Document ym9EO6v8XDNkoy4xXp9y1JJE6
Air Filters and Cleaners
Staynew Filter Corporation
Air Filters for Buildings and Mechanical Equipment
6 Leighton Avenue, Rochester, N. Y.
Products--
Protectomotor Dry Type Positive Filters for removing dust, dirt and foreign matter from small or large volumes of air at atmospheric
or at higher or lower pressures. Made in various types and sizes for buildings, windows, oxygen chamber in hospitals, furnaces, pipe lines, air compressors, diesel engines, blowers, motors, pneumatic systems, air brakes, etc.
Operation--
The efficiency of Protectomotor Air Filters is exceptionally high due to their large filtering sur,. face within a relatively smalt' space. The intake air currents move parallel to the filtering surface at very low velocity, so that the dust and dirt are . not packed on to the felt, but remain in a loose and porous condition, which permits the air to pass through the accumulated dust and dirt quite as readily as through the felt itself. Dust and dirt do not enter pores of felt, which is of extremely fine
texture.
Efficiency--
Due to the low air velocity and the fine texture of the felt, practically complete removal of dust is obtained. An exceptionally high efficiency is maintained, even on fine air-floated dust. Efficiency is not greatly affected by continuous service, nor by any change in volume of air passed.
Protectomotor Building Filter
1 *
itilM
r* if-/- ' 1
'
v.- -1L* .n
m AS
Sr
MIS bn WSgs latest
Pressure Drop--
Resistance to the flow of air is less than 34 in. water gauge when operated at rated capacity. Less
pressure drop, when required, may be obtained by
using an oversize filter.
3838' m lit
SSI US
pi JW
MvM-V-Type Building Filler
Cleaning--
Under ordinary conditions filters operate from six months to a year without atten tion. A special cleaning device enables the material collected on the filtering surface to be very quickly and com pletely removed by compressed air or vacuum cleaner. The material may be reclaimed, if valuable, without con tamination, since no sticky or adhesive oils are used. No spare parts or cleaning tanks are necessary.. Less than two minutes' time, per 1000 cu. ft. per minute of air capacity, required for cleaning. Filters may be cleaned while in operation, without removing filtering units.
.. Proledovenl Window Ventilator One filter cell removed, erposing one of the fane and motors
Application--
All filter units or filter assemblies are complete in weatherproof housing, ready to attach to air intake pipe for applica tion to engines, compressors, etc. For building ventilation, equipment is easily
adapted to space available.
Diagonal view shotcing adjustable ends storm hoods, filter and deflector plate. Note the large, active surface
644
Boiler Cleansers and Leah *5ea/
The Yinco Company, Inc.
305 East 45th Street
New York, N. Y.
Vinco Boiler Cleanser
Vinco Boiler Leak Seal
A positively harmless in* soluble powder cleanser
` for . new, remodeled and old heating systems. A unique, scientifically pro*
cessed compound of in
gredients, on a special for mula not to be confused
with other powder boiler cleaners.
A different liquid leak seal.
Unique in that it does not Induce priming and foam
ing. It has no unpleasant
smell. It makes speedy
and permanent'repairs of all boiler and heating sys
tem leaks. Fine to tighten up new jobs. The direc
tions are simple to follow-.
ADOPTED BY
American Radiator Corp.
American Gas Products Co.
Barnes & Jones
- ~
QUANTITIES Steam and Vapor
Boynton Furnace Co. - *Burnham Boiler Corp.
Systems
Gorton Heating Co. Hart < Crouse Co. : Heggie-Simplez Boiler Co. *
Hoffman Specialty Co.
Ideal Boiler Co.
Distributed by Boiler Manufacturers and Jobbers. Sold only in our trade-marked cans like above.
Use 1 quart Vinco Liq uid Boiler Seal to each 6 square feet grate area.
International Boiler Works Kewanee Boiler Corp. `National Radiator Corp.
Petroleum Heat & Power Co. Sarco Co.
`Standard Sanitary Mfg. Co. The Thatcher Co.
VINCO BOILER CLEANSER
Packed In iy$, 3, 5 and 10 lb. cans
VINCO LEAK SEAL
Packed in 1 qt. cans only
Hot Water Systems
Use 2 quarts Vinco Liq uid Boiler Seal to each 6 square feet grate area.
Thermo Service, Inc.
The. Vapor Heating Co.
TUusviUe Iron Works Co.
The Vapor Engineering Co.
'United States Radiator Corp. and many others.
*Vinco Distributors.
What Vinco Does
V inco permanently removes all the oil, grease, scale and dirt from the internal surfaces and from the boiler water without
the labor ofblowing boilers over the top.
By this thorough cleansing Vinco stops foaming, priming,
Vinco Specifications for Hot Water Systems
Cleaning the System--Upon completion of the installation, the contractor shall clean the system by the Vinco method using *........ lb. of Vinco in exact accordance with manufacturer's special dirrections for hot water systems, given on their cans.
.Only one-half quantities in specification table re quired for hot water systems.
surging, incomplete circulation and poor radiation.
How Vinco Works
Vinco for Old Systems
Each minute grain of Vinco powder absorbs several times its own weight of oil, rust and .dirt.' These larger grains of absorbed impurities then settle and are blown through the
Annual cleaning of the old heating system adds years of life to the boiler, prevents
bottom, according to directions on each can..
rust deterioration and saves much fuel and-
Vinco Specifications for New and
fire attendance.
Remodeled Steam and Vapor Systems
Cleaning the System -- Upon completion of the installation, the contractor haH dean the system by the Vinco method to remove oil, grease, rust and dirt from the boiler using, t---- lb, of Vinco, in exact accordance with manufacturer's directions.
When Vinco is first introduced, have a low fire--just enough for the water to simmer--for three or four hours. After this, pressure can be raised.
This compound must remain in the bniW for 36 actual steaming hours, which corresponds to six or seven diays average operation. - At the.end of this period, boiler must be thoroughly- drained and flushed before refilling with clean water.
fin writing specification, insert in this space number of..
Our Free Laboratory Service
Saves thousands of dollars by analyzing the boiler water before making needless mechanical changes. If desired, the boiler water is again examined after the Vinco treatment is completed, and "certified chemically correct" for boiler operation. Then if the boiler still primes, foams, or surges, look for mechanical flaws. (Write for details.)
schedule. For systems having:
Up to 350 so. ft of tradiation
351 * 600 " "
601 " 1100 " "
noi 1400 " "
1401 " 1800 " 44
1801 " 2100 44 44
2101 " 2700 "
2701 " 3 1 00 44 44
3101 " 3700 " "
3701 " 4200 44 '
4201 ` 4600 " "
4601 " 5000 " "
"
................3 lb.
................5 "
.. 8 "
..10 "
..13 "
..15 "
..18 "
..20 44
* ..23 "
..26 44
..28 "
------------ /
__30 "
Our Three-fold Guarantee.
1. Vinco contains no potash, lye, soda of any kind, oil, acid, or other harmful ingredients. (See most recent publications of leading boiler manufacturers advising against use cf acids or alkali in boilers).
2. Vt'sco meets every performance claim. Purchase price is refunded if results are not entirely satis factory when Vinco has been used according to directions.
3. Your time, money and comfort are further safe guarded by our free laboratory service.
Above 5000 sq. ft. use an additional pound of Vinco for each additional 300 sq. ft. of radiation.
Un determining amount of Vinco to be used all radiation may be taken at actual rating. *For old systems use only one-half quantities given in specification table.
645