Document ypO44Xy5rZVvpG0O9wLKX86wX
BIG RED
AKE-004304
PROJ. SECT.
CONSTR. DETAIL
1461
1462
I46I4
- h66
h&9 561
610 620
6I4O
HYDRAULIC SYSTEM //I
This project section shall include all costs for the purchase and installation of the equipment and motors. Also included here will be the purchase and installation costs of the piping including control vlaves, for the pressurized soluble oil and water system to the roll balance cylinders and spindle supports at the horizontal mill, vertical edger pullbacks, sled and roll tilter.
The costs for the purchase of this equipment will be temporarily accumulated in project section ijOl. Ultimately the costs accumulated in project section iiOl will be taken but and put into the appropriate project sections.
The costs for equipment foundation pads will be included with project section Jh60
The costs for raceways will be included with project section 801.
The costs for power and control wiring, interconnections, equipment grounding, and electrical test will be included with project section 8OI4.
Purchase - Pipe & Fittings Purchase - Valves Pipe Installati on Hangers & Supports Valve Stands Electric Motors Purchase - Equipment Install - Equipment Check & Test
-
April 15, 1966
IjOO-23
AKE-004305
I I 1 I I
H
fl 13
i
r
m
PROJ. SECT.
kbX
CONSTR. DETAIL
U6l
US2 ii61j h66 h69 561 610 620 6I4O
HYDRAULIC SYSTEM #2
This project section shall include all costs for the purchase and installation of the equipment and motors. Also included here will be the purchase and installation costs of the piping including control valves for the pressurized soluble oil and water system to the slab shear top knife block balance, shear holddown gag and crop distributor.
The costs for the purchase of this equipment will' be temporarily accumulated in project section I4OI. Ultimately the costs accumulated in project section I4OI will be taken out and put into the appropriate pro j ect secti ons.
The costs for equipment foundations pads will be included with project section h60.
The costs for raceways will be included with project section 801.
The costs for power and control wiring, interconnections, equipment grounding, and electrical test will be included with project section 80lj.
Purchase - Pipe & Fittings Purchase - Valves Pipe Installation Hangers & Supports Valve Stands Electric Motors Purchase - Equipment Install - Equipment Check & Test
n j
BIG RED
April 15, 1966
hD0-2h
AKE-004306
i
i PROJ. CONSTR.
SECT. EETAIL
I I4I43 -----
CIRCULATING OIL SYSTEM //2
i This project section shall include all costs Lor the purchase and installation of the equipment and piping* The equipment will be located near the Back Manipulators which it serves.
1461 Purchase - Pipe & Fittings 1462 Purchase - Valves 3j61i Pipe - Installation 610 Purchase - Eqxiipment 620 Install - Equipment 61j0 Check & Test
April l, 1966
BIG RED
\ llOG-26
AKE-004307
-
PROJ. SECT.
khh
CONSTR DETAIL
k6l 1*62 I16I,
h& hSS 610 620 6iiO
CIRCULATING OIL SYSTEM //3
This project section shall include all costs for the purchase and installation of the equipment and piping. The equipment will be located in the oil cellar and the piping and val.ves will vbe located to serve the screwdowns and edger.
Purchase - Pipe & Fittings Purchase - Valves Pipe - Installation Pipe - Insulation Pipe - Hangers & Supports Purchase - Equipment Installation - Equipment Check & Test
April IS, 1966
iiOO-2?
AKE-004308
PROJ. SECT.
OONSTR. DETAIL
h6l h62
k6h 1*65 J466
610
620 6I4O
CIRCULATING OIL SYSTEM jfU
This project section shall include all costs Tor the purchase and installation of the equipment and piping. The equipment will be located near the Slabbing Mill and will serve the mill spindles.
Purchase - Pipe & Fittings Purchase - Valves Pipe - Installation Pipe - Insulation Pipe - Hangers & Supports Purchase - Equipment Install - Equipment Check & Test
April 1$, 1966
Ij00^28
AKE-004309
PR0J. SECT.
lth?
CONSTR. DETAIL
-----
1461 1462
k6$ I466 610 620 6I4O
CIRCULATING OIL SYSTEM //6
This project section shall include all costs for the purchase and installation of the equipment and piping. The equipment will be located in the oil cellar and the piping and valves will be located to serve Tables //I and //2.
Purchase - Pipe & Fittings Purchase - Valves Pipe - Installation Pipe - Insulation Pipe - Hangers & Supports Purchase - Equipment Install - Equipment -Check & Test
April l, 1966
1400-30
AKE-004310
I
1
FROJ. CONSTR.
i SECT.
DETAIL
L4l9 CIRCULATING 013, SYSTEM //8
I This project section shall include all costs for the purchase and installation of equipment and
l piping for the M-G Set motor bearing lubrication system.
l ii6i Purchase - Pipe & Fittings b62 Purchase - Valves h&U Pipe - Installation m Pipe - Insulation
I US6 Pipe - Hangers & Supports 610 Purchase - Equipment
620 Install - Equipment
I 6L0 Check & Test
April 11?66
.BIG RED
1400-32
AKE-004311
PROJ. SECT,
70A
CONSTR. DETAIL
461 462
464 465 466
STEAM
This project section shall include all the costs for the steam piping within the Slab Mill Facilities. This system will start at a valved connection near the Hot Strip Mill Slab Reheat Furnaces and end with a valve at the Soaking Pit Structure.
Purchase - Pipe and Fittings Purchase - Valves, Strainers and Traps Pipe Installation Pipe Insulation Hangers and Supports
April 15, 1966
BIG RED
700-4
J
AKE-004312
I BIG RED
AKE-004313