COMPLETED. NENHOBULE CQHPLCTION PLANNED IN JUNE. PROJECT NAS CLOSED TO FIELD CHARGES IN MAY FY91. FINAL REPORT ENGINEERING IS IN PROGRESS ON MODIFICATION. PROJECT HILL BE CLOSED TO FIELD CHANBES IN 4TH OTR. FY91. OESION IS IN PROORGGG. CONRMKTION PLANNED TO START IN JUNE. TARGETED TO K CLOSEB TO FIELD CHRRBES 4TN OTR. FV9I MODIFICATIONS PLANNEB BURINS R1 OUTAGE IN JULY. NEN MODIFIED SCREMS HAVE ARRIVED. PROJECT IS KING MONITORED. PROJECT MILL K CLOSED TO FIELD CHARGES 4TH QTR.FY91 EOS. IN PROGRESS. BIDS DUE BACK IN JUNE. TARGETED COHPL. EARLY-92. ENGINEER016 IS IN PMGRESS ON 7 PROJECTS. 9 PROJECTS COMPLETED. INC1KIATQR DELIVERED. PROJECT COMPLETION PLANNED FOR 8/91 NOOK IS PLANNED FOR JHK/JULY STEAM 0MTA8E. CURRENTLY NQRKIMB NITH VENDORS ON PRICING INCINERATOR IELIVIREI. PROJECT COMPLETION PLANNED FOR 10/91. VAB.0001189686 - K.G. Akins All wastewater discharge parameters were met for the month of May. The new NPDES permit requires us to monitor for total lead and hardness once per month in the water we discharge from the plant into James Creek. Based on the data collected, the State has the option to modify our permit to Include Mississippi's Water Quality Criteria limits on lead. We have been testing our outfall for total lead and hardness once per week to get a quick idea of where we stand with regard to lead in our wastewater discharge. Based on data collected to date, we are far below the State limits. A process sewer was found to be leaking oils from the plasticizer unit into a storm sewer. The leak began during a period of above normal flow in the process sewer due to cooling tower repairs. The leak was repaired and the oils trapped with sorbent booms before it left the plant. A kick-off meeting was held in May to discuss items necessary to comply with the new storm water regulations. Work will begin on the application in June and July. Vista, Conoco, and DuPont Environmental Remediation Services (DERS) met with the MDEQ on May 6 to discuss the final Remedial Investiga tion report. The state agreed with the DERS recommendation to conduct some resampling. the MDEQ will probably not issue final comments on the report until the results from the resampling are available. Resampling work is scheduled for June. Vista, Conoco, and DERS met in Houston to discuss removal of the buried drums at Aberdeen. DERS plans to subcontract the job and is getting bids from local contractors. The MDEQ ruled the resin in Pond 2 is a product and not a waste. This will clear the way for removal of the resin. Vista and Conoco met with Royal Plastics in May to discuss reclaiming the resin from Pond 2. It appears the resin could be hauled offsite and dried at a Royal facility to be located in Prairie and operated by Sun Polymers. VAB.0001189687 Continued The Bureau of the Census Survey of Pollution Abatement Costs and Expenditures for 1990 was completed in May. We issued an environmentally focussed issue of the plant newsletter in May. The Aberdeen Chemical Plant's Industrial Toxics Project (ITP) voluntary emissions reduction plan was prepared and submitted to corporate environmental. 1 attended a three-day environmental regulation course in Houston May 13-15. Rendell Newton and I attended the Mississippi Environment 1991 seminar in Jackson on May 30. Recertification forms were submitted to renew our Alabama Disposal Approval Number (DAN) for our empty lead/antimony bags. The DAN expired in January, 1991. The Aberdeen Plant shipped its first load of office and computer paper for recycle in May. We collected 10,000 pounds of office paper and 2,000 pounds of computer paper. Waste shipments during the month included: Bulk shipment of reactor culls to Sun Polymers in Baton Rouge, LA. Two drums of stabilizer spill to TES in LaPorte, TX. Bulk shipment of waste oil to M&l Chemical in Attalla, AL. A VAB.0001189688 v J. R. Ganc A. Unadjusted EUI B. Adjlisted EUI C. BTU/Lb. Product D. Total Energy Consumption MMM BTU < 7.62> < 6.62> 2673.0 140.5 < 8.70%> < 8.12%> 2744.0 1104.7 Boiler No. 1 No. 2 No. 3 83.2% 83.4% 82.7% 83.1% 83.4% 82.8% VAB.0001189689 a .. i Allan Bodron - Engineering Department - Rahire Employee returned to work ae a Co-op Engineer. Michael Schneider - Engineering Department - Rehire Employee returned to work ae a Co-op Engineer. Franklin D. Andrews - Maintenance - Promoted from Instrument Technician "An to Maintenance Supervisor. Artis Jones -- Lab -- Reduction in force -- employee exercised seniority into Laboratory "A" Technician position - Article VIII, Section 3. Donald Whatley -- Compound -- Employee promoted from Compound Utility to Compound Operator. None. William Berlin Genetti - Engineering Department Employee returned to school. Coleman Haynes - Compound Department - Returned to work from military leave of absence to the Persian Gulf. VAB.0001189690 IQMUI RSOU0 Report May, 1991 Ptgt 2 j -# l*i i * Robert Hamilton - Compound Department - Returned to work from military leave of absence to the Persian Gulf. Charles Reed - Compound Department - Returned to work from military leave of absence to the Persian Gulf. James Gray - Laboratory - Returned to work from military leave of absence to the Persian Gulf. James 0. Howell - Compound Department - Returned to work from military leave of absenOe to the Persian Gulf. VAB.0001189691 b CM - #EMPLOYEES 15 39* 24 39 33 5 167 74 M 9 5 8 5 23 10 2 62 7 F 0 0 0 2 1 1 0 4 18 %M 60% %F 0 TURNOVER MO. YTD 10 0 M 00 0 __ _ _ 20.5% i 20.8% 59% 0 8.3% 2.6% 0 0 4 0 0 0 1.2% 30% 3.0* 0 0 40% 00 0 37.1* 2.4% 9.5* 24.3% .i hHHMPMWM s Ul (A f* .1 s*l |S %1 2 5 CL -M il i 8 N* g* e 0 0 *0 0 .0 0 P'" 8 '1 .4 0 : * 8 8 * * ft 8 ft CMt o* *+ O Ci VJ8 8 8 8 8 85 1 * 0 ;8 8 8 8 8 * : OOHN > 5 it c IS % S B 3 8 I 9 VI I: I i. : t\ 8 8 CM g u i ? ? S1 11 3i a. VAB.0001189693 i DEPARTMENTAL NUMMARY HOURS REPORT ............. TEAR TO DATE................. Non Paid Hours 15.00 UN *8 3 * 9H i i. 4 8 * O 8 O * IA 8 ft 8 8 8 3 8 * < 8 8 N 8 ft 8 ft 8 e 8 * 18 3 ft 8 ft 8 t 8 8 ft 8 3 8 8 ft 3 ft CM 3i s sRl U8l gs s 52a3 o ._ .i- .fi *- a. VAB.0001189694 Printed 6/06/91 tf - D. A. Barclay Safety There were no reportable safety Instances this month. All natural teams met in Hay. The accounting group natural team made a management presentation on * I ail cost reduction. Savings is estimated at $10M. Statlatics Processed Invoices Working Fund Checks Written Cost Savings Through Bid Process Raw Material Purchase Orders Issued MRO/AFE Purchase Orders Issued Spare Parts Purchase Orders Issued 1103 18 $2899 111 206 181 7234 99 $20396 646 1438 1359 Compound "A" Grade PLENEX Compound Off-Grade (BC) Compound Off-Grade (H) Millscrap(*) Dry Blend "A" Grade Dry Blend Offgrade Resin Type I Resin Type "BC" Vacuum Dust Total Packaged Warehouse 4,111,348 88,592 464,049 46,460 41,432 258,968 124,737 649,200 37,500 6,344,493 * Includes PLENEX millscrap and cleanout. (Decrease) 4,008,228 97,949 317,645 49,787 76,730 517,995 167,586 636,250 100 6,013,648 < 92,306> 9,357 <146,404> 3,327 35,298 259,027 42,849 < 12,950> < 37,400> < 64.267> <330,845> Compound "A" Grade Compound Offgrade Dry Blend "A" Grade Dry Blend Offgrade Resin "A" Grade Resin Offgrade Total 1,039,762 177,500 2,185,510 594,860 8,067,700 12,254,482 (Decrease) 752,156 177,500 2,592,530 816,160 8,509,718 14,808,014 < 287,606> 0 407,020 221,300 422,018 ____770.800 1,533,532 VAB.0001189695 m mmm Hl * *1 1000 05/90 07/90 06/90 11/90 01/91 03/91 05/91 05/90 06/90 10/90 12/90 02/91 04/91 PKG'D PRODUCTS INVENTORY VAB.0001189696 \ ABERDEEN CHEMICAL PLANT SNIPPING ANALYSIS NAY 1991 -SHIPMENTS SY PRODUCTS- PUBLIC MONTH IPT/ITC EXCH/TOLL PUBLIC YTD IPT/ITC EXCH/TOLL RESIN-SULK resin-packaged 21 ,456,810 10,394,080 330,990 155,700 0 0 160,872,294 101,422,500 1,777.400 1,929,604 1,580,650 0 FLEXIBLE COMPOUND-BULK FLEXIBLE COMPOUND-PACKAGED 902,770 4,497,035 1,254,900 0 0 0 5,823,030 23,650,364 8,995,350 751,502 0 0 NEW BUSINESS 34,606 00 93,288 00 RIGID COMPOUND-BULK RIGID COMPOUND-PACKAGED 1,045,260 349,629 666,050 178,050 0 0 27,665,050 2,832,808 4,766,100 699,756 0 0 TOLLING - BULK TOLLING - PACKAGED 0 00 0 00 0 0 1,401,960 0 0 33,600 PLASTICIZER 0 378,110 0 779,150 1,480,530 3,652,160 TOTAL 29,425,102 13,026,890 0 223,645,588 119,696,388 6,865,120 -SHIPMENTS BY NODEBULK: MAY* RESIN FLEXIBLE COMPOUND RIGID COMPOUND PLASTICIZER TOTAL NAY RAILCAR 161 10 15 2 i IBB CUSTOMER PICKUP 42 0 2 0 44 COMBI CARRia 39 8 12 1 60 TOTAL 242 18 29 3 292 *YTD* RESIN FLEXIBLE COMPOUND RIGID COMPOUND PLASTICIZER TOTAL YTD 1,305 78 184 20 4 1,587 341 0 26 29 396 305 32 a 27 1,951 110 296 76 2.433 PACKAGED: MAY* RESIN FLEXIBLE COMPOUND RIGID COMPOUND PLASTICIZER CUSTONER PtOfiUP 3 26 1 0 CQNNON CARRIER 12 113 19 1 TOTC AIR/UPS 00 00 00 00 AIR/UPS 12 2 0 0 TOTAL 27 141 20 1 TOTAL MAY YTD* RESIN FLEXIBLE COMPOUND RIGID COMPOUNO PLASTICIZER TOTAL YTD 30 145 0 0 14 25 98 0 0 193 593 0 0 7 112 0 0 0 30 0 49 71 4 0 225 806 0 0 124 189 172 857 123 3 1,155 &CC TLC,AEV,JRF VAB.0001189697 I3 cn CD CM Ml <D CM Id CM CU cl tn CJ =9 <1 CMZ Uf Ul W Uf K I M O. co s CO to n ro 2 2 2> o n w -41 n M cs N cm cm CO O b*k CM CM Cm CM cn m M Ml 2 WN o *o jfl M M J! CM CM CM CM CM CM CM O M MMM mMn CM CM CM CM CM CM Id oo Ml ro CM CM -o rM CM CO CQ id ro CM CM CM ? ? ?Ml lO 40 I lO cm i CM CO CM CM CM III CM CM CM III ? to O I to I to to 2 2 2 CO Id CO CO CO S S 3t c' Oi CO CO id Id CH cn O' Ch Ml u'i M) O CM CM id CM CM Id O til ui un CM CM CM mnn C' Cl- o OJ^ o CM `V o- 04 id u*i M M IO to to rd td id *> to CPOS CK=O> PCO> to id to O Mk CM rs i * i i CM is CM * CM *d to - i " o ppOOOo -O CM <Q iN O HO id M" CM -MJ Ml O' to M) to CM -O CD P'-- IN -Mo 2 | id 'O ) t t 3to to CO 3 tSo3 5 5> $ M I* ^ aa to no to M $g 3 <n -o 33 m 'O -O M) -o U cl. CJ uuu uuu o uu a f'- a a ui ui m Cl <Ui r* iii ui id u * id i Id O O o c> o o to to M M to I irt id id id mi id i 5 CM id Id CO rd T* *T* O- O' o^ 1 s CM I CM I CM (III CM CM CM CM CM CM CM CM CO CO CO CD "*"-l o *1W* t -o id CJ Ht td UO <Cfc 1 CD I I I I I I I I I at cn CM !x 3t CM 1 0; D= CM ---i | id %o CD CD CO CO to CO cn to co to to co c s? 3t!? CL to CJl UotJz CQ CD * oc cl. cl. II Cl cl II to id d W Ch O' O <> <S> CM CM CM id id O CD CD CJ tn tn V&B.0001189698 id Id \ !! i -t * -U 3 I .'4 j 4 QL > |n eo ,J CJ 1 -o N J iTi <Z> * ps CN 4 i 4 M CM J CM CM 34 CD 1j J O CM 1I :) Ph m o CM sr*- -*o P"L 43 '1 * CD L, O' "P-i cm CN rm r> o ,1 0* CM m o -M 'Si 3 1 1 1 In 4 1 CM 1 t* 1 1 5O CO o s 11 scm 11 CM 1O I CO o to M o oo pr <n o m o jIi i 4 O tn m CL m i in o to Li ;:as .u cn Xi * C.O cn cr* 04 iQ CO tn i to cn a I a I I I I <D $ II II II 8 eg II QD H^ II * It M It \ VAB.0001189699 TAWiaATOBT - j. m. Edwards A There were no safety incidents in the Laboratory during May. The monthly safety meeting topic was "Fire Fighting" taught by the Safety Department. There were four customer contacts made during the month. A meeting was held at Intex in Corinth, MS on 5/12 with Mark Manion, Eric Stouder, Harold Coleman and Jim Edwards to discuss 5415 product specifications and to help solve a "window" problem in thin flexible film applications. On 5/20, Dan Preston with Dayton Extruded Plastics, visited the Plant to discuss 5385 and RP-151 specifications. On 5/21, several representatives from Intex visited the Plant. The Intex group was given the Plant "Quality Presen tation" and a tour. Environmental and safety subjects were discussed. Proposals for 5415 resin specifications were negotiated also. On 5/29, a representative from NAPCO and a consultant visited the Plant. The two were given the Plant "Quality Presentation" and the NAPCO representative was given a plant tour. NAPCO is interested in purchasing dry blend for siding manufacturing and eventually resin for their own blending unit. 05/03 The customer complained that 45541 Natural compound ran inconsistent. Variation from two lots of material made on two different lines caused the variability. Line I material was preferred over Line III material. Customer complained of greater than 10% on the 200 mesh sieve analysis for a 5385 truck shipment. The Aberdeen lab analyzed the truck to be 9.6% on the 200 mesh. DEP accepted and used the shipment without problems. TARQBATOBT - Continued Continued 5/06 The customer complained of receiving RP-34 WHT 142 instead of RP-34 WHT 141 as ordered. Apologies were made and the customer was able to use the material anyway. The customer complained of high per centage on 40 mesh, "Blue Waxy Ball" contamination and low fusion torque readings on three compartments of RP151 railcar VIPX 45290. They were returned. 2/flZ 5/09 The customer complained of unmelted wax and excessive contamination in RP-151 railcar VIPX 45200. Also, UTCX 46587 had two compartments with high percentages on the 40 mesh. The material was returned to the Plant. The customer complained of leaves, bark and polyethylene contamination in a hopper truck shipment of 39032 BIX compound. 05/13 The customer complained that RP-151 railcar 44676 was too yellow. In vestigation showed that Vista1 s color targets were different than DEP's re quirements. An adjustment was made in formulation to correct this difference. The customer complained of high per centage on the 40 mesh of compartment NAM and undispersed wax prills in RP- 151 railcar PLWX 44676. This material was returned. Htp mmmmm VAB.0001189701 TJLBOBATOMT - Continued Continued 05/13 The customer complained that all bolts on the railcar compartment bottom outlets were frozen from corrosion on PLUX 44676. During the investigation, the originator could not be found to answer questions concerning why the bolts had to be loosened. 05/16 The customer complained that 5415 lot 19720 caused a lumpy finish on coextruded flexible compound. Retains and samples sent to Aberdeen showed low hard particles. Aberdeen and DEP suspect raw (unplasticized) resin leakage in the DEP process that caused the problem. 05/16 The customer complained of burning and sticking with undispersed blowing agent in RP-461 UHT 110 railcar UTGX 46505. The material in this car was manufactured at the same time several trucks of RP-461 were made which ran great. It is suspected that this material is very sensitive to trans- Railcar material is subjected to more material handling than truck shipments. The customer complained of boxes collapsing of RP-34 WHT 142 when stacked three high. They ask that we only put 1300 pounds net in each box. These are the Premiere boxes and they are not as strong as the Aberdeen boxes. VAB.0001189702 m \ TABABATORY - Continued 05/21 Continued The customer complained that because of lower than contract inventories of 30611 BLK in Aberdeen, 7485 pounds were shipped instead of a 42,000 pound order. Customer ran out of material. 05/28 The customer complained of line scale from 5305 railcar VIPX 45864. This line scale problem is the same one discussed at the last Plant meeting with Mirrex. 05/28 Chelsea The customer complained of an experi mental car of 489-100A WHT 144 that had two compartments which ex perienced "rat holing" while emptying the car. R&D Is investigating. 05/28 The customer complained that 5305 railcar UTCX 48070 produced "grainy film". Calcium analysis of retains showed high calcium concentrations. This resin was made through the old decalcification system just before it was shut down permanently. It is suspected that a manual valve turning sequence was misaligned. 05/29 Flexible The customer reported "grainy" finish on vacuum cleaner hoses. High moisture content in 57121 WT CL 327 was the cause. Several boxes were returned to Aberdeen because of cloudy-looking (high moisture) pellets. VAB.0001189703 LABORATORY - Continued 05/29 Continued The customer complained that the last six trucks of 80273G has not . processed as well and has a different color (not as white) as material they use to get. Ted Nickerson is investlgating. The customer complained of streamers in a hopper truck of 35031 Natural. A formal written explanation was sent. The customer complained of lower gloss and lower impact strength than typical RP-20 WHT 121. Dayton Extruded Plastics RP-151 WHT 145 "L" Color 1 R/C Electriflex H&W Plastics Intex Stylecrest Vinyl Building Products 58661 GRY 550 Hard Particles 1 H/T 5385-3P Static Flow & 2 H/T Contamination 5305 Inherent Viscosity 1 R/C RP-27 WHT 113 40 Mesh & F. Torque 1 R/C RP-20 WHT 121 Stability 1 R/C Vycom RP-461 WHT 110 40 Mesh 2 H/T * VAB.0001189704 umbatmt - Continued '""N The following is a sunaary of residual VCH results on inprocess samples. None of the reactor daily averages ex ceeded 400 ppm RVCM during the month of Hay, 1991. Reactor Number of Samples Average RVCM, ppm 947 41 0 98 0.491 The following is a summary of the residual VGK analysis of shipment samples for the month of May, 1991. 5265 5305 5325 5385 5395 5415 Debox Pond Dry Blend 3 123 0 61 1 68 16 4 13 0.050 0.121 0.301 0.011 0.050 0.449 0.045 0.041 F. (based on dryer "regulars") 5305 5385 5415 Bulk Density Inherent Viscosity (vs. 0.715-0.744) "L" Color "a" Color "b" Color % on Pan (vs. 2% max.) % thru'* 140 Mets I.R. (vs. 95% of Control) Hard Particles, (% > 10) Average Particle Size, Microns 0.92 0.69 0.31 0.96 2.67 0.87 3.83 ---- 2.43 ... ----- 172 1.16 0.41 --- 1.93 ---- 1.44 7.83 ---------- 4.10 --- ... 10.2 180 1.33 0.64 ---- 2.83 ---- 2.50 7.83 2.83 7.17 4.51 2.16 4.2 190 There was no 5265 or 5395 produced during May. 'L I VAB.0001189705 TAiMBATngT - Continued M Lbe. % Hardness Color Hard Particles Contamination Dicing Cross Contamination Streamers Metal Totals 327.8 <5.26> __________________ 327.8 <5.26> Summary Color 40 Mesh Moisture Total M Lbs. XU 5.6 14.3 12.9 32.8 <0.12> <0.32> <0.29> <0.73> M Lbs. 6.0 <0.10> 10.9 <0.17> 123.4 <1.98> 2.1 <0.03> 12.0 <0.19> 1.6 <0.03> 3.2 <0.05> l* 8 <Q. 162.0 <2.60> 1. All natural teams met once during the month. 2. Assistance was given to the OASIS implementation team to help set up hardware. 3. Hardware connections are now complete and the software for lab data entry in the Vinyl VAX computer is continuing. 4. A precision study of the resin viscosity instrument was completed which showed almost all variation currently is due to the instrument (+ .0075 for 3 signa control limits). Work is underway to reduce this variation. VAB.0001189706 \ RESIN Ship Date 5/01/91 5/01/91 5/01/91 5/03/91 5/03/91 5/03/91 5/03/91 5/03/91 5/07/91 5/08/91 5/06/91 5/13/91 6/15/91 5/17/91 5/17/91 5/20/91 5/20/91 5/22/91 SAMPLE SHIPMENTS MAY 1991 Product 5415 5385 5305 5385 5265 5305 5265 5305 5265 5305 5385 5265 5305 5385 5385 5395 5415 5385 5415 Pond Resin 5305 5265 5415 5385 5415 Control 5385 Amount 1 kg. 5 kg. 50 lbs. 50 lbs. 10 kg. 10 kg. 10 kg. 10 kg. 3 kg. 3 kg. 3 kg. 10 kg. 10 kg 10 kg. 5 lbs. 5 lbs. 5 lbs 10 kg. 10 kg. 2 lbs. 100 lbs. 200 lbs. 50 lbs. 5 kgs 50 lbs. 50 lbs. Customer FABRICA ARGENTINA DE ALPARGATAS SAIC PEVECE S.A. (Argentina) Alcan Building Products PLASTIGAMA (Ecuador) ANIONS S.A. (Argentina) VINISA FUEGUINA (Argentina) PAVCO (Columbia) PRINCZ S.A. (Argentina) NEOPLAX S.A. (Argentina) RJF International Corp. NEOPLAZ S. A. (Argentina) H. Heller and Co. AGRICOMINSA PVC Container Corp. Gary Corporation IND. E COM. CARDINALI Vista - OKC INTERNACIONAL PROCURACIONES VAB.0001189707 RESIN (Cont.) Ship Date 5/22/91 5/23/91 5/28/91 Product 5265 5415 5325 5385 5/29/91 5/29/91 5265 5305 5385 Sample Shipments/May 1991 **** ` Amount 50 lbs. 50 lbs. 100 lbs. 5 kg 50 lbs. 50 lbs. 50 lbs. Customer CONDUCOMER Polycast FIOS E CABOS PLASTICOS (Brazil) Eri Extrusion Inc. Synthetic Products COMPOUND Ship Date 5/02/91 5/06/91 Product 34311 NAT 419-73-A NAT 02 5/07/91 5/10/91 5/16/91 5/17/91 5/30/91 54431 CB 50 416-194-1 419-103-C NAT 02 18831 WTCL 46234A BLK 35852 NAT 02 Amount 200 lbs. 400 lbs. 100 lbs. 500 lbs. 500 lbs. 100 lbs. 600 lbs. 1500 lbs. Customer Tandy Wire & Cable Arizona Electric Fabricators Inc. Tandy Wire & Cable Furon Company Florida Central Extrusion LOF Savannah Wire A Cable Co. DRYBLEND Ship Date 5/02/91 5/06/91 5/29/91 Product 489-106A NAT 489-108A WHT 144 489-116 WHT 145 Amount 1300 lbs. 4200 lbs. 1300 lbs. Customer General Binding Corp. Chelsea Building Products Dayton Extruded Plastics VAB.0001189708 *i NUMBER OF i i i i i TTTTTTT M M J S N J'89 M M J S N J'90 M M J S N ^91 M M MONTH TOTAL INJURES OSHA RECORDABLE VAB.0001189709 n/fiu VAB.OOOl189710