Document ym1RJ41mJxX63EMJKmLa3Va4d
FINAL REPORT
Ep2i2d0e-m6iWo-l0og8y,
Medical Department
3M Company St. Paul, MN 55144
Date: July 14, 2010
Title: Biomonitoring Assessmentofthe 3M Cottage Grove Building 15 Demolition and Disposal
Project. Phase II
SSttuardtyDate: August 26, 2009
PIrRoBtoAcpoplrNouvamlbeNr/AN/A
Principal Investigator: Co-investigators:
Geary W. Olsen, D.V.M., Ph.D." Barbara A. Gibson, M.D., MP.H.! David J. Ehresman, B.S., MT (ASCP)?
Diane C. Madsen, CMA-C'
Study Director:
Carol A. Ley, M.D, M.P.H.
1. Corporate Occupational Medicine, Medical Department, 220-6W-08, St. Paul, MN 55144. 2. Toxicology Laboratory, Tox Assmt & Compl Assurance, Medical Department, MailStop 236-1B-22, St. Paul, MN 55144
3M ComPpaagney2 Summary
A totalof25 subjects who worked on the 3M Cottage Grove Building 15 demolition and disposal project had baseline and end-of-project perfluorooctanoate (PFOA) and perfluorooctanesulfonate (PFOS) measurements. These subjects did not include those workers who were involved with the removal of equipment and line that was done earlier. Those results will be presented separately. The 25 subjects' baseline mean PFOA concentration was 3.5 ng/mL (95% CI 3.-0 4.0) and their end-of-project mean PFOA concentration was 4.8 ng/mL (95 CI3.9- 5.7). The baseline mean PFOS concentration was 16.1 ng/mL (95% CI 12.8 - 19.4) and the end-of-project mean PFOS concentration was 15.1 ng/mL (95% CI 12.3 ~ 17.9). The mean paired concentration difference (baseline minus end-of-project) for PFOA was +1.3 ng/mL (p=
0.004). Likewise, the mean paired difference for PFOS was -1.0 ng/mL (p = 0.10). Thus, there was minimal (1 ng/mL) increase in PFOA and no evidenceofan increase in PFOS concentrations from baseline to end-of-project measurements. Conclusion: Based on the paired biomonitoring data, there was no substantive occupational exposure to PFOA or PFOS while working on the 3M Cottage Grove Building 15 demolition and disposal project.
3M ComPpagaeny3
Introduction Several remediation projects were launched in 2009 regarding legacy perfluorochemicals.
`These included the 3M Woodbury landfill remediation project, the 3M Cottage Grove Buildings 15 and 73 demolition and disposal project (hereafter referred to as only Building 15), the 3M Cottage Grove Building 25re-roofproject, the 3M Cottage Grove D1/D2 excavation project, and the 3M Decatur Building 2/49 demolition and disposal project. For each of these projects baseline and end-of-project assessments were requiredof 3M employees and contractor workers `who entered specified work zones where potential exposure to legacy perfluorochemicals (e.g. PFOA (perfluorooctanoate) and PFOS (perfluorooctanesulfonate)) was possible, but due to the uniqueness of the work the magnitude was unknown. Both baseline and end-of-project assessments required a worker's response to a medical questionnaire and collection of blood for Serum measurements of PFOA and PFOS, and analysisofseveral clinical chemistries. The `purposeofthis reporti to provide a descriptive analysisofthe PFOA and PFOS serum concentrations (ng/mL) at baseline and end-of-project time periods for the 3M Cottage Grove Building 15 demolition and disposal project. Results for those workers who were involved with `equipment and line removal from Building 15, that was conductedpriorto the demolition of Building 15, will be presented in a separate report.
Methods
3M ComPpaagneys
1. Informedconsent `The purposeofthe project was explained in an informed consent. Subjects read and
signed this informed consent at both baseline and end-of-project assessments. Subjects were informed they could not work on this specific project without such compliance.
2. Clinical chemistries Clinical chemistries included a lipid panel profile, blood glucose, BUN, creatinine, serum
electrolytes, and liver enzyme tests (including alkaline phosphatase, AST, ALT, and total bilirubin). Fasting was nota requirement because of the logisticsofcollecting blood samples during various timesofthe day. Clinical chemistries were analyzed by Quest Diagnostics. Individual clinical chemistry analyses at baseline and at end-of-project were medically reviewed by Dr. Gibson. Subjects were informed in writing that this examination program was nota full medical `check-up.' Values out of reference range were indicated with a notation for the subjects to follow up with their primary care physician ifthey had abnormal test results However, questions could be directed to Dr. Gibson regarding their clinical chemistry test results should the subject so desire.
3. Analytical measurements ofPFOA and PFOS. Serum samples were analyzed for PFOA and PFOS by state-of-the-art high performance
liquid chromatography mass spectrometry methods by the 3M Medical Department's Toxicology Laboratory under the direction of Dave Ehresman. Medical Department personnel collected
3M ComPpaagneys blood samples that were processed to provide serum samples for analysis. These samples were assigned unique identification numbers and randomized prior to the samples being delivered for analysis. The 3M Medical Department's Toxicology Laboratory was "blinded" to the identity of all samples received for analysis
Sample extractions were performed using solid phase extraction (SPE) technique. The extraction and sample clean-up was based on a 100 ul. sample size and utilized Waters (Milford, MA) Oasis hydrophilic-lipophilic balance (HLB) 3.0mL cartridges (Ehresman et al. 2007).
`The method used two stable labeled intemal standards for quantitation. The internal
standards used were a dual labeled PFOS where two '*0 molecules were included in the
sulfonate group (intemal standard, >99% purity, synthesized by Research Triangle Institute, Research Triangle Park, NC) and a dual labeled PFOA molecule, where the carboxyl and alpha
carbons were labeled with C stable isotope (greater than 97%, provided by DuPont,
`Wilmington, DE). All quantitations were based on matrix matched extracted standard curves. A'S uL injection of the sample eluate was introduced into the High Pressure Liquid
Chromatograph (HPLC) which was directly interfaced into the triple quadrupole mass spectrometer (Applied Biosystems/MDS-Sciex Instrument Corporation, Forest City, CA). Standard curves covered the range from 1.0- 150 ng/mL. Standard curves were evaluated using a quadratic regression model where the standards were weighted at 1/x, and each curve had an ""R'" value equal to or greater than 0.9998. Matrix spiked controls (QC samples) evaluated during this study all had acceptable results "with-in" their previously established ranges. Matrixmatched dilutions were used for samples requiring dilution to bring the samples into the linear range ofthe assay. Extracted serum and aqueous blanks remained below the lower limit of
3M ComPpagaeny6 quantitation established at 1.0 ng/mL (lowest standard fitted on the standard curve used for this project).
4. Communication After each blood collection, individual letters were sent to the participants describing
their results. In the baseline assessments, two letters were sent. One referred to the clinical chemistries and the other letter provided baseline PFOA and PFOS concentrations. At end-ofproject, two letters were again sent to each participant. The first letter provided the individuals clinical chemistry results. The second letter compared baseline to end-of-project serum PFOA `and PFOS concentrations.
Results Table 1 provides the total number of individuals, by company, who were tested for
PFOA and PFOS during the 3M Woodbury landfill remediation project.
Table 1. Distributionof workers by company and participation
VCeoimtpany MetroGravel Other Total
Baseline 25
2 4 31
End-of-Project 2 1 0 25
Reason for No End-of-Project Sample DDiidd nnoott awpoprekaratastibtelo(ond=co1l)lection (n= 1) Did not appear at blood collection (n= 1) Did not work at site (n= 3)
`Tables 2 and 3 provide the measuresofcentral tendency for the baseline and end-ofproject PFOA and PFOS concentrations for those 25 subjects with paired measurements (baseline and end-of-project). Values are provided in ng/mL. (parts-per-billion).
3M ComPpaagney?
`Table 2. PFOA Baseline and End-of-Project Concentrations (ng/mL)
Arithmetic
Baseline
Min Q1
13 25
Median Q3
37 45
Max Mean 95% CI
55 35 30-40
End-of-Project 1.5 4 46 59 98 48
9-56
Geometric
Mean 95% CI
32 27-38
43 36-50
`Table 3. PFOS Baseline and End-of-Project Concentrations (ng/mL)
Baseline
Min Ql Median Q3 Max MAeraitnhm9et5i%cCl
58 10.1 136 21.7 337 161 128-194
End-of-Project 65 10.1 12.6 188 321 151 123-179
MeGaenome9t5r%icCl
145 119-176
138 116-164
Because the data were paired samples, a matched-paired statistical analysis was
performed where the mean difference is the average ofthe sumofthe individual differences for
the 25 subjects . See Equation 1.
Equation 1.
Mean Difference = 5(end-of-projec~tbaseline)25
Becauseofthe skewed PFOS distribution, in particular, as seen in Table 3, the mean differences
ofthe natural logsofthe paired values were also determined. See Equation 2.
3M ComPpagaenys
Equation 2. Mean = (3[(nend-ofproject val~ (iun(heasli)ne valu)2)
Results for Equation 1 and Equation 2, and associated statistics of the mean differences ofthe paired comparisons, are provided in Table4 for both PFOA and PFOS.
Table 4. Matched-pair Analysis Comparing Baseline to End-of-Project PFOA and PFOS concentration (ng/mL)
Mean Paired Difference
PFOA (ng/mL)tratio
__ pvalue __ PFOS (ng/ml) tratio
pvalue
EquatioIn +13
316
0.004 10
Ln 010
Equation? +03
330
0.003 004
2138
018
Only for PFOA was there an increasein the meanofthe paired differences although this
1.3 ng/mL difference was not substantial, given the analytical variability ofthe methods used.
No increase was observed for PFOS. Similar results were seen when the differences between the
logs were analyzed.
Figures 1 and 2 provide another method to compare the baseline to end-of-project concentrations for PFOA and PFO, respectively. [Note: These figures are graphed on a log scale.] A strong linear relation centered along the diagonal is indicative of no change between the paired measurements. The R? was 0.03 for PFOA (Figure 1) and 0.87 for PFOS (Figure 2). `The lack ofa trong linear relation with PFOA i the resultofan increase in 11 workers' end of project concentrations over their baseline as shown in Figure 1. These 11 workers are found in Figure 1 above the depicted identity line where y = x (ic., endofproject = baseline).
3M ComPpagaeny
Discussion `Comparisonofbaseline and end of project serum concentrations of PFOA and PFOS
provided each worker an excellent method to assess his/her exposure experience for the 3M. Building 15 Demolition and Disposal Project. Given the fact that exposure potential during the: courseofthe demolition project was unknown, the useof biomonitoring data allowed for an assessmentofthe actual (unknown) exposure to PFOA or PFOS, or to materials that may degrade to them. The clinical chemistry data were not analyzed by paired statistics because the biomonitoring data indicated there were no substantive differences in exposure to PFOA or PFOS between the baseline and end-of-project measurements. Potential exposure to any other `materials would not be known since only PFOA and PFOS were analyzed in the workers" serum. `The lack of any change in PFOS concentrations between baseline and endofproject is likely due to the fact that, unlike PFOA and its salts, PFOS had not been manufactured in Building 15 for several decades
Conclusion Based on paired biomonitoring data, there was a slight average increase (approximately |
ng/mL) in PFOA serum concentrations for the 25 workers who had paired baseline and end of project measurements involved with the 3M Buidling15 Demolitionand Disposal project. This `was not considered a substantive change in serum PFOA concentrations. There was no difference in PFOS concentrations.
3M CoPmagpean1y0
References Ehresman DJ, Froehlich JW, Olsen GW, Chang SC, Butenhoff JL. 2007. Comparison of human whole blood, plasma, and serum matrices for the determination of perfluorooctanesulfonate (PFOS), perfluorooctanoate (PFOA), and other fluorochemicals. Environ Res 103:176-184.
Fique 1. 3CageGrow DORRemediaPticotn
Baseline vs.EndoProjctPFOACorcrtai(rognfesl)
w
5
Soc ne
Sm
2
i
f)0
)
wo
PFOABasen(gal)
Coompnany
BFsanes.1.CEontdafgPeoGeotveFODSICERreedtorPanondnf)t mo
3M CoPmagpean1y2
Sm
- Identity line
0 "
[3
wo
Bane POSrt)