R. S. Grant ?. H. Scheuerle
`ugust 27, 17C3
I have established, and would like to outline to you, a prcrrar. for inproving environmental control conditions both inside and outside the Berlin Plant.
A report was compiled by the Aetna Life and Casualty Company on industrial hygiene at the Berlin Plant. The survey was made on April 27, 1967 and reported by B. R. Roy, one of, Aetna's Industrial Hygienists. The conclusion of this report was that we had an excessive dust condition in the flatware department, in the molded pipe stripping area, and in the batch house. Since that time there has been a great improvement in the dust collection efficiency in those areas. At this point, I do not feel this Aetna report is valid and for this reason, I have been following the program outlined below:
A. Overall Program
1. At the time of the Barrington Environmental Control Presentation, Sam Thomas agreed to come to Berlin and work with me to develop an overall approach to environmental control at our Plant. This was in July of this year.
2. In a phone conversation with John Vyverberg the week of August 12, he agreed to supply information on J-H's experience as well as our experience with applicators in the field. Also, we agreed to meet at some time in the near future to discuss this information. This phone discussion with Mr. Vyverberg was primarily directed toward asbestos and its effect on health.
3. Sam Thomas visited Berlin the week of August 12. He and I established the following program and timetable:
a. As soon as possible. Dr. Bennett would come to Berlin and sample the exhausts of the SID cylinders, evaluating the difference between oil and not-oiled molds and what particulate, if any, and excessive ph, if any, exists in the effluent exhausted from our SID process.
01 049 087
L'nvirmr.mental Control
J
b. A meeting was sec up for August 29 between Hr. Bradley of Bradley Associates, Dr. Konser. and San Thomas to review and outline a letailed program for analysis of environmental control of both inside and outside the riant.
c. At the tine of this meeting, we will establish when Bradley would make his preliminary investigation. 3radley's investigation with the resultant recommendations would be reviewed bv Gan and nr/salf to determine the overall program for corrective action.
d. Answering of community complaints will be handled by the Plant. We will investigate and record each complaint and review with the individuals the fact that there is a program in progress and Owens-Corning Fiberelas' attitude toward environmental control, citing Barrington as an example.
4. Dr. Bennett spent the week of August 19 sampling the STD stacks. The preliminary results look good, but it is necessary to improve the sampling procedure before any conclusive data can be collected and a formal report written.
3. Immediate Action Proprams
1. Housekeeping
The plan is to establish programs based on conclusive.data from both Dr. Bennett's and Bradley Associates' surveys of both inside and outside the plant. In the interim, we have undertaken immediate correction in the areas we know to be a problem. They are as follows:
a. The primary source of the general dust condition in the plant is the dirty floor condition. This results from waste material falling off the trains during handling. This past several months, we have established two programs to upgrade general floor sweeping, (1) we have had the vendor in to look at the equipment. Based on his operating and maintenance recommendations, the equipment is now doing an adequate job of removing the dust up from the floor. (2) We have established a program for training sweeper operators in the use of the equipment, and have restricted the use of the equipment to these trained operators. Also, we have established a schedule whereby the sweeping is dona a certain number of hours every day, not on a hit or miss basis.
Further plans are to investigate a small push-vacuum sweeper that can be used in cleaning corner areas.
Currently the main floor area has much improved, and as
AM 0i
Environmental Control
August
Pits
i
a result, the fori: lift! co not stir up as tuof. iust in their tracking through the plant. It is necessary, though, to improve scrap and waste in the ccrr.er areas to further reduce the du3t level.
It is also extremely important that thorough sweeping be done at least once in every twenty-fcur hour period. In order to assure this, we will recondition our second floor sweeper so that there is always one available in the Production area.
2. Under Evaluation
a. Dust Collection
Currently we are using dry dust collectors. We will have a wet dust collection system on #3 Line which should give us direction on further equipment. (Is the scrubber route more effective than the current dry bag system!)
b. Flatware Finishing
The current dust collection system on the flatware finishing line is a great improvement and I feel further studies on this line will show that the dust collection is adequate.
c. Batch Mixing
We do have dust collection systems in this area. Additional bulk handling systems would greatly improve this area. We currently have two systems and a third one in the process of being ordered. We now handle cement and silica by these systems and will be handling lime. Further bulk systems should be installed even if the material cannot be bought in the bulk form. If the bags could be fed into a bulk system once a day, wo could isolate the dust and control the atmosphere. Then the totally enclosed bull: systems would eliminate dust in the batch area. I have made plans to review this overall batch mixing area with Phil Klein and come up with a general overall recommendation.
d. Hold Stripping
In August we installed an air stripper to keep the wet mud from the sides of the molds. This will reduce the amount of scrap in this area and improve-the house keeping condition. This is the worst housekeeping area in the plant and nead3 a frosh look at the waste collection system.
r)\ 0 4 9 0*74
Er.vironmental Contro 1
Aurru
Pare 9 7,196:
5/e will be working with General Engineering in the near future to establish a program to improve conditions in this area.
In conclusion, the program is broken into two parts, (1) Sam Thomas to define and locate the problem and the extent of the problem so that action can be taken in these areas; (2) upgrade, with help of General Engineering, the systems, particularly in batch mixing and mold stripping.
As concrete plans and timings develop in these two areas, I will cover you with any reports stating these timings and plans.