Document ym9wZqZd1rOJNJ5wQjRmrjnJr

DATE: SUBJECT: FROM: THRU: TO: UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGIONS 77 WEST JACKSON BOULEVARD CHICAGO, ILLINOIS 60604 CLEAN AIR ACT INSPECTION REPORT Harding Materials Inc, Indianapolis, Indiana Luke Hullinger, Environmental Engineer AECAB (MI/WI) Sarah Marshall, Section Chief AECAB (MI/WI) File BASIC INFORMATION Facility Name: Harding Materials Inc. Facility Location: 1100 South Tibbs Avenue, Indianapolis, Indiana Date oflnspection: 3/27/2019 EPA Inspector(s): 1. Luke Hullinger, Environmental Engineer 2. Albana Bega, Environmental Engineer Other Attendees l. Larry Smith, Compliance Inspector, Indiana Department ofEnviromnental Management 2. Russ Blake, District Manager, Harding Materials Inc. 3. Cody Scott, Plant Manager, Harding Materials Inc. Contact Email Address: rblake@hardinggroup.com Purpose of Inspection: Clean Air Act Inspection Facility Type: Asphalt Production Facility Regulations Central to Inspection: 40 C.F.R. 60, Subpart 000, New Source Performance Standards for Nonmetallic Mineral Processing Plants Arrival Time: 2:00 PM Departure Time: 4:00 PM Inspection Type: ~ Unannounced Inspection LJ Announced lnspect10n OPENING CONFERENCE ~ Credentials Presented ~ CBI warning to facility provided The following information was obtained verbally from Russ Blake unless otherwise noted. Company Ownership: Harding Materials lnc is privately owned and had one additional owner buy into the company in 2018. Process Description: Harding Materials Inc. is an asphalt manufacturing facility in Indianapolis, Indiana. Eight to ten different types of aggregate are trucked onto the facility and stored in stockpiles. Depending on customer needs the different types of aggregate are loaded into bins and then conveyed into a rotary drum to dry at 600F. The dried aggregate goes to the mixing chamber and is combined with solid recycled asphalt and liquid asphalt cement. The final product leaves the mixing chamber through a chute and conveyed to storage silos where it is eventually loaded into trucks. Staff Interview: The rotary drum is heated by a 128 M BTU/hr natural gas burner. The storage silos are heated to 250F. TOUR INFORMATJON EPA toured the facility: Yes RECORDS REVIEW 1. Material Total Report 2. Safety data sheet for liquid asphalt cement SIGNATURES Page 2 of2