Document ymXG9ReqX1XJj40gqRMv2jpmE

In regard to Newport News Shipbuilding's letter dated November 8, 1978 from Marshall Branch, I offer the following comments. 1. The specification on bulkhead for after peak tank was released prior to the vessel entering the yard. (Re leased 10/16/78, vessel entered yard 10/19/78) See attachments. Also, this item appears in Newport News Supplement #1, dated 10/19/78. 2. The specifications originally called for pulling the tailshaft, renewing seals, and bearings, which the shipyard bid on in time. By just renewing the seals, we actually cut down on time. We did not know a seal problem existed until in drydock. JMcC: bt c: Mr. E. J. Worrel, Jr. EXX-MOR-008571 ffvnfl CALCULATION SHEET gm-ocai (A-it5i EXX-MOR-008572 -V" 146. AFTER PEAK TANK INTERNALS - 102 DO NOT START UNTIL AUTHORIZED BE OWNER'S REPRESENTATIVE. QUOTE SEPARATE ITEM PRICES FOR EACH PART OF THE ITEM. FURNISH NECESSARY LABOR, EQUIPMENT AND MATERIAL REQUIRED TO COMPLETE THE FOLLOWING: Rig necessary staging in after peak tank, remove same upon completion of repairs. , | B. Quote price per square foot to crop out, renew and insert 7/16*1 plate on oil tight transverse bulkhead number 18. Allow for approximately 480 square feet /0 C. Quote price per foot to crop out and renew vertical stiffeners 7/16 " thick ^ 5" X 5" angle. Allow for approximately 75 linear feet. rfO D. 1 Quote price per square foot to crop out and renew 7/16" connection brackets between vertical webs and transverse bulkhead. SJ E, Quote price per square foot to sand/grit blast all inserted/renewed steel and areas adjacent to welds. All grit to be removed at completion of repairs <0F. Quote price per square foot to coat inserted/renewed steel with owner * approved coating. G. Quote price to fill after peak tank and test for integrity of oil tight bulkhead to satisfaction of owner's representative, and empty tank at V if completion of test. , A*- TM5 * ,, NO, 200 \ EXXON WASHINGTON SEPTEMBER, 1978 EXX-MOR-008573 872-E S.S. EXXON WASHINGTON Page 4 SUPT. I 123- A. 124-A. 125-A. 126-A. 127-A. 128- A 129-A. 130- A. 132-A. 133- A. 134-A . 136- A. 137- A. 138- A. 139- A. 140-A. 141-A. 142-A. 143-A. 144-A. 146. 147. 148. 149. 150. 151. 152. 153. 154. 155. 156. 157. SPILL VALVES ON VENT LINES - USCG - 408 FLAME ARRESTORS - USCG - 408 PRESSURE VACUUM RELIEF VALVES - USCG - 408 TANK GAUGE FLOAT - 411 REACH RODS - 413 TANK CLEANING PIPING - 415 SHIP'S TELEPHONE AND GENERAL ALARM CIRCUITS 609 VENTILATION COVERS AND PIPING - 703 ELECTRIC MOTORS - 805 CIRCULATION MOTOR - 805 WIRTNG TO FORWARD LIGHTS REMOTE CUT OUT - 805 PUMPROOM LIGHTING - 809 MOTOR CONTROL PANEL BOXES - 210, 310 FORWARD FORCED DRAFT BLOWERS - 310 LIGHT SWITCH WALK IN BOX - 807 STEERING GEAR MODIFICATIONS - 808 CARGO MANIFOLD MODIFICATIONS - 407 SEWAGE TREATMENT AND RETENTION CONVERSION OF EXISTING DINING AND GALLEY FEEDING SYSTEM TO NEW CAFETERIA MODE SYSTEM AFTERPEAK TANK INTERNALS - 102 BULKHEAD LEAK - 102 VENTILATION DUCTING - 703 CARGO PIPING - 407 STEAM LINE - 117 POWER METER CONDENSER INJECTION LINE - 227 MOORING WINCH - 114 LAGGING IN STORES REFRIGERATOR - 705 DECK STEAM LINE - 117 CARGO BOOMS - 103 LAZARET - 102 PAGE 10 10 10 10 10 10 10 11 11 11 11 11 11 11 11 11 11 12 12 12 12 13 14 14 14 14 15 16 16 16 17 17 EXX-MOR-008574 NN 4C-4 Rev 3) Order No.. por Newport News Shipbuilding A Tennecc Company ^ N'EWP0RT"NEWSrv'wG^iA"23607"~PHONE'8M 3^2000 JOB ORDER ................ S.S. EXXON WASHINGTON DESCRIPTION October^19 3 _ 78 156'. CARGO BOOMS - 103 Furnish necessary labor and material required to complete the follow ing; (a) While the port and starboard cargo hose booms are removed wnder item #52s blast and coat both booms, one (1) coat RB-191 or equal and two (2) coats of Buff color coat, (Paint to be furnished by ship.) 157 . LAZARET - 102 Furnish necessary labor, equipment and material required to complete the following; (a) Prove the drain lines from lazaret compartment clear. Fabricate and install suitable strainer at opening to two (2) drain lines. (b) Fabricate a T-bandle wrench for the 16 flush deck scuttle cover of the lazaret. MESSRS; ALL SOFTS, Branch Spencer Worthington Ware Allen Quinn Alford Hancock Sweeney Satchell USCG-1 ABS-1 Testing Lb 120 ;mf/p j Ordered By Exxon Co 3 USA- thru * Alien Proceed with work and charge to J, Cost Engineer G. Guy Via, Jr. Manager of Ship Repair EXX-MOR-008575 Date: Memo From; H. P. LEYENDECKER To: 7 aj/t^ *-o zTppp? PCt? EXX-MOR-008576 .1 NN 26 (3321120) -^ INTER-OFFICE COMMUNICATION NEWPORT NEWS SHIPBUILDING AND DRY DOCK COMPANY A Tenneco Company TO: FOR: FROM: SUBJECT: Mr, G. G, Via, Jr, Information Construction Manager, Ship Repair EXXON WASHINGTON, 872-E FILE NO. DATE November 8, 1978 The subject vessel arrived October 19th and is scheduled to be completed on November 16th. Since arrival there have been six (6) supplements added to the original job order. On October 27th, an item was received to renew the steel in the Fwd. Bhd. of the Aft. Peak Tank. This is a major job and is interfering with the installation of the sewage treatment and retention system. The sewage tanks can-* not be set in place until the Aft. Peak Bhd. steel is in place. To further complicate repairs, an item was received Sunday, November 5th to renew the .inner and outer stem tube seals. This work is causing conflict with the steel renewal in the Aft. Peak Tank. Because of these problems, it is anticipated that some additional days will be required to complete this contract. Copies to: Mr. L. R. Sorenson, Jr. Mr. C. IC. Worthington Mr. L. C. Ware Mr. W. G. Satchell File ' J. M. Branch / EXX-MOR-008577