Document yqMBao3rEJb5OG3o91q9Bz5D
Ed Weaver, in cab of crane, moves 15 ton rough block for column cap sideways to the facing saw and starts lowering marble block.
f
moves pieces of marble, both small and large, to and from various fab ricating machines. Marble pieces range from rough blocks direct from the quarries to finished col umn caps and column segments. Column segments can run from 10 to 15 tons in finished weight. Other special pieces occasionally weigh close to maximum safe limits of the crane.
In the opening between the buildings, the crane unloads vary ing amounts of rough, heavy stock from rail cars and trucks, and also loads finished heavy material into cars and trucks for shipment.
The 36" diameter monolithic col umns across the east front of the Capitol in Washington, D. C., were all handled by this crane. Each finished column was 24 ft 9-9/16 inches high.
Currently the mill is fabricating the segmented columns for the main portico and entrance of the New House Office building in Washington. Six segments will make up each column. Diameters run from 5 ft 6 inches at the base to 4 ft 11 inches at the cap. The Shaw-Box Crane handles all these segments in and out of the mill from rough quarry stock through all the fabricating processes.
Positive control and smoothness in action are most important in handling this type of material in its finished state. A chipped or cracked piece of finished material can represent a substantial loss
Care must be exercised especially in the loading and shipping opera tion.
The size and weight of the mate rial handled varies greatly. This crane is used extensively for the heavier work, but between such lifts it assists in moving much of the smaller and lighter work.
"In the normal operation of the crane, we have been able to demonstrate its efficiency and ver satility by using it both inside and outside the mill to lift heavy ma
terial. The crane has had many heavy, near capacity, lifts. Among these were several large pieces of Tennessee marble which weighed in at over 19 tons each. These were for the new Smithsonian Institu tion building currently being con structed in Washington. It iiftec these blocks with no trouble. I: runs smoothly and quietly and at all times gives us positive control over our lifting problems," states Mr. Wilbur Hattendorf, plant man ager at Nelson.
Column segment being lifted and shifted from one point in the mill to another. Segment weighs about 1 5 tons
SOUTHERN POWER & INDUSTRY for OCTOBER, 1962
RS-259
R8-000224 1/17/02
NUECES
Pensacola Paper Mill
Four Problems
Licked By
One Installation
s; &
By H. R. EMERY, Executive Power Engineer
.4 and
C. S. ANDERSON, JR., Assistant Plant Engineer
THE PENSACOLA St. Regis Paper Mill had, through recent years
of increasing production, developed steam and electric power shortages which resulted in a study being made of the present and future power potential. The problems were as follows:
1. Steam was in short supply re sulting in overloading of the exist ing boilers, and a lack of outage
24
time for proper maintenance. 2. The existing bark burners
were inadequate to burn available bark, creating a disposal problem. In addition, two of these boilers were low pressure units. Their use cut down on the electric power that could be generated in the non condensing sections of the extrac tion turbine, thus further overload ing condensers.
3. The current electric power supply was limited. Relatively high cost power had to be pur chased to supplement St. Regis generation.
4. Continued production in creases resulted in further aggra vation of all of the above prob lems.
The Solution
RS-000226
1/17/02 NUECES
A study was made by the mill power engineer, which considered all of the above needs in addition to predicting the expected power requirements for the ultimate ca pacity of the existing mill. This study indicated that the installa tion of a bark burning and gas or oil fired boiler, operated at the 400 psig pressure level, would relieve the immediate steam and bark burning capacity limitations. De signing the boiler for future 1250 psig and 900 F operation would fit in with plans for a future topping turbine, which might well be in stalled along with a high pressure recovery boiler.
Based on this study, manage ment approved the installation of a bark burning boiler as a first step of this program.
Jackson and Moreland, Inc. was selected as the consulting firm. A 250,000 pound per hour Riley boil er for combination bark and gas or oil firing was purchased.
The boiler, arranged to op erate at 450 psig and 650 F
SOUTHERN POWER t> INDUSTRY for OCTOBER, 1962
Ij-Two flare type burners are in i'.stalled In each furnace side-
wall. Firing aisle view shows four pneumatic distributors.
'1
'and designed for future opera[tion at 1250 psig and 900 F, is
equipped with a 17' wide by 19' (long Riley traveling grate spread er stoker. The twin type grate is powered by two Riley hydraulic drive units. The unit has a capacity for burning 46,000 lb of bark per hour. Four Riley flare type burners installed in furnace side walls are designed for future conversion for pulverized coal firing.
A Riley overfire air and cinder return system complete with three sand separators handles refiring from boiler and dust collector hop
pers. Bark handling equipment, select
ed to handle bark directly as it comes from the barking drums with a minimum by-pass storage provided, consists of a Montgomery Eat-Rite hog, which discharges to !a Merrick 30" weighing belt con veyor. This conveyor feeds a ed *25 x 30 Radar wood waste feeder, It which supplies bark through a cy at clone to a Carrier vibrating con ol veyor bark proportioner. The protes portioner distributes the bark in- evenly to four Riley pneumatic distributors.
Other auxiliary equipment, in cluding a 700 gpm Cochrane deminerslizer, was selected and the installation was made by Mid-Val ley, Inc.
The Result
In the first eight months of op eration the results indicated that :he boiler would fulfill all primary *oals of the installation.
Burning the total mill produc;ion of bark with make-up gas fuel to meet steam load demands, he unit has accounted for an 11.5% eduction in purchase fuel required or steam generation. This has >een realized by increased utilizaion of available bark fuel as well is increased efficiency of bark aiming.
The 250.000 lb per hour boiler ias operated at 275,000 lb per hour or periods up to 10 hours and over 00,000 lb per hour for periods up D 1 hour in 24 hours.
The two i,ow pressure steam generators along with an older bark burning boiler have been retired from service which results in higher availability of by - product power from process steam requirernents. Excessive overloads on previously existing power boilers have been eliminated, and the additional steam generating capacity has permitted maintenance shutdown of any other single boiler without curtailmen: of production.
Although severe abrasion due to sand laden bark has been observed
in the hog and pneumatic conveying system, recent fire side inspection of the boiler from grate to stack disclosed no concentration of wear and no significant abrasion,
After six months operation with demineralized make-up, internal inspection of both new and existing boilers indicates a gratifying improvement in boiler water conditions.
The plant personnel is well satis- tied with the new steam generator * installation and its associated
equipment.
23 OUTHERN POWER & INDUSTRY (or OCTOBER, 1962
RS-000226
1/17/02 NUECE8
25
I
Cose 3 -- Southern Paper Mill
loop control, matching the rate of
withdrawal of material from the
hopper so that the scale beam re
Continuous Feeders
mains in balance at all times. The hopper and feed mechanism
are completely enclosed and the
Provide Accurate Control of Chemicals
scale beam and control system are not subjected to chemical corro
sion. There is, therefore, no chance
for chemical to escape into the
room where it might be dangerous
A SOUTHERN paper mill recently at all times, and the entire hopper to operating personnel or equip
completed construction of ex is mounted on a beam scale system. ment. Since the material is kept
panded facilities for the manufac The rate of material feed is de under control at all times, there
ture of groundwood pulp. As part termined by retracting the beam is no possibility for cumulative
of a program to improve quality poise at the rate desired and, weighing or feeding error and the
of their product, the mill was through a simple mechanical closed optimum accuracy is achieved.
equipped with multiple stage pulp
bleaching for better brightness of
the finished papers. Equipment to provide a continu
Case 4 -- Texas Aluminum Plant
ous hvdrosulfite and a continuous
peroxide bleach stage was in stalled, with the arrangement
Paint Lives 10-Years on Hot Surfaces
suitable for use of either or both
stages. The quantities of chemical THIS PROGRESS report brings up-
J. M. Hammock, vice-president
involved indicated that savings
to-date information on the con of Briner Paint Co. of Corpus
could be effected by taking ad dition of engine exhaust stacks at Christi, Texas stated that in 1952.
vantage of bulk container ship Reynolds Metals Company's San three stacks were painted by three
ments and utilizing high accuracy
Patricio plant near Corpus Christi. different procedures and observed
leedmg equipment. Since these Texas. This was the first job treat for five months. "At the end of that
chemicals are extremely active oxi ed with the Bnner Silicone Sys period, one stack was far superior
dizing agents, the feeders had to tem.
to the others in condition and this
provide accuracy and safety in
Painted 10 years ago. the present method was chosen for application
handling of the materials.
report estimates that the finish will to all.
The plant installed an Omega require only minor touch-up by
"On the 42 Cooper Bessemer
l.oss-In-Weight gravimetric feeder
1964. Previous to that application,
stacks, we sandblasted to white
or each of the chemicals. The a 90 day life tor paint on exhaust metal and applied one coat of Brin
feeders (supplied by B-I-F Indus stacks was considered an excellent er Silicone Primer #2905 to the
tries keep the chemicals enclosed
record among diesel operators.
cold stack. We then ran the engine
26
RS-000227 1117/02
SOUTHERN POWER & INDUSTRY for OCTOBER, 1962
NUECES