Document ykzJn8mnYZ9Q3JBj66w9Dxmy3

AMERICAN PfltrS STANDARD JBQILEB. LIGHT OIL,GAS, COMBINATION GAS-LIGHT OIL INSTRUCTION MANUAL BOILER-BURNER UNITS NOTICE TO INSTALLER AND OPERATOR THIS BOOKLET MUST BE AFFIXED ON OR ADJACENT TO THE HEATING EQUIPMENT FORM HO. RP--31028-02 SERIES HO. 1B-J1 04831 PFA-5 TABLE OF CONTENTS ITEM PAGE NO. General Information ---------------- 1 Setting the Unit --------------- ------------ 1 Chimney or Vent ------------------ l Air Supply ------------------ ------------ i Ratings - Data - -- -- -- -- -- -- -- -- -- 2-6 Altitude Corrections ------------- ------------ 7 Section Assembly --------------- -------- 7-21 Tankless Water Heator Ratings, Installation - - - - 15 Boiler Piping ------------------- 21 Assembly of Jacket - -- -- -- -- -- -- ---- 21-27 Steam Trim - -- -- -- -- -- -- -- -- ---- 27 Water Trim -------------- ------ -- -------- 27 Burner Installation ---------------- 27 Boiler With Jacket Extension --------- ----------- 32 Filling Boiler---------------------------------------------------------------------------------- 32 Attention to Boiler While in Operation ------- 32-34 Cleaning Steam Boiler --------------- 34 Attention to Boiler While Not in Operation - - - -- 34-35 General Maintenance of Heating System ------- 35 Repair Parts ------------------ - 35 04832 PFA-5 1 general information The PFA-5 Is the latest development in large cast iron boiler technology. Designed specifically for forced draft firing, the boiler is available with light oil, gas, or combination gas-light oil burners and operates with an efficiency of over 80%. In addition to the advantages of forced draft firing - the elimination of the need for external draft devices such as a high chimney or mechanical draft equipment - the PFA-5 features: compact, light weight; wet base design; no separate base or combustion chamber; provision for multiple tankless heaters; 4 thru 21 sections ranging from 620 Mbh to 3,430 ilibh gross output', a-nd thre'availability of factory assembled section assemblies. This manual gives the necessary information for the proper installation, operation maintenance, and service of the units. For special installa tion problems contact American Standard, Hydronics Department, 25 Rano Street, Buffalo, New York. Ratings and data are given in Table I. Dimensional information is given in Figures 1, 2 and 3. SETTING THE UNIT The unit should be located in the boiler roam so as to provide ease of venting and adequate clearance for maintenance, serviceability and in stallation of piping. A minimum clearance of 3 feet should be allowed on each side of the unit for cleaning of flues and for tankless water heater Installation. Floor construction should have adequate load bearing characteristics to bear the weight of the boiler filled with water. A boiler foundation similar to the one shown in Figure 4 is recommended if the boiler room floor is weak or uneven or if a water condition exists. If the boiler is set on a combustible floor, a 1" thick layer of foil faced Insulation or equivalent should be placed beneath the boiler foil side up. CHIMNEY OR VENT The PFA-5 series boiler is designed for forced-draft firing and may be used with a conventional natural draft stack or a stub vent (see Figure 5). See Table I for the proper vent size. Draft controls are not normally required, although they may be used on installations where a natural draft stack is used or on multiple boiler installations with a common stack. The boiler is provided with a breeching damper which should be secured in the open position unless high breeching draft makes burner adjustment difficult. AIR SUPPLY A sufficient air supply should be maintained at all times to the boiler room for proper performance of the unit. A permanent opening or duct should be provided such that the boiler input will not exceed 5,000 Btuh/in* of free area. 04833 B U IL T TO ASME SPEC IFIC ATIO N b o ile r > n l b re e c h in g d a m p e r. OOOOOTT^-P^ v <o a c c 0 d - > Q L| s s=i C" -- ^ ' ? -- ** XC"ir a. t- X *r r ^ c -- 'mtw*-^c*xc -- ^ i ^ ^** Ukd . M M M _ <m.O.>l>4*<**Add*d*d Ei * 1 I : -g2 u-. - 2.1 3o.u. INNNNNNNMN^NN^A4IVMN * i -" w _ o_ Zk>i w C u_ S>. i<n t 4Q 00 _' V ^ 9* 4iJ m \Q P4' n ^ ^ F* ^ *4 ^ o ** ,* * ^ iV V'.iW rc ). Otf- 0i E o3a w 2 ac So H n U i>O0ON^0O^i^^O^^M0^NOr*M*O*0OOMVO^ -- r- -- ^ o ^ r- f- -- rf*. >f-^^r> -I issi p *d ^ <* X O ^ f ' n P4 *^o --r S29'0^^a<^'4>P*>0 -- *c 1m 0et8O'S9`0^^e^*^9<D0<0 9>V9'VO^a(',*N0^BV^VCl^O cc M A "3 & rost ^o'O/> '-AO^--p^r*^^^ap^o^^S''A0O^O'^O^ SI -a0 Qxu tf* ^ * X PA ^ t l -- --o * * ( i *na *rf"i^ >r0- *r* pp* ii o wZ v_ 03 I f iA 4 N 0 ^ O PC I <<<<<<C<<<<<<<<<<< Lti*el*U.UeUeUeUL.UaUaUU*UiU<lfcUiU a.a.a.0. -- fi.c-i-0-CLafl.fl-CLCuo-CLa. 2x c 2 3 & C o 1 0 X a E 18 j: ^ 9 e * >-- o S S . 45m : I^ w ? b :| ^ e lz 6* 11 w 3 'It # sS & 11 0 u9. iP K 33 IS) 4A f2 e5 18 32 04834 PFA-5 f 3 (D o o o o o <n <T r rr ^ : 00 CO . 00 00 00 i DIMENSION --IN --tw -KM -w --(CM --lem -- CM --CM --104 --.CM -- '1 --icvrl--km --leu < O) iCnM ro Kro #o ** 0) M* mm 3 N<0 ro h- r- m 00 -- 03 ro> fH --ten -KM -1<M CD o in J roi<r rthr lOI roiv ioiv FOl* n`V lOlV i*W ioi<r lO( mi** fW _J CIfM) fO rKo rO 0> T m m 3 t0 fO N. a> in CO 0-> I1 ON) fO O O) o n cvj fCM- if) 1 Zo oUJ m <0 N * o - CM to * m { <0 N- 00 0) rOsj CM ! I 1 -- NUMBER OF j = I 3 9S FIG URE 1 SECTION THRU BO ILER W ITH FLUSH JACKET- 04835 PTA-6 1/9 CD CM z CM CM CM CM CM CM CM SCM #IOo CD IO m * tf) m IO CO 0) TIT CO s | o IS) < o O o O o * V * <1" CD 00 OD 1 0 u __ ~| a KW mr* nT rtTlMlirW OT rtt rtT mCM 1I I--O fsO- ? 0> in >n 5 S <0 ro 0> m i -- S N 1 00 1 01 N * IO O 0) o W 5! 5 NUMBER OF SECTIONS v | ui (0 i 1! i_ : a> 0) O - CM io j v 1 m CO Si CD 0) O CM _JJ FRONT VIEW " RETURNS L.H SIDE VIEW TOP FLOW TAPPINGS 04836 PPA-6 NUMBER of SECTIONS .4 27 39 63 CD (Si OJ OJ OJ OJ OJ OJ OJ m to m * 3 N m in <0 K V) zo < o o o o O * * V * * * eo <7> z UJ I3 ,5 InT p*|po* -<! 8 -- PO K PO mi* p** m ** mt* w> lO mi* 3 mi* K <0 pO S* mi* mi* mi* mi* mi* m* mi* mi* mi* 1*- IT) 3 N fO o O 2 OJ OJ *j 3 <6 (0 CVI N N* O OJ O O * O OJ <0 OJ OJ fO to * * o (D (0 m OJ if> <0 K o - OJ IO * (0 1 2. o OJ OJ r --*\J tfOo oz z MCD ml K> CVJ a uJ r-f 0> cvi UJ > z oa: u. -4* -m. - CO <r P CO'^r (9 w; o J2< Uj2ujy Oujo^ 20w< u co " <S o G- i w# It UJ > UaJ ot q: 3 UJ a: to Mo h TOP FLOW TAPPINGS 04837 PFA-5 L tt" } 44*' 41" 7" S3" *" G*-9" T,-V 7 * -*` -s" 9' -?M K*-3" 10'-4" 11'-3" no. or sxcrxwa 4 T 10 11 U u 14 10 10 17 10 u so SI ( FIGURE 4 - SUGGESTED BOILER FOUNDATION FIGURE 5 - TYPICAL ARRANGEMENT FOR STUB VENT 04838 ALTITUDE CORRECTIONS Ratings shown in Table I apply at altitudes up to 1000 feet on oil and 2000 feet on gas. For altitudes above those indicated the ratings should be reduced at the rate of 4% for each 1000 feet above sea level. SECTION ASSEMBLY If the boiler was ordered factory assembled, the assemblage should be set in the proper location. Lifting arrangement and weights are given in Figure 6. The tie rod nuts should then be loosened until finger tight. After a hydrostatic test, has .been run on the assemblage, attach the cleanout cover radiation shield(s), and proceed to "Boiler Piping". If the boiler was ordered to be field assembled, follow the assembling procedure outlined below: A. Arrangement of Sections The sections must be assembled according to the arrangement listed in Figure 7 to insure proper operation and proper alignment of piping with jacket knockouts. B. Assembly of Sections (Manual Draw-Up) 1. Place the back section In its approximate final location with regard to the chimney and support it with a suit able prop. It is recommended that a 2-1/2" plug be installed hand-tight in the back to hold the upper end of the prop. See Figure 8. 2. Clean nipples and nipple openings with kerosene or gasoline and coat nipple with nipple paint packed in Misc. Box. A heavy bodied lubricating oil may be used but should be applied to both nipple and port. 3. Drive nipples squarely (thick end first) into section using block of wood and hammer, or preferably an alum inum headed hammer, if available. 4. Special nipple setting gauges are provided for the nipples. Gauge nipple in both directions to insure that it is driven to the proper depth into the nipple opening. Cut-out in gauge must rest on nipple, with legs of gauge touching finished face of section, when nipple is properly driven. See Figure 9. IMPORTANT - NIPPLES MUST BE DRIVEN AS DIRECTED TO INSURE TIGHT JOINTS. MOST NIPPLE LEAKS ARE CAUSED BY TILTED OR COCKED NIPPLES. 04839 no. or BKia. 4 ---- 1- s 8 9 10 11 12 LUTING RIGHT 1680 2000 3355 5515 2980 3300 3680 3555 4300 H0 1 1 1 J 8IN. SLING LENGTH "L" T -6" 81 -6" 8'-10" 9'-2" 9' -6 " 4'-10" 10'-2" PFA-5 NO. OF SHOTS. 13 14 ___LG___ ___1L7S___ 18 19 1 20 1 ii LIFTING MIN. SLING RIGHT LENGTH "L" 4600 4955 S300 5600 5555 6300 6600 6980 7300 10'-6" 10'-10" il'-S" 11'-6" 11'-10" 12'-2" 12'-6" -- 13'-2" Rev. 7/23/69 FIGURE 6 - FACTORY ASSEMBLED SECTION LIFTING ARRANGEMENT ''C0003 'i 04840 PFA 5 SECTION ARRANGEMENT | CODE LETTERS FX- FRONT SECTION WITH 4 " TOP TAPPING C- CENTER SECTION CX-CENTER SECTION W /4" TOP TAPPING CT- CENTER SECTION W/T.W.H. OPENING BX- BACK SECTION WITH 4 " TOP TAPPING CT CT d dy * d y y' d u Eyh B dU y dd d yB BB d y od d yy d B B EUh y B 6 B dyy y Uo y yy d y Hy UEh B EUh 6 B B 5 dyyoU d dd d dd s o HU Hy y EUh B B B BB ayuOUdd y yy u yy 2 B B B HO EOh B B B B B B B 6 Xn y y y d d d y y y y y y d d Xffl OH B B B OEh B HO OEh B 6 B B 5 B B ffl u o y y B U y a d d d d d d y y Xa B B O B LO yh HO EUh HU B OEh EUh B EUh B yEh B y y CJ y u U o y U u o O y y U y y y OH EO- B OH B 6 B B HU Ey- y y u y y y y y X&M XH XH E E XH X X(*4 XPm E X Pm X Pm XPm XH m (O t- ao OJ O rH 0* n ** lO CO 00 a O H rH rH rH pH H rH H rH H CM CM oa Ha. a U 4aaa* aao h M 4O 4a* a _ aa sy a r-i .a SS a 4* aaa iaao4 ft ua 4aaO> a H- oB JO : Hho a4a> HI I Figure 7 04841 PFA 10 < FIGURE 8 - POSITIONING OF BACK SECTION FIGURE 9 - SETTING < NIPPLES 04842 PFA-5 11 SECTION ASSEMBLY (Cont'd.) 0 B. Assembly of Sections (Manual Draw-Up) (Cont'd.) 5. IMPORTANT - THIS IS A FORCED-DRAFT FIRED BOILER AND SEALANT MUST BE APPLIED WHERE SPECIFIED FOR PROPER PERFORMANCE. TWO COMPOUNDS HAVE BEEN APPROVED FOR USE -- SILASTIC 90-086 RTV (BLACK) MANUFACTURED BY DOW CORNING CORPORATION, OR G-E RTV-103 (BLACK) MANUFACTURED BY GENERAL ELECTRIC COMPANY. The grooves in the ground joint along the edge of the section should be cleaned with a wire brush. Then using a cartridge of sealant in a caulking gun, apply a smooth, 1/4" diameter bead to the grooves. See Figure 10. IMPORTANT - SECTIONS MUST BE PULLED UP TIGHT WITHIN FOUR HOURS AFTER APPLICATION OF THE SEALANT. 6. From arrangement of sections (see Figyre 7) select next section according to code letters on section. IMPORTANT - SECTIONS MUST BE ASSEMBLED IN PROPER ORDER. Clean nipple openings and place section on nipples in back section. To facilitate assembly, it is advisable to enter the upper nipple first in its port, then enter the lower nipples in their respective ports. 7. Insert the three tie rods through the nipple ports in the intermediate section extending them through the tapped holes in the back section. Place the three plain assembly draw-up blocks together with nuts and washers on the tie rods (back section side). Place large draw-up clamp block on the upper rod and small draw-up clamp block on each of the lower rods. Insert loose jaws in clamp blocks and tap lightly with hammer to insure tight grip on rods. See Figures 11 and 12. 8. Drive section in place with heavy block of wood, striking blows as squarely as possible over nipples. Draw-up evenly on all tie rod nuts starting with lower tie rods, but only after driving the section up at regular intervals with the heavy block of wood to relieve tension on the tie rod threads. Continue assembling sections in their respective order. WHEN ASSEMBLING SECTIONS WITHOUT HYDRAULIC DRAW-UP EQUIPMENT, NEVER ASSEMBLE MORE THAN ONE SECTION AT A TIME. Be sure to apply the sealant to the groove in the ground joints between adjacent sections as the boiler operates with a posi tive pressure in the firebox and products of combustion will escape between sections unless the sections are properly sealed. The sealant should be applied before each section ^ is placed on the assemblage. NOTE - AVOID DAMAGE TO THE TIE ROD THREADS WHEN ATTACHING DRAW-UP CLAMPS AND WHILE DRAWING UP SECTIONS. APPLY OIL OR GREASE FREELY TO TIE ROD THREADS WHILE ASSEMBLING SECTIONS TO PREVENT STRIPPING OF THREADS ON ROD. 04843 . .1 I <...< V..*. ftwmtsm FIGURE 11 - PULL-UP ASSEMBLY ,, VC< *** - ** <<r '<<< v'* lCc*!c'<*'c -tf<( .'''vt'** " . eCCfc'-<'^v'<* ft,. '<w .- *+t**+3* -< ,* * FIGURE 12 - CLAMP JAff IN POSITION 04844 SECTION ASSEMBLY (Cont'd.) B. Assenbly of Sections (Manual Dray-Up) (Cont'd.) 9. Remove upper and lower tie rods with draw-up clamps and as sembling blocks. Place front section Into position and Insert tie rods through the lugs on the front and back sections. Place regular steel nuts and flat washers on rods and draw nuts up evenly on all three rods until front and next to front sections are tight at ground joints. Adjust the nuts on the back ends of the rods so that they are no more than flush In order that as much thread as possible Is available at the back to begin the draw-up operation. Draw-up evenly on all nuts as previously directed. 10. After the front section -has been drawn-up to sake contact at ground Joint, back-off tie rod nuts until finger tight. Rods should project equally at each end to insure proper fit of the Jacket. See Figure 13 for boiler section assemblage to be equipped with built in water heaters. C. Assembly of Sections (Hydraulic Draw-Un 1. The entire assemblage may be drawn up at one time using hydraulic draw-up equipment obtainable on special order providing the operation is completed within four hours after application of the sealant. I 2. Repeat steps 1 through 6 under "Assembly of Sections (Manual Draw-Up)." 3. Continue assembling sections in their respective order until all sections are in the assemblage. Be sure to apply the sealant to the groove in the ground joints between adjacent sections as the boiler operates with a positive pressure in the firebox and products of combustion will escape between sections unless the sections are properly sealed. The seal ant should be applied before each section is placed on the assemblage. 4. Use 3/4" diameter rod(s) and coupling(s) to draw-up the sections (extra rods and couplings are provided with hydraulic draw-up equipment). 5. Use two steel channel blocks for the upper rod, which is inserted through the upper tappings and nipple ports. See Figure 14. 6. Use four cast iron draw-up blocks for the lower rods, which are inserted through the lower tappings and nipple portB. 7. Use hydraulic rams to draw up sections by applying pressure alternately on the draw-up rods. Continue to draw up until all sections make contact at the ground joints. 8. Remove draw-up equipment and insert regular tie rods through lugs. Rods should project equally at each end to insure proper fit of the Jacket. Tighten tie rod nuts until finger tight. See Figure 13 for boiler section assemblage to be equipped with built in water heaters. 04845 PFA-5 If FIGURE 13 - SECTION ASSEMBLAGE FIGURE 14 - HYDRAULIC DRAW-UP OF SECTIONS 04846 PFA-5 Tankless Water Heater Ratings * For PFA-5 Boilers (Steam and Water) 15 TABLE II Boiler Model Number Number of #548 Heaters Installed 1 23456 78 PFA-504 PFA-505 PFA-506 PFA-507 PFA-508 PFA-509 PFA-510 PFA-511 PFA-512 PFA-513 PFA-514 PFA-515 PFA-516 PFA-517 PFA-518 PFA-519 PFA-520 PFA-521 8 8 16 8 16 8 .16 2.4 8 16 24 8 16 24 32 8 16 24 32 8 16 24 32 8 16 24 32 40 8 16 24 32 40 8 16 24 32 40 8 16 24 32 40 48 8 16 24 32 40 48 8 16 24 32 40 48 8 16 24 32 40 48 56 8 16 24 32 40 48 56 8 16 24 32 40 48 56 64 8 16 24 32 40 48 56 64 * Ratings are given In gallons per minute continuous draw of water heated from 40 F to 140 F with 200 F boiler water. D. Tankless Heater Installation 1. If boiler is ordered with tankless heaters, they must be installed with gaskets. Table II gives the maximum number of heaters permissible per assemblage and the heater ratings. IMPORTANT - THE HEATERS SHOULD BE AS CENTRALLY LOCATED AS POSSIBLE IN THE ASSEMBLAGE. SEE FIGURE 15, 2. Specifications for construction of the heater manifolds are given in Figure 16. HEATER MANIFOLDS SHOULD NOT BE IN STALLED UNTIL AFTER THE JACKET IS IN PLACE. E. Hydrostatic Test 1. When boiler sections have been assembled, it is essential that boiler be tested before platework, jacket or piping is installed. 2. Plug all boiler tappings and fill entirely with cold water. To protect and safeguard the accuracy of steam or watef* gauge supplied DO NOT INSTALL GAUGE UNTIL AFTER TESTING OF BOILER 3. Testing pressure should be at least 10 pounds but should not exceed 50 pounds. 04847 PFA-5 -FIG URE 1 6 TANKLESS HEATER ARRANGEMENT 04848 16 04849 PFA-5 18 SECTION ASSEMBLY (Cont'd.) E. Hydrostatic Test (Cont'd.) 4. EXAMINE BOILER CAREFULLY, INSIDE AND OUTSIDE, to insure against leaks through concealed breakage caused in shipping and handling. 5. After making certain that there are no leaks, drain boiler and remove plugs for boiler trim and other connections. This precaution is for your protection and will simplify handling of necessary replacements and adjustment claims. F. Assembly of Platework 1. .Secure the cleanout covers to the boiler by the 1/4" diameter by 2" long bolts shipped with the covers. The bolts should be anchored to the slots in the cleanout open ings with the head inside and a washer and nut outside. See Figure 17. The covers are placed on the bolts and tightened with washers and nuts until gaskets are compressed gas tight. 2. Place the cleanout cover radiation shield(s), insulation side out, over the bolts protruding from the cleanout covers and secure in place with the nuts shipped with the radiation shield (s). 3. The pressure relief door should be secured to the back section with the word "TOP" in the upright position. A 1/4" DIAMETER BEAD OF SEALANT SHOULD BE APPLIED TO THE GROOVE AROUND THE EDGE OF THE DOOR FRAME before securing with the 5/16" diameter by 1" long bolts provided therefore. 4. Install the refractory firewall plates on the right side of the center sections. The plates should be installed toward the front of the boiler. See Figure 18. IMPORTANT - THIS BOILER REQUIRES NO COMBUSTION CHAMBER. 5. The burner plate should be secured to the front section with the 5/16" diameter studs provided therefore. Before installa tion of steel burner plates for gas and gas-oil burners, the 1/2" asbestos rope provided for steel burner plates should be glued to the front section just inside the rib to which the burner plate seats. An adapter plate is provided for mounting R6 gas and gas-oil burners to the cast iron burner plate. See Figure 19 for view showing steel burner plate installed. G. Assembly of Canopy 1. Attach with sheet metal screws the canopy brackets to the ends of the canopy. Two piece canopies should be joined together using the sheet metal screws provided therefore. 2. Along the groove provided on top of the sections and across the top of the end sections apply a 1/2" diameter bead of sealant. A 1/2" bead of sealant will be delivered by the caulking gun by removing the plastic nozzle from the end of the tube. See Figure 20. 04850 PFA-5 19 ia t a -m i T 1 4 41 9 1 . T1I '* :4 * 3 4i 4 a FIGURE 17 - CLEANOUT ANCHOB BOLTS t FIGURE 18 - FIREWALL PLATES 04851 PYA * 20 04852 SECTION ASSEMBLY (Cont'd.) PFA-5 21 G. Assembly of Canopy (Cont'd.) 3. Pine* the canopy on the sections with the word "FRONT" positioned over the front section. 4. Secure the canopy to the sections using the appropriate "J" bolts and regular bolts. 5. Check the seal between the canopy and the sections. 6. Assemble the flue thimble to the top of the canopy with the bracket toward the front of the boiler. 7. Figure 21 shows the canopy assembled to the sections with the flue thimble in place. 8. Place canopy insulation over canopy foil side up, fold down sides and secure with wire. H. Inspection of Seal 1. After the platework is in place, a visual Inspection should be made of all sealed Joints and repairs made if necessary. A darkened boiler room with a light source in the combustion space and canopy will aid this Inspection. BOILER PIPING Attach flow and return piping lines and insert plugs and bushings in sections as required. Flow and return piping headers are de tailed in Figure 22 and Figure 23. CAUTION - IT IS IMPORTANT THAT THE MINIMUM PIPING REQUIREMENTS AND ARRANGEMENTS BE COMPLIED WITH IN ORDER TO INSURE MAXIMUM RELIABILITY AND PERFORMANCE. PARTICULAR ATTENTION SHOULD BE GIVEN TO THE CONSTRUCTION OF THE HARTFORD LOOP ON STEAM BOILERS. FIGURES 23 and 24 ILLUSTRATE THE RIGHT AND WRONG WAY TO CONSTRUCT THE STEAM HEADER. In the case of steam boilers insert two 1/2" extension pieces in tappings on left side of the front section to take gauge glass fittings. If the boiler is provided with try cocks, also insert two 3/8" extension pieces. ASSEMBLY OF JACKET 1. Place the bottom strip for the front panel in place below the burner plate. Install the number and series plate on the front Jacket panel with #6 x 1/4" sheet metal screws provided. Install panel by sliding it down behind the flanges of the front burner plate. Attach the bottom strip to the front panel with two Jacket screws. Figure 25 shows the front panel assembled to the boiler. 04853 PFA-5 04854 22 -FIGURE 21 CANOPY ASSEMBLED TO SECTIONS 04855 E 03 PFA- cn O Jk i CmD rm- 33 3 SUPPLY AND RETURN (INCHES) ro ro r\oT ccnnO PFA- 04 04 60S 90S PFA- PFA- 507 PFA- 500 -Ck -Ck PFA- -Ck PFA- 510 -Ck cn PFA- -Ck PFA- 512 PFA- 513 c> cn PFA- 514 cn PFA-515 PFA-516 U1 Ol Cn tn 00 PFA- 517 PFA[PFA--519 PFA- 520 O' cn cn PFA- 521 S-VId ZZ -FIG URE 2 2 MINIMUM P IP IN G REQUIREMENTS WATER BO ILER S PFA-5 24 n His w BMC sar ooas HH os aM oo Cm<iNJ sMc a ft x ft w axx: a m 2M a nc* oM Sh mi 2 a. ax: i 2 a. o. 04856 I HORIZONTAL ON RISERS PFA-5 25 CORRECT PHYSICAL ARRANGEMENT FOR STEAM HEADERS END OF HEADER BUSHED DOWN HORIZONTALLY TO EQUALIZER EQUALIZER INCORRECT PHYSICAL ARRANGEMENT FOR STEAM HEADERS I FIGURE 24 - STEAM HEADER ARRANGEMENT 04857 PFA-5 Em 26 I FIGURE 25 FRONT PANEL IN POSITION 0 04858 ASSEMBLY UF JACKET (Cont'd.) 2. If tut* boiler Has more thau sections, the Jacket side panels Till consist of two pieces which should be assembled before application (in addition a small filler piece attaches to the left side panel). If the boiler has more than sixteen sections, the jacket side panels Till consist of three pieces Thlch should be assembled before application. Side panels should be installed following the front panel. In case of steam boilers, remove knockouts from the left side panel filler piece for gauge glass fittings and for try cocks Then provided. When tankless heaters are used, remove the appropriate knock outs from the right hand side panel. Unless ctherrlse noted, the jacket is assembled Tlth #10 x 1/2" sheet metal screws throughout. DO NOT DRAW SCREWS UP TIGHT UNTIL JACKET IS FULLY ASSEMBLED. 3. Assemble the back panel next, then follow with the top panel. Knockouts in the top panel are provided for supply piping clearance. Filler pieces are to be assembled to top panel where knockouts are removed. After the jacket is completely assembled, all jacket screws should be drawn-up uniformly tight, except in case of boiler provided with Jacket extension. See Figure 26 for completely assembled jacket (front view) for boiler with water heaters. STEAM TRIM Install the water column trim in the extension fittings previously in stalled before the jacket was applied. Install the pressure-vacuum gauge, drain valve and controls as shown in Figure 27. Install the safety valve to the back section as shown in Figure 28. The safety valve is installed in the blow-off piping. Figure 29 shows front view of steam boiler assembled completely with water heaters. WATER TRIM Install the combination pressure-temperature gauge, drain valve, and controls as shown in Figure 27. Also install the pressure relief valve as shown in Figure 30. Figure 31 shows front view of water boiler assembled completely when water heaters are required. BURNER INSTALLATION Refer to Burner Installation and Service Manual for proper installation, fuel piping, wiring, burner adjustment and service instructions. Using a hacksaw blade or knife a hole should be cut to the proper size in the burner plate Insulation for receipt of burner air tube, unless steel burner plate is provided for use with R8 and RIO burners. 04859 PFA-5 28 i FIGURE 26 - COMPLETELY ASSEMBLED JACKET 04860 PFA-5 CONTROL APPLICATIONS LOCATION SIZE OF TAPPINGS STEAM WATER F 2^2 LOW WATER CUT-OFF NOT USED G PRESSURE LIMIT CONTROL TEMPERATURE LIMIT CONTROL H *4 OPERATING CONT. OPERATING CONT. TANKLESS HEATER TANKLESS HEATER J '"2 PRESSURE GAGE COMB. ALTITUOE GAGE AND TMEP.uauET.ER K NOT USED NOT USED REVERSE ACTING L NOT USED CONTROL M GAGE GLASS NOT USED N i LOW WATER CUT-OFF NOT USED NOTE-2j-* BLOW-OFF ON BACK OF BACK SECTION SAFETY OR RELIEF VALVE PIPED IN CONNECTION WITH BLOW OFF 29 FRONT VIEW-SHOWING CONTROL TAPPINGS ---------TA^T^G LOCATIONS 04861 PFA-5 SAFETY VALVE 30 FIGURE 28 - STEAM SAFETY VALVE ARRANGEMENT < I 04862 PFA-5 31 (0 FIGURE 30 - WATER PRESSURE RELIEF VALVE ARRANGEMENT (I FIGURE 31 - FRONT VIEW OF WATER BOILER 04863 BOILER WITH JACKET EXTENSION Following are assembly operations for attaching jacket front extension to boiler after the regular (Flush Type) Jacket is complete: 1. If not previously left loose, all Jacket screws attaching side and top panels to the front panel must be loosened. 2. Assemble the two extension side panels with the 12" x 29" opening at the bottom and the notched edge inserted between the side and front panels. Tighten screws to hold panels in place. 3. Assemble the bottom front tie panel to the two side panels with #10 x 1" sheet metal screws provided. 4. Assemble the top extension panel with the rear edge inserted between the top and front panels on the regular Jacket. It must also extend down over the side panels. Insert three Jacket screws on each side and one screw at each upper front corner. Draw all screws up tight. 5. Install the front door panel by engaging the bottom flange first. Figure 32 shows boiler complete with Jacket extension. FILLING BOILER IMPORTANT - BEFORE STARTING BURNER SEE THAT BOILER IS PROPERLY FILLED. Following filling, the piping elsewhere in the system should be checked for leaks. Steam boilers should be filled until water is visible approximately 3-3/4 inches in gauge glass. After boiler is in operation, make-up water should be added slowly to maintain the water level. Fill hot water systems as follows: 1. Open all radiator or convector valves, but keep vents at top of units closed. 2. Open fill valve. If an automatic fill valve is used, the water filling will stop automatically when proper pressure is reached. (Pressure should not exceed 50 pounds unless boiler is especially equipped for 80 pounds.) 3. Beginning with ground floor, vent each radiator or convector as directed above. It may be necessary to add water during this operation. ATTENTION TO BOILER WHILE IN OPERATION Keep water in steam boiler at proper level (approximately 3-3/4 inches high in gauge glass). On steam boilers - at the start of each heating season and once or twice during the season try SAFETY VALVE to be sure it is in working condition. To do this, fasten wire or cord to lever of valve and pull lever standing safe distance away from valve. 04864 PFA-5 33 04865 PFA-5 ATTENTION TO BOILER WHILE IN OPERATION (Cont'd.) 34 ^ ON A HOT WATER SYSTEM THE PRESSURE MUST NOT EXCEED 50 POUNDS UNLESS THE BOILER IS EQUIPPED ESPECIALLY FOR 80 POUNDS. IF IT DOES, IT MUST BE RELIEVED IMMEDIATELY AND THE CAUSE OF RELIEF VALVE FAILURE INVESTI GATED AND CORRECTED, OTHERWISE PRESSURE MAY BUILD UP AND CAUSE DAMAGE TO HEATING SYSTEM. DO NOT draw water from boiler while in use. When adding water while boiler is in operation, do not open supply valve fully but add water slowly. , CLEANING .STEAM BOILER The grease used to lubricate the cutting tools during erection of new piping systems serves as a carrier for dirt, with the result that a scum of fine particles and grease accumulate on the surface of the water in all new boilers, while heavier particles may settle to the bottom of the bailer and form sludge. These impurities tend to cause foaming, preventing the generation of steam and causing an unsteady water line. This unavoidable accumulation of oil and grease should be removed by blowing-off the boiler as follows: If not already provided, install a surface blow-off connection of at least 1-1/4" nominal pipe size with outlet extended to within 18" of the floor or to sewer, inserting a valve in line close to boiler. Bring the water line to center of outlet, raise steam pressure and while burner is operating, open valve in blow-off line. When pres sure recedes, close valve and repeat process adding water at inter vals to maintain proper level. Ab a final operation, bring the pressure in the boiler to about 10 pounds, close blow-off, stop burner and open drain valve. After boiler has cooled, partly fill and flush out several times before filling it to proper water level for normal service. The use of soda or any alkali, vinegar or any acid is not recommended for cleaning heating boilers because of the difficulty of complete removal and the possibility of subsequent Injury after the cleaning process has been completed. Figure 28 shows suggested piping arrangement for blowing-off steam boilers. { ATTENTION TO BOILER WHILE NOT IN OPERATION At end of heating season clean boiler heating surfaces thoroughly. Access t. boiler canopy and flueways may be gained by removing the left hand side Jacket panels and then by removing the radiation shield and section and canopy cleanout covers. Spray inside surfaces with light lubricating or crankcase oil using gun with extended stem so as to reach all corners. Clean and remove smokepipe where feasible. With steam boilers, at end of season add sufficient water to fill boiler to top of water column and leave it that way until fall when water shoulda be drained again to proper level. If at this time boiler water is dirty,TM drain water, flush out boiler, and refill with clean water to prescribed water level. 04866 PFA-5 35 ATTENTION TO BOILER WHILE NOT IN OPERATION (Cont'd.) On water boilers keep system filled with rater. In other words, leave water alone. It is advisable in fall to drain a little water to remove sludge but not more than necessary. IF BOILER IS NOT USED DURING WINTER TIME, IT MUST BE FULLY DRAINED TO PREVENT FREEZE DAMAGE. GENERAL MAINTENANCE OF HEATING SYSTEM 1. Keep radiators and convectors clean. 2. Keep system in good repair. It is advisable to have it inspected by your heating contractor at least once a year. 3. Clean boiler heating surfaces at regular intervals. 4. If a hot water radiator is hot at the bottom but not at the top, it indicates that air has accumulated Inside and should be vented. To vent radiator; hold small cup under air vent (located near top of radiator), open vent until water escapes and then close. 5. If much water is added to system, it is advisable to heat system to a high temperature and vent again. This will make less venting necessary during the winter. 6. Where an expansion tank is used, make sure that neither the tank nor its drain pipe is exposed to freezing tempera tures. Never place valves in piping leading to or from expansion tank. REPAIR PARTS GIVE BOILER MODEL NUMBER AND SERIES NUMBER WHEN ORDERING REPAIR PARTS. 04867 CAUTION TO INSTALLERS AND OWNERS The heat transfer surface of this boiler has been carefully designed to give optimum performance and reliability. However, the presence of contaminants such as scale or lime, sediment and boiler sealing compounds in the section waterways may cause premature failure of the sections. If lerks occur in the system and are undetected or neglected, fresh water repla':.:s the ./cier lost through the leaks. Nearly all water contains dissolved minerals ("lime"). As water is heated in the boiler, the minerals are deposited,' mostly at'Ehw bottom f the 'Sections "dii-ectiy above the fire. No appreciable amount of lime is deposited in a system with no leaks; but when water is hard And makeup water must be added frequently and in large amoynta, boiler waterways may be coated with a thick layer of lime within days or a few weeks of operation. Lime is an insulator, which causes over heating of boiler metal: if deposition of lime is not halted, the boiler will fail. To stop lime deposition, stop system leaks. Leaks may occur occasionally in any system. These leaks are usually of such a nature that they can be prevented or corrected by good workmanship. Every effort should be made to correct them without the use of boiler sealing compounds. If compounds are used, they should be used as sparingly as possible, and never <n excess of manufacturers recommendations. Following use, the boiler must Lie Uushec out thoroughly, or serious damage Is likely to result. Sediment which may accumulate in the boiler should be flushed out in accordance *.in recommenced maintenance practices. Excessive use of water should be avoided 'ecause ot the danger of lime and corrosion buildup. Glycol anti-fieeze is sometimes added to system waiar to protect against freezup. A1 hough American Standard can not recommend this practice, we realize that glycol anti>: seze will occasionally be used. Heat transfer through glycol is poorer than through water: use no more than 50 percent glycol in the system. Witn any proportion of glycol, radiator output will bo lower then with pure water at the same temperature. It is always better, when possible, to drain the system rather than add antl-freezet neither the heating systemnrplumbing system water will freeze so long as the heating system continues to operate; and the plumbing system is not protected against freezeup when the heating system is off, whether or not the heating system contains anti-freeze. Cast iron is highly resistant to corrosion. However, some propellants used in aerosol cans break down into poison gas and corrosive gas, at high temperatures. If aerosol mixtuies are used near boilers, the aerosol will enter the boiler flame and will be heated. Continued use of aerosol cans near heating system boilers can result in severe boiler heating surface corrosion and possible danger to health. The Installer of this boiler is responsible for shoving to the owner operator the location of all emergency shutoff devices, and Instructing him in the use of each. CONSUMER PROTECTION WARRANTY American-Standard products normally reach owners or consumerusers through an industry channel of distributors and plumbing and heat ing contractors. Experience has shown that claims of defects in our pro ducts generally relate to abuse or to other damage which occur after our sale and are not our responsibility. Since determining proper responsibility requires local inspection, our warranty (set forth below) extends only to our direct buyers: distributors are best equipped to obtain the facts un derlying claims, to place responsibility where it belongs and to recom mend ^handle repair or replacement. American-Standard warrants only to its distributors and other direct Buyers that it will furnish by freight a replacement for, or at its option repair, any product of its manufacture or part or portion thereof, proved to its satisfaction to be defective in material or workmanship under nor mal use and service within one year after installation. THERE IS' NO OTHER WARRANTY. EXPRESS OR IMPLIED. IN CLUDING NO IMPLIED WARRANTY OF MERCHANTABILITY OR IMPLIED WARRANTY FOR FITNESS FOR A PARTICULAR PURPOSE AND AMERICAN-STANDARD WILL NOT BE RESPONSIBLE FOR ANY DAMAGES WHATSOEVER NOR FOR LABOR OR TRANSPORTA TION EXPENSES RELATING TO SUCH REPLACEMENT OR SUCH REPAIR. NOR WILL IT BE HELD RESPONSIBLE FOR WARRANTY ADJUSTMENTS COSTING MORE THAN THE PRICE OF THE PRO DUCT TO ITS DISTRIBUTORS AND OTHER DIRECT BUYERS. Goods of other manufacturers sold by American-Standard are not warranted unless accompanied by an express written warranty, but the Seller will endeavor to secure for its direct Buyers the benefits of war ranties extended by such other manufacturers for such goods. American-Standard is proud of its record for product quality and for fairness in handling warranty matters; and, if an ultimate user of our products should feel our warranty system described above does not work fairly in his case, he should write the Office of the President, Director of Consumer Affairs. U. S. Plumbing/Heating, American-Standard, 40 West 40th Street, New York, N. Y. 10018. t ( DEALER'S NAME:__ ___ ADDRESS:_________________ TELEPHONE NO.:_______ DATE OF INSTALLATION: AMERICAN STANDARD PLUMBING & HEATING P. 0. BOX 2903 NEW BRUNSWICK, N.J. 08903 ( 04869