Document yeGwwEw1ry8YX4wwQjzngdzr

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION III 1650 Arch Street Philadelphia, Pennsylvania 19103-2029 Report Title: Inspection Date(s): Regulatory Program(s): Type of Activity: Site/Facility Name: Permittee(s): Site/Facility Operator: Site/Facility Address: County/Parish: Latitude: Longitude: General Permit Number: Site Specific Permit No.: NAICS Code: SIC: Unique Project #: Clean Water Act Compliance Inspection Report 05/25/2021 National Pollutant Discharge Elimination System (NPDES) Construction Stormwater The Marina at Peppers Creek HKS 4, LLC HKS 4, LLC County Road 336 (s/s) and East of County Road Lewes, DE 19958 Sussex 38.570278 -75.210833 DE0051268 DEC001977 236115 1521 3E21WN123A Site/Facility Representative(s): Point of Contact Ken Short, Insight Homes Phone: (302) 339-5802 Email: Kenshort@insight.de.com Bobby Horsey, Horsey Phone: (302) 542-8071 Email: Bobbydgh@aol.com EPA Inspectors: Peter Gold, EPA Region III Phone: (215) 814-5236 Email: Gold.Peter@epa.gov Amanda Pruzinsky, EPA Region III Phone: (215) 814-5456 Email: Pruzinsky.Amanda@epa.gov State/Local Inspectors: Mary Hamilton, DNREC Phone: (302) 222-2197 Email: Mary.Hamilton@delaware.gov Craig Mills, Sussex Conservation District Phone: (302) 381-6135 Email: Craig.mills@sussexconservation.org Digitally signed by Gold, Gold, Peter Date: 2021.07.19 09:18:21 Peter -04'00' Report Preparer Signature/Date Peter Gold, Enforcement Officer NPDES Enforcement Section (3ED32) Date MARK ZOLANDZ Digitally signed by MARK ZOLANDZ Date: 2021.07.20 15:59:20 -04'00' Supervisor Mark Zolandz, Acting Chief Date Signature/Date NPDES Enforcement Section (3ED32) Unique Project #: 3E21WN123A HKS4, LLC The Marina at Peppers Creek 05/25/2021 Table of Contents I. Introduction ................................................................................................................................. 3 A. Inspection Opening Conference ....................................................................................... 3 B. Weather and Precipitation Conditions.............................................................................. 4 C. Summary of the Site/Facility............................................................................................ 4 II. Site/Facility Activity ................................................................................................................. 4 III. Observations ............................................................................................................................. 4 IV. Records Review ........................................................................................................................ 7 V. Closing Conference.................................................................................................................... 7 Attachment A: Attachment B: Attachment C: Attachment D: List of Attachments DE NPDES Construction General Permit DE0051268 Photograph Log Notice of Intent (NOI) Sediment Control and Stormwater Management Plans Unique Project #: 3E21WN123A Page 2 of 7 HKS4, LLC The Marina at Peppers Creek 05/25/2021 I. Introduction On May 25, 2021, an inspection team composed of staff from the U.S. Environmental Protection Agency ("EPA") Region III (hereinafter, "EPA Inspection Team") conducted a Stormwater Inspection of the Marine at Peppers Creek site (hereinafter, "the site"). The purpose of the inspection was to observe compliance with the Clean Water Act (CWA) and to verify compliance with the site's National Pollutant Discharge Elimination System (NPDES) Permit No. DE0051268 Site Specific No. DEC001977 (hereinafter, the "Permit") and applicable State and Federal regulations. A. Inspection Opening Conference The EPA Inspection Team arrived at the site at est. 1:21 PM for the inspection. Inspectors met with the following site representatives: Name Peter Gold Amanda Pruzinsky Ken Short Bobby Horsey Mary Hamilton Craig Mills Table 1: Inspection Attendee List Affiliation Telephone Email EPA Region III Inspectors and Contractors EPA Region III (215) 814-5236 Gold.Peter@epa.gov EPA Region III (215) 814-5456 Pruzinsky.Amanda@epa.gov Site/Facility Representatives Insight Homes (302) 339-5802 Kenshort@insightde.com Horsey (302) 542-8071 bobbydgh@aol.com State or County Representatives DNREC (302) 222- 2197 Mary.Hamilton@Delaware.gov Sussex Conservation (302) 381- 6135 Craig.mills@sussex.conservation.org Peter Gold and Amanda Pruzinsky displayed their credentials to Ken Short at the outset of the inspection, and explained the purpose of the inspection was to observe the site compliance with its Permit. A copy of the Permit is provided in Appendix A. The EPA Inspection Team informed Ken Short that any information that the Facility deemed to be confidential business information ("CBI") should be identified to EPA representatives during the inspection and it would be handled as CBI according to EPA's CBI procedures. Unique Project #: 3E21WN123A Page 3 of 7 HKS4, LLC The Marina at Peppers Creek 05/25/2021 B. Weather and Precipitation Conditions During the inspection, weather was overcast with sporadic rain. National Oceanic and Atmospheric Administration (NOAA) National Weather Service precipitation data for the date of the inspection and 5 days prior are provided in the Table 2 below: Table 2. Precipitation Data Station Name Date Lewes 2.4 SSE, DE US US1 DESS0047 Lewes 2.4 SSE, DE US US1 DESS0047 Lewes 2.4 SSE, DE US US1 DESS0047 Lewes 2.4 SSE, DE US US1 DESS0047 Lewes 2.4 SSE, DE US US1 DESS0047 Lewes 2.4 SSE, DE US US1 DESS0047 05/20/2021 05/21/2021 05/22/2021 05/23/2021 05/24/2021 05/25/2021 Precipitation Amount (inches)1 0.0 0.0 0.0 0.0 0.0 0.0 C. Summary of the Site/Facility The total area of the site is 48.7 acres with 47.6 acres being identified for disturbance. The site is being developed into a residential housing development. II. Site/Facility Activity During the inspection, the EPA Inspection Team inspected the active construction part of the site. The inspection observations were made pursuant to the requirements of the Permit. The observations from the inspection are described in detail below in the Observations section. Photographs were taken during the inspection by Amanda Pruzinsky and are provided in Attachment B. III. Observations The following section summarized the EPA Inspection Team's observations relative to the Permit requirements and approved Sediment & Stormwater Management Plans. The permittee obtained NPDES permit coverage under the General Permit DE0051268. An NOI was initially submitted on April 11, 2006 (Attachment C - NOI). The NPDES permit (DE NPDES Construction General Permit), section D. EFFLUENT LIMITATIONS establishes requirements for managing runoff from construction activities. The NPDES permit, section E.1 Sediment and Stormwater Management Plan requires an approval of a Sediment and Stormwater Management Plan (Plans), compliance with the approved Plans, as well as with the Federal effluent limitations at 40 CFR 450.21. "Sediment and Stormwater Management Plan (Plan) The owner shall develop, fully implement, and maintain at the site, the approved Plan. The plan shall cover all site activities from the date of initiation of construction activity to the date of project completion. Pollution prevention measures, in accordance with the Delaware ESC Handbook standard and specifications for 1 Source: NOAA National Climatic Data Center (http://www.ncdc.noaa.gov/). Unique Project #: 3E21WN123A Page 4 of 7 HKS4, LLC The Marina at Peppers Creek 05/25/2021 Construction Site Waste Management and Spill Control, shall be incorporated into the Plan for construction activity...." Marina at Pepper Creek Sediment Control and Stormwater Management Plan were approved on June 21, 2013 and are provided in Attachment D - Approved Sediment & Stormwater Management Plans (Approved Plans). ESC DETAILS AND SPECIFICATIONS: Sediment Control NOTES: 6. All erosion and sediment control practices shall comply with the Delaware Erosion and Sediment Control Handbook 1989 or latest edition. Inlet Protection General Requirement: Permit Part D.1.8 Protect storm drain inlets a. Install inlet protection measures that remove sediment from discharges prior to entry into any storm drain inlet that carries stormwater flow from the site. b. Clean or remove and replace, the protection measures as sediment accumulates..." Observation #1: As identified in photographs DSCN0274 and DSCN0276 a storm drain inlet located behind an active lot, lacked inlet protection. Photograph DSCN0320 shows inlet protection that may need to be cleaned or replaced due to sedimentation. Handling of Waste Materials General Requirement: Permit Part D.4.3.a "All waste materials shall be collected and stored in securely lidded dumpsters in a location that does not drain to a waterbody." Detail Sheet DE-ESC-3.6.1 Site Pollution Prevention Sheet Notes 3.a "All waste materials shall be collected and stored in securely lidded dumpsters in a location that does not drain to a waterbody" Observation #2: The dumpster in photograph DSCN0316 lacks a lid. Concrete Washout General Requirement: Permit Part D.4.4.e "Washout from concrete trucks shall be disposed of in a designated concrete washout area for hardening and proper disposal." Observation #3: Photographs DSCN0268, DSCN0271 and DSCN0317 show evidence of past concrete washout and hardening on lots which are being actively developed. Unique Project #: 3E21WN123A Page 5 of 7 Stockpile Management HKS4, LLC The Marina at Peppers Creek 05/25/2021 General Requirement: Permit Part D.1.5.b - Stockpile and Sediment Barrier "Install a sediment barrier (e.g., berms, dikes, fiber rolls, compost logs, silt fences, or sandbags) along all downgradient perimeter areas." Section 3.7.3 of the Delaware ESC Handbook requires the stockpile be graded and have a maximum slope of 2:1 and are supposed to be a minimum of three feet from the perimeter control. Observation #4: As identified in photograph DSCN0303, shows a small stockpile that appears to be closer than 3 feet from the perimeter control and a slope greater than 2:1. Silt Fence Maintenance General Requirement: Section 3.1.2-2 of the Delaware ESC Handbook, Design Criteria regarding silt fence "Repairs should be made immediately." Detail DE-ESC-3.1.2.1 of the Sediment and Stormwater Management Plan states "Maintenance shall be performed as needed and material removed when bulges develop in the silt fence" Observation #5: As identified in photographs DSCN0275, DSCN0287, DSCN0289, DSCN0290, DSCN0291, DSCN0303, DSCN0323, DSCN0326 and DSCN0328 silt fencing was ripped, bulging, required cleanout, beginning to fall and not completely around the perimeter of a lot. Maintenance of Sediment Controls General Requirement: Section 3.7.1 of the Delaware ESC Handbook Standard and Specifications for ESC for Minor Development "7. Maintain the control practices. a. Maintain all erosion and sediment control practices until construction is completed and the lot is stabilized. b. Inspect the control practices a minimum of twice a week and after each storm event, making any needed repairs immediately. Toward the end of each work day, sweep or scrape up any soil tracked onto roadways...." Observation #6: Photographs DSCN0318, DSCN00319, DSCN0321 and DSCN0327, show sediment accumulated in a riprap channel. Photograph DSCN0270 illustrates sediment tracked onto the roadway. Unique Project #: 3E21WN123A Page 6 of 7 HKS4, LLC The Marina at Peppers Creek 05/25/2021 IV. Records Review During the opening conference, the EPA Inspection Team requested documentation including: Notice of Intent, Permit, Erosion and Sediment Control Plan, Wetlands Permit and Self Inspection Reports from February 1, 2021 to the date of the inspection. The requested documents were sent to the EPA Inspection Team and received on June 4, 2021. V. Closing Conference After the site walk, the EPA Inspection Team met with the site representatives for a closing conference. The EPA Inspection Team shared preliminary observations with the site. The EPA Inspection Team reiterated to the site representatives that all preliminary observations discussed were not compliance determinations. Any and all preliminary observations shared were subject to further investigation by EPA upon the additional review of records and documentation. Additional observations may be contained in this inspection report that were not identified at the time of the closing conference after EPA reviewed additional materials following the inspection. The inspection concluded at approximately 2:30 pm. Unique Project #: 3E21WN123A Page 7 of 7