^COMPANY CONFIDENTIAL Monsanto Anniston Plant . . . TECHNICAL SERVICES DEPARTMENT MONTHLY REPORT Anniston C. K. Eastman C. A. Rose J. C. Landwehr L. J. Boesch G. W. Miller W. B. Papageorge W. F. Taffee H. L. Williams Summary . May, 1969 Cost Improvement Results Month Est. Act. $41,580 Target______ 7. of Target $51,445 80.8 General Offices YTD $138,215 $179,490 77.0 H. C. Carder W. R. Robirds Danna (5) ,. . B. Hodges D. B. Hosmer (2) W. A. Kuhn C. F. Luecke N. L. Sample J. E. Smith R. J. Stratmeyer H. S. Trail OTHER LOCATIONS D. W. Jackson-WGK T. M. Patrick - So. 2nd St, A. H. Forsten - Alvin, Texas Organic Division The Santowax R still controls project installation com pleted last week in May. Test run on revised still system scheduled for 1st week in June. Long term run to meet FDA approval for chlorinated biphenyl in Solid Aroclor 5460 started and stopped due to affect on biphenyl quality. More detailed test will be run in June. Chlorine unloading and caustic unloading facilities were started up May 2 and May 21 respectively. The caustic unloading system had no problems while the chlorine un loading has only one problem; automatic shutoff of the empty cars. Modifications are being made to correct. Purification started up May 2 with unit consistently produc ing hydrogen at less than 10 ppm CO. HB-40 is operating at record rates using purified hydrogen. Off-gas catch pot performing successfully after modifications, enabling recovery of water white Muriatic Acid. 70 M lb/day rates have been demonstrated with the elimination of acid sewering formerly required to purge organics. Agricultural Division Sulfur Recovery scope development proceeding with Process and Engineering Flow Diagrams and Equipment List in preparation. AN --306. COMPANY CONFIDENTIAL INFORMATION DSW 377629 "This document contains confidential information which is the property of Monsanto Company. Only those portions of the document relevant to a duly authorized individual's need to know may be exerpted for him. The report must not be sent outside the Company without written approval and the recipient is accountable for its safe keeping, exerpting or otherwise disclosing of its contents and for its proper disposal." STLCOPCB4099361 Company Confidential 2. Agricultural Division (Cont'd) All background data for appropriation grade estimate will be available by July 1. Design and Drafting Santowax R still controls successfully started up May 27. Final calibrations targeted by June 1. Liaison with Surplus Property Disposal and design to flask mercury continues. Pollution Control Aroclor and HC1 Department waste audits underway. Quality The Plant Quality Score was 87.5, up 3.5 from April with YTD score of 90.0 against a target of 95.0 minimum. Strong quality improvements have been made in P2S5, HB-40, Aroclor 5460. Aroclor 1242 shows a wider spectrum of chlorinated isomers. Free chlorine in Muriatic has risen sharply since chlorine plant shut down. The 30-day demonstration of the new PNP reactor depressurization control system is underway. In spite of very high solids no pluggage has occurred. Depressuri zing cycles are on target (22 minute average). J. C. Landwehr jw DSW 377630 STLCOPCB4099362 ORGANIC DIVISION 1969 TSD COST IMPROVEMENT ANNUAL JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Sol .Aro. TAR 2250 2250 2250 2250 2250 2250 2250 2250 2250 Li-Still SpG. EST --- AFE 5015 Sp.Solid Aro. Lower 5060 ACT TAR est; ACT --- 2600 2600 2600 2600 2600 2600 2600 2600 2600 1500 5490 4390' 215 C] 467 C 1500 5490 4890 2150 - -- - Sol .Aro.-Still TAR Coolout temp. EST. 160 170 160 170 160 170 160 170 160 AFE 5015 ACT Sol .Aro. -Chlortcr TAR 590 590 390 390 590 390 390 590 590 Batch End AFE 5015 EST' ACT .- SW/R Composition TAR EST. 2750 2750 2750 ?750 2750 2750 2750 2750 - AFE 5016 ACT Solid Aro. TAR 1080 1080 1080 1080 1080 1080 1080 1080 Montar 5 Flake EST - AFE 2949 ACT Sol .Aro. TAR 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 Blend 4465 EST. 1690 1920 1680 1490 710 ACT 1690 1920 1630 1450 Sol.Aro.-Verti- TAR cal Still Cond. EST; AFE 2524 ACT 70 80 70 80 70 70 90 90 9 0 90 70 90 90 90 Sol .Aro.Cl2 T/C Dock AFE 2542 TAR est; ACT 940 940 950 0 - '- 0 ** Cl2 Pit.Down No TAR 950 940 950 940 950 940 950 Unload EST' 900 CED 1851 ACT Solid Aro.-Flake TAR & Drum EST. CED 1450 ACT Liq.Aro. TAR 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 0 0 I GOO 2000 2000 0 0 1000 2000 5000 5000 - - - - - - -- - - - 48-5J M #/yr. AFE 2545 EST-1 ACT 0 550C 0 5500 - -- Liq.Aro."No.2 TAR 3000 5000 Still Entrain Sep. est; AFE 5095 ACT Liq.Aro. -Montar TAR Disposal es.t; AFE 2952 ACT 1080 1080 1080 1080 1080 1080 1080 1080 1080 1080 0 00 00 Warehouse TAR 2000 3000 5000 5000 3000 5000 5000 5000 5000 5000 3000 5000 CEA 1452 EST; 2000 2000 200C 3000 3000 ACT 2000 200C 200C 3000 Liq.Aro.New TAR Burners #3 Still EST ACT 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 0 0 1500 00 Biphenyl Relocate TAR No. 1 Preheat EST CEA 1892 ACT 500 500 500 500 500 500 500 500 500 500 500 500 1500 0 1560 1870 0 1500 0 6 10 187 0 HB-40 2 A/C's AFE 5102 TAR EST ACT 5000 5000 3000 3000 3000 3000 5000 3000 3OOO 3000 5000 5000 2230 25S0 0 600 9000 . . -- 3490 2420 0 600 >mi 077 STLCOPCB4099363 organic division 1969 TSD COST IMPROVEMENT ANNUAL JAN FEB MAR APR MAY JUN JUL AUG . SEP OCT NOV DEC Bi0 Improve TAR 450 450 450 450 450 450 450 450 Tower Treat. EST 0 AFE 3155 Improve Pit. Power Factor ACT TAR EST ACT 900 900 900 900 900 900 900 900 0 * Central Air TAR 1000 1000 1000 1000 System EST ACT Optimize Rx Time TAR 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 EST 0 3420 0 0 PNP ACT 0 3420 0 ' Reduce Mole TAR 4000 4000 4000 4000 4000 4000 4000 j4000 4000 Ratio NaOH/PNCB PNP. EST ACT 00 0 New Wash Water Pump PNP AFE 2998 TAR EST ACT 50 50 50 50 50 50 50 50 25 50 50 50 25 50 Automatic pH TAR 500 500 500 Control PNP EST . . ACT . HC1 Filter Pump TAR 330 330 340 EST 330 330 340 ACT 330 330 340 New Blow Tank HC1 TAR 200 200 200 200 200 200 EST 200 200 200 200 500 ACT 200 200 200 200 150,000 Gal.-HCl Storage Tank AFE 2468 TAR EST ACT 1760 1760 1780 1760 1760 1780 1760 1760 1780 -0 .- - Produce Staley TAR 780 780 790 780 780 790 Grade Acid EST AFE 5076 ACT Clfi-Plt. Shutdown TAR 8880 8880 8880 8880 8880 8880 8880 EST 8880 CEA 1851 ACT Hg Recover from Residue TAR 250 250 250 250 EST 3910 0 00 ACT 3910 0 0 0 Hg Wash Tank AFE P802 Biphenyl Productivity TAR EST ACT TAR EST ACT 250 250 p50 250 o0 00 00 00 5600 5600 5600 5600 5600 5600 5600 5^00 5600 5600 5600 5600 0 9U0U 15,00c 0 0 5150 10,800 13500 0 Total Organic By Month M $ Total Organic YTD M $ TAR EST ACT TAR EST ACT 230 "257s 29.3 57.5 42.3 51,1 51.6 51.6 51.6 52.7 55.5 -50JL 27.1 30.2 11.5 36.3 19.3 23.7 27.8 11.4 23.5 50.1 79.4 116.9 159 r? 210-3 261.9 313.5 i&.l 417.8 471.3 521.9 46.9 78.8 79.6 115.9 19.8 43.5 68.2 79.6 .. DSW 377632 STLCOPCB4099364 AG DIVISION 1969 TSD COST IMPROVEMENT ANNUAL JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Cooling Tower TAR 420 420 410 410 420 420 410 420 420 Repiping AFE 2598 Optimize N2 & EST -ACT - TAR 00 0 6600 6700 6700 6600 6700 67 00 C-lg Levels Increase Waste EST ACT TAR 00 0 * 400 300, 300 400 300 300 400 300 3Q0 Acid Sales EST. ACT 00 0 Chlorinator R.I. TAR 250 250 250 250 250 250 EST AFE 2244 ACT EVOP Condensation TAR 750 750 500 500 750 750 Rx. EST 0 0 12,615 ACT . 0 0 12,615 Cl2 Unloading TAR 5000 5000 5000 2000 2000 2000 EST CEA 1831 ACT Recycle Wash TAR 290 290 290 290 290 290 Water EST AFE 2960 ACT Parathion Recover^ AFE 2655 Reduce Acetone TAR EST ACT TAR 5800 5800 5800 i 1 430014300 4300 Losses EST Formulations AFE 2897 ACT . TAR EST' ACT 1600 1600 1600 1600 1600 1600 3000 6600 '+300 7 l ij Change Cooling H^O Item 7j7 AFE 5067 Well H^O to Jets TAR EST ACT TAR 125 125 125 125 125 125 125 125 125 120 180 120 500 500 500 Ag. Division by Month . EST ACT 4TAR 750 750 50C 9145 9145 9135 14675 1468 5 14685 1457.5 1 443 14485 . EST 1205 3,12 C 6,780 ACT 0 0 1205 + ,433 Ag. Division YTD TAR EST ACT 750 1500 2000 1114-5 20290 2%2} 44100 58785 75470 38045 1025 5C 117015 12,615 15,735 25,815 0 0 12,65fl/,035 TAR EST ACT Organic Div. Untargeted - HC1 Catch Tank TAR EST ACT 0 500 'v DSW 377633 / STLCOPCB4099365 AROCLOR E. E. Bowles, C. R. MeIIwain (V. R. Haupt) Company Confidential 5 Evaluate Quaterphenyl 1969 Savings $63*200 TSD Objective Polyphenyl Effects on NFC $14,000 B ** 8 (a) Solid Aroclor Yields_______________________________________________________ _______ Still awaiting radioactive materials license before the source for the level alarm can be shipped. Operating personnel will be trained in the use of the instruments during June, Debottleneck Solid Aroclor Chlorlnator 1969 Savings TBE Plus Safety TSD Objective ________ B - 8 (f) Includes installing a back pressure controller on the #9 chlorlnator and a larger collection tank, AFE by 6*15, Drafting scheduled for June. Therminol System ____ _______________ Potential _______ Lost Sales TSD Objective ________ B - 8 (h) Project design is complete and equipment has been selected. Have received verbal approval to purchase pump and pump is now on order. Pump delivery is scheduled for six to eight weeks. This project will be installed when the Solid Aroclor expansion is installed. BIPHENYL-SAOTOWAX W. G. Niemeyer, D. A. Self (V. R. Haupt) Debottleneck Biphenyl Stills to 87.6 M lbs/vr. Capacity Increase TSD Objective B - 7 (a) During the week of May 26, the capacity of the Santowax reboiler furnace will be increased and instrumentation required to control the Santowax still will be Installed. A demonstration test run will be conducted on the biphenyl/ Santowax distillation area during the first week of June. Santowax with low biphenyl content for FDA Solid Aroclor Quality TSD Objective B - 7 .Cal Started long term test during week-end of May 16. Incomplete results were obtained. The feed composition to the still is now about 65 - 35 (biphenyl-Santowax) compared to 80 - 20 during the initial testing in January, 1969. The June test will establish the minimum biphenyl content of Santowax C with the present feed composition. os**1634 STLCOPCB4099366 Company Confidential 4. No. 1 Furnace Upgrade Capacity TSD Objective Liaison (CEA-1892)_______________ Increase_________ :_______________ B - 7 (c) The plant punch list is essentially complete. Improve Santowax R Quality with New Distillation Column Quality TSD Objective B - 7 (d) Installation of instrumentation to control the Santowax distillation column was made on May 27. Calibration of instruments should be complete by May 29. A demonstration test run will be conducted on the Santowax column during the first week in June to determine its capacity and optimum operating conditions. CHLORINE - HB-40 D. W. Dudley, J. L. Brown (A. G. McCarty) Chlorine unloading, caustic unloading, and hydrogen purification facilities were successfully started up during May. A problem exists with automatic isolation of empty chlorine cars. System being operated manually until problem is solved. HC1 0. J. Norris, J. M Jones (A. G. McCarty) Production of Staley Grade New Earnings $28.8 M TSD Objective Acid-Project ^076Potential Savings $71 M____________________ B - 10 (c)__ Acid Recovery up significantly (>70,000#/day) when new catch tank is in service and sewer by-pass valve is closed. Experienced problems draining collected organics from tank week-end of 5/10. Modification to steam supply on coils and discharge valve completed 5/16. Draining successfully demonstrated 5/21. Coalescer for Phase II installed along with all required piping. Vendor supplied wrong size heating strips for coalescer dome, maintenance now modifing - completion by 6/15. Muriatic Acid Storage_________ Savings $21.200 TSD Job No. 497 _ Piping completed. Project will be complete upon installation of level indicator. Sewered approximately 140,000# this month because of full storage. Muriatic Acid MIP_______________________ _______________________ ___________________________ ~ All plant groups have been contacted for contributions, rough draft will be ready for typing 6/6. Reduce High Free C12 in Muriatic Acid _________________ ____________ - After extensive KTA, test was made on air sparging HC1 gas to absorber. Tests over weekend of 5/24 showed no improvement. Problem has been given top priority. DSW 377635 STLCOPCB4099367 V PNP 0. J. Norris, J. M. Jones (A. G. McCarty) Company Confidential 5. Debottleneck to 1.8 H #/mo Capacity Savings $27.500 TSD Objective B - 9 (a) Reactor process control program in effect and operating as expected. Rate remains below schedule as tests for determining cause of yield loss continue. This month acid and caustic returned to near normal while PNCB remained high. This would seem to indicate loss occuring in reactor. Production has begun to monitor air flow rate. Poor cycles on carbon towers are being Investigated by P.A.C. Company. NIRAN K. G. Hale, D. W. Dudley, T. W. Lawrence (A. G. McCarty) Demonstrate Parathion . Recovery Savings $17,500 10-15% Reduced COD TSD Objective B - 5 (a) Drawings of test facilities were sent out for review 5/21. Project 3245 ($6350 experimental expense) was approved 5/26 to conduct tests. Project premise was published 5/27. Transmittal to maintenance is slated for 6/4. Acetone Recovery Savings $12,900 40-50%, COD Reduction TSD Objective B - 5 (iV Background data for acetone recovery tests were gathered but test will have to be delayed until approximately 6/9 when a new nozzle for the vacuum jet can be in stalled. Average of acetone loss from number three condensation reactor is 5.06% or 800 pounds per batch on methyl vs. 329 or 500 pounds per batch on ethyl. Recycle Wash Water No change in status. Savings $3,500 TSD Objective B - 5 (g) Central Chlorine Unloading Savings $21,000 TSD Objective B - 6 (a) Construction underway on chlorine dock and railroad spurs. Operator training to be conducted in June with probable start-up of late June. I DSW 377636 STLCOPCB4099368 Company Confidential 6. NIRAN (Cont'd) Sulfur Recovery From Residue $271,000/yr. Savings 40%, Reduction in S0o TSD Objective B - 5 (d) Anniston continues work on scope details, equipment selection and engineering flow sheets. Completion of package for estimating purposes is expected by 7/1/69. Quotes on Hastelloy equipment were delayed until early June. Recent corrosion test indicate S.S. 3I6 is satisfactory in the wash steps under neutralized conditions. P.R.&D. is checking validity of process under changed conditions. EDC for scheduled P.R.&D. work is 6/15/69. Submerged Pump for Refractive Index Control of Chlorination Savings $1500 TSD Objective (Potential Automation) B - 5 (c) _____ - i The Maintenance Engineer's visit to "Taber" was delayed until June. He will at this time discuss design changes for the Refractometer pump with Taber Engineers. Plant tests were stopped when pump seals failed after short service. Optimize Cl2 and N2 Levels Savings $40,000 TSD Objective B-5 Test plans will be issued by 6/6. Plant tests are scheduled to begin when sand blasting is stopped and fume system is started. Methyl-Ethyl Alcohol Savings $3200 Cross Contamination _____ ________________ ______ - TSD Job No. 918 Project premise prepared and circulated for approval. Design package and estimate being prepared. Improve Chlorinator Cooling System Savings $48,000/mon./0.5 hr TSD Objective Reduction in Chlorination Time B - 5 (g) Evaluation has begun on current design and operation. Alternate refrigerants are being considered. Chlorinator Long Cycle Time Savings $46,000/mo TSD Job No. 927 Number 3 Chlorinator consistently exceeds chlorination time standard by approximately 2 hours/batch. Evaluation of operation has begun. DSW 377637 STLCOPCB4099369 NIRAN (Cont'd) Company Confidential 7. Modify PaS5 Charge Valves Safety Item . TSD Job. No. 919 P2S5 hold-up in charge chutes is listed as contributory to sub"major accident (#5-58) involving eye irritation from PaS5 dust and HaS exposure from hydrolyzed PgSs during maintenance on Thio Acid reactor. P2S5 charging system being evaluated for modification of charge valves. ENGINEERING DESIGN AND SERVICES Mechanieal/Electrical/Instrument Design and Drafting J. C. Price. J. A, Veazey, R- V. Carlisle. R. L. Brewer. J. K. Rennie. J. Childress, (W. F. Taffee) Instrument and electrical phase of Santowax-R Still Control. (AFE $016 - $35^0 was started up successfully on 5/27/69. Final check-out and calibration targeted for completion by 6/1/69. A hydrogen sulfide (HgS) monitor has been placed on order (Accident investigation #5-68). Delivery is expected In 90 days. A plant test will be made to determine if the unit is suitable for use in the Niran department. The design for the Plant Fire Alarm (AFE 2575 - $2.9M) is being revised. The new revision, a combination of Monsanto and Bell Telephone equipment, will provide a better overall system than the one originally planned. Final design transmittal should be made in June. A safety and security review for the flashing and storage of mercury obtained from the Dismantling and Removal of Chlorine Manufacturing Facilities at Anniston (AFR 3214) was held on 5/15/69. , Revisions and dismantling in Building 28 A to provide desk space for new employees started in mid May. Delivery of partitions and shelving being expedited by Pur chasing. Additional desks and chairs required have been received. Improved lighting provided for Pollution Control Engineers' area. Projects approved during May: Provide Fire Pump Capacity Check Equipment (AFE 3227 - $4.1M). Review drawings were completed for the following projects: Parathion Recovery Test (AFE 3245 - $6.^1) Alcohol Separation (Niran) (AFE 3256 - $ to be det.) DSW 377638 STLCOPCB4099370 Company Confidential 8. ENGINEERING DESIGN AND SERVICES (Cont'd) Construction drawings were completed for the following projects: Alter Therminol System in Solid Aroclor (AFE 2949 - $12M), provide offices for new TSD Personnel (AFE 3212 - $36m), Liquid Aroclor still Debottleneck (AFE 3093 $4.5M), Bi-0 Cooling Tower Treatment (3155 - $3.6M0, Capacitor Relocation (AFE 3184 ** $18.1M C11.1M transferred equipment 3 ), Niran Tank Farm Area Lighting (AFE 3124 - $7M), Bi-0 Tank Farm Lighting (AFE 3204 - $0.7M), Upgrade Intermediate Dock at Niran (AFE 2934 - $11.5M C5 docks3 ). UTILITIES ENGINEERING J. C. Price, L. 0. Chambers (W. F. Taffee) Forwarded revised project premise for use of Well Water @ Niran Jets. Estimated savings were increased from $6000 to $8000 per year. Trans mitted design packages for Capacitor Relocation and Improve Biphenyl Cooling Tower Treatment projects. Relocation of the capacitors is to be completed early in June with the savings of $10,800 per year to start in July. Preliminary'efficiency studies of the Biphenyl Furnace and Therminol Furnaces in Aroclor, Santowax were completed. PLANT IMPROVEMENT G. C. Goodwin (W. F. Taffee) AFE forwarded for approval, paving Duncan Street South (AFE 3243 $1500). Design packages forwarded for alteration to Building 28-A (AFE 3212 $3600) and drain pad PNP Item 216 (AFE 3222 - $1500) project approved in May, HC1 area drainage (AFE 3221 - $1900). POLLUTION CONTROL E. G. Wright (W. F. Taffee) Community and Government Relations Governmental Relations TSD Objective F-2 The prepared Alabama Air Pollution law, which is backed by the Associated Industries of Alabama, is being criticized by Herlth Department and Conservationist sources as being an industry-oriented bill. The "Anti's" are also quoting HEW as saying that the bill would not meet their standards. Community and Governmental Complaints Relations ;___________________________________________ TSD Objective F-2 Received two air pollution complaints during May. They were aggravated by the weather, i.e. no wind plus high humidity prevented the dispersion of S02 fumes. 3-716^ OS'N STLCOPCB4099371 Company Confidential 9. POLLUTION CONTROL (Cont`d) Waste Audits Pollution Abatement TSD Objective F-^ Plan outlined in memo to Paul Hodges 5/12/69 being followed and is on schedule. Waste audits in the aroclor and HCl departments were started during May. Visual inspection of Snow Creek for visible "pockets" deposits of liquid aroclor started, with completion by 7/1. Samplers will be installed at two more points in the Aroclor department as soon as repairs are completed on the sewer. Waste Treatment All plant wastes were effectively treated during May. However, the Parathion department did have some downtime due to a plugged drain in the north hold tank. Average daily values for Monsanto's effluent are as follows: PNP COD Parathion BOD 1.0 ppm 94.9 ppm .14 ppm No Data 5 ppm ^ 200 ppm 1.0 ppm ^200 ppm DSW 377640 STLCOPCB4099372 Company Confidential 10. PROCESS AND QUALITY ANALYSIS W. B. Dunlap Quality The Plant Quality Score was 87.5, up 3.5 from April with YTD score of 90.0 against a target of 95.0 minimum. Strong quality improvements have been made in PgSj, HB-40, Aroclor 5460. Aroclor 1242 shows a wider spectrum of chlorinated isomers. Free chlorine in Muriatic has risen sharply since chlorine plant shutdown. ' PNP - Monitor Potential Savings Critical Variables $60,000 _____________ ;________________ TSD Objective C-3 Job 879____________ . The 30-day demonstration of the new PNP reactor depressurization control system is underway. In spite Of very high solids no pluggage has occurred. Depressuri zing cycles are on target ( 22 minimum average). Solids have now dropped to normal, without determination of the causes for high level having been made. Manpower Lamar Murphree joined the P6QA group May 15th. DSW 377641 STLCOPCB4099373 PLANT LABORATORIES G. W. Miller Company Confidential 11. PROCESS RESEARCH AND DEVELOPMENT J. T. Bell A laboratory effort of 55 mandays was expended on projects outlined in the 1969 PR&D Program including the expanded study of Sulfur Recovery. The remaining mandays were used for the Hydrogen Purification Unit start-up and on miscellaneous analytical services. p-Nitrophenol___________ Reduce Cycle TimesW. H. Howard The project involving PNP Reactor improvements is on schedule as per the revised work plan issued 5/23/69. The necessity of developing a continuous HB-40 process will postpone the rate studies as planned for the PNP reactor. A PR&D report is to be issued by 6/18/69 covering the entire PNP project started in January. A completion date of 8/1/69 was forecast in the 1969 PR&D Program. .- Sulfur Recovery Sulfur Refinement for Reuse 1. Ransaw The study has progressed according to the original work plan and is over 80% completed. A work plan revision was published 5/28/69 with the project to be reported by 6/16/69. This investigation has been continued past the original planned completion date of 4/1/69. Blend Scavenger Improved Aroclor Refinement (Aroclor)______ Electrical Properties J. L. Brown A work plan was issued on 5/22/69 to cover the study for the up-grading of Aroclor-phenyl glycidyl ether blends via absorptive column treatment. Work is scheduled for completion by 7/3/69. Parathion Isomer Reduction ________ Improve Yields ________________ G. L. Arnett Laboratory studies have been reported in the PR&D report dated 5/6/69. The issuance of a follow-up work plan will be delayed until the prepa ration of a sales sample of Low Color Aroclor 5460 has been completed. The study of Thio Acid Chlorinator Chlorine Distribution and Temperature Improvements is being combined with this project. Hydrogen Purification Unit Start-up Purified Hydrogen for HB-40 ______ J. L. Brown Construction and start-up was completed on the target date of 5/1/69 with excellent results. Revisions are scheduled for the week of 6/2/69 to permit the burning Of purge Hydrogen in the Biphenyl Tubular Units. DSW 377642 STLCOPCB4099374 PLANT LABORATORIES (Cont'd) Company Confidential 12. ANALYTICAL AND QUALITY CONTROL S. 0. Kemp Aroclor Analytical equipment for electrical quality measurements on Aroclor will be completed this month. Complaint Report Quality Number 3-A-69 4-A-69 5-A-69 Material Aroclor 1242 Montar 5 Aroclor 5460 Customer ' Essex Corp. Philip Carey Corp. Yates Mfg. Co. - Reason Moisture Content Particle Size and Solubility Particle Contamina tion YTD Quality Complaints/100 Shipments 0.17 Target 0.20 STLCOPCB4099375 Company Confidential COMMUNITY RELATIONS. PERSONNEL. RECRUITING. AND DEVELOPMENT 13. Personnel 1. J. L. Murphree joined TSD as Process Quality and Analysis Technician under W. B. Dunlap. 2. J. C. Landwehr visited the refinery at El Dorado, Arkansas on the Innovation Exchange Program May 14 and 15. 3. 0. J. Norris was promoted to Production Supervisor at the Nitro Plant. 4. J. L. Brown was promoted to Research Chemist II effective 6-1-69. 5. J. W. Mattern rejoined the TSD Department on May 15 reporting to V. R. Haupt. 6. 0. J. Norris and G. L. Arnett cleaned up a Parathion spill at Edinburg, Texas, week of May 5. 7. G. L. Arnett visited Dr. Scott Tucker in St. Louis, Monday, May 12, to discuss analytical procedure for determination of Aroclor in waste water. Development 1. Dr. J. Bruce Duncan of the New Enterprises Division presented a seminar to 25 Anniston Plant personnel covering Monsanto developed instruments for process measurement and control. May 12, 1969. 2. A. G. McCarty, S. 0. Kemp, J. C. Price, G. W. Miller and W. F. Taffee attended a refresher course in Coaching and Appraisal Interviews conducted by Mr. Ed Pipkin at the Oxford Holiday Inn, May 27 and 28. 3. G. W. Miller and J. C. Landwehr attended Personnel Management course in St. Louis, May 21 and 22. 4. W. B. Dunlap, D. W. Dudley, C. R. Mcllwain and T, W. Lawrence spent week of May 5 at the Holiday Inn attending the "Management Process" course taught by Connie Eastman. Visitors 1. J. E. Smith and J. E. Springgate, Plasticizer Business Group, visited May 8 and 9. 2. R. S. Yates from CED visited to discuss the Solid Aroclor expansion. May 14 and 15. STLCOPCB4099376 PROCESS IMPROVEMENT DISTRIBUTION OF TIME BY TECHNICAL SERVICE Jan. Feb. Mar. Apr. May June July Aug. Sept. Oct. Nov. Dec. NEW PRODUCTS PLANT IMPROVEMENT ASSIST OPERATIONS SPECIAL ENGINEERING SERVICES TECHNICAL MANPOWER MISCELLANEOUS ACTIVITIES AND ABSENCES STLCOPCB4099377 o IN MAINTENANCE FOR CONSTRUCTION 600 500 400 300 200 100 00 TSD PROJECT SUMMARY ------------ IN MAINTENANCE COMPLETED NOT CLOSED 500 400 PROJECTS SUBMITTED FOR APPROVAL 300 CO 200 S QO 100 Cn 0 CO 600 CO 0 500 H Z 400 ^ 300 ) * 200 100 "'`ir 1 l nn LJ_L_ 600 APPROVED PROJECTS IN TSD ( 500 400 --=------ 300 200 k 100 } 1. 0 ... 1 _JL__ Dec. Jan. Feb. Mar. Apr. May June ---- July A113. Sept. Oct. Nov. Dec. Jan. DSW 377646 STLCOPCB4099378 LABORATORY ADMINISTRATION C ANALYTICAL SAMPLES 60 1967 .1968 J F M A M- j j A S 0 N D i- 56 1 52 1 1 /f 48 1 // -j. A i 44 1^ 1 'l V \V / 40 1 1V _____________ t 2400 2300 \--i-- 1 2200 1 1 ANALYTICAL MANPOWER 2100 2000 1 y i K 1900 -------------- _ I i ,M _JL_ 1800 K 1 i--JMZ t 1700 i _J _l.v 1 - $/Manhours ' 11.00 10.00 9.00 i __ i 1 1 1 ir 8.00 ________ 1_______ ii_____ 7.00 % Total Plant Operating Cost 2.0 1.5 ==i---j-- 1.0 0.5 Ti i .. i _____ \\i .... * i % ' ^ertime 7. ] 1 1 JO ff ----A 1 1 1967 1968 J y M A ir -L____ "'l--i--I 1 IS i DSW 377647 J J i, ' A S0 i iN i L) STLCOPCB4099379