Document ykqqNDQ8DBOGVGB9MNg339y66

Monsanto FROM |NAME i LOCATION) E. P. Bailey - 2Z (Ext. 3758) 0ATI November 19, 1984 su,rtCT REFERENCE Hourly Safety Committee Meeting October 30, 1984 Larry Bonds Charles Davis Madeline Hare Donald Jordan AB-1 SS-10 SS-14 SS-13 R. T. Hammann M. A. Riddle G. L. Trotnblee 0-22 0-22 1 0-10 Robert Kozlek *Dan Nelson Ben Peek James Platt *Absent 51D 33D 13/14D SS-18 The guest speaker, Tom Ryan, talked about our recordable injuries YTD, including the last, and about safety results. A defective tool display was discussed for HSC. If additional defective tools are found, we will put them in the display case in the Main Office Building. The HSC will attempt to gather defective tools from the plant for this display. Old Business Stop signs at North 68 need to be reviewed. A stop sign was recommended at Dept. 513 heading east and at warehouse on north side of ditch. Ken Gore will be contacted. Safety log book replies were discussed. The answers are sometimes given to log book the day before an inspection. It is felt that the foreman is overloaded and answers are poor in some cases. We are getting a good answer to 15T1 pit area problems, but the answer has been slow. Warehouse "G" non-skid material needed. SHAC will concentrate on safety log book replies in the next quarterly inspection. New Business It is felt that fire permits are being improperly used as work permits in many cases. The HSC likes the new type piano safety glasses. What is the policy for new safety glasses being handed out? The new glasses are now in Safety Supply and are available for use plantwide. Personnel desiring a pair should see their supervisor. A contractor boilermaker was seen opening the elevator doors on the reformer which is a safety hazard. Contractor not following safety rules -- mis-using manlifts, driving too fast, incorrect tool for correct job, and twelve men in a contractor pickup. SIP, Hartney, Piping Engineering, and CT-3 contractors (not putting out safety signs) are the main violators. This will be included in the overall evaluation of the contractor's safety performance according to our new procedure. SC 12388 LAM013582 / Hourly Safety Committee Meeting October 30, 1984 ( Page 2. Substituting lower-rated valves in piping has been observed. Specific cases need to be brought up and Engineering will review to find out if the valve is correct. Contractor carpenter not using same material (#9 wire and 16p nails) for erecting scaffolds. Don Jordan will talk to Ray Supak. The next HSC meeting will be at 1:30 p.m. on November 27, 1984. /dgb E. P. Bailey SC 12389 LAM013583