Document yp7XxzYG4gVOjRamxazjM7EmX

j/j_ ,. sr METALS DIVISION tocnmmi Division Locto Mr. E. W. Shortridge (2) UCC BOX K King City, CA 93930 Copy to Messrs. R. E. Byrne, Jr. B. L. Ingalls^ J. L. Myers*''''^ H. B. Rhodes R. L. Schult U. C. Thurber File (2) P.0. BOX 579 - 4625 R0YAL AVE,, NIAGARA FALLS, NEW YORK 14302 Oat* March 28, 1977 Oc1lnstfng Dvot. "Calldrla" Asbestos Anwnorlnf lottor data suDiaet Airborne Asbestos Fiber Counts Performed at King City on March 10, 1977 Enclosed is the report on airborne asbestos counts resulting from our March 10 monitoring of the RG-144 and RG-244 bagging operations. On the average, the RG-144 bagging operation indicated slightly higher emissions than the RG-244 operation. However, both are within the allowable limits, as prescribed by OSHA. Time Weighted Averages have been calculated based on the total duration of the monitoring period. We would be very interested in how our results compare with your own. Thank you for the opportunity to visit the production facilities and for the courtesy extended during our recent visit. G. J. Sperjcer / GJSrdal Enclosures A . /U \ AIRBORNE ASBESTOS COUNTS for Union Carbide Corporation King City, California Date Sampled: March 10, 1977 Date Reported: March 23, 1977 Samples Collected By: G. J. Spencer Union Carbide Corporation Samples Analyzed By: G. J. Spencer Union Carbide Corporation Reported By: G. J. Spencer Union Carbide Corporation Union Carbide Corporation Metals Division Niagara Falls, New York A i u^ ' OBJECTIVE ... To monitor airborne asbestos emissions at the subject company's production facilities. DESCRIPTION OF OPERATION Two operations were monitored: Operation #1 - involved the bagging of finished product from the RG-244 circuit. Personal samples were obtained in the breathing zone of the bagger. Operation #2 - involved the bagging of finished product from the RG-144 (main) circuit. Personal samples were obtained in the breathing zone of the bagger. A / J v >.; SAMPLE EQUIPMENT AND TEST PROCEDURES Sampling and dust counting were carried out in accordance with OSHA Regulation 1910.1001, using the Bayer, Zumwalde and Brown method for counting asbestos fibers by phase contrast microscopy (Bureau of Occupational Safety and Health, Feb. 1969). Battery-powered air pumps (M.S.A. type), calibrated to 2 liters per minute, were used to collect personal breathing zone and environmental samples on MiHipore membrane filters of 0.8 micron porosity. Fiber counting was performed on a Nikon phase contrast microscope at 400X utilizing a Porton reticle for sizing and field definition. Two results have been reported for each sample - they are: 1. Chrysotile Asbestos - Any fiber having an aspect ratio z3 and a length *5y that is in the operator's judgement chrysotile. In the event of doubt and in the absence of further information, any fiber having the above physical dimensions will also be counted as chrysotile. 2- Possible Asbestos - Any fiber having an aspect ratio ^3 and a length >5y that is not obvious to be material other than asbestos. This includes all amphiboles and material similar in appearance. COMMENTS The OSHA regulations permit a maximum limit of 2 fibers greater than 5 microns in lenqth per cubic centimeter of air sampled on an 8-hour, tineweighted average (TIJA). The formula Ci,Tt. + Cc-T&, + CnTn describes the TUA IT where C = fiber count in fibers/cc and T = time. The regulations also stipulate a ceiling concentration of 10 fibers/cc greater than 5 microns which is not to be exceeded at any time. TEST RESULTS The details of sample collection and resultant fiber counts are listed in the attached table(s). A / VJ -3 ^urrrwu or r*ot.n uuumo ' , Union Carbide Corporation King City, California Sample Ho. Air Sample Time Minutes Airborne Fiber Cou (fibers/cc >5u) Chrysotile Possibl _________Operation DescriptionAsbestos Asbesto Operation #1 B-2 B-23 B-16 B-1.3 R-36 on: 8:24A off: 8:53A on: 8:53A off: 9:34A on: 9:34A off: 10:00A on: 10:16A off: 11:05A on: 11:05A off: 11:29A 29 Personal - (Domingo Ornelas, bagger) 1.1 During the bagging of RG-244. 41 Personal - (Domingo Ornelas, bagger.) 0.8 Ouring the bagging of RG-244. 26 Personal - (Domingo Ornelas, bagger.) 1.1 During the bagging of RG-244. 49 Personal - (Domingo Ornelas, bagger.) 0.8 During the bagging of RG-244. 24 Personal - (Domingo Ornelas, bagger.) 0.7 During the bagging of RG-244. Operation #2 0 0 0 0 0 B-4 R-39 B-29 B-5 B-24 on: 8:14A off: 8:55A on: 8:55A off: 9:37A on: 9:37A off: 10:26A on: 10:26A off: 11.-01A on: 11:01A off: 11:24A 41 Personal - (David Urquidez, bagger.) 1.4 During the bagging of RG-144. 42 Personal - (David Urquidez, bagger.) 1.4 During the bagging of RG-144. 49 Personal - (David Urquidez, bagger.) 0.2 During the bagging of RG-144. 35 Personal - (David Urquidez, bagger.) 0.8 During the bagging of RG-144. 23 Personal - (David Urquidez, bagger.) 1.9 During the bagging of RG-144. 0 0 0 0 0 King City - Time Weighted Averages Operation #1- (1.1) (29) + (0.8) (41) + (1.1) (25) + (0.8) (49) + (0.7) (24), 169 -3--1--.-9----+---3--2--.-8----+--- 2--8--.-6----+----3--9--.-2----+----1--6--.-8- --_ -1j4g9g.3- *_ 0,,.8,,8,, F/cc Operation #2 - (1.4) (41) + (1.4) (42) + (0.2) (49) + (0.8) (35) + (1.9) (23) , 190 57.4 + 58.8 + 9.8 + 28 + 43.7 . 197.7 . 1.04 F/cc 190 190