Document yp8rQyVEDKgwdOd01aLLN97n
MEMORANDUM
SUBJECT:
CLEAN AIR ACT INSPECTION REPORT PureCycle, Ironton, Ohio
FROM:
Jason Schenandoah, Environmental Engineer AECAB (IL/IN)
THRU:
Nathan Frank, Section Supervisor AECAB (IL/IN)
TO:
File
BASIC INFORMATION Facility Name: PureCycle
Facility Location: 925 County Rd 1A Building 560, Ironton, OH 45638
Date of Inspection: July 10, 2024
EPA Inspector(s): 1. Jason Schenandoah, Environmental Engineer 2. Charles Zeman, Physical Scientist
Other Attendees: 1. Drew Kraemer, Environmental, Health, Safety, and Quality Manager, PureCycle 2. Jeffrey Kramer, Site Manager, PureCycle
Contact Email Address: dkraemer@purecycle.com; jkramer@purecycle.com
Purpose of Inspection: To ensure compliance with the Clean Air Act
Facility Type: Polypropylene recycling facility
Regulations Central to Inspection: To determine applicability to the proposed rulemaking on pyrolysis and gasification units.
Arrival Time: 10:45 am Departure Time: 2:00 pm
Facility Name: PureCycle Facility Location: 925 County Rd 1A Building 560, Ironton, OH 45638
Date of Inspection: July 10, 2024
Inspection Type: Unannounced Inspection Announced Inspection
OPENING CONFERENCE
Presented Credentials Stated authority and purpose of inspection Provided Small Business Resource Information Sheet Small Business Resource Information Sheet not provided. Reason: Provided CBI warning to facility
The following information was obtained verbally from PureCycle Personnel unless otherwise noted.
Process Description: Bails of post-consumer waste arrive at the facility via truck. The bails are sorted to contain mostly polypropylene, #5 recycle plastic waste; the bails have 80-95% polypropylene while the balance is mostly polyethylene plastic and cardboard that is mixed in. The bailed material is fed into a wet line where the material is separated and sprayed off to remove dirt. Cardboard is removed as slurry in the water and any metals that were in the bail are separated via gravity. Material from the wet line is sent to one of two dry lines to be shredded and ground into smaller pieces. The material is then conveyed to an agglomeration process where really fine plastic pieces are agglomerated together. After agglomeration, the shredded, ground, and agglomerated plastics are pneumatically conveyed to storage silos.
Plastics from the storage silos are pneumatically conveyed to a feed extruder and where they are melted and formed into a continuous profile. That continuous profile is fed into a column where it is mixed with a proprietary solvent for an extraction process. Organics with low molecular weight are separated from the polypropylene, polyethylene, and inorganics. The organics with some solvents are sent to a flash tank where the pressure is dropped, and waxy organics drop out. The waxy organics are intended to be sold as a byproduct, but it was not being sold at the time of the inspection. The solvents enter a condenser following the flash tank to be condensed and recycled. The polypropylene, polyethylene, and inorganics from the extraction process are sent to a mixing column. The mixing column creates a homogeneous mixture of the polypropylene, polyethylene, inorganics, and solvent; the polypropylene goes into solution at this stage when subject to proprietary process parameters. The mixture then enters a settling tank where polyethylene is settled out of the mixture with some inorganics followed by a filtration system to remove the remaining inorganics from the mixture. The mixture then enters an adsorber where pigments and dyes are separated from the polypropylene in solution. The polypropylene in solution then enters a decanter where some of the solvent is removed and the remaining solution is 50-60% polypropylene. The remaining solution enters a flash tank to
Facility Name: PureCycle Facility Location: 925 County Rd 1A Building 560, Ironton, OH 45638
Date of Inspection: July 10, 2024
remove nearly all of the solvent. Lastly, the polypropylene enters a product extruder. The polypropylene is degassed in three locations along the extruder to remove residual solvent and finally extrudes ultra-pure recycled polypropylene. At the end of the extruder, water cools the plastic and it's fed through a cutterhead wheel to cut pellet sized polypropylene. Outbound products are shipped via rail.
Staff Interview:
The wet line, the dry lines, agglomeration, and the intermediate shredded plastic storage silos have baghouses for particulate matter control. A thermal oxidizer (TO) controls emissions controls emissions from several sources. All lower pressure process systems route emissions to the TO. Vapor balanced emissions from organic wax drum filling operations are routed to the TO. Media from the filter and adsorber are degassed in an enclosure and emissions from that enclosure are routed to the TO. Any emergency pressure relief devices are routed to an emergency flare. An initial staging silo for final product is used to store final product in a short-term manner; the initial staging silo is slightly heated to volatilize any residual solvent off. The initial staging silo emissions are routed to the TO. The emergency flare has been used more often around the time of the inspection because as maintenance events are needed the units that are being worked on are vented to the flare prior to work. The emergency flare has a thermocouple to monitor for flame presence, it is natural gas and steam assisted, and a drop out box is in place prior to the flare to prevent solids from entering the flare during emergency venting.
TOUR INFORMATION
EPA Toured the Facility: Yes
Data Collected and Observations:
EPA inspectors utilized Optical Gas Imaging (OGI) technology via a Forward Looking Infrared (FLIR) camera while touring PureCycle's facility. Inspectors did not note any excess emissions while conducting OGI. PureCycle's operations are not a pyrolysis or gasification process.
Photos and/or Videos: were taken during the inspection and are listed in Appendix A.
Field Measurements: were not taken during this inspection.
CLOSING CONFERENCE
Provided U.S. EPA point of contact to the facility
Facility Name: PureCycle Facility Location: 925 County Rd 1A Building 560, Ironton, OH 45638
Date of Inspection: July 10, 2024
Requested documents: 1-year's worth of parametric monitoring data for: o Baghouses Wet line Dry lines Agglomeration Intermediate shredded plastic storage silos o TO o Emergency flare
DIGITAL SIGNATURES
JASON
Digitally signed by JASON SCHENANDOAH
Report Author: _S_C_H_E_N_A_N__D_O_A_H_D1_4a_:t2e1_::23_002_-40._50'90_.00_'6____________
Section Supervisor:
NATHAN
Digitally signed by NATHAN FRANK
_F__R_A__N_K_______1_6:0_4_:0_4 -_05_'0_0'_____________ Date: 2024.09.06
APPENDICES 1. Appendix A: Digital Image Log and Digital Video Log
Facility Name: PureCycle Facility Location: 925 County Rd 1A Building 560, Ironton, OH 45638
Date of Inspection: July 10, 2024
APPENDIX A: DIGITAL IMAGE LOG AND DIGITAL VIDEO LOG
Inspector Name: Charles Zeman Archival Record Location: ERC Folder
Image Number
Image Number 1 2 3 4 5 6 7 8 9
10 11 12 13
File Name
File Name IMG_0653.JPG IMG_0654.JPG IMG_0655.JPG IMG_0656.JPG IMG_0657.JPG IMG_0658.JPG IMG_0659.JPG IMG_0660.JPG IMG_0661.JPG
IMG_0662.JPG IMG_0663.JPG IMG_0664.JPG IMG_0665.JPG
Date and Time (incl. Time zone and DST)
Description of Image
Date and Time 7/10/2024 11:56 7/10/2024 12:01 7/10/2024 12:03 7/10/2024 12:05 7/10/2024 12:06 7/10/2024 12:08 7/10/2024 12:09 7/10/2024 12:10 7/10/2024 12:13
7/10/2024 12:16 7/10/2024 12:24 7/10/2024 12:28 7/10/2024 12:39
Description of Image Emergency flare #5 bails Recycling signage Wet line shredder Wet line washer Wet line dryer Wet line dust collector Shredded plastic Agglomeration units Shredded plastic storage silos Settler Extruder Extraction column