Document yb5ozbDENXmEOoQy7npXmGQE3
Preliminary Dust Survey for Asbestos ^textile Institute, June, 1947
OUTUKg .OF BBCCWtBraBP PROCEDURES FOR ASEESlOSia IKVS3TICAT10K3
X. HKHMSEHIMO
A. Dissemination of Existing Information Provide factual inforsatian to Institute mesibers with least possible delay; prepare bulletins vlth desl&i etotchee an sane or all of the several subjects listed below, to be distributed singly as ready. Additional field observations required In many eases. 1. Carding dust control; for various noises of cochinsb 2. Dust In preparation, miscellaneous operations 3* Vet weaving equipment 4. Exhaust far Dry waving 5. Exhaust far winders. etc.
6. Design of duct work
7. Design of dust house
B. Development of Rear Techniques for Dust Control In +Ma category, the problems far vhlch there ere no present answers; ilka twisting, spinning, appraisal of operation, efficiency and cost of canaserolal dust collectors, etc.