Document yr2y3016X5kO5eXDaRK3zmqvD
MAINTENANCE DEPARTMENT ASBESTOS REMOVAL GUIDELINE
I. PURPOSE
This Guide describes practices to be used when removing
asbestos-containing material.
11
policy
.^
L
To safeguard employees from exposure to asbestos materials
which may be hazardous to their health. III. GUIDE
When insulation removal is required, the maintenance foreman
will do the following:
A. Determine if the insulation contains friable asbestos
material. If unable to determine, take a sample to
hygiene lab. Sample must be properly tagged identifying
equipment to be stripped, __ If work must proceed then wear
personal protective equipment and treat as if insulation
is asbestos until results of sample is given.
__
B. If the insulation contains friable asbestos material the
Maintenance Foreman must: .
1. Communicate to employees doing the work the hazards
and procedures for personal protection, housekeeping and disposal of waste when working with asbestoscontaining material.
2. Fill out and post in the area the asbestos insulation removal permit form Q-1002. If barricades are
necessary make sure barricades are sufficient to pro tect other personnel.
6113 19197
MON-305
c
2- -
C
3. When job is completed the Maintenance Foreman must
complete removal permit form Q-1002 and send to
Insulator Foreman.
C. If insulation contains friable asbestos material, when
stripping the Maintenance personnel must:
1. Post asbestos warning signs around the area where
asbestos-containing materials are being stripped.
Barricade where necessary to protect other personnel.
2. Wear approved respirator or mask (mask available at
Insulator Shop). Respirator A.O.-R5000 R30 filter
mask 3M non-toxic partical mask #8710.
3. Wet down material to be stripped if temperature is
above 32F or 0C. Material must be kept wet while
handling. Iflpipes can be taken down in sections
and insulation is contained in a covering, it does not need to be wet down but protective equipment '
must be worn. After removal of section, pipe should
be taken to Insulator Shop for stripping.
t
4. Asbestos material that has been stripped overhead
shall be transported to the ground in impermeable
(plastic) sealed bags; do not drop to the ground.
5. Collect all asbestos-containing material in impermeable
(plastic); bags. Seal the bags and place in load lugger located at CAC Spill Control Basin. Material
must be kept wet during stripping and handling if temperature is above 32F or 0C.
6113 19198
c
-3-
c
6. Clean up area by use of a vacuum or wet area and sweep, never dry sweep asbestos-containing material.
7. Notify the Environmental Group for disposal of asbestos.
8. Upon completion of stripping and before taking a shower, remove clothing, place in a plastic bag. Close the bag with a warning tag and place bag in container marked for asbestos contaminated clothing.
9. A shower must be taken upon completion of stripping. Also a shower and change of clothing will be taken before going "to lunch when stripping asbestos.
/vmg Rev. 6/15/83
Bob Bishop
*
6113 19199
.-s
cc
ASBESTOS REMOVAL PERMIT
Q-1002 DEPARTMENT ____________________________________ AUTHORITY FOR RETIREMENT NUMBER ________ _ PAFE/MWO NUMBER ____________________________ ___ QUANTITY OF ASBESTOS CONTAINING MATERIALS TO BE REMOVED
Pipe Sizes and Approximate Lengths:
Other Asbestos Containing Materials Approximate Area ,,
Warning Signs Posted inArea Containers Available for Disposal Insulator Wearing Respirator or Mask . Materia] Wetted Down before Removal Time and Date Started Time -Date I f no to any of the above explain _
YES ____
NO __
____
__
t-
After job is completed fi11 in the following and send to the insulator foreman:
Time and Date Completed
CTime Date
Material Placed in Container
YES ____
NO
PC&D Notified of Location
Revised V79
6113 19200
Signature
Date
cc
OSHA WILL ACCELERATE RULEMAKING ON ASBESTOS, AUCHTER ANNOUNCES OSHA HEAD THORNE AUCHTER HAS TOLD LABOR REPRESENTATIVES THAT HIS AGENCY WILL ACCELERATE RULEMAKING ON A 1975 PROPOSAL TO LOWER THE CURRENT EXPOSURE LIMIT FROM 2.0 TO 0.5 FIBERS PER CUBIC CENTIMETER. IN TWO SEPARATE LETTERS -ONE TO SHELDON SAMUELS, DIRECTOR OF HEALTH, SAFETY, AND ENVIRONMENT AT THE AFL-CIO INDUSTRIAL UNION DEPARTMENT. AND THE OTHER TO GEORGE H. R. TAYLOR, DIRECTOR OF THE UNION'S SAFETY AND HEALTH DEPARTMENT -- AUCHTER SAID OSHA WILL ISSUE A PUBLIC NOTICE SOON UPDATING THE 1975 PROPOSAL, HOLD RULEMAKING HEARINGS, AND PUBLISH A FINALRULE BY FALL. AUCHTER'S LETTERS CAME IN RESPONSE TO A TELEPHONE CALL BY SAMUELS AND A LETTER BY TAYLOR. IN TAYLOR'S LETTER, HE CHARGED THAT THOUSANDS OF WORKERS EXPOSED AT OR BELOW THE PRESENT LIMIT WILL DIE OF ASBESTOS-RELATED DISEASE. AUCHTER TOLD THE OFFICIALS, "I FULLY AGREE WITH YOU THAT REVISION OF THE ASBESTOS STANDARDS IS A PROJECT WHICH DESERVES HIGH PRIORITY."
6113 19201