Document yr39LNZao9dgxG7VReO0y9Ox4

PLAINTIFF'S EXHIBIT [S-DOW-tefi ST0073 I 40 ! REGULATORY AND LEGISLATIVE ISSUES zfc_ v^A^A^rr< . t> ' ~ FRT: R. D. (DICK) OLSON 1803 Building }17) 636-8295 ST007314 I ST0073I42 THIS MANUAL IS AN UPDATED EDITION OF THE HANDBOOK PREPARED IN 1972 AND REVISED IN 1977 AND 1985. THIS EDITION WAS REVISED BY THE ASBESTOS TASK FORCE DURING THE FOURTH QUARTER OF 1986. ASBESTOS TASK FORCE MEMBERS RED AHLICH DARRYL CRAGAR DONNA HICKS JERRY HINOJOSA BUDDY JACKS WAIT NQACK DICK SYMM BILL TOMLINSON MIKE TOWN GEORGE WILLIAMS DARRELL WORMAN RANDEL SNETGROVE iQual8tv= Performance Means More At Dow. INDEX ST0073 I 43 SECTIONTITLE PAGE I II III IV V VI VII VIII IX X XI XII APPENDIX A RJRPOSE HEALTH EFFECTS TRAINING PROGRAM MINIMUM REQUIREMENTS DEFINITIONS ASBESTOS AWARENESS ASBESTOS MAINTENANCE PROGRAM NOTIFICATION OF DEMOLITION OR RENOVATION WORK HAZARD COMMUNICATION PACKAGING FOR DISPOSAL MINIMUM REQUIREMENTS GASKET & PACKING HANDLING GLOVE BAGS SMALL-SCALE SHORT-DURATION PROJECTS WITHOUT GLOVE BAGS MINI-ENCLOSURES LARGE SCAIE, LONG DURATION PROJECTS TYPICAL DECONTAMINATION AREA NEGATIVE PRESSURE ENCLOSURES AUTOMOTIVE CLUTCH & BRAKE REPAIR ASBESTOS SAFETY CHECKLIST ASBESTOS ABATEMENT AUDIT CHECKLIST APPROVED EQUIPMENT 1 2 3 4 7 18 19 20 22 23 25 26 28 29 31 34 35 37 38 40 -i- ST0073I44 SECTION I IURFOSE This handbook defines safe handling procedures for asbestos materials used in Texas Operations. The intent is to control personnel exposure to asbestos dust through training, asbestos maintenance programs, safe work procedures, proper use of protective equipment, and by the substitution of non-asbestos containing materials. Asbestos has been widely used as insulation, structural wallboaxd, roofing material, etc. Asbestos fibers are currently in use as a mechanical reinforcing matrix in insulation, roofing paper, certain piping systems, gaskets, brake linings, clutch plates, etc. Dow Engineering Specifications were revised in 1970 to exclude asbestoscontaining insulation before the enactment of Federal regulations controlling the use and handling of asbestos. It is Dow's philosophy to eliminate the use of asbestos where feasible. The revised QSHA standards (1910.1001 and 1926.58) which became effective July 21, 1986 define the precautions, procedures and controls required for asbestos handling. These standards also define the allowable exposure levels and the manner of determining exposure levels. The National Emission Standard for Hazardous Air Pollutants (NESHAP) also established specific requirements for removal, packaging, transport and disposed of asbestos-containing materials. Violations of these regulations may result in a. citation or fine or both. Dow is committed to meeting or exceeding government regulations, to protect the health of personnel. -1- SECTICN II HEALTH & ENVIRONMENTAL SCIENCES INFORMATION CENTER POTENTIAL HEALTH EFFECTS 01/07/87 ASBESTOS ER-0027-0713 REVISED: 12/11/86 SYNONYMS AMFfUBQLE PAGE 1 APPEARANCE: fibrous solid in various colors EXPOSURE GUIDELINES: OSHA PEL is 0.2 fibers (>5 um) per cc. 8 hr. TOA OSHA General Industry Standard 29CFR1910.1001. OSHA Construction Standard 29CFR1926.58. AOGIH TLV is 0.5 fibers (>5 um) per cc for amosite, Ala; 0.2 fibers (>5 um) per cc for crocidolite; 2 fibers (>5 um) per cc for chrysotile and other forms of asbestos, Ala. POTENTIAL HEALTH EFFECTS This section includes possible adverse effects which could occur if this material is not handled in the recommended manner. These effects apply to stated material and may not apply to dilutions or formulations of that material. ST0073 I 45 EYE - Mechanical injury only. SKIN - Mechanical injury only. - Skin absorption is unlikely due to physical properties. INGESTION - Single dose oral LD50 has not been determined. - Amounts ingested incidental to industrial handling are not likely to cause injury; however ingestion of larger amounts may cause injury. ACUTE INHALATION EFFECTS - Excessive exposure to dust causes chronic inflammations of lung tissue and pleural membranes, as well as cancers, in both man and animals. SUBCHRONIC EFFECTS - Prolonged exposure to asbestos dust has been found to cause pulmonary fibrosis (asbestosis), which may be disabling and even fatal. CHRONIC EFFECIS/CARCTNOGENICITY - Has been shewn to cause cancer in humans. - For hazard communication purposes under OSHA standard 29 CFR part 1910.1200, this chemical is listed as a carcinogen by NIP and IARC Group I. TERATOGENIC EFFECTS - No relevant information found. REPRODUCTIVE EFFECTS - No relevant information found. MUTAGENICITY - Seine forms of asbestos have been reported to induce chromosomal changes in tissue culture. -2- 9*i i etoois SECTION III ASBESTOS TRAINING EROGRAM MINIMUM REQUIREMENTS All employees who handle asbestos must be trained before initial assignment and annually thereafter. The OSHA asbestos standards and all training materials are available to employees upon request. Information will be presented in a manner the employee can understand. The following items must be included in the training program: 1. The health effects associated with asbestos, 2. The relationship between smoking and exposure to asbestos in producing lung cancer, 3. Methods of recognizing asbestos, 4. The quantity, location, manner of use, release, and storage of asbestos and the specific nature of operations which could result in exposure to asbestos, 5. The engineering controls and work practices associated with the employee's job assignment, 6. The specific procedures implemented to protect employees from exposure to asbestos, such as appropriate work practices, emergency and clean-up procedures, and personal protective equipment to be used, 7. The purpose, proper use, and limitations of respirators and protective clothing, 8. The purpose and a description of the medical surveillance program required by this standard, 9. A review of the OSHA standard, including appendices. NOTE: A video tape, "Asbestos Standards" (VT87-1130B), is available through the Television Department (phone 2620) which cavers all above requirements except 4, 5 & 6. Items 4, 5, & 6 should be addressed locally by line supervision. -3 ST0073 I 47 SECTION IV DEFINITIONS ACTION LEVEL An airborne concentration of asbestos of 0.1 fiber per cubic centimeter (f/cc) of air calculated as an eight (8)-hour time-weighted average. ASBESTOS Chrysotile, amosite, crocidolite, tremolite, anthophyllite, actinolite, and any of these minerals that has been chemically treated and/or altered. AUTHORIZED PERSONNEL Any person authorized by the employer and required by work duties to be present in regulated areas. CLEAN RPCM An uncontaminated roam having facilities for the storage of employees' street clothing and uncontaminated materials and equipment. COMPETENT PERSON One who has been trained in an EPA approved course and is capable of identifying existing asbestos hazards in the workplace and has the authority to take prompt corrective measures to eliminate them. The duties of the competent person include at least the following: establishing the negative-pressure enclosure, ensuring its integrity, and controlling entry to and exit from the enclosure; supervising any employee exposure monitoring required by the standard? ensuring that all employees working within such an enclosure wear the appropriate personal protective equipment, are trained in the use of appropriate methods of exposure control, and vise the hygiene facilities and decontamination procedures specified in the standard? and ensuring that engineering controls in use are in proper operating condition and are functioning properly. DEOONTAmNATION AREA An enclosed area consisting of an equipment roam, shcwer area, and clean rocm, which is used for the decontamination of workers, materials, and equipment contaminated with asbestos. The decontamination area may be adjacent and connected to the regulated area or located remotely. -4 ST0073I48 SECTION IV DEFINITIONS DEMOLITION The wrecking or taking out of any load-supporting structural member and any related razing, removing, or stripping of asbestos. EMPLOYEE EXPOSURE Exposure to airborne asbestos that would occur if the employee were not using respiratory protective equipment. EQUIPMENT ROOM (CHANGE ROOM) A contaminated roam located within the decontamination area that is supplied with impermeable bags or containers for the disposal of contaminated protective clothing and equipment. FIBER A particulate form of asbestos 5 micrometers or longer, with a 1ength-to-diameter ratio of at least 3 to 1. FRIABLE ASBESTOS Any material that when broken, crushed or pulverized releases asbestos fibers. HIGH-EFFICIENCY PARTICUIATE AIR (HEPA) FILTER A filter capable of trapping and retaining at least 99.97 percent of all monodispersed particles of 0.3 micrometers in diameter or larger. MINI-ENCLOSURE An enclosure constructed of 6-mil polyethylene sheeting to restrict access to the area where small-scale, short duration asbestos maintenance or renovation work is to be performed. The enclosure must have a contiguous change roam. NEGATIVE PRESSURE ENCLOSURE An enclosure for large-scale long duration projects constructed of 6-mil polyethylene sheeting and equipped with a ventilation system (which discharges through a HEPA filter) capable of creating a negative pressure of 0.02 inches of water inside the enclosure. Where feasible, a decontamination area should be contiguous to the enclosure and should be the only means of egress. PERMISSIBLE EXPOSURE LIMIT (PEL) No employee shall be exposed to an airborne concentration of asbestos in excess of 0.2 fibers per cubic centimeter of air as an eight-hour time-weighted average (8 hr. TWA). -5- ST0073I 49 SECTION IV DEFINITIONS REGULATED AREA An area established by the employer to demarcate areas where airborne concentrations of asbestos exceed or can reasonably be expected to exceed the permissible exposure limit. The regulated area may take the form of a temporary enclosure, or an area demarcated to restrict access and minimize the number of employees potentially exposed to asbestos. REMOVAL The taking out or stripping of asbestos or materials containing asbestos. RENOVATION The modifying of any existing structure, or portion thereof, where exposure to airborne asbestos may result. REPAIR Overhauling, rebuilding, reconstructing, or reconditioning of structures or substrates where asbestos is present. SMALL-SCALE, SHORT-DURATION ACTIVITIES The tasks such as, but not limited to: the removal of asbestos-containing insulation on pipes prior to repair; the removal of small quantities of asbestos-containing insulation on beams or above ceilings; the replacement of an asbestos-containing gasket on a valve; the installation or removal of a small section of drywall material containing asbestos; or the installation of electrical conduits, pipe, or cable through or proximate to asbestos-containing materials. SURFACTANTS Chemicals added to water to improve its wetting ability. --6-- ST0073I 50 1------------ ASUSTQ8 CONTENT > 0.12 SECTION V isurrot avarness handcinc liyiUMm onu ninaunm I WRCt ALL ABAS tab umu or suspect katerlau AID BEND TO ASALTTICAL ABTIOtS 409-238-1075 --------------1----------------------------------, ASBSTOA context < 0.1Z DOCUMENT BSULTS AND RETAIN BCORDS DOCIMEHT BSULTS AID RETAIN BCORDS TKAII PERSONNEL OH ASBESTOS SECTIOH 111 TOAS HO FURTHER ACT I OH BQ011ED FURTHER INSPECT FOR HATEILAL COHDITIOH AHD VISUAL P1BEB IELEASE MATERIAL IR POOR CONDITION OR VISUAL FIBER RELEASE MATEBIAL IN COOO COHDITIOH. NO PIBEH RELEASE | DOCUMENT. LABEL AHD SET UP MAINTENANCE PBOCR/M TOAH SECTION VI I EVALUATE AHD DECIDE TOM REMOVAL AND/OR REPAIR CONTACT INSULATION SERVICES 409-238-7036 OR INDUSTRIAL RTGIZRE SERVICES 409-238-1281 FOR ASSISTANCE_____________________________________________________________________________ _ MAJOR REMOVAL/MMOUTIOR ~" MINOR UMOVAL AND/OR OR RENOVATION REQUIRED REPAIR REQUIRED NAME PROJECT SUPERVISOR. COPE, JOR, AND (IP REQUIRED) PREPARE R0T1PICATION LETTER TOAH SECTION VII I CONTACT ENVTAOMENTAL SERVICES 409-238-2414 23 DATS IEPORR WORE TO RECIH contact Insulation services TO 8U JOR ON ANRANCN FOR DON PRRSCNKL I WHEN SIDS RECEIVED ON START TIME DECIDED SELECT DON COtPETENT PERSON I RAVE PB-JOR REVIEW WITH SAFETY DIRECTOR, DOW 4 CONTRACTOR COMPETENT PERSON. INDUSTRIAL RTOIERE, DOW UR CONTRACTOR PERSONNEL TO DO JOR I DECIDE ON JOB PROCEDURES AND AREANCE AUDIT AND MONITORING COMPLETE ASBESTOS SAPTTT CRECKLIST IP ALL ASBESTOS 1ZM0VED REVIEW SECTIOH I TORN TO SEE IP JOR PALLS INTO CLOVE BAG OR MALL-SCALE, SHORTDURATION ACTIVITY, IP SO USE CORRECT ASBESTOS ABATEMENT MINIMtM REQUIREMENTS I DOCQfXNT BMAINUC ASBESTOS 4 SET-OP MAINTENANCE PROGRAM `REFERENCES -TEXAS OPERATIONS SAPTTT STANDARD IAS -TEXAS OPERATIONS ASRESTOS HANDBOOK (TORN) -KPA-560 PURPLE BOOK -ONU STANDARDS 1910.1001 A 1926.38 -BIAS OPERATIONS EMTIROMENTAL STANDARD 1S-314. DOCOUNT AND SR UP MAINTENANCE PROCRAM 7- SECTION V ASBESTOS AWARENESS ST0073I 5 1 SUBJECT: ASBESTOS DO'S AND DON'TS This section is provided as general guidance when working with or near cisbestos-containing materials. DO 1. Get positive identification. Sample and have analysis performed at Analytical Services, phone 1075. 2. Take sufficient samples. Sane vessels, equipment, etc. may contain moire than one type of insulation. Asbestos materials may be covered by refractory, siding, or insulation. 3. Consult the appropriate section of this handbook if asbestos is present. Materials containing more them 0.1% by weight must be handled as asbestos. 4. Put all asbestos waste (old insulation, transite, mastic, dust collector solids, disposable clothing, gaskets, packing, shingles, Haveg piping, furnace refractories, pump packing, pipe gaskets, brake shoes, etc.) in approved containers for disposal. The containers must be properly labeled to warn of the asbestos hazard and sent to the designated asbestos landfill. 5. Inform all personnel in the general area that asbestos work is in progress. DO NOT 1. Use materials containing asbestos (i.e. insulation, fireproofing, transite siding, Haveg piping, weatherproofing, and cooling tower materials) where an adequate alternate exists. MAJOR MANAGER APPROVAL IS REQUIRED when using asbestos materials for matching replacement/repair of existing asbestos covered structures or equipment if a suitable alternate is known. 2. Use asbestos labeled bags for disposal of general trash because of landfill permit requirements. 3. Sandblast or hydroblast materials containing asbestos. When sandblasting or hydrdblasting adjacent areas, protect the asbestos materials from overblast. Examples of items to be protected are transite walls, pipe insulation, fireproofing, etc. 4. Use compressed air to remove asbestos materials. For example, do rot clean brake drums and clutch housings with compressed air. This procedure may fill the surrounding atmosphere with asbestos fibers. An acceptable method is to use an approved vacuum. Dispose of the debris in approved containers and send to the designated asbestos landfill. ' -8- ST00731 52 SECTION V DO NOT'S 5. Eat, drink, smoke, chew gum/tobacco products, or apply cosmetics in a regulated area or a decontamination area. 6. Dry sweep asbestos materials 7. Spray asbestos-containing materials 8. Use hand-operated or power-operated tools (such as but not limited to saws, scorers, abrasive wheels and drills) without local exhaust . ventilation if the use of these tools would cause asbestos exposures to personnel in excess of 0.2 fiber cc. 8 hr. TYJA 9. Hang plants or pictures on structures covered with asbestos-containing materials 10. Sand asbestos-containing floor tiles 11. Damage asbestos-containing materials while moving furniture or other objects 12. Install curtains, drapes, or dividers in such a way that they damage asbestos-containing materials 13. Dust floors, ceilings, moldings or other surfaces in asbestos-contaminated environments with a dry brush 14. Use an ordinary vacuum to clean up asbestos-containing debris 15. Remove ceiling tiles belcw asbestos-containing materials without wearing the proper respiratory protection, clearing the area of other people, and observing asbestos removal waste disposal procedures 16. Remove contaminated ventilation system filters without wetting. Do not shake. NOTE: Items 5 through 16 are directly from the OSHA Asbestos Regulations. -9- SECTION V SOME ASBESTOS-CONTAINING MATERIAIS IN BUILDINGS SUBDIVISION______________GENERIC NAME_________ASBESTOS (%) DATES OF USE BINDER/SIZING ST0073I 53 Surfacing material sprayed-or trcweled-on 1-95 1935-1970 sodium silicate, Portland cement, organic binders. Preformed thermal batts, blocks, and insulating products pipe covering 85% magnesia -calcium silicate Textiles cloth3 blankets(fire)a felts: blue stripe red stripe green stripe sheets cord/rope/yam tubing ;tape/strip curtains3 15 6-8 100 90-95 80 90 95 50-95 80-100 80-85 90 1926-1949 1949-1971 magnesium carbonate calcium silicate 1910-present 1920-present 1920-present 1920-present 1920-present 1920-present 1920-present 1920-present 1920-present none cotton/wool cotton cotton cotton cotton cottoiywool cotton/wool cottoiywool (theatre, welding) 60-65 1945-present cotton Cementitious concrete-like Paper products extrusion panels: 8 corrugated 20-45 flat 40-50 flexible 30-50 _ flexible perforated 30-50 laminated 35-50 (outer surface) roof tiles 20-30 clapboard and shingles: _ clapboard 12-15 siding shingles 12-14 roofing shingles 20-32 pipe 20-15 corrugated: high temperature 90 moderate temperature 35-70 ^indented 98 millboard 80-85 1965-1977 1930-present 1930-present 1930-present 1930-present 1930-present 1930-present 1944-1945 unknown-present unknown-present 1935-present 1935-present 1910-present 1935-present 1925-present Portland cement Portland cement Portland cement Portland cement Portland cement Portland cement Portland cement Portland cement Portland cement Portland cement Portland cement sodium silicate starch cotton and organic binder starch, lime, clay -10- SECTION V SCME ASBESTOS-CONTAINING MATERIALS IN BUILDINGS SUBDIVISIONGENERIC NAMEASBESTOS(%) DATES OF USE BINDER/SIZING Roofing felts smooth surface mineral surface shingles pipeline 10-15 10-15 1 10 1910-present 1910-present 1971-1974 1920-present asphalt asphalt asphalt asphalt Asbestos-containing compounds caulking putties 30 adhesive(cold applied) 5-25 joint compound roofing asphalt 5 mastics 5-25 asphalt tile cement 13-25 roof putty 10-25 plaster/stucco 2-10 spackles 3-5 sealants fire/water 50-55 cement,insulation oement, finishing .. cement,magnesia Asbestos ebony products 20-100 55 15 50 1930-present linseed oil 1945-present asphalt 1945-1975 asphalt unknown-present asphalt 1920-present asphalt 1959-present asphalt unknown-present asphalt unkncwn-present Portland cement 1930-1975 starch,casein, synthetic resins 1935-present caster oil or polyisobutylene 1900-1973 clay 1920-1973 clay 1926-1950 magnesium carbonate 1930-present Portland cement Flooring tile and Sheet Goods vinyl asbestos tile 21 asphalt/asbestos tile 26-33 sheet goods/resilient 30 1950-present 1920-present 1950-present poly(vinyl) chloride asphalt dry oils Wallcovering vinyl wallpaper 6-8 unkncwn-present - Paints and coatings roof coating ear tight 4-7 1900-present 15 1940-present asphalt asphalt ST0073154 -11- ST00731.55 SECTION v ASBESTOS AWARENESS SUBJECT: Example pictures of past asbestos uses. Partial listing of examples that we must handle according to the guidance provided in this manual. Figure 1. Many of our daily jobs involve repairing flange leaks, replacing valves, etc. The old insulation that is removed in many cases will contain asbestos. Figure 2. Asbestos insulating tape has been commonly used in the past to insulate small lines and tubing. -12- SECTION v ASBESTOS AWARENESS SUBJECT: Example pictures of past asbestos uses. Partial listing of examples that we must handle according to the guidance provided in this manual. ST0073156 Figure 3. There still remain some asbestos blankets that need disposal. , Figure 4. Also used in past years was fiberglass insulation mixed with 1 asbestos fibers. -13- SECTION v ASBESTOS AWARENESS ST0073I 57 Figure 5. Structural fireproofing often contained asbestos materials. Figure 6. Asbestos insulation blocks in combinations with refractory materials exist in many of our boilers and furnaces. t14- ' ' ' ' ST0073I 58 SECTION v ASBESTOS AWARENESS SUBJECT: Example pictures of past asbestos uses. Partial listing of examples that we must handle according to the guidance provided in this manual. Figure 7. Transite which contains asbestos has been extensively used in the past in many applications in Texas Operations such as cooling towers, buildings, warehouses, etc. Asbestos is also present in cemesto board and asbestos siding shingles which were also used in various type buildings. Figure 8. Our most extensive use of asbestos In the older plants was the thousands of square feet used on piping and equipment insulation. -15- SECTION V ASBESTOS AWARENESS SUBJECT: Example pictures of asbestos uses. Partial testing of example that we must handle according to the guidance provided in this manual. Friable, fluffy sprayed-on material Friable, cementitious sprayed-on or troweled material (acoustical plaster) ST0073I 59 Nonfriable wallboard with friable sprayed-on material behind Pipe lagging Figure 6 Examples of asbestos-containing materials found in buildings, .... > r." -<? *r. ' : - ", '. * . -16- ,, > . ST0073I 60 SECTION V ASBESTOS AWARENESS SUBJECT: Example pictures of asbestos uses. Partial testing of example that we must handle according to the guidance provided in this manual. Figure 7 Asbestos-containing material located above a suspended ceiling. -17- ST0073I 6 I SECTION VI ASBESTOS MAINTENANCE PROGRAM MINIMUM REQUIREMENT An asbestos maintenance program must be initiated in all facilities that have asbestos-containing materials. Such a program shall include: 1. Inspection of buildings and process areas to determine the presence or absence of asbestos containing materials. 2. Development of an inventory of all asbestos-containing materials in the facility. The inventory may be a blueprint, diagram or written description which identifies the location and approximate amount of asbestos. Records must be maintained until the asbestos-containing materials are removed. 3. Maintenance of all labeling of asbestos-containing materials in the facility. 4. Prompt clean up of any asbestos contamination. 5. Examination of all asbestos-containing materials semi-annually to detect deterioration. If deterioration is found. Industrial Hygiene Services must be notified to assess the potential for asbestos fiber release. 6. Written procedures for handling asbestos materials during the ........._ performance of maintenance, demolition and renovation activities. 7. Training for personnel who may be required to handle asbestos-containing materials as outlined in the Training Section of this Handbook. 8. Documentation of compliance with this program. -18- ST0073I 62 SECTION VII NOTIFICATION OF DEMOLITION OR RENOVATION WORK It is the responsibility of the superintendent/cwner to contact Environmental Services (2414) 25 days prior to the start of any reportable asbestos project. Jobs to be reported are: (1) Demolition which involves the removal of friable asbestos material. (2) Renovation in which the cumulative amount of friable asbestos removed in a calendar year exceeds 260 linear feet on pipe or 160 square feet on other facility components. Reference: Texas Operations Environmental Standard ES314 -19- ST0073I 63 SECTION VIII HAZARD COMMUNICATION 1. labels: LABELS MAY BE AFFIXED INDIVIDUALLY TO ITEMS OR A WARNING SIGN MAY BE PLACED AT THE ENTRANCE TO THE BLOCK OR AREA. All products that contain asbestos in concentrations that exceed 0.1% by weight must be labeled. Labeling must be done in accordance with the requirements of 29 CFR 1910.1200 (f) of OSHA's Hazard Ccjmnunication standard. 3" x 5" Vinyl Asbestos Hazard Labels Dow Stock #01-03372 White "Danger" on red oval on a black field - Black block lettering SOME MATERIALS IN THIS BLOCK MAY CONTAIN ASBESTOS CONSULT SUPERVISIONS SPECIFIC INFORMATION WHEN WORKING WITH ASBESTOS AVOID CREATING DUST ASBESTOS IS A CANCER i LUNG OlSEASE HAZARD [O__________________ 14" X 20" Asbestos Hazard Labeling Area Sign Dow Stock #01-03374-010 White "Danger" on a red oval on a black field - Black block lettering -20- ST0073 I 64 SECTION VIII HAZARD OCMMJNICATICN 2. Regulated Area Sign: Warning signs must be posted to demarcate a regulated area and must be posted at such a distance that an employee may read the signs and take necessary protective steps before entering the regulated area. ASBESTOS CANCER AND LUNG DISEASE HAZARD AUTHORIZED PERSONNEL ONLY RESPIRATORS AND PROTECTIVE CLOTHING ARE REOUIRED IN THIS AREA 14" X 20" Asbestos Hazard Sign Dow Stock #01-03374 White "Danger" on a red oval on a black field - Black block lettering 3. All containers used for disposal of asbestos waste must have an approved label. Special purpose, 6 mil, polyethylene bags with the appropriate label are available through Dew Stock #17-30522. -21- ST0073 I 65 SECTION IX PACKAGING OF ASBESTOS WASTE FOR DISPOSAL 1. The recommended container is a 6-mil thick polyethylene bag. These bags are available through Dew Stock #17-30522. Other acceptable containers are polyethylene lined cardboard containers or polyethylene lined metal containers (drums, dempster boxes, or dino boxes). 2. Polyethylene bags labeled with an approved asbestos label must be used only for bagging asbestos waste. 3. When using bags, minimize the amount of void space or air in the bags to minimize their bursting during stacking and disposal. 4. All containers used for asbestos waste must be sealed to make them leak-tight. 5. Tom bags must be rebagged (double bagged) rather than repaired by taping. 6. Disposable clothing worn during asbestos removal, packaging, and disposed, must be placed into properly labeled polyethylene bags and disposed of as asbestos waste. 7. An open-top fiber or steel drum containing a polyethylene liner may be used to accumulate small quantities of bagged and sealed asbestos waste (brake shoes, brake dust, garlock gaskets, etc.). The drum must have an approved warning label, be labeled for asbestos waste use only, and the top must be kept on except during deposit of waste. 8. All dempsters used for unbagged asbestos waste must contain a disposable polyethylene liner obtained from, or approved by. Environmental Operations. 9. Dempster boxes must not be filled higher than the top of the walls. 10. Dempster liners must be lapped over and secured for temporary closure whenever the job is discontinued for a prolonged period (overnight, holiday, weekend). 11. Denpster liners must be securely closed before transport of the dempsters; the sides and ends are to be lapped over and then secured. Proper lapping and seeding procedures cure provided in instructions by Environmental Operations. 12. Tie-downs for denpster liners must be not attached to the denpster boxes. 13. All denpster boxes used for asbestos waste packaging and transport, and all packages of asbestos waste (including denpster liners) must be labeled with an OSHA-approved label. -22- SECTION X ASBESTOS GASKET AND PACKING HANDLING MINIMUM REQUIREMENTS STORAGE FACILITY Preformed gaskets, packing and gasket fabrication materials will be stored in a clean storage area. The storage area will be cleaned regularly with a HEPA filter vacuum to prevent accumulation of debris. ST0073 I 66 REMOVAL If the gasket or packing to be removed is not adhered to the seating surfaces.and can be removed by hand without breaking apart, remove and package for disposed, according to Section IX of this manual. If the gasket or packing is adhered to the seating surfaces so that mechanical means are used and this operation creates particles in the air or surrounding area, then as a minimum, the asbestos abatement minimum requirements for glove bags or small-scale short-duration jobs shall be used. Spiral-wound gasket removal shall comply with the glove bag or small-scale short-duration minimum requirements if wet methods cannot be used. - CUTTING GENERAL: 1. Employees who work with asbestos must receive training in asbestos hazards before the initial assignment and annually thereafter. 2. Personnel in the general area must be notified that asbestos work is in progress. 3. A specific job procedure must exist and be followed. SAFETY: 1. Safety equipment required by the job location must be worn. 2. An approved respirator must be worn during cutting and cleanup. Employee must have completed the mandatory fit test within the last 6 months. Contact (409) 238-3536 for information. 3. Disposable coveralls with attached boots and hoods must be worn for cutting and cleanup operations. Coverall boots may be worn over shoes or inside rubber boots. If monitoring shews the potential asbestos exposure levels are consistently below 0.1 fiber/cc on an 8 hour TVJA, disposable coveralls need not be worn. 4. Vacuum and local exhaust ventilation systems must be equipped with HEPA filters. -23- ST0073167 SECTION X ASBESTOS GASKET AND PACKING HANDLING MINIMUM REQUIREMENTS SAFELY: 5. Personnel monitoring must be done at the beginning of each job unless personnel wear supplied air respirators, or previous personnel monitoring of similar jobs shows 8 hour TWA exposure potentials less than 0.1 fiber/cc. Contact Industrial Hygiene Services (409) 238-1281 for information. 6. Local exhaust ventilation must be provided for hand operated or power operated tools (such as but not limited to saws, scorers, abrasive wheels, and drills). The efficiency of local exhaust ventilation systems must be verified by Industrial Hygiene Services. WORK AREA: 1. Gasket fabrication area must be identified as an asbestos handling area. 2. Gasket cutting table will be fabricated such that asbestos material or dust cannot collect or contaminate the table. 3. Work area must be cleaned after each job. Vacuum to remove any . .. loose material or dust. Dispose of any scrap material in a seeded plastic bag with the proper asbestos label and clean unused fabrication material for storage. 4. Dispose of coveralls and gloves using labeled plastic bags. 5. After area is clean, vacuum work clothes and remove and clean respirator's for storage. -24- ST0073I 68 SECTION X ASBESTOS ABATEMENT MINIMUM REQUIREMENTS GLOVE BAGS. GENERAL: 1. Employees who work with asbestos must receive training in asbestos hazards before the initial assignment and annually thereafter. 2. A specific job procedure must be written before beginning the job. SAFETY: 1. Safety equipment required by the job location must be worn. 2. An approved respirator must be worn during material removed, and cleanup. Employee must have completed the mandatory fit test within the last 6 months. Contact 3536 for information. 3. Vacuum equipment must be equipped with a HEPA filter. 4. Water for wetting must contain a surfactant. REMOVAL: 1. The glove bag must be fitted to the pipe or structure where asbestos work is to be done. Insert the necessary tools into the bag. Attach bag to the pipe or structure and seed, all openings with tape. The bottom seam of the bag must also be reinforced with tape to prevent leakage from the bag that may result from a defect in the bottom seam. 2. An opening must be made in the bag away from the work area. A spray nozzle must be inserted through this opening and the area to be worked sprayed until it is thoroughly wetted. Continue wetting dry material as it is exposed. Dry material in the bottom of the bag must be wetted. Wetting of materials may be eliminated if water is not compatible with the process or materials or equipment may be seriously damaged. 3. After removal of the layer of asbestos containing materials, the pipe or surface must be cleaned with a wire brush and wet wiped until no traces of asbestos containing material can be seen. 4. Exposed asbestos must be encapsulated at terminations. 5. Tools must be wetted and cleaned. Place the tools such that they may be removed after the bag is twisted and sealed. 6. A vacuum hose must be inserted through the opening used for wetting and used to remove any air from the bag that may contain asbestos fibers. The bag must be squeezed as close to the top as possible, twisted and sealed with tape to keep the asbestos materials safely in the bottom of the bag. 7. Remove the bag from the work area and remove tools. 8. The top portion of the bag and the opening used for wetting must be resealed with tape. 9. Disposal of the glove bag must be in an approved container. -25- SECTION X ASBESTOS ABATEMENT MINIMUM REQUIREMENTS ST0073I 69 SMALL-SCALE SHORT-DURATION PROJECTS WHEN GLOVE BAGS ARE NOT USED. GENERAL: 1. Employees who work with asbestos must receive training in asbestos hazards before the initial assignment and annually thereafter. 2. Personnel in the general area must be notified that asbestos work is in progress. 3. A specific job procedure must be written before beginning the job. SAFETY: 1. Safety equipment required by the job location must be worn. 2. An. approved respirator must be worn during material removal and cleanup. Employee must have completed the mandatory fit test within the last 6 months. Contact (409) 238-3536 for information. 3. Disposable coveralls with attached boots and hoods must be worn during cleanup and removed, operations. Coverall boots may be worn over work shoes or inside rubber boots. 4. Vacuum and local exhaust ventilation systems must be equipped with HEPA filters. --- - 5. Personnel monitoring must be done at the beginning of each job unless personnel wear supplied air respirators, or previous personnel monitoring of similar jobs shews 8 hour TWA exposure potentials less than 0.1 fiber/cc. Contact Industried. Hygiene Services (409) 238-1281 for information. 6. Water for wetting must contain a surfactant. 7. Local exhaust ventilation must be provided for hand operated or pewer operated tools (such as but not limited to, saws, scorers, abrasive wheels, and drills) if the use of these tools would cause potential exposure levels to equal or exceed 0.2 fibers/cc 8 hour TWA. The efficiency of local exhaust ventilation systems must be verified by Industrial Hygiene Services. REGULATED AREA: 1. A regulated area must be established and asbestos warning signs posted to restrict access to authorized personnel only. 2. Area must be cleaned of existing asbestos contamination and other debris. 3. Portable objects must be removed to prevent contamination. 4. Coverings must-be placed over remaining objects and underneath the work area. Scaffold landings must be covered. Materials must not be dropped to the ground. Pre-job planning must include provisions for keeping deteriorated material in place after jacketing is removed. < 5. Mini-enclosures or negative pressure enclosures must be used for jobs whenever feasible if the potential exposure level may equal or exceed 0.2 fibers/cc 8 hour TWA (local exhaust ventilation or other engineering controls methods may eliminate the need for enclosures.) -26- ST0073 I 70 SECTION X Snail Scale Asbestos Abatement Minimum Requirements Page 2 REMOVAL: 1. The materials must be wet down before, during, and after removal to prevent airborne emissions. Materials must be thoroughly wetted, but not to the point that they crumble and turn to mush. Wetting of material may be eliminated if water is not compatible with the process, or materials/equipment may be seriously damaged, or local exhaust ventilation reduces the potential exposure limit below 0.2 fibers/cc 8 hour TWA. 2. Material must be removed and placed into labeled polyethylene bags or containers approved by Environmental Operations. Bags or containers must be lowered to the ground, not dropped. 3. The surface from which asbestos has been removed must be wetted and cleaned. 4. Exposed asbestos must be encapsulated at terminations. 5. After asbestos removal, a thorough inspection and cleanup of the area must be conducted. Pick up and dispose of coverings and double bag contaminated or broken bags. Vacuum the work area as required. 6. All items removed from the regulated area must be decontaminated. 7. Disposable coveralls, exposed area of skin and respirator must be vacuumed and boots must be decontaminated each time before exiting the regulated area. 8. Disposable coveralls must be disposed of in a sealed asbestos waste bag. 9. Work clothes must be vacuumed off. 10. All materials used to establish the regulated area must be removed. 11. Bags or containers must be transported to the dempster or collec tion area. -27- SECTION X CONSTRUCTION OF MINI-ENCLOSURE (SMALL-SCALE, SHORT-DURATION JOB) 1. AFFIX 6-MIL THICK POLYETHYLENE SHEETING TO WALLS WITH SPRAY ADHESIVE AND TAPE. 2. COVER THE FLOOR WITH PLASTIC AND SEAL TO THE PLASTIC ON THE WALLS. 3. SEAL ALL PENETRATIONS SUCH AS PIPES OR ELECTRICAL CONDUIT WITH TAPE. 4. CONSTRUCT A SMALL CHANGE ROOM OF 6 MIL THICK POLYETHYLENE PLASTIC CONTIGUOUS TO THE MINI-ENCLOSURE. THE WORKER USES THE CHANGE ROOM TO VACUUM OFF HIS PROTECTIVE COVERALLS AND REMOVE THEM BEFORE LEAVING THE WORK AREA! ST0073I 7 I TOP VIEW SCHEMATIC OF MINI-ENCLOSURE WORK AREA | CHANGE I I ROOM SIDE VIEW 1 PLASTIC CURTAIN \ -1 VACUUM HOSE PLASTIC CURTAIN PLASTIC CURTAIN WORJC AREA CHANGE ROOM CAUTION CONTAINS ASBESTOS V VACUUM BOSE -28- SECTION X ASBESTOS ABATEMENT MINIMUM REQUIREMENTS IARGE SCALE, LONG DURATION PROJECTS. GENERAL; 1. The Superintendent/owner must contact Environmental Services (2414) a minimum of 25 days prior to starting asbestos removal work and specify a project supervisor. 2. Hie project supervisor must provide a written Safe Work procedure specific for each job which includes as a minimum the Safe Work procedures listed below. 3. Hie project supervisor must meet with the industrial hygienist, safety director for the area, and personnel performing the job to discuss the Safe Work procedure and arrange for audit and monitoring. > 4. Hie project supervisor must arrange to have a "Competent Person" for the job. If work is contracted, the contractor must also provide a "Competent Person" to supervise the job. 5. Employees who work with asbestos must receive training in asbestos hazards before the initial assignment and annually thereafter. 6. Personnel in the general area must be notified that asbestos work is in progress. ST0073I 72 SAFETY; 1. Safety equipment required by the job location must be worn. 2. An approved respirator must be worn during material removal and cleanup. Employee must have completed the mandatory fit test within the last 6 months. Contact (409) 238-3536 for information. 3. Disposable coveralls with attached boots and hoods must be worn during cleanup and removal operations. Coverall boots may be worn over work shoes or inside rubber boots. 4. "Street clothes" must not be worn underneath disposable coveralls. 5. If work clothing is worn underneath, it must be left in the "dirty roam" of the decontamination facilities. Contaminated clothing for laundering must be contained in a sealed asbestos waste bag and laundered in a manner which will minimize the release of asbestos fibers. Personnel laundering asbestos contaminated clothing must be informed of this requirement. 6. Vacuum and local, exhaust ventilation systems must be equipped with HEPA filters. 7. Personnel monitoring must be done at the beginning of each job unless glove bags are used or personnel wear supplied air respirators or previous personnel monitoring of similar jobs shows 8 hour TWA exposure potentials less than 0.1 fibers/cc. Contact Industrial Hygiene Services (409) 238-1281 for information. 8. A decontaminaticxTarea must be provided. It must be contiguous to the regulated area if feasible. Egress to the regulated area must be through the decontamination area. 9. Water for wetting must contain a surfactant. 10. local exhaust ventilation must be provided for hand operated or power operated tools, such as but not limited to, saws, scorers, abrasive wheels, and drills if the use of these tools would cause potential exposure levels to equal or exceed 0.2 fibers/cc 8 hour TWA. The efficiency of local exhaust ventilation systems must be verified by Industrial Hygiene Services. 11. An Asbestos Safety Checklist must be completed for each job. -29- Z L 1GL001S SECTION X Large Scale Asbestos Abatement Minimum Requirements Page 2 REGULATED AREA: 1. A regulated area must be established and asbestos warning signs posted to restrict access to authorized personnel only. 2. Area must be cleaned of existing asbestos contamination and other debris. 3. Portable objects must be removed to prevent contamination. 4. Coverings must be placed over remaining objects and underneath the work area. Scaffold landings must be covered. Materials must not be dropped to the ground. Pre-job planning must include provisions for keeping deteriorated material in place after jacketing is removed. 5. Glove bags, mini-enclosures or negative pressure enclosures must be used for jobs whenever feasible if the potential exposure level may equal or exceed 0.2 fibers/cc 8 hour TWA (local exhaust ventilation or other engineering controls methods may eliminate the need for enclosures). REMOVAL; 1. The materials must be wet down before, during, and after removal to prevent airborne emissions. Materials must be thoroughly wetted, tut not to the point that they crumble and turn to mush. Wetting of materials may be eliminated if water is not compatible with the process, or materials/equipment may be seriously damaged, or local exhaust ventilation reduces the potential exposure limit below 0.2 fibers/cc 8 hour TWA. 2. Material must be removed and placed into labeled polyethylene bags or containers approved by Environmental Operations. Bags or containers must be lowered to the ground, not dropped. 3. The surface from which asbestos has been removed must be wetted and cleaned. -- 4. Exposed asbestos must be encapsulated at terminations. 5. After asbestos removal, a thorough inspection and cleanup of the area must be conducted. Pick up and dispose of coverings and double bag contaminated or broken bags. Vacuum work area as required. 6. All items removed from the regulated area must be decontaminated. 7. All materialsoused to establish the regulated area must be removed. 8. Bags or containers must be transported to the dempster or collection area. 30- ST0073 I 7U SECTION X TYPICAL DECONTAMINATION AREA LAYOUT WORK AREA DOUBLE FLAP EQUIPMENT/DIRTY CHANGE ROOM DOUBLE FLAP SHOWER f DOUBLE FLAP_________ r Z________ ZZj CLEAN ROOM L DOUBLE FLAP t -31- SECTION X DECONTAMINATION AREA (CONTIGUOUS TO WORK AREA) ROPED-OFF OR NEGATIVE PRESSURE ENCLOSURE ST0073175 ENTRY 1. ENTER DECONTAMINATION AREA THROUGH CLEAN ROOM. 2. REMOVE AND DEPOSIT "STREET CLOTHES" IN LOCKER. 3. PUT ON PROTECTIVE CLOTHING AND RESPIRATORY PROTECTION (STRAPS UNDER HOOD). 4. PROCEED THROUGH THE DECONTAMINATION AREA INTO THE REGULATED AREA. EXIT -- 1. REMOVE GROSS CONTAMINATION FROM SUIT. 2. REMOVE PROTECTIVE CLOTHING IN EQUIPMENT/DIRTY CHANGE ROOM AND DEPOSIT IN LABELED IMPERMEABLE BAGS. 3. WEAR RESPIRATOR INTO SHOWER AREA. 4. SHOWER BEFORE ENTERING CLEAN ROOM. 5. PUT ON STREET CLOTHES. 6. EXIT DECONTAMINATION AREA. -32- section X DECONTAMINATION AREA (At a Remote Location) ST0073 176 CLOTHING AND EQUIPMENT. 2. REMOVE CONTAMINATED CLOTHING. 3. PUT ON CLEAN SUIT AND PROCEED TO DECONTAMINATION AREA WEARING RESPIRATOR. 4. DEPOSIT CLOTHING IN DIRTY CHANGE ROOM. 5. WEAR RESPIRATOR INTO SHOWER AREA. 6. SHOWER BEFORE ENTERING CLEAN ROOM. 7. EXIT DECONTAMINATION AREA. ENTRY 1. ENTER DECONTAMINATION AREA THROUGH CLEAN ROOMT' - 2. REMOVE AND DEPOSIT "STREET CLOTHES" IN LOCKER. 3. PUT ON PROTECTIVE CLOTHING AND RESPIRATORY PROTECTION (STRAPS UNDER HOOD). 4. PROCEED TO WORK SITE AND ENTER ENCLOSURE/REGULATED AREA THROUGH EQUIPMENT ROOM. ST0073177 SECTION X EXAMPLES OF NEGATIVE PRESSURE SYSTEMS AB DF, Decontamination Facility; EU, Exhaust Unit; WA, Worker Access; A, Single-room work area with multiple windows; B, Single-room work area with single window near entrance; C, Large single-room work area with windows and auxiliary makeup air source (dotted arrow). Arrows denote direction of air flow. Circled numbers indicate progression of removal sequence. -34- ST 0073178 SECTION X ASBESTOS ABATEMENT MINIMUM REQUIREMENTS AUTOMOTIVE CLUTCH AND BRAKE REPAIR GENERAL* 1. Employees who work with asbestos roust receive training in asbestos hazards before the initial assignment and annually thereafter. 2. Do NOT use compressed air to remove asbestos materials or dust from brake drums or clutch housings. 3. Place polyethylene sheeting underneath the work area. SAFETY REQUIREMENTS: 1. Safety equipment required by the job location must be worn. 2. An approved respirator roust be worn during material removal and clean up. Employees must have completed the mandatory fit test within the last 6 months. Call 409-238-3536 for information. 3. Barricade area with yellcw tape or rope to limit access. REMOVAL 1. Two methods can be used to reduce exposure to asbestos fibers. The Enclosed Cylinder/HEPA Vacuum System Method and a wetting method. .. A. The Enclosed Cylinder/HEPA Filter Vacuum System Method consists of three components. * A wheel-shaped cylinder designed to cover and enclose the wheel assembly * A compressed-air hose and nozzle that fits into a port in the cylinder, and * A HEPA-filter vacuum used to evacuate airborne dust generated within the cylinder by the ccmpressed air. B. The wetting method consists of spraying water containing a surfactant to loosen the asbestos containing residue and to capture the resulting airborne particles in the water mist. * Begin spraying the asbestos-containing parts at a sufficient distance to ensure that the asbestos particles are not dislodged by the velocity of the water spray. * When the asbestos particles are thoroughly wetted, the spray will be brought closer to the parts and the parts will be sprayed as necessary to remove grease and other material. * The parts roust then be wiped with disposed, rags or towels which must be placed in a labelled plastic bag and sealed while they are still wet. -35- t ST0073 I 79 SECTION X ASBESTOS ABATEMENT MINIMUM REQUIREMENTS 2. Replaced brake shoes or pads, clutch plates, disposable rags or towels, polyethylene sheeting and other contaminated materials for disposed must be handled as asbestos waste. 3. When the job is completed, a thorough inspection must be made to ensure all asbestos contaminated materials have been picked up. Vacuum work area as required. -36- ST0073!00 SECTION XI ASBESTOS SAFETY CHECKLIST JOB DESCRIPTION___________________ LOCATION DATE PRE-JOB REQUIREMENTS: 1. Environmental Services contacted (ph 409 238-2414)? Yes No Name: Date: . Dew Project Supervisor: 2 Safe Work Procedure Written? Yes No Date: 3. Project Review Held? Industrial Hygienist: _________ Date:_______ Safety Director:_________________ Date:_______ Dew Competent Person:__________ Date:_______ Contractor Competent Person:_ Date:_______ Craftsmen:_________________________ Date:_______ Safe Work Procedure Approved: Yes No Hygiene Monitoring Required: Yes No Audit Required: Yes No Auditor Assigned________________ Fhone: JOB REQUIREMENTS: 1. Safe Work Procedure Reviewed: Yes No 2. Regulated Area Established and Signs Posted: Yes No Negative pressure enclosure established: Yes No Decontamination Area Established: Yes No 3. Personnel Trained: Yes No 4. Block Personnel Informed: Yes No 5. Auditor Notified: Yes No 6. Amended Water Available To Control Dust: Yes No 7. Has packaging of asbestos debris been decided upon? Yes No 8. Has Disposal Of Asbestos Debris Been Arranged: Yes No 9. Arrangements For Clean-up Made: Yes No 10. Safety Equipment Required: Safety equipment required by the location Approved respirator current fit test clean shaven __ Disposable coveralls with hood and boots ___gloves 11. Arrangements for laundering work clothes Yes No 12. Vacuum cleaners and local exhaust ventilation systems equipp* with HEPA filters Yes No Note: Work may commence when Safe Work Permit issued. 13. Final cleanup complete Yes No 14. Job complete: Dew Project Supervisor: Date: 15. Send completed checklist to Industrial Hygiene Services B-101. -37- ST0073 18 1 SECTION XII ASBESTOS ABATEMENT AUDIT CHECKLIST Job Description Date: Location:Removed, by: Company Name 1. Regulated Area Established and Signs Posted: Polyethylene or other coverings over floor & objects: YES YES NO NO 2. Decontamination Area Established: Contiguous Remote: location: YES NO Entry to work area only through decontamination area YES NO 3. Negative Pressure Enclosure Established: Floor Covered Weills Covered Area Ventilation OFF All Edges Sealed Penetrations Around Pipes and Conduit Sealed Entry Curtains Negative Pressure Achieved (-0.02" water) YES YES YES YES YES YES YES YES NO NO NO NO NO NO NO NO____ 4. Protective Eguipment: Disposable Coveralls with Hood and Boots Coveralls Unzipped, Tom, or Cut Coveralls Used One Time Approved Respirator Type Used Clean Shaven Straps Under Hood Safety Equipment Required by Location: Hard Hat Safety Glasses Goggles YES YES YES YES YES YES YES YES YES NO NO NO NO NO NO NO NO NO -38- SECTION XII ASBESTOS ABATEMENT AUDIT CHECKLIST 5. Work Practices: Material Worked Wet Material Kept Wet Until Bagged & Seeded Material Too Wet, Mushy Insulation Broken Intentionally Material Dropped to Ground Removed Material Promptly Bagged Bags Tom or Left Open Visible Emissions HEPA Filtered Vacuum Used Smoking, Eating, Drinking, Chewing, Cosmetics Personnel Decontaminated Each Departure Shower Used by All Personnel Exposed Asbestos at Terminations Sealed with Encapsulant Work Area Cleaned After Completion Personnel Monitoring Initial Monitoring Daily Monitoring Area Monitoring Contractor Dew YES YES YES YES YES YES YES YES YES YES YES YES YES YES NO NO NO NO NO NO NO NO NO NO NO NO NO NO YES YES YES NO NO NO COMMENTS: ST0073I 82 SIGNATURE: ___________^__________________________________ Industrial Hygienist/Safety Director cc: Project Supervisor Area Cwner Safety Director Industrial Hygienist Manager, Industrial Hygiene Services 1/25/87 db -39- ST0073183 APPENDIX A APPROVED EQUIPMENT The equipment listed below has been approved for the specific use, but is not necessarily the only equipment available. Equipment which is not listed should not be purchased unless it fulfills same specific need which is not fulfilled by listed items and has been specifically approved by the Texas Operations Protective Equipment Committee. For information call 5034. Personnel should be fitted with a respirator before ordering. Call 3536 for information. I. Respiratory Protection for Asbestos Fibers Airborne Asbestos Concentration Approved/Required Respirator Supply Source Stock Number Respirator Cartridge < 2 fibers/cc Half-mask MSA Comfo II Snail Medium large Stores 01-04122 01-04124 01-04126 01-04252 01-04252 01-04252 Wilson 6100 Small Medium Large Stores 01-04280 01-04282 01-04284 01-04285 01-04285 01-04285 < 10 fibers/cc A.O. Star 5 Snail Medium Large (American Optical) Safety 01-04173-000 Shoe 01-04173-010 Dist. 01-04173-020 Full facepiece/cartridge 01-040680-500 01-040680-500 01-040680-500 Scott-O-Vista Stores 01-04335 01-04196 A. 0. Star 7 Stores 01-04190 01-04068-500 Racal/Be3/P3 Stores 01-04800 01-04810 < 20 fibers/cc Positive pressure respirator: Full face powered air-purifying respirator MSA Racal EE7/P3 Stores 01-04128 01-04805 01-04132 01-04810 Full Face Mask Supplied Air: Scott-O-Vista MSA Racal Dual-Air Stores Stores Vallen 01-4630 01-04130 01-04808 NA NA NA -40- APPENDIX A ST0073184 II. Respiratory Protection for a Combination of Chemical and Asbestos Airborne Asbestos Approved/Required Supply ConcentrationRespiratorSource Stock Number Respirator Cartridge* < 2 fibers/cc Half-mask A. O. Star 5 Safety Shoe Distributors (233-0605) R53AGHE R510VHE R530VAHE Wilson Stores 6100 01--042860VAGHE < 10 fibers/cc Full-Facepiece A. 0. Star 7 Safety Shoe Distributors R7700 Scott-O-Vista Vallen 80217001 R53AGHE R510VHE R5300VAHE 642AGHE** 6420VHE** 6420VAGHE** * . . . .... AGHE - Acid Gas Cartridge & High Efficiency Filter OVHE - Organic Vapor Cartridges & High Efficiency Filter OVAGHE - Organic Vapor and Acid Gas & High Efficiency Filter III. Clothing: The following list of protective clothing has been shewn to be impervious to asbestos fibers. Tyvek Disposable Paper Coveralls with attached Hood and Boots Small 01-03551-001 Medium 01-03552-001 Large 01-03553-001 Extra Large 01-03554-001 **To use these cartridges an adaptor must be used. Vallen order number is 80245101.