to be made for certain items by comparing total costs for a repair penod with those found during sample observations
Step two: Reporting by repair control cen ters This step involves the development of a system in which the repair or cost control center records property damage It is very important that the system be designed with the least amount of paperwork No one sys tem will work in all companies, because re-
Measuring effectiveness. While a variety of methods could be used to measure the effec tiveness of property damage control, the cost severity rate technique has proved to be of significant value This method expresses total costs in relationship to production and maintenance man-hours
A simple formula then is
Total costs of accidents x 1,000,000 Damage costs per --------------------------------- --- million production and Total production and maintenance man-hours maintenance man-hours
For the metal industry firm mentioned earlier, the cost of property damage accidents in 1965 was near $138,000 per million hourly rated man-hours worked--this was a reduc tion of $188,000 per million hourly rated man-hours, or 58 per cent, for the year as compared with the base year of 1959
On the basis of the expenence gained thus far, the following conclusions can be drawn as to some of the values of incorporating the missing elements -- property damage--into the industrial accident prevention program
Fic 3-11 --Survey of 90,000 incidents resulting in injury or property damage or both showed these ratios between disabling and minor injuries and property damage accidents
Courtesy F E Bird and G L Germain, Damage Control
pair cost accounting methods vary tou much from company to company, and even from plant to plant
Step three: Auditing. The final step to a completely effective reporting program is more complete auditing
Safety personnel receive a copy of every onginal work order processed through the maintenance, planning, and cost control center Safety specialists make on-the-spot checks to see if accidental damage was in volved
1 Management will recognize that the in vest! gabon of the larger group on no-injuryproducing accidents will remedy many un safe practices and conditions that also have been common causes of injury-producing accidents
2 Management is interested in this program, as it is in any program that points the way to improve quality and decrease produc tion delays
3 A broadening of the accident control effort, with the potential of accident cost reduc tion, can be the vehicle for economic justi fication of any valid need for additional safety personnel coverage
4 The stature of the safety organization, as a member of the corporate team is enhanced when its full worth is recognized by man agement The addition of the property damage element can assist appreciably in accomplishing this recognition
5 The realistic possibility of measurable and appreciable cost reduction is a dynamic tool to motivate management interest