Document yk58K59o82rq6DYe52Dbem6JE
99 0 * G07 1
MEMORANDUM
70
Mr. H. F. Leyenderker
SUBJECT
EXXON LEXINGTON
Newport News Shipyard - 1978
5th 4-Year Special Survev
OATE
FILE NO.
W. A. Ingham, Jr.
. October 24, 1978
Attached Reports & Drawings:
1 1975 Ultrasonic Gauging Report 1 1978 Ultrasonic Gauging Report 1 Firefighting Equipment Report Var. Marine Chemists Reports 1 Seahorse Marine Slop Removal Report 1 Balance Record - #1 Feed Pump Turbine Rotor 1 Pintle & Waukesha Weardown Readings 1 HP & LP Main Eng. & #1 & #2 Generator Readings 1 Boiler Tube Report 1 Report of Material Test Expansion Trunk Gasket Material; 1 Englehardt Service Report 1 Ventilation Balance Report 2 Ventilation Balance Report (J. McCracken Has) 1 New Vent Duct Mod. Dwg. (J. McCracken Has) 1 New Galley Elect. Mod. Dwg. (J. McCracken Has) 1 Various USCG & ABS Previous Certificates 1 Ship Repair Daily Labor Report 1 Vessel Completion Date Plan 1 Megger Readings 1 Yard Paint Report 1 Farboil Paint Report 1 Tank Survey Report 1 Drydock Report 1 Copy Ultra Products Powermeter Letter 1 Speck Foam Monitor Sprinkler System 1 Cargo Piping Survey 1 Reach Rod Survey 2 Vessel Repair Completion Estimate 2 Percent Completion Reports 2 Percent Completion Graphs 1 Dwg. Sewage System Mod. 1 Preyard Preshutdown, Drydock Repairs, Start, Final Test 1 Arthur Dooley Foam Test Report 1 Current Certification Report, USCG, ABS 1 Outstanding 835's USCG
40-50
Duro
Neoprene
WAT: bt Attachments
c: Mr. H. J. Borgen Mr. A. T. Fellows Mr. L, A. Hanft
Mr. R. H. Osmer Mr. J. A. Tompkins Mr. E. J. Worrel, Jr.
EXX-MOR-008235