Document ykR1EEwLKrjXDZGeaDBe8bB9X

SAMPLING & ANALYSIS of ASBESTOS-CONTAINING MATERIALS SOME LESSONS LEARNED Inspections: what to look for Defining Sampling Areas Selecting Sample Sites How to Take Samples Specifications Sc Selection of Laboratories Quality Assurance S< Laboratory Reliability Suggestions on Forms Sc Procedures JANUARY 1981 This handout has been prepared as an informal training aid by the Regional Asbestos Coordinator, Environmental Protection Agency, Region IV, Atlanta, Georgia 30365. (404) 881-3864 CSOl HOW TO SAMPLE FRIABLE MATERIAL IN BUILDINGS STEPS TO FOLLOW WHEN SAMPLING SUSPECT ASBESTOS-CONTAINING MATERIALS INSPECT ALL PARTS OF A BUILDING Locate all friable materials; friable materials are those that can be crumbled, pulverized, or reduced to powder in the hand. One must touch the material to know if it is friable. Be careful not to overlook materials covering walls, support beams and columns. Be sure to find materials that serve as fireproofing, insulation, acoustical protection or decorative coating. If friable materials are found, identify them as "suspect." (It might be appropriate to hire an architect or engineering firm to design the sample collection and analysis tasks outlined below. Quality assurance requirements are very important in obtaining good results. Assistance on quality assurance matters can be obtained on 1-800-334-8571, extension: 6741. SET UP SAMPLING AREAS Segment, and mark on a "Floor Flan Diagram" of the building, those areas where the suspect material differs in appearance, or in how it feels to the touch, or in contents (if known). Additions to buildings made years after initial construction should be seg mented, too. Each of these areas constitute "sampling areas." It is possible to have only one sampling area, or to have several sampling areas in the same building. Give each sampling area a code for identification purpose. Be sure to include on the building diagram chose surfaces other than ceilings (i.e., walls and support beam surfaces, etc) if they are covered by suspect materials. Calculate, and mark on the diagram, the outside dimensions of the areas shown. Calculate the number of square feet covered by suspect asbestoscontaining material. Use this number to determine how many bulk samples you should obtain of the suspect material in each sampling area. Less than 1000 sq. ft. - 3 samples, plus duplicates Between 1000 and 5000 sq. ft. - 5 samples, plus duplicates Greater than 5000 sq. ft. - 7 samples, plus duplicates Duplicate samples are needed for quality assurance purposes. The number of duplicates needed are subject to good test design parameters. Assistance is available on the toll-free number above. -1- CS014 2451 SELECT SAMPLE SITES (LOCATIONS) The locations from which you should take samples of suspect materials should be selected in random fashion, and not arbitrarily, if possible. Seek EPA guidance for random number selection procedures; otherwise, do your best to be sure the samples represent the whole of the suspect material. (Don't get caught taking samples only in corners and out-of-the-way places.) Clearly mark sample sites by number on the "floor plan diagram." It is very important that this record be kept carefully. HOW TO TAKE SAMPLES Analysis for asbestos requires at least about a tablespoon of material and no more than two tablespoons. You can sample with a small, wide-mouthed bottle such as a small medicine bottle, a plastic or metal 35mm film cannister, a cork borer, or a knife. Whatever you use, be sure to penetrate and collect the full thickness of the coating. Transfer the sample to a small ziploc-type plastic bag, if necessary. Fill in data on the label on the sample container as soon as you put the sample in it. Use peel-off labels for writing convenience. Each label should include: name of building, name or number of the room, location of the sample or your own sample site number, your name and the date. If you use the sampling tool (bottle, knife or whatever) be sure to clean it thoroughly after each sample is taken. Do not release samples from your custody until you are assured of their chain-of-custody pending your receipt of analytical report. REQUEST ANALYSES ONLY FROM LABORATORIES THAT PARTICIPATE IN EPA's QUALITY ASSURANCE PROGRAM Understand that the best analytical methods available have limitations . Specify PLM (Polarized Light Microscopy) and the Petrographic Method for analyses. If analyses provide results with statistical confidence limits below 1% asbestos, you might then request confirmation of this report through the use of XRD (X-Ray Defraction) . Always make this decision in consultation with your laboratory representative or with the assistance of the EPA contractor on the toll-free number above. -2- CS014 2452 HOW TO FIND OUT IF THE LABORATORY RESULTS ARE CONSISTENT & RELIABLE Your samples should be sent to a laboratory experienced in analysis for asbestos. The lab reports the presence, if there is such, estimated percentage, and type of asbestos in the sample. You might also request identification of all other materials in the sample. To find out whether or not the results from a lab are consistent, you may wish to send them two samples (duplicates collected side by side). Give one sample a disguised number, and location. To compare one laboratory's results with those from another, send the primary samples to the primary laboratory and send the duplicates of samples to a different laboratory. Compare results of laboratory work on a statistical basis. Refer to EPA guidance materials, if possible, to review statistical procedures. Don't be surprised if the results from two different labo ratories differ in reported percentage of asbestos, especially when the percentage of asbestos is 30% or more. Remember, the important information you want is whether or not sample has more than 17 asbestos, and if so, what kina of asbestos does the sample contain. Competent laboratory analysts will expect you to develop your own quality assurance concepts when you are sampling asbestos materials. They expect you to have comparable results from another laboratory, for example. They even like the idea, because comparing results gives them the opportunity to improve on the very difficult analytical procedures involved. Be wary of laboratories claiming to be competent in asbestos analysis. There are many commercial laboratories claiming competence but few that display this skill in the EPAsponsored quality assurance program. A good idea is to check laboratories' qualifications by calling the toll-free number previously listed. -3- C5014 2453 SUMMARY SEARCH THOROUGHLY for soft, crumbling, or flaking surfaces. TAKE SAMPLES WITH GOOD METHODS IN MIND, mark them at once, and locate them on your sketch map. TAKE DUPLICATE (SIDE BY SIDE) SAMPLES to find out whether or not the laboratory is consistent or to compare results from two different laboratories. Be consistent with good quality assurance techniques. BE ASSURED OF THE CHAIN-OF-CUSTODY for all samples, pending receipt of analytical reports. CALCULATE THE STATISTICAL SIGNIFICANCE OF YOUR ANALYTICAL RESULTS when laboratory reports are completed. XRD may be needed. CONVEY THE ANALYTICAL RESULTS TO YOUR ENGINEERING/ARCHITECTURAL REPRESENTATIVE in the event you did not have them do the sample collection tasks. The engineer/architect must proceed with this knowledge from laboratory work to conduct an exposure assessment. Based on such an assessment, contract work pro cedures should be specified to control the release of asbestos fibers. FOR FURTHER INFORMATION AND ADVICE. CONTACT an analytical laboratory representative. Consult materials prepared by E?A on asbestos problems. Of particular interest will be those materials prepared for regulatory purposes. Remember that asbestos problems are frought with expensive litigation issues and that one should proceed with sampling procedures with this fact in mind. SEE FIGURES 1-4 for some suggestions on forms and procedures. SELECTION OF SAMPLE LOCATIONS WORKSHEET Sample Area No. (a) Dimensions of rectangle covering the Sampling Area: Base lb) feet (Choose first random m-nbor between C and no. in .b/) Height (c) feet (Choose second random numbe: between 0 and no. in <ci) RANDOM NUMBERS No. First Second LOCATION FALLS WITHIN SA Yes ho SAMPLE LOCATION Uni due Sample IS * LJ Building Name: Address: Asbestos Analytical Program Coordinator: Date: State: ____________________ Figure 1. Sampling Worksheet -5- C3014 2455 SELECTION OF SAMPLE LOCATIONS WORKSHEET Sample Area No. (a) A________________________ Dimensions of rectangle covering the Sampling Area: Base (b) Height (c) /3a _____ iofeet ___ feet (Choose first random number between 0 and no. in rb)) (Choose second random number between 0 and no. in io)) RANDOM NUMBERS No. First Second (1) A t St (2) 7/ (3) 10% is A /J \ (4) fO / ] (5) i //? 76 j (6) 22 | (7) 7/ ! (8) 67 (9) i I OO) /a (11) (12) LOCATION FALLS WITHIN SA Yes No 0 !0 1i ii :1 i j P| ! i 0 r---- L_J 0 n SAMPLE Uniq'je LOCATION Saino'e iD r ___Numbers-- {For lab] | *6/ 1 j ! a/7 ! 1 J 1 ! i ii i ! 1 i 073 3 06 !\ I S-72 *07 j 6" 77 .... ..i i ! 1 i 1 ! Building Name: Address:____________________________________________ State: Asbestos Analytical Program Coordinator: ____________________ Date: frTOSO Figure 2. Example Worksheet 6- - _J Classroom A-v\v\<_X tA-td i4 \^L) _i r" i ;| : Cei lihQ Hd-f-ev^C Floo^ OpjfvrooiviS. . ... <3nfa<j. fex+wy^d 5*pray i\t*k __ j......................... .. ! ____. __ .,. W\, A 9p.*4'fC<v''?*- .. _..'j_..................... _!_...: _j_ All Ceijliyx^ arg.a<j Skfc*\eJ ^(ovj Cowan'S*. $ *j&pIjy\q ARA QO1 ._!... Wi+K .t>.v\^ <j<depict 'V^ofcju..; (<- .! I.._ I! 4.. 1. .. 16'. ". ii n,. ri... 1"1! 1 is 1 1 z\o' :x : i ; **f ; : J ^ -w <r=~rr ? . i. . ! |\ -j; l * i I r+ i _ X* tom*, (03 _.j. 0QWr..tO% ^.ao^ i"; |2j^ }0S~ 4 .--i-- - feK ! ..I. j.. <>o' 1. - _.j_. , t yy. jV er1 _ d^ an\aA- . f_ | _j ___ .... .. . __ C-ilivNCj ^ bf ok^ av\4 ^A{lm^ ____ S... ^.4,<?-`_CW6K..I.C-?.'^!r'^._VVCs\ri_.^V'\a.1^|t. 7 A eft IY\ S O.TV\ip I \ ir>c^ ' --- -r .... r ^ \J__ ___ jC.a.1<_ '. 5<^l<qjtc. -- V, Axe cU yntn$i'ais3 [_ f\y^{^.J) ; ;! Figure 3. Example Sampling Area Diagram Pro^rourv^ Copy <LiYi*Air Mv. I _ XvtfctbY- . --j_ XAi^C/KjowN _ am -7- CS014 2457 table or RANOOM DIGITS 55363 &*TL6-7&-5 3--'T4-7SD 07449 34835 15290 L. 45573 84358 76616 67191 7094^ 00 00-635W4__j08!. -50147 J70>21625 16999 13385 22782 12777 21861 68689 03263 69393 92785 13186 29431 17726 28652 36520 64465 81628 36100 49902 58447 88190 04588 56836 78351 05550 30157 39254 56835 42048 30378 38733 81290 47327 18518 82242 29520 37636 02421 87618 26933 89541 70290 92222 55201 69753 72602 98063 89641 40640 16281 40113 08243 27340 10493 23756 54935 64953 99337 84649 48968 63291 11618 70502 53225 06426 24771 20711 55609 75215 12613 03655 59935 29430 75498 75055 05915 49801 70165 49539 74240 43915 26488 37140 57051 11082 66762 45406 78484 03466 49292 41116 64531 4 83 93 91322 94477 02494 31639 52009 36401 45525 56327 30825 25653 06543 88215 27191 18873 96927 41990 70538 72452 36618 37042 40318 53766 2375 90585 55955 77191 25860 76298 26678 57099 10528 15987 46962 53122 16025 55204 73417 89334 33 938 09925 89773 67342 77592 84299 53310 83920 69468 95567 29380 41333 96244 57651 9550S S73S0 84249 74972 38712 75906 91807 29002 464S3 80033 69828 25348 04332 32001 62606 10078 91561 13091 96293 6 h 3 24 23073 46145 96112 37203 64516 46354 72157 35389 50324 24177 15294 53959 79607 51530 37C69 6724 S 2013 5 14500 155 62 10061 98124 52244 63303 40251 61374 4 9304 09226 64155 06125 7 5 73 2 00315 0 *i 13 6333 S 05815 06714 54419 29457 71353 77669 33 4 5 2 97355 74762 50289 73864 83014 66668 25467 84745 41042 48068 26805 54310 96175 72457 48894 29493 94595 97594 22682 51043 01836 47907 88616 03033 02365 09044 13357 42035 61714 91726 51926 3 8412 38093 83173 09365 43630 33318 26745 90835 63 i 6 7 63470 25096 5 670 2 00634 95264 * 76508 327S2 4 06-4- 35169 45643 14194 42851 83514 14877 33095 78295 23179 67524 02365 58268 57219 97158 28672 10924 02771 39593 68124 50685 58013 43464 54278 73455 01181 61439 21 8 2 59061 71411 04237 9244 1 83236 08710 24262 19427 42059 24177 05697 67194 26602 6383 5 04234 55005 52106 34308 53739 60170 30495 21157 33032 94770 84171 42596 73 665 74246 04230 16831 94879 5 5606 71446 15232 32886 05644 62048 33711 69085 30802 30401 02602 66715 26385 79316 09819 25290 21526 65559 09205 57658 70091 91513 70566 00813 88407 02223 75947 71829 06498 549S6 41394 02S8S 7 994 1 17461 73925 66466 06232 85650 38707 60437 03195 3 9 68 4 54315 53037 91904 10913 75336 84534 42351 84707 15885 19409 40868 57973 48015 57295 98298 21628 53669 84710 35866 64220 80861 25973 66777 11199 96510 81352 9515 2 06446 8 6311 13860 68493 45924 56144 75228 41600 03107 9S814 32643 8814 i 52S08 26374 24742 96702 47192 43267 72743 12849 73902 69981 63297 45052 88200 66162 35973 23152 94044 83785 30014 25879 07265 69563 84404 88642 21778 02085 93388 07833 71763 96679 64268 88802 30263 80310 27762 46097 38216 3 14 13 90603 99396 72264 66540 11522 57810 43324 34354 70555 03023 74557 74224 01732 08396 27627 78376 09369 14966 54147 06647 18211 91637 19251 83613 36240 48952 1015S 76089 CS014 2458 Figure 4. Random Number Table Used in Figures 3 & 4 -8- TABLE Of RANOOM OIGITS 5>i7^rg^- 5^-tfnr r&23-& 6-27122 45573 84358 55363 07449 34835 15290 76616 6719Z 5^g:L~&3j0g} ZOOTO^T!?-^ $&XoT 21625 16999 12777 21861 739^ jjLTO13385 22782 68689 03263 69393 92785 13186 29431 17726 28652 36520 64465 81628 36100 49902 58447 88190 04588 56836 78351 05550 30157 39254 56835 42048 38733 47327 82242 37636 30378 81290 18518 29520 02421 87618 26933 89541 70290 92222 55201 69753 72602 98063 8S641 40640 16281 40113 08243 27340 10493 23756 54935 64953 99337 84649 48968 63291 11618 70502 53225 06426 24771 20711 55609 75215 75498 12613 75055 03655 05915 59935 49801 29430 70165 49539 43915 37140 11082 45406 74240 26488 57051 66762 78484 03466 41116 48393 94477 31639 49292 64531 91322 024S4 52009 3 6401 45525 56S27 30825 25553 06543 SE215 27191 18873 96927 41990 70538 72452 36618 37042 40318 53766 52875 90585 58955 77191 25860 76298 26678 5709S 10523 15987 46962 53122 16025 55204 73417 89324 33 93 8 09925 8S773 67342 77592 84299 53310 83920 95567 41335 57651 67380 69468 2 93 SO 36244 95508 8424 9 74972 38712 75906 91807 290C2 46453 80033 69828 25348 04332 22001 62606 10078 91561 13091 96293 64324 28073 46145 98112 37203 64516 46354 72157 85389 50324 24177 15294 53959 79607 51530 37069 67248 20135 14500 15562 10061 93124 52244 63303 40261 49804 64165 75732 10413 61374 09226 06125 00815 63839 05315 06714 64419 29457 71353 77669 8345 2 S7355 74762 50289 73864 66668 84745 48068 54310 83014 25467 41042 26805 96175 72457 48894 2S493 94595 97534 22682 51043 01836 47907 88616 03033 61714 02365 91726 09044 51926 12357 38412 42035 38093 88173 09365 43630 3331S 36745 90835 63167 63470 26098 56702 00634 95264 >76508 82782 40644 85169 45643 14194 42851 83514 14877 33095 78295 23179 67524 02865 58268 57219 97158 23672 10924 58013 02771 43464 39593 54278 68124 73455 50685 01181 61439 21882 59061 71411 04237 92441 83236 08710 24262 19427 4 205 S 05637 26602 04284 5210S 24177 67194 63835 55005 34308 5 8739 20495 28032 84171 73685 60170 21157 94770 42596 74246 04230 94879 71 446 32886 62048 16831 56606 15232 05644 33711 69085 30802 30401 02602 66715 26285 79315 09619 25290 21526 65559 57658 91518 00813 02223 09205 70091 70566 88407 75947 71829 06498 54966 41394 02888 79941 17461 73925 66466 06232 85650 38707 60437 03195 29684 54315 53037 91904 10913 75336 84534 84707 19409 57978 57295 42351 15885 40868 48015 98298 21628 53669 84710 35866 64220 80861 25973 66777 11199 96510 81352 06446 13860 45924 75228 95152 86311 68493 56144 41600 08107 98814 32648 88141 52908 26374 24742 96702 47192 43267 72743 1284 9 73902 69981 63297 45052 88200 66162 25973 23152 94044 30014 07265 84404 22778 83785 25879 69563 88642 02085 ' 93388 71763 64268 30263 27762 07833 96679 88802 80310 46097 382] 6 3 14 13 90603 99396 72264 66540 11522 57810 43324 34354 70555 74557 01782 27627 09369 03023 74224 08396 78376 14 966 54147 18211 19251 36240 10158 06647 91637 83613 48952 76089 <SStS b TOSD Figure 4. Random Number Table Used in Figures 3 & 4