Document ypzKEzNX5DwBXMkVOrDEqoQQ2

976 CHAPTER 47 1950 Guide Report on Relative Performance of Air FilteiB, by Mechanical Division, Association of American Ratl> Air Conditioning of Rftilroa4 Passenger Cars, by L. W. Wallace and G. G. Early, Jr. (A.S.MJZ. Transac tions, November, 1937). . .- _ , Passenger Car Cooling Methods, by Kenneth Cartwright {Refrigerating Engineering, February, 1936, p. 83 and March, 1936, p. 158). ,. _ . , . . ,, . . ,, . ,ftlA Diesel Drive for Passenger Air Conditioning, by J. R. Hornaday (Refrigerating Engineering, March/1942, P* ^Railroad Air Conditioning, by Gordon T. Wilson (Refrigerating Engineering, May, 1943, p. 323) Railway Air Conditioning, by M. R. Eastin (Railway Elec. EngrAugust-December, 1942). Head-End Power for Railway Cara, by F. L. Sahlmann and E. M. Bill (Railway Elec. Engr,, May. 1939). Head-End Power for Streamlined Passenger Trains, by J. D. Loftis (A.SJJJ2. Raleigh Section, October 26, 1946). p'C.C. Car Ventilation, B-3697 Westinghouse Electric Corp., September, 1946. Buses and Automobiles Bus Healing, by E. T. Todd and F. O. Gadd (Heating and Ventilating, Dec. 1946, p. 83). Air Conditioning of Automobiles and Buses, by L.- W. Child (Society of Automotive Engineers Journal, June, 1938). Bus Air Conditioning, by Jerry Hicke (Beating, Piping and Air Conditioning, October, 1938, p. 639). Bus Air Conditioning, by A. J. Mallinckroat and Lais Hanson (Refrigerating Engineering, June, ^ Problems ^ A;r Conditioning Automobiles, by F. J. Linsenmeyer (Society of Automotive Engineers Jour nal, July, 1939). Airplanes . Comfort in High Altitude Flying, by D. W. Tomlinson (A.S.H.V.E. Transactions, Vol. 47, 1941. d. 67) Heat HTffhftngpm Tar Aircraft, by Arthur J. Hess (Refrigerating Engineering, September, 1944, p. 192). Heat ing and Ventilating for Transport Airplanes, by B. M. Brod (A.S.H.V.E. Transactions, Vol. 52,1946). Com fort!xation of Aircraft, by Albert A. Amhym (Pitman Publishing Corp.. New York, 1945). . Refrigeration for Air Conditioning Pressurized Transport Aircraft, by B. L. Messinger (Heating and Ventilating, January, 1946, p. 63). Ships The Ventilation of Ships, by R. McDonald (Journal ofthe Institution of Heating and Ventilating Engineers ^FVentilation and Air Conditioning of the S. S. Panama (Heating and Ventilating, September, 1939, p. 47). Air Conditioning the New Mauretania (Heating, Piping and Air Conditioning, July, 1939, p. 431). Hooting,-Ventilating and Air Conditioning on Shipboard, by J. H. Clarke (Heating, Piping and Atr Con ditioning, August, p. 467; September, p. 529: October, p. 610, 1940). , Care of Cargo at Sea, by O. D. Colvin, W. H. E. Hahne, and M. R. Colby (Transaction* of the Society of Naval Architects and Marine Engineers, Part I, Vol. 46, 1938, p. 109; PartH, Vol. 49, 1941, p. 208). 'Ventilation of Ships, by J. Dawson (Journal of The invitation of Heating and Ventilating Engineers, Lon don, Vol. 10, June-July, 1942, No. HI, p. 89). ..... ,, Modern Marino Engineers Manual. Vol. H, Sections 16 to 19, Ind. (Cornell Maritime Press, 1943). Warship Ventilating, Heating and Air Conditioning, by Comdr. T. H. Urd&hl, U.S.N.R., and W. C. Whittlesey (A.S.H.VJE. Transactions, Vol. 49, 1943, p. 35). and I _ Warship 1 ......... - ---- --- -- -- -- . . . sey (Heating, Piping and Air Conditioning, August, 1943, p. 419). Ventilation and Heating of Maritime Commission Ships, by J. W. Markert (Heating and Ventilating, Feb ruary. 1943, p. 32). Why Ship Ventilation, by J. W. Markert (Heating and Ventilating, October, 1943). Evo lution of Stupe Ventilation Systems, by J. W. Markert (The Lag, 1944 Yearbook, p. 202). Refrigeration, Air Conditioning, Ventilation and Heating, by H. E. Parker (Marine Engxnea^ng, Vol. II, The Society of Naval Architects and Marine Engineers, 1944, Chapter VI, p. 319). Blackout at Sea, by J. W. Markert iBsating and Ventilating, March, 1944, p. 55). Your Merchant Marine Will be Comfort Air Conditioned, by J. W. Markert (Heating and VeniUatingt_May, 1945, p. 60). XT . 1ft._ Modem Air Conditioning, by J. W. Markert (Marine Engineering and Shipping Review, November, 1945,. P* Modem Marina Refrigeration and Air Conditioning, by W. H. Carrier and L. E. Star (Marine Engineering and Shipping Review, April, 1946, p. 132). __ \ .,, , ,, ,, . Dehumidification Protects U. S. Navy's Inactive Fleet, by Capt. T. H. Urdahl and Comdr. E. R. Queer (Heating, Piping and Air Conditioning, March, 1946, p. 71). Reconversion of TWy S. S. Lurline, by Robert Tate (Society of Naval Architects and Marine Engineers, ^A^donditioning of P-2 A n^rimn President Liners, by J. W. Markert (Poetic Marine Review, August, 1946). Export Una. Air Conditioning of Four Aces, by J. W. Markert (Marine Engineering, March, 1949). , CHAPTER 48 WATER SERVICES Estimate of Demand Load and Pipe Capacity, Sizing Cold Water Supply Piping, Cooling Water Piping, Heating Load and Storage Capacity, Methods of Heating Water, Computing Heat Transmitting Surface, Hot Water Supply Piping, Control of Service Water Temperature, Safety Devices, Solar Water Heaters, Domestic Hot Water by Heat Pump PROPER design of the water distributing system in a building is neces sary in order that the various fixtures may function properly. The amount of either hot or cold water used in any building is variable, de pending on the type of structure, usage, occupancy, and time of day. It is necessary to provide' piping, water heating, and storage facilities of sufficient capacity to meet the peak demand without wasteful excess in either piping or equivalent cost. Many of the data on the sizing of the water supply pipes have been taken from various reports of the National Bureau of Standards.1 ESTIMATE OF DEMAND LOAD AND PIPE CAPACITY The demand load in building water supply systems cannot be deter mined exactly and is not readily standardized. The two main problems to be considered are: (I) the satisfactory supply of water for a given fixture and (2) the number of fixtures which may be assumed- to be in use at the same time. The minimum flow that will be satisfactory to the consumer depends greatly on the consumer, his standard of living, his professional needs, size of family, garden requirements and similar factors. Depending on these factors, per capita water consumption for domestic use usually varies between 30-80 gal per day. Table 1 gives the rate of flow desirable for many common types of fixtures, and the average pressure necessary to give this rate of flow. The pressure necessarily varies with fixture design; with some, a much greater pressure is necessary to give the same rate of flow than with others. In general, the lower the quality of the faucet the greater will be the pressure required. In estimating the load, the rate of flow is frequently computed in fixture units. One fixture unit is equivalent to 7.5 gal per min. Table 2 gives the demand weights in terms of fixture units for different plumbing fix tures under several conditions of service, and Fig. 1 gives the estimated demand in gallons per minute corresponding to any total number of fix ture units. Fig. 2 shows an enlargement of Fig. 1 for a range up to 250 fixture units. The estimated demand load for fixtures used intermittently on any supply pipe will be obtained by multiplying the number of each kind of . fixture supplied through that pipe by its weight from Table 2, adding the products, and then referring to the appropriate curve of Figs. 1 or 2 to find the demand corresponding to the total fixture units. In using this method it should be noted that the demand for fixture or supply