Document ykYr3wq9GKyKbJ4MnXy2B66Br
FILE NAME Corning OC
DATE 1969
DOC OC115 DOCUMENT DESCRIPTION Local Union Grievance Form RE Dust
and Working Conditions in OC Berlin Plant
ot nyt etu @lates and Canada
ee
A.F.L
imaierd
*
-
Local Union No.
Union No. 232
LOCAL UNION GRIEVANCE FORM No
) Company Corning Fiberglas
Date_
7-69
Plant and Berlia
Department Department
NATURE OF GRIEVANCE
happened INSTRUCTIONS State exactly- What
When didit happehanppen Where did it happen Why did
TYPEWRITE it happen What adjustment is sought -
OR PRINT
Grievance covering dust and working conditions at the
Berlin Plant See attached sheet
WalterTownsTeonwdnsend
Signed
Signed_ President President
Sunda
Breck Signed
Char Char President President
Grievance Char
o Breck
Grievance
tiran tiran
Results of Grievance Meeting between Aggrieved Employee Shop Steward and Foreman - Step #
#
vom
iq {
.
Sipercmttin 3
ee
BM teeee
wom
tse
6
,
eer oe an. os see,
OVER
Signature of Foreman
Fone all 7
( son
erect
Fac
icr
cet,
tions agreement inworking conditions and the 1968 working condi-
~ B.B.A. that
accordance with the new
safety matters should be constitution of the
they are discussed and the Union
made a grievance after
.
. is reving too slow on this
Committee feels that the Company
Local officers of
serious Local
matter
in
the
name of
the
* grievance
the
231 and the Safety Committee file
on
following items
a *-
oo
7
+
if
~~
The general dust condition throughout the
for immediate correction of this dust
plant We are calling
condition
lCoavleldingeacfhor sha ifrtegouflarthefloor cleaning program that would be fol-
operation of this plant
Calling for dust correction at the Flatware
especially at the loading and
Finishing Line
continuously being subject to packing station These men are
ing and of this line The
a concentration of dust at the box-
entire line condition is not good
Router area needs correcting too
The Batch Mixing Department needs
method of feeding batch to this
correcting
be discontinued
department by
The hazardous a lift truck should
The method of cooling molds with
floor of the Production
large powered fans on the
enother method
Department should be discontinued and
dust
installed This keeps & constant agitation of
spread throughout the production
area
The number of vehicles
area continuously stir
be devised to minimize
^ minimum .
moving back and forth in the up the dust and fumes Some
this traffic and the dust on
production method should the floors at
The use of fiberglas pads after they deteriate and burn This
kteheeps a constant amount of fiberglas dust and other dust into
atmosphere by the cages passing in front of
dropping off of lift trucks and is a
cooling fans
tion to the employees body and eyes constant source of irrita-
The save
exhaust
need
serious
attention
.
A and C SAVE - a better dust
Special Assembly Department The Lines Nos
2
men strip this dust should be
1
and 3
now used of
collected instead of the
blowing the dust into faces of the
men
where the method
The method of bulk loading material - the
load into the bulk
trucks discharge their
dust from these
system Here there is carelessness and the
trucks blows into the plant in a large cloud
"
ce " ^'ererept enleev mee teee meeete >r
nae
arr
Mee
se aed
gant
wes
557
~
ae+g2
= ~
=>
a.
( 2
':The ventilating of the Dowthers ares over the
pumps Any ventilation coming into this ares
top of the Dowthers must pass over the ~.
pumps and contaminated with Dowthers fumes before it gets into
the plant Another method of ventilating this area should be
devised Motor operated valves used in the Dowtherm area
High noise level from machinery and steam leaks should be con-
troll^,d
The Local Union and the Safety Committee are further calling for an educational program to avere the employees of this plant of
the seriousness of the contents of this dust so that everyone
is very familiar with this fact and through their daily work will do whatever they can to reduce the amount of dust
The Union is been checking last nine
requesting a copy of the report made by men the dust and funes conditions in the plant
months
who have over the
Attached to this grievance will be an additional list of requests by the Safety Committee for other improvements
+
-
~ 7"
toa ao aes Sete PP swe ween. -
3
owe tee .
kines
.
7 are +
.
endanger Incinare tow.
The area Incinerato stacked
This Incinerato stacked stacked bbaeggss,floordust and funk that that
Ventila ting the plant
during summer heat .
-~
on
{
~
:
See
(PPE ie yee 8
EE er on 7 8 . me _
-*
and
wf see