Document ypmyBEj3g607DBLME02mgoam6
FRIDAY, APRIL 6. 1973
ENVIRONMENTAL PROTECTION ' AGENCY
NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS
AibeiloJ, Beryllium, and Mercury
8820
T TJtla 40--protection of Dwlroomant
CHATTER 1--ENVIRONMENTAL
rKOTtCnON AGENCY
suacMAPTTR c--Am moauut
PART 61--NATIONAL EMISSION STAND ARDS FOR HAZARDOUS AIR POLLUTANTS
Atbnlot, Btfyfflum, and Mamury
On March 31. 1971 436 PIT S93l. pur suant to section 113 of the Clean Air Act. as amended, the Administrator published an Initial list of three haxardous air pol lutants which. In his judgment may cause, or contribute to. an Increase In mortality or an Increase In serious Ir reversible. or Incapacltatlnc reversible. Illness. The pollutants were asbestos, beryllium, and mercury. On December 7. 1971 <36 m 332391. the Administrator proposed standards for these pollutants.
Interested persons participated la the rulemaking by giving testimony at public hearings and by scodlns comments to EPA Public heartngx were held to New York City on January 16. 1973. and to To* Angeles on February 16 and 16.1971. A third hearing. scheduled to be held In Kansas City, on February 1. 1973. was canceled because of a lack of requests to participate. Sixty-eight persons yae* testimony at the public hearings, and 56 persons sent comments to EPA. Repre sented were Industries, universities, govemmental scenclea--Federal. Slate, and local, and environmental croups. Copies of the public hearlnc records are avail able at all ETA Rcclonal Offices and at the Division of Stationary Source En forcement. room 3230. 401 M Street 6W. Washington. D.C. 20460. where copies of the comments received are also available.
The bases for the Administrator's de terminations that asbestos, beryllium, and mercury are haxardous. the deriva tions of the standards now adopted, the Environmental Protection Agency's re sponses to the significant comments received, and the principal revisions to the proposed standards are summanred below. A more detailed statement Is available on request from the Emission Standards and Ehglnenng Division. En vironmental Protection Agency. Re search Triangle Park. N C. 27711. Atten tion: Mr. Don Goodwin. In addition, the Administrator Is Issutng Information co control techniques for asbestos, beryl lium. and mercury as directed by section U2tb><2> of the act. Copies of these documents may be obtained free of charge from EPA Regional Offices.
Asscstos
Asbestos Is a harardous air pollutant within the meaning of section 112. Many persons exposed to asbestos dust de veloped asbestosIs when the dust concen tration was high or the duration of ex posure was long (f-D. A large number of studies have shown that there Is an association between occupational ex posure to asbestos and a hlgher-thanexpeeted Incidence of bronchial cancer (2-JO). Asbestos also has been Identified as a causal factor In the development of mesotheliomas, cancers of the mem -
Refsrvooca at nU at artld*.
*utrs AND *ECUlATIONS
branc* lining the cheat and abdomen 36--471. Thera are report* of meaolhclloerva associated with nonorcupalional
exposure* to the neighborhood of as bestos source* ill. 42. 47. 4<>. An out standing feature has been the tong period, commonly over 30 years, between the first exposure to Jbevies and live ap pearance of a tumor <4. SOi. There Is evidence which Indicates that raeaothllomss occur after much leva exposure to asbestos dust than the cvtwwurv associ ated with asbratoa <11. 17).
It U Pot practicable, *1 this time, to establish allowable numerical cocieentrsllacv* or mass emission limit* for asbestos. Satisfactory means of measuring ambient asbestos concentrations Ivave only re cently been developed, and satisfactory mesas of measuring asbestos emissions are still unavailable. Kwn If satisfactory mnsrv* of measuring asbestos emissions 4hd exist, lbs previous unavailability of a satisfactory means of measuring ambient levels of asbaslos makes It Impossible to estimate even roughly the quantitative relationship bclsrcen asbestos-caused Ill ness and the dose* which caused those Ill nesses. This Is a motor problem, since some asbestos caused illnesses have a 30yrar latency period.
EPA considered the possibility of ban ning production, processing, and use of asbestos or banning all emissions of as bestos Into the atmosphere, but rejected these approaches. The problem of meas uring asbestos emissions would make the latter approach impossible to enforce. Either approach would mull In the pro hibition of many activities which are extremely Important: moreover, the available evidence relating to live health hazards of asbestos does not suggest that such prohibition is necessary to protect public health. For example, demolition of any building containing asbestos fire proofing or lnsuJatinr materials would have to be prohibited as would the use of materials containing even trace amounts of asbestos which could escape Into the atmosphere.
Finally, the available evidence suggests a gradient of effects from direct occupa tional. to Indirect occupational exposure, to families of workers cx;o-ed to asbestos and persons in the neighborhood of as bestos source?--in all of which situa tions asbestos concentrations are un doubtedly high bv cvvr.p.srtson with most community air. This suggests that there are levels of asbestos exposure that wifi not be associated with any delectable risk, although these levels are not known <51 >.
It Is probable lh.\l the effect- of as bestos Inhalation are cumulative: that Is. iow-level and or intermittent exposure to asbestos oCcr a long time may be equally as Important in the etiology of osbeslotlc disease as high level and/or continuous exposure over a shorter pe riod. On the oilier hand, the available evidence docs not Indicate that levels of asbestos In most community air cause asbcstotlc disease. Taking both these considerations into account, the Admin istrator has determined that. In order to provide an ample margin of safety to protect the public health from asbestos.
It U necessary to control emissions from major man-made sources of osbosloa cmiajdoo* into the atmosphere, but that It is not necessary to prohibit all emissions.
In UUs determination, the Administra tor has retied on the National Academy of Science** report on asbestoa <331, which concludes: "Asbestos la too Im portant to our technology said economy for ID essential use to be stopped. Uut, because of the known serious etTccD of uncontrolled Inhalation of asbestos min erals In Industry and uncertainly as to the shape and character of the doseresponse curve to man. It would be highly Imprudent to permit additional contami nation of lha public environment with asbestos. Continued use at minimal risk to the public requires that the`major source* of man-made asbratoa# emission Into the atmosphere be defined and con trolled."
The means of control Used at* limita tions on visible emissions with an option to some coses to use designated control^ equipment, requirements that certain procedures be followed, and prohibitions on the use of certain materials or of cer tain operations. These means of control are required because of the Impossibility at this time of prescribing and enforc ing allowable numerical concentrations or mass emission limitations known to provide an ample margin of safety. The alternative of no control of the sources subject to this standard wax rejected because of the significant health hazard of unregulated emissions of axbeatoe into the atmosphere from the designated major source*.
it lx the Administrator's judgment that the asbestos sources subject to thlx standard are the major sources of as bestos emissions. In the absence of quontlDtlvs emission data, the Administra tor's Judgment wax boxed on an national Inventory of sources and emissions of asbestos <J4> and other reports <SJ. ill. The asbestos emissions and emission factor* presented In the national Inven tory were based on Information obtained ` from production and reprocessing com panies. This Information Included pro duction figures, estimates of control equipment efficiency and material bal ances; It did not Include emission test results. The major sources of asbestos emissions were considered to fall Into five categoric*: <i> Mining and milling: <2) manufacturing: (3) fabrication; <41 de molition: and <51 spraying. In deter mining which of these major sources should be covered by the standard pro mulgated herein, the Administrator con sidered the effect other Federal regula tions will have on the emissions from such sources and the proximity of such sources to the public. In addition, the Administrator considered comments on the proposed standard and additional technical data not available before pro posal. The following paragraphs explain these considerations and the changes made to the standard LA^i tun proposal and final promulgation.
The promulgated standard applies to Asbestos mills, selected manufacturing operations, the use ot spray-on asbestos
ft OCXS.I XtCWtt. VOt 3, NO
It DAT. Xftll 6. 1V73
TMXr>\\* . -
I
8Uf.ES ANO 8EGUIATIONS
SS21
. materials. demolition operations, and the . surfactor of roadways with asbestos tail
ings. The Administrator will contlmse to - Investigate other crtstlng and new
sources at asbestos emission and tl say of them are found to be major sources, ths standard will be rcrisod to cover
them. As applied to mines, the proposed
standard would have limited the emis sions from drilltor operations and pro hibited risible emissions of particulate matter from mine roads surfaced with asbestos talllncs. The Bureau of Mines has proscribed health and safety refuta tions (JO ent ISA) for the purpose of protecting life, the promotion of health
measure* taken to comply with the Bu reau of to"" and Occupational Safety and Health Administration regulations to protect the health of persons who work In proximity to dump* and open storage areas wilt prevent the dumps and storage areas from being major sources of asbes-
Tho proposed standard would have ap plied to bulldinrx, structures, or facilities within which any fabricating or manu facturing operation Is carried on which Involves the use of asbestos materials. Comments received on tho proposed standard indicated that the requirements for fabricating and manufacturing oper ations were confusing. Much tho eon-
The proposed slaniard would have
"limited emissions from . a number of sources by stipulating* that such Emis sions could not exceed the amounts which
would be emitted frort the source If tho source were equipped with a fabric filter, or. In some cases, a wrt-collcctlon alrdcanlng device. This would hgve required a standardized emission-measuring tech nique. which Is not currently available. The promulgated standard prohibits visi
ble emissions which contain asbestos and provides the option of using specified air-cleaning methods. The existence of particulate asbestos material to a gas stream vented to the atmosphere con bo determined by collecting a sample on a
smd safety, and the prevention of acci fusion was created by tho uso of termsfHter and analyzing It by microscopy
dents In open pit metal and noometalho uch as "any." "continuously." and techniques. The proposed standard stated
mines. As related to asbestos mines, these "forced gas streams." The promulgated that the alr-cleanlng requirement would '
reeolations prohibit persons working In standard is more definitive as to applica cot be met If a number of listed faults,
a mine from betof expoaod to asbestos bility of tho provUlaaa. The promulgated eg, broken bags, leaking! gases, thread
concentrations which exceed the thresh standard prohibits visible emissions from bare bags, existed and tt required that
old limit value adopted by the American the nirm manufacturing operations collection hoppers on some baghouses be
Conference of Governmental Industrial which, to the Judgment of the Adminis emptied without generating visible emis
. Hygienists. The regulations specify that trator, are major sources of asbestos. Tho sions. Comments received suggested that
respirators shall not be used to prevent promulgated standard does not cover this negative approach tended to makq.
persons from betor exposed to asbestos fabrication operations. Of sH fabrication the quality of sir-cleaning operations de**
where environmental measures are avail operations, only those operations at new pendent upon the ability of EPA to an
able. for drilling operations, the regula construction sites are considered to bo ticipate and to Include to the standard
tions require that the holes be collared major sources of asbestos emissions The all the factors which would constitute
arid drilled wet. The regulations recom Occupational Safety and Health Admin Improper methods. Since the Intent was.
mend that haulace roods, rock transfer istration .regulations specify that all and Is, to require high quality alr-clean-
points, crushers, and other points where hand- or power-operated tools (l.e: saws, tog operations, the promulgated standard
dust (asbestos) Is produced sufficient to scorers, abrasive wheels, and drills) requires proper installation, use. opera
cause a health or safety hazard be wetted which prodfice asbestos dust be provided tion, and maintenance without precisely
down as often as necessary unless the with dust collection systems. In the Judg defining the means to be used.
dust Is controlled adequately by other ment of the Administrator. Implementa
The proposed standard would have
means. In the Judrnient of the Admin tion of these regulations will prevent prohibited the spraying of any material
istrator, Implementation of those regu fabrication operations from being a containing asbestos on nny portion of
lations will prevent asbestos mines from major source which must be'covered by a building or structure, prohibited the
betor a major source which must be cov the standard promulgated herein.
spraying of any material containing as
ered by the standard promulgated here
The proposed standard would have bestos to an area directly open to the
in. Furthermore, the public Is sufficiently prohibited visible emissions of asbestos atmosphere, and limited emissions from removed from the mine work environ particulate material from the repair or all othtir spraying of any material con
ment tliat their exposure should be sig demolition of any building or structure taining asbestos to the amount which
nificantly less than that of the workers other than a single-family dwelling. would be emitted If specified alr-cleanlng
In the work environment. Accordingly, Comments Indicated that the no visible equipment were used. Comments re
the promulgated standard docs not apply emission requirement would prohibit re ceived pointed out that this standard
to drilling operations or roadways at pair or demolition to many situations, would: (l> Prohibit the use of materials
mine locations.
since It would be Impracticable. If not containing only the trace amounts of
For asbestos mills, the proposed stand Impossible, to do such work without cre asbestos which occur In numerous nat ard would have applied to ore dumps, ating visible emissions. Accordingly, tho ural substances, <2) prohibit the use of
open storage areas for asbestos materials, promulgated standard specifies certain materials to which very small quantities
tailings dumps, ore dryers, air for proc work practices which must be followed of asbestos are added In order to enhance
essing ore. air for exhausting particulate when demolishing certain buildings or their effectiveness, and (3) prohibit the
material from work areas, and any mill structures. The standard covers Institu use of materials In which the asbestos Is ing operation which continuously gen tional. Industrial, and commercial build strongly bound and which would not gen
erates InpluA visible emissions. The ings or structures. Including apartment erate particulate asbestos emissions. Tho
promulgated standard prohibits risible houses having more than four dwelling promulgated standard applies to those emissions from any pert of the mill, but units, which contain friable asbestos ma uses of spray-on asbestos materials
It does not apply to dumps of asbestos terial. This coverage Is based on the Na which could generate major emissions of
tailings or open storage of asbestos ores. tional Academy of Sciences' report (5J) particulate asbestos material. For those
The Bureau of Mines' regulations pre which states. "In general, single-family spray-on materials used to Insulate or
viously referenced and regulations Issued ^ by tho Occupational Safety and Health
Administration (20 CFR 1910.93a) pro tect workers from the hoards of Hr con taminants to the work environment. The Occupational Safety and Health Admin istration regulations were promulgated 'on June 7. 1972. The regulations are ln-
tended to protect the health of employees ' from asbestos exposure by means of en-
h glneering controls (l.e. Isolation, enclo-
. - cures, and dust collection! rather than by ,, personal protective equipment. It Is tho
residential structures contain only small amounts of asbestos Insulation. Demoli tion of Industrial and commercial build ings that have been fireproofed with asbestos-containing materials wiU prove to be an emission source to the future, requiring control measures." Apartment bouses with four dwelling units or less are considered to be equivalent to single
family residential structures. The stand
ard requires that the Administrator bo
notified at least 20 days prior to the com
fireproof buildings, structures, pipes, and conduits, the standard limits the asbestos content to no more than 1 percent. Ma terials currently used contain from 10io SO-perccnt asbestos. The intent of the 1-percent limit is to ban the use of ma terials which contain significant quanti ties of asbestos, but to allow the use of materials which would: (1) Contain trace amounts of asbestos which occur in numerous natural substances, and (2) Include very small qmirvUtlcsaof asbestos (less than 1 percent) added to enlianco
* Judgment of the Administrator that mencement of demolition.
the material's effectiveness. Although a
ftOfkAJ. XfCISTM. VOt- 31. NO. 66-----fllOAr. *ftli 6. 1973
8822
KUIE3 AND ttCULATIONI
stamUrvUzcd refcrsoce method hu not been developed to quiutlutlTdr deter mine U) content of asbestos In * mstertsi, there ere acceptable method* Tellable, baaed oa electron microacopr. which Independent laboratories bare de veloped. Determining the aabcaloa con tent ot a material with thoaa method*
standard will not require disposal. Where " If. Catrttxv*. r. X jad U, A. Xodr1cXl
disposal is required. U Occupational AabMtoivdiMt CxpovurM it Vtrtoui Dt*||
Safety and llosfth Administration regu lations ( Cm mosiaihl) requlrs that any asbestos waste, consigned for disposal, bs collected and disposed of In
4Ad MortAitif. ArcB. Xartr, BmIUi, /I, m196. 1947.
xt. obr. 6 it.: hMuoMooAMa: a itutotf^tcU Burwy ot HKrop*T KiUrut la 1,306 CW UaaovIw 2. 910-414* INI. '
sealed Impermeable bags or other closed.
If. iMtlMCbif. H. J,|VL C|\M, (Ad tf* L-
Impermeable containers The contamina lUrdj: Aatwtcwt* m4 RroacBofftld Cwrl
coat* approximately WOO. and tha rcaulta are accurate within plus or mlnua M percent; Lheao limit* on accuracy were taken Into account In establishing tha 1-percent limitation. ' : The proposed standard would hare prohibited the surfacing o1 any roadway with aabcaloa tailing*. The promulgated standard applies to all roadways except those on ore deposits: these roadway* are temporary, and control measure* taken to comply with tha Bureau of Mines reg ulations prevent them from being a major source which must be ooerred by the standard promulgated herein. At this time, the application ot asbestos tailings to public roadways Is not widely prac ticed. but because of the close proximity of roads to the public, a ban an using asbestos tailings on roadways is Included In the promulgated standard to arold a future problem and stop the practice where It is followed. The term "surfac ing" is defined to Include the deposit of asbestos tailings on. roadways covered with snow or Ice; therefore, this practice is prohibited.
Consideration was given to Including provisions In the standard requiring proper disposal of the asbestos material generated during demolition and col lected In control devices used to comply with the requirements of this standard. It was decided that this was not neces sary because the Occupational Safety and Health Administration regulations <W CTR 1910.93a(h>> include house keeping and waste disposal requirements. These regulations require that any as bestos waste, consigned for disposal, be collected and disposed of In sealed Im permeable bags or other closed. Imperme able containers.
The potential environmental Impact of the promulgated standard was evalu ated. and It was concluded that the standard will not cause any adverse ef fects. The potentially adverse environ mental ellects of the standard are:
(1) The asbestos-materials which will be collected In control devices and gen erated during demolition will have to be disposed of or recycled.
tion of ground water stavbre with asbes tos from landfill disposal u not consid ered a potential problem.
The substitution of ceramic weed, min eral wool, and fibers lass for asbestos 1* not now known to be a problem. There it no evidence that these materials cause health effects in the concentrations found in occupational or ambtral environments.
Although the standard was not based od ccooomlo oostsidcrations, EPA Is aware of lie impact (U) and considers it to bs reasonable. Costs among the various source* covered by the standard are quite variable. Although the standard may ad versely affect some Individual plants or companies which are marginal opera tions. it appear* that such ellects will ba Tr>ietfrsl sod the Impact to the asbestos Industrie* as a whole will not be large.
rU7ruMCti
1. Coot*. W. X : ribtv*** of Um Lucvo 4m
to Um Iah*UUoo at A*b**to* Durt Urtt Ud.
J. I. 147.1974.
I. Ooofc*. W. X : PulcoocxjlT7 Aab*otou.
am. u*d. j,, i. iQM-ioaa. iru.
J. Dr*-- IB. w. O, J. U. DIUr%tW. T. L
dvc4<, J. vr. MlU+r. and It- *41. a7n*. A
Otttdy ot A*fr--to* in Um AjbMtai T*ttU* In
dustry Public
Bull. >41. WuhlntUin.
UJJ. OottnuMQl iTIntin* Offic*. 19M. 1>4 pp. 4. McDonald. & : HMtary of Tula*oomjj Aa-
b*toiu. &m_ u*d. j. 2. iaj6-to>4, !rr. J. Ur*wthr, X K A.: 77** Occumoo ot
Pulmooary nbroM ud Otr Pulmonary
ASkUoo* ta Aib*tw Wofk*r, J. lad. Hjt- 1** 196-133. and 12. 769-237. 1960.
4. Ulllt. R. Q.: Pulmonary AMm1o*1j: Rport at a coo*. Ulna. U*d.. 13. tW-tN. 1930.
7. Bop*r, w. o.: PuUsooAfy A*b*hvo*te. A trport ot a om* iod a rvTWv, Am. JWt.
Tuboru. 22. 671-6*4. 1MO. 6. SoAMf. O. U. J. S. rmuldA cod U. J. OccvpAtiorui C*n<*r ot u>* UfUu/7
&l*4dr In Dy**tuffi Op*r*Mn and of th*
Lmx In AA>mIoi T*rtU Work*r* and trooor* Mtarn Am J Ota. Path. 23, 126-134.
1966. . Braun. D C. *nd T. D Tru*n: An
EpVlrmVoloc'c-fci ?tu3 j ot Luty; C*ncrf in A*. b*tOi klLrvcr"* Aren Ind. HmJUi. IT. 664
666. 1966.
10. Buchonor.. W, D A*be*tooli *nd Prt*
mary Iatrothorortc
Ann, X Y.
Acad. SCI. 132. *07.618 1966 11. OorOor*. J r. II Troluk. and U P.
KnudtJpo: Anrto* *nd Carcinoma* o: in*
mm: twport ot OO# imnyUtd <* ind rt vWv ot Um ifmUihU Uunturt. Am. J. Md^ II. Tll-Tll. 1993.
I#, J+eoO. 6* ind U. Atwpich: rulnwniry HiopluU Inwoi Pf*d<o Alton ton Wotlirt. Aaa. K.Y. A4d. Bc4_ 161. 9*-94* 1946.
U. KUtaHM. Um J. Um4U, and O. Kdbjr* ua: UorulltT Xp*t#ooi ta 9 Oraup of Aitoito< Wofnoco- Arc*. Kaftr. tttoUB. II, 177 190. 1947.
* If. Raoc. J.' r li. 8s Ootl and t. D. HUl:
O060CI AmljiU of CtuafH ta Inrtdvnci of BiuortoUI OMxtaoaM ta 9 Ttostlto IVVN7. Aaa. K.Y. Acad. 0C /if, Ud*4IU 1966.
f J.* Cnoc. J. r, 0. Woltnto. A DoU, ind 1* D* Kill: MoruiUf troca Luof dam cad OUm( Cima Aa^ocx Workm ta aft Anbiloi IkiUU ructory. Bnv J. tad. UL. fJ. 396-603* 1964.
14. Lkba. J.: KidfTunclM in Aitoiito* Vofita Area. t&Ttr. ttaltt* if,
1964.
If. Umch. IC. M. and w. A. Bmllto: fMI-
000W7 Aidatotti, ZXZ. Circtnoau of Lunf la
AibMloi lUlopili Am. J* Ouo*r, 14. 64*44.
1936.
14. UiacuM. T*
ind A. A. C*AtUr:.
UorUlUr niura ta 1 Qohort of Aabiton
Workiru. J. Occup. KUd* 9. 147-103. 1947.
17. McDonald. J. O.* A. D. UcOonild. D, W.
OlbtM. J. ftiiaditxrkl. iad C. X. Wouiurt
UorUlUy ta th Chrj+aAtlo Atx*lo Uknti
iad MUM of Qut><. ArcB. Xtodr. U*IU), 22.
477-468. 1971.
li. MmitUiir. x. r. a.: AjShumu ind
Cajxlaoaxa of tl> Luax. to: Aaoud rrpon, of
tto ctoWf
of r*ctorw for Ui< 7**x
1947. Loodoa: M. T. StoUoaary OOo*. 1949.
79 pp.
It. M. t.: A Otod; of th 14or-
Wttf of Wortm tn in AiMtUx nctory, QrtU
J. Iad. VUd. 14. 394-601.1969.
39. 1. J. J. Omif. oad X. C. ITun-
mood: Ait>4cw Xrpomtr* od
JAMA. 141. 73-34. 1964.
31. Borov. M. A. Oooitoa. La L. UronifM.
end H. Ochiltt: klftoUiilkwii and Ito AjmocI-
itloo tUi AiC>*(o. JAUA. 201. 647-691.
7947.
J J. Dnn, P. C~ W. T. X. McC*MCb*j. ^nd
O. La W^d; DUTu** Mf*oUiUomi of tn
n#ur* ind Aibttloi. Drlt* Md, J^ 1. 360
363. 1966. J J. COM4. P. C . *nd O. La w*dr: JlrUUon*
ihlp IWtv**o Crpotun to Aitx-*to nd nurJ UilUnancjr In ZMUut. Ann. H.7`.
Ac*d Bel, IJJ. M9-667. 1946.
34 EnUcXrukp. J. H_ end W. K. Bmlthrr:
PrrUoarJ TXimor tn AM>ritol. Brit. J. Ind. XXrd . 21, 30-31. 1964.
(I)Materials, such as mineral wool, ceramic wool, and fiberglass, will be sub
Unx. C*ncrr. U. 1181-1197. 1942 12. Doll. R : Mortality from Lunf C*nrrr In
3S. rovlcr. T. B.
J. C. SlOfxr. uid E. C.
W*xnrr; Ezprovir* to Ait>rcto4 *nd Unothrll-
stituted for asbestos presently contained A>Brt04 Worxrr* Rrn J Ind Vied . J.' 61*64. om* of U)* riruria Brtt. Mrd. J.. 2. 311-313.
In spray-applied fireproofing and Insulat 1966.
1964.
ing materials.
13. Duaa. J T.. Jr. *r>d J. id w*ir: a
Jf. n*mmood. E. C- 1. J. Brltko7. And J.
In some manufacturing operations, a major portion of the asbestos-material collected by fabric Alters Is either re cycled to the process or Is marketed for other uses. For example, one asbestos tex tile mill recycles large quantities of longer-fiber asbestos for process use and
rro>**<t4Tr 6lody of Mortality of 5SrrrnJ Occuykotsooal Oroup*--Sped*! Emrfia-c* on lgmg Conorr. Arxn. Enxlr. lle*j;h. IT. 71-76. 1966.
14. Dunn. J K . Jr . and J id W*:r Ccictf ExpcrVoo* ol s<Tcr*d Occupation*! Oroup* roOo**d Fro*pc<tire It Am. J. Put) llfsJUi. SS. 1367-1176. 1966
Ctourc: Sopl**iA Aooof Inal*tkon Worker*
la ta United 8t*tra wUh 6plil Rrferenco
to lotrAAtodocatnaJ NropliAi*. Ann. H.Y. Acad.
Set, JJ1. 619-636. 1946.
y.
J7. HourlBixkr. D. 0*3.: Tht PmtholoCT MrocalloavA and *a AmlyiU of Their Aioci*Uoa vtih Aitoeito* Expour. TTionut, 19, 366-376. 1964.
sells more than 90 percent of the remain ing collected materials to a brake lining
manufacturer. Consequently, a signifi
15. Cwood. r. C. and A. U Ccvhron*: a Pollov*up 8Vudy ol Wcrtfrt rrocn *n A*bcto* r*CtOT7. Bm. J. Ind. Mrd, 21. XX-SQT. 1964.
Jf. Llrtoen. J, ind H. Ptctavk*: Meolt>eU* om* and A*be*to* Erpoa%r*.o>Aretu Enrlr. Hr*JUx. 24. 669-643. 1947.
cant portion of the Increased quantities
S. Xawrtta*. r. X: VtorLdJily Amon< A>-
It. Mima. R. n, J. U Oro*h. and W. M.
of "wasto** asbestos materials which will Bocto* rrodurt Wcrtrn tn Ui* Ualtrd flv^tr*. O'Donnell: Mraothrlloma Aaaoctaled with
. msult from the Implementation of the Aaa. X.T. Acad Bel. HI. 166-166. 1966.
'A*b<ato*la. Cancer. 19, 631-636. 1964.
rtOCtAL tfOfSTlt. VOL 3. NO 66--ItlOAT. APtil 6. 1973
tlrt.ES AND REGUVVTIONS
SS23
40. UoC.ucb*r. W. T. k- O. I*. W|*1. ami
f. O. Bom: kxpoatira to
Oust a*d
Dtffuar flvural M *mlh4<lvma*. Blit Mt J.
I. 1991, IKt
41. UcOnlMW. A. D. A.
O. A. H-
Attu'. ud j. a. udid: cpmunmoq o<
Prtouiy UillfuAt MmoUmIUI Tuawn la
ClMlU. Cucar, AA. 014-019. 1970.
47. NnbWM, U. U. and H. Tbaoiwo:
KpldanMocr 04 Unoiatlul Tunan In Um
of fhr-tr were most llkrly due to exposure prior to the Institution of controls, proper assessment of tho period of exposure Is not always possible (f. 2); It Is known, however, that chronic beryllium dlscaso la associated not only with activities In volving extraction processes, but also that 44 registry cases resulted from exposure during machining operations on beryl
tions used to mfte the dispersion es timates are glvenln'the Background In formation Report for Asbestos. Beryl
lium. and Mercury (APTD-07J53), pub
lished at the time the standards wens
proposed.
,]f
`
Rocket testing!facilities are required
to meet the llmlt.of 75 microgram-min
utes per cubic meter, accumulated dur
Inadoa Ana. Ann. H.T. Acad. Sd. 111. 479-
Hl, 1944.
'
41. OnA W, 0.1 UwiUulUl Turnon and
Xlp4Mn to Aabaatoa Duat. Ann. H.T. Aoad.
Bel, ill. 074-079, 1004.
-
44, BalUcid. L J_ J. Cbur*. and X. C. Hi ml
zztondl Halation Bitvm Cxpotun to Aa-
bntaa and MaooUMlloaa. Nov line. J. Med-
lium materials (I). There are at least 45 cases of nonoccupntlonallylncurrcd dis eases on file with the registry, of which approximately half hare been fatal (3), and retrospective studies of the concen trations of beryllium that resulted In ooe cases of chronic beryllium disease
ing any period of 2-consecutive weeks. The limit for rocket testing facilities Is
the same as that developed In 1968 by the Committee on Toxlcology'of the Na
tional Academy of Sciences for protec tion of otf-slte personnel from intermit tent exposures to soluble beryllium com
171. 400-400. 1004.
from xtonoccupatlonal exposure hate pounds arising from the filing of rocket
<1. Wrlcbt. a. W.l Aatwtoa and KaalUa In 1900. Am. Rot. Harp. Ola. 100. 407-479. 1900.
44. DalUad, L 2- X. O. Hammond, and A. Chur*: Aabaatoa Eapoauna, Amo*In*. and
Haoplaala. JAMA. 204. 104-111 1904L 41. VTacnar. A. O- O. A. Slacsa. nod T.
Mareband: DUtuaa rtourel MaoUtiallnma and Aabaatoo Czpoauia tn tba North Waatarn
concluded that the lowest concentration motors <I).
which produced disease was greater than
The proposed standard did not include
0.01 ag/m* and probably loss than .040 a provision on open burning of beryIlium-
Ag/ta* ).
containlng waste. The promulgated
In 1049. when It became apparent that standard Includes a ban on open burning
beryllium was a toxic material, the of beryllium-containlng waste. This
Atomic Energy Commission adopted a ' change was made because Information
Capa rruTtnoa. Bltt A. 2nd. Mad- 27. >00-371. limit for beryllium concentrations In received after proposal Indicated that
1900. 44. Cbamptoc. p.: Tn oaaaa ol Malignant
Maaotbrlluma Altar Kxporar* to Aabaaloa. Am. Rar. Raap. nu , 203. S21-030. 1071.
<1. Srllfcoff. L A. and X. O. Hammond: EarlToomrntal EpVOaaIoioc7. IU. Oommunity dacta oi HoooocupaUonal EnTtranmaatal Aabntoa Kkpoaur*. Am. A. rub. HttlUt 44.
community air (l.e- 0.01 eg of beryllium per cubic meter of air averaged over a 30day period) (2). Beryllium refining com panies holding contracts with the ABC to operate ABC-owned refinery faculties and expand their own refinery capacity to meet ABC's beryllium requirements,
such sources can cause ambient concen trations of beryllium In gnea of 03)1 ag/m* and because It is not possible to control the emissions from open budking. The promulgated standard does allow disposal of beryllium-containing waste In Incinerators which are controlled ao
1440--1000. 1900.
were required to observe the community aa not to exceed the 10-gram-per-day
40. Wacnar, J.C.I gpldamWOoey ol OtSuaa Maaotbaltal Turnon: Xvldenoa od an AaaodaUon fram-Studlaa In South ATrlea and tba United Stardom. Ann. X.Y. Acad. Sol- 132. (74-479. 1900.
SI. national Inatltula lor Occupational Salary and Haaltb: Occupational Expoaura to AaPaatoa (Cntarla foe a Bammmanibd
air limit. With the termination of these contracts In tho 1961-83 period due to a reduction- In ABC requirement* far beryllium, the refineries were no longer subject to the ABC community air limit. Tho ABC's health and safety require ments, however, have continued to apply
limit. The disposal of beryIlium-contain ing explosive waste Is included In tho standard covering rocket testing.
The proposed standard would have covered all machining operations which use alloys containing any amount of be ryllium. Comments wero received which
Standard). Washington. UA Dapartmant of Health. education, and VToilira (PSS. H5MHA). 1973 (HSM 73-10307).
42. SalUtofT. X. A- W. A. Nlcfcolaon. and A. M. laapr: Aabeatoa Air Pollution. Arch. Enrtr. Haaltb. 24. 1-11. 1973.
S3. Rational Academy of Sdcncea: Aabeatoa (The Hard for and PeaalblUly of Air Pollu tion Cootrola). Washington, Rational Aoad-
to all ABC-owned facilities, some of which fabricate and assemble beryllium parts.
In the period since tho implementation of tho ABC guideline, no reported cases of chronic beryllium disease have oc curred os a result of community exposure, end the Committee on Toxicology of the
claimed that numerous machining opera tions use alloys containing low concen trations of beryllium and do not exceed the 10-gram-per-day emission limita tion. An Investigation or these com ments revealed that alloys which Include beryllium either ooataln a large amount (greater than 60 percent) or a small
acay of Sdcncea. 1971. 40 pp. 51. National Inventory of Sourcea and
Emlaalona--Cadmium. RlcJtcl. and Aabeatoa. Report by W. X. Dart* A Aaaodatea Under contract to the Department of Health, edu cation. and Welfare (Oontraor No. CPA 330-tll). Prb. 1970.
44. Heaearcb Tt1angl XnaUtute: Oociprehanalea Study of Specified Air Pollution
National Academy of Sciences concluded amount (less than 5 percent), and that
that the ABC guideline limit represents a approximately 8.000 machining opera
oafs level of exposure 111.
tions use the low beryllium content al
Accordingly, the Administrator has de- * loys. Tests were conducted by the Agency
ti-rminert that in order to provide an to determine the beryllium emissions
ample margin of safety to protect the from the operations which use the low 4
public health from beryllium, sources of beryllium content alloys (e.g. stamping,
beryllium dust, fume, or mist emissions tube drawing, milling, and sawing). Tho
Sources to Aaaeaa the Economic Impart of Air Quality Standard*--Aabeatoa, Beryllium. Mer cury. Report prepared under contract to the Environmental protection Areocy (Contract No. 04-03^004). Aug. 1973.
Banirov
Beryllium 1* a harejdom air pollutant within the meaning of section 111. The proven eUect* of airborne beryllium ma terials on turn an health include both
tnto tho atmosphere thould bo controlled to Insure that ambient concentrations of beryllium do not exceed 0.01 Ag/m"-- 30-day average.
The beryllium standard covers extrac tion plants, foundries, ceramic manufac turing plants, machine shops (processing beryllium or beryllium ^lloys containing In excess of 5 percent beryllium) and
result* indicated that even If tho emis sions were vented to tho outside air. which they ordinarily are not. they would be significantly below tho 10-gram-per- . day emission limitation. After consider--' lng these results and the administrative burden If tho standard applied to such a large number of sources, the proposed standard was changed to exempt tho machining operations which use alloys
acuta and chronic lethal Inhalatloa af disposal of beryllium-containing wastes. containing less than 5-pcrccnt beryllium.
fects <1. 2). as well as akin and conjunotlral effects (2). Insufficient data am available to lnrrlmtrutts beryllium a* a human carcinogen Cl, 2). but the lark- of of any median ten foe the total elimlna-
Most allected beryllium sources are lim ited to emissions of not more than 10 grams per day. This level was determined through dispersion estimates as the level
The proposed standard would have al lowed all sources of beryllium to choose between meeting the 10-gram-per-day emission limit and complying by use of ambient monitoring to Insure that the
Uoq of beryllium body burdens, and tho which would protect against the occur 0.01 Ag/m` 30-day average Is never ex
resulting possibly long residence tima msy enhance the opportunity for cancer Induetioo. Tha Beryllium Registry dot contains over 830 proven cases of beryillum-rdated disease (J). but since many
References at end of articl*.
rence of 30-day average ambient concen trations exceeding 0.01 pg/m\ Tho sources covered by the standard are the only known ones that could result In am bient beryllium concentrations In excess of 0.01 Ag.'m`. The assumptions and equa
ceeded. After reconsidering the proposed standard and the difficulty Inherent tn using ambient air quality data, os op posed to emission dSfa, SS a regulatory tool. It was decided to limit tho use of ambient data as a means of compliance
- FEOEtAl tEGISTE*. VOI_ 31. NO. ti-----FtlOAr. AP*ll 4, 1973
8S24
RULES ANO ItCUtATlONS
to tfaoie source* tnilch b*v* demon
Maser* v
' equation* Used to make tlie dispersion
strated o a re--onahls pxt period )b*t they can meet aod bar* met the ambient limitation. Therefore, the stand ard being promulgated herein allow* the ambient option only to eiUtin* source* which hare 1 yean of current ambient air Quality data which demonstrate to the Administrator's satisfaction that the 0.01 *g/m* level can be met in the vicinity of the source. A minimum of 3 yean of data was Judged to be necessary to dem onstrate that the ambient suldcllne of O.Oi aC/m" <JO-day averags) can be met because of the poasibliity of monthly, seasonal, and even annual variations in ambient levels caused by variations in meteorology and production. The exlstinx sources which oouid duality or this option are four beryllium extraction plants and. possibly, a small number of machine shops. These sources were de signed or modified to facilitate compli ance with \he 0.01 pxtta ambient limit.
The potential environmental Impact of this standard was evaluated and it eras concluded that the standard will not cause any adverse effects. beryllium Is a very expensive material, and moat r*s streams emitting significant duantitle* of beryllium are oootroUed wtth hlxh ef ficiency dry collector*, and the collected material is recycled or sold back to the primary producer*. Wet collector* sire rarely used strictly as an air pollution control device, but more often as an ex traction process control device allowing recycle of waste ilduld* to the process. Absolute filter* are often used as final filters and collect small quantities of beryllium from very low concentration gas streams. These filter* are usually burled in company owned or secretsled dumps or stored In unused mine* or buildings. Most of the solid waste* are prepackaged prior to burial to prevent escape of beryllium to the environment.
Although the standard is not based on economic considerations. EPA is aware of the economic Impact IS) of the stand ard. Since most of the sources of beryl lium emissions are already controlled and In compliance wtth the standard, the economic Impact will be very small.
mnstHcu
1. Committee on ToxicolOCT. KaUooal Acadaj of &cieacc*: Air Quality Criteria roc Beryllium aod Its OocajxmnOs- Report pre pared uodsr oootraet to tiv* UJ5. Public Health Gerrlo* (Contract h"7oar--21 (SI )). Waahtnstoo. March 1. 186S.
2. National Institute for Occupational Gaiety aod Health: Occupational Exposure to Beryllium (Criteria lor a Recommended Standard). Washington. OS. Department ok Health. Education, and Wetlara (PBS. HS1THA). 18TJ (H3MTl-lahSS).
Mercury is * haxardous air pollutant within the meaning of eoctloo ill. Exposur* to metallic mercury vapor* may cause central nervous eyatem injury, and renal damage (f. J). Experience with mercury vapor cocao* almost exclusively from animal experiments and industrial exposure*. Animal (rati data indicate a risk of accumulation In critical system* upon prolonged exposure, with a poten tial. for example, for elective brain dam age (l, J). Prolonged exposure to about 100 microcrams mercury per cubic meter of air Invoire* a definite risk of mercury intoxication (11.
To determine the ambient air level of mercury that doe* not impair health, the airborne burden must be considered to gether with the water- and food-borne burden*. An expert group concluded, based on Its analysis of several episodes of mercury poisoning in J span, that 4 microcram* of mcthylmcrcury per kilo gram of bodysretght per day would result in the intoxication of a acnsUlrv adult; application of a aafety factor of 10 yielded an acceptable exposure of about 30 mi croerams per day for a 70-kilogram man, and this level la also believed to provide satisfactory protection against genetic lesion*, and poisoning of the Ictus and of children (<>.
It should be poked that mcthylmcrcury is considered to be by far the most haxardous mercury compound, particularly via the Ingestion of fish In which It has been concentrated through the food chain. (J. J). The Environmental Protec tion Agency, in view of the present lim ited knowledge as to the effect* of In haled mercury in the general population, and in order to best assure the requisite "ample margin of safety to protect the public health.- has concluded that It Is prudent to consider exposures to mcthyl mcrcury (diet) and mercury vapor (air) to be equivalent and additive. It has been estimated that from average diets, over a considerable period, mercury intakes of 10 micrograms per day may be expected (<). so that, in order to restrict total Intake to 30 microcrams per day. ths average mercury Intake from air would have to be limited to 20 microcrams per day. Assuming Inhalation of 70 cubic meter* of air per day. the air could con tain an average daily concentration of nq more than 1 microcram of mercury per cubic meter.
The standard promulgated herein reg ulates the only two sources, mercury ore processing facilities and mercury cell chlor-alkall plants, which bare been found to emit mercury In a manner that could cause the ambient concentration to
Miimab* are given in the Background Information Report for Aabesto*. Beryl lium. and Mercury <ATTT>-Q7&3i. pub lished at the Ume the standards were proposed.
Many mercury cell chlor-alkall plant
cell rooms presont severe source testing problems du* to their design and con struction. Such source* may either recon struct the cell room so that accurate source tests can be made or employ housekeeping and maintenance practices that minimi** mercury emissions from the celt room. Source test data and cal culation* have indicated that when such practices are used. 1.300 grama per day is a reasonable estimate of emission*
from th* cell room. Therefore, when this option Is choen. an emission of 1J0Q grama per day will be assigned to the cell room. This permits emissions of not more than 1.000 grams per day from the hydro
gen and end box ventilation streams com bined.
Compliance with the standard wife be determined by the EPA reference method or EPA-approvrd substitute methods. Where a chlor-alkall plant choose* the housekeeping and maintenance practices option, determination of compliance of the cell room emission will bo based on the use of EPA-approved practices. A list of approved practice* may be obtained from EPA on request to regional office*.
The jnly major change in the mercury standard is the Introduction of the above option of assigning an emission number to the cell room provided certain house keeping and maintenance requirements are mcL When this option Is chosen, test ing la not required for emissions from tho cell room. This option Is offered because comment*, testimony, and EPA source testing experience indicated that most existing cell rooms cannot be accurately tested for mercury emissions. Accurate emission tests are unduly complicated and costly because of the cell room configuration.
Borne of the chances suggested in writ ten comments and public hearing testi mony wero considered by EPA but not made. Tlie most significant one Involved the environmental chemistry of mercury, that is. environmental mercury In the at mosphere Is transformed to mercuric oxldo by tho action of ultraviolet radia tion. and alnco mercuric oxide 1s not as toxic as elemental mercury, tho stand ard should be less stringent. This argu ment is bored on laboratory experiments under controlled conditions with gener ated radiation. The reaction cited in tho testimony occur* when elemental mer cury is Irradiated with ultraviolet light
I. Massachusetts Oaneral . Hospital. 03. exceed the Inhalation effects limits of 1 with a wavelength of 2.537 angstrom (A).
Beryllium Caae Registry. Boston, lias*.
mlcrocTam per cubic meter. The stand Naturally occurring ozone In the upper
<- Xtsenbod. M. R_ C. Wants. C. Dustan. ard limits emissions from these facilities atmosphere absorbs light in tho ultra
fi. T. Steadman. W. B. Harris, and B. a. Wotl:
HoooceupaUonal BeryUlosla. J. Odd. Hyg. Toxicol. 31. ZS3-394. 18*8.
g. Research Triangle Institute: Cotnpre* benaira Study of Specified Air PuUaUcm
Source* to Aaaeea the Economic Tmy--t oi Air Quality Standards--Asbestos. Berytltum. Mer-
dry. Report prepared under oootraet to the
Xnrlronmental Protection Agency (Oootraet
Ho. e3-03-0OS3). August 1873.
.
to not more than 2.300 crams per day. The emission limit of 3.300 grams per day was derived from dispersion esti mate* as the level which would protect against the violation of an average dally ambient coocentra Uoq of i talcrocram per cubic meter. The assumptions and
R^.'ffTQCr* At <r>2 of
violet region below 3,000 A; (7) hence the wavelength of ultraviolet necessary for the reaction is absent in the ambient at mosphere, and the reaction does not pro ceed at as high a r*]f as Implied by the submitted testimony.nelameasurecaenta of both mercury vapor* and particulate mercury In ambient air indicate that as much as 94 percent of the mercury de
ftDUAt uciitu. vot it. no
tioar. Art.-t *. 1873
RULES ANO REGULATIONS
8325
tectcd waa in an elemental vapor form (data collected by ETA at the Federal Building In MoundsrlUe. W. Vo.).
do not cause n waste disposal problem because the sieves can be regenerated
Air Quality SUndai Mercury. Report pre; . the Enrtronmeatal
--Asbestos. Beryllium.' under contract to
tectlou Agency (Coa-
In placo without retorting and can be' tract No. 88-Oa-OOM)'- August 1973.
The Environmental Protection Agency
reused nuiur times. Although the standard was not based
recognise* that mercury and Its com
pounds cooiUtutd a multimedia conta- on economic considerations. EPA Is
pounrU constitute a multimedia contam aware of the impact (<) and considers It
ination problem. Le_ strong evidence to be reasonable. Because mercury Is an
alter It* natural distribution In the en International commodity, world prices
vironment: that such uses may cause or determine the fortunes of the domestic
hasten additional deposits Into water mercury mining Industry. Historically,
or soil over and above those occurring mercury prices fluctuate greatly In re
naturally, thereby building up environ sponse to small changes In demand or
GENEluawPKOVISIOWS *
Tlie standards promulgated below are applicable to new. modified, and'exlstlng sources. Any new or modified source must comply with the standards upon begin ning operation. Any existing source must comply with the standards within 90 days after promulgation, unless a waiver of compliance is granted.
mental concentrations; and the mercury levels accumulate In the biota, with the result that potentially dangerous residue levels arc reached In foods consumed by
Current data on the environmental transport of mercury do not permit a clear assessment of the effect of mercury emissions into the atmosphere on the mercury content in the aquatic and ter restrial environments. Results of ongoing research will determine If there U a need for more comprehensive control of mer cury emissions Into the air. The stand ard promulgated herein Is Intended to protect the public health from the effects of Inhaled mercury.
supply. Domestic mercury mines are con
After considering the proposed general
sidered high-cost producers In relation to provisions and the comments received on
foreign producers. Because the average them, the Administrator made several price has dropped from $404 per flask
In 19<9 to approximately >330 currently,
changes which are included in the stand ards promulgated below. A new section
the number of domestic mercury mines was added to specifically require new sta in operation has dropped sharply from 109 In 1909 to six or seven In March 1973.. tionary sources to notify the Administra As long as the price of mercury remains tor before beginnning operation. The below marginal costs of production (gen .requirements lor source reporting and
erally about >400). the remaining domes request for waiver of compliance were
tic mines will be ill equipped to absorb combined Into one section. The time for
any cost Increases. The total chlor-alkall Industry com
prises 60 plants. Approximately 28 are
submitting the source report was ex tended from 30 to 90 da?s to provide sources with more time to complete the Information required. Appendix A was*
mercury cell plants and account for about 27 percent of the UJ5. production added to provide sources a description
of chlorine and caustic.
and format of the information required.
The environmental Impact of this
The future of the chlorine-caustic In
The proposed standards required all
standard was evaluated and It was con dustry appears healthy. Demand for sources of merchry and beryllium to test
cluded that the standard will -not cause chlorine Is expected to grow at an annual their emissions within 3 months of the
any adverse effects since the control of rate of 6 percent projected from 1971. effective date and at least once every 3
mercury emissions to the atmosphere Demand for caustic soda will grow at months thereafter:-a provision was in
will hare only minimal Impact on other least at the same'rate as chlorine, and cluded to allow the Administrator to
areas of environmental concern. The perhaps faster. Prices for chlorine and waive the periodic tests ior sources in
simplest control for mercury emissions to sodium hydroxide have been rising compliance with a standard. The stand
the atmosphere is cooling to condense steadily through the sixties Into 1971. ards promulgated below require the Ini
the mercury. This cooling can be Indirect Based on these trends, the cost'of control tial test within 90 days of the effective
or direct. By indirect cooling, the mer to comply with the mercury standard will date and include a provision to allow the
cury condenses and la retained for re be passed forward to the consumer. Use Administrator to waive this requirement
cycle or sale. By direct cooling with a of these two basic commodities Is so di If the source Is meeting the'standard or
water scrubber, the water Is usually re verse that any price Increases will be has requested a waiver of compliance.
circulated after using centrifugal or well dispersed through all manufacturing Periodic tests are not required unless
gravitational separation to remove the activities. mercury. The water cannot be reused
RxrCJLENCTS
specifically requested by the Administra tor. The Administrator may cancel a
Indefinitely and eventually requires addi
waiver of emission tests and may require
tional treatment to remove the mercury. In moot cases, such treatment facilities aro already being utilized to meet water quality standards.
1. Report of an International Committee: Maximum Allowable Concentrations of mer cury Compounds. Arch. Enrlr. Health. 19, 691 905, December 1969.
2. Clarkson. T. W.: The Pharmacology of
a test under the authority of section in 'of the Act at any time. Appendix A speci fies the information which a source must provide the Administrator when applying
A widely used control device for par Mercury Compounds. Ann. Rev. Pharmacol for a waivor of initial emission testing.
ticulate mercury emissions Is tho mist eliminator. Residues In these devices are removed by gravity and washing with a recycled liquid. Another control method Is chemical scrubbing. In this system, scrubbing {fluids are continuously made
ogy. 12. 375-tOO. 1972. J. Prtberg. L.. and J. Voctal (Eds.): Mer
cury to the Environment--A Toxicological and Epidemiological Appraisal. Prepared by the Karollnska Institute Department of En vironmental Hygiene (Stockholm) for the U.S. Environmental Protection Agency (Ofllce
The standards promulgated below do not require the owner or operator to request a waiver of compliance before a specific date. However, the owner or op erator should submit the request within 30 days after the effective date of the
up while waste materials are usually re of Air Programs). November 1971.
regulation to be assured that action will
cycled to the process feed solutions. Re cycling of these liquids avoids significant contamination of water with mercury residues.
. Tho use of adsorption beds Is a highly efficient control method for removing mercury from gas streams. Two primary types are available: (1) Chemically treated activated cartoon beds, and (2) molecular sieves. Most of the mercury collected by activated carbon can be re claimed by retorting the carbon but this usually destroys tho carbon structure and necessitates disposal. Some small amount of residual mercury will remain with the carbon, but it Is tightly bound
and Is not easily transferred Into the air
or water. Regenerative molecular sieves
4. Methylmercury in Fish; a Toxicologlc-
Epldemlologlc Evaluation of Risks. Report
from an expert group. Nord. Hyg. Tlsdkr.
(Stockholm). Supplement
1971 (English
translation).
5. Nelson. N . T. C. Byerly. A. C. Kolbye. Jr,,
L. T. Kurland. R. S. Shapiro. S. I. ShlbkO.
W, H. Stickle. J. E. Thompson. L. A. Van Den
Derg, and A. Welsslcr: Hazards of Mercury (special report to the Secretary's Pesticide
Advisory Committee. Department of Health.
Education, and Welfare. November 1970).
Envtr. Rea.. 4. 1-OT. 1971.
6. Westoo. O : Mercury in Foodstuff*--la
There a Great Risk of Poisoning? VAR FODA.
4. 1-0. 1965.
7. Leighton. P. A : Photochemistry of Air
Pollution. Academic Press. 1961.
$. Research Triangle Institute: Compre
hensive 8tudy of Specified Air Pollution
Sources to Assess the Economic Impact of
be taken on the waiver application prior to the 90th day after the effective date. Continued operation In excess of a stand ard alter the 90th day without a waiver is a violation of the act.
Tlie Administrator may grant an exist ing source a waiver, permitting a period of up to 2 years for compliance, provided, that steps will be taken during the waiver period to assure that the health of per sons'will be protected from imminent endangerment and provided that such period Is necessary for the Installation of controls. To be granted a waiver of com pliance. a source must submit a written request to tlie AdminIstrator"and pro
vide certain Information to assist tlie
Administrator In making a Judgment.
FtOtRAL RtGISTlR, VOL 3, NO. 66-----FRIDAY, APRIL 6, 1973
8826
KUIES AND tEGULATtONS
. Within SO days after receiving a request, the Administrator srlH notify the owner or operator of approval or lntentloa to deny the waiver. Any waiver of com pliance (ranted by the Administrator will be tn writing and specify conditions the source must meet dortnc the waiver period. If the Administrator Intends to deny a request, the owner or operator win be riven a specified time to provide additional information or arguments prior to final action on the request, rtnal action on a request will be tn wrttlnr by the Administrator, and If denied, will in clude reasons for denial.
ferred methods of sampling and analys ing used to determine compliance. The reference methods for beryllium and mercury arc Included In appendix B to this part An equivalent method Is any method of sampling and ansLlytlng which has been demonstrated to the Admin istrator's satisfaction to have a con sistent and quantitatively known rela tionship to ths reference method under specified conditions An alternative method Is any method of sampling and analysing which does not meet all ths criteria for equivalency but which can be used In specific cases to determine com
61 XX <133 <134
Pnlatofl tAikUf6. AU clMAlac. Iwporttn*.
fwlulwi
61 61 Jt 61 XX 61 JL3 61 >4
61 40 61 41 61 44
Appivcabauy. rWQattkKM PoWkm viandaTd. oua aampUnc. Atr aapllnf.
------J f*afc4 Maav
AptkUCabQttr. Dadnmoo*. rmUaVm ytandard.
* -
f (w
The President may exempt any new, modified, or existing stationary source from compliance with the standards for
pliance. Alternative methods may be ap proved by the Administrator for source teaUng: however, in cases where deter
61 43 61 44
XhImIoq 4 xUny rorMt flxtxvf or pro* j*Uaat dupp--l.
Stack varapltags
a period of tip to a years, provided the technolory Is not available to implement the standards and the operation of such source Is required for reasons of national security. Also, the President may grant exemptions for additional periods of 2 years or less.
The constructtoo of a new source or modification of an .existing source cov ered by these standards cannot begin without approval of the Administrator. To obtain approval, the owner or opera tor of such sources must apply In writing to the Administrator. Within 00 days, the Administrator will notify the owner or operator of approval or Intention to deny approval. If the Administrator In tends to deny approval, a specified time will be given to provide additional Infor mation or arguments prior to final action on the application. The final action on any application win be In writing by the Administrator, and If denied, will In clude the reasons tor denial.
Although the demolition of buildings or structures containing asbestos ma terial and the spraying of asbestos ma terial will in many cases be modifications of existing stationary sources, the Ad ministrator's approval Is not required be
minations of compliance using an alter
native method are disputed, use of tha
reference method or Its equivalent will
be required by the Administrator. An ap
proved alternative method for beryllium
Is Included In appendix B hereto.
All cm IsaIon data provided to or ob
tained by the Administrator In carrying
out these regulations will be available to
ths public. Records, report*, or Informa
tion other than trade secrets will be
available to the public.
Pursuant to section 112(dtl> of the
act. the Environmental Protection
Agency Intends to delegate the author-'
lty to Implement and enforce national
emission standards (except with respect
to stationary sources owned or operated
by the United States! for haxardous air
pollutants to any State which submits an
adequate procedure to the Administrator.
The requisite procedure for requesting
such delegation Win be issued In the
future by the Environmental Protection
Agency.
The regulations for the national emis
sion standards for asbestos, beryllium,
and mercury are hereby promulgated ef
fective upon promulgation (April 8.
1973).
''
Uxtvcy
61 IO Applicability. 61 At Ov&aIUoo*.
*
<113 ftntatoa vUbdirl 61 A3 Stark axopUn<.
Appaodis A---Oxnplftmov 6U(\M laformattoct. ApfxodU ft--TM MvtbodA
vutbod 101--lUftwow tovlbod (or dtUnnl' naUoo of partktiUU and paoua DMccufy
awtono front oUUoowy iouivh (air trMiro).
Malfeod 103--RvCarvoTO tMlhod for dvWrml* nation o< partktiltU and patow mtreury mUatooa from aUUocujy aourroa (hydropa ftrvmi).
Utho4 104--twrytUum tcmalnc cn*tbod.
Uvtbod 104--lufmoo* mvtbod for dvtacmlnatloo of barytlluA vmUaVaaa ftoar^ta-
ttooary aourcaa.
Atrrtaoarrr: 43 OAC. 1633o-7.
A--Gmtnl Piwhloot
161.01 AppUe^Oiiy.
The provisions of this part apply to tho owner or operator of any stationary source tor which a standard Is prescribed under Uj^ part.
fi 61.02 Definition*.
As used In this part, all terms not de fined herein shall hare the meaning given
fore beginning such operations Section 112(cl(l) of the act specifics that no person may construct any new source or modify any existing source - unless
the Administrator finds that such source
Dated: March 30. 1973.
Rossst W. Fxi. Acllnp Administrator. EntvrcnmentcJ I'rotection Agency.
them in the act: (a> "Act" means the Clean Air Act H2
UB.C. 1817 etseq.). (b> "Administrator" means the Ad
ministrator of the Environmental Pro
if properly operated will not cause emis
A new- Part 81 is added to Chapter 1. tection Agency or his authorised repre
sions In violation of such standard." The demolition and spraying provisions are expressed In terms of procedures to be
Title 0. Code of Federal Regulations, a* follows:
sentative. (c) "Alternative method" means any
method of sampling and analjnlng for an
followed. Therefore. If the source Is prop erly operated. It will be complying with the standard, and there Is no need for the Administrator to make a finding with respect to each new source subject to these provisions.
Each source covered by these stand ards tv required to submit to the Admin istrator within 90 days after promulga tion certain Information pertaining to Its operation. Changes tn the Information must be submitted within 30 day* after tho change, except where tho chance Is considered a modification. Then the re quirements for a modified source are applicable.
Three terms are associated with deter mining compliance by means of source testing: (l) Reference method, til equivalent method, and (31 alternative method. Reference methods are the pre-
dec 61.01 61 03 61 OJ flitM 6105 61 06
6103
61 06 61 00 61.10 61.11 61 13 61.13 61 14 61 13 61 16
Applicability
CVfcnltiarn
AbbrwUttonA AalrrM
1'robltollrd vcUvllW* De*-erai1n*tkin of conAtrucloo
modification.
of
Application for approral of con*true -
lico or modlArailoo.
Approval by Administrator.
fwotlicatkjo of tartup.
Jtourc* rrporun* and a-airrr rv-quru
VCairrt of ComplUnoa. KniMioa LrU and monitoring.
Watrrr of rmUawxr ImU
OoAirc*
and analytical tnrUtcdx.
Availability of InfortnaUoa.
?U`.f auUtedty
J ,.Ti-T ~M>pwsl
Standard f*
61 30 Applicability 61 21 DfinHWu
air pollutant which does not meet all of
the criteria for equivalency but which has
been demonstrated to the Administra
tor's satisfaction to. tn specific cases, pro duce results adequate for his determina
tion of compliance. <d) "Commenced" means that an own
er or operator has undertaken a con
tinuous program of construction or
modification or that an owner or operator
has entered Into a contractual obligation
to undertake and complete, within a rea
sonable time, a continuous program of
construction or modification.
(e) "Compliance schedule" means tho
date or dates by which a source or cate
gory of sources Is required to comply with
the standards of this part and with any
steps toward such compliance which axe
art forth In a waiver of compliance under
I 81.11.
'
FtOCiai UOiltl. VOC 1. NO A-----ftlOAT. ATtll A. 1V71
E
RULES AND REGULATIONS
S827-
(f) ."Cooxtructlon" means fabricatlon.
erection, or Installation of a mtatlonxry
source. <gl "Effective date" Is the date of
promulgation In the Fzdcxai. Rxcistxi of an applicable standard or other regu lation under this part.
<h) "Equivalent method" means any method of sampUnc and analyzing for an stir pollutant which has been demon strated to the Administrator's satisfac tion to have a consistent and quantita tively known relationship to the reference method, under specified conditions.
(I) "Existing source" means any sta tionary source which Is not a new source.
<J) "Modification" means any physical change In. or change In the method of operation of. a stationary source which Increases the amount of any hazardous air pollutant emitted by such source or which results In the emission of any hazardous air pollutant not previously
emitted, except that: <1) Routine maintenance, repair, and
replacement shall not be considered physical changes, and
<2) The following shall not be con sidered a change In the method of operation:
(1) An Increase In the production rate, tf such Increase does not exceed the op erating design capacity of the stationary
source: <1U An increase In hours of operation. (k> "New source" means any stationary
source, the construction or modification of which is commenced after the publi cation In the Frotnju. Rcgistxx of pro posed national emission standards for hazardous air pollutants which will be applicable to such source.
U> "Owner or operator" means any person who owns, leases, operates, con trols. or supervises a stationary source.
<tn> "Reference method" means any method of sampling and analyzing for an air pollutant, as described In ap pendix B to this part.
<n> "Startup" means the setting In operation of a stationary source for any purpose.
(o) "Standard" means a national emission standard for a hazardous air pollutant proposed or promulgated under this part.
(p) "Stationary source" means any building, structure, facility, or Installa tion which emits or may emit any air pollutant which has been designated as
hazardous by the Administrator.
61.03 Abbreviation*. The abbt^-latlons used in
have the following meanings: *C--Degrees Centigrade,
cfm--Cubic feet per minute, ft'--Square feet, ft*--Cubit feet. *F--Degrees Fahrenheit. In--Inch. 1--Liter, ml--Milliliter. M--Molar, m*--Cubic meter,
run--Nanometer, or--Ounces. v/v--Volume per volume.
this
part
yd*--Square yards. w.g.--Water gage. InHg--Inches of mercury. lnll-O--Inches of water, g--Grams. mg--Milligrams. N--Normal. *R--Degree Ranklne. min--Minute sec--Second,
,
of which commenceAtfter the publica tion date of the standards proposed to bo applicable to suchource. are subject
to this prohibition. (b) After the .efffctlve-date of any'
standard prescribed finder this part, no owner or operator shiul operate any new .
source In violation of 'such standard ex cept under an exemption granted by the President under section 112(c)(2) of the
avg.--Average. I.D.--Inside diameter.
act.
, ,
(c) Ninety days after the effective date .
O.D.--Outside diameter. *.g--Micrograms U0"*gram).
of any standard prescribed under this part, no owner or operator'Shall operate
%--Percent. Hg--Mercury.
any existing stationary source In viola tion of such itandard. except under a
Be--Beryllium.
waiver granted by the Administrator in
61.04 Adder**.
accordance with this subpart or under an exemption granted by the President
All requests, reports, applications, sub under sectloa 112(e) (2) of the act.
mittals. and other communications to
(d) No owner or operator subject -to
the Administrator pursuant to this part the provisions of this part shall fall to
shall be submitted In duplicate and adv report, revise-reports, or report source, dressed to the appropriate regional office " test results as required under this part.
of the Environmental Protection Agency,
to the attention of the Director. Enforce ment Division. Tire regional offlees are as
61.06 Determination' of construction or modification- j
follows:
' Upon written application by an owner
Region I (Connecticut. Maine. Massa or operator, the Administrator will make
chusetts. New Hampshire. Rhode Island. a determination of whether actions taken
Vermont). John F. Kennedy Federal or intended to be taken by Such owner
Building. Boston. Mass. 02203.
or operator constitute cot^ruction or
Region II (New York. New Jersey. modification or the commencement
Puerto Rico. Virgin Islands). Federal thereof within the meaning of this part.
Office Building. 26 Federal Plaza (Foley Square). New York. N.Y. 10007. ,
Region HI (Delaware. District of Co
The Administrator will within 30 days of receipt of sufficient Information to evaluate an application, notify the owner
lumbia. Pennsylvania. Maryland. Vir ginia. West Virginia). Curtis Building. Sixth and Walnut Streets. Philadelphia.
Pa. 19106. Region IV (Alabama. Florida. Georgia.
or operator of his determination.
61.07 Application for approval of ronnlruction or modification.
(a) The owner or operator of any new
Mississippi. Kentucky. North Carolina. source to which a standard prescribed
South Carolina. Tennessee). Suite 300. under this part Is applicable shall, prior
1421 Peachtree Street. Atlanta. Ga. to the date on which construction or
30309.
'
modification is planned to commence, or
Region V (Illinois. Indiana. Minne within 30 days after the effective date
sota. Michigan. Ohio. Wisconsin). In the case of a new source tljat already
1 North Wacker Drive. Chicago. III. has commenced construction or modifi
60606.
' , cation and has not begun operation, sub
Region VT (Arkansas. Louisiana. New mit to the Administrator an application
Mexico. Oklahoma. Texas). 1600 Pater for approval of such construction or
son Street. Dallas. Tex. 75201.
modification. A separate application shall
Region VII (Iowa. Kansas. Missouri. be submitted for each stationary source.
Nebraska). 1735 Baltimore Street. Kan * (b) Each application shall Include:
sas City. Mo. 64108.
(1) The name and address of the ap
Region VHI (Colorado. Montana. plicant.
North Dakota. South Dakota. Utah. Wy
(2) The location or proposed location
oming ). 916 Lincoln Towers. 1860 Lin of the source.
coln Street. Denver. Colo. 80203.
(3) Technical information describing
Region IX (Arizona. California. the proposed nature, size, design, operat
Hawaii. Nevada. Guam, American ing design capacity, and method of oper Samoa). 100 California Street. San ation of the source. Including a descrip
Francisco. Calif. 94111.
tion of any equipment to be used for
Region X (Washington.Oregon. Idaho. Alaska). 1200 Sixth Avenue. Seattle. Wash. 98101.
control of emissions. Such technical in formation shall Include calculations of emission estimates in sufficient detail to
61.05 Prohibited clhily**.
(a) After the effective date of any standard prescribed under this part, no
permit assessment of the validity of such calculations. -
61.08 Approvttl by AdnnniMraior.
owner or operator shall construct or mod ify any stationary source subject to such standard without first obtaining written approval of the Administrator In accord ance with this subpart, except under an exemption granted by the President under section 112(c)(2) of the act. Sources, the construction or modification
(a) The Administrator will, within 60 days of receipt of sufficient information to evaluate'an application under 5 61.07. notify the owner or operator of approval or intention to deny approval of con struction or modification-
lb) If the Administrator determines that a stationary source for which an
No. 64--rt. n--------1
FtOOCAL EGCSTt. VOL 3S. NO. 44---- f)0AT. AP8IL *. 1 97 3
4
8828
RULES AND REGULATIONS
*
application pursuant to I 81.07 was sub
<51 The average weight per month of specified under paragraph <b) (3) of this
mitted will, IX properly operated, not tha hazardous materials being processed ection are not met.
,
cause emissions In violation of a stand by the source, over the last 12 months
<3) Specify dates by which steps to
ard. he win approve the construction or preceding the date of the report.
ward compliance are to be taken; and
modification of such source.
(8) A deacriptloa of the existing con Impose such additional condition* as the
<c> Prior to denying any application trol equipment for ract. emission point. Administrator determines to be neces
for approval of construction or modifica
(1! (Timary control device*si for each sary to assure Installation of the neces
tion pursuant to this section, the Admin hazardous pollutant.
sary controls within the waiver period,
istrator will notify the owner or operator
ilii Secondary control derlee*si for and to assure protection of the health
making such application of the Admin each hazardous pollutant.
of persona during the waiver period.
istrator's Intention to Issue such denial,
till) Estimated control efficiency (per-
tel Prior to denying any request for %
together with:
centi for each control device.
a waiver pursuant to this section, the
< 1 > Notice Of the Information and
<71 A statement by the owner or oper Administrator will notify the owner or
findings on which such Intended denial ator of the source as to wheliter he can operator making such request of the Ad
Is based, and *21 Notice of opportunity for such
owner or operator to present, within such
comply with the standards proscribed In this part within 90 days of the effective date.
ministrator's Intention to issue such denial, together with;
<11 Notice of the Information and
time limit as the Administrator shall specify, additional information or argu ments to the Administrator prior to final
tbl The owner or operator of an exist findings on which such Intended denial
ing source unable to operate In compll- - Is based, and
anee with any standard prescribed under
<21 Notice of opportunity for such
action on such application.
this part may request a waiver of com owner or operator to present, within
<d> A final determination to deny any aiiplleatlon for approval will be In writ ing and will set forth the specific grounds on which such denial is based. Such final
pliance with such standard for a period not exceeding 3 years from the effective date. Any request shall be in writing and shall Include the following Information:
such time limit as the Administrator specifics, additional Information or argu
ments to the Administrator prlorm final action on such request.
determination will be made srlthln 80 days of presentation of additional Infor mation or arguments, or 80 days after the final date specified for presentation. If no presentation Is made.
<e> Neither the.submission of an ap plication for approval nor the Admin istrator's granting of approval to con struct or modify shall:
(1) Relieve an owner or operator of lcjral responsibility for compliance with any applicable provision of this part or of any other applicable Federal. State, or local requirement, or
<2> Prevent the Administrator from Implementing or enforcing this part or taking any other action under the act.
61.09 Notification of tartup.
<11 A description of the controls to be Installed to comply with the standard.
til A compliance schedule. Including the date each step toward compliance will be reached. Such list shall Include as a minimum the following dates:
til Date by which contracts for emis sion control systems or process modifica tions will be awarded, or date by which orders will be Issued for the purchase of component parts to accomplish emis sion control or process' modification;
till Dale ol Initiation of onsite con struction or Installation of emission con trol equipment or process change;
*1111 Date by which onsite construc tion or Installation of emission control equipment or process modification Is to
<d) A final determination to deny any request for a waiver will be In writing and will set forth the specific grounds on which such denial U based. Ouch final determination will be made within 80 days after presentation of additional in formation or arguments, or 60 days after the final date specified for such presen tation. If no presentation Is made.
<e> The granting of a waiver under this section shall not abrogate the Ad ministrator's authority under section lit of. the act.
9 61.12 IjnUvlon tnt* and monitoring.
(a) Emission tests and monitoring shall be conducted and reported as set forth In this part and appendix II to this part.
< a i Any owner or operator of a source which has an Initial startup after the effective date of a standard prescribed under this part shall furnish the Admin istrator written notification as follows:
< 1 > A notification of the anticipated date of Initial startup of the source not more than 80 days nor less than 30 days prior to such date.
<2) A notification of the actual date of Initial startup of the source within 15 days after such date.
61.10 Sourer reporting and
quc*4.
'
rr rr-
bo completed; and
<lv! Date by which final compliance Is to be achieved.
<31 A description of interim emission control steps which will be taken during the waiver period.
<c! Changes In the Information pro vided under paragraph <a> of tills section shall be provided to the Administrator within 30 days after such change, except that if changes will result from modifica tion of the source, as defined In l 81.02 < J1. the provisions of 1 61,07 and I 61.03 are applicable.
(bl The owner or operator of a new source subject to this part, and at tho request of the Administrator, the owner or operator of an existing source sub ject to this part, shall provide or cause to be provided, emission testing facili ties as follows:
(1) Sampling ports adequate for test methods applicable to such source.
(21 Safe sampling platformts). <31 Safe access to sampling platforints). ttl Utilities for sampling and testing equipment.
<ai The owner or operator of any existing source, or any new "source to which a standard prescribed under this part is applicable which had an Initial startup which preceded the effective date
*d' The format for reporting under this section Is Included as appendix A of this port. Advice on reporting the status of compliance may be obtained from the Administrator.
of a standard prescribed under this part 61.11 TCaiirr of romjliinrr.
shall, within 90 days after the effective date, provide the following Information In writing to the Administrator:
*11 Name and address of the owner or operator.
*31 The location of the source. *31 The type of hazardous pollutants emitted by the stationary source. i) A brief description of the nature, sire, design, and method of operation of the stationary source Including the op
<al Based on the information provided In any request under 1 61.10. or other In formation. the Administrator may grant a waiver of compliance with a standard for a period not exceeding 2 years from the cCcctlve date of such standard.
<bl Such waiver will be In writing and will:
<11 Identify the stationary source covered.
erating design capacity of such source.
*21 Specify the termination dale of
Identify each point of emission for each . the waiver. The waiver may be termi
hazardous pollutant.
nated at an earlier date If the conditions
61.13 Taitcr of rtniuion ln*l*.
(a) Emission tests may be waived upon written application to the Admin istrator If. In his Judgment, the source Is meeting the standard, or If the source Is operating under a waiver of compliance or has requested a waiver of compliance.
*bl If application for waiver of the emission test Is made, such application shall accompany the Information re quired by 1 61.10. The appropriate form Is contained In appendix A to this part.
*cl Approval of any waiver granted pursuant to this oeWloiTTvhnll not abro gate the Administrator's authority under the act or in any way prohibit the Ad ministrator from later canceling 6uch waiver. Such cancellation will be made only after notice is given to the owner or operator of the source.
ftoUM 1CJ1TC. vou 3 rvO --riiOAr. acta s. ivyj
<UIE5 AND REGULATIONS
' jj *.
8S29
{ 61.14 Sooree Ut m4 analytical roethwli. .
Subpart 8--National Emission Standard for Asbestos
(a) Method* 101. 103. and 104 In ap 61.20 Applicability.
pendix B to thla part ahall be used far all aouree teats required under this part, unless an equivalent method or an al ternative method has been approved by the Administrator.
The provisions of this subvert are ap plicable to those sources specified in I 61.22.
61.21 DeSnilracu.
(b) Method 103 In appendix B to this . Terms used In this subpart are defined port Is hereby approved by the Admin 'in the act. in subpart A of this part, or in
istrator as an alternative method lor this section as follows:
sources subject to I 51.32(a) and I 51.42
(a) "Asbestos** means actinolite. amo-
<b>.
site. anthophylllte. chrysotile. crocldollte.
<c> The Administrator may. alter no tice to the owner or operator, withdraw approval o1 an alternative method cranted under paragraph <ai or (b) ol this section. Where the test results using an alternative method do not adequately Indicate whether a source Is in compli ance with a standard, the Administrator may require the use ol the reference method or Its equivalent.
tremollte. <b> "Asbestos material**; means as
bestos or any material containing as
bestos. <c) "Particulate asbestos material"
means finely divided particles of asbestos material.
<d) "Asbestos tailings" means any solid waste product of asbestos mining or milling operations which contains as bestos..
61.IS Availability of information.
<e> "Outside air" means the air out
(a) Emission data provided to. or oth erwise obtained by. the Administrator in accordance with the provisions of this part shall be available to the public.
<b) Any records, reports, or Informa tion. other than emission data, provided
side buildings and structures. <f> "Visible emissions" means any
emissions which are visually detectable without the aid of instruments and which contain particulate asbestos material.
61.22 Emii-ionilrndrrd.
to. or otherwise obtained by, the Admin istrator in accordance with the provisions of this part shall be available to the pub lic. except that upon a showing satisfac tory to the Administrator by any person that such records, reports, or informa tion. or particular part thereof (other than emission data). If made public, would divulge methods or processes en titled to protection as trade secrets ol such person, the Administrator will con sider such records, reports, or informa tion. or particular part thereof, confi dential tn accordance with the purposes of section 1905 of title 18 of the United States Code, except that such records, re ports. or Information, or particular part thereof, may be disclosed to other officers,
(a) Asbestos mills: There shall be no visible emissions tb the outside air from any asbestos mill except as provided Ln paragraph <f) of this section. Outside storage of asbestos materials Is not con sidered a part of an asbestos mill.
tb) Roadways: The surfacing of road ways with asbestos tailings is prohibited, except for temporary roadways on an area of asbestos ore deposits. The deposi tion of asbestos tailings on roadways cov ered with snow or lcc Is considered "sur facing."
(cl Manufacturing: There shall be no visible emissions to the outside air. ex cept as provided ln paragraph (f) of this section, from any building or struc ture ln which the following operations
employees, or authorized representatives of the United States concerned with car rying out the provisions of the act or when relevant In any proceeding under the act.
are conducted or directly from any of the following operations If they are con ducted outside of buildings or structures.
(1) The manufacture of cloth, cord, wicks, tubing, tape, twine, rope, thread,
61.16 ate authority.
(al The provisions of this part shall not be construed In any manner to pre
yarn, roving, lap. or other textile ma terials.
(2) The manufacture of cement prod ucts.
clude any State or political subdivision thereof from:
(1) Adopting and enforcing any emis sion limiting regulation applicable to a stationary source, prodded that such
<3i The manufacture of fireproofing and insulating materials.'*
< * * The manufacture of friction products.
<5> The manufacture of paper, mill board. and felt.
emission limiting regulation is not less
<6> The manufacture of floor tile.
stringent than the standards prescribed
under this part.
`
(2) Requiring the owner or operator
of a stationary source, other than a sta
tionary source owned or operated by the
United States, to obtain permits, licenses,
(2) The manufacture of paints, coat ings. caulks, adhesives, sealants.
(8) The manufacture of plastics and rubber materials.
(9) The manufacture of chlorine. <di Demolition: Any owner or opera tor of a demolition operation who Intends
or approvals prior to Initiating construc tion. modification, or operation of such source.
to demolish any Institutional, commer cial. or Industrial building (including apartment buildings having more than four dwelling units), structure, facility.
Installation, of portion thereof which
contains any boUei, pipe, or load-sup
' porting structural'member that is Insu
lated or fireproofed with friable asbestos -
material shall comply with the require
ments set forth ln this paragraph. (I) Notice of intent!oh to demolish
shall be provided to the Administrator
at least 20 days prior to commencement
of such demolition or* Anytime prior to
commencement of demolition subject to
'paragraph (d) (4) of this section.
-
Such notice shall Include the following
Information:
(1) Name of owner or operator.
(II) Address of owner or operator.
(Hi) Description of the building, struc
ture. facility, or installation to be de
molished.
-<lv> Address or location of the build
ing. structure, facility or installation.
<v> Scheduled starting and completion
dates of demolition. (vl) Method of demolition to be em
ployed.
<vll) Procedures to be employed to
meet the requirements of this paragraph.
(2) The following procedures shall be
used to prevent emissions of particulate
asbestos material to outside air:
(I) Friable asbestos .materials, used to
insulate or fireproof any boiler, pipe, or
load-supporting structural member, shall
be wetted and removed from any build
ing, structure, lacility. or Installation
subject to this parsgraph before wreck
ing of load-supporting structural mem
bers Is commenced. The friable asbestos
debris shall be wetted adequately to In
sure that such debris remains wet during
all stages of demolition and related han
dling operations.
(II) No pipe or load-supporting struc
tural member that Is covered with fri
able asbestos Insulating or fireproofing
material shall be dropped or thrown to
the ground from any building, structure.
'facility, or Installation subject to this
paragraph, but shall be carefully low
ered or taken to ground level.
(III) No friable asbestos debris shall be
dropped or thrown to the ground from
any building, structure, facility, or In
stallation subject to this paragraph or
from any floor to any floor below. For
buildings, structures, facilities, or in
stallations. 50 feet or greater In height,
friable asbestos debris shall be trans
ported to the ground via dust-tight
chutes or containers.
<31 Sources subject to this paragraph
arc exempt from the requirements of
55 61.05(a). 61.07. and 61.09.
((> Any owner or operator of a demoli tion operation who Intends to demolish a building, structure, facility, or Installa tion to which the provisions of this para graph would be applicable but which has been declared by proper State or local authority to be structurally unsound and which Is ln danger of Imminent collapse Is exempt from the requirements of this paragraph other thiyi thr fpnoj-t.lnore.
qulrcments specified by paragraph <d) (l) of this section and the wetting of friable asbestos debris as specified by paragraph (d)(3) (1) of this section.
fEOESAl 8ECISTE8, VOL 38, NO. 6t-----F8I0AY, APll 6, 1973
8850
(e) Spraying: There sliall be no risible emissions to the outside air from the spray-on application of materUli con taining more Ihu 1 percent asbestos. on a dry welxbt basis. used to Insulate or nreproof equipment end machinery. ex cept M prtrrlded In paragraph <fl of this section. Spray-on materials tued to insu late or fireproof buildings. structure*, pipes, end conduits shell contain less than 1 percent asbestos on a dry weight basis. (1) Sources subject to this paragraph are exempt from the requirements of I l-05<a>. f 81.07. and I 61.09. <31 Any owner or operator who Intends to spray asbestos materials to Insulate or fireproof building*. structures, pipes, con duits. equipment, and machinery shall report such Intention to the administra tor at least 30 days prior to the com mencement of the sprayIns operation. Such report shall Include the foliowins information: <1> Name of owner or operator.
(Ill Address of owner or operator.
fill) Location of spraying operation.
(lr) Procedures to be followed to meet the requirements of this paragraph.
<f) Rather than meet the no-rlslblecmlsslon requirements of paragraphs (a). (c). and (e) of this section, an owner or operator may elect to use the methods specified by I 61.33 to dean emissions containing pstrtlculate asbestos material before such emissions escape to. or are vented to. the outside -air.
61.23 Air-drjnin(.
If alr-cleanlng Is elected, sls permit ted by | 61.23 (f). the requirements of this
section must be met.
(a) Psbric filter collection devices must be used, except ss noted In para graphs (b) and <c> of this section. Such devices must be operated at a pressure drop of no more than 4 inches water gage, as measured across the niter labrlc. The alrHow permeability, as determined by ASTM method D737-69. must not exceed 30 ft'/raln/ft* for woven fabrics or 35 It'/mln/Xl* for felted fabrics, except that 10 ftVmin/ft' for woven and IS ft*/ mln/ft' for felted fabrics Is allowed for Altering air from asbestos ore dryers.
Each square yard, of felled fabric must weigh at least 14 ounces and be at least one-sixteenth Inch thick throughout. Synthetic fabrics must not contain nil yam other than that which Is spun.
(b) If the use of fabric niters creates
a Are or explosion hazard. the adminis
trator may authorise the use of wet col
lectors designed to ojerate with a unit
contacting energy ol at least 40 Inches
water gage pressure.
tel The administrator may authorize the use of filtering equipment other than that described In paragraphs (a> and tb) of this section If the owner or operator
demonstrates to the satisfaction of the administrator that the filtering of par ticulate asbestos material Is equivalent to that of the described equipment.
<dl.AU alr-cleanlng equipment au thorized by this section must be properly Installed, used, operated, and maintained. Bypass derlces may be used only during Upset or emergency conditions and then
RULES AND REGULATIONS
" onlj for *o Ion* *1 It Uc* to &hut down the operation rmrraUn* the particulate aabolo* material.
6 61-14 Rfpoftln|.
% The owner or operator at any exbUiut ource to which thU cubpart U applicable hall, within 00 dajr alter the effective date, provide the following information to the administrator:
<a> A description of the emission eon-* trol equipment used for each process:
<b) If a fabric filter device U used to control emissions, the pressure drop acroe* the fabric filter in Inches water face.
U i If the fabric filter device utilises a woven fabric, the airflow permeability La ftVmin/ft*; and. if the fabric U syn thetic. indicate whether the flU yam is spun or not spun.
(3) If the fabric filter device utilises a felted fabric, the density in ox/yd*, the minimum thickness in Inches, and the airflow permeability in ftVmin/ft*. <c> Such Information shall accompany the information required by | 61.10. The appropriate form Is contained in appen dix A to this part.
Subpart C---*National Emission Standard tor Beryllium
5 61.30 Applicability.
The provisions of this subpart are ap plicable to Ute following stationary sources:
<a) Extraction plans, ceramic plants, foundries. Incinerators, and propellant plants which process beryllium ore. beryl lium. beryllium oxide, beryllium alloys, or beryllium-containInc waste.
<b> Machine sliops which process
beryllium, bcrylllunr oxides, or any alloy when such alloy cdntalns more than 5 percent beryllium by weight.
61.31 Definition*.
Terms used In this subpart arc de fined In the act. In subpart A of this part, or in this section as follows:
(a> "Beryllium** means the element beryllium. Where weights or concentra tions are specified, such weights or con centrations apply to beryllium only, excluding the weight or concentration of any associated elements.
<b "Extraction plant** means a fa cility chemically processing beryllium ore to beryllium metal, alloy, or oxide, or performing any of the Intermediate steps In these processes.
ic) "Beryllium ore" means any natu rally occurring material mined or gathered for its beryllium content.
<di "Machine shop** means a facility performing cutting, grinding, turning, honing, milling, dcburrlng. lapping, electrochemical machining, etching, or
other similar operations <el "Ceramic plant" means A manu
facturing plant producing ceramic Items.
<fi "Foundry" means a`facility en gaged In the melting or casting of beryllium metal or alloy.
<g* "Ben* Ilium-containing waste** means material contaminated with beryllium and or beryllium compounds used oe generated during any process or operation performed by a source subject to this subpart.
fi .i
<h> "Incinerator- moans any furnace
used In yhe process of burning nj| for tho primary purpose of reducing the"
columo of tho wuu hr removing com bustible mxlter.
U) TropcUant- means a fuel and ox3-
dlicr physically or chemically combined
which undergoes combustion to provide
rocket propulsion.
*
<Jl "Beryllium alloy**means any metal to which beryllium has been added In order to Increase 1U beryllium content and which contains mors than 0.1 per cent beryllium by weight.
<k> "Propellant pl*nt- means eny
facility entaxed In tho mixing. casting,
or machining of propellant.
k
j 6131 EmImIwi Oiahnl
<a) Emlaalona to tho atmoaphero from
ataUonary sources subject to tho provi
sions of thlx oubpart ahall not exceed 10
cram* of beryllium over a 34-hour period,
except ax provided in paracraph tb> of
thlx section.
.
<b! Rather than meet tho require
ment of paragraph (a) of this oocUon,
an owner or operator may requeat ap proval from tho Administrator to meet an ambient concentration Utnlfon beryl
lium In tho vicinity of tho stationary
ource of 0.01 ^x/m*. areraxed over a
30-day period.
<11 Approval of uch requests may be
granted by the Administrator provided
that:
(1) At least 3 years of data lx avail
able which In the judgment ol tho Ad
ministrator demonstrates that the fu
ture ambient concentrations of beryllium
In the vicinity of the stationary source
will not exceed 0.01 sg/m\ averaged over
a 30-day period. Such 3-year period shall
be the 3 years ending 30 days before the
effective dale ol thi.Ytandard.
(Ill The owner or operator requests
such approval In writing within 30 days
after the effective date of this standard.
<1111 The owner or operator submits a
report to the Administrator within 45
days after the effective date of this
standard which report Includes the fol
lowing Information:
(a> Description of sampling method
Including the method and frequency of
calibration.
^
(b) Method ol sample analysis.
<c> Averaging technique for determin ing 30-day average concentrations.-
<d) Number, identity, and location (address, coordinates, or distance and heading from plant) of sampling sites.
<e) Qround elevations and height above ground of sampling Inlets.
</) Plant and sampling area plots showing emission points and sampling sites. Topographic features significantly affecting dispersion Including plant building heights and locations shall be Included.
<c> Information necessary for esti mating dispersion Including stack height. Inside diameter, exit gas temperature,
exit velocity or flow rate, and beryllium concentration.
(ft) A description of data and proce
dures (methodsor models) Used to de sign the air sampnng'nctwork U.e.. num
ber and location of sampling sites).
FtOrtAi. timirtx. vex. j. ho as--idat. afvii a. tvrj
RULES AND REGULATIONS
SS31
(O Air sampling data Indtcsting beryl
lium concentrations la the vicinity of the
stationary source lor the 3-year period
specified In paragraph (bldl of this
section. ThU data shall be presented
chronologically and Include the beryl
lium concentration and location ot each
Individual sample taken by the network
and the corresponding 30-day average
beryllium concentrations.
(2) Within 60 days alter receiving
such report, the Administrator will notify
the owner or operator In writing whether
approval la granted or denied. Prior to
denying approval to comply arlth the pro
visions ot paragraph <bi of this section,
the Administrator will consult with'
representatives of the stationary source
lor which the demonstration report was
submitted.
.
<c> The burning ot beryllium and/or
beryllium-containing waste, except pro
pellants. U prohibited except In Incinera
tors, emissions from which must comply
with the standard.
6131 Stack sampling.
(a) Unless a waiver ot emission testing
Is obtained under I 61.13. each owner or
operator required to comply with
I 61.32(a) shall test emissions from his
source.
(1) Within BO days ot the effective
date In the case ot an existing source or
a new source which has an Initial startup
date preceding the effective date: or
(2) Within 90 days of startup In the
case ot a new source which did not hare
an Initial startup date preceding the ef
fective date.
<b) The Administrator shall be noti
fied at least 30 days prior to an emission
test so that he may at his option observe
the test.
(c) Samples shall be taken over such a
period or periods as arc necessary to ac
curately determine the maximum emis
sions which will occur In any 21-hour
period. Where emissions depend upon the
relative frequency ot operation of differ
ent types ot processes, operating hours,
operating capacities, or other factors,
the calculation of maximum 24-hour-
perlod emissions will be based on that
combination ot factors which Is likely to
occur during the subject period and
which result In the maximum emissions.
No changes In the operation shall be
made, which would potentially Increase
emissions above that determined by the
most recent source test, until a new emis
sion level has been estimated by calcula
tion and,6he results reported to the Ad
ministrator.
<d> All samples shall be analyzed and
beryllium emissions shall be determined
within 30 days atter the source test. All
determinations shall be reported to the
Administrator by a registered letter dis
patched before the close of the next busi
ness day following such delermlnatlon.
<e) Records ol emission test results
and other data needed to determine total
emissions shall be retained at the source
and made available, lor Inspection by the
Administrator, for a minimum of 2 years.
61-3-1 Airaampling-
(a) Stationary sources subject-, to i 61312(b) 6haU locate air sampling sites
In accordance with a plan approved by the Administrator. Such sites shall bo located In such a manner as Is calculated to detect maximum concentrations of beryllium In the ambient air.
tb) All monitoring sites shall be op erated continuously except for a reason able time allowance for Instrument main tenance and calibration, for changing filters, or for replacemet of equipment
needing major repair.
<ci Filters shall be analyzed and con
centrations calculated within 30 days
after filters arc collected. Records of
concentrations at all sampling sites and
other data needed to determine such con
centrations shall be retained at the source
and made available, for Inspection by the
Administrator, tor a minimum of 2 years.
(d) Concentrations measured at all
sampling sites shall be reported to the
Administrator every 30 days by a regis
tered letter.
"
-(e) The Administrator may at any time require changes in. or expansion of. the
sampling network.
Subpact D--National Emission Standard for Beryllium Rocket Motor Firing
61.40 Applicability.
.
The provisions of this subpart are ap plicable to rocket motor test sites.
61.41 Definition*.
Terms used In this subpart are defined in the Act. In Subpart A of this part, or In this section as follows:
(a) 'Rocket motor test site" means any building, structure, facility, or Installa tion whfre the static test firing of a beryllium rocket motor and/or the dis posal of beryllium propellant Is conducted.
(b) "Beryllium propellant" means any propellant Incorporating beryllium.
61.42 EmUaion standard.
(a) Emissions to the atmosphere from rocket-motor test sites shall not cause time-weighted atmospheric concentra tions of beryllium to exceed 75 micro gram minutes per cubic meter of air within the limits of 10 to 60 minutes, accumulated during any 2 consecutive weeks. In any area In which an effect adverse to public health could occur.
<b> If combustion products from the firing of beryllium propellant are col lected In a closed tank, emissions from such tank shall not exceed 2 grams per hour and a maximum of 10 grams per day.
61.-13 Emi--i<n Ic-linc--r<H-kct firing iif proprllnnl di-fvo-at.
<a' Ambient air concentrations shall be measured during and after firing of a rocket motor or propellant dlsi>osal and In such a manner that the effect of these emissions CAn be compared with the standard. Such sampling techniques shall be approved by the Administrator.
tb) All samples shall be analyzed and results shall be calculated within 30 days after samples are taken and before any subsequent rocket motor firing or pro pellant disposal at the given site. All re sults shall be reported to the Adminis trator by a registered letter dispatched
e next business day
Ion of such results,
iampling test results Ml to determine innt concentrations ae source mnd-made Ion by the Adminlstrator. for a minimum of 2 years. <d> The AdmhjUtrator shall be noti
fied at least 30 days prior to an air sam
pling test, so thaf he may at tils option
observe the test.
j.
61.44 Slack sampling/
(a) Sources subject to S 61.42(b) shall
be continuously sampled, during release
of combustion products from the tank. In
such a manner that compliance with the
standards can be determined. The pro
visions of i 61.14 shall apply.
(b) All samples shall be analyzed.-and
beryllium emissions shall be determined
within 30 days after samples are taken
and before any subsequent rocket motor
firing or propellant disposal at the given
site. All determinations shall be reported
to the Administrator by a registered let
ter dispatched before the close of the
next business day following such deter
minations. `
'`
(c) Records of emission testjpsults and
other data needed to determine total
emissions shall be retained at the source
and made available, for Inspection by the
Administrator, lor a minimum of 2 years.
<d) The Administrator shall be noti
fied at least 30 days prior to an emission
test, so that he may at his option observe
the test.
Subpart E--National Emission Standard for Mercury
61.S0 Applicability.
The provisions of this subpart are ap plicable to those stationary sources which process mercury ore to recover mercury, and to those which use mercury chloralkall cells to produce chlorine gas and alkali metal hydroxide.
61.51 Definitions.
Terms used in this subpart are defined In the act. In subpart A of this part, or In this section as follows:
(a) "Mercury" means the element mer cury. excluding any associated elements. , and includes mercury In particulates. va-`
pors. aerosols, and compounds. (b) "Mercury ore" means a mineral
mined specifically lor Its mercury'* con tent.
<c) "Mercury ore processing facility" means a facility processing mercury ore to obtain mercury-.
(d) "Condenser stack gases" mean the gaseous effluent evolved from the stack of processes utilizing heat to extract mer cury metal from mercury ore.
(c) "Mercury chlor-alkull cell" means a device which Is basically composed of an electrolyzer section and a denuder (decomposer) section and utilizes mer cury to produce chlorine gas. hydrogen gas. and alkali metal hydroxide.
"(f) "Mercury chlor-alkall electrolyzer" means an electrolytic device which Is part of a mercury chlor-alkall cell and utilizes a flowing mercury cathode to produce chlorine gas anf^Qkgti metal amalgam.
fCOEtAt 8EGHIEX. VOL. 38. NO Sfr--ftlOAY, APll
1973
*
8832
-RULES AND REGULATIONS
t
<C> "Denuder" menu * horizontal or rertlcal container which U part of a mer cury chtor-alkall cell and In which water and allcall metal amaleazn are converted to allcall metal hydroxide, mercury, and hydroeen car In a short-circuited. elec
date In the case of an existing source or a new source which has an initial startup date preceding the effective date; or
(ill Within 90 days of startup tn the case of a new source which did not hare an Initial startup date preceding the ef
the Administrator, for a minimum of
2 years.
(ci Mercury chlor-alkall . plant*___
cell roocs ventilation system.
(II Stationary sourcca usInc mercury
chlor-alkall cell* may teal cell room
trolytic reaction. ih> "Hydrogen *as atrenrn" mearu a
hydroten ttream lormed in Wic chlor-
fective date. <3> Tlie Administrator shah be noti
fied at least 30 days prior to an emission
emission* tn accordance with paragraph ci (2i of this section or demonstrate compliance with paracraph (c) (t* of this
alkall cell denuder. It "End box" mean* a container!**
located on one or both end* ot a mercury rhlor-alkall electrolyzer which serve*
teat, so that he may at his option otrtervr the test
(3* Samples shall be taken over such a period or periods as are necessary to
section and assume ventilation emissions of 1.300 ems/day of mercury.
<2i Unless a waiver of emission testin* is obtained under i 81.13. each owner
as a connection between the electrolyzer and denuder for rich and at ripped nmslcsm.
< J "End box ventilation syatem" mean* a ventilation tyatem which col lect* mercury emission* from the endboxes. the mercury pump sumps, and their water coloctlon system*.
i k > "Cell room" mean* a structure!*! housing one or more mercury electro lytic chtor-alkall cell*.
accurately determine the maximum emis sions which will occur m a 24-hour period. No changes tn the operation shall be made, which would potentially in crease cmluioru above-that determined by the moat recent source test, until the new emission has been estimated by cal culation and the reautu reported to the Administrator.
<41 AU samples shall be analysed and mercury emlsiona shall be determined
or operator shall pas* alt celt room air
In forced *as streams through stacks
suitable focAeatlnc.
<U Within 90 days of the effective dale 9
In Use case of an cxlsUnx source or a new
source which ha* an Initial startup date
prcccdln* the effective date: or
(fit Within 90 days of startup tn the
ease of a new source which did not have
an Initial startup date preceding the
effective date.
Eml--ioo unisri.
Emissions to the atmosphere 'corn ats-
iriesrul' ,op*tt an
M,
12c: a.4W
crams of mercury $xr 24-Ikui iwrlod.
$61.33 Surk Mmplin(.
<a* Mercury ore processing facility. < \ i Unlea* a waiver of ctnlwKm testing is obtained under I Cl. 13. each owner
within 30 days after the source test. All the determinations will be reported to
the Administrator by a restored letter 4 |#s. 1^..... .* M.. _ _
tiulifltM <sy Micsll<z sucV. tl'-tci
tion. (II Uncords of emission test results
uid other data needed to determine total emissions shall be retained at the source and made available, lor Inspection by
<3> The Administrator shall be noti fied at least 30 day* prior to an emission test so that he may at his option observe
II.. <
'*' An owner or operator inky carry
out approved design, maintenance, atfff housekeeping practice*. A list of ap
proved deaign. maintenance, and house keeping practice* may be obtained from the Administrator.
or operator processing mercury ore shall test emissions from his source.
A/TUOU A
<1* Within 90 days of the effective date In the case of an existing wurce or
National fjtitiion Standard* for Hazardous Air Pollutants
a new source which has an initial start* up date preceding the effective date: or
<ll> Within 90 days of startup in the
I. S0WCC RETORT.
CorplUr.ee Stlus Information
case of a new source which did not have an initial startup date preceding the ef fective date.
12* The Administrator shall be noti fied at least 30 days prior to an emission test, so that he may at his option observe the test.
<3* Samples shall be taken overmuch a period or periods as 'are necessary* to accurately determine the maximum emissions which mill occur In a 24-hour
Inttryctlorti: 0an or operators of sources~of hazardous pollutant*
subject to tta National E!st1oa Standards for Hazardous Air Pollutants (ft required to iubalt tha Information contained In' Section t to the appropriate tnvlrorwwntal Protection Agency Regional Office before (data ettlch Is 90 days after tM standards art proojlgated}, Is provided 1ft f 61.04.
. A listing of regional offices
period. No changes in the operation shall be made, which would potentially in
A. SOURCE IKfORWION.
crease emissions above that determined by the most recent source test, until the new emission level has been estimated by calculation and the results reported to
-
1. Idcntlfleetlon/locatlon - Indicate the nae and address of each source.
A29 Ata
-
the Administrator. * 4 * All samples shall be analyzed, and
mercury emissions shall be determined within 30 days after the source test. Each
M9
A68
determination will be reported to the Ad
ministrator by a registered letter dis>aiched before the close of the next busi
ness day following such determination. <5* Records of emission test results
B19
1 * 1 ___-- J.. C< i t
Wir'333 BM B33 zrfrzjc
and oth<w data needed to determine total
emissions shall be retained at the source and made available, for Inspection by the
COuT
Administrator. lor a minimum of 2 years. <b) Mercury chlor-alkall plant--hy
drogen and end-box Tcntilauon gas streams.
<1* Unless a waiver of cmt\Mon test ing Is obtained under | 61.13. each owner
2* Coetact - Indicate the ntre and telephooe n*x6er of tha owner or operator or other responsible cfftctal vfroa EPA *ty contact con cerning this report.
E39 &S3 1 t- 1 -A 1 X s-- 1 . --t I I f-- t I I
or operator employing mercury chlorxlkait cell < a) shall test emissions from his source.
<U Within 90 days of the effective
tSA
I----1--i--------i--i--i--1 iLLiiXJfti.
3
FCDCtAX ttCZSTft. VOC 39. HO. 66--ftlOAY. Art It. 6. \9T3
fID U A l I t c m t l , VOl. J l, NO. 66-- HIDAr,
8836
RULES ANO REGULATIONS
titles of particulate matter. Th# filter bolder
must provide * positive ocai against from outside or around the niter. A healing
system capable of maintaining the filter at
a temperature of 350* I*, should
be used to prarest ooodenesiioo from occur
ring. 2.1 M Barometer. To measure atmospheric
pressure to jOJ is Bg. 32 ifwureim< of stork coM<tte4
(stacJt prnmr# frmperefur*. meuiwre eng
velocity)--33.1 tttot lube. Tyr*e B. or
equivalent, with a coeOdeat within 5 percent
over the working range.
333 pigrrenttai pressure pawpe Inclined
manometer, or equivalent, to measure veloc
ity held to within 10 percent of the minimum
value. Micromanometer* ahould be used U
warranted. "- ' 233 Temperature gauge. Any tempera
ture measuring device to measure stack tem
perature to within 1* f.
33.1 tresrufe gauge. rttot tube and In
clined manometer, or equivalent, to measure
stack preeeure to within 0.1 In llg.
333 KoUhtff defmntnetton. Wet and
dry bulb thermometers, drying tub**, con
densers. or equivalent, to determine stack
gas moisture contest to within I percent. 33 SmmpU recovery--33.1 Leakiest glass
ample bottles. 100 ml and 100 ml with Teflon
lined tope. 233 Graduated cylinder. 350 ml.
233 rustic for. Approximately 300 ml.
2 4 Xaelpste--3.4.1 Spectrophotometer.
To measure aheoebanew at 353.7 am. Perkin
rimer Model 301, with % cylindrical gas cell
(approximately 13 la. OD. x 7 is.) with
quarts glass windows, and hollow cathode
source, or equivalent. 2 43 Cos sampling babbler. Tudor Scien
tific Olaas Co. Smog Bubbler. Catalogue Ho.
TP-1150. or equivalent.
2.4 3. Arcorder. To match output of spec-
teophotometcr.
3. Reagents- 3.1 Slock reagent*--3.1.1
fofoittvm iodide. Reagent grade. 3.13 DutUIcd water--1 t S Potassium.
iodtdc solution. 25 percent. Dissolve 250 g
of potassium Iodide (reagent 3 11) In dis
tilled water and dilute to 1 to 1.
3.1.4 Hydrochloric acid. Concentrated.
3 15. Potassium todafe. Reagent grade.
3,1.0 Jodtne monochloride </C/ 1 0M. To
500 ml. of 35*3- potassium Iodide solution
(reagent 3.1 J). add 500 ml. of concentrated
hydrochloric acid. Cool to room temperature.
With rigorous stirring, slowly add 135 g. of
potassium lodate and continue stirring until
all free Iodine has dissolved to glee a clear
orange-red solution. Coot to room tempera
ture and dilute to 1500 ml. with distilled
water. The solution should be kept in amber
bottles to prevent degradation.
. 3.1.7 Sodium hydroxide pellets Reagent grade.
3.1 a Kitrte acid. Concentrated
3 1 3 H jrdroxflamine sulfate. Reagent
grade.
3.1.10 Sodium chloride. Reagent grade.-
3.1.11 Verc-wrtc chloride. Reagent grade.
32 .Sampling--3 2.1 Absorbing rolvtlon, 0J U JCI. Dilute 100 ml. of the l Okl 1CI stock solution (reagent 3.1 d\ to l to 1 with distilled water. The solution should be kept In glass bottle* to preveot degradation. Thl* reagent ahould be stable for at lead 3 months: however, periodic check* -.Mould be performed to insure quality.
332 Wash acid. 1:1 V/V nitric acid-, water.
333 DvaXUlrd, drlcmtrrcj water.
32.4 Silica pel. Indicating type. 5 to Id meah dried at 350* 1*. for 3 hours.
333 Ftiter (optional). Olavs fiber. VOn* SaSetf Appliances UOdBH, or equivalent. A filter may be necessary ta caws where the
*** tream to be sampled contain* large quantities of particulate matter.
33 iastriii--3 3 t Sodium hydrortde.
4 32 The sampling site ahould be at "least
tO N.--OtMutrs 400 ( of w.'dium hyoresvd* eight stack or duct diameters downstream
pellets ta distilled water and dilute to I to-4. and two diameters upstream from any flow
132 ked aging agent. if prrrraf hydros- disturbance euch aa a bend, expansion, or
ftamtna mifate. i f percent sodium cAio- contraction, roc a rectangular croe* section,
nde.-->To O0 ml of dlsulted water, add 13 c determine an equivalent diameter from the
of hydrosylamine rullate and 13 g of-eodium following equation:
<
chloride. Dilute to lOO ml. This quantity U sufficient for 30 analyses and must be pre
pared daily. 133 Aeration pas --Zero grade air 33.4 Hydrochloric aesd. 0 J.v.--Otlute 35 5
ml of ooncentrated hytlivchlwic acid t%* 1 to 1 wtlh distilled water
3f.tr 0'~L^W
where: D. i: Equivalent diameter. L i Length. U* ^ Width.
eq. 101-1 -
3 4 Standard mercury #oK. f ton i 34 1
4 3 3 When the above sampling site cri
Stock solution --Add 01354 g of mercuric teria can be met. the minimum number of
chloride to 90 ml of 03N hydrochloric acid. traverse points is four (4) for stacks 1 foci
After the mercuric chloride has dUaivd. In diameter or lee*. eight () for stacks larger
add OSH hydrochloric acid and adjust the than l foot hut 2 feet In diameter or leas, and
volume to 100 ml. One ml of this aiutioo twelve (12) for stacks larger than 2 feet.
Is equivalent to l mg of free mercury
4 2 4 home sampling situations may ren
3.4 2 Standard eotuftowi.--Prepare cali der the above sampling site criteria Imprac
bration solutions by aerially diluting the tical. When this U the case, choose a con
stock solution (3.4.1) with 0 3N hydn-chlo venient sampling location and use figure
ric add. Prepare solutions at concentrations 101-3 to determine the minimum number of
In the linear working range for the Instru traverse points. However, use figure 101-3
ment to be Used. Ooutlona of 02 eg* ml. 0 4 only for stacks \ foot In diameter or larger.
#g/ml and 0.0 eg/m1 have been found ac
4 3 5 TO use figure 101-3, first measure
ceptable for moat Instruments. DUr# all the distance from the chosen sampling loca-
solutions ta glass-stoppered, glass buttles. ' tton to the nearest upstream and downstream
These solutions ahould be stable for at least disturbances. Divide this distance by tM
2 months; however, periodic checks should diameter or equivalent diameter to deter
be performed to insure quality.
mine the distance ta terms of pipe diameters.
4. Procedure.--^.1 QuideUnee for source testing are detailed In the following sections. These guidelines are generally applicable: however, most sample sues differ to some degree arid temporary alterations such as stack extensions Or expansion* often are re quired to ensure the beet possible sample site, further, slao^ mercury is hazardous, care should be taken to minimis* ctpvture. finally, since the total quantity of mercury to be collected generally is small, the test must be carefully conducted to prevent contam bastion or loss of sample. -
Determine the correepoodlng number of traverse points lor each distance from fig ure 101-3. Select the higher of the two num bers of traverse points, or a greater value, such that for circular stacks the number is a multiple of four, and for rectangular stacks the number follows the criteria of section 433.
4 2,0 If a selected sampling point Ls closer than 1 Inch from the stack wall, adjust the locatloti'tof that point to ensure that the aampls Is taken st least 1 Inch away from the wail.
4 2 Selection of a sampling site and mini
4.3 Cross sectional layout and location of
mum number of traverse points:
traverse points:
'
42.1 Select a suitable sampling site that
43.1 For circular stacks locate the trav
Is as close as is practicable to the point of erse points on at least two diameter* accord
atmospheric emission. If possible, a: acts smaller than 1 foot in diameter should not be sampled.
ing to figure 101-4 sod table 101-1. The traverse ates shall divide the stack cross section into equal parts.
NUMfif r or DUCT OtAOtfTCRS UPSTRCAM (0lSTA.NCt AJ
0 5 2.0
MABtA Of DUCT OlAigTIK DOfTXSTOAJf* (DISTANCE EJ
figure 10C-3. Minimum ot traverse points.
ffDtlAl CCGtSTtt, YOC 3t, NO. 66--/ttOAT. Artll 6. 1973
..
RULES AND REGULATIONS
Table 101-1. Location of traverse points in circular stacks (Percent of stack diameter from Inside vail to traverse point)
Traverse|
point nuabcr
Number of traverse points on a diameter
*
di*x>eter 2 4 6 8 10 12 14 16 18 20 22 24 i
i 14.6 6.7 4.4 3.3 2.5 2.1 1.8 1.6 1.4 1.3 1.1 1.1 2 85.4 25.0 14.7 10.5 8.2 6.7 5.7 4..9 4.4 3.9 3.5 3.2 3 7S.0 29.S 19.4 14.6 11.8 9.9 8.5 7.5 6.7 6.0 5.5 4 93.3 70.5 32.3 22.6 17.7 14.6 12.5 10.9 9.7 8.7 7.9 5 85.3 67.7 34.2 25.0 20.1 16.9 14.6 12.9 11.6 10.5 6 95.6 80.6 65.8 35.5 26.9 22.0 18.8 16.5 14.6 13.2 7 89.5 77.4 64.5 36.6 28.3 23.6 20.4 18.0 16.1 8 96.7 85.4 75.0 63.4 37.5 '29.6 25.0 21.8 19.4 9 91.8 82.3 73.1 62.5 38.2 30.6 26.1 23.0 10 97.5 88.2 79.9 71.7 61.8 38.8 31.5 27.2 11 93.3 85.4 78.0 70.4 61.2 39.3 32.3 12 97.9 90.1 83.1 76.4 69.4 60.7 39.8 13 94.3 87.5 81.2 75.0 68.5 60.2 14 98.2 91.S 85.4 79.6 73.9 67.7* 15 95.1 89.1 83.5 78.2 72.8 16 98.4 92.5 87.1 82.0 77.0 17 95.6 9(7.3 85.4 80.6 18 98.6 93.3 88.4 83.9 19 96.1 91.3. 86.8 20 98.7 94.0 89.5 21 96.5 92.1 22 98.9 94.5" 23 96.8 24 98.9
Ft**/* 1CW. Crwt
tkcvilr
vrt4 JCtTO Ml pMlM<iCwlr <lMltl,
loctltoiof
ici *. C--W* <! ntlfCiW llacl 4iiVj4 1*1a 12 QI
vwi, *:v
i f.i i: mvjm < eft via.
<.3.2 For rectangular stacks divide the cross 6CCtioA Lnto as many equal rectangular areas as traverse points, such that the ratio of the length to the width of the elemental areas Is between one and two. Locate the traverse points at the centroid of each equal area according to figure 101-S.
<.< Measurement of stack conditions:
4.4.1 Set up the apparatus as shown In figure 101-2. Make sure all connections are tight and leak-free. Measure the velocity head and temperature at the traverse points specified by section 4.2 and 4.3.
4.4J2 Measure the 6tatlc pressure in the
stack.
.
4.4.3 Determine the stack gas moisture. _
4.4.4 Determine the stack gas molecular weight from the measured moisture content and knowledge of the expected gas stream composition. A standard Oraat analyzer baa been found valuable at combustion sources, lq all cases, sound englsiecrlng Judgment should be used.
SS37
8838
*Uirc AND HEGULATIONS
I
.1
.r
AS PrvparaUoa of sampling train: 4Jft.t Prior to uttabl^ claan all (UMvin (probe. trnplogerft ehd oocoKtort) by rinsing with wash add. tap vur, O.IK ICl. tap watt, and finally dUtltivd wUr. flto* too ml of 0.1U lot ta mc& o^4h am uvn Imping*TM. and plan* approximately 000 g of prswslgbvd ftU lea gsl ta the fourth Unploiu. San 00 ml of ih* 0.IU SCI m a bual lo the ample analysts. Bet up the Lrmla aitd ths probe aa to figure 101-1. 4iJ If the fat atraam to t>v umpU4 la excessively dirty or moist, Um Oral tmplngvr may'clof or become dliuta too rapidly for sufficient lnUn|. A altar can be placed ahead of the tmplngers to collect the particulate* Aa initial empty laptuftr may aleo be used to remote excess moisture. If a fifth Impiftpr la required, the final tmplngvr may hare to be carefully taped to the ouutd# of the sample boa. , 4il Lrak check the sampling train st thv sampling. *Ua. The leakage rate ahcmid not be in no*M of | percent of the dealred wn* pltng rate. If condensation la the probe or fitter is a problem, probe and filter healer* wtll be required. Adjust the heater* to pro Tide a temperature of at least 2AO* 9*. Place crushed lev around the implngvrs Add more
loe during the teet to keep the temperature
of the ga*** tea* to* the last Imping** at TO* T or lea*.
AS Mercury train operation:
A 4.1 tor each run, record the data re quired oo the example aheet shoea to figure 101-4. Take readme* at rtrh Muapllaf point at least every ft minute* and when slgntficant chance* In slack condition* n*creait*te additional adjustment* la flow rate. .
4 4J Oample at a rate of 0 ft to 10 cfm fiampWe shall be taken over uch a period or period* a* are tvroraaary to accurately determine the maximum rmtatMii whirh would occur la a 24-hour perhd la the case of cyclic oieration*, oufirwitt teat* shall be made eo a* to allow accurate determination or calculation of the rroluUNu which will occur over tike duration of the cycle. A mini mum sample time of 2 hour* U recommended, la mm instances. bifti mercury concentratloo* can prevent sampling in one run lt*r the deatred mtatmum tlcue. TbU I* Indicated by rvddvatog ta the first Inpiopr a* free Iodine 1* liberated, la this case, a run may be divided Into two or more eubrun* to en
sure that the absorb Inc solutions are not
depleted.
'
than 2 daft, the Initial add wash proced must be followed.
4 4 Analysis:
*
4 i Apps/efws prepareMon.--Clean all
Claeswar* according to the procedure of sec
tion 4 ft l. Adjust the Instrument setting* ao-
oordtnc to the Instrument manual. uMng m abaoepUoo wer*4ecifth of 253.7 ft,
4 ft 2 AaafjrfO pvcp*r(to*.--Adjust the
air delivery pressure and the needle valve' to obtain a constant airflow of about 13 to/
l/tain The analyal* tube should be bypassed
except during aeration. Purge the equipment
few 3 minute* Prepare e sample of mercury
standard aolutloo (3.43) accordIn* to section
4 ft 3. 1*1 ace the analysts tube in the line,
and aerate until s mlkiaium peak height U
reached on the recorder. Remove the analysts
tube, flush the liar*, and rttise the analysts
tube with distilled water. Repeat with an
other sample of the same standard solution.
This puree and analysis cycle u to be re-
l*et#4 until peak height* are reproducible.
4 ft 3 Srmpu perpsrsfum.--Juat prior to
analysis, transfer a sample aliquot of up
to AO ml to the cleaned 100 ml analysis tube.
Adjust the voluou lo M ml with 0.1 M ICl U required. Add 6 ml of 10 M sodium hy
droxide. cap tube with a clean (lass stopper
and shake rigorously, Prolonged. etgorous
shaking at this point is necessary to obtain
an accurate analysts. Add ft ml of the re
ducing agent (reagent 333). cap tube with
a clean glass stopper nod shake vigorously
and Immediately in sample line.
4 ft.4 ftfcrcury determtaafto*.--After lh# system has beea etabtltxed. prepare eamplHr^t
from the sample bottle according to section 4 81. Aerate the sample until a maximum peak height is reached oo the recorder. The mercury content t* determined by compar ing ths peak heights of the samples to the peak height* of the calibration solutions. If collected samples *r* out of U>s linear range, the sample* should be diluted. ITrparv a blank from the 100 ml bottl* according to section 4 83 and analyze to determine the reagent blank mercury level.
ft Calibration.--3.1 5ampflnp Crain.-- S.l 1 Use xtandsrd methods and equipment a* detailed In AITD-0578 to calibrate the rate meter, pitot tube, dry gas meter. and pro>e heater (If u-ed). Recalibrate prior to each teat aerie*.
r r*v uu. nll fill
ft.2 A najytu.---53.1 Prepare a calibra tion curve foe the spectrophotometer using the standard mercury solution*. Plot the peak height* read on the recorder versus the concentrations of mercury In thv standard solution*. Standard* should be Interspersed with the samples since the calibration can change slightly with time. A new calibration curre should be prepared for each hew set of samples run.
4 63 To begin sampling, position the
nozzle st the first trsrera* point with the Up
pointing directly into the fa* stresco. Im
mediately start the pump and adjust the
flow to isokinetic condition*. Sample for at
least 5 minutes st eai traverse point: samp
ling time mutt be U?V
foe each point,
klatntaln Uoktnetlc sampling throughout the
sampling period. Nomograph* which aid in
the rapid adjustment of the sampling rate
without other computation* are la APTt>-
Oft76 and are available from commercial sup
plier*. Note the standard nomograph* are
applicable only foe type S pitot tubes aod
*lr or a stack gas with an equivalent density.
Ooatact EPA oe thv sampling train supplier
foe Instruction* when the standard nomo
graph U not applicable.
4.6.4 Turn off the pump at thv conclusion
Ot each run and record the final reading*.
Immediately remora the probe
nocxJe
from the stack and handle la accordance
with the asmpie recovery proeee* described in section 4.7.
<-7 &*mple recovery;
4.73 (Ail glass storage bottles and the grad
uated cylinder must be precleaned a* in sec tion 4 A.I). This operation should be per formed in an acre free of poaalbl* mercury contamination. Industrial laboratories and ambient air around mercury-using facilities are not normally free of mercury contamina tion. When thv sampling train is moved, care must be exercised to prevent breakage and contamination.
4.73 Disconnect the probe from the Implager train. Place the content* (measured to ^1 ml) of tha first three Lmptnger* Into a 500 ml sample bottle. Rln*e the probe and all glaa*wars between It and the back half of thv third lmptogcT with two 50 ml portion* of 0.IM ICl solution. Add the** rin*o* to the first sample bottle. Poc a blank, place 60 ml of the 0.1 W ICl In a 100 ml sample bottle. If used, place thv filter along with 100 ml of 0.1 VC ICl in another 100 ml sample bottle. Retain a filter blank. Place the silica get In the plastic Jar. deal and secure all containers for shipment. If an additional test 1* desired, the glassware can be carefully double rtored with distilled water and reassembled. How ever. If thv glasswsr* u to be out of use more
6 Calculation* --6.1 Average dry gas meter temperature, stack temperature, stack pressure and average orifice pressure drop. Bee data aheet (fig. 101-6).
6 2 Dry pa* relume.--Correct the sample volume measured by ths dry gas meter to tack condition* by using equation 101-2.
ztt iri.r,
" cq. 101-2
w \ .. -
of c*< v*mcle lt*ro*ixh *Uy fa* msiev
coo*1iu<w\j). fi*.
Vm - Vdumv of ca wmpU through the 6<y c* meter cvoditaKu). A*.
T. -- A vrrac* tecafvritura of stwk css. *PJ". -- a Tffrt Cry exj nwee um(vntun, * R.
pvt* =: Barometric pressure at ths ortfice
meter,. Inlig.
\
6H = Average pmiuridrop acroaa the ori
fice meter. lnK0.
13 fl = Specific gravity of mercury.
P. = Stack prvasur*. Pv-. + static pressure,
lallg.
/ FfOfkAi ttdfTTk. voc. 3, HO. 66------FtlOAT. Artie 6, 1971
W JW 1W
&M *
S3 Volrniu of voter vapor.
eq. 101-3
Vr4V*lwn# l al*r vapor la tl*a (u uapM (tuck
t eoodnieaa), A*.
C*-*44(00
vita Umm o*iu arv oaad.
I'l.-TtOl tlM f
toOvtAj ) faaptAcrt
ad flLflc* gW (** ngur* 101-7). ml.
T*Attv^fUdl |W Uopmuorr, *K.
' f-lUtl prvuft.
db sialic prawure. In. Hr.
" 4.4 Total rw velum*.
# Vm-V^+Vw,
vq.101-4
V\^*t--TKAai vatama ( pe narapie (iwk condition*),
ft*.
V-,--Valina# f c*U thraogb (u mc(v (sUek coo41* Uaoi),fM.
. Kr*Vikan l valer vapor la c* amf4* (stack o*q4U1m), ft*.
vovic ot uouo
mwcoiicm
RULES and regulations
PLANT
________________________________
DATE______________________________________
RUN NO.______________________________________
STACK DIAMETER. In._______________________
BAROMETRIC PRESSURE. In. Hg;__________
STATIC PRESSURE IN STACK (Pgl. In. Hg.
OPERATORS__________________________'
.
Traversa point .number
Velocity head. In. HjO
v7
Stack Temperature
uouaeauciia mKUM<oucno convict wt Mm to vcuaa vr dividing total velg^t acvAM otam or vatu. <i *-**
TOLV **nt -4
flftsa 10t*7. An4|t*e*t 4#v. 6.8 8tack (u Telocity. Use equation 101-5 to calculate the slack gas velocity.
(r.)... =K.C.(N/AP)....^/i?y~i-
cq. 101-5
Tflirtf,
(rj. r. - Arvrace stack pes vcWit jr. f^* p*r seven*).
K,'
.. , ft. / .-* He ` vcAtb.tuaU*'
V* / *W n
lb*e* units arc u*ed.
c,, - I'ttOt tub* coafllcioit. dlTnrnjtonbv*.
ni.
Arcmcc stack (u (nutertturf, Ml.
iVAf).*.-Average aquare root of the velocity head
ol stack cas (in. lltO)'* (see nc. ll'l*M. /'.-Slack pro-wire. f\w astatic j<ct*Fure.ln. Ur.
A/-Molecular veiebt of stack jra* (a-rt bans), the summation of the prc*lu<tj of tha
molecular wricM ot *wh component multiplied by Its volume-trie pf<>i"ortloa la the mixture. lb./U>. mole.
Figure 101-8 above* a sample recording sheet
for Telocity traverse data. Use the averages
la the Wat two coluaiu of figure 101-8 to
determine the average stack gas velocity from equauoa 101-6.
6.6 Mercury collected. Calculate the total
weight of mercury collected by using equa tion 101-6.
W, = VCi~ V*C* < +V*Cf) _.eq. 101-6 where:
Wtrs total weight of mercury collected, ag.
I -j*
.
.
AVERAGE: Figure 101-8- Velocity traverse data.
KWtAl UCISTTa, VOl. 38, NO. 44-----FUDAT, AMU 4, 1973
t
88-10
RULES ANO REGULATIONS
fisTDUl TOlUtM Of OOTVWAMd BVOUtur**
us4 ICX la aampte'botUe. ml. CisCoocvalnAhm of mercury ommuti^ ta
ample bottle. *</ml. 7=Tot*l eoium* ot 1CI QMd La ampUng
(tmplager content* and all wa*h amount*). mi C* = Blank concentration of mercury In ICl oiuUoa. #f/III1 7V=sTotal eoiume ot ICl uaed In Biter bottle (If u*ed). ml. C/=Cooc*QlnOoQ or mercury In filter boUk (tf uaedt.
9.1 TbU] mercury cmluloa. Calculate the total amount of mercury emitted from each Uet per day by equation 101*7. Tbl* aquaUrn fee applicable for conuououe operation*. For cyclic operation*. uae only IP# time per day each etaefc U In operation. Tbe total mercury emimlnne from a aouroa IU be the eumxaatioa of reeutu from all auekju
R6.LOO pcowWcUt R
10*
J. I0I-7 *bm:
/( Reieef eoa^aea. tdf. eUbl < awrwy celketal. <.
I\^.l *Ttj*aJ ttlutMW cm aape tflack coodKlonsi, A . Uek ce ***eeity. M jwe --coed.
4.0Ud era*. ft*.
pling Measurement*. paper presented at the Annual U**Ung of tbe Atr IN>liwUcn Control AaeociaUon. Ot LouU. Mo. June 14-19. 1970
11. Smith. W o_ el ai, Qtack Oaa Sampling Improved and dimpltfied with New equip ment. AJ<CA paper No. 07-119. 1007.
11 smith. W 0 _ K. T. ttbtcehara. and VC. f. Tudd. A Method of Interpeettnc (Hack. Ciamplln* Data. Paper preaeated at the Odd Annual MeeUn* of tbe Air f'ollutlon Control Ajeociation. Ot. Inula, Mo. June 14-19. 1970.
17. OpeCtfloatloae for Incinerator Teetln* at Pederai pacHUlea ntS, NCAJX7. I9d7.
14. Otandard Method for Sampling Stack.* for Particulate Matter. In: 1971 llook of ASTM Alondarda. part XS. Philadelphia. 1971. ASTV OealcMUM O-Sth-71.
11 Veoaard. J. K. KWmentary Ptuld Meohanfena. John WUey and flooi Inc- New Tort. 1947.
Mxmo9 i9t. umtkCt mctmoo roa ema* MiMiTioe or r4TCUTt un oascotrt an* cxjwt ucnnona non mnokUT movck (KTwoout truutai
1. Frimciptr and cyylkrMKy-U frlud-
--particulate and caaroue mercury *cnMmne are leokfaeUcaily aampled from the ^urce and collected in acidic Iodine monoChlonda eotuuoo. The mercury coUectod <tn the mercurio form) U reduced to elemental mercury In baaic eotuttoo by hydrorylamtne eulfate. Mercury M aerated from'the eolutlon and aaeiywed vulot pretrophotometry.
1J Applicability.--Thla method u appli cable for the determination of particulate and faeeou* mercury emu*lone when the carrier f*a etream U prtoctpaUy hydrocen. Th# method U for uae la duota or alack* at atationary aouroea. Unlre* othenrUe apectaed. ihle method la not Intended to apply to fa* atreama other than thoee emitted directly t^ the atmosphere without further proree*lnf.
2. Apperefwe--7.1 laeipfiaf trafn.--A ache* matfeo of the eampUnf train tieed by SPA u ahowm ka fifure 101*1. Oommerotal modela of thia train are eeeitabte. althoufh complete ooootracUoa detalid are deeoclbed ta APTO0671/ ahd operatiof and molotananoe procwdurea are deecxibed la Ai*TD-067d. The componeata eeeeoUal to thu eampllnf train are the followlac:
ACIO TRAP
ti.t taokinetlc rartation (comparieoa of velocity of CMla probe up to ctock velocity).
`
" -L.-T'tO...,
cq. 101-8
-- TUJ ruliuiit l<( < vtii.flt \4m l (vtflUViirtl.
ft*.
A . -- Prole Up ;, A*
-jtampOug linif,
* AVffK^ itrk (w
fm i*v
7. Xraiuafton o/ reult--7_1 Pcfcrmtna(ion of compliance,--'7.1 ,1 Each partormoQO* teat ahaU cooalat Ot threw repetition* of the applicable teet method. For the purpose of determining compliance with an applicable national eoxieelaa *tandard. tbe average of multi of all repetition* *hail apply.
7 2 Acceptable UoJWnetic rendu.--7,3.1 Tbe following range *et* tbe limit on accept able Doklnetlc oampling rewult*;
tf the result* are accept able; otherwise. reject tbe teet and repeat.
8. ftc/crmcee.-- 1. Addendum to Specific*, ttoo* for Incinerator Teettng at fVdcraJ racUlUea. PHS. NCAPC. Dec. 6. 1967.
X Determining Dust Concentration ta a Qw Stream. ASMS Performance Tc*t Cede No. 77. New Toek. N.T- 1957.
7. Devoekln. Howard, el a),, Air Pollution Source TcwlLog Manual. Atr Pollution Con trol DUUIct. Loe Angelea. CalLf.. Nor. 1943.
4. Hatch. W. R. and W L. Ott. "Determina tion of Sub-Micro-gram Quantities of Mercury by Alocate Absorption Spectropbotomctry." Anal. Chem.. 40:2066-67, ISXS6.
5. Mart. L. S. Mechanical Engineer*' Hand-
boo<. McOraw-Hlll Soot Co. Inc. New Tort. N.T.. 1951.
6. Martin. Robert M . Construction Details of laotlnetlc Source 5Ampllng Equipment. Environmental Protection Agency. APTO-- osei.
7. Methods for Determination of Velocity. Volume. Dust and MUt Content of Ooj*c*. Western Precipitation Dithioo of Joy Mfg. Co-Xoa Ancetca. Calif Sul WP^O, 19<53.
6. Perry. J. R_ Chemical Engineer** Hand book. McGraw-Hill Boot Co. Inc, New Twt. N.T, 1900.
9. Roca. Jerome J. Maintenance. Calibra tion. and Operatloo of l -otinetic Source Sam pling Equipment. Environme ot*b FTotccuoo
Agency. APTD-0576.
10. Sbtctharv. B- T- W. r. Todd. and W. 3. Smith, Significance ol 5toc* in Stack Sam
PUMP
Figure 102*1. J\?rcury sampling train
7.1.1 Nocjk*. Stainlea* etc*l or gl** wttb abarp. tap*rcO leaning edfe.
3.1 2 f*robc. Sbcathed PjTrt * glaee. 3.1 7 fito< tube. Type & l&fure 103-3). or equivalent, with e ooefScieQt within & per oral over the working range, attached to probe to monitor rtack foe Telocity. 3.1.4 /mpTnpfri, rour Oroenburg-Smlth lmplngen connected in ecrlee with (Uu balljoint Otunga. TTie Hrt. third, and fourth imploger* may be modified by replacing tbe tip with ooe-half loch ID staie tube extend ing to one-helf Incb from the bottom ol the fia.k. 3 15 Arid trap Mine *afe(y appliance* air line Oiler, catalogue No. 61657. with acid ahorbtnc cartridge and ultable connectloos. Or equivalent. 3 16 Xctcr-lru} tftiem. Vacuum gage, leak-
lea* pump, thermometer* capable of measur ing temperature to within 6*P. dry go* meter with 3 percent accuracy, and related equip ment. described in APTD-0M1. to maintain an Leotinetlc Sampling rate and to determine aample volume.
3.1.7 Sarometef. To meaeure atmospheric prceeure to -, 0.1 in bg.
* Theee document* are available for a nomi nal coat from the National Technical loformaUoa Service. UJ3. Department of Com merce. 5365 Port Royal Road. Springfield. Va. 23151.
* Mention of trad name* or commercial product* dove not oooatltut* endorsement by tbe Environmental Protection Agency.
9 RDlkAl tfClSUk. VOt. 34. NO. 66--ftlOAT. A^tlL 6. 1973
RULES AND REGULATIONS
. 8S-11
22 Measurement of stack conditions
(stock pfcjtufe, temperature, motilure, and velocity)--2X1 Pitot tube, Type 6. or equivalent, with * coct&cteot within 6 per
cent over Lheworfctng range. 222 Differential pressure gape. Inclined
miQocarver, or equivalent, to measure veloc
ity bead to wtthtn 10 percent of the mini mum value, UlotMunomctcra ahoutd be used
U wwTtaUd. 222 Temperofure gage. Any tempera
ture-measuring <levloe to measure stack tem
perature to within 1* T. 22.4 frmerr pope. Pitot tube and in
clined manometer, or equivalent, to measure
stack preaeure to within 0J tn tig. 222 Moisture determination, Drying
tube*, condensers. or equivalent, to deter
mine slack gas moisture content in hydrogen
to within 1 percent. 22 Sample recovery--22.1 Lea*less glass
sample bottles. 600 ml and 200 ml with Tcflon-Uned tope.
222 Graduated cylinder. 350 ml.
222 fhi((C far. Approximately 300 ml. 2.4 Analysis--3.4.1 Spectrophotometer.
To measure abeoebanoo at 253.7 nm. Perkin
Elmer model 303* with a cylindrical gas cell
(approximately U In o.d. x 7 tn) with quarts glaee windows, and hollow cathode source, or equivalent,
2.4.2 Gas sampling bubbler.Tudor Scien
tific Co. Smog Bubbler, catalogue XTo. TP1160. or equivalent.
2.42 Recorder. To match output of
spectrophotometer. 3. Reagent*.--3.1 Stock reagents.--2.1.1
Potassium Iodide. Reagent grade. 3.12 Distilled teater,
3.13 Potassium Iodide solution, 25 percent.--Dissolve 360 g of potassium Iodide (re agent 3.1.1) in dUtUled water and dilute to 1 to 1.
3.1.4 Hydrochloric acid. Concentrated.
3.1.5 Potassium iodate. Reagent grade.
3.1.5 Iodine monochloride (/Cl) 1J3M. To 800 ml of 35 percent potassium Iodide
solution (reagent 3.13), add 800 ml of con centrated hydrochloric acid. Coot to room temperature. With vigorous stirring, slowly add 155 g of potassium Iodate and continue
stirring until all free iodine has dissolved to give a clear orange-red solution. Cool to room
temperature and dilute to 1.800 ml with dis tilled water. The solution should be kept in
amber bottles to prevent degradation. 3.1.7 Sodium hydroxide pellets. Reagent
grade.
3.1.8 3.1 9 grade.
Nitric acid. Concentrated. Hydraxytaminc rulfate.
Reagent
3.1.10 Sodium chloride. Reagent grade.
3.1.11 Mercuric chloride. Reagent grade. 32 Ssmpllnp. 32.1 Absorbing solution.
OJLM /Cl. Dilute 100 ml of the l.OM 1C1 stock
solution (reagent 3.1.8) to 1 V with dlatallied water. The solution should be kept In glass
bottles to prevent degradation. This reagent should W stable for at least 2 months; how
ever, periodic checks should be performed to Insure quality.
3.2.2 Wash acid. 1:1 V/V nttrtc acid-water. 32 3 Distilled, deionized irater. '
3.2 4 Silica gel. Indicating type. 8 to 1C mesh, dried at 350*F for 2 hours.
33. Analysts--33.1 Sodium hydroxide. 10S. Dissolve 400 g of sodium hydroxide pel lets la distilled water and dilute to l \.
3 32 Reducing agent. 12 percent hydroxylamfne rulfate. 12 percent sodium chloride.
To 60 ml of distilled water, add 12 g of hy-
drotytamlne sulfate and 12 g of sodium chlo ride. Dilute to 100 ml. This quantity is
suacient for 20 analyses and must be pre pared dally.
3.32 Aeraflon gas. Hero pmdc Mr.
33.4 Hydrochloric acid. OJS. Dilute 23.5 ml of coocentrated hydrochloric acid to 1 1 with distilled water.
3.4 Standard mercury solu (ton?--3.4.1 Stock solution. Add 0.1334 g of mercuric chJorids to 80 ml of 03N hydrochloric acid. After th mercuric chloride has dissolved, add 03H hydrochloric acid and adjust the volume to 100 ml. One ml of this solution ts equivalent to t mg of free mercury.
3.42 Standard solutions. Prepare cali bration solutions by serially diluting the stock solution (3.4.1) with 02N hydrochloric acid. Prepare solutions at concentrations in the Unear working range for the instrument to be used. Solutions of 02 #g/ral. 0.4 sg.'tnl and 0.8 ag/ml have been found acceptable for most instruments. Store all solutions in glass-toppared, glass bottles. These solutions should be stable for at least 2 months: how ever. periodic checks should be performed to Insure quality. * <
4. Procedure. 4.1 Guidelines for source testing are detailed In the following sections. These guidelines are generally applicable: however, most sample sites differ to some de gree and temporary alterations such as stack extensions or expansions often are required to insure the beat possible sample site. Fur ther. since mercury la hazardous, care should be taken to minimize exposure. Easily, since the total quantity of mercury to be collected generally la smalt, the test must be care fully conducted to prevent contamination or loss of sample.
42 Selection of a sampling site and mini mum number of traverse points.
42.1 Select a suitable sampling site that is as close as is practicable to the point of atmospheric emission. If possible, stacks smaller than 1 foot la diameter should not be sampled.
4.2.2 The samflog site should be at least eight stack or diet diameters downstream
and two dlametei upstream from any flow
disturbance suctuaa a bend, expansion or
contraction. For* rectangular erase section,
determine to equivalent diameter from the
following equation:
'
" D'=r?w
where:
'
?. = equivalent dlamctlr.
X- = length. Wsrwldlh.
., .
. **
4.22 Whea.the above sampling atte crite ria can be met, the minimum number of traverse points la four (4) for stacka 1 foot in diameter or leas, eight (I) for stacks larger than l foot but 2 feat In diameter or leas, and twelve (12) for stacks larger than 2 feet.
42.4 Some sampling situations may ren der the above sampling site criteria Imprac tical. When this la the case, choose a con venient sampling location and use figure 102-2 to determine the minimum number of traverse points. However, use figure 102-3 only for stacks 1 foot la diameter or larger.
4.2.5 To use figure 102-3. tint measure the distance from the chosen sampling location to the nearest upstream an& downstream dis
turbances. Divide this distance toy>4flfe di ameter or equivalent diameter to determine the distance in terms of pipe diameters. De termine the corresponding number of trav erse points for each distance from figure
102-3. Select the higher of the two numbers
of traverse points, or a greater value, such that for circular stacks the number Is a mul
tiple of four, and for rectangular stacks the
number follows the criteria of section 432.
NUUK* Of 0UCT OtAMETEftS UPSTREAM* (DISTANCE A]
0.5 1.0 1.S
2.0 23
Flflum 104-3. Wlntatm nu.T-bor cf traverse points.
43.8 If a selected sapling point is closer tion of that point to Insure that the sample than l loch from stack wall, adjust the loca is taken at leafft 1 inch away from the wall.
ftOUAl tECISTER, VOL 3, NO. 66-----FRI0AT. AfUl 6, 1973
A
8842
*t/lK AND *CGULAriONS
; 4J
Ujwit and location of
tnnrw point*.
4 J.t roc circular leti lonu IM tra
cer** point* og at l#**t two diwwim m-
cordlng to Qfur 103-4 and table 103-1. Tb*
tracer** un ahall divide the luck-crt** *<-
txwt into (quii prU.
r
4 22 Tut rectangular stark* dine* th
fTOW-yrUon tDto a* many equal rectangular
r/f a* tracer** point*, such that the ratio ot
the length to tb* width of the element*! area*
| between on* and two. Locate the tracer**
points at the centroid of each equal area ac-
to Qptft 1014.
4.4 Measurement of stack coodiuona
4 4.1 Set Up tb* apparatus a* ahoam In Ague* 101-2. Malta aura all connection* arc tight and leak free. Utmur the velocity head and temperature at tb* tracer** point* speci fied by section 4J and 42.
4 4.2 Measure the stalk pressure in the . alack.
' 4.43 Determine tb* atack fa* moisture.
C4 O'i-- w--
T*bl 102-1. Locttion of tren point* In c1rculr iUcU (Percent Of itck dl.ncter froa Imtde wll to trevene point)
Tr.ver**
point
db<r on *
dl4eter
2
4
Hunter of trsreric point* on <51 aweter
6 8
10 12 14 16 18 20 22 24
1 2. 3 4
5 6 7 8 9 10
n 12
13
u
15 16 17 18 19 20 21 22 23 24
14.6 85.4
6.7 25.0 75.0 93.3
-
4.4
14.7
29.5
70.5
85.3 95.6
3.3 10.5 19.4 32.3 67.7 80.6 89.5 96.7
2.5
a.2
14.6
22.6
34.2 65.8
77.4 8S.4
91.8
97.5
2.1 1.8 6.7 5.7 11.8 9.9 17.7 14.6 25.0 20.1 35.5 26.9 64.5 36.6 73.0 63.4 82.3 73.1 88.2 79.9 93.3 85.4 97.9 90.1
91.3 98.2
1
1.6 4.9 8.5 12.5 16.9 22.0 28.3 37.5 62.5 71.7 78.0 83.1 87.5 91.5 95.1 93.4
1.4 4.4 7.5 10.9 14.6 18.8 23.6 29.6 38.2 61.8 70.4 76.4 81.2 85.4 89.1 92.5 95.6 93.6
1.3 3.9 6/7 9.7 12.9 16.S 20.4 25.0 30.6 38.8 61.2 69.4 75.0 79.6 S3.5 7.1 90.3 93.3 96.1 93.7
1.1 3.5 6.0 8.7 11.6 14.5 18.0 21.8 26.1 31.5 39.3 60.7 68.5 73.9 78.2 82.0 8S/4 88.4 91.3 94.0 96.5 98.9
1.1 3.2 5.5 7.9 10.5 13.2 16.1 19.4 23.0 27.2 32.3 39.8 60.2 67.7" 72.8 77.0 80.6 83.9 86.8 89.5 92.1 94.S 96.8 98.9
4 4 4 rvtermio* th* slack fa* mnleculat weight from th* measured moutur* content jw! knowledge of th* *tpected (a* ttrtan composition. hound engineering Judgment should N tard.
4 1 Freparstloa of sampling train. 4 3 1 rrlor to assembly. clan J1 gla*-
Iprob*. tmplngera, and connector*) by rin*lnc with vu* acid, tap water. 0,1)4 JCl tap water, and finally distilled water. Place 100 ml (4 0 iM ICl la each of th* first threw tmptngera. and ptac* approximately, 300 f. of prvtl|hr4 silica g*1 In th* fourth lmptnger. bar* aO ml of th* 0.1)4 ICl a* a blank in th* aample analyst*. 0*t up the train and the probe a* In Hfure 103-1.
4 32 Leak check tb* sampling train at the sampling alt*. The leakage- rat* should not be In race** of 1 percent of th* deatred sampling rate. Place crushed tc* around th* impinger*. Add more Ice during th* run to keep the temperature of th* gaa* leaving the last tmptnger at TO* Tot lea*.
4 d Mercury train operation. 4 4 t Safety procedure*. It t* Imperative that th* sampler oonduct th* sourew teat under condition* of utmost safety, since hydrogen and air mixture* are *plo*tv*. Th* aampl* train essentially l* Iaklea*. ao that attention to aaf* operation can be concen trated at U* inlet and outlet. The following specific Item* are recommended;
4 0 1.1 Operate only tb* vacuum pump during the te*L. The other electrical equip ment. eg. heaters, fan* and timer*, oorrad^
are not essential to tb* succwa* of a hydro gen stream teat.
4 0 1 2 8*al th* aampl* port to minimise leakage* of hydrogen from th* stack.
4 0 13 Vent sampled hydrogen at least. 10 feet away from tb* train. This can be
accomplished easily by attaching a y^-ln Id. Tygoo tub* to tb* exhaust from th* orifice meter.
4 0 2 For each run. record the data re quired on tbfr aampl* aheet shown In figure
103-0. Take readings at each sampling point at least every 3 minute* and when significant
change* In stack conditions necessitate ad ditional adjustments In flow rate.
40 3 Sampla at a rat* of 0.3 to 1.0 efrn. Sample* shall b* taken over such a period
or periods as axe necessary to accurately determine the maxlnvupi emissions which
would occur In a 34-hour period. In the case of cyclic opertUoqa, sufficient tests shall be
mad* so as to allow accurate determination or calculation of the emissions which will
occur over the duration of tb* cycle. A mini
mum sample Urn* of 2 hours Is recommended. In torn* instance*, high mercury conocntra-
Uorw can prevent sampling in on* run for
the desired minimum tiro*. This la indicated by reddening In tb* first impinger as free Iodine u liberated. In this case, a run may
be divided into two or more subrun* to insure
that the abeocblng solutions are not depleted.
/ KDCLAl HCOTU, YOC 3*. HO. -----ftlOAT. ATTtt 4. 1973
RULES ANO REGULATIONS
* SS43'
i^MvtnwruPX.
worptlon wavelength of
loan*. tftum.
untnc reowe_ &mo.*<. v
r*w tne** *4. ,,
MK(
m
MM
d*nc rj. *4
iua nwtuiwi
waocm MAO
on<nui *CM
MTU ( M.
CAS IAM( ST3
c*t turn 41 OHtUTlM
* MiT r*-*.L*
evtut
*
tMM mas hmum. HMU1UK
r
t, cporaUon.--Adjust the
*nd the needle Valve to
flow or about 1,3 1/mln.
should be bypassed .ex-
u Purge, the equipment
re a sample of mercury
M.2) > according to sec*
l analysis tube in the line.% laxtmum peak height is
reached on te recorder. Remove the analy sts tube,' flush* the lines, and rinsesthe
analysts tube with distilled water. Repeat
with another sample of the same standard
olutlon.'Thls purge and analysts cycle Is to
be repeated until peak heights' are repro
ducible.
r
+a*M. M*UI
.
4.6.3 Semple preparation.--Just prior to A-4. analysis, transfer a sample aliquot of up to
SO ml to the cleaned *100 chi analysis tube.
r^*nW4. ft*n 4tt
Adjust the volume to 60 ml with O.IM let If required. Add 6 ml of 10 N sodium hydrox
4.6.4 To begin sampling. position the nos* tie at tha drat traverse point with the tip polnttnc directly into the gas stream. Imme diately start the pump and adjust the flow to Isokinetic conditions. Sample for at least & minute* at each traverse point; sampling time must be the same for each point. Main* --flatn Isokinetic aampllog throughout the sam pling period, using the following procedures.
4.6.4.1 Nomographs which aid in the rapid adjustment of the sampling rate without other computations are in APTD-0676 and are available from commercial suppliers. The available nomographs, however, are set up for uee in air streams, and minor changes are required to provide applicability to hydrogen.
4.6.43 Calibrate the meter bos orifice. Use the technique* as described In APTD-057G.
4.6.4 J The correction factor nomograph discussed ta APTD-OS76 and shown on the rrverae side of commercial nomographs will not be used. In its place, the correction factor wui be calculated using equation 102-2.
(C..AM*. V C0.0l
V
r~
cq. 102 2
where: C = Correction factor.
Cr ~ PI tot tube coefficient.
N. = Mole fraction dry gas. r,s=Stack pressure. inHg. F-=Meter pressure. InHg. T-. = Meter temperature. *R. if. s= Molecular weight of stack gas (from
4.4.4). lb/lb mole. s Meter box calibration factor, ob
tained tn step 4.6.4.2.
4.6.4.4 J5et the calculated correction factor on the ^>ht of the operating nomograph.
Select the proper nozzle and set the K-factor on the nomograph as detailed In ATTD-0576.
t.6.4.5 Read the velocity head In the stack at each sample point from the manometer In the meter box. Convert the hydrogen if* to an equivalent value foe air by multiplying by a ratio of the molecular weight of air to hy drogen at the stack moisture content. Insert this value of A? onto the nomograph and read off AH. Again, convert the AH. which is an air equivalent value, to the AH lor hydro
gen by dividing by 13. This factor includes the ratio of the dry molecular weights and a correction foe the different orifice calibration factors for hydrogen and atr. This procedure is diagrammed below:
ide, cap tube with a clean glass stopper and shake vigorously. Prolonged, vigorous shak ing at this point U necessary to obtain an accurate analysis. Add 6 ml of the reducing agent (reagent 3.3.2).-cap tube with a clean glass stopper and shake vigorously and im
/A/IJ nr\
. mediately place la sample Une.
r Al*--Multiply f
}*">< thUen
4.8.4 Mercury determination.--'After - the
l.y \ .*1 tt tlj /
agmofrapb. system has been stabilized, prepare samples
V - from the sample bottle according to section
4.6.3. Aerate the sample until a maximum
peak height Is reached on the recorder. The
mercury content is determined by comparing
the' peak heights of the samples to the peak Headed Alt--IHvldeOy 12 117/ to l<e usedon meter Ues. hetghts of the calibration Wolutlons. If col
4.0.4.6 Operate the sample train at the lected samples are out of the Ugear range,
calculate^ AH at each sample point.
the samples should be diluted--Prepare a
4.6.5 Turn off the pump at the conclusion blank from the 100 ml bottle according to
of each run and record the final readings. section 4.6.3 and analyze to determine the
Immediately remove the probe and nozzle reagent blank mercury level.
from the stack and handle In accordance with
the sample recovery process described In sec
tion 4.7.
*
4.7 Sample recovery.
4.7.1 (All glass storage bottles and the
graduated cylinder must be precleaned as In
section 4.5.1). This operation should be per
formed In an area free of possible mercury
contamination. Industrial laboratories and
ambient atr around mercury-using faculties
are uoi normally free of mercury contamina
tion. When the sampling train is moved, care
must be exercised to prevent breakage and
contamination.
4.7:2 Disconnect the probe from the implnger train. Place the contents (measured to cl ml) of the first three Implngers into a 500 ml sample bottle. Rinse the probe and all glassware between It and the back half of the third imptnger with two 50 ml por tions of 0.1M ICl solution. Add these rinses to the first bottle. For a blank, place 60 ml of the 0.1M ICl la a 100 ml sample bottle. Place the silica gel in the plastic Jar. Seal and secure all containers for shipment. If an ad ditional test Is desired, the glassware can be carefully double rinsed with distilled water and reassembled. Howevef. if the glassware is to be out of use more than 2 days, the Initial acid wash procedure must be followed.
4.8 Analysts--4.8.1 Apparatus prepara tion,--Clean all glassa-are according to the procedure of section 4 6.1. Adjust the instru ment settings according to the Instrument
6. Calibration.--6.1 Sampling Train. 5.1.1
Use standard methods and equipment as de
tailed In APTD-0576 to calibrate the rate
meter, pitot tube and dry gas meter. Recali
brate prior to each test series.
5.2 Analysis.--5J2.1 Prepare a calibra
tion curve for the spectrophotometer using
the standard mercury solutions. Plot the
peak heights read on the recorder versus the
concentration of mercury in the standard
solutions. Standards should be Interspersed
with the samples since the calibration can
change slightly wtth time. A new calibration
curve should be prepared for each new set
of samples run.
'
6. Ca/cVu/aff~oVru--6.1 Average dry gas meter
temperature, stack temperature, stack pres
sure and average ort/lce pressure dcrqo.p.1--0S2e-3e adahtfaff:sheet (fig. 102-6).
l*6...2VDu(hsritymacegkaoesfoptatvdsodliuorimtxn*pe)l.i*.i--tt.h4Cruourprlietchte tdhrye psaa* mmepileer volume measured by the dry gas meter to
stacVk'-, c=oVnodliutimones obfy guassinsgameqpuleattihonrou1g0h2-3t.he dry gas meter (meter conditions),
ft*.
7, =r Average temperature of stack gas. R.
7- = Average dry gas meter temperature,
R.
P*. = Barometric pressure at the orifice
meter, lolig.
AH = Averago pressure drop across the ori
fice meter. inHfO.
13 6 = Speclflc gravity of mercury.
P. = Stack pressure. F<^static pressure,
loilg.
No. 66--Pt. n-
FEOfkAl 01STl. VOL 38. NO. 66--FRIDAY. APftll 6, 1973
884-1
U Volume of teeter repor. r.-K.r,.!j-*
-moj-e
vim: Vho* *4 *iW vapor Utb*c^ **aplm Otari
r.-oocoo *1. *
Oiw (Mtu vi
Ki4T*Ul filw> W fcqi*4 veQ<rd %m tmptc^n
vU tkr r4 i** kcw* 10*7) al.
T<*Atv* iUm cm UwiM^tvf, *k,
/*- tt*r* pr--iivt, /*u A *U1V
la. Ilf.
4.4 Toll p*4 solum*.
5'<----1"
rq. 102-S
ttflES AND IEGULATIONS
PLANT_________________________________________ DATE__________________________________________ RUN NO.______________________________________ STAC* DIAMETER. In._______________________ RAA0UETR1C PRESSURE, in. H).___________ STATIC PRESSURE IN STAC* (Pg). In. Hg, OPERATORS___________________________________
V|= total volume of (U maple (sleek
COOdlUoo*), ft*.
04 fit IWvock 4i7 CM MS (ssl mdlttMi A*. V^oVvtpt 0i stis nr t* CM MpW uurl
Trsvsrss point VHsrfct*
Valocity Mad. In. HjO
SCHEMATIC Of STACK CROSS SECTION* 4
va7
Suck Tampmatura
V*"F
rw ia-7
ROI 4 f --*
si*.
M<ti m
5(rk p4 rrlocttf--Cm equation 103-0 to calculate tbs sleek (u r*locit y.
(r-A\C,(v.S/')...
/(r.w \ IW.
rq 102-0
us*r:
laj ... " A rrrwt Svl Cm *W% *t y. lrl if ttKid.
*.-**-vn*</'\ lb bouuW- *m"-K"<i'l(e*u_I_1_V_y.\ *^8
<b*P txnju ar* u^*i
C. -- hUK IqU
dlmfft'RwiHR
< 7\' .., -- Arrn<f tuck CM brraprrtlur*. * K.
fVli` ... - Amvt etusfr n<n r< EN*
S**-l
fieri c* (lull h */ * * Arur* K*? **.
/*. flvt pwrtVt. 1`vwS*uue i*riy\ Is
He.
XI. -WoVrnk/ RTficbt Rlert CM *< b*S4\.
IS* mntDiiKf tie
at is*
mritociW
c4 *^h n'npcfwol
muJUpb*d by m *Uun<tn< i*vtuao
to tb* mtttur*. JStt*nui*.
n^urr 103*8 shovs a ustplt rreordlnf aheet for trXelty trerme dele Cm the areracee Ln the Wt taro columns ot fcj-ure 103-8 to de termine the arcra^e stock f Telocity from equation 103-8.
8 8 Mercury collected Calculate the total *relht of mercury collected by using eq. 103*7.
.A
i
AVERAGE:
Flcure 1C2-8. Vclcclly Uavcrso data..
/ FI0C1A1 kSCHTtt, VOL 31. NO. 86-----ftlOAT, AJUtL 6, 1?73
RULES ANO REGULATIONS
8843'
Whet*:
WrfsV.Ci-V.C.............eq. 103-7
C?sT<7tal weight of mercury collected. *g. ViscTotal volume of condensed moisture
and ICl la sample bottle, ml. Ci=Concentration of mercury measured In
ample bottle. #g/mD V*=Total volume of 1CI ueod to tempting
(Implnger content* tod all wash ctoounu). ml. C = Blank concentration of mercury 1 IC1 aolutlon. *g/ml.
0.7 Tofaf mercury emtjjton,--Calculate
the total amount of mercury emitted from each Hack pee day by equation 103-4. This equation U applicable for continuous opera tions. roe cyclic operations, use only tbe time per day each stoek U in operation. Tbe total mercury emission* from a source will be the summation of results from all stacks.
,, fr.CO...,/t.,,8G,'400 secoods/day
* 1G4 /*g/c
where)
eq. 102-8
RwRaWofeaaljatoa, (/day. W,Toc*i weight of *rcury collected, t*D**i-To<al volume efgas auepW (*udt conditions),
ft*.
(*0 stack gas wlocltr, fret per second.
A*8uck arm, ft*. *
0.8 Isokinetic variation {comparison of velocity of pas in probe tip to stack velocity),
T lOOV^i
A.
cq. 102-9
alter*:
f-i'rfi'Cttt ll>tli*rU>
.l-70tln|Cl0fHsU}inn *('. i irl.
... ........................ *f
1 ' * \
|l<. tf(l IIM, (I*
lie*. Arir stock c* cecity.I*l i*cr w**m*l.
7. Evaluation of results.--'7.1 Determina tion of compliance.--7.1.1 Each performance test shall consist of three rrptlKlona of the applicable test method. For the purpose of determining compliance with an applicable national emission standard, tbe average of results of all repetitions shall apply.
7.3 Acceptable isokinetic results.--7.2.1 The following range sets tbe limit on ac ceptable isokinetic sampling results: If C0 7^X^110^, the results are acceptable: otherwise, reject the test and repeat.
8. References.--1. Addendum to Specifi cations for Incinerator Testing at Federal Facilities, PHS. NCAFC. Dec. 0. 1987.
2. Determining Dust Concentration In a Oas Stream. ASMS Performance Test Code No. 27. New Tork. N.Y., 1957.
3. Derorkln. Howard, et al.. Air Pollution Source Testing Manual. Air Pollution Con trol District. Doe Angeles. Calif.. Nov, 1963.
4. Hatch. W. R. and W. D. Ott. "Determina tion of Sub-Mlcrograco. Quantities of Mer cury by Atomic Absorption Spectrophotom etry." Anal. Cbem.. 40: 2083-87, 1968.
5. Mark. L. S.. Mechanical Engineers' Handbook. McGraw-Hill Book Co. Inc.. New York. N.Y-. 1951.
6. Martin. Robert M.. Construction Details of isokinetic Source Sampling Equipment. Environmental Protection Agency. APTD0381.
7. Methods for Determination of Velocity. Volume. Dust and Mist Content of Oases. Western Precipitation Division of Joy Manu facturing Co.. Dos Angeles, Calif. Bull. VTP-60. 1968. *
8. Perry. J. H.. Chemical Engineers' Hand book. McGraw-Hill Book Co.. Inc.. New Tork N.Y.. I960.
9. Rom. Jerome J,, Maintenance. Calibra tion. and Operation of Isokinetic Source Sampling Equipment. Environmental Protec tion Agency. APTD-057fi.
10. Shlgebara. R. T,, W. F. Todd, and W. S. Smith, Significance of Errors m Stack Sam pling Measurements. Paper presented at tbe Annual Meeting of tbe Air Pollution Control Association. 8t. Louis. Mo, June 14?19. 1970.
U. Smith. W. 3, et at.. Stack Gas Sam pling Improved and Simplified with New Equipment. APCA paper No. 67-119. 1967.
13. Smith. W. S, R. T. Shlgebara, and V7. P. Todd. A Method of Interpreting Stack Sam pling Data, Paper presented at tbe 63d An nual Meeting of the Air Pollution Control Association. St. Uouu. Mo, June 14-19. 1970.
13. Specifications for Incinerator Testing at Federal Faculties PHS. NCAPC. 1967.
14. Standard Method for Sampling Stacks for Particulate Matter. In: 1971 Book of ASTM Standards, part 33, Philadelphia. 1971. ASTM Designation D-2928-71.
16. Vennard. J. K, Elementary Fluid Me chanic*. John Wiley and Sons, Ind-, New York. 1947.
WETHOO tOS. tOYLUVU OCKCXKtKC MCTMOO^*.
1, Principle and applicability.--l.l Prin
ciple.--Beryllium emissions are Uoklnetlcally
sampled-from three points In a duct or stack.
The collected sample Is analyzed for beryl
lium using an appropriate technique.
*
12 Appliesbility.--This procedure details
guidelines and. requirements for methods
acceptable for use In determining beryllium
emissions in ducts or stacks at stationary
sources, as specified under the provisions of
f 61.14 of the regulations.
3. Apparatus--3.1 Sampling train.--A
schematic of the required sampling train
configuration is shown tn figure 103-1. The
essential components of Uie train are the
following:
uiv r .
7.1 | ft**?*te
letil, wMli
V,--t ft
vtfp*
3.1 3 trvl*.--Olivet hc<l Pyres * glass.
2.13 Fitter.--MU11pore AA. or equivalent. with appropriate filter holder that provides a positive seal against leakage from outside or around the filter. It is suggested that a Whatman 41. or equivalent, be placed imme diately against the back side of the Mllllpore filter as a guard against breakage of the Mllllpore. Include the Whatman 41 In the analysis. Equivalent filters must be at least 99.65 percent efficient (DOF Test) and amenable to the analytical procedure.
ran*
F>gtft
t-'ttfoj; 4.`n;t Vain 1CV-MIIC.
2.1.4 Mcter-pump system.--Any system that will maintain Isokinetic sampling rate, determine sample volume, and is capable of a sampling rate of greater than 0.3 efra.
23 Measurement of stack conditions (stack pressure, temperature, moisture and velocity).--The following equipment shall be used in the manner specified In section 4.3.1.
2.2.1 Plrof fube.--Type S. or equivalent, with a coefficient within 5 percent over the working range.
2.2.2 Differential pressure gauge.--In clined manometer, or equivalent, to measure velocity head to within 10 percent of the minimum vaiuc.1
1 Mention of trade aamea or specific prod ucts does not constitute endorsement by the Environmental Protection Agency,
2.2.3. Temperature auge.--Any tempera
ture measuring devtcevo measure stack tem
perature to within
. *
.
2.2.4 Pressure 'game.--Any dertoe to measure stack pressurflto within 0.1 In. Hg.
22.S Aerometer.--Tb * measure ,, atmos-*
pherlc pressure to wlthjaO.t In. Hg. '
_
2.2.6 Moisture determination.--Wet and
dry bulb thermemetets, drying tubes, con densers. or equivalent.'to determine stack gas moisture content to within I percent.*'
2.3 Sampte recovery.--22.D Probe clean ing equipment.--Probe bruslfW cleaning rod
at least as tong as probe, or equivalent. Clean
cotton balls, or equivalent, should* be used
with the'rod.
,. *
22.2 Leakless glass sample bottles.
2.4 Atid/yrO.--2.4.1 Equipment neces
sary to perform an atomic absorption,
spectrographic, flucroroetrtc. chromato
graphic,, or equivalent analysis.
2. Reagents,--2.1 Semple recovery.--3.1.1 * Acetone.--Reagent grade. '
3.12 Wash ecifiL--1:1 V/V hydrochloric
acid-water,
32 Analysts--32.1 Reagents as neces
sary for the selected analytical procedure.
- 4. Procedure.--4.1 Guideline* for source
testing are. detailed in ths following sections.
There guidelines are generally applicable: however, most sample sites differ to some de
gree and temporary alterations guch ms stack-
extensions or expansions often ara^requlred to Insure the best possible samplc^te. Fur
ther, since beryllium Is hazardous, care
should be taken to minimize exposure.
Finally, since the total quantity of beryllium
to be collected Is quite smalD the test must
be csrefully conducted to prevent contami
nation nr low* of sample. |4*,!>*#! ui Ji'jU'l'**. _
t
I d flrfrrllrtij o/ d iumfclitip i#i<* dmi :*! *
fief f flUM.--4 3 1 ItalaM: a suitable *!!
plltig Mtv that Is as dvre as practicable l<< ihc point of atmospheric emission. If possible, stacks smaller than 1 foot In diameter should not be sampled.
422 The sampling site should be at least eight stack or duct diameters downstream and two diameters upstream from any Cowdisturbance such as a bend, expansion or contraction. For rectangular cross-section, determine an equivalent diameter using the following equation:
2LW D,= L+W~
eq.103-1
where:
D.=:equlvalent diameter Es: length Wss width
42.3 Some sampling situations may ren der the above sampling site criteria Imprac tical. NVhen this is the case, an alternate site may be selected but must be no lass than two diameters downstream and onehalf diameter upstream from any .point of disturbance. Additional sample runs are rec ommended at any sample site not meeting the crltcrta of section 422.
42.4 Three runs shall constitute a test. The runs shall bo conducted at three dif ferent points. The threo points shall pro portionately divide the diameter, l.c. be lo cated at 25. 50 and 75 percent of the diameter from the Inside wall. For horizontal ducts, the diameter shall be in the vertical dlrcc-* Hon. For rectangular ducts, sample on a lino through the centroid and parallel to a side. If additional runs are required per section 4 23. proportionately divide thc*duct to ac commodate the total number of runs.
43 Measurement of stack 'conditions.
4.3.1 Measure the stack gas pressure, mois
ture. and temperature, using the equipment
described In { 2.3. Determine the molecular
weight of the stack
STOnd engineering
estimates may be mado la Ueu at direct'
. FIOEIAI CISTE, VOL 3S, NO. it-----F*I0AT. AP*lt 6. 1973
T 8848
RULES AND REGULATIONS
BMUurtmRoU. Tb** bAk far wcb estimate*
b*U bt ftm te Um U*( rrporv.
4.4 Preparation of aasnpHnf train.--
4.4.! /jwctnbl# Om Maptinr trua u
la Cgur* SOVt. It k rtoouia>eo4d I6*( *11
(Uvi U prclMM4 bf MUlaf in wash cid toe 2 boon.
4.4 J UtJi dM<t the MfnplVof train at th
sampling iJU. Tb# leakage rate ibouM not b*
in cxcea* at 1 prml of the 4rird t*apU
rate,
4.5 Beryllium fret* opm/ton--41.1 rw
each run. acMttr* Um velocity At Um artecied
Atapiln^ point. DtUnata* the tootincite
ampi mg r*U. Record the velocity bead and
U> required sampling rate.
4.5 2 Place Um nocar U at Um tunplUtc
point with the tip pointing directly into the
{M stream. Immediately start to# pump sod
adjust the Dow to took tactic conditions. At
the conclusion of the test, record the mai*
pllng rate. Again measure the velocity head
at the sampling point. The required tootin*U<
rate at the end of the period should not bare
deflated more than 30 percent from that
originally calculated.
4iJ Sample at a minimum rate of Oi
fto/mln. Samples shall be taken om curb s
period or periods as are necessary to deter*
mine the martmum *eni*toa* which would
occur Ln a M*bour period. In the <**# of
cyclic operations. sufficient teats shall be
made eo as to allow determination or calcu
lation of the emissions which would occur
oeer the duration of the cycle. A minimum
sampling time of a hours to recommended.
4A4 Alt pertinent data should be in
cluded in the test report.
. .4.<5 Sample recovery.--4 6 I It to recorn*
mended that all (lasswars be precleaned as
ln | 4 4.1. Sample recovery should also be
performed la an area free of possible beryl*
Hum contamination. When the sampling
train to moved. exercise care to prevent
breakage and contamination. Get aside a por
tion of the acetooe used In the sample re
covery as a blank for analysis. The total
amount of acetone used should be measured
tor accurate blank correction. Blanks can be
eliminated If prior analysis shove negligible
amounts.
4.6 3 Remove the biter and any loose par
ticulate matter from filter holder and place
In a container.
.
4 63 Clean the probe with acetone and a
brush or long rod and cotton balls. Wash into
the container. Wash out the filter holder
with acetone and add to the same container.
4.7 Xnslptt.--4.7.1 Make the nece**ary
preparation of samples and analyte foe beryl
lium Any currently acceptable method such
as atomic absorption, spectrographlc. ftuoro-
metric, chromatographic, or equivalent may
be used.
5. Calibration and. standard*--5 \ Sam
p/mg train.--6.1.1 As a procedural check.
sampling rate regulation should be compared
a-|th a dry gas meter, spirometer, rotameter
(calibrated for prevailing atmospheric con-
ditlcnM. or equtvaleot. attached to norzit
Inlet of the complete sampling train.
6 13 Data from this test e:vd calculations
should be thorn In test report
6 3 AaaIjtju,--63.1 Standard ir-atlon U
made as suggested by the manufacturer of
the Instrument or the procedures foe the
analytical method.
6 Calculations--d.l Total ber^Jfiw*** emo
tion. Calculate the total amount of beryl
lium emitted from each slack per day by
equation 101-2. This equation u applicable
for continuous operations. Por cyclic opera
tions. use only the time per day each stack
Is la operation. Th total beryllium emis
sions from a source wiU be the summation
of results from all stacks.
D
A" 1
S4.400 aeeonda.ViaV
-- ----" X
-- JT- -- --
i --j
vtov
A * Haw f i ,l i ipw. cd*r.
W.-Ttoai vtocMW t-oLSuae 0tod. *. ..-TatW n*a ei rw iwfto*. A* SJ... -- Axrm awl r* RMMiy, a>n pe witaj. A.-SWS Ha n*
7. r#i( report. 7.1 A teat report shall be
prepared which shall Include as a minimum:
7 1.1 A detailed description of the sam
pling train used and results <4 the proce
dural cheek with alt data and calculations
made.
7.1 3 All pertinent data taken during
test, the beats for any estimates made, cal
culations. and results.
7.13 A description of the feet site. In cluding a block diagram with a brief de scription of the proc*location of the sam ple points la the crow erelion, dimensions and distances from any point of disturbance.
Mentos t*e. tmaxitri Mrrtios res wmmimsoom ae nuuou iMtMtost noM
iranosuT eocaca*
l. frtaotpto and appttcabtftfg-- l.t m*cipte -- Beryllium emisalon* are isokinetical ly sampled from the source, and the collected
-mpi. te dlc*wd ta 1LQ *eM aoluUoa uid
1 by .locale KbcorpUoa (pectropho. tome-try.
13 . Applies bUlfyv--This method u appii-
cahU for tbs deteradosUon of beryllium
emimtons In ducts or stack* at stationary
sources. Unices otherwise specified, thts
method to not totended to apply to gas
streams other than those emitted directly
to the atmosphere processing.
without
further
3. Appsfetwe--2.1 Ssmptta# train.--A schematic of the sampling train used by ITA u shown tn figure 104-1. OocnmerctoJ models of this train are available, although construction details are described In APTD0641.* and operating and maintenance pro cedure* are described In APTD-0676. The components essential to this sampling train are the following:
3.1.1 Aoatle.--Gtalnleee steel or glass with sharp, tapered leading edge.
3.13 PraOe.--Gheethed pyres* glass. A heating system capable of maintaining a
minimum gas temperature tn the range of
the stack temperature at the probe outlet
during sampling may be used to prevent
condeosauoo from occurring.
PUUP
Fi&uro 104-1. Bcrylliun sampling train
2 13 Pitot tube -- Type S (figure 104*2). or equivalent, vrtth a coefficient within 6 per cent over the working range, attached to probe to monitor stack gas velocity.
2 1 4 fitter holder -- I'yrex class. The filter holder muai provide a positive al against leakage from outside or around the filter. A heating system capable of maintaining the filter at a minimum temperature in the range of the start temperature may be u*ed to pretent condensation from occurring.
3 l 3 tmptnpm --four Oreenburg-Smtth Impittgers connected In series with glasa ball joint fltttngv The first. third, and fourth implngrre mar be modified by replacing the tip with a 1,-tnrh l.d. glass tube extending to one*hal? Inch from the bottom of the
Cask. 3 1 6 Xcfertng rj-rtem --Vacuum gauge,
leakieaa pump, thermometer* capable of
measuring temperature to withIn 6* T. dry
gw* meter with 3 percent accuracy, and re
lated equipment, described tn ATTD-0S61,
to maintain an Isokinetic aampHog rate and to determine sample volume.
3.1.7 Barometer.--To meeaure atmos pheric pressure to 0.1 In Kg.
2 2 Measurement of stack conditions {stack pressure, femperafvre. moOfurc end reJocffjr)--2.3.1 Pttot tube.--Type 8. or equivalent, with a coefficient within 6 percent over the working range.
333 Dttfercnltal pressure gauge.--In clined manometer, or equivalent, to measure velocity head to within 10 percent of the minimum value.
1 These documents are available for a nom inal cost from ths National Technical In formation'Service. t7j3. Department of Com merce. 5366 Port Royal Road, SprlQgfield. V*. 22151.
MeoUon of trade names on specific prod
ucts doe* not constitute endorsement by the
environmental Protection Agency.
\
FtDCkM. GISTl*. VOC 3*. NO. 66--f tlOAT. Aftll 6,
4
RULES ANO REGULATIONS
SS47
however, most sample sites differ to some
degree
temporary alterations such as
tack extensions or expansions often sre re
quired to insure the beet possible sample
one. Further, since beryllium is hazardous,
care should be taken to minimize exposure.
Finally, since the total quantity of beryllium
to be collected is quite small, the test must
be carefully conducted to prevent contami
nation or Io*a of sample.
44 Selection of a sampling site and mini mum number of traverse points.
44.1 Select a suitable sampling site that
la as close as practicable to the point of at
mospheric emission. Lf possible, stacks
smaller than 1 foot In be sampled.
ameter should hot
444* The sampling sif 8 stack or duct dlamet 2 diameters upstream fr<
should be at least downstream and any flow disturb-
ance such as a bead,
anston or eoatrac-
lion. For** rectangular oss-section. deter-
mine an equivalent following equation:
ameter ' from the
' D-=2tW* '
L+W
where:
'
D, =equivalent diameter
L=length
\V>
W = width
}
eq. 104-1
NUUK* Of 0UCT OUUtTtflS UTSTttAU* (OISTANCC A)
244 Tan perat we gage.--Aay tempera
ture dcijurtfli dc* too to tnc*sun
Kto-
peroture to within 6* F.
34.4 frearure gsge.--PHot -tub* and la*
dined manometer. r equivalent, to measure
stock proaauro to within 0.1 La Hf.
23i Moisture determination.--1Wet and
dry bulb thermometer*. drying tubes, oon-
daoacrt, or equlvoZeat. to determine stock
|m moUrtur* content to within 1 percent.
34 Sample reoturry--34.1 Probe clean
ing rod.--At treat m long u probe.
244 Leakiest glass sample bodies.--600
ml.
344 Graduated cylinder.--250 ml.
24.4 Plastic fa* -Approximately 300 ml.
2.4 Analysis--2 4 i Atomic absorption
spectrophotometer To measure absorbance
at 2344 am. Per:n Elmer Model 303. or
equivalent* with N,o.'acetylene burner.
2.44 Hot plate. 2.44 Perchloric acid fume hood.
3. Reagent*--3.1 Stock reagent*.--3.1.1 Hydrochloric acid.--Concentrated.
3.14 Perchloric acid.--Concentrated. 70 peroeot. '
3.14 Mtric acid Concentrated. 3.1.4 Sulfuric acut.--Concentrated. 3.14 Distilled and deionised tcater. 3.14 Beryllium potrder.--06 percent mini* mum purity.
34 Sampling--34.1 filter. -- MlUlpore AA. or equivalent. It U suggested that a Whatman 41 filter be placed immediately against tbs bade aide of the Mill]pore filter
as a guard against breaktag the MUllporo
fitter. In the analysts of the filter, the What man 41 fitter should be Included with the MlUlpore filter.
344 Silica gel.--Indicating type. 6 to 16 mesh, dried at 360* F for 3 hours.
344 Distilled and deionised wafer*. 34 .Sample recovery--34.1 ZMsfllled end deionised xeater.
344 Acetone.--Reagent grade.
344 Wash acid.--1.1 V/V hydrochloric acid-water.
3.4 Analysts.--3.4.1 Sulfuric acid solu tion, 12 H.--Dilute 333 ml of concentrated sulfuric add to l 1 with distilled water.
3.44 25 parent V/V hydrochloric acidtreter.
34 Standard beryllium solution--3.5.1 rlocAc solution----1 *g/ml beryllium. Dis solve 10 mg ovberylltum la 80 ml of 12 N sulfuric acid solution and dilute to a volume of 1000 ml with distilled mater. Dilute a 10 ml aliquot to 10O ml with 25 percent V/V hydro chloric acid, giving a concentration of 1 *g/ml. This dilute stock solution should be prepared fresh dally. Equivalent strength (In beryllium! stock solutions may be prepared from beryllium salts as BeCl, and Be (NO,) t (08 percent minimum purity).
4. Procedure. 4.1 Guidelines for source testing are detailed In the following sections. These guidelines are generally applicable;
0 $ i.O 1.5 2.0 2.5
Figaro iQl*3. tylntaium numoer of traverse points.
Ftfir* 1&4-4, Ov*4 4Ctlon f circular task taiWM psMt m pwvnsicUf (luaun.
of
tS4-S. Cm* mcUm at rwurQvW i>.t <lrl>r4 Iflts 1J wwm. ia Citrw folnL* tcmnl4 M +ao> vm.
444 When the above sampling site cri teria can be met. the minimum number of traverse points la four (4) for stacks i foot In diameter or lees, eight (8) for stacks larger than 1 foot but 2 feet in diameter or less, and twelve (12) for stacks larger than 2 feet.
44.4 Some sampling situations may rea der the above sampling site criteria Imprac tical, When this Is the case, choose a con venient sampling location and use figure 104-3 to determine the minimum number of traverse points. However, use figure 104-3 only.for stacks l foot In diameter or larger.
44.6 To use figure 104-3. first measure the distance from the chosen sampling lo cation to the nearest upstream and down stream disturbances. Divide this distance by the diameter or equivalent diameter to deter mine the distance In terms of pipe diameters.
Determine the corresponding number of
traverse points for each distance from fig
ure 104-3. Select the higher of the two num
bers of traverse points, or a greater value,
such that .for circular stacks the number is a multiple of four, and for rectangular stacks
the number follows the criteria of section 4.3.2.
44.6 If a selected sampling point is closer than 1 Inch from the stack wall, adjust the location of that point to ensure that the
sample Is taken at least 1 inch awqy from the
wall.
,
44 Croes-sectlonal layout and location of traverse points.
1 FLOEKAL tfGISm, VOL. 38, NO. 66-----FftfOAIT, AP*ll 6, 1973
i4.-
8848
r
aAwasBsasmgB
*UIES ANO REGULATIONS
il-
;I-
s
SF >l
M
!!
3
*/
in
jfiim
In
iii
1
ii^sa 15* S11
* "3^3< I :*
iSlilIi3?1
i|!?Ipf:
3***1*'.
i!i!*}S
fs h
a
I 1 |
3
C
2. C
O J
IS -o oS -uW
-J 3
"2
-Q
N lA O) W> M
r o w n co N
n >o tv d n *o C n r>. cw *- *- n N o r>
O o 9 CO l/> (A CO O'
..............................x & g
^UlOKOtOOOr^tfinNUtOkNO^^ r> o w
^
N"- Nw"
#n
o r>
o o
w
n r*
CD
t4
tA
s s s SJ
os W) r O so
cm *r o
M r-
D -
O N
to N
So
a3
*
a -- n n ^*
^ WS O'
so n a} ^
CM * *--
s
O
v
<,--o
r> cm
<<ma
ccoq
^ so
rs
rv
Oi tn wt OS O
W tn c*. o
u> sr> <-
r a m tCo> CNM Q rs n co n N. .-- so -- CM CM fl so rs rs CO Q C\ Ol
N OS jo m Os r
r cm
so r>
n SO fs
os c^
u> cO
o O'
s
si
fs CD fs O sC* so o n M rt O'
N so
tC V* US 'Y w> cm eo CM rt
SO CM SO so CM CD
N CO N s s rs <s os os
<< cs h. so M fx o^s CnSS wfs 3o `aOS sco
rs a us
-r os O S
fs o.o n
His iSSHe* "8;s .s^s;5 3*2* 1^3 S5s
3-322 jS
npst
' ^2 3^-3
aa
|
-
ill is *" Nfl*csosOfsc5^0c*Noctosorsat3\0'-- ^ ^ t-- ^-r-- r--r-- CM`MM CM CM CM
O
RULES AND REGULATIONS
SS49
from tha stack and bundle la accordance with
tbe sample recovery process described 1q I 4.7.
4.7 Sample reooocry.--4.7.1 (All glass
storage bottla* and the graduated cylinder
must b predoanod aa tn f 4.6.1.) This opera-
tloa should be performed la aa area free of
poeslbte beryllium contamination. When the
sampling train la moved, care tnuit be exer-
cleed to prevent breakage and contamination.
4.72 Disconnect Uie probe from the lm-
ptnger train. Remove tbe filter and aay looee particulate matter from tbe fitter bolder and
place la a aample bottle. Place the contents
(measured to cl ml) of tbe first three lm-
plngers Into another sample bottle. Rinse the
probe and all glassware between It and tbe
back half of the third lmplnger with water and acetone, and add this to the latter sam
ple bottle. Clean the probe with a brush or a long slender rod and cotton balls. Uae acetone
while cleaning. Add these to the aample bot
tle. Retain a sample of tbe water and acetone
as a blank. The total amount of wash water
and acetone used ahould be measured for ac curate blank correction. Place the silica 1
In the plastic Jar. Seal and secure all sample containers for shtpment. If an additional test
is desired, the glassware can be carefully dou
ble rinsed with distilled water and reassem
bled. However, if the glassware is to be out of
use more than 2 days, the Initial acid
wash procedure must be followed.
4.8 Analysis.
*
44.1 Apparatus preparation.--Clean all
glassware according to the procedure of sec tion 44.1. Adjust the Instrument eetunge
according to the instrument manual. u<>"f
an absorption wavelength of 2344 nm 4.6.2 Sample preparatiem.--The digestion
of beryllium samples Is accomplished In part la* coaoentrstod perchloric add. Caution:
The analyst must Insure that the sample is heated to light brown fumes after the
nitric acid addition; otherwise, dangerous
perchlorates may result from the subsequent
perchloric add digestion. Perchloric add also ahould be used only under a perchloric add hood.
4 6.2.1 Transfer tbe filter and any loose
particulate matter from the sample container to a 160 ml beaker. Add 36 ml concentrated
nitric acid. Heat on a hotplate until light brown fumes are evident to destroy all or
ganic matter. Cool to room temperature and
add 6 ml concentrated suUuric add and 6 ml concentrated perchloric acid. Then pro ceed with step 44.2.4.
4.8.22 Place a portion of the water and acetone sample into a 160 ml beaker and put
on a hotplate. Add portions of the remainder
as evaporation proceeds and evaporate to dry
ness. Cool the residue and add 36 ml concen
trated nitric acid. Heat on a hotplate untU light brown fumes are evident to destroy any
organic matter. Cool to room temperature
and add 6 ml concentrated sulfuric acid, and
6 ml concentrated perchloric acid. Then pro
ceed with step 44.2.4. 4.824 Weigh tbe spent silica gel and re
port to the nearest gram.
442.4 Samples from 44.2.1 and 442.2
may be combined here for ease of analysis.
Replace on a hotplate and evaporate to dry-
neaa to a perchloric acid bood. Cool aod dis
solve the residue tn 10.0 ml of 26 percent
V/V hydrochloric acid. Samples are now
ready for the atomic absorption unit. The
beryllium concentration of the sample must
be within the calibration range of the unit.
If necessary, further dilution of sample with
26 percent V/V hydrochloric acid must be
performed to bring the aample within the
calibration range.
.
442 Beryllium determination.--Analyze
^the samples prepared in 442 at 2344 nm
using a nitrous oxide/acetylene flame. Alumi
num. silicon and other elements can Inter-
feta with this method if present In large
quantities. Standard methods are available,
however, to effectively eliminate these Inter
ferences (see Referenoe 6).
6. Calibration--6.1 Sampling train--- 6.1.1 Use'standard methods and equipment as detailed In APTD-0576 to calibrate the rate meter, pitot tube, dry gas meter and probe heater (If vised). Recalibrate prior to each teat series.
62 Analysts.--62.1 Standardization is made with th procedure sa suggested by the manufacturer with standard beryllium solu tion. Standard solutions will be prepared from the stock solution by dilution with 2$ percent V/V hydroehlortc acid. The linearity of working range should be established with a series of standard solutions. If collected samples are out of the linear range, the samples ahould be diluted. Standards sbould be Interspersed with tbe samples since the calibration can change slightly with time.
6. Calculations- -6.1 a verage dry gas meter temperature, stack temperature, stack pres sure and average orifice pressure drop. See data sheet (flgfire 104-6).
62 Dry gas oofume.--Correct the sample volume measured by the dry gas meter to alack conditions by using equation 104-2.
r
K,,. = K.
(p";
V
+
Ii
13.C
' T_
cq. 104-2
where:
1*-,-Volume of gas sample through the dry gas meter (stack conditions). U\
V. - Volume of gas sample through the dry gas meter
(meter conditions). ft*. T.-Acmice temperature of Mack rij. *R.
T-. - Average dry gas meter temperature. * R. /'tu -- barometric pressure at the ortQoe meter, in 17c.
Alf-A verse# pressure drop across the onicc metet,
tn HtO. lifiw^peclrtcirrsvlty of mercury.
/'.-Stack pressure.
* smile pressure. In Ilg.
Volume of icaf<] vapor.
.
where:
TJV
Is : *cq. 104-3
\\ - \ oluma of watery4 ; la lbs (ss sample (stack . conditions), ft*.-'
A\- 0. W___7m----ii-c, -n* mi K
,, 1these unila aroused.'
.
`Tula) volume of Qqufd collected ta*(a}pk>gm
Aid dUca cel (.we firuro 10*-7). ml. '
> Average stack gas UMupereiura *R. * pressure. /VJ:fc3Ullc pressure. In tig.
Total pas volume. i
+
*
\
cq. 104-4
inert:
,
1 Ml -Totul volume Olgas sa&ple (stackxondUtons), *
ft*. .
Volume ot cu through dry gas meter (stack
conditions!.'ft*. . V-- Volume o( water vapor Id gas sample (stack
conditions), ft*. .
6.6 Stack gas velocity.
Use equation 104-6 to calculate the stack
gaa velocity.
'*
(Vap).,,.-^/ PM.
cq. 104-5
where:
Averse# stack gas velocity, feet per second.
J 'A-.-M.il-2. (_____!yg?S. v .y When
*
V lb
R-toUaO
these units are used.
^
C, * Pitot tube ooeddent. dlmenslonkss.
(T.)
Average steck gas temperatore. *R.
Averse* square root of tbe velocity bead of stack gas (JoH.O)*/* (mt figure
f*.--Slack prasrare, i\.sUUc pressure. la Ug.
.\t, - Molecular weight of stack gas (wet bsdsl* tbe summation of tbe products o( tbe molcu)sr weight of each oomponanc multiplied by Us volumetric proportion In tbe mixture, lb/lbaota.
votueortovo e*n caxtcuo
TJHAi.
*wfmsre
votiA<c. 4
wjca ca. wkxt.
*
nTuc lOJ(0 COUICTTS
T0t*i
aXUCTTD
..rl
cokstvt
or wattrto vtxiak it dividing toUl wolcht
victim p otvjirr or satu. tt
3
ntewAtr. 1 -t> T` V0UAC SATTA-i
Flflure IM-r. AMlyUoxl d*is.
4
ROfkAL *ClSTt, VOL 38, NO. 64-----FR10AY, APtll 6, 1973
jjQD8BB9EB8S32
8850
tfUI.ES 'AND tfEGULATIONS
RUN NO. STACK DIAMETER. In._____________ RAROMCTRIC PRESSURE. In. Hg._ STATIC PRESSURE IN STACK (Pg). in. Hg._
6 6 it* Ki**ttc carUtion (comparison of * raj ( probe tip (o stack ivlod(y),
I- voov\--,
^.(K
oq. l(H-8
I - J rv'pnt W iRitIMk n|\iU8nln<g. V_., - *. .H*! VluJM* W(M i |Jr U4*rk comllUarvL
.<. -- r*e* up vii. (i*.
-'nmrflMC UlMy RVC.
(J.., - a
(M Hkltf, M per weood.
OPERATORS____________________________________
7r*vrs* point nwitcr
V.loclty h*d. In. HjO
vs;
SCHEMATIC Of STACK CROSS SECTION
$UCk T*rr*>ev*tur
7. rna/waffort of revwfft---7.1 Determinetu>n o/ oo*ipii<awe.--7,1.1 Each performance teat shai; consist of three repetition* of the applicable tet method, Por the purpose of determining compliance with an applicable national emtaatoo standard, the average of rvaulta of all repetition* shall apply,
7.2 AcccpiaOl* Uok(iw(le rveuff*.--7.3.1 The following range aeU the ItmU on accept able laokiiwoc sampling reeulte:
If 00 percent el^HO percent, the reeutU
are acceptable: other*!**, reject the test and
repeat.
.
7. ite/mrei.--1* Addendum to Opeclfic*tlona foe Incinerator TCettng at Federal Factl* Ulee. PIW. NCAPC. December 0. 1007.
2. Amos. M. D,, and WU1U. J. B,, -U*e or lllgh-Temperature Prw-MIxcd Plante* In Atomic Absorption Spectroscopy.** Spectrocfatm. Acta. 22: 1335, 1900.
3. Determining Duet Concentration ln^a Ota Stream. ABATE Performance Teel Cooa No. 27. New York. N.Y.. 1967.
4. Devorkla. Howard et al,, Air Pollution Source Testing llsausl. Air Pollution Control District, loe Angelos, Calif. November 1963.
6. meet. B.. Liberty. K. V,, and West, T. 3.. "A Study of Some Matrix EHecu in the Deter
mination of Beryllium by Atomic Absorption Spiroc-py In the Nitrous Oxide-Acetylene
< name." Taianta, 17: 203.1970.
6. U*t. L. 8h Mechanical Engineers* Handbook. McOraw-HUJ Book Co.. Inc., New York. N,Y.. 1061.
7 MAf.in. Robert M.. Construction Details of Iso*i:**tlc Source Sampling Equipment. Environmental Protection Agency. APTD0M1.
8, Meit.*ds for Determination of Velocity. Volume. Dust and Mist Content of Gases. Western ITecipltatlon Division or Joy Manu facturing Co. Loe Angelce. Calif. Bulletin
WF-50.
0. Perkin Elmer Standard Conditions (Rev. March 1971).
10. PerTy. J. II., Chemical Engineer** Hand book. McOra w*ut!l Book Co.. Inc,, New York. N.Y . I960.
AVERAGE:
11. Rem. Jerome J.. Maintenance. Calibra tion. and Operation of Isokinetic Source Sampling Equipment, Environmental Pro tection Acency. APTD--0576.
Figure io-S-8. Velocity traverse data.
Figure ICH--8 ihot? a 4inp] recording
hee*t for velocity traverse data. Use U>e aver
age* la the tact two column* of figure ICH--6
to determine the average stack ga* velocity
from equation 10+-3.
.
6.6 Beryllium cof/eefed,--Calculate the
total weight of beryllium collected by using
equation HH-6.
where:
WtssViCi-V.C- -- t*.C*. _eq, 164-6
W* = Total weight of beryllium collected, g. *
V = Total volume of hydrochloric add from step 4 63.4. ml.
Ci =c Concentration of beryllium found la ample, Ag/ml.
V.sTotal volume of water u*ed la iaa*
pilng (implogev oootcata plua all w-a*h amount*). ml
C- = Blank cooeentrauoa of beryllium la
V=Total volume of acetone used In sam pling lall wash amount*), a;1.
C. = Blank, concentration of beryllium in acetone.
6.7 Tofai berytitum c-ntssions --Calculate the total amount of beryitium emitted from each stack per day by equation 104-7. Thl* equation It applicable for continuous opera tion*. Por cyclic operation*, use only the time per day each stack la In operation. The toud beryllium emissions from a source will be the summation of result* from all stack*.
WA. . 56.400 *ocnnl>;ciny
l'j
*
ll/'KC
cq. 104-7
bw.
f\ Rl W <mJv4oi-i. otT.
N'i~ Total
of tTT-yUiura rniWln).
Vm^T<<u| tdJium of ru ai9|<if (jurt coodJUocu).
h. A --rv vl cu ttkicUj, M pK wcoed.
*r*a. A*.
12. Shlgehar*. R. T,, W. P. Todd, and W. S. Smith. Significance of Error* in Stack Sam pling Measurements. Paper presented at the annual meeting of the Air Pollution Control Association. St. Louis. Xlo, June 14-19. 1970.
13. Smith. W. S. et *1,, Stack Gas Sam pling Improved and Simplified with New Equipment. APCA Paper No. 67-119. 1967.
14 Smith. W. S, R. T. Shlgehara. and VC y Todd. a Method of Interpreting Stack Samp*jng Data. Paper presented at the 63d annual meeting of the Air Pollution Control Association. St. Louts. Mo.. June 14-19. 1970.
15. Specification* lor Incinerator Testing at Federal Facilities. PHS. NCAPC. 1967.
16. Standard Method for Sampling Stack* for Particulate Matter. In: 1971 Book of ASTM standard*. Part 23. Philadelphia. 1971. ASTM OvdgnaUon D-2923-71.
17. Vennard. J. EC Elementary Pluld Me chanic*. John Wiley and Son*. Inc., New York. I9t7.
i
k*t< p: ggt m
%
te?
m