PCB ENVIRONMENTAL PROBLEM JULY STATUS REPORT
<e H. S. BERGEN J. MASON J. E. SPRINGOATE
D. S. CAMERON - BRUSSELS
W. S. CLARK
J. R. DURLAND - TOKYO
M. W. FARRAR - 2ND STREET
E. V. JOHN
R. E. KELLER - 2ND STREET
R. M. KOUNTZ
D. A. OLSON
P. S. PARK
.
W. R. RICHARD
J. R. SAVAOE
.
E. P. WHEELER
MARKETING;
.Market withdrawal programs continue on schedule. Therminol food users are converting to Therminol 66 or Therminol 55# with little loss of business.
Customer letters for notification of Pydraul F9A are prepared and will be Issued when manufacture is complete (estimate 2 weeks).
The withdrawal/replacement program for Aroclor plasticizers appears to be going well. Several customers have reported success in reformulating in such applications as epoxy coating/potting systems and inks. Production orders for the.' products being withdrawn have been very heavy, however, the producing plants and production planning have done an excellent Job of keeping shipments moving in an orderly fashion.' . '
ENGINEERING;
*
Aroclor Incineration
'
.
A preliminary project scope for a 10 IT pound/year liquid incineration system was developed and issued for review. A safety review was held. The project scope is being modified to reflect comments received. The appropriation request data transmittal will be Issued in early Avgust.
TRAN 036311
^dfcOTudUr
HARTOLDMONOQ43284
/
-2
=r.'QI>.'55RING: (continued)
.
KCS-101'6 Distillation
/
Economic analyses to establish method and location
for distilling 55 IT pounds/year of MCS-1016 were
completed and issued. The preliminary project '
scope was prepared and Issued for comments. A
safety review has Just been held. The appropriation
request data transmittal will be Issued In early
August.
*
There has been little new activity during July.
'
Neither of the NERC reports has yet been published,
although the new journal "Envlroamcntal Pollution" ,
carried the paper- written by the Monk3wood people
on the avian toxicity of PCB's. This provoked one
or two reports In the popular press.
i
A NATO committee Is sponsoring an Investigation Into marine pollution along the coast from Calais to the north of Holland, with special referonce to PCB's. They were advised to get In touch with Bayer and Prodclec for Information on the usage of PCB's In Belgian and within the whole of the EEC.
Implementation of the PCS plan for Europe Is held
up pending further meetings with the other PCB
producers, firstly to determine their attitude
towards a voluntary withdrawal from uncontrollable
applications, and secondly to determine their
reaction In the event of a unilateral withdrawal
by Monsanto.
.
JAPAN
No new public developments In Japan. KMK writing a revised policy for marketing of Aroclors. U.S.A. customers (3M# Thlokol) Investigating Japanese sources.
. i'
TRAN 036312 HARTOLDMONOQ43285
-3-
MEDICAL
Two year feeding studies continue. Twelve month status report Is expected In August. Pish toxicity studies are being repeated as well as some of the chicken reproduction studies. PDA has Issued guidelines establishing upper limits on PC3 contents In milk at 0.2 ppm and other food at 5*0 ppm. .
PUBLIC RELATIONS
i
A nows rolease on Monsanto's rocent actions to curb the use of PC3 was distributed on July 16. It was primarily a rebuttal to recent stories that PCS caused
birth defects, but Included a complete background of voluntary actions taken to solve the PCS problem. Copies went to all nows media who'have carried PCB stories In tho past two yoars. f
Use of our story by the press has been light. */
TRAN 036313 I
HARTOLDMON0043286
Aroclor 1242 Replacement for NCR
The two major problems with nonoisopropyl biphenyl
(''.IPS) are now defined as odor and eye irritation.
Both problems could be solved by changing from
propylene to a higher olefin for alkylation of
biphenyl. I\aJor Interest Is now centered on Cg o
alkyl biphenyl (ABP-11) from Ethyl Corp. 0^ -oI6rin,
our oxo process feedstock. Early testing by NCR was
highly encouraging* however, print fade looms as a
major problem. Back-up candidates Include butyl*
amyl* and hexyl biphenyl.
j
A series of six odor masks were provided NCR in an
effort to improve the odor of MIPB without interfering
with solvent performance.
:
Samples of extender and cosolvents were supplied to
NCR to Improve dye solubility and to give more rapid
color development than NCR's current cosolvent. These
materials are (l) heads fraction from alkyl benzene
manufacture at Chocolate Bayou* (2) alkyl benzene
(Alkylate 215)* and (3) alkyl benzene high boiler
(Alkylate H-230).
.
Plasticizer Replacements
'
Blends of Aroclors 5^60, 5^42 and 1221 were developed
to approximately match the viscosities of Aroclors
1254* 1248 and 1242. Replacement recommendations
were made to customers to whom viscosity is important.
Specifications are being developed in cooperation with
the Anniston Laboratory.
'1
NCS-IO16
Sixteen drums of the MCS-1016 have been prepared by fractionating Aroclor 1142 In a packed column
equivalent to 25 trays In the Dayton Pilot Plant.
The distillate was brought hero and analyzed. Then
the fractions wore recombined to give the desired
composition'and treated with a Porocel column to give tho doslred electrical properties. The product, is now ready for shipment to customers for testing in capacitors. Since all the electrical properties of KC3 are Indistinguishable from those of Aroclor 1242 and there are only minor differences In other properties* this fluid should be a direct substitute for Aroclor 1242 in the capacitor Industry with no capacitor design change or processing changes needed.
TRAN 03631*
HARTOLDMON0043287
-5-
RSSEARCH: (Continued)
Industrial Fluids
Pydraul JMI&
Pydraul F-9 was reformulated as Pydraul F-9A
to avoid the use of chlorinated biphenyl. Tne new formulation is compatible with F-9. The lubricity in V105E pump tests is superior to any fluid we have ever run,
. NC Phosphate Ester
Manufacturing costs are directly proportional to reaction times in the Step I reactor. We demonstrated that foaming in the Step I lab reactor and reaction time could be reduced by concurrent addition of POCI3 and nonylphenol/
cumylphenol. mis should bring the reactor cycle to <6 hours. The process pay-load might
be further increased by employing the SchottenBaumann Step II and III reactors.
me pilot plant is reworking 1000 pounds of plant material by add hydrolysis and washing to reduce acidity and hydrolyzable material.
Aroclor Substitutes
'
Bromoaroclor 1233 (15 Br) was scaled-up in a
33 gallon run in the Pilot Plant, mis fluid
is being tested in hydraulic fluid applications
as a more biodegradable replacement of chlorl-
natod biphenyl.
j
4
Isomerization of chlorinated terphenyl 3032
results in a fluid with a 100? vlsoosity of 2800 cs and a 210F viscosity of 11.7- We are seeking the lowest viscosity, all liquid torphonyl for use in hydraulic fluids, .
a-Koth^lstyrene diner was mono and diehlorinated
for evaluation as a plasticizer in place of chlorinated biphenyl.
TRAN 036315
HARTOLDMON0043288
-6
RESEARCH: (Continued)
Biodegradation - Ruabon
.
Priority has been given to the development of more
refined GLC analytical techniques so that more
selectivity will be available for degradation studies
of multicomponent PCB's such as Aroclor 1242. This
has caused some delay, but work in progress Includes
biodegradation studies of Pyralene 1500 (a competitive
product), two of the key Isomers for assessing the
viability of the theoretical mechanism for degradation
and HB-40. We are also studying the soil culture
which Professor Evans, at Bangor University, has
said will grow on Aroclors 1242 or 1254 as sole carbon
source.
'
.
Biodegradation Testing - St. Louis
.
Testing of Aroclor 1242, Aroclor 1254, mcs-1016 (Aroclor 12423), and Aroclor 1230B in our semi* continuous activated sludge units will be started as soon as sample background problems have been
resolved. Identical conditions will be employed to permit a comparison between our present Aroclor product and the proposed substitutes.
?-!ANUFACTURINQ
Anniston
Current Level
Aroclor losses during July averaged 3280 ppb in
the plant effluent. Ibis Is equal to 38 pounds/
day of Aroclor.
'
Plant Effluent Suspended Aroclor Control
Aroclor sump construction continues. Revision
requesting an additional $4500 has been prepared.
Ibis was necessitated by unforeseen ground water
problems. Completion by 9/1/70 still appears
possible. .
1.
0
1
TRAN 036316
HARTOLDMON0043289
-7-
MAKUPACTURIKO: (Continued)
Sulk Waste Disposal
Data defining magnitude of solid material quantities will be completely collected by
week of August 31, Quantities and the basic estimates from which they are derived will be
discussed with Production and TSD representatives . August 6.
/ Laboratory testing of mixtures of Montar 1 and /
. Montar 5 were not dramatically successful In /:
reducing pumping temperatures required - 200C7
range still necessary.
'
Experiments with hydrocarbon dilution of chlorinated and unchlorln&tcd Montars appear to Indicate this as an extremely attractive route to effectively reduce pumping temperatures,
. In some cases to near ambient. Economic evaluations will be made In the next two months. If successful, this will reduce handling costs and also provide
auxiliary fuel for Incineration.
Saugct
.
PC3 Levels In Sewer
Current losses are about pounds/day to the ` . river which Is a concentration of 200-230 ppb. .
Memo being published by M. Plerle covering the > sampling program for the plant. The Aroclor ' Department and total plant effluent will be
monitored dally. Current effort Is to Improve the sampling technique.
Aroclor analyzer received and laboratory Is
ready for routine analysis. Sampling will begin
on a routine basis this week.
1
PC3 Levels In Atmosphere
Points of loss have been determined. Report being publlehod. Most severe losses are from Thormlnol
units In Departments 239, 2b5, 24Q and 233* Work begun to eorreot those areas.
TRAN 036317
HARTOLDMON0043290
-8-
KA?IU?AC?URIKO: (Continued)
Equipment has been purchased to take vapor sar.ples. Where vapor Is flowing, losses can be measured quantitatively. Where vapor flows cannot be measured such as in breather vents, qualitative results will be obtained. Will
complete this as per schedule by September 1, 1970.
Projects To Reduce Sewered PCB^ From Aroclor
Department
.
Absorber rupture disk replping (Est. 1512) com
plete.
'
Basin for trenches (Est. 1795) complete.
Blow.tank demister (Est. 2031) project approved,7
long delivery items on order and project package
will be issued by August 7. 1970.
'
Provide paving curbs and catch basin in Aroclor department to prevent losses from spills,
especially in the tank car loading area. Guesstimate cost is $60,000 to $80,000. ' Estimate will be submitted by mid-August.
PCB Rework Project (Est. 2095)
.
Estimate completed, $32,000 capital, $3,000 expense. Appropriation request being typed.
Incineration Liaison
Phenol department fusion reactor area firmed ' up as location for Aroclor incineration. Tony '
Rasmussen named Manufacturing Representative.
TRAN 036318 HARTOLDMON0043291