Document ykDxnY6QQL2MY8gZ7jdG5DdY4
Monsanto
E.I nOM (NAML ft LOCATIONJy E. Stewart, WGK
:
October ?, 197?
--
: STATUS -PCB POLLUTION CONTROL PROGRAM
TO :
Mr. J. R. Savage General Offices
B2SL
COMPANY CONFIDENTIAL
= G. L. Bratsch C. F. Buckley W. C. Engman P. E. Heisler G. A. Hlppe P. B. Hodges G.O. (E1SF) A. E. Leisy/R M. McCutchan
, W. R. Richard G.O. (T3A)
This is the October 1, 197? status of PCB pollution control program.
I. PCB LEVEL IN SEWERS
September "knowing PCB losses" from the operating department and the incinerator area at 0.7? #/day are slightly lower-rthan last month. Losses measured at Waste Treatment Plant Effluent of 3 #/day are 50$ lower than last month. Waste Treatment Influent losses of 8 #/day are also lower than August and reflect back ground from plant and neighboring industries and village.
Aroclor sewer loss control data are attached.
A. Aroclor Department - Continuous samples taken from main department effluent stream average 0.55 #/day. Department operating below capacity and Aroclor and Chlorosulfonic operations are coordinated so as not to sewer off-gas at the Aroclor Department, con tinued air blowing during the entire month. Premise for long range correction will be issued in October.
B. Incinerator - Measured losses averaged 0.17 ///day. Incinerator in operation about 1 week but had to shut down for repairs. Losses are about one-half of last month. Extra effort being made to limit
^storage of drums within the sumped operating area , "and not in roadway where leaks can get into plant
sewer system.
.. i '
C. Total Plant - Average losses measured at Influent dropped from l1) #/day at beginning of month to 8 ///day at month's end. September rains were above normal and probably was a factor in PCB flow to Waste Treatment Plant as PCB's from ground are leached with rainwater. Gradual decrease in background expected with time.
CONFIDENTIAL 92-CV-204-ITOS
PAUL HODGES DEPOSITION May 31 - June 1, 1994
EXHIBIT NO. 40
CER 014340
HARTOLDMON0007333
Mr. J. R-. Savage STATUS - PCB POLLUTION CONTROL PROGRAM
Page 2 10/2/72
WGK
I. PCS LEVEL IN SEWERS (Continued)
D. Treatment Plant Effluent - September losses at 3 #/day
are half the amount measured last month. This loss Is equivalent to aboiit 0.003 ppb in the Mississippi River.
EPA guidelines are 0.01 ppb in the river.
II. PROJECT STATUS
Project 3972 - "Reroute North Basin Sewer" - To reroute effluent from department North Settling Basin such that all sewer flow from the department will flow from one point.
EEC 12/15/72.
Project 3956 - "Alterations to HC1 Distribution Sys tem" to eliminate possibility of sewering Dept. 246 HC1 gas. EDC 12/15/72.
III. PROGRAM STATUS Re Engman/Bratsch 4/2*1/72
1. HC1 Off-Gas
A. Aroclor - Continuing to coordinate production with operations in the C/S department so as not to sewer off-gas.
B. Estimate prepared to "install PCB Off-Gas Scrubber" $73*000 capital, $4,000 expense. Appropriation Request being prepared. Will permit operation of the Aroclor department independent of chlorosulfonie operations. Scrubber will also permit recovery of the HC1 gas in the proposed adiabatic HC1 absorber.
2. Blow Tank Off-Gas
Resumed air blowing 8/l4. Had discontinued air blowing about nine weeks ago to reduce PCB loss to the sewer, premise for longer range correction to be completed in
October.
3. Aroclor Department Catch Basin
.
Project 3972 EDC at 12/15/72. (See write-up under "Project Status".
Project to be prepared in 4th quarter to permit either filtration or carbon treatment of overflow from south basin to permit reduction of losses to essentially zero.
CONFIDENTIAL 92 - CV- 204 - ffDS ceR 014341
HARTOLDMONOOQ7334
Mr- J. R. Savage STATUS - PCB
POLLUTION CONTROL PROGRAM
Page v
IO/2/7P WGK
III. PROGRAM STATUS (Continued)
4. Incinerator Scrubber
No work planned.
5. Incinerator Catch Basin
Project to be prepared in 4th quarter to permit either filtration or carbon treatment of overflow to permit reduction of losses to essentially zero.
6. Rip Track Washer
Did not wash any T/C or T/T during month of September. Will analyze wash water content during October. Future work required (filtration, carbon treatment, etc.) to
get PCB content in wash water down to desired 0.01 #/wash.
WGK STRATEGY
.
Reports being prepared of plant program to control "knowing losses" of PCB to conform with recommendations expected from the federal authorities.
Plant strategy review meeting scheduled 10/20/72.
Edward E. Stewart Technical Services Department
/tm att
CONFIDENTIAL 92-GV-204-WDS
CER 014342
HARTOLDMONOOQ7335
2 0 X 2 0 TO THE INCH 4 6 12 4 0
HARTOLDMONOOQ7336