Document ypqgBpQ7j3g26Y193dEBxjXQd

internal correspondence \ CEIVEP FEB 11^85 R. C. WISE uc :<v- 2 ' *\f'- SOLVENTS AND COATINGS MATERIALS DIVISION Energy Systems Department________________ P' m*.*" TEXA` C,TV> TE*A* 7?59 rt 11 t IV t U DATE: TO: January 31, 1985 Mr. B. V. Binford - 511 Mr. D. C. Kirby - Ml Mr. 6. D. Twaii - 511 FEB 11 1985 0. H. CUNNINGHAM COPY: Mr. J. W. Beard - 511 Mr. T. 0. Blum Mr. G. G. Cochran Mr. V. D. Dutcher - B03 Mr. R. V. Klein Mr. J. B. Leverton Mr. F.C. Phinney Mr. J. M. PouTson - 51? Mr. F. S, Proveniano Mr. D. T. Matters - 511 Mr. H. M. Wegert - 511 Mr. R. C. Wise - 803 Mr. R. 1. Yelton - 500 SUBJECT: Response to OS/HS Mo. 3 Powerhouse - Texas City Plant ! Gentlemen: The attached is the 1984 4th Quarter update to the concerns from the Operational Safety/Health Survey at No. 3 Powerhouse. Again, let me thank you for a fine job. The Implementation of the items identified in your survey will contribute significantly to the safety of our operation at No. 3 Powerhouse. Very truly yours, KWK/pd KK2851 Attachment K. W. Klyng UCC 022253 I PLAINTIFF'S exhibit UC-4037 HL.l Knockout Pots - Cont'd Response The drafns will be re-routed to one unit blowdown pot minimizing any possible personnel exposure. Completion Date: Complete Responsibility: G. G. Cochran HI,2 Removal of Asbestos-Containing Insulation Asbestos-containing insulation Is still present In the No. 3 Powerhouse facility. Some activities require that this insulation be stripped. When the maintenance department Insulator strips asbestos-containing insulation. OSHA CFR 1910.1001 regulations are reported to be followed. However, employee exposure to ambient concentrations of asbestos fibers have reportedly occurred at times when: 1) Unit personnel disregard the barriers installed around the area where asbestos-containing insulation is being removed. 2) Maintenance personnel other than insulators unintentionally strip asbestos-containing insulation. 3) Insulator's outer clothing which Is contaminated with asbestos fibers is not properly removed. 4) Winds carry the asbestos fibers outside the area that Is barricaded for the removal operation. Reconroendation Continue emphasizing to unit personnel the Importance of obeying barriers and the importance of following established procedures when removing asbestos-containing Insulation and when removing asbestos-contaminated clothing. When the insulation material 1$ unknown, the Insulation should be treated as though it contains asbestos. Response All personnel in the area will be removed from roped off. areas during removal of asbestos insulation. Completion Date: Complete Responsibility: B. Vyvial 1549D UCC 022254