Document yr3OwKeQGnJg6nq97nzGjkNXE
PROCESS IMPROVEMENT 4CONTD,) CRITICAL
ESTABLISH PROCESS IMPROVEMENT GROUPS PlVELOP SPECIFIC PROBLEMS/CHECKPOINTS REVIEW WITH PLANT/WHMINGTON MANAI COMPLETE MAJOR DOCUMENTATION COMPLETE FAC I LITIES
PONE PONE l/'82 12/'82 12/`83
PAW 11-24-81
25835
PROCESS IMPROVEMENT OBJECTIVE:
IMPROVE PIGMENTS PROCESS TECHNOLOGY AND OPERATING FACILITIES TO OBTAIN FUTURE BATCH PRODUCTION >90% MMMHE TO AFS WITHIN EACH PRODUCTION CAMfPMSR AND CONTINUOUS PRODUCTION TO >95% OK STRAIGHT. DEVELOP FULLY TECHNOLOGY ON EMM PROCESS.
MANPOWER: 18 (19821 INCENTIVE: $1500M (19851
lAL APPROACH: REVIEW CURRENT PROCESS DOCUMOMTIGN AND
PRODUCTION HISTORY(PROBLEMS FOR EACH PRODUCT MANUFACTURED. DEVELOP LAB PROGRAMS TO EXPLORE CRITICAL VARIABLES WHERE NEEDED TO INSURE ADEQUATE PRODUCTION REPRODUCIBILITY M DEVELOP RECOMMENDATIONS FOR IMPROVED FACILITIES WHERE REQUIRED DOCUMENT ALL TECHNOLOGY.
DUP050145321
1982 MTE TECHNICAL PROGRAMS
PROCESS IMPROVEMENT
DOCUMENTATION OF BMSTHR TECHNOLOGY - PROCESS DEVELOPMENT - IMPROVED MMtsMG FACILITIES - IMPROVED WASTE TREATMENT
BLUE HUMUS HEAVY METALS
* PLANT ASSISTANCE
QUALITY MAINTENANCE - TECHNOLOGY TRANSFER ' - COST REDUCTION
REWORK OF SUBSTANDARD ENERGY LOWER COST INGREDIENTS
PAW 11-24-81
DU P050145322
1982 MTE RESOURCE ALLOCATtfi
PROCESS .IMPROMEMMI
WANT ASSISTANCE
QA 4, 3.4
CPC 5.7 3.1
INORGANIC!5
3.5
2.0
OTHER ORG/1NICS JJ,
13 10
TOTAL 7.9
as
5.5
5,8
18
PAW 11-24-81
DUP050145323
NEW CHEMISTRY OBJECTIVE:
DEVELOP AND DEMONSTRATE PLANT PROCESS FOR XYT-303-D (ANTHRANILAMIDE (AA) -- ACETOACETYLAMINOBENZIMIDAZOLONE (AABII), AN AUTOMOTIVE QUALITY AZQ YELLOW PIGMENT. MANPOWER (DIRECT 1982);
LO
INCENTIVE: 60-75M PTE/YEAR (1981 $; BASED ON 1983 PLANNING
VOLUME Of 12-15M LB., 25/LB. SELLING PRICE, T20/LB.,
COST Of SALES). TECHNICAL APPROACH:
ONE m, DIAZOTIZATION/COUPLING IN SOLVENT. NO ISOLATION m SURFACTANT ASSISTED CRYSTAL DEVELOPMENT,
USE PURCHASED INTERMEDIATES.
DU P050145324
MEW CHEMISTRY (COOT'S.)
CURRENT STATUS;
CHESTNUT RUN AND INITIAL F&F EVALUATION POSITIVE.
VALUE-IN-USE ESTIMATE ONLY FROM CHESTNUT RUN. BUSINESS
CENTER APPROVAL TO PROCEED WITH DEVELOPMENT (UNDERWAY).
HASKEU SKIN IRRITATION TEST (ML AA ON HAND FOR SEMI-
WORKS TRIAL, AABI ORDERED.
INVESTMENT SMALL
LOT MANUFACTURING SET AT "MONASTRAL" BLDG.. NEEDS
COMMITMENT TO SECURE VIS A VIS BIOCHEM'S POTENTIAL
INTEREST.
FUTURE CHECKPOINTS:
ESTABLISH COMMERCIAL AVAILABILITY OF AABI
DEC. ` 81
OBTAIN AABI TOR SSM-WiKS TRIAL, COMPLETE
DEVELOPMENT WORK ^
MARCH '82
START SEMI-WORKS RUN; 1 YEAR FLORIDA ON EARLIER SAMPLE
Aim *82
20-30 LB. MADE IN SEMI-WORKS; SAMPLE TO CUSTOMERS
MAY *82
F&PS VALUE-IN-USE FEEDBACK
JULY `82
MCN ON "MONASTRAL" EQUIPMENT
AUG, *82
RECEIVE AABI FOR PLANT TRIAL EQUIPMENT READY
NOV. 82 DEC. 82
PLANT TRIALS
. JAN. /FEB, -0
CUSTOMERS HAVE ONE YEAR FLORIDA EXPOSURE (SEMI-WORKS MATERIAL)
JULY *83
EARLIEST ORDERS FOR 1984 MODEL CAR CONSUMPTION
AUG. *83
DU P050145325
COLORED PIGMENTS R&D 1982 DUD GET AMD
PAW 11-24-Si
DUP050145326
OVERVIEW BUDGET: '81 vs. *
- MANPOWER m EXPENSE
MANPOWER FORECAST: '82-'86 IEB RESOURCE ALLOCATION: `82- 86 1982 TECHNICAL PROGRAMS: OVERVIEW MAJOR TECHNICAL PROGRAMS
PAW 11-24-81
DUP050145327
JACKSON LAB. IEB $M MP
PIGMENTS R&D BUDGET
ACTUAL VS. *81 BUDGET
1981 (9+3)
% ACTUAL VS. BUDGET
92 19 18 105
^AtK/NEWPORT MTE $M
MP
CONTtOI
3460
a. 7
PROJECT BML
m**
MP
410
3.7
82 88
94 100
92 92
`ADDITIONAL T240M SPENT ON P.E. AT GRASSELLI
11-24-81
DUP050145328
COLORED
JACKSON LAB
IEB m
MP* MTE
1981 (9+31
m 3500
MP 19
1982 AS % OF 1981
11 1008
5 3358
84%
MU IM
3460
108%
MP 23.7
23 97%
CONTROL LAB $M
1915
MP 7**
8 114%
PROJECT ENG.***
m
650
MP 6.7
6 90%
*RE5. MANAGER INCLUDED IN IEB NUMBERS **MAN ON LOAN TO PRODUCTION IN 19MOTRNS IN *82 ***TOTAL EXPENDITURES EXPECTED t?i, BUDGET NO
LONGER UNDER R&D CONTROL
PAW 11-24-81
DUP050145329
MANPOWER FORECAST
JACKSON LAB IEB MTE
1982 1983 1984 1985 1986
18 10 5
12
NEWARK MTE CONTROL LAB
12 6
77 44
NEWPORT MTE CONTROL LAB.
12 2
2
10 8
22
7 1
7 1
RESEARCH MNGR. 1 1
1
TOTAL
51
26
ASSUMPTIONS
ABLE TO RETAIN MOST COMPETENT
MINIMAL MOVEMENT OF EXPERIENCED
$, 0 PERFORMERS
DUP050145330
MANPOWER FORECAST
SITE JACKSON LAS
IEB MTE
1982 1983 1984 1985 1986
18 10 -5
12 9 7 7
- - -
NEWARK
MTE 12 12 11 10 7 7
CONTROL LAB 6 6
44 4 4
NEWPORT MU CONTROL LAB
12 2
11 2
10 8 22
7 1
7 1
RESEARCH MNBR. 1
1
11 - m
TOTAL
51 47
40 34 26
26
vlVir lUtid
ABLE TO RETAIN Wm COMPETENT PERSONNEL
MINIMAL MOVEMWT OF EXPERIENCED PERSONNEL
* ABLE TO MOVE 5, C PERFORMERS
PAW
DUP050145331
IEB RESOURCE
1982 1983 M
QA 3.9 41 it
CPC o if li
INORGANICS
12 .8 .8
OTHER ORGANICS 15 2.0 to
NEW CHEMISTRY 2.1 .5 *
m mi ti
1986 5.2 5.2 .6 .6 .6 .6 .6 .6 - li 7.0
DIRECT MANPOWER, RES. MGR. EXCLUDED
tt-H-ll
DUP050145332
QU3MAC8IPONES FOR HIGH SOUPS EMAILS OBJECTIVE:
d e v e l o p mm q a p r o d u c t s t h a t p r o v id e t h e
RHEOlOGICAt AND TINCTORIAL PROPERTIES REQUIRED BY NEW HIGH SOLIDS ENAMEL SYSTEMS. MANPOWER (DIRECT 1982):
0 INCENTIVE:
MM PTE '83-'86. PROTECTION OF EXISTING BUSINESS WAT WOULD BE LOST BECAUSE OF RHEOLOGICAL DEFICIENCIES OF EXISTING PRODUCTS. TECHNICAL APPROACH:
MODIFY PIGMENT PARTICLE MORPHOLOGY AND SURFACE PROPERTIES TO GIVE ACCEPTABLE RHEOLOGY IN HIGH SOLIDS ENAMEL SYSTEMS. UTILIZE SOLVENT (ACETONE OR AQUEOUS) MILLING PROCESS ROUTE. CURRENT STATUS:
SEMI-WORKS SCALE-UP COMPLETE FOR THREE POTENTIAL NEW PRODUCTS. CUSTOMER EVALUATIONS ARE IN PROGRESS FOR THESE MATERI ALS. LABORATORY/SEMI-WORKS DEVELOPMENT OF LOW INVESTMENT ROUTE (AQUEOUS MILLING) HAS BEEN INITIATED.
DU P050145333
QUINACRIDONES FOR HIGH SOLIDS S4AMELS ____ ____________ (CONTO.) FUTURE CHECKPOINTS:
BASIC DATA - ACETONE MILLING RESULT CUSTOMER EVALUATIONS
(ACETONE MILLED, BREACHED) PUNT TEST - ACETONE MILLING SEMI-WORKS TESTS - AQUEOUS PROCESS DECISION DEADLINE ALTERNATIVE PROCESSES PROJECT AUTHORIZATION - ACETONE MUMS PUNT TEST ALTERNATIVE PROCESS Ilf NEEDED) EQUIPMENT TURNOVER - ACETONE MILLING COMMERCIALIZE NEW PRODUCT
11/'81 ll/'81-l/'82
2tm
IQ 4/' 5/ 82 3Q`82 1Q*S 1Q
DUP050145334
EASY DISPERSING QA FOR PLASTICS OBJECTIVE:
DEVELOP IMPROVED VJU PRODUCTS TO INCREASE QA SALES TO THE PLASTICS INDUSTRY. MANPOWER (DIRECT Hlfe
0.5 INCENTIVE:
$54QM PTE '82- 85 FROM NEW BUSINESS IN A MARKET WE DO NOT NOW PARTICIPATE IN, TECHNICAL APPI
UTILIZE DISPERSION MILLING OF PIGMENT AND RESIN TO DEVELOP RESIN EXTENDED QA PRODUCTS WITH IMPROVED DISPERSION PROPERTIES IN PLASTICS. CURRENT STATUS:
TWO NEW PRODUCTS HAVE BEEN DEVELOPED THROUGH IKE SEMI-WORKS WITH 90% AND 50% TONER CONTENT. SAMPLES HAVE BEEN SENT FOR CUSTOMER EVALUATION. PLANT TEST OF 90% TONER PRODUCT IS IN PROGRESS. ECONOMICALLY MOST DESIRED PRODUCT IS 90% TONER.
DUP050145335
EASY 01SPERSING QA (CONT'P.)
FUTURE CHECKPOINTS:
PLANT TEST m
SAMPLE CUSTOMERS - PLANT MATERIAL CONFIRMING PUNT TEST CC^WERCIALIZE
1Q'I 2Q'82
BY
DUP050145336
EASY DISPERSING CPC FOB PLASTICS OBJECTIVE:
DEVELOP IMPROVED VIM PRODUCTS TO INCREASE CPC SALES THE PLASTICS INDUSTRY. MANPOWER (DIRECT 1982):
INCENTIVE:
MM INCREMENTAL PE 82- 86.
TECHNICAL APPROACH:
UTILIZE EXCESS SOLVENT MILLING CAPACITY TO DEVELOP RESIN EXTENDED CPC PRODUCTS WITH IMPROVED
DISPERSION PROPERTIES m PUSTICS SYSTEMS.
CURRENT STATUS:
COMPLETED TWO PLANT TESTS. DEFINED PROCESS CONDITIONS NEEDED TO PRODUCE A 55% TONER PRODUCT THAT MEETS AMPACET'S TECHNICAL SCREEN.
FUTURE CHECKPOINTS:
COMMERCIALIZE XBP-565-D (55%) SAMPLE INDUSTRY OPTIMIZE AND DOCUMENT PROCESS EXPAND PRODUCT LINE
l/'82 IQ/82 2QK 12/82
DUP050145337
HIGH SOLIDS DISPERSIONS
OBJECTIVE:
DEVELOP HIGH SOUDS DISPERSIONS TO MEET THE INCREASING DEMAND IN THE TRADE SALES PAINT INDUSTRY FOR PREDISPERSED VS, MY PIGMENT PRODUCTS.
MANPOWER (DIRECT 1982):
0.5
INCENTIVE:
$2.4MM *82-'86. TECHNICAL APPROACH:
UTILIZE SAND MILLING DISPERSION TO FORMULATE AQUEOUS HIGH SOLIDS (>4l PRODUCTS THAT CAN BE USED IN UNIVERSAL COLORANT AND IN-PUNT TINTING SYSTEM!
CURRENT STATUS:
HAVE COMMERCIALIZED FIVE NEW PRODUCTS.
FUTURE CHECKPOINTS:
COMMERCIALIZE HIGH STRENGTH PRODUCT (YW-958-P)
COMPLETE "DALAMAT PRODUCTS CONVERSION TO HIGH SOLIDS PRESSCAKES
PRODUCT/PROCESS MODIFICATIONS TO MEEET TOTAL MARKET NEEDS
DEVELOP ALTERNATIVE PRODUCTION CAPABILITY
lQ'ffi
JO*
12/'82 I2PK
DUP050145338
1982 IEB TECHNICAL PROGRAMS
oo irs co
oo oo m c m oo
1
QQ
CL |u-v
SIc m
r-
*'
en
I
m
o* o o
CL
O
g
<*> to/
izo/>
o
i "g
u* &
--Q
X-
OO
ooOHM*
GX</w*
e
0(0
5
oo
o 3 oc s<
5 o<
s
im
00 f-. I I
i;
DUP050145339
1982 IEB TECHNICAL PROGRAMS (CONT'D.)
DUP050145340