Document yVY0re5OegjygRRgQRmzbpJD
1/19/93
LAH PLANT B SAM1?
[S (259 ) RESULTS THRU 1989
DEPT COHT
COMPOUND
DATE
JOB TITLE
CCL9
771219
HYDRO
HYDROTECH LEADMAN COLLECTING
AND TRANSFERING WASTEWATER-B
SAMPLE# 77-276-200
RESULT .000
UNIT DURATION
PPM
925
CONT
CCL9
771219
HYDRO
HYDROTECH HELPER COLLECTING
AND TRANSFERING WASTEWATER-B
77-277-201
.000
PPM
925
CONT CONT CONT
CCL9
820810 VATKOP
MONTGOMERY VACUUM TRUCK LOAD
ING AND UNLOADING ORGANIC
WATER TO CLASSIFIER
82-318-193
CCL9
820810
VATKOP
MONTGOMERY VACUUM TRUCK LOAD
ING AND UNLOADING ORGANIC
WATER TO CLASSIFIER
82-319-199
CIS
771219 HYDRO
HYDROTECH LEADMAN COLLECTING
AND TRANSFERING WASTEWATER-B
77-276-200
.230
PPM
955
.290
PPM
953
.110
PPM
925
CONT
CIS
771219
HYDRO
HYDROTECH HELPER COLLECTING
AND TRANSFERING WASTEWATER-B
77-277-201
.000
PPM
925
CONT
CIS
801010
80-521-256
DOWNWIND OF CRANE OPERATION -
EAST SIDE,MIXING KILN DUST
2.900
PPM
30
CONT
CIS
801010
HEQOPR
80-518-253
CRANE OPERATOR MOVING ORGANIC
SLUDGE FROM PIT TO TRUCK
3.200
PPM
33
. TOQNT
CIS
801010
TRDRIV
80-519-259
STANDING BY TRUCK WHILE BEING
LOADED WITH ORGANIC SLUDGE
acrm CIS
801010
TRDRIV
J STiAMDING BY WHILE TRUCK IS
'lilHJADED AND ADJUSTING TARP
80-520-255
CONT
CIS
801015
VATKOP
80-526-26^1
WEST MONTGOMERY VACUUM JRUCK OPERATOR HAULING ORGANICS
.830
PPM
25
.990
PPM
61
I . .180
(il' PPM
.' 396
*! i i
SL 26550
PAGE
1/19/93
LAkHARLES (254) PLANT B SAMWlJG RESULTS THRU 1984
DEPT CO NT
COMPOUND
DATE
JOB TITLE
CIS
B01020
DOWNWIND,SOUTHWEST CORNER OF
ORGANIC PITS
SAMPLE# 80-533-264
RESULT .160
UNIT PPM
DURATION 333
COMT
CIS
801023
HEQOPR
CRANE OPER. MIXING KILN DUST
WITH ORG. BOTTOMS WIND NEB
80-540-271
.590
PPM
365
CO NT
CIS
801023
VATKOP
B.F.I. VACUUM TRUCK OPERATOR
PUMPING ORGANICS INTO TRUCK
80-541-272
.380
PPM
15
CONT
CIS
801027
HEQOPR
80-556-279
OPERATING BULLDOZER IN ORGANIC
PIT,MIXING IN KILN DUST
13.300
PPM
15
COMT CONT CONT
CIS
810309
VATKOP
81-084-042
PUMPING WATER AND ORGANICS
FROM VACUUM TRUCK INTO CLASSI
FIER AND API
CIS
810309
VATKOP
81-085-043
PUMPING WATER AND ORGANICS
FROM VACUUM TRUCK INTO CLASSI
FIER AND API
CIS
810608
BFI
WORKING IN INCINERATOR AREA
AT WASTE TREATMENT.
81-231-119
.370
PPM
373
.440
PPM
440
.140
PPM
437
CONT
CIS
810929
VATKOP
VACUUMING UP WASTE FROM API
SEPARATOR AND CLASSIFIER
81-484-270
1.820
PPM
380
CONT CONT CONT
CIS
811102
HEQOPR
R.E. HEIDT BULLDOZER OPERATOR
WORKING IN OLD ORGANIC POND;
SCRAPING AND LOADING.
81-561-310
CIS
811103
HEQOPR
R.E. HEIDT BULLDOZER OPERATOR
WORKING IN OLD ORGANIC POND;
SCRAPING AND LOADING.
81-563-312
CIS
811210
BFI
81-640-379
VACUUMED OUT API SEPARATOR AND
CLASSIFIER THEN HAULED TO THE
PLANT WASTE STORAGE TANK
.130 PPM
275
.300 PPM
410
.140 PPM
453
SL 016551
PAGE
1/19/93
LAI^fcnARLES (254) PLANT B SAMWTnG RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
CIS
811210
VATKOP
81-641-380
VACUUMED OUT API SEPARATOR AND
CLASSIFIER THEN HAULED TO THE
PLANT WASTE STORAGE TANK.
CONT
CIS
820519
VATKOP
82-176-087
HAULING, LOADING, 8 UNLOADING
LIQUID ORGANIC WASTE IN VACUUM
TRUCK TO API SEPARATOR. MONTG.
CONT
t CONT
CIS
820519
VATKOP
82-177-088
HAULING LIQUID ORGANIC WASTE
CLASSIFIER TO PUERTO RICAN TK.
WORKS FOR SIMPSON VAC.
CIS
820714
VATKOP
82-275-157
MONTGOMERY VACUUM TRUCK LOAD
ING 8 UNLOADING ORGANIC-WATER
TO CLASSIFIER. CLEANED P/T PIT
CONT
CIS
820714
VATKOP
82-276-158
MONTGOMERY VAC. TRUCK LOADING/
UNLOADING ORGANIC-WATER TO
CLASSIFIER. CLEANED P/T PIT.
CONT
CIS
820810
VATKOP
MONTGOMERY VACUUM TRUCK LOAD
ING AND UNLOADING ORGANIC
WATER TO CLASSIFIER
82-318-193
CONT
CIS
820903
VATKOP
82-372-230
SIMPSON VAC. TRANSFERRING ORG.
API, N.CLASSIFIER, PUERTO RIC.
TK.
CONT
CIS
821118
VATKOP
CLEANING S. CLASSIFIER WITH
VACTOR 8 VAC TRUCK.
82-519-344
RESULT .180
UNIT PPM
DURATION 453
.430
PPM
450
3.930
PPM
452
3.690
PPM
443
3.500
PPM
440
.110
PPM
455
4.590
PPM
336
.220
PPM
376
CONT
CIS
821118
VATKOP
CLEANING S. CLASSIFIER WITH
VACTOR 8 VAC TRUCK.
82-520-345
.220
PPM
374
CONT
CIS
821122
VATKOP
82-528-349
MONTGOMERY VAC ROUTINE CONTRAC
WORK .
.130
PPM
385
CONT
CIS
821122
VATKOP
82-529-350
MONTGOMERY VAC ROUTINE CONTRAC
WORK
.220
PPM
385
SL 016552
PAGE
LAt^HHARLES (254) . PLANT B SAMWInG RESULTS THRU 1984
DEPT CONT
COMPOUND
DATE
JOB TITLE
CIS
830317
VATKOP
MONTGOMERY VAC ROUTINE CONT.
WORK.
SAMPLE# 83-161-109
RESULT .110
UNIT PPM
DURATION 443
CONT
CIS
830505
VATKOP
83-221-156
SCOTTY'S VAC HAULED PROCESS
SEWER WATER IN PLANT B CLEANED
2.400
PPM
447
CONT
CONT CONT CONT CONT CONT CONT CONT
CIS
830505 VATKOP
83-222-157
SCOTTY'S VAC HAULED PROCESS
SEWER WATER IN PLANT B CLEANED
ORG BOX VCI, COOL T. SCEEN P/T
CIS
830712 VATKOP
83-317-225
SCOTTY'S VAC CLEANED OUT 6 PLT
B SUMPS DUMPED IN N CLASSIFIER
HAULED CATALYST FROM TE2
CIS
830712 VATKOP
83-318-226
SCOTTY'S VAC CLEANED OUT 6 PLT
B SUMPS DUMPED IN N CLASSIFIER
HAULED CATALYST FROM TE2
CIS
830915
VATKOP
83-425-300
SIMPSON DRY-VAC LOADING ORG.
SLUDGE FROM PUERTO RICAN TANK
TO CWM VAC TRUCK. WINDS E-7
CIS
830915
VATKOP
83-426-301
SIMPSON DRY-VAC LOADING ORG.
SLUDGE FROM PUERTO RICAN TANK
TO CWM VAC TRUCK. WINDS E-7
CIS
840103
VATKOP
ROUTINE PLANT B CONTRACT VAC
(SCOTTY'S VAC) WORK CLEANING
SUMPS.
84-001-001
CIS
840320
PAINT
84-163-107
SPRAY PAINTED LEGS OF VCM
SPHERE S-3. SLINE CO.EMPLOYEE.
NORMAL OPERATIONS.
CIS
840403
VATKOP
84-179-117
SCOTTY'S VAC CLEANING PLANT B
SUMPS/LIFT STATIONS.
3.890
PPM
447
.430
PPM
380
1.090
PPM
379
1.100
PPM
421
1.490
PPM
405
1.800
PPM
410
.180
PPM
436
.280
PPM
401
CONT
CIS
840403
VATKOP
84-180-118
SCOTTY'S VAC CLEANING PLANT B
SUMPS/LIFT STATIONS.
.220
PPM
SL 016553
401
1/19/93
LAf^ftHARLES (254) PLANT 6 SAMPLING RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
CIS
840518
VATKOP
84-284-208
SCOTTY'S VACUUM TRUCK SERVICE
CLEANING ORGANICS FROM CLASSI
FIER. NORMAL OPERATIONS.
CONT
CIS
841115
CONLAB
SIMPSON VAC CLEANING SOUTH
CLASSIFIER. WIND S-13 RH 67.
84-608-469
RESULT .300
UNIT PPM
DURATION 451
1.420
PPM
425
CONT
DCE
801010
80-521-256
DOWNWIND OF CRANE OPERATION -
EAST SIDE,MIXING KILN DUST
17.200
PPM
30
CONT
DCE
801010
HEQOPR
80-518-253
CRANE OPERATOR MOVING ORGANIC
SLUDGE FROM PIT TO TRUCK
4.700
PPM
33
CONT
DCE
801010
TRDRIV
80-519-254
STANDING BY TRUCK WHILE BEING
LOADED WITH ORGANIC SLUDGE
5.900
PPM
25
CONT
DCE
801010
TRDRIV
STANDING BY WHILE TRUCK IS
LOADED AND ADJUSTING TARP
80-520-255
6.100
PPM
61
CONT
DCE
801015
VATKOP
WEST ^MONTGOMERY VACUUM TRUCK
OPERATOR HAULING ORGANICS
80-526-261
.220
PPM
396
CONT
DCE
801020
CONSTRUCTION SITE, 100 FEET
DOWNWIND OF ORGANIC PITS
80-532-263
.210
PPM
336
CONT
DCE
801020
DOWNWIND,SOUTHWEST CORNER OF
ORGANIC PITS
80-533-264
3.000
PPM
333
CONT
DCE
801023
CONSTRUCTION SITE,WIND NE5,
REFRIGERATION UNIT.NW CORNER
80-551-274
.120
PPM
350
CONT
DCE
801023
HEQOPR
80-540-271
CRANE OPER. MIXING KILN DUST
WITH ORG. BOTTOMS WIND NE5
4.440
PPM
365
SL 0lto$T3/^
PAGE
1/19/93
LAI^knARLES (259) PLANT B SAMPWnG RESULTS THRU 1989
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
DCE
801023
VATKOP
B.F.I. VACUUM TRUCK OPERATOR
PUMPING ORGANICS INTO TRUCK
80-591-272
RESULT 3.600
UNIT DURATION
PPM
15
CONT
DCE
801023
VATKOP
BFI VACUUM TRUCK OPERATOR
PUMPING ORGANICS INTO TRUCK
80-592-273
1,800
PPM
15
CONT *
CONT
CONT
CONT
DCE
801027 HEQOPR
80-556-279
OPERATING BULLDOZER IN ORGANIC
PIT,MIXING IN KILN DUST
DCE
810309
VATKOP
81-089-092
PUMPING WATER AND ORGANICS
FROM VACUUM TRUCK INTO CLASSI
FIER AND API
DCE
810309
VATKOP
81-085-093
PUMPING WATER AND ORGANICS
FROM VACUUM TRUCK INTO CLASSI
FIER AND API
DCE
810608
BFI
WORKING IN INCINERATOR AREA
AT WASTE TREATMENT.
81-230-118
113.800
PPM
11.800
PPM
10.700
PPM
.900
PPM
15 373 990 938
CONT
DCE
810608
BFI
WORKING IN INCINERATOR AREA
AT WASTE TREATMENT.
81-231-119
.910
PPM
937
CONT
DCE
810929
VATKOP
VACUUMING UP WASTE FROM API
SEPARATOR AND CLASSIFIER
81-989-270
19.900
PPM
380
CONT CONT CONT
DCE
811102
HEQOPR
R.E. HEIDT BULLDOZER OPERATOR
WORKING IN OLD ORGANIC POND;
SCRAPING AND LOADING.
81-561-310
DCE
811103
HEQOPR
R.E. HEIDT BULLDOZER OPERATOR
WORKING IN OLD ORGANIC POND;
SCRAPING AND LOADING.
81-563-312
DCE
811210
BFI
81-690-379
VACUUMED OUT API SEPARATOR AND
CLASSIFIER THEN HAULED TO THE
PLANT WASTE STORAGE TANK
.610
PPM
275
.890
PPM
910
.320
PPM
953
SL 016554
PAGE
1/19/93
LAI^^HARLES (259) PLANT B SAMWffNG RESULTS THRU 1989
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
DCE
811210
VATKOP
81-691-380
VACUUMED OUT API SEPARATOR AND
CLASSIFIER THEN HAULED TO THE
PLANT WASTE STORAGE TANK.
CONT
DCE
820519
VATKOP
82-176-087
HAULING, LOADING, S UNLOADING
LIQUID ORGANIC WASTE IN VACUUM
TRUCK TO API SEPARATOR. MONTG.
CONT
CONT
DCE
820519
VATKOP
82-177-088
HAULING LIQUID ORGANIC WASTE
CLASSIFIER TO PUERTO RICAN TK.
WORKS FOR SIMPSON VAC.
DCE
820719
VATKOP
82-275-157
MONTGOMERY VACUUM TRUCK LOAD
ING 8 UNLOADING ORGANIC-WATER
TO CLASSIFIER. CLEANED P/T PIT
CONT
DCE
820719
VATKOP
82-276-158
MONTGOMERY VAC. TRUCK LOADING/
UNLOADING ORGANIC-WATER TO
CLASSIFIER. CLEANED P/T PIT.
CONT
DCE
820805
VATKOP
82-309-187
TRASFERING ORGANICS FROM API,
N. CLASSIFIER, PUERTO RICAN TK
89 F, SE-5 MPH WINDS.(SIMPSON)
CONT
DCE
820805
VATKOP
82-310-188
SIMPSON VAC. SERVICE HAULING
ORGANICS FROM API, CLASS., P.
RICAN TK. 89 F WINDS SE-5.
CONT
DCE
820810
VATKOP
82-318-193
MONTGOMERY VACUUM TRUCK LOAD
ING AND UNLOADING ORGANIC
WATER TO CLASSIFIER
CONT
DCE
820810
VATKOP
82-319-199
MONTGOMERY VACUUM TRUCK LOAD
ING AND UNLOADING ORGANIC
WATER TO CLASSIFIER
CONT
DCE
820816
VATKOP
MONTGOMERY VAC. TRANSFERING
CLASSIFIER MATERIAL FROM OLD
DRUMS TO NEW DRUMS
82-393-209
CONT
DCE
820903
VATKOP
82-372-230
SIMPSON VAC. TRANSFERRING ORG.
API, N.CLASSIFIER, PUERTO RIC.
TK.
RESULT .280
UNIT PPM
DURATION 953
1.090
PPM
950
15.500
PPM
952
1.570
PPM
993
.310
PPM
990
1.660
PPM
283
2.230
PPM
283
.810
PPM
955
.580
PPM
953
.290
PPM
322
21.800
PPM
336
SL 016555
PAGE
1/19/93
LAtAtHARLES (254) PLANT B SAMWIhg RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
DCE
820903
VATKOP
SIMPSON VAC. TRANSFERING ORG.
WASTE FROM API, CLASSIFIER,
PUERTO RICAN TK.
82-373-231
CONT
DCE
820914
VATKOP
MONTGOMERY VAC CLEANING ORG.
SLUDGE FROM CLASSIFIER
82-390-247
RESULT 2.230
UNIT PPM
DURATION 335
15.700
PPM
223
CONT
DCE
820914
VATKOP
MONTGOMERY VAC CLEANING ORG.
SLUDGE FROM CLASSIFIER
82-391-248
.450
PPM
223
CONT
DCE
821103
VATKOP
MONTGOMERY DRY VAC CLEANING
#1 INCINERATOR FEED TANK.
82-477-318
.110
PPM
374
CONT
DCE
821103
VATKOP
MONTGOMERY DRY VAC CLEANING
#1 INCINERATOR FEED TANK.
82-478-319
.100
PPM
374
CONT
DCE
821118
VATKOP
CLEANING S. CLASSIFIER WITH
VACTOR 8 VAC TRUCK.
82-519-344
4.300
PPM
376
CONT
DCE
821118
VATKOP
CLEANING S. CLASSIFIER WITH
VACTOR 8 VAC TRUCK.
82-520-345
4.370
PPM
374
CONT
DCE
821122
VATKOP
82-528-349
MONTGOMERY VAC ROUTINE CONTRAC
WORK.
.070
PPM
385
CONT
DCE
821122
VATKOP
82-529-350
MONTGOMERY VAC ROUTINE CONTRAC
WORK
.680
PPM
385
CONT CONT
DCE
830118
VATKOP
83-041-029
MONTGOMERY VAC SERVICE CLEAN
ING S. CLASSIFIER WITH VACTOR.
TEMP 48, WINDS NE-18, RH 62.
DCE
830118
VATKOP
83-042-030
MONTGOMERY VAC SERVICE CLEAN
ING S-CLASSIFIER WITH VACTOR.
TEMP 48, WINDS NE-18, RH 62.
1.410
PPM
389
.200
PPM
389
SL 016556
PAGE
1/19/93
LAI^MARLES (259) PLANT B SAMWTnG RESULTS THRU 1989
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
DCE
830505
VATKOP
83-221-156
SCOTTY'S VAC HAULED PROCESS
SEWER WATER IN PLANT B CLEANED
RESULT .910
UNIT PPM
DURATION 997
CONT CONT
* CONT CONT CONT CONT CONT CONT CONT CONT
DCE
830505
VATKOP
83-222-157
SCOTTY'S VAC HAULED PROCESS
SEWER WATER IN PLANT B CLEANED
ORG BOX VCI, COOL T. SCEEN P/T
DCE
830915
VATKOP
SIMPSON DRY-VAC LOADING ORG.
SLUDGE FROM PUERTO RICAN TANK
TO CWM VAC TRUCK. WINDS E-7
83-925-300
DCE
830915
VATKOP
SIMPSON DRY-VAC LOADING ORG.
SLUDGE FROM PUERTO RICAN TANK
TO CWM VAC TRUCK. WINDS E-7
83-926-301
DCE
831101
VATKOP
83-511-359
NORMAL OPERATIONS, HAULED ORG
ANIC WASTE WATER FROM SUMPS,
CLASSIFIER, PUERTO RICAN DOCK.
DCE
890320
PAINT
89-162-106
SPRAY PAINTED LEGS OF VCM
SPHERE S-3. SLIME CO.EMPLOYEE.
NORMAL OPERATIONS.
DCE
890320
PAINT
89-163-107
SPRAY PAINTED LEGS OF VCM
SPHERE S-3. SLIDE CO.EMPLOYEE.
NORMAL OPERATIONS.
DCE
890518
VATKOP
89-289-208
SCOTTY'S VACUUM TRUCK SERVICE.
CLEANING ORGANICS FROM CLASSI
FIER. NORMAL OPERATIONS.
DCE
890605
VATKOP
89-306-223
SCOTTY'S VAC CLEANING PLANT B
SUMPS, LIFT STATIONS, N.CLASS.
TO P.RICAN TK.
DCE
890605
VATKOP
89-307-229
SCOTTY'S VAC CLEANING PLANT B
SUMPS, LIFT STATIONS, N.CLASS.
TO P.RICAN TK.
DCE
890729
VATKOP
89-399-301
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
.710
PPM
997
1.810
PPM
921
2.590
PPM
905
.610
PPM
921
.200
PPM
990
.260
PPM
936
.990
PPM
951
.960
PPM
905
.590
PPM
905
1.980
PPM
93
SL 016557
PAGE
1/19/93
LAJ^^ARLES (254) PLANT B SAMWIhG RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
DCE
840724
VATKOP
84-396-303
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
DCE
840724
VATKOP
84-397-304
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
* CONT
DCE
840724
VATKOP
84-398-305
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
DCE
840724
VATKOP
84-399-306
OSHA INSPECTION. SIMPSON VAC.
TRUCK. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
DCE
840724
VATKOP
84-400-307
OSHA INSPECTION. SIMPSON VAC.
TRUCK. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
DCE
840724
VATKOP
84-401-308
OSHA INSPECT. SIMPSON VAC. CO.
PREPARING TO CLEAN OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
DCE
840724
VATKOP
84-402-309
OSHA ^INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
DCE
840724
VATKOP
84-403-310
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
DCE
840724
VATKOP
84-404-311
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
DCE
840724
VATKOP
84-405-312
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
DCE
840724
VATKOP
84-406-313
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
RESULT 1.820
UNIT PPM
DURATION 77
2.580
PPM
79
1.520
PPM
93
1.720
PPM
128
1.940
PPM
100
1.670
PPM
97
3.070
PPM
69
3.120
PPM
89
2.130
PPM
91
5.140
PPM
101
1.770
PPM
110
SL 016558
I
PAGE
1/19/93
LA^^HARLES (259) PLANT B SAMSUNG RESULTS THRU 1989
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
DCE
890729
VATKOP
89-907-319
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
DCE
891012
VATKOP
89-538-909
SCOTTY'S VAC CLEANING PLANT B
SUMPS, LIFT STATIONS, #1 EDC
LIQ PH RX: TO P.RICAN TK.
CONT
DCE
891012
VATKOP
89-539-910
SCOTTY'S VAC CLEANING PLANT B
SUMPS LIFT STATIONS #1 EDC LIQ
PHASE RX TO P. RICAN TK.
CONT
DCE
891115
CONLAB
89-607-968
SIMPSON VAC CLEANING S. CLAS
SIFIER. WIND S-13 RH 67.
RESULT 3.780
UNIT PPM
DURATION 108
1.930
PPM
389
1.350
PPM
379
57.100
PPM
925
CONT
DCE
891115
CONLAB
SIMPSON VAC CLEANING SOUTH
CLASSIFIER. WIND S-13 RH 67.
89-608-969
35.800
PPM
925
CONT
DCE
891127
CONLAB
SIMPSON VAC SERVICE CLEANING
API SEPARATOR. WIND NW-19.
89-609-970
9.690
PPM
307
CONT
DCE
891127
CONLAB
SIMPSON VAC SERVICE CLEANING
API SEPARATOR. WIND NW-19.
89-610-971
9.750
PPM
303
CONT
EC
771219
HYDRO
HYDROTECH LEADMAN COLLECTING
AND TRANSFERING WASTEWATER-B
77-276-200
9.100
PPM
925
CONT
EC
771219
HYDRO
HYDROTECH HELPER COLLECTING
AND TRANSFERING WASTEWATER-B
77-277-201
3.900
PPM
925
CONT
EC 801010
80-521-256
DOWNWIND OF CRANE OPERATION -
EAST SIDE,MIXING KILN DUST
5.900
PPM
30
CONT
EC
801010
HEQOPR
80-518-253
CRANE OPERATOR MOVING ORGANIC
SLUDGE FROM PIT TO TRUCK
9.600
PPM
33
SL 016559
PAGE
1/19/93
LAld^HARLES (254) PLANT B SAMPHhG RESULTS THRU 1984
DEPT CO NT
COMPOUND
DATE
JOB TITLE SAMPLES
EC
801010
TRDRIV
80-519-254
STANDING BY TRUCK WHILE BEING
LOADED WITH ORGANIC SLUDGE
RESULT 2.100
UNIT PPM
DURATION 25
CONT
EC
801010
TRDRIV
STANDING BY WHILE TRUCK IS
LOADED AND ADJUSTING TARP
80-520-255
3.100
PPM
61
CO NT
EC
801015
VATKOP
WEST MONTGOMERY VACUUM TRUCK
OPERATOR HAULING ORGANICS
80-526-261
.780
PPM
396
CONT
EC
801015
VATKOP
WEST MONTGOMERY VACUUM TRUCK
OPERATOR HAULING ORGANICS
80-527-262
.170
PPM
396
CONT
EC 801020 DOWNWIND,SOUTHWEST CORNER OF ORGANIC PITS
80-533-264
.350
PPM
333
CONT
EC
801023
HEQOPR
80-540-271
CRANE OPER. MIXING KILN DUST
WITH ORG. BOTTOMS WIND NEB
1.160
PPM
365
CONT
EC
801023
VATKOP
80-541-272
B.F.I. VACUUM TRUCK OPERATOR
PUMPING ORGANICS INTO TRUCK
12.200
PPM
15
CONT
EC
801023
VATKOP
BFI VACUUM TRUCK OPERATOR
PUMPING ORGANICS INTO TRUCK
80-542-273
5.700
PPM
15
CONT
EC
801027 HEQOPR
80-556-279
OPERATING BULLDOZER IN ORGANIC
PIT,MIXING IN KILN DUST
32.200
PPM
15
CONT CONT
EC
810309
VATKOP
81-084-042
PUMPING WATER AND ORGANICS
FROM VACUUM TRUCK INTO CLASSI
FIER AND API
EC
810309
VATKOP
81-085-043
PUMPING WATER AND ORGANICS
FROM VACUUM TRUCK INTO CLASSI
FIER AND API
30.700
PPM
373
28.900
PPM
440
SL 016560
PAGE
1/19/93
LAf^HHARLES (259) PLANT B SAILING RESULTS THRU 1989
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
EC
810608
BFI
WORKING IN INCINERATOR AREA
AT WASTE TREATMENT.
81-230-118
RESULT .560
UNIT DURATION
PPM
938
CONT
EC
810608
BFI
WORKING IN INCINERATOR AREA
AT WASTE TREATMENT.
81-231-119
1.300
PPM
937
CONT
EC
810929
BFI
VACUUMING WASTE FROM SODIUM
FORMATE UNIT
81-985-271
.130
PPM
927
CONT
EC
810929
VATKOP
VACUUMING UP WASTE FROM API
SEPARATOR AND CLASSIFIER
81-989-270
25.600
PPM
380
CONT CONT CONT CONT CONT CONT CONT
EC
811210
BFI
81-690-379
VACUUMED OUT API SEPARATOR AND
CLASSIFIER THEN HAULED TO THE
PLANT WASTE STORAGE TANK
EC
811210
VATKOP
81-691-380
VACUUMED OUT API SEPARATOR AND
CLASSIFIER THEN HAULED TO THE
PLANT WASTE STORAGE TANK.
EC
820519
VATKOP
82-177-088
HAULING LIQUID ORGANIC WASTE
CLASSIFIER TO PUERTO RICAN TK.
WORKS FOR SIMPSON VAC.
EC
820805
VATKOP
82-309-187
TRASFERING ORGANICS FROM API,
N. CLASSIFIER, PUERTO RICAN TK
89 F, SE-5 MPH WINDS.(SIMPSON)
EC
820805
VATKOP
82-310-188
SIMPSON VAC. SERVICE HAULING
ORGANICS FROM API, CLASS., P.
RICAN TK. 89 F WINDS SE-5.
EC
820810
VATKOP
MONTGOMERY VACUUM TRUCK LOAD
ING AND UNLOADING ORGANIC
WATER TO CLASSIFIER
82-319-199
EC
820816
VATKOP
MONTGOMERY VAC. TRANSFERTHG
CLASSIFIER MATERIAL FROM OLD
DRUMS TO NEW DRUMS
82-393-209
.880
PPM
953
1.330
PPM
953
19.900
PPM
952
2.380
PPM
283
2.130
PPM
283
.310
PPM
953
.250
PPM
322 SL 016561
PAGE
1/19/93
LAI^^KARLES (254) PLANT B SAMWlNG RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CO NT
EC
820903
VATKOP
82-372-230
SIMPSON VAC. TRANSFERRING ORG.
API, H.CLASSIFIER, PUERTO RIC.
TK.
CONT
EC
820903
VATKOP
82-373-231
SIMPSON VAC. TRANSFERIHG ORG.
WASTE FROM API, CLASSIFIER,
PUERTO RICAN TK.
CONT
EC
820914
VATKOP
82-390-247
MONTGOMERY VAC CLEANING ORG.
SLUDGE FROM CLASSIFIER
CON*T
EC
820914
VATKOP
MONTGOMERY VAC CLEANING ORG.
SLUDGE FROM CLASSIFIER
82-391-248
RESULT 24.900
UNIT DURATION
PPM
336
1.220
PPM
335
5.420
PPM
223
1.260
PPM
223
CONT
EC
821102
VATKOP
82-473-314
MONTGOMERY VAC SERVICE HAULING
ORG/WATER TO API SEPARATOR
.690
PPM
440
CONT
EC
821102
VATKOP
82-474-315
MONTGOMERY VAC SERVICE HAULING
ORG/WATER TO API SEPARATOR
.180
PPM
439
CONT
EC
821103
VATKOP
MONTGOMERY DRY VAC CLEANING
#1 INCINERATOR FEED TANK.
82-477-318
1.690
PPM
374
CONT
EC
821103
VATKOP
MONTGOMERY DRY VAC CLEANING
#1 INCINERATOR FEED TANK.
82-478-319
6.620
PPM
374
CONT
EC
821118
VATKOP
CLEANING S. CLASSIFIER WITH
VACTOR 8 VAC TRUCK.
82-519-344
24.400
PPM
376
CONT
EC
821118
VATKOP
CLEANING S. CLASSIFIER WITH
VACTOR 8 VAC TRUCK.
82-520-345
13.800
PPM
374
CONT
EC
821122
VATKOP
82-528-349
MONTGOMERY VAC ROUTINE CONTRAC
WORK.
4.000
PPM
385
SL 016562
PAGE
1/19/93
LAf^BHARLES (254) PLANT B SAMWftlG RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
EC
821122
VATKOP
82-529-350
MONTGOMERY VAC ROUTINE CONTRAC
WORK
RESULT 9.760
UNIT DURATION
PPM
385
CONT
CONT
i CONT
EC
830118
VATKOP
83-041-029
MONTGOMERY VAC SERVICE CLEAN
ING S. CLASSIFIER WITH VACTOR.
TEMP 48, WINDS NE-18, RH 62.
EC
830118
VATKOP
MONTGOMERY VAC SERVICE CLEAN
ING S-CLASSIFIER WITH VACTOR.
TEMP 48, WINDS NE-18, RH 62.
83-042-030
EC
830317
VATKOP
MONTGOMERY VAC ROUTINE CONT.
WORK.
83-160-108
2.190
PPM
389
1.490
PPM
389
.140
PPM
442
CONT
EC
830317
VATKOP
MONTGOMERY VAC ROUTINE CONT.
WORK.
83-161-109
.160
PPM
443
CONT
EC
830505
VATKOP
83-221-156
SCOTTY'S VAC HAULED PROCESS
SEWER WATER IN PLANT B CLEANED
.670
PPM
447
CONT CONT CONT CONT CONT
EC
830505 VATKOP
83-222-157
SCOTTY'S VAC HAULED PROCESS
SEWER WATER IN PLANT B CLEANED
ORG BOX VCI, COOL T. SCEEN P/T
EC
830712 VATKOP
83-317-225
SCOTTY'S VAC CLEANED OUT 6 PLT
B SUMPS DUMPED IN N CLASSIFIER
HAULED CATALYST FROM TE2
EC
830712 VATKOP
83-318-226
SCOTTY'S VAC CLEANED OUT 6 PLT
B SUMPS DUMPED IN N CLASSIFIER
HAULED CATALYST FROM TE2
EC
831101
VATKOP
83-511-359
NORMAL OPERATIONS, HAULED ORG
ANIC WASTE WATER FROM SUMPS,
CLASSIFIER, PUERTO RICAN DOCK.
EC
840103
VATKOP
ROUTINE PLANT B CONTRACT VAC
(SCOTTY'S VAC) WORK CLEANING
SUMPS.
84-001-001
1.300
PPM
447
.180
PPM
380
.250
PPM
379
.270
PPM
421
.220
PPM
410 SL 016563
PAGE
1/19/93
LAI^BHARLES (254) PLANT B SAtBWNG RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
EC
840320
PAINT
84-161-105
SPRAY PAINTED LEGS OF VCM
SPHERE S-3. SLINE CO.EMPLOYEE.
NORMAL OPERATIONS.
CONT
EC
840320
PAINT
84-162-106
SPRAY PAINTED LEGS OF VCM
SPHERE S-3. SLINE CO.EMPLOYEE.
NORMAL OPERATIONS.
CONT
CONT
EC
840320
PAINT
84-163-107
SPRAY PAINTED LEGS OF VCM
SPHERE S-3. SLINE CO.EMPLOYEE.
NORMAL OPERATIONS.
EC
840403
VATKOP
84-179-117
SCOTTY'S VAC CLEANING PLANT B
SUMPS/LIFT STATIONS.
RESULT .100
UNIT PPM
DURATION 443
.090
PPM
440
.810
PPM
436
.820
PPM
401
CONT
EC
840403
VATKOP
84-180-118
SCOTTY'S VAC CLEANING PLANT B
SUMPS/LIFT STATIONS.
.970
PPM
401
CONT CONT CONT CONT CONT CONT
EC
840518
VATKOP
84-284-208
SCOTTY'S VACUUM TRUCK SERVICE.
CLEANING ORGANICS FROM CLASSI
FIER. NORMAL OPERATIONS.
EC
840605
VATKOP
84-306-223
SCOTTY'S VAC CLEANING PLANT B
SUMPS, LIFT STATIONS, N.CLASS.
TO P.RICAN TK.
EC
840605
VATKOP
84-307-224
SCOTTY'S VAC CLEANING PLANT B
SUMPS, LIFT STATIONS, N.CLASS.
TO P.RICAN TK.
EC
840724
VATKOP
84-394-301
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
EC
840724
VATKOP
84-396-303
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
EC
840724
VATKOP
84-397-304
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
.190
PPM
451
3.750
PPM
405
3.130
PPM
405
7.930
PPM
93
6.560
PPM
77
5.300
PPM
79
SL 016564
PAGE
1/19/93
i I
LAI^BHARLES (2591 PLANT B SAMffiNG RESULTS THRU 1989
PAGE
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
EC
890729
VATKOP
89-398-305
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
EC
890729
VATKOP
89-399-306
OSHA INSPECTION. SIMPSON VAC.
TRUCK. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
i CONT
EC
890729
VATKOP
89-900-307
OSHA INSPECTION. SIMPSON VAC.
TRUCK. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
EC
890729
VATKOP
89-901-308
OSHA INSPECT. SIMPSON VAC. CO.
PREPARING TO CLEAN OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
EC
890729
VATKOP
89-902-309
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
EC
890729
VATKOP
89-903-310
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
EC
890729
VATKOP
89-909-311
OSHA^INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
EC
890729
VATKOP
89-905-312
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
EC
890729
VATKOP
89-906-313
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
EC
890729
VATKOP
89-907-319
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
EC 890913 S. FENCE 6FT HI. WIND NW-7/ CALM
89-983-375
RESULT 8.780
UNIT PPM
DURATION 93
5.530
PPM
128
6.960
PPM
100
.550
PPM
97
2.060
PPM
69
2.310
PPM
89
3.970
PPM
91
2.690
PPM
101
3.280
PPM
110
3.820
PPM
108
.050
PPM
259
SL 016565
1/19/93
LAMMARLES (254) PLANT B SAMWIhG RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CO NT
EC
840913
CONLAB
84-485-377
MCMANUS CONSTRUCTION CO. OPER
ATING BULL DOZER. WIND NW-7/
CALM.
CONT
EC
840913
FORMAN
MARS CONSTRUCTION CO. HAZAR
DOUS WASTE STG. FACILITY.
WIND NW-7/CALM.
84-484-376
CONT
* CONT
EC
841012
VATKOP
SCOTTY'S VAC CLEANING PLANT B
SUMPS, LIFT STATIONS, #1 EDC
LIQ PH RX TO P.RICAN TK.
84-538-409
EC
841012
VATKOP
84-539-410
SCOTTY'S VAC CLEANING PLANT B
SUMPS LIFT STATIONS #1 EDC LIQ
PHASE RX TO P, RICAN TK.
CONT
EC
841015
CONLAB
MCCLELLAND ENGINEERS DRILLING
MONITORING WELL IN S-40.
WIND SW-12/15
84-546-417
CONT
EC
841016
CONLAB
84-550-421
MCCLELLAND ENG. HELPING NEAR
WELL POINTS 19/22 S-40 EXTRAC
WELL SYSTEM. WIND S-17.
CONT
EC
841016
OPERAT
84-549-420
MCCLELLAND ENG. OPERATING DRIL
LING EQUIP. S-40 EXTRAC WELL
POINTS 19/22. WIND S-17.
CONT
EC
841024
CONLAB
84-563-430
DANIEL CONST. S TERMINAL EX
TRAC WELL POINTS 34-38 SHOVEL.
MUD. WIND E-9.
CONT
EC
841024
CONLAB
84-564-431
DANIEL CONST. S TERMINAL EX
TRAC WELL POINTS 34-38 SHOVEL.
MUD. WIND E-9.
CONT
EC
841115
CONLAB
84-607-468
SIMPSON VAC CLEANING S. CLAS
SIFIER. WIND S-13 RH 67.
RESULT .050
UNIT PPM
DURATION 252
.050
PPM
259
6.200
PPM
384
4.080
PPM
379
.130
PPM
349
.050
PPM
540
.050
PPM
540
.050
PPM
255
.050
PPM
252
11.400
PPM
425
CONT
EC
841115
CONLAB
SIMPSON VAC CLEANING SOUTH
CLASSIFIER. WIND S-13 RH 67.
84-608-469
2.310
PPM
425
SL 016566
PAGE
1/19/93
B SANDING RESULTS THRU 1989
DEPT CONT
COMPOUND
DATE
JOB TITLE
EC
891127
CONLAB
SIMPSON VAC SERVICE CLEANING
API SEPARATOR, WIND NW-19.
SAMPLE# 89-609-970
RESULT 7.230
UNIT DURATION
PPM
307
CONT
EC
891127
CONLAB
89-610-971
SIMPSON VAC SERVICE CLEANING
API SEPARATOR. WIND NW-19.
11.900
PPM
303
CONT
EDC
771219
HYDRO
HYDROTECH LEADMAN COLLECTING
AND TRANSFERING WASTEWATER-B
77-276-200
2.200
PPM
925
CONT
EDC
771219
HYDRO
HYDROTECH HELPER COLLECTING
AND TRANSFERING WASTEWATER-B
77-277-201
1.200
PPM
925
CONT
EDC
801010
80-521-256
DOWNWIND OF CRANE OPERATION -
EAST SIDE,MIXING KILN DUST
39.900
PPM
30
CONT
EDC
801010
HEQOPR
80-518-253
CRANE OPERATOR MOVING ORGANIC
SLUDGE FROM PIT TO TRUCK
9.200
PPM
33
CONT
EDC
801010
TRDRIV
80-519-259
STANDING BY TRUCK WHILE BEING
LOADED WITH ORGANIC SLUDGE
19.000
PPM
25
CONT
EDC
801010
TRDRIV
STANDING BY WHILE TRUCK IS
LOADED AND ADJUSTING TARP
80-520-255
13.000
PPM
61
CONT
EDC
801015
VATKOP
WEST MONTGOMERY VACUUM TRUCK
OPERATOR HAULING ORGANICS
80-526-261
1.700
PPM
396
CONT
EDC
801015
VATKOP
WEST MONTGOMERY VACUUM TRUCK
OPERATOR HAULING ORGANICS
80-527-262
.860
PPM
396
CONT
EDC
801020
CONSTRUCTION SITE,100 FEET
DOWNWIND OF ORGANIC PITS
80-532-263
.170
PPM
336 SL 016567
PAGE
LAK1VHARLES (254) PLANT B SAMPLING RESULTS THRU 1984
DEPT CONT
COMPOUND DATE
JOB TITLE
EDC
801020
DOWNWIND,SOUTHWEST CORNER OF
ORGANIC PITS
SAMPLE# 80-533-264
RESULT 4.000
UNIT DURATION
PPM
333
CONT
EDC
801023
CONSTRUCTION SITE,WIND HE5,
REFRIGERATION UNIT.NW CORNER
80-551-274
.330
PPM
350
CONT
EDC
801023
CONSTRUCTION SITE,WIND NEB,
REFRIGERATION UNIT,NE CORNER
80-552-275
.110
PPM
349
CONT
EDC
801023
HEQOPR
80-540-271
CRANE OPER. MIXING KILN DUST
WITH ORG. BOTTOMS WIND NEB
7.460
PPM
365
CONT
EDC
801023
VATKOP
B.F.I. VACUUM TRUCK OPERATOR
PUMPING ORGANICS INTO TRUCK
80-541-272
6.400
PPM
15
CONT
EDC
801023
VATKOP
BFI VACUUM TRUCK OPERATOR
PUMPING ORGANICS INTO TRUCK
80-542-273
3.600
PPM
15
CONT
EDC
801027
HEQOPR
80-556-279
OPERATING BULLDOZER IN ORGANIC
PIT,MIXING IN KILN DUST
204.200
PPM
15
CONT CONT CONT
EDC
810309
VATKOP
81-084-042
PUMPING WATER AND ORGANICS
FROM VACUUM TRUCK INTO CLASSI
FIER AND API
EDC
810309
VATKOP
81-085-043
PUMPING WATER AND ORGANICS
FROM VACUUM TRUCK INTO CLASSI
FIER AND API
EDC
810608
BFI
WORKING IN INCINERATOR AREA
AT WASTE TREATMENT.
81-230-118
3.600
PPM
373
4.200
PPM
440
15.100
PPM
438
CONT
EDC
810608
BFI
WORKING IN INCINERATOR AREA
AT WASTE TREATMENT.
81-231-119
23.400
PPM
437
SL 016568
1/19/93
LAK^BHARLES (259) PLANT B SAMHfrNG RESULTS THRU 1989
DEPT CO NT
COMPOUND
DATE
JOB TITLE
EDC
810929
BFI
VACUUMING WASTE FROM SODIUM
FORMATE UNIT
SAMPLE# 81-985-271
RESULT .390
UNIT DURATION
PPM
927
CONT
EDC
810929
VATKOP
VACUUMING UP WASTE FROM API
SEPARATOR AND CLASSIFIER
81-989-270
15.300
PPM
380
CONT t
CONT CONT CONT CONT CONT CONT CONT CONT
EDC
811102
HEQOPR
R.E. HEIDT BULLDOZER OPERATOR
WORKING IN OLD ORGANIC POND;
SCRAPING AND LOADING.
81-561-310
EDC
811103
HEQOPR
R.E. HEIDT BULLDOZER OPERATOR
WORKING IN OLD ORGANIC POND;
SCRAPING AND LOADING.
81-563-312
EDC
811103
HEQOPR
R.E. HEIDT BULLDOZER OPERATOR
WORKING IN OLD ORGANIC POND;
SCRAPING AND LOADING.
81-569-313
EDC
811210
BFI
81-690-379
VACUUMED OUT API SEPARATOR AND
CLASSIFIER THEN HAULED TO THE
PLANT WASTE STORAGE TANK
EDC
811210
VATKOP
81-691-380
VACUUMED OUT API SEPARATOR AND
CLASSIFIER THEN HAULED TO THE
PLANT WASTE STORAGE TANK.
EDC
820519
VATKOP
82-176-087
HAULING, LOADING, 8 UNLOADING
LIQUID ORGANIC WASTE IN VACUUM
TRUCK TO API SEPARATOR. MONTG.
EDC
820519
VATKOP
82-177-088
HAULING LIQUID ORGANIC WASTE
CLASSIFIER TO PUERTO RICAN TK.
WORKS FOR SIMPSON VAC.
EDC
820719
VATKOP
82-275-157
MONTGOMERY VACUUM TRUCK LOAD
ING 8 UNLOADING ORGANIC-WATER
TO CLASSIFIER. CLEANED P/T PIT
EDC
820719
VATKOP
82-276-158
MONTGOMERY VAC. TRUCK LOADING/
UNLOADING ORGANIC-WATER TO
CLASSIFIER. CLEANED P/T PIT.
3.750
PPM
5.190
PPM
.910
PPM
2.970
PPM
2.520
PPM
10.000
PPM
192.000
PPM
9.010
PPM
2.110
PPM
275 910 908 953 953 950 952 993 990 SL 016569
PAGE
1/19/93
LAxflfHARLES C254) PLANT B SAMPO NG RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
EDC
820805
VATKOP
82-309-187
TRASFERING ORGANICS FROM API,
N. CLASSIFIER, PUERTO RICAN TK
89 F, SE-5 MPH WINDS.(SIMPSON)
CONT
EDC
820805
VATKOP
82-310-188
SIMPSON VAC. SERVICE HAULING
ORGANICS FROM API, CLASS., P.
RICAN TK. 89 F WINDS SE-5.
CONT
CONT
EDC
820810
VATKOP
82-318-193
MONTGOMERY VACUUM TRUCK LOAD
ING AND UNLOADING ORGANIC
WATER TO CLASSIFIER
EDC
820810
VATKOP
82-319-194
MONTGOMERY VACUUM TRUCK LOAD
ING AND UNLOADING ORGANIC
WATER TO CLASSIFIER
CONT
EDC
820816
VATKOP
MONTGOMERY VAC. TRANSFERING
CLASSIFIER MATERIAL FROM OLD
DRUMS TO NEW DRUMS
82-343-209
CONT
EDC
820903
VATKOP
82-372-230
SIMPSON VAC. TRANSFERRING ORG.
API, M.CLASSIFIER, PUERTO RIC.
TK.
CONT
EDC
820903
VATKOP
82-373-231
SIMPSON VAC. TRANSFERING ORG.
WASTE FROM API, CLASSIFIER,
PUERTO RICAN TK.
CONT
EDC
820914
VATKOP
82-390-247
MONTGOMERY VAC CLEANING ORG.
SLUDGE FROM CLASSIFIER
RESULT 17.400
UNIT PPM
DURATION 283
10.400
PPM
283
46.200
PPM
455
42.200
PPM
453
2.770
PPM
322
201.000
PPM
336
4.170
PPM
335
16.900
PPM
223
CONT
EDC
820914
VATKOP
MONTGOMERY VAC CLEANING ORG.
SLUDGE FROM CLASSIFIER
82-391-248
4.340
PPM
223
CONT
EDC
821102
VATKOP
82-473-314
MONTGOMERY VAC SERVICE HAULING
ORG/WATER TO API SEPARATOR
1.300
PPM
440
CONT
EDC
821102
VATKOP
82-474-315
MONTGOMERY VAC SERVICE HAULING
ORG/WATER TO API SEPARATOR
1.060
PPM
439
SL 016570
PAGE
1/19/93
#LA fARLES C259)
PLANT B SAMHffllNG RESULTS THRU 1989
DEPT CONT
COMPOUND
DATE
JOB TITLE
EDC
821103
VATKOP
MONTGOMERY DRY VAC CLEANING
#1 INCINERATOR FEED TANK.
SAMPLE# 82-977-318
RESULT 10.900
UNIT DURATION
PPM
379
CONT
EDC
821103
VATKOP
MONTGOMERY DRY VAC CLEANING
#1 INCINERATOR FEED TANK.
82-978-319
7.930
PPM
379
CONT
EDC
821118
VATKOP
CLEANING S. CLASSIFIER WITH
VACTOR 8 VAC TRUCK.
82-519-399
50.700
PPM
376
CONT
EDC
821118
VATKOP
CLEANING S. CLASSIFIER WITH
VACTOR 8 VAC TRUCK.
82-520-395
96.900
PPM
379
CONT
EDC
821122
VATKOP
82-528-399
MONTGOMERY VAC ROUTINE CONTRAC
WORK.
9.990
PPM
385
CONT
EDC
821122
VATKOP
82-529-350
MONTGOMERY VAC ROUTINE CONTRAC
WORK
10.500
PPM
385
CONT CONT CONT
EDC
830118
VATKOP
83-091-029
MONTGOMERY VAC SERVICE CLEAN
ING S. CLASSIFIER WITH VACTOR.
TEMP 98, WINDS HE-18, RH 62.
EDC
830118
VATKOP
MONTGOMERY VAC SERVICE CLEAN
ING S-CLASSIFIER WITH VACTOR.
TEMP 98, WINDS NE-18, RH 62.
83-092-030
EDC
830317
VATKOP
MONTGOMERY VAC ROUTINE CONT.
WORK.
83-160-108
7.980
PPM
389
1.810
PPM
389
2.200
PPM
992
CONT
EDC
830317
VATKOP
MONTGOMERY VAC ROUTINE CONT.
WORK.
83-161-109
2.510
PPM
993
CONT
EDC
830505
VATKOP
83-221-156
SCOTTY'S VAC HAULED PROCESS
SEWER WATER IN PLANT B CLEANED
3.580
PPM
997 SL 016571
PAGE
1/19/93
LAkWEHARLES (254) PLANT B SAMPLING RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLES
CQNT
EDC
830505
VATKOP
83-222-157
SCOTTY'S VAC HAULED PROCESS
SEWER WATER IN PLANT B CLEANED
ORG BOX VCI, COOL T. SCEEN P/T
CONT
EDC
830712
VATKOP
83-317-225
SCOTTY'S VAC CLEANED OUT 6 PLT
B SUMPS DUMPED IN N CLASSIFIER
HAULED CATALYST FROM TE2
CONT *
EDC
830712
VATKOP
83-318-226
SCOTTY'S VAC CLEANED OUT 6 PLT
B SUMPS DUMPED IN N CLASSIFIER
HAULED CATALYST FROM TE2
CONT
EDC
830915
VATKOP
83-425-300
SIMPSON DRY-VAC LOADING ORG.
SLUDGE FROM PUERTO RICAN TANK
TO CWM VAC TRUCK. WINDS E-7
CONT
EDC
830915
VATKOP
83-426-301
SIMPSON DRY-VAC LOADING ORG.
SLUDGE FROM PUERTO RICAN TANK
TO CWM VAC TRUCK. WINDS E-7
CONT
EDC
831101
VATKOP
83-511-359
NORMAL OPERATIONS, HAULED ORG
ANIC WASTE WATER FROM SUMPS,
CLASSIFIER, PUERTO RICAN DOCK.
CONT
EDC ,,
840103
VATKOP
ROUTINE PLANT B CONTRACT VAC
(SCOTTY'S VAC) WORK CLEANING
SUMPS.
84-001-001
CONT
EDC
840403
VATKOP
84-179-117
SCOTTY'S VAC CLEANING PLANT B
SUMPS/LIFT STATIONS.
RESULT 4.260
UNIT PPM
DURATION 447
23.100
PPM
380
36.700
PPM
379
13.600
PPM
421
25.400
PPM
405
5.970
PPM
421
1.480
PPM
410
1.780
PPM
401
CONT
EDC
840403
VATKOP
84-180-118
SCOTTY'S VAC CLEANING PLANT B
SUMPS/LIFT STATIONS.
1.500
PPM
401
CONT CONT
EDC
840518
VATKOP
84-284-208
SCOTTY'S VACUUM TRUCK SERVICE.
CLEANING ORGANICS FROM CLASSI
FIER. NORMAL OPERATIONS.
EDC
840605
VATKOP
84-306-223
SCOTTY'S VAC CLEANING PLANT B
SUMPS, LIFT STATIONS, N.CLASS.
TO P.RICAN TK.
1.740
PPM
451
2.750
PPM
405
SL 016572
PAGE
1/19/93
LAF^BhARLES (259) PLANT B SAMWtNG RESULTS THRU 1989
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
EDC
890605
VATKOP
89-307-229
SCOTTY'S VAC CLEANING PLANT B
SUMPS, LIFT STATIONS, N.CLASS.
TO P.RICAN TK.
CONT
EDC
890729
VATKOP
89-392-299
OSHA INSPECT. SIMPSON VAC. CO.
PREPARING TO CLEAN OUT SOUTH
CLASSIFIER-WTU UNIT-NORMAL OP.
CONT
CONT
EDC
890729
VATKOP
89-393-300
OSHA INSPECT. SIMPSON VAC. CO.
PREPARING TO CLEAN OUT SOUTH
CLASSIFIER-WTU UNIT-NORMAL OP.
EDC
890729
VATKOP
89-399-301
QSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
EDC
890729
VATKOP
89-396-303
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
EDC
890729
VATKOP
89-397-309
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
EDC
890729
VATKOP
89-398-305
OSHA^INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
EDC
890729
VATKOP
89-399-306
OSHA INSPECTION. SIMPSON VAC.
TRUCK. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
EDC
890729
VATKOP
89-900-307
OSHA INSPECTION. SIMPSON VAC.
TRUCK. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
EDC
890729
VATKOP
89-901-308
OSHA INSPECT. SIMPSON VAC. CO.
PREPARING TO CLEAN OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
EDC
890729
VATKOP
89-902-309
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
RESULT 9.210
UNIT PPM
DURATION 905
.100
PPM
107
.100
PPM
102
26.090
PPM
93
51.720
PPM
77
92.010
PPM
79
97.500
PPM
93
90.650
PPM
128
50.110
PPM
100
6.330
PPM
97
18.500
PPM
69 SL 016573
PAGE
1/19/93
, j
LAl4BHARt.ES (254) PLANT B SAMWInG RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
EDC
840724
VATKOP
84-403-310
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
EDC
840724
VATKOP
84-404-311
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
4 CONT
EDC
840724
VATKOP
84-405-312
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
EDC
840724
VATKOP
84-406-313
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
EDC
840724
VATKOP
84-407-314
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
EDC
840913
S. FENCE 6FT HI. WIND NW-7/
CALM
84-483-375
RESULT 23.180
UNIT DURATION
PPM
89
30.360
PPM
91
23.260
PPM
101
27.040
PPM
110
33.950
PPM
108
.100
PPM
259
CONT CONT CONT CONT CONT
EDC
840913
CONLAB
84-485-377
MCMANUS CONSTRUCTION CO. OPER
ATING BULL DOZER. WIND NW-7/
CALM.
EDC
840913
FORMAN
MARS CONSTRUCTION CO. HAZAR
DOUS WASTE STG. FACILITY.
WIND NW-7/CALM.
84-484-376
EDC
841012
VATKOP
84-538-409
SCOTTY'S VAC CLEANING PLANT B
SUMPS, LIFT STATIONS, #1 EDC
LIQ PH RX TO P.RICAN TK.
EDC
841012
VATKOP
84-539-410
SCOTTY'S VAC CLEANING PLANT B
SUMPS LIFT STATIONS #1 EDC Lit)
PHASE RX TO P. RICAN TK.
EDC
841015
CONLAB
84-546-417
MCCLELLAND ENGINEERS DRILLING
MONITORING WELL IN S-40.
WIND SW-12/15
.070
PPM
252
.050
PPM
259
7.430
PPM
384
5.500
PPM
379
.970
PPM
349
SL 016574
PAGE
1/19/93
LAl^W-IARLES (254) PLANT B SAMWiNG RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
EDC
841016
CONLAB
84-550-421
MCCLELLAND ENG. HELPING NEAR
WELL POINTS 19/22 S-40 EXTRAC
WELL SYSTEM. WIND S-17.
CONT
EDC
841024
CONLAB
84-561-428
DANIEL CONST. S TERMINAL EXTRA
CTION WELL POINT 34 SHOVELING
MUD. WIND E-9.
CONT
i CONT
EDC
841024
CONLAB
84-562-429
MCCLELLAND ENG. S TERMINAL EX
TRAC WELL POINT 35 SHOVELING
SAND INTO WELL CASING WIND E-9
EDC
841024
CONLAB
84-563-430
DANIEL CONST. S TERMINAL EX
TRAC WELL POINTS 34-38 SHOVEL.
MUD. WIND E-9.
CONT
EDC
841024
CONLAB
84-564-431
DANIEL CONST. S TERMINAL EX
TRAC WELL POINTS 34-38 SHOVEL.
MUD. WIND E-9.
CONT
EDC
841115
CONLAB
84-607-468
SIMPSON VAC CLEANING S. CLAS
SIFIER. WIND $-13 RH 67.
RESULT .190
UNIT PPM
DURATION 540
1.280
PPM
18
.100
PPM
17
.390
PPM
255
.140
PPM
252
89.800
PPM
425
CONT
EDC
841115
CONLAB
SIMPSON VAC CLEANING SOUTH
CLASSIFIER. WIND S-13 RH 67.
84-608-469
58.300
PPM
425
CONT
EDC
841127
CONLAB
SIMPSON VAC SERVICE CLEANING
API SEPARATOR. WIND NW-14.
84-609-470
23.400
PPM
307
CONT
EDC
841127
CONLAB
SIMPSON VAC SERVICE CLEANING
API SEPARATOR. WIND NW-14.
84-610-471
27.600
PPM
303
CONT
MC
771214
HYDRO
HYDROTECH LEADMAN COLLECTING
AND TRAHSFERING WASTEWATER-B
77-276-200
1.500
PPM
425
CONT
MC
771214
HYDRO
HYDROTECH HELPER COLLECTING
AND TRAHSFERING WASTEWATER-B
77-277-201
1.300
PPM
425
SL 016575
PAGE
1/19/93
LAI^kHARLES (259) PLANT B SAM^ING RESULTS THRU 1984
DEPT COMT
COMPOUND
DATE
JOB TITLE
SAMPLE#
MC 801010
80-521-256
DOWNWIND OF CRANE OPERATION -
EAST SIDE,MIXING KILN DUST
RESULT 8.500
UNIT PPM
DURATION 30
CONT
MC
801010
HEQOPR
80-518-253
CRANE OPERATOR MOVING ORGANIC
SLUDGE FROM PIT TO TRUCK
2.200
PPM
33
CO NT
MC
801010
TRDRIV
80-519-254
STANDING BY TRUCK WHILE BEING
LOADED WITH ORGANIC SLUDGE
2.700
PPM
25
COHT
MC
801010
TRDRIV
STANDING BY WHILE TRUCK IS
LOADED AND ADJUSTING TARP
80-520-255
2.200
PPM
61
CO NT
MC
801015
VATKOP
WEST MONTGOMERY VACUUM TRUCK
OPERATOR HAULING ORGANICS
80-526-261
1.800
PPM
396
CONT
MC
801015
VATKOP
WEST MONTGOMERY VACUUM TRUCK
OPERATOR HAULING ORGANICS
80-527-262
1.300
PPM
396
CONT
MC 801020
DOWNWIND,SOUTHWEST CORNER OF ORGANIC PITS
80-533-264
.880
PPM
333
CONT
MC 801023 CONSTRUCTION SITE,WIND NE5, REFRIGERATION UNIT,NW CORNER
80-551-274
.060
PPM
350
CONT
MC
801023
HEQOPR
CRANE OPER. MIXING KILN DUST
WITH ORG. BOTTOMS WIND NE5
80-540-271
1.530
PPM
365
CONT
MC
801023
VATKOP
B.F.I. VACUUM TRUCK OPERATOR
PUMPING ORGANICS INTO TRUCK
80-541-272
1.100
PPM
15
CONT
MC
801023
VATKOP
BFI VACUUM TRUCK OPERATOR
PUMPING ORGANICS INTO TRUCK
80-542-273
.830
PPM
15
SL 016576
PAGE
1/19/93
LAI^fcuARLES (259) PLANT B SAILING RESULTS THRU 1989
DEPT CONT
COMPOUND
DATE
JOB TITLE SAMPLE#
MC
801027
HEQOPR
80-556-279
OPERATING BULLDOZER IN ORGANIC
PIT,MIXING IN KILN DUST
RESULT 91.700
UNIT DURATION
PPM
15
CONT
CONT *
CONT
MC
810309
VATKOP
81-089-092
PUMPING WATER AND ORGANICS
FROM VACUUM TRUCK INTO CLASSI
FIER AND API
MC
810309
VATKOP
81-085-093
PUMPING WATER AND ORGANICS
FROM VACUUM TRUCK INTO CLAS SI-
FIER AND API
MC
810608
BFI
WORKING IN INCINERATOR AREA
AT WASTE TREATMENT.
81-230-118
7.300
PPM
373
7.800
PPM
990
.500
PPM
938
CONT
MC
810608
BFI
WORKING IN INCINERATOR AREA
AT WASTE TREATMENT.
81-231-119
.900
PPM
937
CONT
MC
810929
BFI
VACUUMING WASTE FROM SODIUM
FORMATE UNIT
81-985-271
.190
PPM
927
CONT
MC
810929
VATKOP
VACUUMING UP WASTE FROM API
SEPARATOR AND CLASSIFIER
81-989-270
2.730
PPM
380
CONT CONT CONT CONT
MC
811102
HEQ0PR
R.E. HEIDT BULLDOZER OPERATOR
WORKING IN OLD ORGANIC POND;
SCRAPING AND LOADING.
81-561-310
MC
811103
HEQOPR
R.E. HEIDT BULLDOZER OPERATOR
WORKING IN OLD ORGANIC POND;
SCRAPING AND LOADING.
81-563-312
MC
811210
BFI
81-690-379
VACUUMED OUT API SEPARATOR AND
CLASSIFIER THEN HAULED TO THE
PLANT WASTE STORAGE TANK
MC
820719
VATKOP
82-275-157
MONTGOMERY VACUUM TRUCK LOAD
ING 8 UNLOADING ORGANIC-WATER
TO CLASSIFIER. CLEANED P/T PIT
.700
PPM
275
.970
PPM
910
.150
PPM
953
6.780
PPM
993 Sl 016577
PAGE
1/19/93
LAI PLANT B SAI
HARLES (259) NG RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
MC
820714
VATKOP
82-276-158
MONTGOMERY VAC. TRUCK LOADING/
UNLOADING ORGANIC-WATER TO
CLASSIFIER. CLEANED P/T PIT.
CONT
MC
820805
VATKOP
82-309-187
TRASFERING ORGANICS FROM API,
N. CLASSIFIER, PUERTO RICAN TK
89 F, SE-5 MPH WIHDS.(SIMPSON)
CONT
* CONT
MC
820805
VATKOP
SIMPSON VAC. SERVICE HAULING
ORGANICS FROM API, CLASS., P.
RICAN TK. 89 F WINDS SE-5.
82-310-188
MC
820903
VATKOP
SIMPSON VAC. TRANSFERIMG ORG.
WASTE FROM API, CLASSIFIER,
PUERTO RICAN TK.
82-373-231
CONT
MC
820914
VATKOP
MONTGOMERY VAC CLEANING ORG.
SLUDGE FROM CLASSIFIER
82-390-247
RESULT 3.510
UNIT PPM
DURATION 440
1.200 PPM
283
.910 PPM
283
.530 PPM
335
12.700
PPM
223
CONT
MC
821102
VATKOP
82-473-314
MONTGOMERY VAC SERVICE HAULING
ORG/WATER TO API SEPARATOR
4.760
PPM
440
CONT
MC
821102
VATKOP
82-474-315
MONTGOMERY VAC SERVICE HAULING
ORG/WATER TO API SEPARATOR
4.380
PPM
439
CONT
MC
821103
VATKOP
MONTGOMERY DRY VAC CLEANING
#1 INCINERATOR FEED TANK.
82-477-318
.140
PPM
374
CONT
MC
821103
VATKOP
MONTGOMERY DRY VAC CLEANING
#1 INCINERATOR FEED TANK.
82-478-319
.130
PPM
374
CONT
MC
821118
VATKOP
CLEANING S. CLASSIFIER WITH
VACTOR 8 VAC TRUCK.
82-519-344
1.000
PPM
376
CONT
MC
821118
VATKOP
CLEANING S. CLASSIFIER WITH
VACTOR 8 VAC TRUCK.
82-520-345
1.040
PPM
374
SL 016578
PAGE
1/19/93
LAK^HARLES (254) PLANT B SAMmNG RESULTS THRU 1984
DEPT CONT
COMPOUND
DATE
JOB TITLE SAMPLE#
MC
821122
VATKOP
82-528-349
MONTGOMERY VAC ROUTINE CONTRAC
WORK.
RESULT 1.230
UNIT PPM
DURATION 385
CO NT
MC
821122
VATKOP
82-529-350
MONTGOMERY VAC ROUTINE CONTRAC
WORK
2.880
PPM
385
CONT
*
CONT
CONT
MC
830118
VATKOP
83-041-029
MONTGOMERY VAC SERVICE CLEAN
ING S. CLASSIFIER WITH VACTOR.
TEMP 48, WINDS NE-18, RH 62.
MC
830118
VATKOP
83-042-030
MONTGOMERY VAC SERVICE CLEAN
ING S-CLASSIFIER WITH VACTOR.
TEMP 48, WINDS NE-18, RH 62.
MC
830317
VATKOP
83-160-108
MONTGOMERY VAC ROUTINE CONT.
WORK.
.460
PPM
389
.180
PPM
389
.170
PPM
442
CONT
MC
830317
VATKOP
MONTGOMERY VAC ROUTINE CONT.
WORK .
83-161-109
.190
PPM
443
CONT CONT CONT CONT CONT
MC
830712 VATKOP
83-317-225
SCOTTY'S VAC CLEANED OUT 6 PLT
B SUMPS DUMPED IN N CLASSIFIER
HAULED CATALYST FROM TE2
MC
830712 VATKOP
83-318-226
SCOTTY'S VAC CLEANED OUT 6 PLT
B SUMPS DUMPED IN H CLASSIFIER
HAULED CATALYST FROM TE2
MC 830915 VATKOP SIMPSON DRY-VAC LOADING ORG.
SLUDGE FROM PUERTO RICAN TANK
TO CWM VAC TRUCK. WINDS E-7
83-425-300
MC
830915
VATKOP
83-426-301
SIMPSON DRY-VAC LOADING ORG.
SLUDGE FROM PUERTO RICAN TANK
TO CWM VAC TRUCK. WINDS E-7
MC
831101
VATKOP
83-511-359
NORMAL OPERATIONS, HAULED ORG
ANIC WASTE WATER FROM SUMPS,
CLASSIFIER, PUERTO RICAN DOCK.
.370
PPM
380
.440
PPM
379
1.390
PPM
421
1.760
PPM
405
.490
PPM
421 SL 016579
PAGE
1/19/93
LAK^HARLES (259) PLANT B SAtIPffNG RESULTS THRU 1989
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
COHT
MC
890103
VATKOP
ROUTINE PLANT B CONTRACT VAC
(SCOTTY'S VAC) WORK CLEANING
SUMPS.
89-001-001
CONT
MC
890320
PAINT
89-160-109
SPRAY PAINTED LEGS OF VCM
SPHERE S-3. SLIDE CO. EMPLOYEE
NORMAL OPERATIONS.
CONT
*
CONT
MC
890320
PAINT
89-161-105
SPRAY PAINTED LEGS OF VCM
SPHERE S-3. SLIDE CO.EMPLOYEE.
NORMAL OPERATIONS.
MC
890320
PAINT
89-162-106
SPRAY PAINTED LEGS OF VCM
SPHERE S-3. SLIDE CO.EMPLOYEE.
NORMAL OPERATIONS.
CONT
MC
890320
PAINT
89-163-107
SPRAY PAINTED LEGS OF VCM
SPHERE S-3. SLINE CO.EMPLOYEE.
NORMAL OPERATIONS.
CONT
MC
890321
PAINT
89-165-108
SPRAY PAINTED LEGS OF VCM
SPHERE S-3. SLINE CO.EMPLOYEE.
NORMAL OPERATIONS.
CONT
MC
890321
PAINT
89-166-109
SPRAY PAINTED LEGS OF VCM
SPHERE S-3. SLINE CO.EMPLOYEE.
NORMAL OPERATIONS.
CONT
MC
890321
PAINT
89-167-110
SPRAY PAINTED LEGS OF VCM
SPHERE S-3. SLINE CO.EMPLOYEE.
NORMAL OPERATIONS.
CONT
MC
890321
PAINT
89-168-111
SPRAY PAINTED LEGS OF VCM
SPHERE S-3. SLINE CO.EMPLOYEE.
NORMAL OPERATIONS.
CONT
MC
890903
VATKOP
89-179-117
SCOTTY'S VAC CLEANING PLANT B
SUMPS/LIFT STATIONS.
RESULT .110
UNIT DURATION
PPM
910
3.510
PPM
990
17.580
PPM
993
2.510
PPM
990
3.800
PPM
936
7.380
PPM
990
9.130
PPM
935
112.200
PPM
939
6.990
PPM
936
.520
PPM
901
CONT
MC
890903
VATKOP
89-180-118
SCOTTY'S VAC CLEANING PLANT B
SUMPS/LIFT STATIONS.
.950
PPM
901
SL 016580
PAGE
1/19/93
LAK^HARLES (259) PLANT B SAMWtNG RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
MC
840605
VATKOP
84-306-223
SCOTTY'S VAC CLEANING PLANT B
SUMPS, LIFT STATIONS, N.CLASS.
TO P.RICAN TK.
CONT
MC
840605
VATKOP
84-307-224
SCOTTY'S VAC CLEANING PLANT B
SUMPS, LIFT STATIONS, N.CLASS.
TO P.RICAN TK.
CONT
MC
840724
VATKOP
84-394-301
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
MC
840724
VATKOP
84-396-303
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
MC
840724
VATKOP
84-397-304
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
MC
840724
VATKOP
84-398-305
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
MC
840724
VATKOP
84-399-306
OSHA ^INSPECTION. SIMPSON VAC.
TRUCK. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
MC
840724
VATKOP
84-400-307
OSHA INSPECTION. SIMPSON VAC.
TRUCK. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
MC
840724
VATKOP
84-401-308
OSHA INSPECT. SIMPSON VAC. CO.
PREPARING TO CLEAN OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
MC
840724
VATKOP
84-402-309
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
MC
840724
VATKOP
84-403-310
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
RESULT .370
UNIT PPM
DURATION 405
.390
PPM
405
.680
PPM
93
1.930
PPM
77
1.460
PPM
79
1.480
PPM
93
1.870
PPM
128
2.220
PPM
100
.670
PPM
97
1.230
PPM
69
1.810
PPM
89 SL 016581
PAGE
1/19/93
LAI^B HARLES (259) PLANT B SAMPO NG RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
MC
840724
VATKOP
84-404-311
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
MC
840724
VATKOP
84-405-312
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
i CONT
MC
840724
VATKOP
84-406-313
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
MC
840724
VATKOP
84-407-314
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
MC
841012
VATKOP
84-538-409
SCOTTY'S VAC CLEANING PLANT B
SUMPS, LIFT STATIONS, #1 EDC
LIQ PH RX TO P.RICAN TK.
CONT
MC
841012
VATKOP
84-539-410
SCOTTY'S VAC CLEANING PLANT B
SUMPS LIFT STATIONS #1 EDC LIQ
PHASE RX TO P. RICAN TK.
CONT
MC
841015
CONLAB
84-546-417
MCCLELLAND ENGINEERS DRILLING
MONITORING WELL IN S-40.
WIND SW-12/15
CONT
MC
841016
CONLAB
84-550-421
MCCLELLAND ENG. HELPING NEAR
WELL POINTS 19/22 S-40 EXTRAC
WELL SYSTEM. WIND S-17.
CONT
MC
841024
CONLAB
84-563-430
DANIEL CONST. S TERMINAL EX
TRAC WELL POINTS 34-38 SHOVEL.
MUD. WIND E-9.
CONT
MC
841115
CONLAB
84-607-468
SIMPSON VAC CLEANING S. CLAS
SIFIER. WIND S-13 RH 67.
RESULT 1.820
UNIT PPM
DURATION 91
2.510
PPM
101
1.890
PPM
110
3.350
PPM
108
.760
PPM
384
.710
PPM
379
.370
PPM
349
.100
PPM
540
.100
PPM
255
13.500
PPM
425
CONT
MC
841115
CONLAB
SIMPSON VAC CLEANING SOUTH
CLASSIFIER. WIND S-13 RH 67.
84-608-469
9.100
PPM
425
SL 016582
PAGE
1/19/93
LAI^HhARLES (259) PLANT B SAMHTING RESULTS THRU 1989
DEPT CONT
COMPOUND
DATE
JOB TITLE
MC
891127
CONLAB
SIMPSON VAC SERVICE CLEANING
API SEPARATOR. WIND HW-14.
SAMPLE# 84-609-470
RESULT 6.280
UNIT DURATION
PPM
307
CONT
MC
841127
CONLAB
SIMPSON VAC SERVICE CLEANING
API SEPARATOR. WIND NW-14.
84-610-471
5.160
PPM
303
CONT
PER
771214
HYDRO
HYDROTECH LEADMAN COLLECTING
AND TRANSFERING WASTEWATER-B
77-276-200
10.100
PPM
425
CONT
PER
771214
HYDRO
HYDROTECH HELPER COLLECTING
AND TRANSFERING WASTEWATER-B
77-277-201
3.500
PPM
425
CONT
PER
801010
80-521-256
DOWNWIND OF CRANE OPERATION -
EAST SIDE,MIXING KILN DUST
21.900
PPM
30
CONT
PER
801010
HEQOPR
80-518-253
CRANE OPERATOR MOVING ORGANIC
SLUDGE FROM PIT TO TRUCK
4.300
PPM
33
CONT
PER
801010
TRDRIV
80-519-254
STANDING BY TRUCK WHILE BEING
LOADED WITH ORGANIC SLUDGE
6.600
PPM
25
CONT
PER
801010
TRDRIV
STANDING BY WHILE TRUCK IS
LOADED AND ADJUSTING TARP
80-520-255
4.000
PPM
61
CONT
PER
801015
VATKOP
WEST MONTGOMERY VACUUM TRUCK
OPERATOR HAULING ORGANICS
80-526-261
2.000
PPM
396
CONT
PER
801015
VATKOP
WEST MONTGOMERY VACUUM TRUCK
OPERATOR HAULING ORGANICS
80-527-262
1.400
PPM
396
CONT
PER
801020
80-533-264
DOWNWIND,SOUTHWEST CORNER OF
ORGANIC PITS
.780
PPM
333 SL 016583
PAGE
1/19/93
LAljHHARLES (254) PLANT B SArWlNG RESULTS THRU 1984
DEPT CONT
COMPOUND DATE
JOB TITLE
PER
801023
CONSTRUCTION SITE,WIND NEB,
REFRIGERATION UNIT,NW CORNER
SAMPLE# 80-551-274
RESULT .140
UNIT DURATION
PPM
350
CONT
PER
801023
HEQOPR
CRANE OPER. MIXING KILN DUST
WITH ORG. BOTTOMS WIND NE5
80-540-271
4.410
PPM
365
CONT
PER
801023
VATKOP
B.F.I. VACUUM TRUCK OPERATOR
PUMPING ORGANICS INTO TRUCK
80-541-272
3.300
PPM
15
CONT
PER
801023
VATKOP
BFI VACUUM TRUCK OPERATOR
PUMPING ORGANICS INTO TRUCK
80-542-273
3.100
PPM
15
CONT
PER
801027
HEQOPR
80-556-279
OPERATING BULLDOZER IN ORGANIC
PIT,MIXING IN KILN DUST
97.900
PPM
15
CONT CONT CONT
PER
810309
VATKOP
81-084-042
PUMPING WATER AND ORGANICS
FROM VACUUM TRUCK INTO CLASSI
FIER AND API
PER
810309
VATKOP
81-085-043
PUMPING WATER AND ORGANICS
FROM VACUUM TRUCK INTO CLASSI
FIER AND API
PER
810929
VATKOP
VACUUMING UP WASTE FROM API
SEPARATOR AND CLASSIFIER
81-484-270
.810
PPM
373
.950
PPM
440
.780
PPM
380
CONT CONT CONT
PER
811102
HEQOPR
R.E. HEIDT BULLDOZER OPERATOR
WORKING IN OLD ORGANIC POND;
SCRAPING AND LOADING.
81-561-310
PER
811103
HEQOPR
R.E. HEIDT BULLDOZER OPERATOR
WORKING IN OLD ORGANIC POND;
SCRAPING AND LOADING.
81-563-312
PER
811103
HEQOPR
R.E. HEIDT BULLDOZER OPERATOR
WORKING IN OLD ORGANIC POND;
SCRAPING AND LOADING.
81-564-313
2.660
PPM
275
3.540
PPM
410
.440
PPM
408
SL 016584
PAGE
1/19/93
LAI^HhARLES (259) PLANT B SAMWtUG RESULTS THRU 1989
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
PER
811210
BFI
81-690-379
VACUUMED OUT API SEPARATOR AND
CLASSIFIER THEN HAULED TO THE
PLANT WASTE STORAGE TANK
CONT
PER
811210
VATKOP
81-641-380
VACUUMED OUT API SEPARATOR AND
CLASSIFIER THEN HAULED TO THE
PLANT WASTE STORAGE TANK.
CONT
CONT
PER
820519
VATKOP
82-176-087
HAULING, LOADING, 8 UNLOADING
LIQUID ORGANIC WASTE IN VACUUM
TRUCK TO API SEPARATOR. MONTG.
PER
820519
VATKOP
82-177-088
HAULING LIQUID ORGANIC WASTE
CLASSIFIER TO PUERTO RICAN TK.
WORKS FOR SIMPSON VAC.
CONT
PER
820719
VATKOP
82-275-157
MONTGOMERY VACUUM TRUCK LOAD
ING 8 UNLOADING ORGANIC-WATER
TO CLASSIFIER. CLEANED P/T PIT
CONT
PER
820714
VATKOP
82-276-158
MONTGOMERY VAC. TRUCK LOADING/
UNLOADING ORGANIC-WATER TO
CLASSIFIER. CLEANED P/T PIT.
CONT
PER
820805
VATKOP
82-309-187
TRASRERING ORGANICS FROM API,
N. CLASSIFIER, PUERTO RICAN TK
89 F, SE-5 MPH WINDS.(SIMPSON)
CONT
PER
820805
VATKOP
82-310-188
SIMPSON VAC. SERVICE HAULING
ORGANICS FROM API, CLASS., P.
RICAN TK. 89 F WINDS SE-5.
CONT
PER
820810
VATKOP
82-318-193
MONTGOMERY VACUUM TRUCK LOAD
ING AND UNLOADING ORGANIC
WATER TO CLASSIFIER
CONT
PER
820810
VATKOP
82-319-194
MONTGOMERY VACUUM TRUCK LOAD
ING AND UNLOADING ORGANIC
WATER TO CLASSIFIER
CONT
PER
820816
VATKOP
MONTGOMERY VAC. TRANSFERING
CLASSIFIER MATERIAL FROM OLD
DRUMS TO NEW DRUMS
82-343-209
RESULT .970
UNIT PPM
DURATION 453
.390
PPM
453
.570
PPM
450
2.660
PPM
452
8.330
PPM
443
7.170
PPM
440
1.680
PPM
283
1.010
PPM
283
1.980
PPM
455
2.420
PPM
453
.310
PPM
322 SL 016585
PAGE
1/19/93
LAH^BhARLES (254) PLANT B SAMmNG RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
PER
820903
VATKOP
82-373-231
SIMPSON VAC. TRANSFERING ORG.
WASTE FROM API, CLASSIFIER,
PUERTO RICAN TK.
CONT
PER
821102
VATKOP
82-473-314
MONTGOMERY VAC SERVICE HAULING
ORG/WATER TO API SEPARATOR
RESULT .150
UNIT PPM
DURATION 335
4.040
PPM
440
CONT
PER
821102
VATKOP
82-474-315
MONTGOMERY VAC SERVICE HAULING
ORG/WATER TO API SEPARATOR
3.330
PPM
439
CONT
PER
821103
VATKOP
MONTGOMERY DRY VAC CLEANING
#1 INCINERATOR FEED TANK.
82-477-318
.620
PPM
374
CONT
PER
821103
VATKOP
MONTGOMERY DRY VAC CLEANING
#1 INCINERATOR FEED TANK.
82-478-319
.480
PPM
374
CONT
PER
821118
VATKOP
CLEANING S. CLASSIFIER WITH
VACTOR 8 VAC TRUCK.
82-519-344
2.500
PPM
376
CONT
PER
821118
VATKOP
CLEANING S. CLASSIFIER WITH
VACTOR 8 VAC TRUCK.
82-520-345
3.320
PPM
374
CONT
PER
821122
VATKOP
82-528-349
MONTGOMERY VAC ROUTINE CONTRAC
WORK.
4.480
PPM
385
CONT
PER
821122
VATKOP
82-529-350
MONTGOMERY VAC ROUTINE CONTRAC
WORK
5.140
PPM
385
CONT CONT
PER
830118
VATKOP
83-041-029
MONTGOMERY VAC SERVICE CLEAN
ING S. CLASSIFIER WITH VACTOR.
TEMP 48, WINDS NE-18, RH 62.
PER
830118
VATKOP
83-042-030
MONTGOMERY VAC SERVICE CLEAN
ING S-CLASSIFIER WITH VACTOR.
TEMP 48, WINDS NE-18, RH 62.
.240
PPM
389
.110
PPM
389
SL 016586
PAGE
1/19/93
LA: ARLES (254) PLANT B SAMMPPFiNGi RESULTS THRU 1984
DEPT CONT
COMPOUND
DATE
JOB TITLE
PER
830317
VATKOP
MONTGOMERY VAC ROUTINE CONT.
WORK.
SAMPLE# 83-160-108
RESULT .230
UNIT PPM
DURATION 442
CONT
PER
830317
VATKOP
MONTGOMERY VAC ROUTINE CONT.
WORK.
83-161-109
.290
PPM
443
CONT
PER
830505
VATKOP
83-221-156
SCOTTY'S VAC HAULED PROCESS
SEWER WATER IN PLANT B CLEANED
2.270
PPM
447
CONT CONT CONT CONT CONT CONT
PER
830505 VATKOP
83-222-157
SCOTTY'S VAC HAULED PROCESS
SEWER WATER IN PLANT B CLEANED
ORG BOX VCI, COOL T. SCEEN P/T
PER
830712 VATKOP
83-317-225
SCOTTY'S VAC CLEANED OUT 6 PLT
B SUMPS DUMPED IN N CLASSIFIER
HAULED CATALYST FROM TE2
PER
830712 VATKOP
83-318-226
SCOTTY'S VAC CLEANED OUT 6 PLT
B SUMPS DUMPED IN N CLASSIFIER
HAULED CATALYST FROM TE2
PER
831101
VATKOP
83-511-359
NORMAL OPERATIONS, HAULED ORG
ANIC WASTE WATER FROM SUMPS,
CLASSIFIER, PUERTO RICAN DOCK.
PER
840103
VATKOP
ROUTINE PLANT B CONTRACT VAC
(SCOTTY'S VAC) WORK CLEANING
SUMPS.
84-001-001
PER
840403
VATKOP
84-179-117
SCOTTY'S VAC CLEANING PLANT B
SUMPS/LIFT STATIONS.
14.100
PPM
447
5.690
PPM
380
13.400
PPM
379
.200
PPM
421
.100
PPM
410
.370
PPM
401
CONT
PER
840403
VATKOP
84-180-118
SCOTTY'S VAC CLEANING PLANT B
SUMPS/LIFT STATIONS.
.260
PPM
401
CONT
PER
840518
VATKOP
84-284-208
SCOTTY'S VACUUM TRUCK SERVICE.
CLEANING ORGANICS FROM CLASSI
FIER. NORMAL OPERATIONS.
.190
PPM
451
SL 016587
PAGE
1/19/93
LAK^HARLES (259) PLANT B SAMTONG RESULTS THRU 1989
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
PER
890605
VATKOP
89-306-223
SCOTTY'S VAC CLEANING PLANT B
SUMPS, LIFT STATIONS, N.CLASS.
TO P.RICAN TK.
CONT
PER
890605
VATKOP
89-307-229
SCOTTY'S VAC CLEANING PLANT B
SUMPS, LIFT STATIONS, N.CLASS.
TO P.RICAN TK.
CONT
*
CONT
PER
890729
VATKOP
89-399-301
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
PER
890729
VATKOP
89-396-303
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
PER
890729
VATKOP
89-397-309
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
PER
890729
VATKOP
89-398-305
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
PER
890729
VATKOP
89-399-306
OSHA ^INSPECTION. SIMPSON VAC.
TRUCK. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
PER
890729
VATKOP
89-900-307
OSHA INSPECTION. SIMPSON VAC.
TRUCK. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
PER
890729
VATKOP
89-901-308
OSHA INSPECT. SIMPSON VAC. CO.
PREPARING TO CLEAN OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
PER
890729
VATKOP
89-902-309
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT, NORMAL OP
CONT
PER
890729
VATKOP
89-903-310
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
RESULT .130
UNIT PPM
DURATION 905
.190
PPM
905
1.680
PPM
93
6.560
PPM
77
5.030
PPM
79
9.090
PPM
93
7.320
PPM
128
9.010
PPM
100
2.770
PPM
97
9.890
PPM
69
6.970
PPM
89
SL 016588
PAGE
1/19/93
ALA ARLES (259)
PLANT B SAMHI mtNlG RESULTS THRU 1989
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
PER
890729
VATKOP
89-909-311
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
PER
890729
VATKOP
89-905-312
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
t CONT
PER
890729
VATKOP
89-906-313
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
PER
890729
VATKOP
89-907-319
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
PER
891012
VATKOP
89-538-909
SCOTTY'S VAC CLEANING PLANT B
SUMPS, LIFT STATIONS, #1 EDC
LIQ PH RX TO P.RICAN TK.
CONT
PER
891012
VATKOP
89-539-910
SCOTTY'S VAC CLEANING PLANT B
SUMPS LIFT STATIONS #1 EDC LIQ
PHASE RX TO P. RICAN TK.
CONT
PER
891015
CONLAB
89-596-917
MCCLBLLAND ENGINEERS DRILLING
MONITORING WELL IN S-90.
WIND SW-12/15
CONT
PER
891016
CONLAB
89-550-921
MCCLELLAND ENG. HELPING NEAR
WELL POINTS 19/22 S-90 EXTRAC
WELL SYSTEM. WIND S-17.
CONT
PER
891029
CONLAB
89-561-928
DANIEL CONST. S TERMINAL EXTRA
CTION WELL POINT 39 SHOVELING
MUD. WIND E-9.
CONT
PER
891029
CONLAB
89-562-929
MCCLELLAND ENG. S TERMINAL EX
TRAC WELL POINT 35 SHOVELING
SAND INTO WELL CASING WIND E-9
CONT
PER
891029
CONLAB
89-563-930
DANIEL CONST. S TERMINAL EX
TRAC WELL POINTS 39-38 SHOVEL.
MUD. WIND E-9.
RESULT 6.690
UNIT PPM
DURATION 91
6.720
PPM
101
7.690
PPM
110
9.210
PPM
108
.910
PPM
389
.990
PPM
379
.950
PPM
399
.110
PPM
590
.560
PPM
18
.100
PPM
17
.230
PPM
255 SL 016589
PAGE
1/19/93
LA icflm ARLES (254) PLANT B SAMMPPLINNG RESULTS THRU 1984
DEPT CONT
CONT
COMPOUND
DATE
JOB TITLE SAMPLE#
PER
841024
CONLAB
84-564-431
DANIEL CONST. S TERMINAL EX-
TRAC WELL POINTS 34-38 SHOVEL
MUD. WIND E-9.
PER
841115
CONLAB
84-607-468
SIMPSON VAC CLEANING S. CLAS
SIFIER. WIND S-13 RH 67.
RESULT .100
UNIT DURATION
PPM
252
11.300
PPM
425
CONT
PER
841115
CONLAB
SIMPSON VAC CLEANING SOUTH
CLASSIFIER. WIND S-13 RH 67.
84-608-469
8.130
PPM
425
CONT
PER
841127
CONLAB
SIMPSON VAC SERVICE CLEANING
API SEPARATOR. WIND NW-14.
84-609-470
3.450
PPM
307
CONT
PER
841127
CONLAB
SIMPSON VAC SERVICE CLEANING
API SEPARATOR. WIND NW-14.
84-610-471
4.000
PPM
303
CONT CONT
SYM
820903
VATKOP
82-372-230
SIMPSON VAC. TRANSFERRING ORG
API, N.CLASSIFIER, PUERTO RIC
TK.
SYM
821103
VATKOP
MONTGOMERY DRY VAC CLEANING
# 1 INCINERATOR FEED TANK.
82-477-318
1.880
PPM
336
.450
PPM
374
CONT
SYM
821103
VATKOP
MONTGOMERY DRY VAC CLEANING
#1 INCINERATOR FEED TANK.
82-478-319
.340
PPM
374
CONT CONT CONT
SYM
840724
VATKOP
84-394-301
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
SYM
840724
VATKOP
84-405-312
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
SYM
841024
CONLAB
84-563-430
DANIEL CONST. S TERMINAL EX-
TRAC WELL POINTS 34-38 SHOVEL.
MUD. WIND E-9.
.200
PPM
93
.150
PPM
101
.100
PPM
255
SL 016590
PAGE
1/19/93
LAIk^BiIARLES <254) PLANT B SAMMPorNG RESULTS THRU 1984
DEPT CONT
COMPOUND
DATE
JOB TITLE
TCE
771214
HYDRO
HYDROTECH LEADMAN COLLECTING
AND TRANSFERING WASTEWATER-B
SAMPLE# 77-276-200
RESULT 4.200
UNIT DURATION
PPM
425
CONT
TCE
771214
HYDRO
HYDROTECH HELPER COLLECTING
AND TRANSFERING WASTEWATER-B
77-277-201
1.800
PPM
425
CONT
TCE
801010
80-521-256
DOWNWIND OF CRANE OPERATION -
EAST SIDE,MIXING KILN DUST
7.700
PPM
30
CONT
TCE
801010
HEQOPR
80-518-253
CRANE OPERATOR MOVING ORGANIC
SLUDGE FROM PIT TO TRUCK
1.400
PPM
33
CONT
TCE
801010
TRDRIV
80-519-254
STANDING BY TRUCK WHILE BEING
LOADED WITH ORGANIC SLUDGE
2.200
PPM
25
CONT
TCE
801010
TRDRIV
STANDING BY WHILE TRUCK IS
LOADED AND ADJUSTING TARP
80-520-255
1.500
PPM
61
CONT
TCE
801015
VATKOP
WEST 'MONTGOMERY VACUUM TRUCK
OPERATOR HAULING ORGANICS
80-526-261
.300
PPM
396
CONT
TCE
801015
VATKOP
WEST MONTGOMERY VACUUM TRUCK
OPERATOR HAULING ORGANICS
80-527-262
.120
PPM
396
CONT
TCE
801020
DOWNWIND,SOUTHWEST CORNER OF
ORGANIC PITS
80-533-264
.300
PPM
333
CONT
TCE
801023
HEQOPR
CRANE OPER. MIXING KILN DUST
WITH ORG. BOTTOMS WIND NE5
80-540-271
1.520
PPM
365
CONT
TCE
801023
VATKOP
B.F.I. VACUUM TRUCK OPERATOR
PUMPING ORGANICS INTO TRUCK
80-541-272
1.300
PPM
15 SL 016591
PAGE
1/19/93
LA ARLES C254) PLANT B SAMMPTlNMG RESULTS THRU 1984
DEPT CONT
COMPOUND
DATE
JOB TITLE
TCE
801023
VATKOP
BFI VACUUM TRUCK OPERATOR
PUMPING ORGANICS INTO TRUCK
SAMPLE# 80-542-273
RESULT 2.200
UNIT DURATION
PPM
15
CONT
TCE
801027
HEQOPR
80-556-279
OPERATING BULLDOZER IN ORGANIC
PIT,MIXING IN KILN DUST
38.100
PPM
15
CO NT CONT CONT
TCE
810309
VATKOP
81-084-042
PUMPING WATER AND ORGANICS
FROM VACUUM TRUCK INTO CLASSI
FIER AND API
TCE
810309
VATKOP
81-085-043
PUMPING WATER AND ORGANICS
FROM VACUUM TRUCK INTO CLASSI
FIER AND API
TCE
810608
BFI
WORKING IN INCINERATOR AREA
AT WASTE TREATMENT.
81-230-118
.860
PPM
373
.910
PPM
440
.180
PPM
438
CONT
TCE
810608
BFI
WORKING IN INCINERATOR AREA
AT WASTE TREATMENT.
81-231-119
.180
PPM
437
CONT
TCE
810929
VATKOP
VACUUMING UP WASTE FROM API
SEPARATOR AND CLASSIFIER
81-484-270
.820
PPM
380
CONT CONT CONT CONT
TCE
811102
HEQOPR
R.E. HEIDT BULLDOZER OPERATOR
WORKING IN OLD ORGANIC POND;
SCRAPING AND LOADING.
81-561-310
TCE
811103
HEQOPR
81-563-312
R.E. HEIDT BULLDOZER OPERATOR
WORKING IN OLD ORGANIC POND;
SCRAPING AND LOADING.
TCE
811103
HEQOPR
81-564-313
R.E. HEIDT BULLDOZER OPERATOR
WORKING IN OLD ORGANIC POND;
SCRAPING AND LOADING.
TCE
811210
BFI
81-640-379
VACUUMED OUT API SEPARATOR AND
CLASSIFIER THEN HAULED TO THE
PLANT WASTE STORAGE TANK
.650
PPM
275
.720
PPM
410
.110
PPM
408
.350
PPM
453
SL 016592
PAGE
1/19/93
LA!k^Pk ARLES C254) PLANT B SAMM! PflNNG RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
TCE
811210
VATKOP
81-641-380
VACUUMED OUT API SEPARATOR AND
CLASSIFIER THEN HAULED TO THE
PLANT WASTE STORAGE TANK.
CONT
TCE
820519
VATKOP
82-176-087
HAULING, LOADING, 8 UNLOADING
LIQUID ORGANIC WASTE IN VACUUM
TRUCK TO API SEPARATOR. MONTG.
CONT
* CONT
TCE
820519
VATKOP
82-177-088
HAULING LIQUID ORGANIC WASTE
CLASSIFIER TO PUERTO RICAN TK.
WORKS FOR SIMPSON VAC.
TCE
820714
VATKOP
82-275-157
MONTGOMERY VACUUM TRUCK LOAD
ING 8 UNLOADING ORGANIC-WATER
TO CLASSIFIER. CLEANED P/T PIT
CONT
TCE
820714
VATKOP
82-276-158
MONTGOMERY VAC. TRUCK LOADING/
UNLOADING ORGANIC-WATER TO
CLASSIFIER. CLEANED P/T PIT.
CONT
TCE
820805
VATKOP
82-309-187
TRASFERING ORGANICS FROM API,
N. CLASSIFIER, PUERTO RICAN TK
89 F, SE-5 MPH WINDS.(SIMPSON)
CONT
TCE
820805
VATKOP
SIMPSON VAC. SERVICE HAULING
ORGANICS FROM API, CLASS., P.
RICAN TK. 89 F WINDS SE-5.
82-310-188
CONT
TCE
820810
VATKOP
82-318-193
MONTGOMERY VACUUM TRUCK LOAD
ING AND UNLOADING ORGANIC
WATER TO CLASSIFIER
CONT
TCE
820810
VATKOP
82-319-194
MONTGOMERY VACUUM TRUCK LOAD
ING AND UNLOADING ORGANIC
WATER TO CLASSIFIER
CONT
TCE
820816
VATKOP
MONTGOMERY VAC. TRANSFERING
CLASSIFIER MATERIAL FROM OLD
DRUMS TO NEW DRUMS
82-343-209
CONT
TCE
820903
VATKOP
82-372-230
SIMPSON VAC. TRANSFERRING ORG.
API, H.CLASSIFIER, PUERTO RIC.
TK.
RESULT .390
UNIT PPM
DURATION 453
.220
PPM
450
3.690
PPM
452
.370
PPM
443
.200
PPM
440
1.940
PPM
283
.930
PPM
283
.820
PPM
455
.860
PPM
453
.440
PPM
322
24.200
PPM
336 SL 016593
PAGE
1/19/93
LA ARLES (254) PLANT B SAMMPONNG RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
TCE
820903
VATKOP
82-373-231
SIMPSON VAC. TRANSFERING ORG.
WASTE FROM API, CLASSIFIER,
PUERTO RICAN TK.
CONT
TCE
820914
VATKOP
82-390-247
MONTGOMERY VAC CLEANING ORG.
SLUDGE FROM CLASSIFIER
RESULT .400
UNIT PPM
DURATION 335
2.540
PPM
223
CONT
TCE
820914
VATKOP
MONTGOMERY VAC CLEANING ORG.
SLUDGE FROM CLASSIFIER
82-391-248
.670
PPM
223
CONT
TCE
821102
VATKOP
82-473-314
MONTGOMERY VAC SERVICE HAULING
ORG/WATER TO API SEPARATOR
.250
PPM
440
CONT
TCE
821102
VATKOP
82-474-315
MONTGOMERY VAC SERVICE HAULING
ORG/WATER TO API SEPARATOR
.140
PPM
439
CONT
TCE
821103
VATKOP
MONTGOMERY DRY VAC CLEANING
#1 INCINERATOR FEED TANK.
82-477-318
1.200
PPM
374
CONT
TCE
821103
VATKOP
MONTGOMERY DRY VAC CLEANING
#1 INCINERATOR FEED TANK.
82-478-319
.830
PPM
374
CONT
TCE
821118
VATKOP
CLEANING S. CLASSIFIER WITH
VACTOR 8 VAC TRUCK.
82-519-344
4.980
PPM
376
CONT
TCE
821118
VATKOP
CLEANING S. CLASSIFIER WITH
VACTOR & VAC TRUCK.
82-520-345
5.440
PPM
374
CONT
TCE
821122
VATKOP
82-528-349
MONTGOMERY VAC ROUTINE CONTRAC
WORK.
.540
PPM
385
CONT
TCE
821122
VATKOP
82-529-350
MONTGOMERY VAC ROUTINE CONTRAC
WORK
1.280
PPM
385
SL 016594
PAGE
1/19/93
LA ARLES (254) PLANT B SAMUPONNG RESULTS THRU 1984
DEPT CQNT
CONT
CONT
COMPOUND
DATE
JOB TITLE SAMPLE#
TCE
830118
VATKOP
83-041-029
MONTGOMERY VAC SERVICE CLEAN
ING S. CLASSIFIER WITH VACTOR
TEMP 48, WINDS NE-18, RH 62.
TCE
830118
VATKOP
MONTGOMERY VAC SERVICE CLEAN
ING S-CLASSIFIER WITH VACTOR.
TEMP 48, WINDS HE-18, RH 62,
83-042-030
TCE
830317
VATKOP
MONTGOMERY VAC ROUTINE CONT.
WORK.
83-160-108
RESULT 1.240
UNIT DURATION
PPM
389
.250
PPM
389
.230
PPM
442
CONT
TCE
830317
VATKOP
MONTGOMERY VAC ROUTINE CONT.
WORK.
83-161-109
.290
PPM
443
CONT
TCE
830505
VATKOP
83-221-156
SCOTTY'S VAC HAULED PROCESS
SEWER WATER IN PLANT B CLEANED
.530
PPM
447
CONT CONT CONT CONT CONT CONT
TCE
830505 VATKOP
83-222-157
SCOTTY'S VAC HAULED PROCESS
SEWER WATER IN PLANT B CLEANED
ORG BOX VCI, COOL T. SCEEN P/T
TCE
830712 VATKOP
83-317-225
SCOTTY * S VAC CLEANED OUT 6 PLT
B SUMPS DUMPED IN N CLASSIFIER
HAULED CATALYST FROM TE2
TCE
830712 VATKOP
83-318-226
SCOTTY'S VAC CLEANED OUT 6 PLT
B SUMPS DUMPED IN N CLASSIFIER
HAULED CATALYST FROM TE2
TCE
830915
VATKOP
83-425-300
SIMPSON DRY-VAC LOADING ORG.
SLUDGE FROM PUERTO RICAN TANK
TO CWM VAC TRUCK. WINDS E-7
TCE
830915
VATKOP
83-426-301
SIMPSON DRY-VAC LOADING ORG.
SLUDGE FROM PUERTO RICAN TANK
TO CWM VAC TRUCK. WINDS E-7
TCE
831101
VATKOP
83-511-359
NORMAL OPERATIONS, HAULED ORG
ANIC WASTE WATER FROM SUMPS,
CLASSIFIER, PUERTO RICAN DOCK.
2.610
PPM
447
.200
PPM
380
.110
PPM
379
1.170
PPM
421
3.060
PPM
405
.110
PPM
421 SL 016595
PAGE
1/19/93
LA.k^Ph ARLES (254) PLANT B SAMMPONNG RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
TCE
840605
VATKOP
84-306-223
SCOTTY'S VAC CLEANING PLANT B
SUMPS, LIFT STATIONS, N.CLASS,
TO P.RICAN TK.
CONT
TCE
840724
VATKOP
84-394-301
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
i CONT
TCE
840724
VATKOP
84-396-303
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
TCE
840724
VATKOP
84-397-304
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
TCE
840724
VATKOP
84-398-305
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
TCE
840724
VATKOP
84-399-306
OSHA INSPECTION. SIMPSON VAC.
TRUCK. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
TCE
840724
VATKOP
84-400-307
OSHA "INSPECTION. SIMPSON VAC.
TRUCK. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
TCE
840724
VATKOP
84-401-308
OSHA INSPECT. SIMPSON VAC. CO.
PREPARING TO CLEAN OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
TCE
840724
VATKOP
84-402-309
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
TCE
840724
VATKOP
84-404-311
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
TCE
840724
VATKOP
84-405-312
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
RESULT .100
UNIT PPM
DURATION 405
.860
PPM
93
1.820
PPM
77
1.340
PPM
79
1.260
PPM
93
1.600
PPM
128
1.980
PPM
100
.170
PPM
97
.760
PPM
69
1.120
PPM
91
.970
PPM
101 SL 016596
PAGE
1/19/93
LA ARLES (254 ) PLANT B SAMMFONNG RESULTS THRU 1984
PAGE
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
TCE
840724
VATKOP
84-406-313
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
TCE
840724
VATKOP
84-407-314
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
*
CONT
TCE
841012
VATKOP
84-538-409
SCOTTY'S VAC CLEANING PLANT B
SUMPS, LIFT STATIONS, #1 EDC
LIQ PH RX TO P.RICAN TK.
TCE
841012
VATKOP
84-539-410
SCOTTY'S VAC CLEANING PLANT B
SUMPS LIFT STATIONS #1 EDC LIQ
PHASE RX TO P. RICAN TK.
CONT
TCE
841016
CONLAB
84-550-421
MCCLELLAND ENG. HELPING NEAR
WELL POINTS 19/22 S-40 EXTRAC
WELL SYSTEM. WIND S-17.
CONT
TCE
841024
CONLAB
84-561-428
DANIEL CONST. S TERMINAL EXTRA
CTION WELL POINT 34 SHOVELING
MUD. WIND E-9.
CONT
TCE
841024
CONLAB
84-562-429
MCCLELLAND ENG. S TERMINAL EX
TRAC WELL POINT 35 SHOVELING
SAND INTO WELL CASING WIND E-9
CONT
TCE
841024
CONLAB
84-563-430
DANIEL CONST. S TERMINAL EX
TRAC WELL POINTS 34-38 SHOVEL.
MUD. WIND E-9.
CONT
TCE
841024
CONLAB
84-564-431
DANIEL CONST. S TERMINAL EX
TRAC WELL POINTS 34-38 SHOVEL.
MUD. WIND E-9.
CONT
TCE
841115
CONLAB
84-607-468
SIMPSON VAC CLEANING S. CLAS
SIFIER. WIND S-13 RH 67.
RESULT 1.120
UNIT PPM
DURATION 110
3.750
PPM
108
.230
PPM
384
.300
PPM
379
.100
PPM
540
1.220
PPM
18
.100
PPM
17
.310
PPM
255
.120
PPM
252
9.320
PPM
425
CONT
TCE
841115
CONLAB
SIMPSON VAC CLEANING SOUTH
CLASSIFIER. WIND S-13 RH 67.
84-608-469
6.330
PPM
425
SL 016597
1/19/93
LAK^BhARLES (254) PLANT B SAMPONG RESULTS THRU 1984
DEPT CONT
COMPOUND
DATE
JOB TITLE
TCE
841127
CONLAB
SIMPSON VAC SERVICE CLEANING
API SEPARATOR. WIND NW-14.
SAMPLE# 84-609-470
RESULT 1.440
UNIT DURATION
PPM
307
CONT
TCE
841127
CONLAB
84-610-471
SIMPSON VAC SERVICE CLEANING
API SEPARATOR. WIND NW-14.
1.730
PPM
303
CONT
t
CONT
TRANS
771214
HYDRO
77-276-200
HYDROTECH LEADMAN COLLECTING
AND TRANSFERING WASTEWATER-B
TRANS
771214
HYDRO
77-277-201
HYDROTECH HELPER COLLECTING
AND TRANSFERING WASTEWATER-B
.000
PPM
425
.000
PPM
425
CONT CONT CONT CONT CONT CONT CONT
TRANS
811102
HEQOPR
81-561-310
R.E. HEIDT BULLDOZER OPERATOR
WORKING IN OLD ORGANIC POND;
SCRAPING AND LOADING.
TRANS
811210
VATKOP
81-641-380
VACUUMED OUT API SEPARATOR AND1
CLASSIFIER THEN HAULED TO THE
PLANT WASTE STORAGE TANK.
TRANS
820519
VATKOP
82-176-087
HAUL PNG, LOADING, 8 UNLOADING
LIQUID ORGANIC WASTE IN VACUUM1
TRUCK TO API SEPARATOR. MONTG.
TRANS
820519
VATKOP
82-177-088
HAULING LIQUID ORGANIC WASTE
CLASSIFIER TO PUERTO RICAN TK.
WORKS FOR SIMPSON VAC.
TRANS
820714
VATKOP
82-275-157
MONTGOMERY VACUUM TRUCK LOAD
ING 8 UNLOADING ORGANIC-WATER
TO CLASSIFIER. CLEANED P/T PIT
TRANS
820714
VATKOP
82-276-158
MONTGOMERY VAC. TRUCK LOADING/
UNLOADING ORGANIC-WATER TO
CLASSIFIER. CLEANED P/T PIT.
TRANS
820810
VATKOP
82-318-193
MONTGOMERY VACUUM TRUCK LOAD
ING AND UNLOADING ORGANIC
WATER TO CLASSIFIER
.160
PPM
275
.100
PPM
453
.990
PPM
450
3.660
PPM
452
2.210
PPM
443
1.380
PPM
440
.970
PPM
455
SL 01659qbq
PAGE
1/19/93
LA K^PiARLES (254) PLANT B SAMhMi wHG RESULTS THRU 1984
PAGE
DEPT CONT
COMPOUND
DATE
JOB TITLE SAMPLE#
TRANS
830505
VATKOP
83-221-156
SCOTTY'S VAC HAULED PROCESS
SEWER WATER IN PLANT B CLEANED
RESULT 1.090
UNIT DURATION
PPM
447
CONT CONT CONT CONT CONT
TRANS
830505
VATKOP
83-222-157
SCOTTY'S VAC HAULED PROCESS
SEWER WATER IN PLANT B CLEANED
ORG BOX VCI, COOL T. SCEEN P/T
TRANS
830712
VATKOP
B3-318-226
SCOTTY'S VAC CLEANED OUT 6 PLT
B SUMPS DUMPED IN N CLASSIFIER
HAULED CATALYST FROM TE2
TRANS
830915
VATKOP 63-425-300
SIMPSON DRY-VAC LOADING ORG.
SLUDGE FROM PUERTO RICAN TANK
TO CWM VAC TRUCK. WINDS E-7
TRANS
830915
VATKOP 83-426-301
SIMPSON DRY-VAC LOADING ORG.
SLUDGE FROM PUERTO RICAN TANK
TO CWM VAC TRUCK. WINDS E-7
TRANS
840403
VATKOP 84-179-117
SCOTTY'S VAC CLEANING PLANT B
SUMPS/LIFT STATIONS.
1.610
PPM
447
.270
PPM
379
1.100
PPM
421
1.400
PPM
405
.490
PPM
401
CONT
TRANS
840403
VATKOP
84-180-118
SCOTTY'S VAC CLEANING PLANT B
SUMPS/LIFT STATIONS.
460 PPM
401
CONT CONT CONT CONT
TRANS
840518
VATKOP
84-284-208
SCOTTY'S VACUUM TRUCK SERVICE.
CLEANING ORGANICS FROM CLASSI
FIER. NORMAL OPERATIONS.
TRANS
840605
VATKOP
84-306-223
SCOTTY'S VAC CLEANING PLANT B
SUMPS, LIFT STATIONS, N.CLASS.
TO P.RICAN TK.
TRANS
840605
VATKOP
84-307-224
SCOTTY'S VAC CLEANING PLANT B
SUMPS, LIFT STATIONS, H.CLASS.
TO P.RICAN TK.
TRANS
840724
VATKOP
84-396-303
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
1.000
PPM
451
.270
PPM
405
.350
PPM
405
,710
PPM
77 SL 016599
1/19/93
LA HARLES (254) PLANT B SAM^NG RESULTS THRU 1984
DEPT CONT corn CONT CONT CONT CONT CONT CONT CONT CONT CONT
COMPOUND
DATE
JOB TITLE SAMPLE#
TRANS
840724
VATKOP
84-398-305
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
TRANS
840724
VATKOP
84-399-306
OSHA INSPECTION. SIMPSON VAC.
TRUCK. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
TRANS
840724
VATKOP
84-400-307
OSHA INSPECTION. SIMPSON VAC.
TRUCK. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
TRANS
840724
VATKOP
84-401-308
OSHA INSPECT. SIMPSON VAC. CO.
PREPARING TO CLEAN OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
TRANS
840724
VATKOP
84-402-309
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
TRANS
840724
VATKOP
84-403-310
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
TRANS
840724
VATKOP
84-404-311
OSHA *! NSPECTION . SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
TRANS
840724
VATKOP
84-406-313
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
TRANS
840724
VATKOP
84-407-314
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
TRANS
841012
VATKOP
84-538-409
SCOTTY'S VAC CLEANING PLANT B
SUMPS, LIFT STATIONS, #1 EDC
LIQ PH RX TO P.RICAN TK.
TRANS
841012
VATKOP
84-539-410
SCOTTY'S VAC CLEANING PLANT B
SUMPS LIFT STATIONS #1 EDC LIQ
PHASE RX TO P. RICAN TK.
RESULT .830
UNIT PPM
DURATION 93
.990
PPM
128
1.020
PPM
100
1.540
PPM
97
2.010
PPM
69
1.800
PPM
89
1.520
PPM
91
1.070
PPM
110
2.180
PPM
108
.770
PPM
384
.600
PPM
379
SL 016600
PAGE
1/19/93
LAK^BhARLES (254) PLANT B SAMWNG RESULTS THRU 1984
PAGE
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
TRANS
841115
CONLAB
84-607-468
SIMPSON VAC CLEANING S. CLAS
SIFIER. WIND S-13 RH 67.
RESULT 1.150
UNIT DURATION
PPM
425
CO NT
TRANS
841127
CONLAB
84-609-470
SIMPSON VAC SERVICE CLEANING
API SEPARATOR. WIND HW-14.
1.040
PPM
307
CONT
* CONT
TRI
771214
HYDRO
HYDROTECH LEADMAN COLLECTING
AND TRAHSFERING WASTEWATER-B
77-276-200
TRI
771214
HYDRO
HYDROTECH HELPER COLLECTING
AND TRANSFERING WASTEWATER-B
77-277-201
2.100
PPM
425
.900
PPM
425
CONT
TRI
801010
80-521-256
DOWNWIND OF CRANE OPERATION -
EAST SIDE,MIXING KILN DUST
13.500
PPM
30
CONT
TRI
801010
HEQOPR
80-518-253
CRANE OPERATOR MOVING ORGANIC
SLUDGE FROM PIT TO TRUCK
4.100
PPM
33
CONT
TRI
801010
TRDRIV
80-519-254
STANDING BY TRUCK WHILE BEING
LOADED WITH ORGANIC SLUDGE
4.500
PPM
25
CONT
TRI
801010
TRDRIV
STANDING BY WHILE TRUCK IS
LOADED AND ADJUSTING TARP
80-520-255
3.100
PPM
61
CONT
TRI
801015
VATKOP
WEST MONTGOMERY VACUUM TRUCK
OPERATOR HAULING ORGANICS
80-526-261
5.400
PPM
396
CONT
TRI
801015
VATKOP
WEST MONTGOMERY VACUUM TRUCK
OPERATOR HAULING ORGANICS
80-527-262
6.800
PPM
396
CONT
TRI
801020
DOWNWIND,SOUTHWEST CORNER OF
ORGANIC PITS
80-533-264
1.000
PPM
333
SL 016601
1/19/93
LA MHARLES (259)
PLAMT B SAM(WllNG RESULTS THRU 1989
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
TRI
801023
CONSTRUCTION SITE,WIND NEB,
REFRIGERATION UNIT,NW CORNER
80-551-279
RESULT .100
UNIT DURATION
PPM
350
CONT
TRI
801023
HEQOPR
80-590-271
CRANE OPER. MIXING KILN DUST
WITH ORG. BOTTOMS WIND NEB
2.970
PPM
365
CONT
TRI
801023
VATKQP
80-591-272
B.F.l. VACUUM TRUCK OPERATOR
PUMPING ORGANICS INTO TRUCK
2.500
PPM
15
CONT
TRI
801023
VATKOP
BFI VACUUM TRUCK OPERATOR
PUMPING ORGANICS INTO TRUCK
80-592-273
1.700
PPM
15
CONT
TRI
801027 HEQOPR
80-556-279
OPERATING BULLDOZER IN ORGANIC
PIT,MIXING IN KILN DUST
68.900
PPM
15
CONT CONT CONT
TRI
810309 VATKOP
81-084-092
PUMPING WATER AND ORGANICS
FROM VACUUM TRUCK INTO CLASSI
FIER AND API
TRI
810309 VATKOP
81-085-043
PUMPiHG WATER AND ORGANICS
FROM VACUUM TRUCK INTO CLASSI
FIER AND API
TRI 810608 BFI WORKING IN INCINERATOR AREA AT WASTE TREATMENT.
81-230-118
2.300 PPM
373
2.800 PPM
440
.180 PPM
438
CONT
TRI
810608
BFI
WORKING IN INCINERATOR AREA
AT WASTE TREATMENT.
81-231-119
.220
PPM
437
CONT CONT
TRI
811102
HEQOPR
81-561-310
R.E. HEIDT BULLDOZER OPERATOR
WORKING IN OLD ORGANIC POND;
SCRAPING AND LOADING.
TRI
811103
HEQOPR
81-563-312
R.E. HEIDT BULLDOZER OPERATOR
WORKING IN OLD ORGANIC POND;
,
SCRAPING AND LOADING.
1.430
PPM
275
2.550
PPM
410 SL 016602
PAGE
1/19/93
LA ARLES C259) PLANT B SAMiffitiHiG RESULTS THRU 1989
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
TRI
811103
HEQOPR
81-569-313
R.E. HEIDT BULLDOZER OPERATOR
WORKING IN OLD ORGANIC POND;
SCRAPING AND LOADING.
CONT
TRI
811210
BFI
81-690-379
VACUUMED OUT API SEPARATOR AND
CLASSIFIER THEN HAULED TO THE
PLANT WASTE STORAGE TANK
CONT
t CONT
TRI
811210
VATKOP
81-691-380
VACUUMED OUT API SEPARATOR AND
CLASSIFIER THEN HAULED TO THE
PLANT WASTE STORAGE TANK.
TRI
820519
VATKOP
82-176-087
HAULING, LOADING, 8 UNLOADING
LIQUID ORGANIC WASTE IN VACUUM
TRUCK TO API SEPARATOR. MONTG.
CONT
TRI
820719
VATKOP
82-275-157
MONTGOMERY VACUUM TRUCK LOAD
ING 8 UNLOADING ORGANIC-WATER
TO CLASSIFIER. CLEANED P/T PIT
CONT
TRI
820719
VATKOP
82-276-158
MONTGOMERY VAC. TRUCK LOADING/
UNLOADING ORGANIC-WATER TO
CLASSIFIER. CLEANED P/T PIT.
CONT
TRI
820805
VATKOP
82-309-187
TRASGERING ORGANICS FROM API,
N. CLASSIFIER, PUERTO RICAN TK
89 F, SE-5 MPH WINDS.(SIMPSON)
CONT
TRI
820805
VATKOP
SIMPSON VAC. SERVICE HAULING
ORGANICS FROM API, CLASS., P.
RICAN TK. 89 F WINDS SE-5.
82-310-188
CONT
TRI
820810
VATKOP
82-319-199
MONTGOMERY VACUUM TRUCK LOAD
ING AND UNLOADING ORGANIC
WATER TO CLASSIFIER
CONT
TRI
820816
VATKOP
MONTGOMERY VAC. TRANSFERING
CLASSIFIER MATERIAL FROM OLD
DRUMS TO HEW DRUMS
82-393-209
CONT
TRI
820903
VATKOP
82-372-230
SIMPSON VAC. TRANSFERRING ORG.
API, N.CLASSIFIER, PUERTO RIC.
TK.
RESULT .230
UNIT PPM
DURATION 908
.570
PPM
953
.520
PPM
953
1.200
PPM
950
23.900
PPM
993
20.600
PPM
990
3.370
PPM
283
1.700
PPM
283
9.060
PPM
953
.300
PPM
322
16.700
PPM
336 SL 016603
PAGE
1/19/93
LA ARLES (254) PLANT B SAMMI PflNNG RESULTS THRU 1984
DEPT CO NT
COMPOUND
DATE
JOB TITLE SAMPLE#
TRI
820903
VATKOP
82-373-231
SIMPSON VAC. TRANSFERING ORG.
WASTE FROM API, CLASSIFIER,
PUERTO RICAN TK.
CONT
TRI
821102
VATKOP
82-473-314
MONTGOMERY VAC SERVICE HAULING
ORG/WATER TO API SEPARATOR
RESULT .270
UNIT PPM
DURATION 335
2.670
PPM
440
CONT
TRI
821102
VATKOP
82-474-315
MONTGOMERY VAC SERVICE HAULING
ORG/WATER TO API SEPARATOR
2.530
PPM
439
CONT
TRI
821103
VATKOP
MONTGOMERY DRY VAC CLEANING
#1 INCINERATOR FEED TANK.
82-477-318
.250
PPM
374
CONT
TRI
821103
VATKOP
MONTGOMERY DRY VAC CLEANING
#1 INCINERATOR FEED TANK.
82-478-319
.200
PPM
374
CONT
TRI
821122
VATKOP
82-528-349
MONTGOMERY VAC ROUTINE CONTRAC
WORK.
.810
PPM
385
CONT
TRI
821122
VATKOP
82-529-350
MONTGOMERY VAC ROUTINE CONTRAC
WORK
1.470
PPM
385
CONT CONT CONT
TRI
830118
VATKOP
83-041-029
MONTGOMERY VAC SERVICE CLEAN
ING S. CLASSIFIER WITH VACTOR.
TEMP 48, WINDS NE-18, RH 62.
TRI
830118
VATKOP
MONTGOMERY VAC SERVICE CLEAN
ING S-CLASSIFIER WITH VACTOR.
TEMP 48, WINDS NE-18, RH 62.
83-042-030
TRI
830317
VATKOP
MONTGOMERY VAC ROUTINE CONT.
WORK.
83-160-108
.250
PPM
389
.090
PPM
389
.110
PPM
442
CONT
TRI
830317
VATKOP
MONTGOMERY VAC ROUTINE CONT.
WORK.
83-161-109
.140
PPM
443 SL 016604
PAGE
1/19/93
LAk^MIARLES (259) PLANT B SAILING RESULTS THRU 1984
<
DEPT CONT
COMPOUND
DATE
JOB TITLE SAMPLE#
TRI
830505
VATKOP
83-221-156
SCOTTY'S VAC HAULED PROCESS
SEWER WATER IN PLANT B CLEANED
RESULT 9.610
UNIT DURATION
PPM
447
CONT CONT
+
CONT CONT CONT CONT CONT CONT
TRI
830505 VATKOP
83-222-157
SCOTTY'S VAC HAULED PROCESS
SEWER WATER IN PLANT B CLEANED
ORG BOX VCI, COOL T. SCEEN P/T
TRI
830712 VATKOP
83-317-225
SCOTTY'S VAC CLEANED OUT 6 PLT
B SUMPS DUMPED IN N CLASSIFIER
HAULED CATALYST FROM TE2
TRI
830712 VATKOP
83-318-226
SCOTTY'S VAC CLEANED OUT 6 PLT
B SUMPS DUMPED IN N CLASSIFIER
HAULED CATALYST FROM TE2
TRI
830915
VATKOP
83-425-300
SIMPSON DRY-VAC LOADING ORG.
SLUDGE FROM PUERTO RICAN TANK
TO CWM VAC TRUCK. WINDS E-7
TRI
830915
VATKOP
83-426-301
SIMPSON DRY-VAC LOADING ORG.
SLUDGE FROM PUERTO RICAN TANK
TO CWM VAC TRUCK. WINDS E-7
TRI
831101
VATKOP
83-511-359
NORMAL OPERATIONS, HAULED ORG
ANIC WASTE WATER FROM SUMPS,
CLASSIFIER, PUERTO RICAN DOCK.
TRI
840103
VATKOP
ROUTINE PLANT B CONTRACT VAC
(SCOTTY'S VAC) WORK CLEANING
SUMPS.
84-001-001
TRI
840403
VATKOP
84-179-117
SCOTTY'S VAC CLEANING PLANT B
SUMPS/LIFT STATIONS.
29.300
PPM
447
4.130
PPM
380
13.000
PPM
379
.910
PPM
421
1.770
PPM
405
.400
PPM
421
.530
PPM
410
.610
PPM
401
CONT
TRI
840403
VATKOP
84-180-118
SCOTTY'S VAC CLEANING PLANT B
SUMPS/LIFT STATIONS.
.470
PPM
401
CONT
TRI
840518
VATKOP
84-284-208
SCOTTY'S VACUUM TRUCK SERVICE.
CLEANING ORGANICS FROM CLASSI
FIER. NORMAL OPERATIONS.
.370
PPM
451
SL 016605
PAGE
1/19/93
LAM^HARLES (254) PLANT B SAMflFlNG RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
TRI
840605
VATKOP
84-306-223
SCOTTY'S VAC CLEANING PLANT B
SUMPS, LIFT STATIONS, N.CLASS.
TO P.RICAN TK.
CONT
TRI
840605
VATKOP
84-307-224
SCOTTY'S VAC CLEANING PLANT B
SUMPS, LIFT STATIONS, N.CLASS.
TO P.RICAN TK.
CONT
TRI
840724
VATKOP
84-394-301
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
TRI
840724
VATKOP
84-396-303
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
TRI
840724
VATKOP
84-397-304
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
TRI
840724
VATKOP
84-398-305
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
TRI
840724
VATKOP
84-399-306
OSHA ^INSPECTION. SIMPSON VAC.
TRUCK. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
TRI
840724
VATKOP
84-400-307
OSHA INSPECTION. SIMPSON VAC.
TRUCK. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
TRI
840724
VATKOP
84-401-308
OSHA INSPECT. SIMPSON VAC. CO.
PREPARING TO CLEAN OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
TRI
840724
VATKOP
84-402-309
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
TRI
840724
VATKOP
84-403-310
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
RESULT .420
UNIT PPM
DURATION 405
.400
PPM
405
.550 PPM
93
2.160
PPM
77
1.740
PPM
79
1.440
PPM
93
2.220
PPM
128
2.620
PPM
100
.510
PPM
97
1.310
PPM
69
1.660
PPM
89
SL 016606
PAGE
1/19/93
LAI ARLES (259) PLAMT B SAMHPuHMG RESULTS THRU 1989
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
TRI
890729
VATKOP
89-909-311
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-MTU UNIT. NORMAL OP
CONT
TRI
890729
VATKOP
89-905-312
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
*
CONT
TRI
890729
VATKOP
89-906-313
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
TRI
890729
VATKOP
89-907-319
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
TRI
891012
VATKOP
89-538-909
SCOTTY'S VAC CLEANING PLANT B
SUMPS, LIFT STATIONS, #1 EDC
LIQ PH RX TO P.RICAN TK.
CONT
TRI
891012
VATKOP
89-539-910
SCOTTY'S VAC CLEANING PLANT B
SUMPS LIFT STATIONS #1 EDC LIQ
PHASE RX TO P. RICAN TK.
CONT
TRI
891015
CONLAB
89-596-917
MCCLELLAND ENGINEERS DRILLING
MONITORING WELL IN S-90.
WIND SW-12/15
CONT
TRI
891016
CONLAB
89-550-921
MCCLELLAND ENG. HELPING NEAR
WELL POINTS 19/22 S-90 EXTRAC
WELL SYSTEM. WIND S-17.
CONT
TRI
891029
CONLAB
89-561-928
DANIEL CONST. S TERMINAL EXTRA
CTION WELL POINT 39 SHOVELING
MUD. WIND E-9.
CONT
TRI
891029
CONLAB
89-562-929
MCCLELLAND ENG. S TERMINAL EX
TRAC WELL POINT 35 SHOVELING
SAND INTO WELL CASING WIND E-9
CONT
TRI
891029
CONLAB
89-563-930
DANIEL CONST. S TERMINAL EX
TRAC WELL POINTS 39-38 SHOVEL.
MUD. WIND E-9.
RESULT 1.670
UNIT DURATION
PPM
91
1.560
PPM
101
1.870
PPM
110
9.690
PPM
108
.530
PPM
389
.970
PPM
379
.730
PPM
399
.190
PPM
590
.580
PPM
18
.100
PPM
17
.200
PPM
255 SL 016607
PAGE
1/19/93
LAI<#HARLES (254) PLANT B SAMiIffNG RESULTS THRU 1984
i
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
TRI
841024
CONLAB
84-564-431
DANIEL CONST. S TERMINAL EX-
TRAC WELL POINTS 34-38 SHOVEL
MUD. WIND E-9.
CONT
TRI
841115
CONLAB
84-607-468
SIMPSON VAC CLEANING S. CLAS
SIFIER. WIND S-13 RH 67.
RESULT .100
UNIT DURATION
PPM
252
9.920
PPM
425
CONT
TRI
841115
CONLAB
SIMPSON VAC CLEANING SOUTH
CLASSIFIER. WIND S-13 RH 67.
84-608-469
6.140
PPM
425
CONT
TRI
841127
CONLAB
SIMPSON VAC SERVICE CLEANING
API SEPARATOR. WIND NW-14.
84-609-470
9.760
PPM
307
CONT
TRI
841127
CONLAB
84-610-471
SIMPSON VAC SERVICE CLEANING
API SEPARATOR. WIND NW-14.
9.650
PPM
303
CONT
VCM
771214
HYDRO
HYDROTECH LEADMAN COLLECTING
AND TRANSFERING WASTEWATER-B
77-276-200
.000
PPM
425
CONT
VCM
771214
HYDRO
HYDRGTECH HELPER COLLECTING
AND TRANSFERING WASTEWATER-B
77-277-201
.000
PPM
425
CONT
VCM
801010
80-521-256
DOWNWIND OF CRANE OPERATION -
EAST SIDEjMIXING KILN DUST
.330
PPM
30
CONT
VCM
801010
HEQOPR
80-518-253
CRANE OPERATOR MOVING ORGANIC
SLUDGE FROM PIT TO TRUCK
.170
PPM
33
CONT
VCM
801010
TRDRIV
80-519-254
STANDING BY TRUCK WHILE BEING
LOADED WITH ORGANIC SLUDGE
.160
PPM
25
CONT
VCM
801010
TRDRIV
STANDING BY WHILE TRUCK IS
LOADED AND ADJUSTING TARP
80-520-255
.220
PPM
61 SL 016608
PAGE
1/19/93
LAK^WARLES (259) PLANT B SAMflHNG RESULTS THRU 1989
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
VCM
801020
CONSTRUCTION SITE,100 FEET
DOWNWIND OF ORGANIC PITS
80-532-263
RESULT .020
UNIT PPM
DURATION 336
CONT
VCM
801020
80-533-269
DOWNWIND,SOUTHWEST CORNER OF
ORGANIC PITS
.090
PPM
333
CONT
VCM
801023
HEQOPR
80-590-271
CRANE OPER. MIXING KILN DUST
WITH ORG. BOTTOMS WIND NE5
.150
PPM
365
CONT
VCM
801023
VATKOP
B.F.I. VACUUM TRUCK OPERATOR
PUMPING ORGANICS INTO TRUCK
80-541-272
.130
PPM
15
CONT
VCM
801023
VATKOP
BFI VACUUM TRUCK OPERATOR
PUMPING ORGANICS INTO TRUCK
80-542-273
.250
PPM
15
CONT
VCM
801027 HEQOPR
80-556-279
OPERATING BULLDOZER IN ORGANIC
PIT,MIXING IN KILN DUST
2.000
PPM
15
CONT CONT CONT
VCM
810309
VATKOP
81-084-042
PUMP5NG WATER AND ORGANICS
FROM VACUUM TRUCK INTO CLASSI
FIER AND API
VCM
810309
VATKOP
81-085-043
PUMPING WATER AND ORGANICS
FROM VACUUM TRUCK INTO CLASSI
FIER AND API
VCM
810608
BFI
WORKING IN INCINERATOR AREA
AT WASTE TREATMENT.
81-230-118
.170
PPM
373
.190
PPM
440
.120
PPM
438
CONT
VCM
810608
BFI
WORKING IN INCINERATOR AREA
AT WASTE TREATMENT.
81-231-119
.310
PPM
437
CONT
VCM
810929
BFI
VACUUMING WASTE FROM SODIUM
FORMATE UNIT
81-485-271
.050
PPM
427 SL 016609
PAGE
1/19/93
LA# NAPLES (254)
PLANT B SAMPn NG RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
VCM
810929
VATKOP
VACUUMING UP WASTE FROM API
SEPARATOR AND CLASSIFIER
81-484-270
RESULT .220
UNIT PPM
DURATION 380
CONT CONT
t
CONT CONT CONT CONT CONT CONT CONT CONT
VCM
811102
HEQOPR
R.E. HEIDT BULLDOZER OPERATOR
WORKING IN OLD ORGANIC POND;
SCRAPING AND LOADING.
81-561-310
VCM
811103
HEQOPR
R.E. HEIDT BULLDOZER OPERATOR
WORKING IN OLD ORGANIC POND;
SCRAPING AND LOADING.
81-563-312
VCM
811103
HEQOPR
R.E. HEIDT BULLDOZER OPERATOR
WORKING IN OLD ORGANIC POND;
SCRAPING AND LOADING.
81-564-313
VCM
811210
BFI
81-640-379
VACUUMED OUT API SEPARATOR AND
CLASSIFIER THEN HAULED TO THE
PLANT WASTE STORAGE TANK
VCM
811210
VATKOP
81-641-380
VACUUMED OUT API SEPARATOR AND
CLASSIFIER THEN HAULED TO THE
PLANT WASTE STORAGE TANK.
VCM
820519
VATKOP
82-176-087
HAULING, LOADING, 8 UNLOADING
LIQUID ORGANIC WASTE IN VACUUM
TRUCK TO API SEPARATOR. MONTG.
VCM
820519
VATKOP
82-177-088
HAULING LIQUID ORGANIC WASTE
CLASSIFIER TO PUERTO RICAN TK.
WORKS FOR SIMPSON VAC.
VCM
820805
VATKOP
82-309-187
TRASFERING ORGANICS FROM API,
N. CLASSIFIER, PUERTO RICAN TK
89 F, SE-5 MPH WINDS.(SIMPSON)
VCM
820903
VATKOP
82-372-230
SIMPSON VAC. TRANSFERRING ORG.
API, N.CLASSIFIER, PUERTO RIC.
TK.
VCM
820914
VATKOP
MONTGOMERY VAC CLEANING ORG.
SLUDGE FROM CLASSIFIER
82-390-247
.050 PPM
275
.070 PPM
410
.050 PPM
408
.080
PPM
453
.130
PPM
453
.050
PPM
450
1.180
PPM
452
.080
PPM
283
.480
PPM
336
.470
PPM
223
SL 016610
PAGE
1/19/93
LAt^HHARLES (254) PLANT B SAlWlNG RESULTS THRU 1984
DEPT CONT
COMPOUND
DATE
JOB TITLE
VCM
820914
VATKOP
MONTGOMERY VAC CLEANING ORG.
SLUDGE FROM CLASSIFIER
SAMPLE# 82-391-248
RESULT .100
UNIT PPM
DURATION 223
CONT
VCM
821103
VATKOP
MONTGOMERY DRY VAC CLEANING
#1 INCINERATOR FEED TANK.
82-477-318
070 PPM
374
CONT
VCM
821103
VATKOP
MONTGOMERY DRY VAC CLEANING
#1 INCINERATOR FEED TANK.
82-478-319
,050
PPM
374
CONT
VCM
821118
VATKOP
CLEANING S. CLASSIFIER WITH
VACTOR & VAC TRUCK.
82-519-344
,070
PPM
376
CONT
VCM
821118
VATKOP
CLEANING S. CLASSIFIER WITH
VACTOR 8 VAC TRUCK.
82-520-345
,050
PPM
374
CONT CONT CONT
VCM
830118
VATKOP
83-041-029
MONTGOMERY VAC SERVICE CLEAN
ING S. CLASSIFIER WITH VACTOR.
TEMP 48, WINDS NE-18, RH 62.
VCM
830118
VATKOP
MONTGOMERY VAC SERVICE CLEAN
ING S-CLASSIFIER WITH VACTOR.
TEMP 48, WINDS NE-18, RH 62.
83-042-030
VCM
830317
VATKOP
MONTGOMERY VAC ROUTINE CONT.
WORK.
83-160-108
,050
PPM
389
.050
PPM
389
.050
PPM
442
CONT
VCM
830317
VATKOP
MONTGOMERY VAC ROUTINE CONT.
WORK.
83-161-109
.050
PPM
443
CONT CONT
VCM
830505
VATKOP
83-222-157
SCOTTY'S VAC HAULED PROCESS
SEWER WATER IN PLANT B CLEANED
ORG BOX VCI, COOL T. SCEEN P/T
VCM
830712
VATKOP
83-317-225
SCOTTY'S VAC CLEANED OUT 6 PLT
B SUMPS DUMPED IN N CLASSIFIER
HAULED CATALYST FROM TE2
.260
PPM
447
.050
PPM
380
SL 016611
PAGE
1/19/93
LAF^mARLES (254) PLANT B SAhimNG RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
VCM
830712
VATKOP
83-318-226
SCOTTY'S VAC CLEANED OUT 6 PLT
B SUMPS DUMPED IN N CLASSIFIER
HAULED CATALYST FROM TE2
CONT
VCM
830915
VATKOP
83-425-300
SIMPSON DRY-VAC LOADING ORG.
SLUDGE FROM PUERTO RICAN TANK
TO CWM VAC TRUCK. WINDS E-7
CONT
* CONT
VCM
830915 VATKOP
SIMPSON DRY-VAC LOADING ORG.
SLUDGE FROM PUERTO RICAN TANK
TO CWM VAC TRUCK. WINDS E-7
83-426-301
VCM
831101 VATKOP
83-511-359
NORMAL OPERATIONS, HAULED ORG
ANIC WASTE WATER FROM SUMPS,
CLASSIFIER, PUERTO RICAN DOCK.
CONT
VCM
840103 VATKOP
ROUTINE PLANT B CONTRACT VAC
(SCOTTY'S VAC) WORK CLEANING
SUMPS.
84-001-001
CONT
VCM
840320
PAINT
84-160-104
SPRAY PAINTED LEGS OF VCM
SPHERE S-3. SLINE CO. EMPLOYEE
NORMAL OPERATIONS.
CONT
VCM
840320
PAINT
84-161-105
SPRAY PAINTED LEGS OF VCM
SPHERE S-3. SLINE CO.EMPLOYEE.
NORMAL OPERATIONS.
CONT
VCM
840320
PAINT
84-162-106
SPRAY PAINTED LEGS OF VCM
SPHERE S-3. SLINE CO.EMPLOYEE.
NORMAL OPERATIONS.
CONT
VCM
840320
PAINT
84-163-107
SPRAY PAINTED LEGS OF VCM
SPHERE S-3. SLINE CO.EMPLOYEE.
NORMAL OPERATIONS.
CONT
VCM
840321
PAINT
84-165-108
SPRAY PAINTED LEGS OF VCM
SPHERE S-3. SLINE CO.EMPLOYEE.
NORMAL OPERATIONS.
CONT
VCM
840321
PAINT
84-166-109
SPRAY PAINTED LEGS OF VCM
SPHERE S-3. SLINE CO.EMPLOYEE.
NORMAL OPERATIONS.
RESULT .050
UNIT PPM
DURATION 379
.140
PPM
421
.420
PPM
405
.050
PPM
421
.090
PPM
410
.050
PPM
440
.080
PPM
443
.070
PPM
440
.800
PPM
436
.050
PPM
440
.070
PPM
435
SL 016612
PAGE
1/19/93
LAI^BhARLES (259) PLANT B SflHfflNG RESULTS THRU 1989
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
VCM
890321
PAINT
89-167-110
SPRAY PAINTED LEGS OF VCM
SPHERE S-3. SLINE CO.EMPLOYEE.
NORMAL OPERATIONS.
CONT
VCM
890321
PAINT
89-168-111
SPRAY PAINTED LEGS OF VCM
SPHERE S-3. SLINE CO.EMPLOYEE.
NORMAL OPERATIONS.
CONT
VCM
890903
VATKOP
89-179-117
SCOTTY'S VAC CLEANING PLANT B
SUMPS/LIFT STATIONS.
RESULT .050
UNIT DURATION PPM 939
.120
PPM
936
.050
PPM
901
CONT
VCM
890903
VATKOP
89-180-118
SCOTTY'S VAC CLEANING PLANT B
SUMPS/LIFT STATIONS.
.050
PPM
901
CONT CONT CONT CONT CONT CONT CONT
VCM
890518
VATKOP
89-289-208
SCOTTY'S VACUUM TRUCK SERVICE.
CLEANING ORGANICS FROM CLASSI
FIER. NORMAL OPERATIONS.
VCM
890605
VATKOP
89-306-223
SCOTTY'S VAC CLEANING PLANT B
SUMPS, LIFT STATIONS, N.CLASS.
TO P.RICAN TK.
VCM
890605
VATKOP
89-307-229
SCOTTY'S VAC CLEANING PLANT B
SUMPS, LIFT STATIONS, N.CLASS.
TO P.RICAN TK.
VCM
890729
VATKOP
89-399-301
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
VCM
890729
VATKOP
89-396-303
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
VCM
890729
VATKOP
89-397-309
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
VCM
890729
VATKOP
89-398-305
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
.210
PPM
951
.250
PPM
905
.220
PPM
905
.060
PPM
93
.060
PPM
77
.060
PPM
79
.060
PPM
93
SL 016613
PAGE
1/19/93
LAF^^HARLES (254) PLANT B SAHWInG RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
VCM
840724
VATKOP
84-399-306
OSHA INSPECTION. SIMPSON VAC.
TRUCK. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
VCM
840724
VATKOP
84-400-307
OSHA INSPECTION. SIMPSON VAC.
TRUCK. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
CONT
VCM
840724 VATKOP
84-402-309
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
VCM
840724 VATKOP
84-403-310
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
VCM
840724 VATKOP
84-404-311
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
VCM
840724
VATKOP
84-407-314
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
VCM
840913
S. FENCE 6FT HI. WIND NW-7/
CALM
84-483-375
RESULT .090
UNIT PPM
DURATION 128
.120
PPM
100
.250 PPM
69
.110 PPM
89
.080 PPM
91
.850
PPM
108
.050
PPM
259
CONT CONT CONT CONT
VCM
841012
VATKOP
84-538-409
SCOTTY'S VAC CLEANING PLANT B
SUMPS, LIFT STATIONS, #1 EDC
LIQ PH RX TO P.RICAN TK.
VCM
841012
VATKOP
84-539-410
SCOTTY'S VAC CLEANING PLANT B
SUMPS LIFT STATIONS #1 EDC LIQ
PHASE RX TO P. RICAN TK.
VCM
841015
CONLAB
84-546-417
MCCLELLAND ENGINEERS DRILLING
MONITORING WELL IN S-40.
WIND SW-12/15
VCM
841016
OPERAT
84-549-420
MCCLELLAND ENG. OPERATING DRIL
LING EQUIP. S-40 EXTRAC WELL
POINTS 19/22. WIND S-17.
.050 PPM
384
.050 PPM
379
.050 PPM
349
.050 PPM
540
SL 016614
PAGE
1/19/93
LAlJ^PHARLES (254) PLANT B SAMmNG RESULTS THRU 1984
I PAGE
DEPT CONT
CONT
COMPOUND
DATE
JOB TITLE SAMPLE#
VCM
841024
CONLAB
84-563-430
DANIEL CONST. S TERMINAL EX-
TRAC WELL POINTS 34-38 SHOVEL
MUD. WIND E-9.
VCM
841127
CONLAB
84-609-470
SIMPSON VAC SERVICE CLEANING
API SEPARATOR. WIND HW-14.
RESULT .050
UNIT DURATION PPM 255
.550
PPM
307
CONT
VCM
841127
CONLAB
84-610-471
SIMPSON VAC SERVICE CLEANING
API SEPARATOR. WIND NW-14.
.520
PPM
303
CONT
VDC
771214
HYDRO
77-276-200
HYDROTECH LEADMAN COLLECTING
AND TRANSFERING WASTEWATER-B
.620
PPM
425
CONT
VDC
771214
HYDRO
HYDROTECH HELPER COLLECTING
AND TRANSFERING WASTEWATER-B
77-277-201
.490
PPM
425
CONT
VDC 801010
80-521-256
DOWNWIND OF CRANE OPERATION -
EAST SIDE,MIXING KILN DUST
4.900
PPM
30
CONT
VDC
801010
HEQOPR
80-518-253
CRANB OPERATOR MOVING ORGANIC
SLUDGE FROM PIT TO TRUCK
12.200
PPM
33
CONT
VDC
801010
TRDRIV
80-519-254
STANDING BY TRUCK WHILE BEING
LOADED WITH ORGANIC SLUDGE
3.000
PPM
25
CONT
VDC
801010
TRDRIV
STANDING BY WHILE TRUCK IS
LOADED AND ADJUSTING TARP
80-520-255
3.200
PPM
61
CONT
VDC
801015
VATKOP
80-526-261
WEST MONTGOMERY VACUUM TRUCK
OPERATOR HAULING ORGANICS
.580
PPM
396
CONT
VDC
801015
VATKOP
80-527-262
WEST MONTGOMERY VACUUM TRUCK
OPERATOR HAULING ORGANICS
.360
PPM
396 ,,,, ,,
SL 016615
1/19/93
LAK^HARLES (254) PLANT B SAMWffNG RESULTS THRU 1984
DEPT COMPOUND DATE
JOB TITLE
CQMT VDC
801020
CONSTRUCTION SITE,100 FEET
DOWNWIND OF ORGANIC PITS
SAMPLE# 80-532-263
RESULT .240
UNIT DURATION PPM 336
CONT
VDC 801020
80-533-264
DOWNWIND,SOUTHWEST CORNER OF
ORGANIC PITS
.540
PPM
333
CONT
VDC 801023
80-551-274
CONSTRUCTION SITE,WIND NEB,
REFRIGERATION UNIT,NW CORNER
.520
PPM
350
CONT
VDC
801023
HEQOPR
80-540-271
CRANE OPER. MIXING KILN DUST
WITH ORG. BOTTOMS WIND NEB
1.220
PPM
365
CONT
VDC
801023
VATKOP
80-541-272
B.F.I. VACUUM TRUCK OPERATOR
PUMPING ORGANICS INTO TRUCK
8.900
PPM
15
CONT
VDC
801023
VATKOP
BFI VACUUM TRUCK OPERATOR
PUMPING ORGANICS INTO TRUCK
80-542-273
6.300
PPM
15
CONT
VDC
801027
HEQOPR
80-556-279
OPERATING BULLDOZER IN ORGANIC
PIT,MIXING IN KILN DUST
23.700
PPM
15
CONT CONT CONT
VDC
810309
VATKOP
81-084-042
PUMPING WATER AND ORGANICS
FROM VACUUM TRUCK INTO CLASSI
FIER AND API
VDC
810309
VATKOP
81-085-043
PUMPING WATER AND ORGANICS
FROM VACUUM TRUCK INTO CLASSI
FIER AND API
VDC
810608
BFI
WORKING IN INCINERATOR AREA
AT WASTE TREATMENT.
81-230-118
.360
PPM
373
.470
PPM
440
.120
PPM
438
CONT
VDC
810608
BFI
WORKING IN INCINERATOR AREA
AT WASTE TREATMENT.
81-231-119
.300
PPM
437
SL 016616
PAGE
1/19/93
LA mm ARLES (254) PLANT B SAMMPP'LTNNG RESULTS THRU 1984
DEPT CONT
COMPOUND
DATE
JOB TITLE
VDC
810929
BFI
VACUUMING WASTE FROM SODIUM
FORMATE UNIT
SAMPLE# 81-485-271
RESULT .100
UNIT DURATION PPM 427
CO NT
VDC
810929
VATKOP
VACUUMING UP WASTE FROM API
SEPARATOR AND CLASSIFIER
81-484-270
2.930
PPM
380
CONT *
CONT CONT CONT CONT CONT CONT CONT CONT
VDC
811102
HEQOPR
R.E. HEIDT BULLDOZER OPERATOR
WORKING IN OLD ORGANIC POND;
SCRAPING AND LOADING.
81-561-310
VDC
811103
HEQOPR
R.E. HEIDT BULLDOZER OPERATOR
WORKING IN OLD ORGANIC POND;
SCRAPING AND LOADING.
81-563-312
VDC
811210
BFI
81-640-379
VACUUMED OUT API SEPARATOR AND
CLASSIFIER THEN HAULED TO THE
PLANT WASTE STORAGE TANK
VDC
811210
VATKOP
81-641-380
VACUUMED OUT API SEPARATOR AND
CLASSIFIER THEN HAULED TO THE
PLANT WASTE STORAGE TANK.
VDC
820519
VATKOP
82-176-087
HAULING, LOADING, & UNLOADING
LIQUID ORGANIC WASTE IN VACUUM
TRUCK TO API SEPARATOR. MONTG.
VDC
820519
VATKOP
82-177-088
HAULING LIQUID ORGANIC WASTE
CLASSIFIER TO PUERTO RICAN TK.
WORKS FOR SIMPSON VAC.
VDC
820714
VATKOP
82-275-157
MONTGOMERY VACUUM TRUCK LOAD
ING 8 UNLOADING ORGANIC-WATER
TO CLASSIFIER. CLEANED P/T PIT
VDC
820714
VATKOP
82-276-158
MONTGOMERY VAC. TRUCK LOADING/
UNLOADING ORGANIC-WATER TO
CLASSIFIER. CLEANED P/T PIT.
VDC
820805
VATKOP
82-309-187
TRASFERING ORGANICS FROM API,
N. CLASSIFIER, PUERTO RICAN TK
89 F, SE-5 MPH WINDS.CSIMPSON)
.290
PPM
275
1.020
PPM
410
.370
PPM
453
.350
PPM
453
.240
PPM
450
1.890
PPM
452
.430
PPM
443
.430
PPM
440
.170
PPM
283
SL 016617
PAGE
1/19/93
LAIK^WARLES (254) PLANT B SAMmIWTNNGi RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
VDC
820810
VATK0P
82-318-193
MONTGOMERY VACUUM TRUCK LOAD
ING AND UNLOADING ORGANIC
WATER TO CLASSIFIER
CONT
VDC
820810
VATKOP
82-319-194
MONTGOMERY VACUUM TRUCK LOAD
ING AND UNLOADING ORGANIC
WATER TO CLASSIFIER
CONT
*
CONT
VDC
820903
VATKOP
82-372-230
SIMPSON VAC. TRANSFERRING ORG.
API, H.CLASSIFIER, PUERTO RIC.
TK.
VDC
820903
VATKOP
82-373-231
SIMPSON VAC. TRANSFERING ORG.
WASTE FROM API, CLASSIFIER,
PUERTO RICAN TK.
CONT
VDC
821118
VATKOP
CLEANING S. CLASSIFIER WITH
VACTOR 8 VAC TRUCK.
82-519-344
RESULT .300
UNIT DURATION PPM 455
.240
PPM
453
4.470
PPM
336
.150 PPM 335
1.560
PPM
376
CONT
VDC
821118
VATKOP
CLEANING S. CLASSIFIER WITH
VACTOR 8 VAC TRUCK.
82-520-345
1.060
PPM
374
CONT
VDC
821122
VATKOP
82-529-350
MONTGOMERY VAC ROUTINE CONTRAC
WORK
.180
PPM
385
CONT CONT CONT
VDC
830118
VATKOP
83-041-029
MONTGOMERY VAC SERVICE CLEAN
ING S. CLASSIFIER WITH VACTOR.
TEMP 48, WINDS NE-18, RH 62.
VDC
830118
VATKOP
MONTGOMERY VAC SERVICE CLEAN
ING S-CLASSIFIER WITH VACTOR.
TEMP 48, WINDS NE-18, RH 62.
83-042-030
VDC
830317
VATKOP
MONTGOMERY VAC ROUTINE CONT.
WORK.
83-160-108
.340 PPM
389
.360 PPM
389
.050 PPM
442
CONT
VDC
830317
VATKOP
MONTGOMERY VAC ROUTINE CONT.
WORK .
83-161-109
.050
PPM
443
SL 016618
PAGE
1/19/93 l
LAK^MARLES (259) PLANT B SAMTOHG RESULTS THRU 1989
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
VDC
830505
VATKOP
83-222-157
SCOTTY'S VAC HAULED PROCESS
SEWER WATER IN PLANT B CLEANED
ORG BOX VCI, COOL T. SCEEN P/T
CONT
VDC
830712
VATKOP
83-317-225
SCOTTY'S VAC CLEANED OUT 6 PLT
B SUMPS DUMPED IN N CLASSIFIER
HAULED CATALYST FROM TE2
CDNT
i CONT
VDC
830712
VATKOP
83-318-226
SCOTTY'S VAC CLEANED OUT 6 PLT
B SUMPS DUMPED IN N CLASSIFIER
HAULED CATALYST FROM TE2
VDC
830915
VATKOP
83-925-300
SIMPSON DRY-VAC LOADING ORG.
SLUDGE FROM PUERTO RICAN TANK
TO CWM VAC TRUCK. WINDS E-7
CONT
VDC
830915
VATKOP
83-926-301
SIMPSON DRY-VAC LOADING ORG.
SLUDGE FROM PUERTO RICAN TANK
TO CWM VAC TRUCK. WINDS E-7
CONT
VDC
831101
VATKOP
83-511-359
NORMAL OPERATIONS, HAULED ORG
ANIC WASTE WATER FROM SUMPS,
CLASSIFIER, PUERTO RICAN DOCK.
CONT
VDC
890103
VATKOP
ROUTINE PLANT B CONTRACT VAC
(SCOTTY'S VAC) WORK CLEANING
SUMPS.
89-001-001
CONT
VDC
890320
PAINT
89-162-106
SPRAY PAINTED LEGS OF VCM
SPHERE S-3. SLINE CO.EMPLOYEE.
NORMAL OPERATIONS.
CONT
VDC
890320
PAINT
89-163-107
SPRAY PAINTED LEGS OF VCM
SPHERE S-3. SLINE CO.EMPLOYEE.
NORMAL OPERATIONS.
CONT
VDC
890903
VATKOP
89-179-117
SCOTTY'S VAC CLEANING PLANT B
SUMPS/LIFT STATIONS.
RESULT .840
UNIT DURATION PPM 447
.100
PPM
380
.160
PPM
379
.690
PPM
921
.910
PPM
905
.050
PPM
921
.050
PPM
910
.200
PPM
990
.270
PPM
936
.130
PPM
901
CONT
VDC
84Q903
VATKOP
89-180-118
SCOTTY'S VAC CLEANING PLANT B
SUMPS/LIFT STATIONS.
.130
PPM
401
Si* 016619
PAGE
1/19/93
#LA HARLES (254)
PLANT B SAMMPRTN1 G RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
VDC
840518
VATKOP
84-284-208
SCOTTY'S VACUUM TRUCK SERVICE.
CLEANING ORGANICS FROM CLASSI
FIER. NORMAL OPERATIONS.
CONT
VDC
840605
VATKOP
84-306-223
SCOTTY'S VAC CLEANING PLANT B
SUMPS, LIFT STATIONS, N.CLASS.
TO P.RICAN TK.
CONT
*
CONT
VDC
840605
VATKOP
84-307-224
SCOTTY'S VAC CLEANING PLANT B
SUMPS, LIFT STATIONS, N.CLASS.
TO P.RICAN TK.
VDC
840724
VATKOP
84-392-299
OSHA INSPECT. SIMPSON VAC. CO.
PREPARING TO CLEAN OUT SOUTH
CLASSIFIER-WTU UNIT-NORMAL OP.
CONT
VDC
840724
VATKOP
84-393-300
OSHA INSPECT. SIMPSON VAC. CO.
PREPARING TO CLEAN OUT SOUTH
CLASSIFIER-WTU UNIT-NORMAL OP.
CONT
VDC
840724
VATKOP
84-394-301
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT, NORMAL OP
CONT
VDC
840724
VATKOP
84-396-303
OSHA .INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
VDC
840724
VATKOP
84-397-304
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
VDC
840724
VATKOP
84-398-305
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
VDC
840724
VATKOP
84-399-306
OSHA INSPECTION. SIMPSON VAC.
TRUCK. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
VDC
840724
VATKOP
84-400-307
OSHA INSPECTION. SIMPSON VAC.
TRUCK. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
RESULT ,240
UNIT DURATION PPM 451
.050
PPM
405
.150
PPM
405
.050
PPM
107
.320
PPM
102
.050
PPM
93
.120
PPM
77
.120
PPM
79
.090
PPM
93
.130
PPM
128
.160
PPM
100
SL 016620
PAGE
1/19/93
mLA
PLANT B SA
HARLES (254) ING RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
CONT
VDC
840724
VATKOP
84-401-308
GSHA INSPECT. SIMPSON VAC. CO.
PREPARING TO CLEAN OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
VDC
840724
VATKOP
84-402-309
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
* CONT
VDC
840724
VATKOP
84-403-310
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
VDC
840724
VATKOP
84-404-311
OSHA INSPECTION, SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
VDC
840724
VATKOP
84-405-312
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
VDC
840724
VATKOP
84-406-313
OSHA INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
VDC
840724
VATKOP
84-407-314
OSHA^INSPECTION. SIMPSON VAC.
TRUCK CO. CLEANING OUT SOUTH
CLASSIFIER-WTU UNIT. NORMAL OP
CONT
VDC
841012
VATKOP
84-538-409
SCOTTY'S VAC CLEANING PLANT B
SUMPS, LIFT STATIONS, #1 EDC
LIQ PH RX TO P.RICAN TK.
CONT
VDC
841012
VATKOP
84-539-410
SCOTTY'S VAC CLEANING PLANT B
SUMPS LIFT STATIONS #1 EDC LIQ
PHASE RX TO P. RICAN TK.
CONT
VDC
841015
CONLAB
84-546-417
MCCLELLAND ENGINEERS DRILLING
MONITORING WELL IN S-40.
WIND SW-12/15
CONT
VDC
841016
CONLAB
84-550-421
MCCLELLAND ENG. HELPING NEAR
WELL POINTS 19/22 S-40 EXTRAC
WELL SYSTEM. WIND S-17.
RESULT .090
UNIT DURATION PPM 97
.110
PPM
69
.120
PPM
89
.090
PPM
91
.080
PPM
101
.140
PPM
110
.520
PPM
106
.190
PPM
384
.090
PPM
379
.120
PPM
349
.050
PPM
540
SL 016621
PAGE
1/19/93
#LAI NAPLES (254)
PLANT B SAMmIfTiING RESULTS THRU 1984
DEPT CO NT
CONT
CO NT
COMPOUND
DATE
JOB TITLE SAMPLE#
VDC
841016
OPERAT
84-549-420
MCCLELLAND ENG. OPERATING DRIL
LING EQUIP. S-40 EXTRAC WELL
POINTS 19/22. WIND S-17.
VDC
841024
CONLAB
84-563-430
DANIEL CONST. S TERMINAL EX
TRAC WELL POINTS 34-38 SHOVEL
MUD. WIND E-9.
VDC
841115
CONLAB
84-607-468
SIMPSON VAC CLEANING S. CLAS-
SIFIER. WIND S-13 RH 67.
RESULT .050
UNIT DURATION
PPM
540
. 050
PPM
255
5.250
PPM
425
CONT
VDC
841115
CONLAB
SIMPSON VAC CLEANING SOUTH
CLASSIFIER. WIND S-13 RH 67.
84-608-469
3.610
PPM
425
CONT
VDC
841127
CONLAB
84-609-470
SIMPSON VAC SERVICE CLEANING
API SEPARATOR. WIND NW-14.
2.390
PPM
307
CONT
VDC
841127
CONLAB
84-610-471
SIMPSON VAC SERVICE CLEANING
API SEPARATOR. WIND NW-14.
1.730
PPM
303
EC CCL4
761101
ECOP
ROUTINE SHIFT
76-304-197
.000
PPM
365
EC CCL4
761108
ECOP
ROUTINE SHIFT
76-308-201
.000
PPM
335
EC CCL4
770119
ECOP
ROUTINE SHIFT
77-008-008
.000
PPM
390
EC CCL4
770203
ECOP
ROUTINE SHIFT
77-011-011
.000
PPM
249
EC CCL4
770221
ECOP
ROUTINE SHIFT
77-029-014
.000
PPM
345
Sk 016622
PAGE
1/19/93
om
LAMfcHARLES 1254) PLANT B SAMRTing results thru 1984
DEPT EC
COMPOUND
DATE
CCL4
770310
ROUTINE SHIFT
JOB TITLE SAMPLE#
ECOP
77-052-029
RESULT .000
UNIT DURATION PPM 300
PAGE
EC CCL4
770822
ECOP
ROUTINE SHIFT
77-185-130
.000
PPM
365
EC CCL4
770831
ECOP
ROUTINE SHIFT
77-198-141
.000
PPM
120
CCL4
770912
ROUTINE SHIFT
ECOP
77-206-147
.000
PPM
395
EC CCL4
771018
ECOP
ROUTINE SHIFT
77-224-159
.000
PPM
430
EC CCL4
771114
ECOP
ROUTINE SHIFT
77-250-174
.000
PPM
219
EC CCL4
771129
ECOP
ROUTINE SHIFT
77-264-188
.000
PPM
210
EC CCL4
780417
ECOP
ROUTINE SHIFT
78-131-081
.000
PPM
405
EC
761101
ECOP
ROUTINE SHIFT
76-304-197
.000
PPM
365
EC
761108
ECOP
ROUTINE SHIFT
76-308-201
.000
PPM
335
EC
770119
ECOP
ROUTINE SHIFT
77-008-008
. 000
PPM
390
SL 016623
1/19/93
LAlHtHARLES (254) PLANT B SAMPLING RESULTS THRU 1984
DEPT EC
COMPOUND
DATE
CIS 770203 ROUTINE SHIFT
JOB TITLE SAMPLE#
ECOP
77-011-011
RESULT .000
UNIT DURATION PPM 249
EC CIS
770221
ECOP
ROUTINE SHIFT
77-029-014
.000
PPM
345
EC
* EC
CIS 770310 ROUTINE SHIFT
CIS 770822 ROUTINE SHIFT
ECOP ECOP
77-052-029 77-185-130
.000
PPM
300
.000
PPM
365
EC CIS
770831
ECOP
ROUTINE SHIFT
77-198-141
.000
PPM
120
EC CIS
770912
ECOP
ROUTINE SHIFT
77-206-147
.000
PPM
395
EC CIS
771018
ECOP
ROUTINE SHIFT
77-224-159
.000
PPM
430
EC CIS
771114
ECOP
ROUTINE SHIFT
77-250-174
.000
PPM
219
EC CIS
771129
ECOP
ROUTINE SHIFT
77-264-188
. 000
PPM
210
EC CIS
780417
ECOP
ROUTINE SHIFT
78-131-081
.000
PPM
405
EC EC
761101
ECOP
ROUTINE SHIFT
76-304-197
1.300
PPM
365
016624
PAGE
1/19/93
LAMtHARLES (254) PLANT B SAMPLING RESULTS THRU 1984
DEPT EC
COMPOUND
DATE
EC 761108 ROUTINE SHIFT
JOB TITLE SAMPLE#
ECOP
76-308-201
RESULT .000
UNIT DURATION PPM 335
EC EC
770119
ECOP
ROUTINE SHIFT
77-008-008
.890
PPM
390
EC
*
EC
EC 770203 ROUTINE SHIFT
EC 770221 ROUTINE SHIFT
ECOP ECOP
77-011-011 77-029-014
8.600
PPM
249
26.400
PPM
345
EC EC
770310
ECOP
ROUTINE SHIFT
77-052-029
9.700
PPM
300
EC EC
770822
ECOP
ROUTINE SHIFT
77-185-130
11.600
PPM
365
EC EC
770831
ECOP
ROUTINE SHIFT
77-198-141
.190
PPM
120
EC EC
770912
ECOP
ROUTINE SHIFT
77-206-147
10.300
PPM
395
EC EC
771018
ECOP
ROUTINE SHIFT
77-224-159
1.100
PPM
430
EC EC
771114
ECOP
ROUTINE SHIFT
77-250-174
.670
PPM
219
EC EC
771129
ECOP
ROUTINE SHIFT
77-264-188
2.800
PPM
210
SL 016625
PAGE
1/19/93
LA^KHARLES (254) PLANT B SAMPLING RESULTS THRU 1984
DEPT EC
COMPOUND
DATE
EC 780221 ROUTINE SHIFT
JOB TITLE SAMPLE#
ECOP
78-051-037
RESULT .120
UNIT DURATION
PPM
385
PAGE
EC EC
780314
ECOP
ROUTINE SHIFT
78-091-052
1.260
PPM
378
EC
*
EC
EC 780417 ROUTINE SHIFT
EDC 761101 ROUTINE SHIFT
ECOP ECOP
78-131-081 76-304-197
1.900
PPM
405
.000
PPM
365
EC EDC
761108
ECOP
ROUTINE SHIFT
76-308-201
.000
PPM
335
EC EDC
770119
ECOP
ROUTINE SHIFT
77-008-008
.200
PPM
390
EC EDC
770203
ECOP
ROUTBNE SHIFT
77-011-011
.200
PPM
249
EC EDC
770221
ECOP
ROUTINE SHIFT
77-029-014
2.100
PPM
345
EC EDC
770310
ECOP
ROUTINE SHIFT
77-052-029
.000
PPM
300
EC EDC
770822
ECOP
ROUTINE SHIFT
77-185-130
.270
PPM
365
EC EDC
770831
ECOP
ROUTINE SHIFT
77-198-141
2.500
PPM
120
SL 016626
1/19/93
LA^HHARLES ( 254 ) PLANT B SAMmNG RESULTS THRU 1984
DEPT EC
COMPOUND
DATE
EDC 770912 ROUTINE SHIFT
JOB TITLE SAMPLE#
ECOP
77-206-147
RESULT 1.500
UNIT DURATION
PPM
395
EC EDC
771018
ECOP
ROUTINE SHIFT
77-224-159
1.000
PPM
430
EC
* EC
EDC 771114 ROUTINE SHIFT
EDC 771129 ROUTINE SHIFT
ECOP ECOP
77-250-174 77-264-188
.000
PPM
219
.000
PPM
210
EC EDC
780221
ECOP
ROUTINE SHIFT
78-051-037
.000
PPM
385
EC EDC
780314
ECOP
ROUTINE SHIFT
78-091-052
.610
PPM
378
EC EDC
780417
ECOP
ROUTINE SHIFT
78-131-081
.110
PPM
405
EC MC
761101
ECOP
ROUTINE SHIFT
76-304-197
.240
PPM
365
EC MC
761108
ECOP
ROUTINE SHIFT
76-308-201
.540
PPM
335
EC MC
770119
ECOP
ROUTINE SHIFT
77-008-008
.000
PPM
390
EC MC
770203
ECOP
ROUTINE SHIFT
77-011-011
31.500
PPM
249
SL 016627
PAGE
1/19/93
LAI^BhARLES (259) PLANT 6 SAfWlNG RESULTS THRU 1989
DEPT EC
COMPOUND
DATE
MC 770221 ROUTINE SHIFT
JOB TITLE SAMPLE#
ECOP
77-029-019
RESULT .130
UNIT DURATION PPM 395
EC MC
770310
ECOP
ROUTINE SHIFT
77-052-029
.200
PPM
300
EC
* EC
MC 770822 ROUTINE SHIFT
MC 770631 ROUTINE SHIFT
ECOP ECOP
77-185-130 77-198-191
.000
PPM
365
.110
PPM
120
EC MC
770912
ECOP
ROUTINE SHIFT
77-206-197
.120
PPM
395
EC MC
771018
ECOP
ROUTINE SHIFT
77-229-159
1.200
PPM
930
EC MC
771119
ECOP
ROUTINE SHIFT
77-250-179
.900
PPM
219
EC MC
771129
ECOP
ROUTINE SHIFT
77-269-188
1.600
PPM
210
EC MC
780221
ECOP
ROUTINE SHIFT
78-051-037
.370
PPM
385
EC MC
780319
ECOP
ROUTINE SHIFT
78-091-052
.300
PPM
378
EC MC
780917
ECOP
ROUTINE SHIFT
78-131-081
.000
PPM
905
SL 016628
PAGE
1/19/93
LAI^^HARLES (254) PLANT B SAMmilG RESULTS THRU 1984
DEPT EC
COMPOUND
DATE
PER 761101 ROUTINE SHIFT
JOB TITLE SAMPLE#
ECOP
76-304-197
RESULT .000
UNIT DURATION PPM 365
EC PER
761108
ECOP
ROUTINE SHIFT
76-308-201
.000
PPM
335
EC PER
770119
ECOP
ROUTINE SHIFT
77-008-008
.000
PPM
390
EC PER
770203
ECOP
ROUTINE SHIFT
77-011-011
1.800
PPM
249
EC PER
770221
ECOP
ROUTINE SHIFT
77-029-014
.000
PPM
345
EC PER
770310
ECOP
ROUTINE SHIFT
77-052-029
.000
PPM
300
EC PER
770822
ECOP
ROUTSHE SHIFT
77-185-130
.000
PPM
365
EC PER
770831
ECOP
ROUTINE SHIFT
77-198-141
.000
PPM
120
EC PER
770912
ECOP
ROUTINE SHIFT
77-206-147
.000
PPM
395
EC PER
771018
ECOP
ROUTINE SHIFT
77-224-159
.130
PPM
430
EC PER
771114
ECOP
ROUTINE SHIFT
77-250-174
.000
PPM
219
SL 016629
PAGE
1/19/93
LAI^PHARLES (254) PLANT B SAMmNG RESULTS THRU 1989
DEPT EC
COMPOUND
DATE
PER 771129 ROUTINE SHIFT
JOB TITLE SAMPLE#
ECOP
77-269-188
RESULT .000
UNIT DURATION PPM 210
EC PER
780319
ECOP
ROUTINE SHIFT
78-091-052
.330
PPM
378
EC
* EC
PER 780917 ROUTINE SHIFT
SYM 761101 ROUTINE SHIFT
ECOP ECOP
78-131-081 76-309-197
.000
PPM
905
.080
PPM
365
EC SYM
761108
ECOP
ROUTINE SHIFT
76-308-201
.180
PPM
335
EC SYM
770119
ECOP
ROUTINE SHIFT
77-008-008
.000
PPM
390
EC SYM
770203
ECOP
ROUTINE SHIFT
77-011-011
.000
PPM
299
EC SYM
770221
ECOP
ROUTINE SHIFT
77-029-019
.000
PPM
395
EC SYM
770310
ECOP
ROUTINE SHIFT
77-052-029
.000
PPM
300
EC SYM
770822
ECOP
ROUTINE SHIFT
77-185-130
.000
PPM
365
EC SYM
770831
ECOP
ROUTINE SHIFT
77-198-191
.000
PPM
120
SL 016630
PAGE
1/19/93
LAl^MARLES (259) PLANT B SAfWlHG RESULTS THRU 1989
DEPT EC
COMPOUND
DATE
TCE 761101 ROUTINE SHIFT
JOB TITLE SAMPLE#
ECOP
76-309-197
RESULT .000
UNIT DURATION PPM 365
EC TCE
761108
ECOP
ROUTINE SHIFT
76-308-201
.000
PPM
335
EC TCE
770119
ECOP
ROUTINE SHIFT
77-008-008
.000
PPM
390
EC TCE
770203
ECOP
ROUTINE SHIFT
77-011-011
. 000
PPM
299
EC TCE
770221
ECOP
ROUTINE SHIFT
77-029-019
.250
PPM
395
EC TCE
770310
ECOP
ROUTINE SHIFT
77-052-029
.000
PPM
300
EC TCE
770822
ECOP
ROUTINE SHIFT
77-185-130
.000
PPM
365
EC TCE
770831
ECOP
ROUTINE SHIFT
77-198-191
.000
PPM
120
EC TCE
770912
ECOP
ROUTINE SHIFT
77-206-197
.000
PPM
395
EC TCE
771018
ECOP
ROUTINE SHIFT
77-229-159
.000
PPM
930
EC TCE
771119
ECOP
ROUTINE SHIFT
77-250-179
.000
PPM
219
SL 016631
PAGE
1/19/93
LAI^ARLES (259) PLANT B SAMmNG RESULTS THRU 1989
DEPT EC
COMPOUND
DATE
TCE 771129 ROUTINE SHIFT
JOB TITLE SAMPLES
ECOP
77-264-188
RESULT .000
UNIT DURATION
PPM
210
EC TCE
780417
ECOP
ROUTINE SHIFT
78-131-081
.000
PPM
405
EC
t EC
TRANS
770310
ROUTINE SHIFT
TRANS
770822
ROUTINE SHIFT
ECOP ECOP
77-052-029 77-185-130
.000
PPM
300
.000
PPM
365
EC
TRANS
770831
ECOP
ROUTINE SHIFT
77-198-141
.000
PPM
120
EC
TRANS
770912
ECOP
ROUTINE SHIFT
77-206-147
.000
PPM
395
EC
TRANS
771018
ECOP
ROUTINE SHIFT
77-224-159
. 000
PPM
430
EC
TRANS
771119
ECOP
ROUTINE SHIFT
77-250-174
. 000
PPM
219
EC
TRANS
771129
ECOP
ROUTINE SHIFT
77-264-188
.000
PPM
210
EC
TRANS
780417
ECOP
ROUTINE SHIFT
78-131-081
.000
PPM
405
EC TRI
761101
ECOP
ROUTINE SHIFT
76-304-197
.000
PPM
365
SL 016632
PAGE
1/19/93
LAMKHARLES (259) PLANT B SAMPPing results thru 1989
DEPT EC
COMPOUND
DATE
TRI 761108 ROUTINE SHIFT
JOB TITLE SAMPLE#
ECOP
76-308-201
RESULT .110
UNIT DURATION PPM 335
EC TRI
770119
ECOP
ROUTINE SHIFT
77-008-008
.000
PPM
390
EC TRI
770203
ECOP
ROUTINE SHIFT
77-011-011
.000
PPM
299
EC TRI
770221
ECOP
ROUTINE SHIFT
77-029-019
. 000
PPM
395
EC TRI
770310
ECOP
ROUTINE SHIFT
77-052-029
.000
PPM
300
EC TRI
770822
ECOP
ROUTINE SHIFT
77-185-130
.000
PPM
365
EC TRI
770831
ECOP
ROUTINE SHIFT
77-198-191
.100
PPM
120
EC TRI
770912
ECOP
ROUTINE SHIFT
77-206-197
.110
PPM
395
EC TRI
771018
ECOP
ROUTINE SHIFT
77-229-159
.000
PPM
930
EC TRI
771119
ECOP
ROUTINE SHIFT
77-250-179
.000
PPM
219
EC TRI
771129
ECOP
ROUTINE SHIFT
77-269-188
.000
PPM
210
PAGE 026633
1/19/93
LA*|HARLES (254) PLANT B SAMmNS RESULTS THRU 1984
DEPT EC
COMPOUND
DATE
TRI 780314 ROUTINE SHIFT
JOB TITLE SAMPLE#
ECOP
78-091-052
RESULT .360
UNIT DURATION PPM 378
PAGE
EC TRI
780417
ECOP
ROUTINE SHIFT
78-131-081
.000
PPM
405
EC
* EC
VCM 761101 ROUTINE SHIFT
VCM
761108
ROUTINE SHIFT
ECOP ECOP
76-304-197 76-308-201
.000
PPM
365
.910
PPM
335
EC VCM
770119
ECOP
ROUTINE SHIFT
77-008-008
.000
PPM
390
EC VCM
770203
ECOP
ROUTINE SHIFT
77-011-011
.000
PPM
249
EC VCM
770221
ECOP
ROUTINE SHIFT
77-029-014
.160
PPM
345
EC VCM
770310
ECOP
ROUTINE SHIFT
77-052-029
.050
PPM
300
EC VCM
770822
ECOP
ROUTINE SHIFT
77-185-130
.270
PPM
365
EC VCM
770831
ECOP
ROUTINE SHIFT
77-198-141
.000
PPM
120
EC VCM
770912
ECOP
ROUTINE SHIFT
77-206-147
.260
PPM
395 SL 016^34
1/19/93
LAKHfcARLES (254) PLANT B SAMPLING RESULTS THRU 1984
DEPT EC
COMPOUND
DATE
VCM 771018 ROUTINE SHIFT
JOB TITLE SAMPLE#
ECOP
77-224-159
RESULT .230
UNIT DURATION PPM 430
I
PAGE
EC VCM
771114
ECOP
ROUTINE SHIFT
77-250-174
.000
PPM
219
EC
* EC
VCM 771129 ROUTINE SHIFT
ECOP
VCM
771205
ECOP
TAKING 1READINGS ON ROUNDS
77-264-188 77-269-193
.000
PPM
210
.100
PPM
15
EC VCM
771212
ECOP
77-272-196
COLLECTING AND ANALYZING EC
SAMPLES(VC/EC LABORATORY)
EC VCM
780221
ECOP
ROUTINE SHIFT
78-051-037
.100
PPM
15
.000
PPM
385
EC VCM
780314
ECOP
ROUTINE SHIFT
78-091-052
.190
PPM
378
EC VCM
780417
ECOP
ROUTINE SHIFT
78-131-081
.070
PPM
405
EC VDC
761101
ECOP
ROUTINE SHIFT
76-304-197
.000
PPM
365
EC VDC
761108
ECOP
ROUTINE SHIFT
76-308-201
.390
PPM
335
EC VDC
770119
ECOP
ROUTINE SHIFT
77-008-008
.000
PPM
390
SL 016635
1/19/93
LAI^MARLES (259) PLANT B SAMnriNG RESULTS THRU 1984
DEPT EC
COMPOUND
DATE
VDC 770203 ROUTINE SHIFT
JOB TITLE SAMPLE#
ECOP
77-011-011
RESULT .000
UNIT DURATION
PPM
249
PAGE
EC VDC
770221
ECOP
ROUTINE SHIFT
77-029-014
.000
PPM
345
EC
* EC
VDC 770310 ROUTINE SHIFT
VDC
770822
ROUTINE SHIFT
ECOP ECOP
77-052-029 77-185-130
.000
PPM
300
.000
PPM
365
EC VDC
770831
ECOP
ROUTINE SHIFT
77-198-141
.120
PPM
120
EC VDC
770912
ECOP
ROUTINE SHIFT
77-206-147
.000
PPM
395
EC VDC
771018
ECOP
ROUTINE SHIFT
77-224-159
.000
PPM
430
EC VDC
771114
ECOP
ROUTINE SHIFT
77-250-174
.420
PPM
219
EC VDC
771129
ECOP
ROUTINE SHIFT
77-264-188
.400
PPM
210
EC VDC
780221
ECOP
ROUTINE SHIFT
78-051-037
.000
PPM
385
EC VDC
780314
ECOP
ROUTINE SHIFT
78-091-052
.360
PPM
378
SL 016636
1/19/93
LAmHhARLES (254) PLANT B SAMmHG RESULTS THRU 1984
DEPT EC
COMPOUND
DATE
VDC 780417 ROUTINE SHIFT
JOB TITLE SAMPLE#
ECOP
78-131-081
RESULT .000
UNIT DURATION PPM 405
ECVC
CCL4
780516
ECOP
78-173-114
ROUTINE SHIFT-LEAK UNDER NO 2
NEUTRALIZER
ECVC
CCL4
780526
GEWORK
ADDING 1HA0H TO NEUTRALIZER
78-188-116
* ECVC
CCL4
780601
ROUTINE SHIFT
LEADOP
78-204-117
.000
PPM
425
.000
PPM
33
.000
PPM
404
ECVC
CCL4
780601
ROUTINE SHIFT
OPERVF
78-205-118
.000
PPM
240
ECVC
CCL4
780710
ROUTINE SHIFT
ECOP
78-261-158
.000
PPM
473
ECVC
CCL4
780710
ROUTINE SHIFT
OPERVF
78-237-157
.000
PPM
473
ECVC
CCL4
780710
ROUTINE SHIFT
OPERVP
78-236-156
.000
PPM
473
ECVC
CCL4
780907
ROUTINE SHIFT
ECOP
78-339-207
.000
PPM
4Q1
ECVC
CCL4
780907
ROUTINE SHIFT
LEADOP
78-336-204
.000
PPM
401
ECVC
CCL4
780907
ROUTINE SHIFT
OPERVF
78-338-206
.000
PPM
401
SL 016637
PAGE
1/19/93
LAI^WMRLES (254) PLANT B SAMTCING RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
CCL4
780907
ROUTINE SHIFT
JOB TITLE SAMPLE#
OPERVP
78-337-205
RESULT .000
UNIT DURATION PPM 401
ECVC
CCL4
781003
ROUTINE SHIFT
ECOP
78-304-194
.000
PPM
435
ECVC
CCL4
781003
ROUTINE SHIFT
OPERVF
78-303-193
.000
PPM
435
ECVC
CCL4
781003
ROUTINE SHIFT
OPERVP
78-302-192
.000
PPM
435
ECVC
CCL4
781114
ROUTINE SHIFT
ECOP
78-426-264
.000
PPM
410
ECVC
CCL4
781114
ROUTINE SHIFT
LEADOP
78-424-262
.000
PPM
410
ECVC
CCL4
781128
ROUTINE SHIFT
OPERVP
78-427-265
.000
PPM
430
ECVC
CCL4
781206
ROUTINE SHIFT
ECOP
78-447-283
.000
PPM
425
ECVC
CCL4
781206
ROUTINE SHIFT
LEADOP
78-444-280
.000
PPM
425
ECVC CCL4
781206
ROUTINE SHIFT
OPERVF
78-445-281
.000
PPM
425
ECVC
CCL4
781206
ROUTINE SHIFT
OPERVP
78-446-282
.000
PPM
425
SL 016638
PAGE
1/19/93
LAM^BHARLES (259) PLANT B SAMPTING RESULTS THRU 1989
DEPT ECVC
COMPOUND
DATE
CCL9
790105
ROUTINE SHIFT
JOB TITLE SAMPLE#
OPERVF
79-016-011
RESULT .000
UNIT DURATION PPM 905
PAGE
ECVC
CCL9
790110
ROUTINE SHIFT
ECOP
79-023-018
.000
PPM
370
ECVC
CCL9
790110
ROUTINE SHIFT
LEADOP
79-021-016
.000
PPM
370
ECVC
CCL9
790110
ROUTINE SHIFT
OPERVP
79-022-017
.000
PPM
370
ECVC
CCL9
790306
ROUTINE SHIFT
LEADOP
79-119-069
.000
PPM
920
ECVC CCL9
790306
ROUTINE SHIFT
OPERVF
79-115-070
.000
PPM
920
ECVC
CCL9
790322
ROUTINE SHIFT
OPERVP
79-157-093
.000
PPM
910
ECVC
CCL9
790929
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAN
ECVC
CCL9
790929
PIPEFI
ROUTINE SHIFT WORKING AS
LOGBOOK MECHANIC
ECVC
CCL9
790502
ROUTINE SHIFT
LEADOP
79-296-128 79-235-129 79-299-126
.000
PPM
935
.000
PPM
935
.000
PPM
935
ECVC
CCL9
790502
ROUTINE SHIFT
OPERVP
79-295-127
.000
PPM
935
SL 016639
1/19/93
LAHBhARLES (254) PLANT B SAMmNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
CCL4
790524
ROUTINE SHIFT
JOB TITLE OPERVF
SAMPLE# 79-277-155
RESULT .000
UNIT DURATION PPM 420
PAGE
ECVC
CCL4
790530
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAN.
79-302-164
ECVC
* ECVC
CCL4
790530
PIPEFI
ROUTINE SHIFT WORKING AS
LOGBOOK MECHANIC
79-301-163
CCL4
790614
INSTRU
79-315-178
ROUTINE SHIFT WORKING AS LOG
BOOK INSTRUMENT MAH
ECVC
CCL4
790614
PIPEFI
79-316-179
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC
ECVC
CCL4
790621
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-342-190
ECVC
CCL4
790621
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-343-191
ECVC
CCL4
790710
ROUTINE SHIFT
LEADOP
79-368-211
.000
PPM
405
.000
PPM
405
. 000
PPM
440
.000
PPM
440
.000
PPM
430
.000
PPM
430
.000
PPM
405
ECVC
CCL4
790710
ROUTINE SHIFT
OPERVF
79-369-212
.000
PPM
405
ECVC
CCL4
790710
ROUTINE SHIFT
OPERVP
79-370-213
.000
PPM
405
ECVC
CCL4
790806
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING EC/VC TAR BUGGIES
79-387-224
.000
PPM
375 ,,.n
SL 0l6*u
1/19/93
LAt^BlHARLES (25A> PLANT B SAMmMG RESULTS THRU I98A
DEPT ECVC
COMPOUND
DATE
CCLA
791008
ROUTINE SHIFT
JOB TITLE SAMPLE#
LEADOP
79-445-2A2
RESULT .000
UNIT DURATION
PPM
A15
PAGE
ECVC
CCL4
791008
ROUTINE SHIFT
OPERVF
79-4A7-2AA
.000
PPM
A15
ECVC
CCLA
791008
ROUTINE SHIFT
OPERVP
* ECVC
CCLA
791017
ECOP
FECL3 ADDITION JOB
79-AA6-2A3 79-552-328
.000
PPM
AI5
.000
PPM
15
ECVC
CCL4
791113
79-66A-A3A
AFT N-NE OF VENT OFF LIFT STA
1,CLEAR, A1F,N,7MPH
ECVC
CCLA
791113
79-665-A35
7FT SW OF VENT OFF LIFT STA 1,
CLEAR,A1F,N,7MPH
ECVC
CCLA
791113
79-666-A36
6FT OF VCM DOPP KETTLE SEALC1)
,CLEAR, A1F,N,7MPH
ECVC
CCLA
791113
5FT S-SW OF VCM DOPP KETTLE
SEAL(l), CLEAR,A1F,N, 7MPH
79-667-A37
ECVC
CCLA
791113
79-668-A38
5FT S OF VCM DOPP KETTLE SEAL
(2),CLEAR,A1F,N,7MPH
ECVC
CCLA
800317
INSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAN
80-230-105
ECVC
CCLA
811012
VCAXOP
ROUTINE MORNING ROUND
81-532-300
.000
PPM
297
.050
PPM
297
.000
PPM
298
.000
PPM
298
.000
PPM
295
.360
PPM
A30
7.660
PPM
15
SL 016641
1/19/93
LAK^ARLES (254) PLANT B SAMmNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE SAMPLE#
CIS
780516
ECOP
78-173-114
ROUTINE SHIFT-LEAK UNDER NO 2
NEUTRALIZER
RESULT .000
UNIT DURATION PPM 425
ECVC
780526
GEWORK
ADDING 1NAOH TO NEUTRALIZER
78-188-116
.000
PPM
33
PAGE
ECVC
780601 ROUTINE SHIFT
* ECVC
780601 ROUTINE SHIFT
LEADOP OPERVF
78-204-117 78-205-118
.000
PPM
404
.000
PPM
240
ECVC
780612 ROUTINE SHIFT
ECOP
78-212-125
,000
PPM
411
ECVC
780710 ROUTINE SHIFT
ECOP
78-261-158
.000
PPM
473
ECVC
780710 ROUTINE SHIFT
OPERVF
78-237-157
.000
PPM
473
ECVC
780710 ROUTINE SHIFT
OPERVP
78-236-156
.000
PPM
473
ECVC
780907 ROUTINE SHIFT
ECOP
78-339-207
. 000
PPM
401
ECVC
780907 ROUTINE SHIFT
LEADOP
78-336-204
,000
PPM
401
ECVC
780907 ROUTINE SHIFT
OPERVF
78-338-206
.000
PPM
401
SL 016642
1/19/93
LAK^BhARLES (254) PLANT B SAMWiNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
CIS 780907 ROUTINE SHIFT
JOB TITLE SAMPLES
OPERVP
78-337-205
RESULT .000
UNIT DURATION PPM 401
ECVC
781003 ROUTINE SHIFT
ECOP
78-304-194
.000
PPM
435
ECVC
781003 ROUTINE SHIFT
t
ECVC
781003 ROUTINE SHIFT
OPERVF OPERVP
78-303-193 78-302-192
.000
PPM
435
. 000
PPM
435
ECVC
781114 ROUTINE SHIFT
ECOP
78-426-264
.000
PPM
410
ECVC
781114 ROUTINE SHIFT
LEADOP
78-424-262
.000
PPM
410
ECVC
781128 ROUTINE SHIFT
OPERVP
78-427-265
.000
PPM
430
ECVC
781206 ROUTINE SHIFT
ECOP
78-447-283
.000
PPM
425
ECVC
CIS 781206 ROUTINE SHIFT
LEADOP
78-444-280
.000
PPM
425
ECVC
CIS 781206 ROUTINE SHIFT
OPERVF
78-445-281
.000
PPM
425
ECVC
CIS 781206 ROUTINE SHIFT
OPERVP
78-446-282
.000
PPM
425
SL 016643
PAGE
1/19/93
LA k^^h ARLES (259)
PLANT B SAMhWI hNG RESULTS THRU 1989
DEPT ECVC
COMPOUND
DATE
CIS 790105 ROUTINE SHIFT
JOB TITLE SAMPLE#
LEADOP
79-015-010
RESULT .000
UNIT DURATION
PPM
905
PAGE
ECVC
CIS 790105 ROUTINE SHIFT
OPERVF
79-016-011
.000
PPM
905
ECVC
CIS 790110 ROUTINE SHIFT
ECOP
79-023-018
.000
PPM
370
ECVC
CIS 790110 ROUTINE SHIFT
LEADOP
79-021-016
.000
PPM
370
ECVC
CIS 790110 ROUTINE SHIFT
OPERVP
79-022-017
.000
PPM
370
ECVC
CIS
790306
INSTRU
79-117-072
ROUTINE SHIFT WORKING LOGBOOK
INSTRUMENT MAN'S JOB
ECVC
CIS 790306 ROUTINE SHIFT
LEADOP
79-119-069
.000
PPM
920
.000
PPM
920
ECVC
CIS 790306 ROUTINE SHIFT
OPERVF
79-115-070
.000
PPM
920
ECVC
CIS 790322 ROUTINE SHIFT
OPERVP
79-157-093
.000
PPM
910
ECVC
CIS
790929
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAN
ECVC
CIS
790929
PIPEFI
ROUTINE SHIFT WORKING AS
LOGBOOK MECHANIC
79-296-128 79-235-129
.000
PPM
935
.000
PPM
935
SL 016644
1/19/93
LAMWARLES (254) PLANT B SAMWTNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
790502 ROUTINE SHIFT
JOB TITLE SAMPLE#
ECOP
79-247-129
RESULT .180
UNIT DURATION PPM 435
ECVC
CT ^ 790502 ROUTINE SHIFT
LEADOP
79-244-126
.050
PPM
435
ECVC
790502 ROUTINE SHIFT
OPERVP
79-245-127
* ECVC
790509
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-251-133
ECVC
790509
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-252-134
ECVC
790524 ROUTINE SHIFT
OPERVF
79-277-155
.000
PPM
435
.000
PPM
455
.110
PPM
455
.000
PPM
420
ECVC
CIS
790530
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAN.
79-302-164
ECVC
790530
PIPEFI
ROUTINE SHIFT WORKING AS
LOGBOOK MECHANIC
79-301-163
ECVC
CIS
790614
INSTRU
79-315-178
ROUTINE SHIFT WORKING AS LOG
BOOK INSTRUMENT MAN
ECVC
CIS
790614
PIPEFI
79-316-179
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC
ECVC
CIS
790621
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-342-190
.000
PPM
405
.000
PPM
405
.000
PPM
440
. 000
PPM
440
.000
PPM
430
SL 016645
PAGE
1/19/93
LAK^BHARLES (254) PLANT B SAHWWmG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
790621
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
SAMPLE# 79-343-191
RESULT .000
UNIT DURATION
PPM
430
ECVC
Cl ^ 790710 ROUTINE SHIFT
LEADOP
79-368-211
.050
PPM
405
PAGE
ECVC
790710 ROUTINE SHIFT
OPERVF
79-369-212
.050
PPM
405
ECVC
790710 ROUTINE SHIFT
OPERVP
79-370-213
.050
PPM
405
ECVC
790806
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING EC/VC TAR BUGGIES
79-386-223
ECVC
ci*;
790806
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING EC/VC TAR BUGGIES
79-387-224
ECVC CIS
791008
ROUTINE SHIFT
LEADOP
79-445-242
.160
PPM
385
.050
PPM
375
.000
PPM
415
ECVC
791008 ROUTINE SHIFT
OPERVF
79-447-244
.000
PPM
415
ECVC
791008
ROUTINE SHIFT
OPERVP
79-446-243
.050
PPM
415
ECVC
CIS 791015
79-519-316
5FT SE OF SUMP/5FT ABV GRND/
NE WND/6MPH/5QF/86RH/CLEAR
ECVC
CIS 791015
79-520-317
4FT NE OF SUMP/4FT ABV GRND/
NE WND/6MPH/5QF/86RH/CLEAR
.050
PPM
276
.050
PPM
276
SL 0166A6
1/19/93
LAK^MARLES (259) PLANT B $AMmHG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
CIS
791017
ECOP
FECL3 ADDITION JOB
SAMPLE# 79-552-328
RESULT .000
UNIT DURATION PPM 15
I
PAGE
ECVC
CIS 791113
79-664-434
4FT N-NE OF VENT OFF LIFT STA
1,CLEAR,41F,N,7MPH
ECVC
CIS 791113
79-665-435
7FT SW OF VENT OFF LIFT STA 1
CLEAR,41F,N,7MPH
ECVC
CIS 791113
79-666-436
6FT OF VCM DOPP KETTLE SEALC1 i
,CLEAR,41F,N,7MPH
ECVC
CIS 791113
5FT S-SW OF VCM DOPP KETTLE SEAL(1),CLEAR,41F,N,7MPH
79-667-437
ECVC
CIS 791113
79-668-438
5FT S OF VCM DOPP KETTLE SEAL
(2),CLEAR,41F,N,7MPH
ECVC
CIS
800207
PIPEFI
ROUTINE SHIFT AS LOG BOOK
MECHANIC
80-099-043
ECVC
CIS
800214
OPERVF
MORNING SAMPLE ROUND
80-031-016
.000
PPM
297
.000
PPM
297
.000
PPM
298
.000
PPM
298
.000
PPM
295
.600
PPM
435
6.530
PPM
15
ECVC
CIS
811012
VCAXOP
ROUTINE MORNING ROUND
81-532-300
1.280
PPM
15
ECVC
CIS
820625
LGMC
82-241-130
ROUTINE SHIFT- WORKED THROUGH
OUT UNIT
ECVC
CIS
830610
ECOP
ROUTINE SHIFT. SOME EXTRA
SAMPLING. NORMAL OPERATIONS.
83-282-194
.110
PPM
447
.290
PPM
449
SL 016647
1/19/93
LAMW1ARLES (254) PLANT B SAMnnUG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
CIS
830610
LGINM
ROUTE WORK IN UNIT. NORMAL
OPERATIONS.
SAMPLE# 83-284-196
RESULT .210
UNIT DURATION PPM 446
ECVC
CIS
830616
OPERVP
83-293-205
ROUTINE MORNING ROUNDS. NORMAL
OPERATIONS.
1.930
PPM
15
ECVC
*
ECVC
ECVC
CIS
830901
OPERVF
DECOKED FURNACE AND DEPRESSU
RIZED DEHUMIDIFIER. REDUCED
OPERATIONS. VC UNIT DOWN.
83-400-292
CIS
830901
OPERVP 83-399-291
RAN COOLING TOWER SAMPLE AND
CHECKED PURGE ON VC HUMIDIFIER
REDUCED OPERATIONS-VC DOWN.
DCE
790806
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING EC/VC TAR BUGGIES
79-386-223
.480
PPM
19
1.040
PPM
15
.170
PPM 385
ECVC
DCE
791031
GEWORK
79-449-246
DUMPING VC TAR BUGGY AT WASTE
POND.
13.300
PPM
5
ECVC
DCE
791031
GEWORK
DISCHARGING VC TAR BUGGY TO
WASTE POND
79-565-341
20.400
PPM
6
ECVC
DCE
791031
GEWORK
DISCHARGING VC TAR BUGGY TO
WASTE POND
79-625-395
.600
PPM
6
ECVC
DCE 791113
79-664-434
4FT N-HE OF VENT OFF LIFT STA
1,CLEAR,41F,N,7MPH
.000
PPM
297
ECVC
DCE 791113
79-665-435
7FT SW OF VENT OFF LIFT STA 1,
CLEAR,41F,N,7MPH
.050
PPM
297
ECVC
DCE 791113
79-666-436
6FT OF VCM DOPP KETTLE SEAL(l)
,CLEAR,41F,N,7MPH
.000
PPM
298
SL 016648
PAGE
1/19/93
LAK^MARLES (254) PLANT B SAMmPIG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
DCE 791113 5FT S-SVJ OF VCM DOPP KETTLE SEAL(l) ,CLEAR,41F ,H,7MPH
SAMPLE# 79-667-437
RESULT .000
UNIT DURATION PPM 298
ECVC
DCE 791113
79-668-438
5FT S OF VCM DOPP KETTLE SEAL
<2),CLEAR,41F,N,7MPH
.000
PPM
295
ECVC
* ECVC
DCE 800207 ROUTINE SHIFT SPRAYED WITH EC
DCE 800325 ROUTINE SHIFT
ECOP VCAXOP
80-098-042 80-177-078
.070
PPM
450
.110
PPM
432
i
ECVC
DCE 800527 ROUTINE SHIFT
LEADOP
80-301-147
.060
PPM
445
ECVC
DCE 800527 ROUTINE SHIFT
OPERVF
80-303-149
.540
PPM
440
ECVC
DCE 800527 ROUTINE SHIFT
OPERVP
80-302-148
.070
PPM
440
ECVC
DCE
800611
VCAXOP
MORNING SAMPLE ROUND
80-337-167
6.020
PPM
15
ECVC
DCE 800623 ROUTINE SHIFT
ECOP
80-338-168
1.260
PPM
421
ECVC
DCE
801001
INSTRU
ROUTINE SHIFT AS 1LOGBOOK
INSTRUMENT MAN
ECVC
DCE
810625
OPERVP
MORNING SAMPLE ROUND.
80-511-244 81-283-154
. 070
PPM
433
2.600
PPM
15
5L 016649
PAGE
1/19/93
LAK^WARLES (259) PLANT B SAMHHNG RESULTS THRU 1989
DEPT ECVC
COMPOUND
DATE
JOB TITLE SAMPLES
DCE
820708
LGINM
82-267-199
REPAIRED HCL VALVE TO ABSORBER
RESULT .230
UNIT DURATION PPM 955
PAGE
ECVC
DCE
820708
VCAXOP
82-269-196
EC UNIT BROUGHT UP DURING MORN
ADDED CATALYST TO EC PRODUCT.
ECVC
DCE
830610
ECOP
ROUTINE SHIFT. SOME EXTRA
SAMPLING. NORMAL OPERATIONS.
83-282-19$
ECVC
DCE
830610
LGINM
ROUTE WORK IN UNIT. NORMAL
OPERATIONS.
83-289-196
ECVC
DCE
830616
OPERVP
83-293-205
ROUTINE MORNING ROUNDS. NORMAL
OPERATIONS.
ECVC
DCE
830713
OPERVF
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-320-228
ECVC
DCE
890116
ECOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
83-091-022
ECVC
DCE
890116
FUOP
83-090-021
VC UNIT DOWN; SCHEDULED OUTAGE
DUTIES.
ECVC
DCE
890201
OPERVP
NORMAL START-UP OPERATIONS.
89-092-050
2.090
PPM
997
1.790
PPM
999
1.190
PPM
$96
3.680
PPM
15
.130
PPM
397
.100
PPM
397
.100
PPM
393
.120
PPM
913
ECVC
DCE
890909
FUOP
NORMAL OPERATIONS. ROUTINE
SAMPLE ROUND AND ANALYSIS.
89-192-130
ECVC
DCE 890910
WINDS SE-12/S-10. NORMAL OP. UPSTAIRS WEST SIDE
89-199-137
9.330
PPM
193
1.110
PPM
269
SL 016650
1/19/93
LAK^ARLES <259) PLANT B SAMWTNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE SAMPLE#
DCE 840410
84-204-142
WINDS SE-12/S-10. NORMAL OP.
N. DAY TK NEAR PUMPS 5FT HIGH
RESULT .890
UNIT DURATION PPM 263
ECVC
DCE
840516
PSOP
LEAK PATROL WITH HNU. VINYL
UNIT DOWN.
84-281-205
.930
PPM
300
ECVC
t
ECVC
DCE
840530
ECOP
ROUTINE SHIFT. NORMAL OPERA
TIONS.
84-294-216
DCE
640606
ECOP
NORMAL OPERATIONS . ROUTINE
SHIFT.
84-309-226
.430
PPM
423
.290
PPM
413
ECVC
DCE
840711
PSOP
LEAK PATROL WITH HNU. UNIT
DOWN.
84-378-287
.350
PPM
180
ECVC
DCE
840830
PSOP
NORMAL OP. ROUTINE SHIFT.
84-443-344
.170
PPM
408
ECVC
DCE
840907
ECOP
NORMAL OP. ROUTINE SHIFT.
84-465-360
.210
PPM
415
ECVC
DCE
840907
FUOP
NORMAL OP. ROUTINE SHIFT.
84-464-359
.120
PPM
397
ECVC
DCE
841101
ECOP
84-575-437
NORMAL OP. EC/HCL UNIT. ROUTI
NE SHIFT.
ECVC ECVC
DCE
841101
PSOP
84-574-436
DOWN OP. VC/UNIT. DOWN OP.
DUTIES ON PROCESS AND FURNACE
JOBS.
EC
780206
LEADOP
ROUTINE SHIFT VCM LEAD OPER
78-028-020
.220
PPM
403
.210
PPM
407
.140
PPM
390
S** 016651
PAGE
1/19/93
LAH^BHARLES (254) PLANT B SAHPflNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
EC 780314 ROUTINE SHIFT
JOB TITLE SAMPLE#
LEADOP
78-088-049
RESULT .530
UNIT DURATION PPM 329
PAGE
ECVC
EC
780516
ECOP
78-173-114
ROUTINE SHIFT-LEAK UNDER HO 2
NEUTRALIZER
ECVC
EC
780526
GEWORK
ADDING 1NAOH TO NEUTRALIZER
78-188-116
2.400
PPM
425
.000
PPM
33
ECVC
EC 760601 ROUTINE SHIFT
LEADOP
78-204-117
.710
PPM
404
ECVC
EC 780601 ROUTINE SHIFT
OPERVF
78-205-118
.670
PPM
240
ECVC
EC 780612 ROUTINE SHIFT
ECOP
78-212-125
1.100
PPM
411
ECVC
EC 780612 ROUTINE SHIFT
OPERVP
78-213-126
1.100
PPM
411
ECVC
EC 780710 ROUTINE SHIFT
ECOP
78-261-158
6.730
PPM
473
ECVC
EC 780710 ROUTINE SHIFT
LEADOP
78-262-159
2.110
PPM
472
ECVC
EC 780710 ROUTINE SHIFT
OPERVF
78-237-157
1.800
PPM
473
ECVC
EC 780710 ROUTINE SHIFT
OPERVP
78-236-156
1.970
PPM
473
SL 016652
1/19/93
LAi^^PHARLES (254) PLANT B SAMWtNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
EC 780907 ROUTINE SHIFT
JOB TITLE SAMPLE#
ECOP
78-339-207
RESULT .640
UNIT DURATION PPM 401
I
PA6E
ECVC EC
780907
ROUTINE SHIFT
LEADOP
78-336-204
.000
PPM
401
ECVC
EC 780907 ROUTINE SHIFT
* ECVC
EC 780907 ROUTINE SHIFT
OPERVF OPERVP
78-338-206 78-337-205
.180
PPM
401
.200
PPM
401
ECVC
EC 781003 ROUTINE SHIFT
ECOP
78-304-194
.000
PPM
435
ECVC
EC 781003 ROUTINE SHIFT
OPERVF
78-303-193
.000
PPM
435
ECVC
EC 781003 ROUTINE SHIFT
OPERVP
78-302-192
.000
PPM
435
ECVC
EC 781114 ROUTINE SHIFT
ECOP
78-426-264
.000
PPM
410
ECVC
EC 781114 ROUTINE SHIFT
LEADOP
78-424-262
.000
PPM
410
ECVC
EC 781128 ROUTINE SHIFT
OPERVP
78-427-265
.000
PPM
430
ECVC
EC 781206 ROUTINE SHIFT
ECOP
78-447-283
.000
PPM
425
Ifi653
1/19/93
LAF^HHARLES (254)
PLANT B SAHPPtHG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
EC 781206 ROUTINE SHIFT
JOB TITLE SAMPLE#
LEADOP
78-444-280
RESULT .000
UNIT DURATION
PPM
425
PAGE
ECVC
EC 781206 ROUTINE SHIFT
OPERVF
78-445-281
.000
PPM
425
ECVC
EC 781206 ROUTINE SHIFT
* ECVC
EC 790105 ROUTINE SHIFT
OPERVP OPERVF
78-446-282 79-016-011
.000
PPM
425
.000
PPM
405
ECVC
EC 790110 ROUTINE SHIFT
ECOP
79-023-018
.000
PPM
370
ECVC
EC 790110 ROUTINE SHIFT
LEADOP
79-021-016
.000
PPM
370
ECVC
EC 790110 ROUTINE SHIFT
OPERVP
79-022-017
.000
PPM
370
ECVC
EC
790306
INSTRU
79-117-072
ROUTINE SHIFT WORKING LOGBOOK
INSTRUMENT MAN'S JOB
ECVC
EC 790306 ROUTINE SHIFT
LEADOP
79-114-069
.000
PPM
420
.000
PPM
420
ECVC
EC 790306 ROUTINE SHIFT
OPERVF
79-115-070
.000
PPM
420
ECVC
EC 790322 ROUTINE SHIFT
OPERVP
79-157-093
. 000
PPM
410
SL 016654
1/19/93
LflljBHARLES C254) PLANT B SAMPFiNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
EC
790424
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAN
SAMPLES 79-246-128
RESULT .000
UNIT DURATION
PPM
435
ECVC
EC
790424
PIPEFI
ROUTINE SHIFT WORKING AS
LOGBOOK MECHANIC
79-235-124
.000
PPM
435
ECVC
EC 790502 ROUTINE SHIFT
LEADOP
79-244-126
.290
PPM
435
ECVC
EC 790502 ROUTINE SHIFT
QPERVP
79-245-127
.000
PPM
435
I
ECVC
EC 790524 ROUTINE SHIFT
OPERVF
79-277-155
.640
PPM
420
ECVC
EC
790530
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAN.
79-302-164
ECVC
EC
790530
PIPEFI
ROUTINE SHIFT WORKING AS
LOGBOOK MECHANIC
79-301-163
ECVC
EC
790614
INSTRU
79-315-178
ROUTINE SHIFT WORKING AS LOG
BOOK INSTRUMENT MAN
ECVC
EC
790614
PIPEFI
79-316-179
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC
ECVC
EC
790621
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-342-190
ECVC
EC
790621
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-343-191
.160
PPM
405
.620
PPM
405
2.740
PPM
440
2.790
PPM
440
2.700
PPM
430
2.980
PPM
430 SL 016655
PAGE
1/19/93
LAI^KhARLES (2591 PLANT B SAMWlNG RESULTS THRU 1989
DEPT ECVC
COMPOUND
DATE
EC 790710 ROUTINE SHIFT
JOB TITLE SAMPLE#
LEADOP
79-368-211
RESULT 6.760
UNIT DURATION PPM 405
I
PAGE
ECVC
EC 790710 ROUTINE SHIFT
OPERVF
79-369-212
3.000
PPM
405
ECVC
EC 790710 ROUTINE SHIFT
OPERVP
79-370-213
2.810
PPM
405
ECVC
EC
790806
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING EC/VC TAR BUGGIES
79-386-223
ECVC
EC
790806
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING EC/VC TAR BUGGIES
79-387-224
ECVC
EC 791008 ROUTINE SHIFT
LEADOP
79-445-242
6.710
PPM
385
6.360
PPM
375
.960
PPM
415
ECVC
EC 791008 ROUTINE SHIFT
OPERVF
79-447-244
2.340
PPM
415
ECVC
EC 791008 ROUTINE SHIFT
OPERVP
79-446-243
.110
PPM
415
ECVC
EC 791011
79-507-304
AFT S OF KETTLE/AFT ABV PLTFRM
SW WND/8MPH/73F/43RH/FAIR
ECVC
EC 791011
79-508-305
3FT NE OF KETTLE/5FT ABV PLTFM
SW WND/8MPH/73F/43RH/FAIR
ECVC
EC 791015
79-519-316
5FT SE OF SUMP/5FT ABV GRND/
NE WND/6MPH/50F/86RH/CLEAR
.050
PPM
258
.050
PPM
257
.330
PPM
276
SL 016656
1/19/93
LAHBHARLES (254) PLANT B SAfWTHG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
EC 791015 4FT NE OF SUMP/4FT ABV GRND/
NE WND/6MPH/5OF/86RH/CLEAR
SAMPLE# 79-520-317
RESULT 2.800
UNIT DURATION PPM 276
ECVC
EC
791017
ECOP
FECL3 ADDITION JOB
79-552-328
189.000
PPM
15
ECVC EC
791017
VCAXOP
FECL3 ADDITION JOB
79-553-329
31.500
PPM
15
ECVC
EC
791018
OPERVF
79-554-330
LOADING TAR BUGGY AT DOPP KETL
1 AT VC/NE/4MPH/62F/97RH/FAIR
ECVC
EC
791024
OPERVF
MAKING SAMPLE ROUNDS IN VCM
UNIT
79-590-366
ECVC
EC
791029
GEW0RK
UNLOADING VC TAR BUGGY AT
WASTE POND.
79-616-386
ECVC
EC
791029
GEWORK
UNLOADING VC TAR BUGGY AT
WASTE POND
79-617-387
ECVC
EC
791031
GEWORK
79-449-246
DUMPING VC TAR BUGGY AT WASTE
POND.
ECVC
EC
791031
GEWORK
DISCHARGING VC TAR BUGGY TO
WASTE POND
79-565-341
ECVC
EC
791031
GEWORK
DISCHARGING VC TAR BUGGY TO
WASTE POND
79-625-395
ECVC
EC 791108 ROUTINE SHIFT
ECOP
79-645-415
.050
PPM
15
100 PPM
15
1.100
PPM
12
.100
PPM
12
11.900
PPM
15.400
PPM
.800
PPM
2.140
PPM
380
SL 016657
PAGE
1/19/93
#LA HARLES (259)
PLANT B SAMM' Wl NG RESULTS THRU 1989
DEPT ECVC
COMPOUND
DATE
EC 791108 ROUTINE SHIFT
JOB TITLE SAMPLE#
LEADOP
79-692-912
RESULT .730
UNIT DURATION PPM 380
PAGE
ECVC
EC 791108 ROUTINE SHIFT
OPERVF
79-699-919
5.030
PPM
380
ECVC
EC 791108 ROUTING SHIFT
ECVC
EC 791108 ROUTINE SHIFT
OPERVP VCAXOP
79-693-913 79-696-916
.610
PPM
380
11.300
PPM
900
ECVC
EC 791113
79-669-939
9FT N-NE OF VENT OFF LIFT STA
1,CLEAR,91F,N,7MPH
ECVC
EC 791113
79-665-935
7FT SW OF VENT OFF LIFT STA 1,
CLEAR, 91F,N,7MPH
ECVC
EC 791113
79-666-936
6FT 0F VCM DOPP KETTLE SEAL(l)
,CLEAR,91F,H,7MPH
ECVC
EC 791113 5FT S-SW OF VCM DOPP KETTLE
SEAL(l),CLEAR,91F,N,7MPH
79-667-937
ECVC
EC 791113
79-668-938
5FT S OF VCM DOPP KETTLE SEAL
(2),CLEAR,91F,N,7MPH
ECVC
EC
800122
INSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAN
80-096-026
ECVC EC
800122
ROUTINE SHIFT
LEADOP
80-092-022
1.380
PPM
297
22.600
PPM
297
.050
PPM
298
.030
PPM
298
.010
PPM
295
.510
PPM
920
.590
PPM
920
SL 016658
1/19/93
LAI^HhARLES (254) PLANT B SAM^ING RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
EC
800122
MACHIN
ROUTINE SHIFT AS LOG BOOK
MECHANIC
SAMPLE# 80-041-021
RESULT .250
UNIT DURATION PPM 420
ECVC
EC 800122 ROUTINE SHIFT
OPERVF
80-044-024
.830
PPM
420
ECVC
EC 800123 ROUTINE SHIFT
* ECVC
EC 800205 ROUTINE SHIFT
OPERVP LEADOP
80-043-023 80-140-066
.880
PPM
420
1.320
PPM
428
ECVC
EC 800207
ROUTINE SHIFT SPRAYED WITH EC
ECOP
80-098-042
ECVC
EC
800207
PIPEFI
ROUTINE SHIFT AS LOG BOOK
MECHANIC
80-099-043
ECVC
EC
800305
OPERVF
ROUTINE SHIFT, OPERATOR WAS
SPRAYED WHEN VALVE BROKE
80-148-067
ECVC
EC 800305 ROUTINE SHIFT
OPERVF
80-149-068
23.050
PPM
450
1.670
PPM
435
1.300
PPM
428
1.290
PPM
428
ECVC
EC
800311
PIPEFI
80-168-078
REMOVING HEAVY STILL REBOILER
.200
PPM
55
ECVC
EC
800311
PIPEFI
80-241-114
REMOVING HEAVY STILL REBOILER
.200
PPM
55
ECVC
EC
800311
WELDER
80-170-080
REMOVING HEAVY STILL REBOILERS
.250
PPM
55
SL 016659
PAGE
1/19/93
LAI^BhaRLES (259) PLANT B SAMWfNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE SAMPLE#
EC
800311
WELDER
80-243-116
REMOVING HEAVY STILL REBOILERS
RESULT .250
UNIT DURATION
PPM
55
PAGE
ECVC
EC
800324
INSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAN
ECVC
t
ECVC
EC
800324
WELDER
ROUTINE SHIFT AS LOG BOOK
MECHANIC
EC 800417 ROUTINE SHIFT
ECOP
80-179-080 80-178-079 80-228-103
.210
PPM
427
.220
PPM
429
6.500
PPM
430
ECVC
EC
800417
VCAXOP
MORNING SAMPLE ROUND
80-232-107
.500
PPM
15
ECVC
EC
800425
OPERVF
80-253-121
MORNING SAMPLE ROUND CATCHING
VCM BOMB
ECVC
EC
800425
WELDER
80-255-133
INSTALLING SRV ON VCM #4 DAY
TANK
ECVC
EC 800623 ROUTINE SHIFT
ECOP
80-338-168
2.100
PPM
15
1.250
PPM
40
45.400
PPM
421
ECVC
EC 800714 ROUTINE SHIFT
VCAXOP
80-392-198
4.140
PPM
433
ECVC
EC 800923 ROUTINE SHIFT
INSTRU
80-492-234
.710
PPM
440
ECVC
EC 800923 ROUTINE SHIFT
LEADOP
80-487-229
1.180
PPM
447
SL 016660
1/19/93
LAI^BhARLES (25$) PLANT B SAHmNG RESULTS THRU 1989
DEPT ECVC
COMPOUND
DATE
JOB TITLE SAMPLE#
EC
800923
MACHIN
80-991-233
ROUTINE SHIFT AS LOG BOOK MECH
RESULT .910
UNIT DURATION
PPM
997
ECVC
EC 800923 ROUTINE SHIFT
OPERVF
80-989-231
32.890
PPM
997
ECVC
EC 800923 ROUTINE SHIFT
* ECVC
EC 800923 ROUTINE SHIFT
OPERVP VCAXOP
80-990-232 80-988-230
12.020
PPM
998
9.920
PPM
957
ECVC
EC 801001 CENTER OF CONTROL ROOM
80-512-295
1.150
PPM
937
ECVC
EC
801001
INSTRU
ROUTINE SHIFT AS LOGBOOK
INSTRUMENT MAN
ECVC
EC 801001 ROUTINE SHIFT
LEADOP
80-511-299 80-955-229
1.690
PPM
933
.610
PPM
399
ECVC
EC 801001 ROUTINE SHIFT
OPERVF
80-509-292
.380
PPM
933
ECVC
EC 801001 ROUTINE SHIFT
OPERVP
80-510-293
.590
PPM
939
ECVC
EC 801001 ROUTINE SHIFT
VCAXOP
80-959-223
5.580
PPM
923
ECVC
EC 801023 ROUTINE SHIFT
ECOP
80-553-276
21.700
PPM
995
SI* 016661
PAGE
1/19/93
LAI^WIARLES (254) PLANT B SAMWENG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
EC 810223 ROUTINE SHIFT
JOB TITLE SAMPLE#
ECOP
81-059-028
RESULT .120
UNIT DURATION PPM 442
ECVC
EC 810316 ROUTINE SHIFT
LEADOP
81-100-050
.390
PPM
438
ECVC
EC 810316 ROUTINE SHIFT
t
ECVC
EC 810423 ROUTINE SHIFT.
VCAXOP ECOP
81-102-052 81-147-068
.590
PPM
447
.250
PPM
457
ECVC EC
810507
ROUTINE SHIFT.
OPERVP
81-175-085
.720
PPM
441
ECVC
EC 810507 ROUTINE SHIFT.
VCAXOP
81-176-086
.600
PPM
437
ECVC
EC 810625 ROUTINE SHIFT.
ECOP
81-285-156
2.100
PPM
425
ECVC
EC 810625 ROUTINE SHIFT.
LGINM
81-287-158
2.400
PPM
431
ECVC
EC
810625
LGMC
DID REPAIR WORK ON VALVES
AROUND THE VCM DAY TANKS.
ECVC
EC
810630
VCAXOP
CLOSING OFF A VINYL SAMPLE
BOMB.
ECVC
EC 810730 ROUTINE SHIFT.
OPERVF
81-286-157 81-288-159 81-338-187
1.000
PPM
431
.550
PPM
15
.750
PPM
216
0
PAGE
1/19/93
LAI^RhaRLES (254) PLANT B SAILING RESULTS THRU 1989
DEPT COMPOUND
DATE
ECVC
EC 810730 ROUTINE SHIFT.
JOB TITLE SAMPLE#
OPERVP
81-337-186
RESULT .920
UNIT DURATION
PPM
958
ECVC EC
810730
ROUTINE SHIFT.
VCAXOP
81-339-188
3.100
PPM
960
ECVC
EC 810918 ROUTINE SHIFT
OPERVP
81-955-262
1.590
PPM
932
ECVC
EC 810918 ROUTINE SHIFT
VCAXOP
81-956-263
9.390
PPM
932
ECVC
EC 810928 ROUTINE SHIFT
OPERVF
81-980-269
5.930
PPM
937
ECVC
EC 811012 ROUTINE SHIFT
ECOP
81-533-301
1.360
PPM
926
ECVC
EC
811012
LGINM
WORKED IN CONTROL ROOM THE
MAJORITY OF THE DAY
81-539-302
ECVC
EC
811013
LGMC
81-538-309
REPAIRED EQUIPMENT IN EC AND
VC UNITS.
ECVC ECVC
EC
811013
OPERVF
81-537-303
COLLECTING SAMPLES AND WASHED-
DOWN HEAVY BOTTOMS AND FURNACE
FEED AREA
EC
820107
LEADOP
HCL AND EC UNITS RUNNING
NORMAL RATES; VCM UNIT DOWN.
82-011-009
ECVC
EC
820107
OPERVF
HCL AND EC UNITS RUNNING
NORMAL RATES; VCM UNIT DOWN.
82-012-010
.350
PPM
933
.370
PPM
939
.620
PPM
15
1.520
PPM
995
.920
PPM
957
SL 016663
PAGE
1/19/93
LA PLANT B SA
HARLES (254) NG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
EC
820107
VCAXOP
HCL AND EC UNITS RUNNING
NORMAL RATES; VCM UNIT DOWN.
SAMPLE# 82-013-011
RESULT 14.800
UNIT DURATION PPM 445
ECVC ECVC
EC
820603
ECOP
OUTSIDE WORK UNDER UPSET
CONDITIONS- INSTRUMENT AIR
LOST EARLY IN MORNING
EC
820603
LGINM
WORKED IN CONTROL ROOM
82-122-077 82-123-078
14.430
PPM
440
2.080
PPM
423
PAGE
ECVC ECVC
EC
820603 OPERVP
82-195-099
REPAIRED VINYL PROCESS PUMP;
LEAKING HOSE, 6 MINUTES. 77 F
PC WINDS E 6MPH 93X RH
EC 820603 VCAXOP MORNING SAMPLING ROUND
82-196-100
1.260
PPM
14.500
PPM
16 15
ECVC
EC
820625
LGMC
82-241-130
ROUTINE SHIFT- WORKED THROUGH
OUT UNIT
ECVC ECVC
EC
820708
ECOP
RECHARGED CATALYST TANKS IN
EC/HCL UNIT ; EC BROUGHT UP
DURING MORN. TO NORMAL OP.
82-265-147
EC
820708
LGINM
82-267-149
REPAIRED HCL VALVE TO ABSORBER
.530
PPM
447
29.000
PPM
435
.450 PPM
455
ECVC
EC
820708
LGMC
REPAIRED SCRUBBERS IN HCL
UNITS.
82-266-148
ECVC ECVC
EC
820708
OPERVF
CLEARING TANKS IN EMERGENCY
SHUT-DOWN CONDITIONS OF VC
UNIT. 87 F 61X RH W-6MPH
82-263-145
EC
820708
VCAXOP
82-264-146
EC UNIT BROUGHT UP DURING MORN
ADDED CATALYST TO EC PRODUCT.
.110
PPM
456
.770
PPM
453
61.900
PPM
447
SL 016664
1/19/93
LAI^WHARLES (254) PLANT B SAMmNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
EC 820820 ROUTINE SHIFT
JOB TITLE SAMPLE#
ECOP
82-352-218
RESULT 1.880
UNIT DURATION
PPM
446
ECVC
EC
820820
LGINM
ROUTINE SHIFT. ROUTE WORK.
82-354-220
.270
PPM
416
ECVC
EC 820820 ROUTINE SHIFT
LGMC
82-353-219
ECVC
EC
820908
OPERVP
82-374-232
ROUTINE MORNING ROUND COLLECT-
ING SAMPLES IN VC UNIT.
ECVC
EC
820908
VCAXOP
82-376-234
ROUTINE MORNING ROUND COLLECT-
ING SAMPLES IN HCL UNIT.
ECVC
EC
821011
ECOP
82-430-276
CLEARED AND ADDED CATALYST TO
REACTOR.
ECVC
EC
821011
LGMC
WORKED THROUGHOUT UNIT.
82-431-277
.250
PPM
430
1.200
PPM
17
1.160
PPM
16
12.010
PPM
436
.930
PPM
429
ECVC
EC
821026
VCAXOP
ROUTINE MORNING ROUNDS
82-463-304
24.200
PPM
17
ECVC
EC
821103
OPERVF
ROUTINE SHIFT. VC/HCL UNITS
DOWN.
82-480-321
ECVC
EC
821103
OPERVP
ROUTINE SHIFT. VC/HCL UNITS
DOWN.
82-479-320
ECVC
EC
821103
VCAXOP
ROUTINE SHIFT. VC/HCL UNITS
DOWN.
82-481-322
1.740
PPM
419
2.180
PPM
420
11.700
PPM
413
SL 016665
PAGE
LAI^HKARLES (254) PLANT B SAMFHhS RESULTS THRU 1984
DEPT ECVC
ECVC
COMPOUND
DATE
JOB TITLE SAMPLE#
EC
821118
LGMC
82-517-342
REPAIRED RELEIF VALVE ON COM
PRESSOR 8 WORKED ON RUBBER
LINE STG. TK. WINDS E-6.
EC 821202 ROUTINE SHIFT.
ECOP
82-540-359
RESULT .270
UNIT DURATION PPM 435
.670
PPM
438
ECVC
EC
821202
VCAXOP
MAINTENANCE WORK IN FURNACE
AREA
82-539-358
ECVC
EC
830215
OPERVF
83-099-066
ROUTINE SAMPLE ROUNDS. NORMAL
OPERATIONS.
ECVC ECVC
EC
830215
OPERVP
CAUGHT SAMPLES AND DRAINED
NEUTRALIZER SYSTEM. NORMAL
OPERATIONS.
83-098-065
EC
830314
OPERVF
83-157-105
UPSET OPERATING CONDITIONS /2
OHC REACTORS WENT DOWN.
ECVC
EC
830314
OPERVP
83-156-104
UPSET OPERATING CONDITIONS/2
OHC REACTORS DOWN
ECVC
EC
830429
OPERVF
CAUGHT SAMPLES ON MORNING
ROUNDS. NORMAL OPERATIONS.
83-200-143
ECVC ECVC
EC
830429
OPERVP
CLEARED VINYL PUMP AND DID
MORNING ROUNDS. NORMAL OPE
RATIONS.
EC
830517
OPERVF
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-199-142 83-228-161
ECVC
EC
830517
OPERVP
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-227-160
2.310
PPM
445
1.410
PPM
16
1.430
PPM
32
.090
PPM
434
.050
PPM
433
.900
PPM
24
.490
PPM
21
.150
PPM
424
.170
PPM
400
1/19/93
#LA 1ARLES (259)
PLANT B SAMMPOIMG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
EC
830610
ECOP
ROUTINE SHIFT. SOME EXTRA
SAMPLING. NORMAL OPERATIONS.
SAMPLES 83-282-194
RESULT 5.790
UNIT DURATION
PPM
449
ECVC
EC
830610
LGINM
ROUTE WORK IN UNIT. NORMAL
OPERATIONS.
83-284-196
1.410
PPM
446
ECVC
EC
830610
LGMC
83-283-195
ROUTINE LOG BOOK WORK IN UNIT.
NORMAL OPERATIONS.
.870
PPM
463
ECVC
EC
830616
OPERVP
83-293-205
ROUTINE MORNING ROUNDS. NORMAL
OPERATIONS.
1.020
PPM
15
ECVC
EC
830713
ECOP
NORMAL OPERATIONS, ROUTINE
SHIFT
83-321-229
.210
PPM
377
ECVC
EC
830713
OPERVF
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-320-228
.790
PPM
397
ECVC
EC
830713
OPERVP
NORMAL OPERATIONS, ROUTINE
SHIFT
83-319-227
.870
PPM
384
ECVC
EC
830825
ECOP
ROUTINE SHIFT. REDUCED OPE
RATIONS- VC UNIT DOWN.
83-379-280
1.140
PPM
435
ECVC ECVC ECVC
EC
830825
LGINM
83-380-281
PULLED ABSORBER AND PRODUCT
STILL FLOAT CHAMBERS. REDUCED
OPERATIONS- VC UNIT DOWN
EC
830901
OPERVF
83-400-292
DECOKED FURNACE AND DEPRESSU
RIZED DEHUMIDIFIER. REDUCED
OPERATIONS. VC UNIT DOWN.
EC
830901
OPERVP
83-399-291
RAN COOLING TOWER SAMPLE AND
CHECKED PURGE ON VC HUMIDIFIER
REDUCED OPERATIONS-VC DOWN.
1.200
PPM
432
1.070
PPM
19
4.490
PPM
15
SL 016667
PAGE
1/19/93
LAlMniARLES (254) PLANT B SAMPLING RESULTS THRU 1984
PAGE
DEPT ECVC
COMPOUND
DATE
JOB TITLE
EC
830922
OPERVP
OPERATIONS DOWN, PRESSURE
CHECKS AND DOWN ACTIVITIES
SAMPLE# 83-443-312
RESULT .630
UNIT DURATION PPM 375
ECVC
EC
831017
ECOP
83-497-345
ROUTINE SHIFT. NORMAL OPERA-
TIONS.
.100
PPM
436
ECVC
EC
831017
LGINM
LOGBOOK: WORK IN VC AREA.
NORMAL OPERATIONS.
83-498-346
.090
PPM
444
ECVC
EC
831031
ECOP
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-509-357
8.800
PPM
409
ECVC
EC
831031
OPERVF
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-508-356
3.200
PPM
411
ECVC
EC
831031
OPERVP
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-507-355
2.710
PPM
409
ECVC
EC
831207
ECOP
ADDED CATALYST TO REACTOR.
NORMAL OPERATIONS.
83-568-404
9.520
PPM
453
ECVC
EC
840116
ECOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
83-041-022
25.300
PPM
397
ECVC
EC
840116
FUOP
83-040-021
VC UNIT DOWN: SCHEDULED OUTAGE
DUTIES.
34.900
PPM
393
ECVC ECVC
EC
840125
OPERVP
DOWN OPERATIONS. LEAK PATROL
HNU IN PROCESS, DAY TK AND
SPHERES AREA. WIND NNE-13.
EC
840201
ECOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
84-068-034 84-093-051
3.490
PPM
210
SL 016668
21.200
PPM
401
1/19/93
HARLES (259) PLANT B SAMnfl HG RESULTS THRU 1989
DEPT ECVC
COMPOUND
DATE
JOB TITLE
EC
890201
OPERVP
NORMAL START-UP OPERATIONS.
SAMPLE# 89-092-050
RESULT 9.900
UNIT DURATION
PPM
913
PAGE
ECVC
ECVC *
ECVC
ECVC
ECVC
EC
890201
OPERVP
NORMAL OPERATIONS STARTING-UP
VCM PLANT. LEAK PATROL WITH
HHU.
89-099-052
EC
890209
OPERVP
89-115-067
NORMAL OPERATIONS. LEAK PATROL
WITH HHU IN PROCESS, DAY TK,
SPHERES AREAS. RAINING.
EC
890215
OPERVP
89-123-073
NORMAL OPERATIONS. LEAK PATROL
WITH HNU IN PROCESS, DAY TK,
SPHERES AREAS.
EC
890309
ECOP
ROUTINE SHIFT. WORKED ON
LEAKING EC PUMP. NORMAL OPE
RATIONS.
89-196-090
EC
890309
OPERVF
ROUTINE SHIFT. DUMPED A TAR
BUGGY. NORMAL OPERATIONS.
89-195-089
ECVC
EC
890309
OPERVP
ROUTINE SHIFT. NORMAL OPERA
TIONS.
89-199-088
ECVC ECVC
EC
890328
OPERVP
89-171-119
LEAK PATROL WITH HNU. WASHING
DOWN NO.3 NEUTRALIZER. NORMAL
OPERATIONS.
EC 890910 WINDS SE-12/S-10. NORMAL OP. UPSTAIRS WEST SIDE
89-199-137
ECVC
EC
890918
PSOP
89-223-161
NORMAL OPERATIONS. EC/VC/HCL
UNITS. LEAK PATROL WITH HNU.
ECVC
EC
890925
PSOP
89-236-179
NORMAL OPERATIONS. LEAK PATROL
WITH HNU. WINDS S-E-18.
8.100
PPM
270
.650
PPM
195
.310
PPM
270
2.990
PPM
993
6.790
PPM
993
1.990
PPM
995
.990
PPM
270
.050
PPM
269
.280
PPM
155
.950
PPM
190
SL 016669
1/19/93
LAI^BhARLES (254) PLANT B SAMmilG RESULTS THRU 1984
PAGE
DEPT ECVC
COMPOUND
DATE
JOB TITLE
EC
840502
PSOP
LEAK PATROL WITH HHU. UNIT
DOWN.
SAMPLE# 84-245-183
RESULT .050
UNIT DURATION
PPM
325
ECVC
EC
840509
OPERVP
ROUTINE SHIFT. VINYL UNIT
DOWN.
84-260-196
.420
PPM
396
ECVC
EC
840516
PSOP
LEAK PATROL WITH HNU. VINYL
UNIT DOWN.
84-281-205
1.300
PPM
300
ECVC ECVC
EC
840523
PSOP
LEAK PATROL WITH HNU AROUND
VINYL DAY TANKS AND SPHERES.
VC UNIT DOWN.
84-289-211
EC
840530
ECOP
84-294-216
ROUTINE SHIFT. NORMAL OPERA
TIONS.
.220 PPM
180
2.190
PPM
423
ECVC
EC
840606
ECOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
84-309-226
11.100
PPM
413
ECVC
EC
840606
FUOP
84-310-227
DOWN 'OPERATIONS. LEAK PATROL
WITH HNU.
.750
PPM
125
ECVC ECVC
EC
840606
PSOP
DOWN OPERATIONS. MORN. ROUND
UNPLUGGED BLEED LINE TO TAR
BUGGY.
84-308-225
EC
840613
PSOP
84-332-244
DOWN OPERATIONS. LEAK PATROL
WITH HNU.
.940 PPM
18
1.160
PPM
117
ECVC
EC
840620
FUOP
84-349-261
DOWN OPERATIONS. ROUNDS DURING
DOWN OP. WIND W/SW-5.
1.610
PPM
387
ECVC
EC
840620
PSOP
84-348-260
DOWN OPERATIONS. LEAK PATROL
WITH HHU.
.190
PPM
90 CT Ol667 blJ
1/19/93
LAI^^HARLES (254) PLANT B SAHWlNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
EC
840627
PSOP
DOWN OPERATIONS. LEAK PATROL
WITH HNU.
SAMPLE# 84-352-264
RESULT .740
UNIT DURATION PPM 150
ECVC
EC
840711
ECOP
ROUTINE SHIFT. UNIT DOWN.
84-380-289
1.620
PPM
415
ECVC
* ECVC
EC
840711
FUOP
CLEARED PRODUCT STILL FEED
TANK. UNIT DOWN.
EC
840711
PSOP
LEAK PATROL WITH HNU. UNIT
DOWN.
ECVC
EC
840830
FUOP
NORMAL OP. MORN. SAMPLING
ROUND.
ECVC
EC
840830
PSOP
NORMAL OP. ROUTINE SHIFT.
84-379-288 84-378-287 84-444-345 84-443-344
1.580
PPM
415
29.130
PPM
180
1.960
PPM
17
1.450
PPM
408
ECVC
EC
840907
ECOP
NORMAL OP. ROUTINE SHIFT.
84-465-360
5.750
PPM
415
ECVC
EC
840907
FUOP
NORMAL OP. ROUTINE SHIFT.
84-464-359
.610
PPM
397
ECVC
EC
840907
PSOP
84-463-358
NORMAL OP. ROUTINE MORN. SAM-
PLE ROUND. WIND E/NE-8.
ECVC
EC
841001
FUOP
NORMAL OP. ROUTINE SHIFT.
84-525-402
.410
PPM
17
1.580
PPM
420
ECVC
EC
841001
PSOP
NORMAL OPERATIONS ROUTINE
SHIFT.
84-524-401
1.780
PPM
420
SL 016671
PAGE
1/19/93
LAf^WJARLES (254) PLANT B SAMWnG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE SAMPLE#
EC
841101
ECOP
84-575-437
NORMAL OP. EC/HCL UNIT. ROUTI -
NE SHIFT.
RESULT 19.000
UNIT DURATION
PPM
403
ECVC ECVC
EC
841101
PSOP
84-574-436
DOWN OP . VC/UNIT. DOWN OP.
DUTIES ON PROCESS AND FURNACE
JOBS.
EDC
780206
LEADOP
ROUTINE SHIFT VCM LEAD OPER
78-028-020
.170
PPM
407
.000
PPM
390
PAGE
ECVC
EDC 780314 ROUTINE SHIFT
LEADOP
78-088-049
.000
PPM
329
ECVC
EDC
780516
ECOP
78-173-114
ROUTINE SHIFT-LEAK UNDER NO 2
NEUTRALIZER
ECVC
EDC
780526
GEWORK
ADDING 1NAOH TO NEUTRALIZER
78-188-116
.000
PPM
425
.000
PPM
33
ECVC
EDC 780601 ROUTINE SHIFT
LEADOP
78-204-117
.250
PPM
404
ECVC
EDC 780601 ROUTINE SHIFT
OPERVF
78-205-118
.990
PPM
240
ECVC
EDC 780612 ROUTINE SHIFT
ECOP
78-212-125
.580
PPM
411
ECVC
EDC 780612 ROUTINE SHIFT
OPERVP
78-213-126
ECVC
EDC 780710 ROUTINE SHIFT
ECOP
78-261-158
.000
PPM
411
.240
PPM
473
SL 016672
1/19/93
LAI^WMRLES (254) PLANT B SAmWING RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
EDC 780710 ROUTINE SHIFT
JOB TITLE SAMPLE#
LEADOP
78-262-159
RESULT .950
UNIT DURATION PPM 472
ECVC EDC
780710
ROUTINE SHIFT
OPERVF
78-237-157
1.280
PPM
473
ECVC
EDC 780710 ROUTINE SHIFT
OPERVP
78-236-156
1.160
PPM
473
ECVC EDC
780907
ROUTINE SHIFT
ECQP
78-339-207
.120
PPM
401
ECVC
EDC 780907 ROUTINE SHIFT
LEADOP
78-336-204
.480
PPM
401
ECVC
EDC 780907 ROUTINE SHIFT
OPERVF
78-338-206
.000
PPM
401
ECVC
EDC 780907 ROUTINE SHIFT
OPERVP
78-337-205
.600
PPM
401
ECVC
EDC 781003 ROUTINE SHIFT
ECOP
78-304-194
.000
PPM
435
ECVC
EDC 781003 ROUTINE SHIFT
LEADOP
78-301-191
.190
PPM
435
ECVC
EDC 781003 ROUTINE SHIFT
OPERVF
78-303-193
.000
PPM
435
ECVC
EDC 781003 ROUTINE SHIFT
OPERVP
78-302-192
.480
PPM
435
SL 016673
PAGE
LAARLES (254) PLANT B SAMmNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
EDC 781114 ROUTINE SHIFT
JOB TITLE SAMPLE#
ECOP
78-426-264
RESULT .220
UNIT DURATION
PPM
410
ECVC
EDC
781114
ROUTINE SHIFT
LEADOP
78-424-262
.310
PPM
410
ECVC
EDC 781128 ROUTINE SHIFT
* ECVC
EDC 761206 ROUTINE SHIFT
OPERVP ECOP
78-427-265 78-447-283
.600
PPM
430
.000
PPM
425
ECVC
EDC
781206
ROUTINE SHIFT
LEADOP
78-444-280
.290
PPM
425
ECVC
EDC 781206 ROUTINE SHIFT
OPERVF
78-445-281
.940
PPM
425
ECVC
EDC 781206 ROUTINE SHIFT
OPERVP
78-446-282
.190
PPM
425
ECVC
EDC 790105 ROUTINE SHIFT
LEADOP
79-015-010
.500
PPM
405
ECVC
EDC 790105 ROUTINE SHIFT
OPERVF
79-016-011
.000
PPM
405
ECVC
EDC 790110 ROUTINE SHIFT
ECOP
79-023-018
.190
PPM
370
ECVC
EDC 790110 ROUTINE SHIFT
LEADOP
79-021-016
.210
PPM
370
SL 016674
1/19/93
LAHHARLES (259) PLANT B SAMfflHG RESULTS THRU 1989
DEPT ECVC
COMPOUND
DATE
EDC 790110 ROUTINE SHIFT
JOB TITLE SAMPLE#
OPERVP
79-022-017
RESULT .000
UNIT DURATION PPM 370
ECVC
EDC 790306 ROUTINE SHIFT
ECOP
79-116-071
.920
PPM
920
ECVC
EDC
790306
INSTRU
79-117-072
ROUTINE SHIFT WORKING LOGBOOK
INSTRUMENT MAN'S JOB
ECVC
EDC 790306 ROUTINE SHIFT
LEADOP
79-119-069
.280
PPM
920
. 090
PPM
920
ECVC
EDC 790306 ROUTINE SHIFT
OPERVF
79-115-070
.510
PPM
920
ECVC
EDC 790322 ROUTINE SHIFT
OPERVP
79-157-093
.290
PPM
910
ECVC
EDC
790327
ECOP
ROUTLNE SHIFT
WIND-SSE AT 9.9MPH
ECVC
EDC
790327
PIPEFI
ROUTINE SHIFT AS LOGBOOK
MECHANIC , WIND SSE AT 9MPH
ECVC
EDC
790929
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAN
ECVC
EDC
790929
PIPEFI
ROUTINE SHIFT WORKING AS
LOGBOOK MECHANIC
ECVC
EDC 790502 ROUTINE SHIFT
ECOP
79-199-090 79-171-097 79-296-128 79-235-129 79-297-129
.000
PPM
925
.190
PPM
230
.260
PPM
935
.590
PPM
935
.920
PPM
935
SL 016675
PAGE
LaJBhARLES (254) PLANT B SAMWiNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
EDC 790502 ROUTINE SHIFT
JOB TITLE SAMPLE#
LEADOP
79-244-126
RESULT 1.200
UNIT DURATION PPM 435
ECVC
EDC 790502 ROUTINE SHIFT
OPERVP
79-245-127
.610
PPM
435
ECVC
EDC
790509
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-251-133
ECVC
EDC
790509
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-252-134
ECVC
EDC 790524 ROUTINE SHIFT
OPERVF
79-277-155
.090
PPM
455
.460
PPM
455
.000
PPM
420
ECVC
EDC
790530
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAN.
79-302-164
ECVC
EDC
790530
PIPEFI
ROUTINE SHIFT WORKING AS
LOGBOOK MECHANIC
79-301-163
ECVC
EDC
790614
INSTRU
79-315-178
ROUTINE SHIFT WORKING AS LOG
BOOK INSTRUMENT MAN
ECVC
EDC
790614
PIPEFI
79-316-179
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC
ECVC
EDC
790621
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-342-190
ECVC
EDC
790621
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-343-191
.490
PPM
405
.270
PPM
405
.200
PPM
440
.070
PPM
440
.500
PPM
430
.700
PPM
430
1/19/93
LAl^WIARLES (254) PLANT B SAMWiNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
EDC 790710 ROUTINE SHIFT
JOB TITLE SAMPLE#
LEADOP
79-368-211
RESULT .110
UNIT DURATION
PPM
405
ECVC
EDC 790710 ROUTINE SHIFT
OPERVF
79-369-212
.090
PPM
405
ECVC
EDC 790710 ROUTINE SHIFT
OPERVP
79-370-213
t ECVC
EDC
790806
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING EC/VC TAR BUGGIES
79-386-223
ECVC
EDC
790806
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING EC/VC TAR BUGGIES
79-387-224
ECVC
EDC 791008 ROUTINE SHIFT
LEADOP
79-445-242
1.080
PPM
405
1.120
PPM
385
.540
PPM
375
1.960
PPM
415
ECVC
EDC 791008 ROUTINE SHIFT
OPERVF
79-447-244
1.190
PPM
415
ECVC
EDC 791008 ROUTINE SHIFT
OPERVP
79-446-243
.050
PPM
415
ECVC
EDC 791011
79-506-303
3FT N OF KETTLE/4FT ABV PLTFRM
SW WND/8MPH/73F/43RH/FAIR
ECVC
EDC 791011
79-507-304
4FT S OF KETTLE/4FT ABV PLTFRM
SW WND/8MPH/73F/43RH/FAIR
ECVC
EDC 791011
79-508-305
3FT NE OF KETTLE/5FT ABV PLTFM
SW WND/8MPH/73F/43RH/FA1R
.050
PPM
259
1.760
PPM
258
1.330
PPM
257
SL 016677
PAGE
1/19/93
LAI^^HARLES (254) PLANT B SAHmNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
EDC 791015 5FT SE OF SUMP/5FT ABV GRND/ NE WND/6MPH/50F/86RH/CLEAR
SAMPLE# 79-519-316
RESULT .100
UNIT DURATION PPM 276
ECVC
EDC 791015
79-520-317
4FT HE OF SUMP/4FT ABV GRND/
NE WND/6MPH/5OF/86RH/CLEAR
.280
PPM
276
ECVC
EDC
791017
ECOP
FECL3 ADDITION JOB
79-552-328
.000
PPM
15
PAGE
ECVC
EDC
791018
OPERVF
79-554-330
LOADING TAR BUGGY AT DOPP KETL
1 AT VC/NE/4MPH/62F/97RH/FAIR
ECVC
EDC
791024
OPERVF
MAKING SAMPLE ROUNDS IN VCM
UNIT
79-590-366
ECVC
EDC
791029
GEWORK
UNLOADING VC TAR BUGGY AT
WASTE POND.
79-616-386
ECVC
EDC
791029
GEWORK
UNLOADING VC TAR BUGGY AT
WASTE POND
79-617-387
ECVC
EDC
791031
GEWORK
79-449-246
DUMPING VC TAR BUGGY AT WASTE
POND.
ECVC
EDC
791031
GEWORK
DISCHARGING VC TAR BUGGY TO
WASTE POND
79-565-341
ECVC
EDC
791031
GEWORK
DISCHARGING VC TAR BUGGY TO
WASTE POND
79-625-395
ECVC
EDC 791108 ROUTINE SHIFT
ECOP
79-645-415
1.990
PPM
15
.500
PPM
15
.100
PPM
12
.100
PPM
12
19.300
PPM
5
32.200
PPM
6
2.800
PPM
6
.250
PPM
380
SL 016678
1/19/93
LAI^MARLES (259) PLANT B SAMWNG RESULTS THRU 1989
DEPT ECVC
COMPOUND
DATE
EDC 791108 ROUTINE SHIFT
JOB TITLE SAMPLE#
LEADOP
79-692-912
RESULT .230
UNIT DURATION
PPM
380
PAGE
ECVC
EDC 791108 ROUTINE SHIFT
OPERVF
79-699-919
.610
PPM
380
ECVC
EDC 791108 ROUTING SHIFT
t ECVC
EDC 791108 ROUTINE SHIFT
OPERVP VCAXOP
79-693-913 79-696-916
.590
PPM
380
.150
PPM
900
ECVC
EDC 791113
79-669-939
9FT N-HE OF VENT OFF LIFT STA
1 .CLEAR, 91F,N,7MPH
ECVC
EDC 791113
79-665-935
7FT SW OF VENT OFF LIFT STA 1
CLEAR,91F,N,7MPH
ECVC
EDC 791113
79-666-936
6FT (IF VCM DOPP KETTLE SEALC1
,CLEAR,91F,H,7MPH
ECVC
EDC 791113 5FT S-SW OF VCM DOPP KETTLE SEAL(1).CLEAR,91F,N,7MPH
79-667-937
ECVC
EDC 791113
79-668-938
5FT S OF VCM DOPP KETTLE SEAL
(2) ,CLEAR,91F,N,7MPH
ECVC
EDC
800122
INSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAH
80-096-026
ECVC
EDC 800122 ROUTINE SHIFT
LEADOP
80-092-022
.960
PPM
297
3.870
PPM
297
.130
PPM
298
.290
PPM
29S
.130
PPM
295
.190
PPM
920
.190
PPM
920
SL 016679
1/19/93
LAI^JARLES (254) PLANT B SAMflmiG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
EDC
800122
MACHIN
ROUTINE SHIFT AS LOG BOOK
MECHANIC
SAMPLE# 80-041-021
RESULT .060
UNIT DURATION PPM 420
ECVC
EDC 800122 ROUTINE SHIFT
OPERVF
80-044-024
.180
PPM
420
ECVC
EDC 800123 ROUTINE SHIFT
* ECVC
EDC 800205 ROUTINE SHIFT
OPERVP LEADOP
80-043-023 80-140-066
.190
PPM
420
.220
PPM
428
ECVC
EDC 800207 ROUTINE SHIFT SPRAYED WITH EC
ECOP
ECVC
EDC
800207
PIPEFI
ROUTINE SHIFT AS LOG BOOK
MECHANIC
ECVC
EDC
800214
OPERVF
MORNBNG SAMPLE ROUND
80-098-042 80-099-043 80-031-016
.200
PPM
450
. 170
PPM
435
18.870
PPM
15
ECVC
EDC 800214 SAMPLE ANALYSIS
VCAXOP
80-114-056
1.490
PPM
15
ECVC
EDC
800305
OPERVF
ROUTINE SHIFT, OPERATOR WAS
SPRAYED WHEN VALVE BROKE
80-148-067
ECVC
EDC 800305 ROUTINE SHIFT
OPERVF
80-149-068
.420
PPM
428
.860
PPM
428
ECVC
EDC
800311
PIPEFI
80-168-078
REMOVING HEAVY STILL REBOILER
132.000
PPM
55
PAGE si. l668
1/19/93 I
LAJ^^HARLES (254) PLANT B SAMWlNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE SAMPLE#
EDC
800311
PIPEFI
80-169-079
REMOVING HEAVY STILL REBOILER
RESULT 1.780
UNIT DURATION
PPM
50
PAGE
ECVC
EDC
800311
PIPEFI
80-241-114
REMOVING HEAVY STILL REBOILER
132.000
PPM
55
ECVC
EDC
800311
PIPEFI
80-242-115
REMOVING HEAVY STILL REBOILER
* ECVC
EDC
800311
WELDER
80-170-080
REMOVING HEAVY STILL REBOILERS
1.780
PPM
35.900
PPM
50 55
ECVC
EDC
800311
WELDER
80-243-116
REMOVING HEAVY STILL REBOILERS
35.900
PPM
55
ECVC
EDC
800317
IHSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAN
ECVC
EDC
800324
INSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAN
ECVC
EDC
800324
WELDER
ROUTINE SHIFT AS LOG BOOK
MECHANIC
ECVC
EDC 800325 ROUTINE SHIFT
VCAXOP
80-230-105 80-179-080 80-178-079 80-177-078
.120
PPM
430
1.040
PPM
427
.070
PPM
429
.340
PPM
432
ECVC
EDC 800417 ROUTINE SHIFT
ECOP
80-228-103
170 PPM
430
ECVC
EDC
800417
OPERVF
MORNING SAMPLE ROUND
80-231-106
.360
PPM
15
Si ole6ai
1/19/93
LAf^KHARLES (254) PLANT B SAMPLING RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
EDC
800423
MACHIN
ROUTINE SHIFT AS LOG BOOK
MECHANIC
SAMPLE# 80-218-101
RESULT .090
UNIT DURATION PPM 380
ECVC
EDC
800527
INSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAN
80-306-152
.590
PPM
437
ECVC
EDC 800527 ROUTINE SHIFT
LEADOP
80-301-147
.650
PPM
445
* ECVC
EDC
800527
MACHIN
ROUTINE SHIFT AS LOG BOOK
MECHANIC
80-305-151
.260
PPM
451
ECVC
EDC 800527 ROUTINE SHIFT
OPERVF
80-303-149
.690
PPM
440
PAGE
ECVC
EDC 800527 ROUTINE SHIFT
OPERVP
80-302-148
.590
PPM
440
ECVC
EDC
800611
VCAXOP
MORNBNG SAMPLE ROUND
80-337-167
2.750
PPM
15
ECVC
EDC 800623 ROUTINE SHIFT
ECOP
80-338-168
1.550
PPM
421
ECVC
EDC 800623 ROUTINE SHIFT
INSTRU
80-358-177
.300
PPM
422
ECVC
EDC
800623
OPERVF
MORNING SAMPLE ROUND
80-360-179
.500
PPM
15
ECVC
EDC
800623
OPERVP
MORNING SAMPLE ROUND AND
ANALYSIS HOOD BROKEN
80-359-178
.670
PPM
15
SL 016682
1/19/93
LA^BtHARLES C25^> PLANT B SAtWlNG RESULTS THRU 1989
DEPT ECVC
COMPOUND
DATE
EDC 800719 ROUTINE SHIFT
JOB TITLE SAMPLE#
LEADOP
80-389-195
RESULT .560
UNIT DURATION PPM 936
ECVC
EDC 800719 ROUTINE SHIFT
OPERVF
80-391-197
1.210
PPM
935
ECVC
EDC 800719 ROUTINE SHIFT
( ECVC
EDC 800719 ROUTINE SHIFT
OPERVP VCAXOP
80-390-196 80-392-198
.390
PPM
937
.650
PPM
933
ECVC
EDC 800923 ROUTINE SHIFT
INSTRU
80-992-239
.110
PPM
990
ECVC
EDC 800923 ROUTINE SHIFT
LEADOP
80-987-229
.190
PPM
997
ECVC
EDC
800923
MACHIN
80-991-233
ROUTINE SHIFT AS LOG BOOK MECH
.160
PPM
997
ECVC
EDC 800923 ROUTINE SHIFT
OPERVF
80-989-231
.910
PPM
997
ECVC
EDC 800923 ROUTINE SHIFT
OPERVP
80-990-232
.090
PPM
998
ECVC
EDC 800923 ROUTINE SHIFT
VCAXOP
80-988-230
.320
PPM
957
ECVC
EDC 801001 CENTER OF CONTROL ROOM
80-512-295
.230
PPM
937
SI* 016683
PAGE
1/19/93
LAlMbHARLES (254) PLANT B SAMmHG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
EDC
801001
INSTRU
ROUTINE SHIFT AS LOGBOOK
INSTRUMENT MAN
SAMPLE# 80-511-244
RESULT .110
UNIT DURATION PPM 433
ECVC
EDC 801001 ROUTINE SHIFT
LEADOP
80-455-224
.110
PPM
399
PAGE
ECVC
EDC 801001 ROUTINE SHIFT
OPERVF
80-509-242
.840
PPM
433
ECVC
EDC 801001 ROUTINE SHIFT
OPERVP
80-510-243
.110
PPM
434
ECVC
EDC 801001 ROUTINE SHIFT
VCAXOP
80-454-223
.130
PPM
423
ECVC
EDC 801023 ROUTINE SHIFT
ECOP
80-553-276
.120
PPM
445
ECVC
EDC 810223 ROUTINE SHIFT
ECOP
81-059-028
.160
PPM
442
ECVC
EDC 810223 ROUTINE SHIFT
LGINM
81-061-030
.080
PPM
433
ECVC
EDC 810223 ROUTINE SHIFT
LGMC
81-060-029
.090
PPM
431
ECVC
EDC 810316 ROUTINE SHIFT
LEADOP
81-100-050
.080
PPM
438
ECVC
EDC 810316 ROUTINE SHIFT
VCAXOP
81-102-052
.170
PPM
W SL 016684
1/19/93
LAlflhARLES (254) PLANT B SAMmHG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
EDC 810317 ROUTINE SHIFT
JOB TITLE SAMPLE#
OPERVP
81-101-051
RESULT .800
UNIT DURATION
PPM
437
PAGE
ECVC
EDC 810423 ROUTINE SHIFT.
ECOP
81-147-068
.240
PPM
457
ECVC
EDC 810507 ROUTINE SHIFT.
* ECVC
EDC 810507 ROUTINE SHIFT.
OPERVP VCAXOP
81-175-085 81-176-086
.630
PPM
441
.880
PPM
437
ECVC
EDC
810518
VCAXOP
81-195-103
CAUGHT Ai VCM BOMB FROM THE #7
VCM DAY TANK.
ECVC
EDC
810518
VCAXOP
81-196-104
CAUGHT Ai VCM BOMB FROM THE #5
VCM DAY TANK.
ECVC
EDC 810625 ROUTINE SHIFT.
ECOP
81-285-156
.100
PPM
15
.100
PPM
15
.210
PPM
425
ECVC
EDC 810625 ROUTINE SHIFT.
LGINM
81-287-158
.370
PPM
431
ECVC
EDC
810625
LGMC
DID REPAIR WORK ON VALVES
AROUND THE VCM DAY TANKS.
81-286-157
ECVC ECVC
EDC
810625
VCAXOP
81-284-155
MORNING SAMPLE ROUND.CAUGHT
FURNACE FEED,HEAVY BOTTOMS, &
HEAVY FEED SAMPLES
EDC 810730 ROUTINE SHIFT.
OPERVF
81-338-187
.220
PPM
431
8.500
PPM
15
1.400
PPM
216
SL 016685
1/19/93
LAI^KHARLES (254) PLANT B SAtWlNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
EDC 810730 ROUTINE SHIFT.
JOB TITLE SAMPLE#
OPERVP
81-337-186
RESULT .270
UNIT DURATION PPM 458
PAGE
ECVC
EDC 810730 ROUTINE SHIFT.
VCAXOP
81-339-188
.250
PPM
460
ECVC
EDC 810918 ROUTINE SHIFT
* ECVC
EDC 810918 ROUTINE SHIFT
OPERVP VCAXOP
81-455-262 81-456-263
.350
PPM
432
.140
PPM
432
ECVC
EDC
810928
ROUTINE SHIFT
OPERVF
81-480-269
1.420
PPM
437
ECVC
EDC 811012 ROUTINE SHIFT
ECOP
81-533-301
.230
PPM
426
ECVC
EDC
811012
LGINM
WORKED IN CONTROL ROOM THE
MAJORITY OF THE DAY
ECVC
EDC
811012
OPERVP
ROUTINE MORNING ROUND
81-534-302 81-530-298
.180
PPM
433
.450
PPM
15
ECVC
EDC
811012
VCAXOP
ROUTINE MORNING ROUND
81-532-300
.300
PPM
15
ECVC
EDC
811013
LGMC
81-538-304
REPAIRED EQUIPMENT IN EC AND
VC UNITS
ECVC
EDC
811013
OPERVF
81-537-303
COLLECTING SAMPLES AND WASHED-
DOWN HEAVY BOTTOMS AND FURNACE FEED AREA
.320
PPM
434
64.700
PPM
15 Si nlK,0 U1686
1/19/93
LAI^KHARLES (254) PLANT B SALTING RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
EDC
820107
LEADOP
HCL AND EC UNITS RUNNING
NORMAL RATES; VCM UNIT DOWN.
SAMPLE# 82-011-009
RESULT .100
UNIT DURATION PPM 445
ECVC
EDC
820107
OPERVF
HCL AND EC UNITS RUNNING
NORMAL RATES; VCM UNIT DOWN.
82-012-010
.100
PPM
457
ECVC
*
ECVC
ECVC
EDC
820107
VCAXOP
HCL AND EC UNITS RUNNING
NORMAL RATES; VCM UNIT DOWN.
82-013-011
EDC
820603
ECOP
OUTSIDE WORK UNDER UPSET
CONDITIONS- INSTRUMENT AIR
LOST EARLY IN MORNING
EDC
820603
LGINM
WORKED IN CONTROL ROOM
82-122-077 82-123-078
.100
PPM
445
.570
PPM
440
.470
PPM
423
ECVC ECVC
EDC
820603
OPERVP
82-195-099
REPAIRED VINYL PROCESS PUMP;
LEAKING HOSE, 6 MINUTES. 77 F
PC WINDS E 6MPH 93X RH
EDC
820603
VCAXOP
MORNING SAMPLING ROUND
82-196-100
4.290
PPM
.100
PPM
16 15
ECVC
EDC
820625
LGMC
82-241-130
ROUTINE SHIFT- WORKED THROUGH
OUT UNIT
ECVC
EDC
820629
OPERVF
ROUTINE SAMPLE RUN
82-244-133
.490
PPM
447
16.200
PPM
15
ECVC ECVC
EDC
820708
ECOP
RECHARGED CATALYST TANKS IN
EC/HCL UNIT ; EC BROUGHT UP
DURING MORN. TO NORMAL OP.
82-265-147
EDC
820708
LGINM
82-267-149
REPAIRED HCL VALVE TO ABSORBER
1.210
PPM
435
.800
PPM
455
SL 016687
PAGE
1/19/93
LAItHARLES (254) PLANT B SAM^ING RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
ECVC
EDC
820708
LGMC
REPAIRED SCRUBBERS IN HCL
UNITS.
82-266-148
RESULT .240
UNIT DURATION
PPM
456
ECVC ECVC
EDC
820708
OPERVF
CLEARING TANKS IN EMERGENCY
SHUT-DOWN CONDITIONS OF VC
UNIT. 87 F 61X RH W-6MPH
82-263-145
EDC
820708
VCAXOP
82-264-146
EC UNIT BROUGHT UP DURING MORN
ADDED CATALYST TO EC PRODUCT.
2.560
PPM
453
1.750
PPM
447
ECVC EDC
820820
ROUTINE SHIFT
ECOP
82-352-218
.220
PPM
446
PAGE
ECVC
EDC
820820
LGINM
ROUTINE SHIFT. ROUTE WORK.
82-354-220
.310
PPM
416
ECVC
EDC 820820 ROUTINE SHIFT
LGMC
82-353-219
.190
PPM
430
ECVC
EDC
820908
OPERVF
82-375-233
ROUTINE MORNING ROUND COLLECT
ING EDC SAMPLES.
ECVC
EDC
820908
OPERVP
82-374-232
ROUTINE MORNING ROUND COLLECT
ING SAMPLES IN VC UNIT.
ECVC
EDC
820908
VCAXOP
82-376-234
ROUTINE MORNING ROUND COLLECT
ING SAMPLES IN HCL UNIT.
ECVC
EDC
821011
ECOP
82-430-276
CLEARED AND ADDED CATALYST TO
REACTOR.
ECVC
EDC
821011
LGMC
WORKED THROUGHOUT UNIT.
82-431-277
13.100
PPM
17
.100
PPM
17
.100
PPM
16
.160
PPM
436
.120
PPM
429 SL 016688
1/19/93
LAl^^HARLES (254) PLANT B SAlWlNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
EDC
821026
VCAXOP
ROUTINE MORNING ROUNDS
SAMPLE# 82-463-304
RESULT .100
UNIT DURATION PPM 17
PAGE
ECVC
EDC
821103
OPERVF
ROUTINE SHIFT. VC/HCL UNITS
DOWN.
82-480-321
ECVC
* ECVC
EDC
821103
OPERVP
ROUTINE SHIFT. VC/HCL UNITS
DOWN.
EDC
821103
VCAXOP
ROUTINE SHIFT. VC/HCL UNITS
DOWN.
82-479-320 82-481-322
ECVC ECVC
EDC
821118
LGMC
82-517-342
REPAIRED RELEIF VALVE ON COM
PRESSOR 8 WORKED ON RUBBER
LINE STG. TK. WINDS E-6.
EDC 821202 ROUTINE SHIFT.
ECOP
82-540-359
.100
PPM
419
.100
PPM
420
.100
PPM
413
.130
PPM
435
.310
PPM
438
ECVC
EDC
821202
VCAXOP
MAINTENANCE WORK IN FURNACE
AREA
82-539-358
ECVC
EDC
830207
LGINM
ROUTINE ROUTE WORK IN UNIT.
NORMAL OPERATIONS.
83-088-057
ECVC ECVC
EDC
830215
ECOP
ROUTINE HCL WORK. EC UNIT
DOWN. NORMAL OPERATIONS IN
VCM AND HCL UNITS.
83-100-067
EDC
830215
OPERVF
83-099-066
ROUTINE SAMPLE ROUNDS. NORMAL
OPERATIONS.
ECVC
EDC
830215
OPERVP
CAUGHT SAMPLES AND DRAINED
NEUTRALIZER SYSTEM. NORMAL
OPERATIONS.
83-098-065
.310
PPM
445
.440
PPM
440
3.920
PPM
440
14.800
PPM
16
7.090
PPM
32 ,,T ^
SL 016689
1/19/93
fLA
PLANT B SA
bHARLES (259) IIMG RESULTS THRU 1989
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
RESULT
ECVC
EDO
830319
OPERVF
83-157-105
UPSET OPERATING CONDITIONS /2
OHC REACTORS WENT DOWN.
3.160
UNIT DURATION
PPM
939
PAGE
ECVC
EDC
830319
OPERVP
83-156-109
UPSET OPERATING CONDITIONS/2
OHC REACTORS DOWN
.590
PPM
933
ECVC
EDC
830929
OPERVF
CAUGHT SAMPLES ON MORNING
ROUNDS. NORMAL OPERATIONS.
83-200-193
6.970
PPM
29
ECVC ECVC
EDC
830929
OPERVP
CLEARED VINYL PUMP AND DID
MORNING ROUNDS. NORMAL OPE
RATIONS.
EDC
830517
OPERVF
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-199-192 83-228-161
.870
PPM
21
2.210
PPM
929
ECVC
EDC
830517
OPERVP
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-227-160
.290
PPM
900
ECVC
EDC
830610
ECOP
ROUTINE SHIFT. SOME EXTRA
SAMPLING. NORMAL OPERATIONS.
83-282-199
.990
PPM
999
ECVC
EDC
830610
LGINM
ROUTE WORK IN UNIT. NORMAL
OPERATIONS.
83-289-196
.760
PPM
996
ECVC
EDC
830610
LGMC
83-283-195
ROUTINE LOG BOOK WORK IN UNIT.
NORMAL OPERATIONS.
.930
PPM
963
ECVC
EDC
830616
OPERVF
ROUTINE MORNING ROUNDS.
NORMAL OPERATIONS.
83-299-206
2.190
PPM
15
ECVC
EDC
830616
OPERVP
83-293-205
ROUTINE MORNING ROUNDS. NORMAL
OPERATIONS.
3.080
PPM
15 SL 016690
1/19/93
#LA HARLES (25A)
PLANT B SA tWIiMG RESULTS THRU 198A
DEPT ECVC
COMPOUND
DATE
JOB TITLE
EDC
830713
ECOP
NORMAL OPERATIONS, ROUTINE
SHIFT
SAMPLE# 83-321-229
RESULT .100
UNIT DURATION PPM 377
ECVC
EDC
830713
OPERVF
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-320-228
3.A10
PPM
397
ECVC
EDC
830713
OPERVP
NORMAL OPERATIONS, ROUTINE
SHIFT
83-319-227
.280
PPM
38 A
ECVC
EDC
830825
ECOP
ROUTINE SHIFT. REDUCED OPE
RATIONS- VC UNIT DOWN.
83-379-280
320 PPM
A35
ECVC ECVC ECVC ECVC
EDC
830825
LGINM
PULLED ABSORBER AND PRODUCT
STILL FLOAT CHAMBERS. REDUCED
OPERATIONS- VC UNIT DOWN
83-380-281
EDC
830901
OPERVF
DECOKED FURNACE AND DEPRESSU
RIZED DEHUMIDIFIER. REDUCED
OPERATIONS. VC UNIT DOWN.
83-A00-292
EDC
830901
OPERVP
83-399-291
RAN 600LING TOWER SAMPLE AND
CHECKED PURGE ON VC HUMIDIFIER
REDUCED OPERATIONS-VC DOWN.
EDC
830922
OPERVP
OPERATIONS DOWN, PRESSURE
CHECKS AND DOWN ACTIVITIES
83-4A3-312
.850
PPM
A32
.500
PPM
19
.500
PPM
15
19.900
PPM
375
ECVC
EDC
831013
OPERVF
83-A85-3AA
ROUTINE MORNING ROUNDS. NORMAL
OPERATIONS.
.500
PPM
22
ECVC
EDC
831013
OPERVP
83-48A-343
ROUTINE MORNING ROUNDS. NORMAL
OPERATIONS.
.970
PPM
3A
ECVC
EDC
831017
ECOP
83-A97-3A5
ROUTINE SHIFT. NORMAL OPERA
TIONS.
.A00
PPM
A36
SL 016691
PAGE
1/19/93
LAmiARLES (254) PLANT B SAfWlNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
EDC
831017
LGINM
LOGBOOK WORK IN VC AREA.
NORMAL OPERATIONS.
SAMPLE# 83-498-346
ECVC
EDC
831031
ECOP
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-509-357
RESULT .420
UNIT DURATION PPM 444
.200
PPM
409
ECVC
* ECVC
EDC
831031
OPERVF
NORMAL OPERATIONS, ROUTINE
SHIFT.
EDC
831031
OPERVP
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-508-356 83-507-355
1.490
PPM
411
.290
PPM
409
ECVC
EDC
831207
ECOP
ADDED CATALYST TO REACTOR.
NORMAL OPERATIONS.
83-568-404
.220
PPM
453
ECVC
EDC
840116
ECOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
83-041-022
.260
PPM
397
ECVC
EDC
840116
FUOP
83-040-021
VC UNIT DOWN; SCHEDULED OUTAGE
DUTIES.
.350
PPM
393
ECVC
EDC
840201
ECOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
84-093-051
.230
PPM
401
ECVC
EDC
840201
OPERVP
NORMAL START-UP OPERATIONS.
84-092-050
10.200
PPM
413
PAGE
ECVC ECVC
EDC
840201
OPERVP
84-094-052
NORMAL OPERATIONS STARTING-UP
VCM PLANT. LEAK PATROL WITH
HNU.
EDC
840209
OPERVP
84-115-067
NORMAL OPERATIONS. LEAK PATROL
WITH HNU IN PROCESS, DAY TK,
SPHERES AREAS. RAINING.
.600
PPM
270
1.040
PPM
195 SL U-I6fi92
1/19/93 I
LA^bHARLES (259) PLANT B SAlWlNG RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
ECVC
EDC
840215
OPERVP
84-123-073
NORMAL OPERATIONS. LEAK PATROL
WITH HNU IN PROCESS, DAY TK,
SPHERES AREAS.
ECVC
EDC
840309
ECOP
ROUTINE SHIFT. WORKED ON
LEAKING EC PUMP. NORMAL OPE
RATIONS.
84-146-090
ECVC
EDC
840309
OPERVF
ROUTINE SHIFT. DUMPED A TAR
BUGGY. NORMAL OPERATIONS.
84-145-089
RESULT .380
UNIT DURATION
PPM
270
.250
PPM
443
1.530
PPM
443
ECVC
EDC
840309
OPERVP
84-144-088
ROUTINE SHIFT. NORMAL OPERA
TIONS.
.260
PPM
445
ECVC ECVC
EDC
840328
OPERVP
84-171-114
LEAK PATROL WITH HNU. WASHING
DOWN NO.3 NEUTRALIZER. NORMAL
OPERATIONS.
EDC
840404
FUOP
NORMAL OPERATIONS VC I UNIT
ROUTINE SHIFT.
84-183-121
.310 PPM 27 0
1.410
PPM
415
ECVC
EDC
640404
PSOP
NORMAL OPERATIONS EC/VC/HCL
UNITS. ROUTINE SHIFT.
84-184-122
.340
PPM
414
ECVC
EDC
840409
FUOP
NORMAL OPERATIONS . ROUTINE
SAMPLE ROUND AND ,ANALYSIS.
84-192-130
1.490
PPM
193
ECVC
EDC
840409
PSOP
NORMAL OPERATIONS . ROUTINE
SAMPLE ROUND IN VCM UNIT.
84-191-129
.410
PPM
172
ECVC
EDC 840410 WINDS SE-12/S-10. NORMAL OP.
UPSTAIRS WEST SIDE
84-199-137
.390
PPM
269
ECVC
EDC 840410 PLACED OH WEST WALL SHELF. NORMAL OP.
84-200-138
.560
PPM
265
SL 016693
PAGE
l
1/19/93
LA^^HARLES (254) PLANT B SAlWlNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
EDC 840410 PLACED ON TOP COKE MACHINE.
SAMPLE# 84-201-139
RESULT .440
UNIT DURATION PPM 268
PAGE
ECVC
EDC 840410 WINDS SE-12/S-I0. NORMAL OP.
WEST SIDE GROUND LEVEL
84-202-140
ECVC
* ECVC
EDC 840410
84-204-142
WINDS SE-12/S-10. NORMAL OP.
N. DAY TK NEAR PUMPS 5FT HIGH
EDC
840411
PSOP
UPSET OPERATIONS. LOST FUR
NACE AND VAPORIZER.
84-208-146
ECVC ECVC
EDC
840412
FUOP
START-UP FURNACE DUTIES ON
CONTROL BOARD. 1HR. IN UNIT;
VCI PROCESS NORMAL OP.
84-210-148
EDC
840412
PSOP
84-209-147
PROCESS UNIT NORMAL OP. HELPED
START-UP FURNACE.
ECVC
EDC
840418
PSOP
84-223-161
NORMAL OPERATIONS. EC/VC/HCL
UNITS. LEAK PATROL WITH HNU.
ECVC
EDC
840425
PSOP
84-236-174
NORMAL OPERATIONS. LEAK PATROL
WITH HNU. WINDS S-E-18.
ECVC
EDC
840502
PSOP
LEAK PATROL WITH HNU. UNIT
DOWN.
84-245-183
ECVC
EDC
840509
OPERVP
ROUTINE SHIFT. VINYL UNIT
DOWN.
84-260-196
ECVC
EDC
840516
PSOP
LEAK PATROL WITH HNU. VINYL
UNIT DOWN.
84-281-205
1.080
PPM
59
.210
PPM
263
2.100
PPM
165
.420
PPM
433
.520
PPM
372
.660
PPM
155
.240
PPM
190
.230
PPM
325
1.000
PPM
396
.240
PPM
300
SL 016694
1/19/93
LAI^BkARLES (254) PLANT B SfllfflllG RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
ECVC
EDC
840523
PSOP
LEAK PATROL WITH HNU AROUND
VINYL DAY TANKS AND SPHERES.
VC UNIT DOWN.
84-289-211
ECVC
EDC
840530
ECOP
84-294-216
ROUTINE SHIFT. NORMAL OPERA
TIONS,
RESULT .100
UNIT PPM
DURATION 180
.100
PPM
423
ECVC
EDC
840606
ECOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
84-309-226
.470
PPM
413
ECVC
EDC
840606
FUOP
84-310-227
DOWN OPERATIONS. LEAK PATROL
WITH HNU.
.290
PPM
125
ECVC ECVC
EDC
840606
PSOP
DOWN OPERATIONS. MORN. ROUND
UNPLUGGED BLEED LINE TO TAR
BUGGY.
84-308-225
EDC
840613
PSOP
84-332-244
DOWN OPERATIONS. LEAK PATROL
WITH HNU.
.830
PPM
18
.250
PPM
117
ECVC
EDC
840620
FUOP
84-349-261
DOWN ^OPERATIONS. ROUNDS DURING
DOWN OP. WIND W/SW-5.
.100
PPM
387
ECVC
EDC
840711
ECOP
ROUTINE SHIFT. UNIT DOWN.
84-380-289
.190
PPM
415
ECVC
EDC
840711
FUOP
CLEARED PRODUCT STILL FEED
TANK. UNIT DOWN.
ECVC
EDC
840711
PSOP
LEAK PATROL WITH HNU. UNIT
DOWN.
ECVC
EDC
840830
FUOP
NORMAL OP. MORN. SAMPLING
ROUND.
84-379-288 84-378-287 84-444-345
2.290
PPM
415
.410
PPM
180
64.500
PPM
17
SL 016695
PAGE
1/19/93
LAifl^HARLES (254) PLANT B SAlWlNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
EDC
840830
PSOP
NORMAL OP. ROUTINE SHIFT.
SAMPLES 84-443-344
RESULT .430
UNIT DURATION
PPM
408
PAGE
ECVC
EDC
840907
ECOP
NORMAL OP. ROUTINE SHIFT.
84-465-360
.590
PPM
415
ECVC
EDC
840907
FUOP
NORMAL OP. ROUTINE SHIFT.
84-464-359
* ECVC
EDC
840907
PSOP
84-463-358
NORMAL OP. ROUTINE MORN. SAM
PLE ROUND. WIND E/NE-8.
ECVC
EDC
841001
FUOP
NORMAL OP. ROUTINE SHIFT.
84-525-402
7.240
PPM
397
1.240
PPM
17
.140
PPM
420
ECVC
EDC
841001
PSOP
NORMAL OPERATIONS ROUTINE
SHIFT.
84-524-401
ECVC
EDC
841101
ECOP
84-575-437
NORMAL OP. EC/HCL UNIT. ROUTI
NE SHIFT.
ECVC ECVC
EDC
841101
PSOP
84-574-436
DOWN OP. VC/UNIT. DOWN OP.
DUTIES ON PROCESS AND FURNACE
JOBS.
MC
780206
LEADOP
ROUTINE SHIFT VCM LEAD OPER
78-028-020
.180
PPM
420
.100
PPM
403
.100
PPM
407
.420
PPM
390
ECVC
MC
780516
ECOP
78-173-114
ROUTINE SHIFT-LEAK UNDER NO 2
NEUTRALIZER
ECVC
MC
780526
GEWORK
ADDING NAOH TO NEUTRALIZER
78-188-116
.320
PPM
425
.000
PPM
SL 016696
1/19/93
LAI^bHARLES (254) PLANT fi SAMmNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
MC 780601 ROUTINE SHIFT
JOB TITLE SAMPLE#
LEADOP
78-204-117
RESULT .000
UNIT DURATION
PPM
404
ECVC
MC 780601 ROUTINE SHIFT
OPERVF
78-205-118
.000
PPM
240
ECVC
MC 780612 ROUTINE SHIFT
ECVC
MC 780612 ROUTINE SHIFT
ECOP OPERVP
78-212-125 78-213-126
.000
PPM
411
.530
PPM
411
ECVC
MC 780710 ROUTINE SHIFT
ECOP
78-261-158
.500
PPM
473
ECVC
MC 780710 ROUTINE SHIFT
LEADOP
78-262-159
1.590
PPM
472
ECVC
MC 780710 ROUTINE SHIFT
OPERVF
78-237-157
1.220
PPM
473
ECVC
MC 780710 ROUTINE SHIFT
OPERVP
78-236-156
1.140
PPM
473
ECVC
MC 780907 ROUTINE SHIFT
ECOP
78-339-207
.630
PPM
401
ECVC
MC 780907 ROUTINE SHIFT
LEADOP
78-336-204
.780
PPM
401
ECVC
MC 780907 ROUTINE SHIFT
OPERVF
78-338-206
.560
PPM
401
SL 016697
PAGE
1/19/93
LAlMCharles C254> PLANT B SAMWI[NG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
MC 780907 ROUTINE SHIFT
JOB TITLE SAMPLE#
OPERVP
78-337-205
RESULT .440
UNIT DURATION PPM 401
PAGE
ECVC
MC 781003 ROUTINE SHIFT
ECOP
78-304-194
.330
PPM
435
ECVC
MC 781003 ROUTINE SHIFT
* ECVC
MC 781003 ROUTINE SHIFT
LEADOP OPERVF
78-301-191 78-303-193
.570
PPM
435
.160
PPM
435
ECVC
MC 781003 ROUTINE SHIFT
OPERVP
78-302-192
.170
PPM
435
ECVC
MC 78111A ROUTINE SHIFT
ECOP
78-426-264
.000
PPM
410
ECVC
MC 781114 ROUTINE SHIFT
LEADOP
78-424-262
.130
PPM
410
ECVC
MC 781128 ROUTINE SHIFT
OPERVP
78-427-265
.250
PPM
430
ECVC
MC 781206 ROUTINE SHIFT
ECOP
78-447-283
1.680
PPM
425
ECVC
MC 781206 ROUTINE SHIFT
LEADOP
78-444-280
ECVC
MC 781206 ROUTINE SHIFT
OPERVF
78-445-281
.990
PPM
425
.820
PPM
425
SL 016698
1/19/93
LAlM^HARLES (254) PLANT B SALTING RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
MC 781206 ROUTINE SHIFT
JOB TITLE SAMPLE#
OPERVP
78-446-282
RESULT 1.200
UNIT DURATION PPM 425
ECVC
MC 790105 ROUTINE SHIFT
LEADOP
79-015-010
.940
PPM
405
ECVC
MC 790105 ROUTINE SHIFT
* ECVC
MC 790110 ROUTINE SHIFT
OPERVF ECOP
79-016-011 79-023-018
.000
PPM
405
1.040
PPM
370
ECVC
MC 790110 ROUTINE SHIFT
LEADOP
79-021-016
.990
PPM
370
ECVC
MC 790110 ROUTINE SHIFT
OPERVP
79-022-017
.320
PPM
370
ECVC
MC 790306 ROUTINE SHIFT
ECOP
79-116-071
.000
PPM
420
ECVC
MC
790306
INSTRU
79-117-072
ROUTINE SHIFT WORKING LOGBOOK
INSTRUMENT MAN'S JOB
ECVC
MC 790306 ROUTINE SHIFT
LEADOP
79-114-069
.480
PPM
420
. 000
PPM
420
ECVC
MC 790306 ROUTINE SHIFT
OPERVF
79-115-070
.000
PPM
420
ECVC
MC 790322 ROUTINE SHIFT
OPERVP
79-157-093
9 .860
PPM
410
SL 016699
PAGE
1/19/93
LA^BHARLES (254) PLANT B SAJWING RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
MC
790327
ECOP
ROUTINE SHIFT
WIND-SSE AT 9.4MPH
SAMPLE# 79-149-090
RESULT .000
UNIT DURATION
PPM
425
ECVC
MC
790327
PIPEFI
ROUTINE SHIFT AS LOGBOOK
MECHANIC, WIND SSE AT 9MPH
79-171-097
.160
PPM
230
ECVC
MC
790424
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAN
79-246-128
.390
PPM
435
ECVC
MC
790424
PIPEFI
ROUTINE SHIFT WORKING AS
LOGBOOK MECHANIC
79-235-124
.200
PPM
435
ECVC
MC 790502 ROUTINE SHIFT
ECOP
79-247-129
.100
PPM
435
PAGE
ECVC
MC 790502 ROUTINE SHIFT
LEADOP
79-244-126
.120
PPM
435
ECVC MC
790502
ROUTINE SHIFT
OPERVP
79-245-127
.110
PPM
435
ECVC
MC
790509
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-251-133
ECVC
MC
790509
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-252-134
ECVC
MC 790524 ROUTINE SHIFT
OPERVF
79-277-155
ECVC
MC
790530
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAN.
79-302-164
.070
PPM
455
.340
PPM
455
.220
PPM
420
8.240
PPM
405
SL 016700
1/19/93
LAlfl^HARLES (254) PLANT B SAMmNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
MC
790530
PIPEFI
ROUTINE SHIFT WORKING AS
LOGBOOK MECHANIC
SAMPLE# 79-301-163
RESULT .490
UNIT DURATION PPM 405
ECVC
MC
790614
INSTRU
79-315-178
ROUTINE SHIFT WORKING AS LOG
BOOK INSTRUMENT MAN
.640
PPM
440
ECVC
t ECVC
MC
790614
PIPEFI
79-316-179
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC
MC
790621
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-342-190
.820
PPM
440
.200
PPM
430
ECVC
MC
790621
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-343-191
.190
PPM
430
ECVC
MC 790710 ROUTINE SHIFT
LEADOP
79-368-211
. 100
PPM
405
PAGE
ECVC
MC 790710 ROUTINE SHIFT
OPERVF
79-369-212
.080
PPM
405
ECVC
MC 790710 ROUTINE SHIFT
OPERVP
79-370-213
.070
PPM
405
ECVC
MC
790806
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING EC/VC TAR BUGGIES
79-386-223
ECVC
MC
790806
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING EC/VC TAR BUGGIES
79-387-224
ECVC
MC 791008 ROUTINE SHIFT
LEADOP
79-445-242
.360
PPM
385
.170
PPM
375
.070
PPM
415
SL 016701
1/19/93
LA^JARLES (259) PLANT B SANDING RESULTS THRU 1989
DEPT ECVC
COMPOUND
DATE
MC 791008 ROUTINE SHIFT
JOB TITLE SAMPLE#
OPERVF
79-997-299
RESULT .310
UNIT DURATION
PPM
915
PAGE
ECVC
MC 791008 ROUTINE SHIFT
OPERVP
79-996-293
.000
PPM
915
ECVC
MC 791015
79-519-316
5FT SE OF SUMP/5FT ABV GRHD/
NE WND/6MPH/50F/86RH/CLEAR
ECVC
MC 791015
79-520-317
9FT NE OF SUMP/9FT ABV GRND/
NE WND/6MPH/50F/86RH/CLEAR
ECVC
MC
791017
ECOP
FECL3 ADDITION JOB
79-552-328
.050
PPM
276
.050
PPM
276
.000
PPM
15
ECVC
MC 791108 ROUTINE SHIFT
ECOP
79-695-915
.050
PPM
380
ECVC
MC 791108 ROUTINE SHIFT
LEADOP
79-692-912
.390
PPM
380
ECVC
MC 791108 ROUTING SHIFT
OPERVP
79-693-913
.050
PPM
380
ECVC
MC 791113
79-669-939
9FT N-NE OF VENT OFF LIFT STA
1, CLEAR,91F,M,7MPH
ECVC
MC 791113
79-665-935
7FT SW OF VENT OFF LIFT STA 1,
CLEAR,91F,N,7MPH
ECVC
MC 791113
79-666-936
6FT OF VCM DOPP KETTLE SEALC1)
,CLEAR,91F,N,7MPH
.000
PPM
297
.000
PPM
297
.000
PPM
298
SL 016702
1/19/93
LAI^BlHARLES (254) PLANT B SAHmNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
MC 791113 5FT S-SW OF VCM DOPP KETTLE SEAL(l), CLEAR,41F,N,7MPH
SAMPLE# 79-667-437
RESULT .000
UNIT DURATION PPM 298
ECVC
MC 791113
79-668-438
5FT S OF VCM DOPP KETTLE SEAL
(2),CLEAR,41F,N, 7MPH
.000
PPM
295
ECVC
MC
800122
INSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAN
80-046-026
.080
PPM
420
ECVC
MC
800122
MACHIN
ROUTINE SHIFT AS LOG BOOK
MECHANIC
80-041-021
.150
PPM
420
ECVC
MC 800122 ROUTINE SHIFT
OPERVF
80-044-024
.260
PPM
420
PAGE
ECVC
MC 800123 ROUTINE SHIFT
OPERVP
80-043-023
.270
PPM
420
ECVC
MC 800207 ROUTINE SHIFT SPRAYED WITH EC
ECOP
ECVC
MC
800317
INSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAN
ECVC
MC
800324
INSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT HAN
ECVC
MC
800324
WELDER
ROUTINE SHIFT AS LOG BOOK
MECHANIC
ECVC MC
800325
ROUTINE SHIFT
VCAXOP
80-098-042 80-230-105 80-179-080 80-178-079 80-177-078
.310
PPM
450
.500
PPM
430
1.890
PPM
427
2.800
PPM
429
.080 . PPM
432
SL 016703
1/19/93
lajMtHARLES (253) PLANT B SAMfln[NG RESULTS THRU 1983
DEPT ECVC
COMPOUND
DATE
MC 800317 ROUTINE SHIFT
JOB TITLE SAMPLE# 1
ECOP
80-228-103
RESULT .300
UNIT DURATION PPM 330
1
PAGE
ECVC
MC
800317
MACHIN
ROUTINE SHIFT AS LOGBOOK
MECHANIC
ECVC
* ECVC
MC
800323
MACHIN
ROUTINE SHIFT AS LOG BOOK
MECHANIC
MC
800527
INSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAN
ECVC
MC 800527 ROUTINE SHIFT
LEADOP
80-229-103 80-218-101 80-306-152 80-301-137
.370
PPM
330
.720
PPM
380
.320
PPM
337
.790
PPM
335
ECVC
MC
800527
MACHIN
ROUTINE SHIFT AS LOG BOOK
MECHANIC
ECVC
MC 800527 ROUTINE SHIFT
OPERVF
80-305-151 80-303-139
.310
PPM
351
1.370
PPM
330
ECVC
MC 800527 ROUTINE SHIFT
OPERVP
80-302-138
.300
PPM
330
ECVC
MC 800623 ROUTINE SHIFT
ECOP
80-338-168
.880
PPM
321
ECVC
MC 800623 ROUTINE SHIFT
INSTRU
80-358-177
ECVC
MC 800923 ROUTINE SHIFT
INSTRU
80-392-233
.330
PPM
322
1.970
PPM
330
SL 016704
1/19/93
LAI^khARLES C259) PLANT B SAtWlNG RESULTS THRU 1989
DEPT ECVC
COMPOUND
DATE
MC 800923 ROUTINE SHIFT
JOB TITLE SAMPLE#
LEADOP
80-987-229
RESULT .590
UNIT DURATION PPM 997
PAGE
ECVC
MC
800923
MACHIN
80-991-233
ROUTINE SHIFT AS LOG BOOK MECH
.560
PPM
997
ECVC
MC 800923 ROUTINE SHIFT
OPERVF
80-989-231
.650
PPM
997
ECVC
MC 800923 ROUTINE SHIFT
OPERVP
80-990-232
.370
PPM
998
ECVC
MC 800923 ROUTINE SHIFT
VCAXOP
80-988-230
.910
PPM
957
ECVC
MC 801001 CENTER OF CONTROL ROOM
80-512-295
.970
PPM
937
ECVC
MC
801001
INSTRU
R0UT5NE SHIFT AS LOGBOOK
INSTRUMENT MAN
ECVC
MC 801001 ROUTINE SHIFT
LEADOP
80-511-299 80-955-229
2.190
PPM
933
.710
PPM
399
ECVC
MC 801001 ROUTINE SHIFT
OPERVF
80-509-292
.290
PPM
933
ECVC
MC 801001 ROUTINE SHIFT
OPERVP
80-510-293
.600
PPM
939
ECVC
MC 801001 ROUTINE SHIFT
VCAXOP
80-959-223
.900
PPM
923
SL 016705
1/19/93
LAI^^HARLES (254) PLANT B SARONG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
MC 801023 ROUTINE SHIFT
JOB TITLE SAMPLE#
ECOP
80-553-276
RESULT .230
UNIT DURATION PPM 445
PAGE
ECVC
MC 810223 ROUTINE SHIFT
ECOP
81-059-028
.480
PPM
442
ECVC
MC 810223 ROUTINE SHIFT
* ECVC
MC 810223 ROUTINE SHIFT
LGIHM LGMC
81-061-030 81-060-029
.170
PPM
433
.240
PPM
431
ECVC MC
810316
ROUTINE SHIFT
LEADOP
81-100-050
.120
PPM
438
ECVC
MC 810316 ROUTINE SHIFT
VCAXOP
81-102-052
.100
PPM
447
ECVC
MC 810317 ROUTINE SHIFT
ECVC
MC 810423 ROUTINE SHIFT.
OPERVP ECOP
81-101-051 %
81-147-068
.100
PPM
437
2.400
PPM
457
ECVC
MC 810507 ROUTINE SHIFT.
OPERVP
81-175-085
.140
PPM
441
ECVC
MC 810507 ROUTINE SHIFT.
VCAXOP
81-176-086
ECVC
MC 810625 ROUTINE SHIFT.
ECOP
81-285-156
.170
PPM
437
1.900
PPM
425
SL 016706
1/19/93
LA^feHARLES (254) PLANT fi SAlWlNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
MC 810625 ROUTINE SHIFT.
JOB TITLE SAMPLE#
LGINM
81-287-158
RESULT 2.200
UNIT DURATION
PPM
431
EC VC
MC
810625
LGMC
DID REPAIR WORK ON VALVES
AROUND THE VCM DAY TANKS.
ECVC
MC
810625
OPERVP
MORNING SAMPLE ROUND.
81-286-157 81-283-154
1.300
PPM
431
2.800
PPM
15
ECVC
MC 810730 ROUTINE SHIFT.
OPERVP
81-337-186
.100
PPM
458
ECVC
MC 810730 ROUTINE SHIFT.
VCAXOP
81-339-188
.120
PPM
46 0
ECVC
MC 810918 ROUTINE SHIFT
OPERVP
81-455-262
.280
PPM
432
ECVC
MC 810918 ROUTINE SHIFT
VCAXOP
81-456-263
.280
PPM
432
ECVC
MC 810928 ROUTINE SHIFT
OPERVF
81-480-269
.200
PPM
437
ECVC
MC 811012 ROUTINE SHIFT
ECOP
81-533-301
.250
PPM
426
ECVC
MC
811012
LGINM
WORKED IN CONTROL ROOM THE
MAJORITY OF THE DAY
81-534-302
ECVC
MC
811013
LGMC
81-538-304
REPAIRED EQUIPMENT IN EC AND
VC UNITS.
.530
PPM
433
.810
PPM
434
SL 016707
PAGE
1/19/93
LAfflhfARLES (259) PLANT B SAHmHG RESULTS THRU 1989
DEPT ECVC
COMPOUND
DATE
JOB TITLE
MC
820107
LEADOP
HCL AND EC,UNITS RUNNING
NORMAL RATES; VCM UNIT DOWN.
SAMPLE# 82-011-009
RESULT 1.820
UNIT DURATION PPM 995
ECVC
MC
820107
OPERVF
HCL AND EC UNITS RUNNING
NORMAL RATES; VCM UNIT DOWN.
82-012-010
.850
PPM
957
ECVC
MC
820107
VCAXOP
HCL AND EC UNITS RUNNING
NORMAL RATES; VCM UNIT DOWN.
82-013-011
.950
PPM
995
ECVC ECVC
MC
820603
ECOP
OUTSIDE WORK UNDER UPSET
CONDITIONS- INSTRUMENT AIR
LOST EARLY IN MORNING
MC
820603
LGINM
WORKED IN CONTROL ROOM
82-122-077 82-123-078
.230
PPM
990
.700
PPM
923
PAGE
ECVC
MC
820625
LGMC
82-291-130
ROUTINE SHIFT- WORKED THROUGH
OUT UNIT
ECVC
MC
820708
LGINM
82-267-199
REPAIRED HCL VALVE TO ABSORBER
.990
PPM
997
1.170
PPM
955
ECVC
MC
820708
LGMC
REPAIRED SCRUBBERS IN HCL
UNITS.
82-266-198
ECVC
MC
820708
VCAXOP
82-269-196
EC UNIT BROUGHT UP DURING MORN
ADDED CATALYST TO EC PRODUCT.
ECVC
MC
820820
LGINM
ROUTINE SHIFT. ROUTE WORK.
82-359-220
1.790
PPM
956
9.190
PPM
997
.280
PPM
916
ECVC
MC 820820 ROUTINE SHIFT
LGMC
82-353-219
1.930
PPM
930
SL 016708
PLAIIT B SAMmMG RESULTS THRU 198A
DEPT ECVC
COMPOUND
DATE
JOB TITLE
MC
821011
LGMC
WORKED THROUGHOUT UNIT.
SAMPLE# 82-A31-277
RESULT .A10
UNIT DURATION
PPM
A29
ECVC
MC
821103
VCAXOP
ROUTINE SHIFT. VC/HCL UNITS
DOWN.
82-A81-322
ECVC
*
ECVC
MC
821118
LGMC
82-517-3A2
REPAIRED RELEIF VALVE ON COM
PRESSOR 8 WORKED ON RUBBER
LINE STG. TK. WINDS E-6,
MC 821202 ROUTINE SHIFT.
ECOP
82-5A0-359
.210
PPM
A13
1.150
PPM
A35
.130
PPM
A38
ECVC
MC
830207
LGINM
ROUTINE ROUTE WORK IN UNIT.
NORMAL OPERATIONS.
83-088-057
ECVC ECVC
MC
830215
ECOP
ROUTINE HCL WORK. EC UNIT
DOWN. NORMAL OPERATIONS IN
VCM AND HCL UNITS.
83-100-067
MC
83031A
OPERVF
83-157-105
UPSET* OPERATING CONDITIONS /2
OHC REACTORS WENT DOWN.
ECVC
MC
83031A
OPERVP
83-156-1OA
UPSET OPERATING CONDITIONS/2
OHC REACTORS DOWN
ECVC
MC
830517
OPERVF
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-228-161
ECVC
MC
830517
OPERVP
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-227-160
ECVC
MC
830610
ECOP
ROUTINE SHIFT. SOME EXTRA
SAMPLING. NORMAL OPERATIONS.
83-282-19A
. 8A0
PPM
AAO
7.160
PPM
AAO
. AOO
PPM
A3A
. 2A0
PPM
A33
.220
PPM
A2A
. A30
PPM
AOO
1.500
PPM
AA9
SL 016709
1/19/93
LAI^BHARLES (259) PLANT B SAMTONG RESULTS THRU 1989
DEPT ECVC
COMPOUND
DATE
JOB TITLE
MC
830610
LGINM
ROUTE WORK IN UNIT . NORMAL
OPERATIONS.
SAMPLE# 83-289-196
RESULT 6.020
UNIT DURATION PPM 996
ECVC
MC
830610
LGMC
83-283-195
ROUTINE LOG BOOK WORK IN UNIT
NORMAL OPERATIONS.
1.950
PPM
963
ECVC
MC
830713
OPERVF
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-320-228
.150
PPM
397
ECVC
MC
830713
OPERVP
NORMAL OPERATIONS, ROUTINE
SHIFT
83-319-227
.190
PPM
389
ECVC
MC
830825
ECOP
ROUTINE SHIFT. REDUCED OPE
RATIONS- VC UNIT DOWN.
83-379-280
1.370
PPM
935
ECVC ECVC
MC
830825
LGINM
83-380-281
PULLED ABSORBER AND PRODUCT
STILL FLOAT CHAMBERS. REDUCED
OPERATIONS- VC UNIT DOWN
MC
830922
OPERVP
OPERATIONS DOWN, PRESSURE
CHECKS AND DOWN ACTIVITIES
83-993-312
.990
PPM
932
.100
PPM
375
ECVC
MC
831017
ECOP
ROUTINE SHIFT. NORMAL OPERA
TIONS.
83-997-395
.580
PPM
936
ECVC
MC
831017
LGINM
LOGBOOK WORK IN VC AREA.
NORMAL OPERATIONS.
83-998-396
.250
PPM
999
ECVC
MC
831031
ECOP
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-509-357
.150
PPM
909
ECVC
MC
831031
OPERVF
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-508-356
.190
PPM
911
PAGE
SL 016710
1/19/93
i
LAlflt HARLES (254) PLANT B SAMnTl NG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
MC
831031
OPERVP
NORMAL OPERATIONS, ROUTINE
SHIFT.
SAMPLE# 83-507-355
RESULT .230
UNIT DURATION PPM 409
ECVC
MC
840116
ECOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
83-041-022
.330
PPM
397
ECVC
MC
840116
FUOP
83-040-021
VC UNIT DOWN; SCHEDULED OUTAGE
DUTIES.
.290
PPM
393
ECVC ECVC
MC
840125
OPERVP
DOWN OPERATIONS. LEAK PATROL
HNU IN PROCESS, DAY TK AND
SPHERES AREA. WIND NNE-13.
84-068-034
MC
840201
ECOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
84-093-051
.270
PPM
210
.100
PPM
401
ECVC ECVC ECVC
MC
840215 OPERVP
84-123-073
NORMAL OPERATIONS. LEAK PATROL
WITH HNU IN PROCESS, DAY TK,
SPHERES AREAS.
MC 840328 OPERVP LEAK ^PATROL WITH HNU. WASHING
DOWN NO.3 NEUTRALIZER. NORMAL OPERATIONS.
84-171-114
MC 840404 FUOP NORMAL OPERATIONS VC I UNIT
ROUTINE SHIFT.
84-183-121
.780
PPM
270
.200
PPM
270
4.820
PPM
415
ECVC
MC
840404
OPERVP
NORMAL OPERATIONS EC/VC/HCL
UNITS. LEAK PATROL WITH HNU.
84-185-123
1.060
PPM
120
ECVC
MC
840404
PSOP
NORMAL OPERATIONS EC/VC/HCL
UNITS. ROUTINE SHIFT.
84-184-122
3.050
PPM
414
ECVC
MC
840409
FUOP
NORMAL OPERATIONS. ROUTINE
SAMPLE ROUND AND ANALYSIS.
84-192-130
4.160
PPM
193
SL 016711
PAGE
1/19/93
LAI^BhARLES (259) PLANT B SAMnrlUG RESULTS THRU 1989
DEPT ECVC
COMPOUND
DATE
JOB TITLE
MC
890909
PSOP
NORMAL OPERATIONS. ROUTINE
SAMPLE ROUND IN VCM UNIT.
SAMPLE# 89-191-129
RESULT 9.580
UNIT DURATION PPM 172
ECVC
MC 890910
WINDS SE-12/S-10. NORMAL OP. UPSTAIRS WEST SIDE
89-199-137
.120
PPM
269
ECVC
MC 890910 PLACED OH TOP COKE MACHINE.
89-201-139
.120
PPM
268
PAGE
ECVC
MC
890911
PSOP
UPSET OPERATIONS. LOST FUR
NACE AND VAPORIZER.
89-208-196
ECVC ECVC
MC
890912
FUOP
START-UP FURNACE DUTIES ON
CONTROL BOARD. 1HR. IN UNIT;
VCI PROCESS NORMAL OP.
89-210-198
MC
890912
PSOP
89-209-197
PROCESS UNIT NORMAL OP. HELPED
START-UP FURNACE.
ECVC
MC
890925
PSOP
89-236-179
NORMAL OPERATIONS. LEAK PATROL
WITH HNU. WINDS S-E-18.
ECVC
MC
890502
PSOP
LEAK PATROL WITH HNU. UNIT
DOWN.
89-295-183
ECVC ECVC
MC
890523
PSOP
LEAK PATROL WITH HNU AROUND
VINYL DAY TANKS AND SPHERES.
VC UNIT DOWN.
89-289-211
MC
890606
ECOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
89-309-226
ECVC
MC
890620
FUOP
89-399-261
DOWN OPERATIONS. ROUNDS DURING
DOWN OP. WIND W/SW-5.
1.610
PPM
165
.270
PPM
933
.170
PPM
372
.300
PPM
190
17.500
PPM
325
.190
PPM
180
.100
PPM
913
.560
PPM
387
SL 016712
1/19/93
LA|A|hARLES (254) PLAHT B SAMTONG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
MC
840711
ECOP
ROUTINE SHIFT. UNIT DOWN.
SAMPLE# 84-380-289
RESULT 1.050
UNIT DURATION PPM 415
PAGE
ECVC
MC
840711
FUOP
CLEARED PRODUCT STILL FEED
TANK . UNIT DOWN.
ECVC
4
ECVC
MC
840711
PSOP
LEAK PATROL WITH HMU. UNIT
DOWN.
MC
840830
PSOP
NORMAL OP. ROUTINE SHIFT.
84-379-288 84-378-287 84-443-344
.890
PPM
415
2.080
PPM
180
.120
PPM
408
ECVC
MC
840907
ECOP
NORMAL OP. ROUTINE SHIFT.
84-465-360
.140
PPM
415
ECVC
MC
840907
FUOP
NORMAL OP. ROUTINE SHIFT.
84-464-359
.100
PPM
397
ECVC
MC
841101
ECOP
84-575-437
NORMAL OP. EC/HCL UNIT. ROUTI
NE SHIFT.
ECVC ECVC
MC
841101
PSOP
84-574-436
DOWN OP. VC/UNIT. DOWN OP.
DUTIES ON PROCESS AND FJJRNACE
JOBS.
PER
780516
ECOP
78-173-114
ROUTINE SHIFT-LEAK UNDER NO 2
NEUTRALIZER
ECVC
PER
780526
GEWORK
ADDING NAOH TO NEUTRALIZER
78-188-116
.100
PPM
403
.110
PPM
407
.000
PPM
425
.000
PPM
33
ECVC
PER 780601 ROUTINE SHIFT
LEADOP
78-204-117
.000
PPM
404
SL 016713
1/19/93
LAH|lHARLES (256)
PLANT B SAMm[MG RESULTS THRU 1986
DEPT ECVC
COMPOUND
DATE
PER 780601 ROUTINE SHIFT
JOB TITLE SAMPLE#
OPERVF
78-205-118
RESULT .000
UNIT DURATION
PPM
260
PAGE
ECVC
PER 780612 ROUTINE SHIFT
ECOP
78-212-125
.000
PPM
611
ECVC
PER 780612 ROUTINE SHIFT
* ECVC
PER 780710 ROUTINE SHIFT
OPERVP ECOP
78-213-126 78-261-158
.000
PPM
611
.000
PPM
673
ECVC
PER 780710 ROUTINE SHIFT
LEADOP
78-262-159
.000
PPM
672
ECVC
PER 780710 ROUTINE SHIFT
OPERVF
78-237-157
.000
PPM
673
ECVC
PER 780710 ROUTINE SHIFT
OPERVP
78-236-156
.000
PPM
673
ECVC
PER 780907 ROUTINE SHIFT
ECOP
78-339-207
.000
PPM
601
ECVC
PER 780907 ROUTINE SHIFT
LEADOP
78-336-206
.070
PPM
601
ECVC
PER 780907 ROUTINE SHIFT
OPERVF
78-338-206
.000
PPM
601
ECVC
PER 780907 ROUTINE SHIFT
OPERVP
78-337-205
.000
PPM
601 SL 016714
1/19/93
LAf^HARLES (254) PLANT B SAiWlllG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
PER 781003 ROUTINE SHIFT
JOB TITLE SAMPLE#
ECOP
78-304-194
RESULT .000
UNIT DURATION PPM 435
ECVC
PER 781003 ROUTINE SHIFT
LEADOP
78-301-191
.000
PPM
435
ECVC
PER 781003 ROUTINE SHIFT
OPERVF
78-303-193
.000
PPM
435
ECVC
PER 781003 ROUTINE SHIFT
OPERVP
78-302-192
.000
PPM
435
ECVC
PER 781114 ROUTINE SHIFT
ECOP
78-426-264
.090
PPM
410
ECVC
PER 781114 ROUTINE SHIFT
LEADOP
78-424-262
.150
PPM
410
ECVC
PER 781128 ROUTINE SHIFT
OPERVP
78-427-265
.080
PPM
430
ECVC
PER 781206 ROUTINE SHIFT
ECOP
78-447-283
.610
PPM
425
ECVC PER
781206
ROUTINE SHIFT
LEADOP
78-444-280
.140
PPM
425
ECVC PER
781206
ROUTINE SHIFT
OPERVF
78-445-281
.180
PPM
425
ECVC
PER 781206 ROUTINE SHIFT
OPERVP
78-446-282
.130
PPM
425
SL 016715
PAGE
1/19/93
LAHmARLES (259) PLANT B SAMWInG RESULTS THRU 1989
DEPT ECVC
COMPOUND
DATE
PER 790105 ROUTINE SHIFT
JOB TITLE SAMPLE#
LEADOP
79-015-010
RESULT .000
UNIT DURATION
PPM
905
PAGE
ECVC
PER 790105 ROUTINE SHIFT
OPERVF
79-016-011
.000
PPM
905
ECVC
PER 790110 ROUTINE SHIFT
ECOP
79-023-018
ECVC
pep 790110 ROUTINE SHIFT
LEADOP
79-021-016
.000
PPM
370
.000
PPM
370
ECVC
PER 790110 ROUTINE SHIFT
OPERVP
79-022-017
.000
PPM
370
ECVC
PER 790306 ROUTINE SHIFT
ECOP
79-116-071
.000
PPM
920
ECVC
PER
790306
INSTRU
79-117-072
ROUTINE SHIFT WORKING LOGBOOK
INSTRUMENT MAN'S JOB
ECVC
PER 790306 ROUTINE SHIFT
LEADOP
79-119-069
.070
PPM
920
.000
PPM
920
ECVC
PER 790306 ROUTINE SHIFT
OPERVF
79-115-070
. 000
PPM
920
ECVC
PER 790322 ROUTINE SHIFT
OPERVP
79-157-093
.250
PPM
910
ECVC
PER
790929
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAH
79-296-128
.000
PPM
935
SL 016716
1/19/93
LAI^BhARLES (259) PLANT B SAMmHG RESULTS THRU 1989
DEPT ECVC
COMPOUND
DATE
JOB TITLE
PER
790929
PIPEFI
ROUTINE SHIFT WORKING AS
LOGBOOK MECHANIC
SAMPLE# 79-235-129
RESULT .000
UNIT DURATION PPM 935
ECVC
PER 7905Q2 ROUTINE SHIFT
ECQP
79-297-129
.070
PPM
935
PAGE
ECVC
PER 790502 ROUTINE SHIFT
* ECVC
PER 790502 ROUTINE SHIFT
LEADOP OPERVP
79-299-126 79-295-127
.090
PPM
935
.090
PPM
935
ECVC
PER
790509
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-251-133
ECVC
PER
790509
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-252-139
ECVC
PER 790529 ROUTINE SHIFT
OPERVF
79-277-155
.000
PPM
955
.090
PPM
955
.000
PPM
920
ECVC
PER
790530
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAN.
79-302-169
ECVC
PER
790530
PIPEFI
ROUTINE SHIFT WORKING AS
LOGBOOK MECHANIC
79-301-163
ECVC
PER
790619
INSTRU
79-315-178
ROUTINE SHIFT WORKING AS LOG
BOOK INSTRUMENT MAN
ECVC
PER
790619
PIPEFI
79-316-179
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC
.080
PPM
905
.070
PPM
905
.270
PPM
990
.090
PPM
990
SL 016717
1/19/93
LAI^PHARLES (259) PLANT B SAHWiHG RESULTS THRU 1989
DEPT ECVC
COMPOUND
DATE
JOB TITLE
PER
790621
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
SAMPLE# 79-392-190
RESULT .590
UNIT DURATION PPM 930
ECVC
PER
790621
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-393-191
.000
PPM
930
ECVC
PER 790710 ROUTINE SHIFT
LEADOP
79-368-211
.050
PPM
905
PAGE
ECVC
PER 790710 ROUTINE SHIFT
OPERVF
79-369-212
.050
PPM
905
ECVC
PER 790710 ROUTINE SHIFT
OPERVP
79-370-213
.050
PPM
905
ECVC
PER
790806
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING EC/VC TAR BUGGIES
79-386-223
ECVC
PER
790806
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING EC/VC TAR BUGGIES
79-387-229
ECVC
PER 791008 ROUTINE SHIFT
LEADOP
79-995-292
.170
PPM
385
.050
PPM
375
.050
PPM
915
ECVC
PER 791008 ROUTINE SHIFT
OPERVF
79-997-299
.060
PPM
915
ECVC
PER 791008 ROUTINE SHIFT
OPERVP
79-996-293
.050
PPM
915
ECVC
PER 791011
79-506-303
3FT N OF KETTLE/9FT ABV PLTFRM
SW WND/8MPH/73F/43RH/FAIR
.050
PPM
259
SL 016718
1/19/93
LAt^BHARLES (25A) PLANT B SAMraNG RESULTS THRU 198A
DEPT ECVC
COMPOUND
DATE
JOB TITLE SAMPLE#
PER 791011
79-507-3GA
AFT S OF KETTLE/AFT ABV PLTFRM
SW WND/8MPH/73F/A3RH/FAIR
RESULT .050
UNIT DURATION PPM 258
ECVC
PER 791011
79-508-305
3FT NE OF KETTLE/5FT ABV PLTFM
SW WND/8MPH/73F/A3RH/FAIR
.050
PPM
257
ECVC
PER 791015
79-519-316
5FT SE OF SUMP/5FT ABV GRND/
NE WND/6MPH/50F/86RH/CLEAR
.050
PPM
276
ECVC
PER 791015
79-520-317
AFT NE OF SUMP/AFT ABV GRND/
HE WND/6MPH/5OF/86RH/CLEAR
.080
PPM
276
ECVC
PER
791017
ECOP
FECL3 ADDITION JOB
79-552-328
.000
PPM
15
PAGE
ECVC
PER
791018
OPERVF
79-55A-330
LOADING TAR BUGGY AT DOPP KETL
1 AT VC/NE/AMPH/62F/97RH/FAIR
ECVC
PER
79102A
OPERVF
MAKING SAMPLE ROUNDS IN VCM
UNIT
79-590-366
ECVC
PER
791029
GEWORK
UNLOADING VC TAR BUGGY AT
WASTE POND.
79-616-386
ECVC
PER
791029
GEWORK
UNLOADING VC TAR BUGGY AT
WASTE POND
79-617-387
ECVC
PER
791031
GEWORK
79-AA9-2A6
DUMPING VC TAR BUGGY AT WASTE
POND.
ECVC
PER
791031
GEWORK
DISCHARGING VC TAR BUGGY TO
WASTE POND
79-565-3A1
.050
PPM
15
.500
PPM
15
.100
PPM
12
.100
PPM
12
.100
PPM
5
.100
PPM
6
SL 016719
1/19/93
LAF^^HARLES (254) PLANT B SAfPKNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
PER
791031
GEWORK
DISCHARGING VC TAR BUGGY TO
WASTE POND
SAMPLE# 79-625-395
RESULT .100
UNIT DURATION
PPM
6
ECVC
PER 791108 ROUTINE SHIFT
ECOP
79-645-415
.090
PPM
380
PAGE
ECVC
PER 791108 ROUTINE SHIFT
LEADOP
79-642-412
.090
PPM
380
ECVC
PER 791108 ROUTINE SHIFT
OPERVF
79-644-414
.070
PPM
380
ECVC
PER 791108 ROUTING SHIFT
OPERVP
79-643-413
.080
PPM
380
ECVC
PER 791108 ROUTINE SHIFT
VCAXOP
79-646-416
.050
PPM
400
ECVC
PER 791113
79-664-434
4FT N-NE OF VENT OFF LIFT STA
1,CLEAR,41F,N,7MPH
ECVC
PER 791113
79-665-435
7FT SW OF VENT OFF LIFT STA 1,
CLEAR,41F,N,7MPH
ECVC
PER 791113
79-666-436
6FT OF VCM DOPP KETTLE SEALC1)
,CLEAR,41F,N,7MPH
ECVC
PER 791113 5FT S-SW OF VCM DOPP KETTLE
SEAL(1),CLEAR,41F,M,7MPH
79-667-437
ECVC
PER 791113
79-668-438
5FT S OF VCM DOPP KETTLE SEAL
(2),CLEAR,41F,N,7MPH
.050
PPM
297
.050
PPM
297
.050
PPM
298
.050
PPM
298
.000
PPM
295
SL 016720
1/19/93
LAf^fctHARLES (259) PLANT B SAMPWNG RESULTS THRU 1989
DEPT ECVC
COMPOUND
DATE
JOB TITLE
PER
800122
INSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAN
SAMPLE# 80-096-026
RESULT .060
UNIT DURATION PPM 920
ECVC
PER 800122 ROUTINE SHIFT
LEADOP
80-092-022
.600
PPM
920
ECVC
PER 800123 ROUTINE SHIFT
OPERVP
80-093-023
.280
PPM
920
ECVC
PER 800207 ROUTINE SHIFT SPRAYED WITH EC
ECOP
ECVC
PER
800207
PIPEFI
ROUTINE SHIFT AS LOG BOOK
MECHANIC
ECVC
PER
800219
OPERVF
MORNING SAMPLE ROUND
80-098-092 80-099-093 80-031-016
.130
PPM
950
.150
PPM
935
.710
PPM
15
ECVC
PER
800219
OPERVP
TAKING VALVE READINGS
80-113-055
.330
PPM
18
ECVC
PER 800219 SAMPLE ANALYSIS
VCAXOP
80-119-056
9.990
PPM
15
ECVC
PER
800305
OPERVF
ROUTINE SHIFT, OPERATOR WAS
SPRAYED WHEN VALVE BROKE
80-198-067
ECVC
PER 800305 ROUTINE SHIFT
OPERVF
80-199-068
.060
PPM
928
.620
PPM
928
ECVC
PER
800311
PIPEFI
80-168-078
REMOVING HEAVY STILL REBOILER
.130
PPM
55
SL 016721
PAGE
1/19/93
LAI^B^HARLES (254) PLANT B SAIWING RESULTS THRU 1984
DEPT EC VC
COMPOUND
DATE
JOB TITLE SAMPLE#
PER
800311
PIPEFI
80-169-079
REMOVING HEAVY STILL REBOILER
RESULT .200
UNIT DURATION PPM 50
PAGE
ECVC
PER
800311
PIPEFI
80-241-114
REMOVING HEAVY STILL REBOILER
.130
PPM
55
ECVC
PER
800311
PIPEFI
80-242-115
REMOVING HEAVY STILL REBOILER
* ECVC
PER
800311
WELDER
80-170-080
REMOVING HEAVY STILL REBOILERS
.200
PPM
50
.150
PPM
55
ECVC
PER
800311
WELDER
80-243-116
REMOVING HEAVY STILL REBOILERS
.150
PPM
55
ECVC
PER
800417
MACHIN
ROUTINE :SHIFT AS LOGBOOK
MECHANIC
ECVC
PER
800417
OPERVF
MORNMIG :SAMPLE ROUND
80-229-104 80-231-106
.050
PPM
430
.210
PPM
15
ECVC
PER
800417
VCAXOP
MORNING :SAMPLE ROUND
80-232-107
.330
PPM
15
ECVC
PER
800425
OPERVF
80-253-121
MORNING ISAMPLE ROUND CATCHING
VCM BOMB
ECVC
PER
800425
PIPEFI
80-254-122
INSTALLING SRV ON VCM #4 DAY
TANK
ECVC
PER
800425
WELDER
80-255-133
INSTALLING SRV ON VCM #4 DAY
T A Ml/
.310
PPM
15
.120
PPM
40
.150
PPM
40 SL 016722
1/19/93
LAI^BhARLES (259) PLANT B SAMmHG RESULTS THRU 1989
DEPT ECVC
COMPOUND
DATE
JOB TITLE
PER
800527
INSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAH
SAMPLE# 80-306-152
RESULT .110
UNIT DURATION PPM 937
ECVC
PER
800527
MACHIN
ROUTINE SHIFT AS LOG BOOK
MECHANIC
80-305-151
.150
PPM
951
ECVC
PER
800611
VCAXOP
MORNING SAMPLE ROUND
80-337-167
9.390
PPM
15
PAGE
ECVC
PER 800719 ROUTINE SHIFT
VCAXOP
80-392-198
.060
PPM
933
ECVC ECVC
PER
820603
ECOP
OUTSIDE WORK UNDER UPSET
CONDITIONS- INSTRUMENT AIR
LOST EARLY IN MORNING
PER
820603
LGINM
WORKED IN CONTROL ROOM
82-122-077 82-123-078
.200
PPM
990
.200
PPM
923
ECVC
PER
820708
LGINM
82-267-199
REPAIRED HCL VALVE TO ABSORBER
.150
PPM
955
ECVC
PER
890516
PSOP
LEAK PATROL WITH HNU. VINYL
UNIT DOWN.
89-281-205
ECVC
SYM 780612 ROUTINE SHIFT
ECOP
78-212-125
.110
PPM
300
.290
PPM
911
ECVC
SYM 780612 ROUTINE SHIFT
OPERVP
78-213-126
.200
PPM
911
ECVC
SYM 780710 ROUTINE SHIFT
LEADOP
78-262-159
.080
PPM
972
SL 016723
1/19/93
LAlM^HARLES (254) PLANT B SAMWriG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
SVM 780710 ROUTINE SHIFT
JOB TITLE SAMPLE#
OPERVP
78-236-156
RESULT .040
UNIT DURATION
PPM
473
PAGE
ECVC
SVM 780907 ROUTINE SHIFT
ECOP
78-339-207
.530
PPM
401
ECVC
SVM 780907 ROUTINE SHIFT
ECVC
SVM 780907 ROUTINE SHIFT
LEADOP OPERVF
78-336-204 78-338-206
.530
PPM
401
.720
PPM
401
ECVC
SVM 780907 ROUTINE SHIFT
OPERVP
78-337-205
.480
PPM
401
ECVC
SVM 781114 ROUTINE SHIFT
LEADOP
78-424-262
.000
PPM
410
ECVC
SYM 781128 ROUTINE SHIFT
OPERVP
78-427-265
1.010
PPM
430
ECVC
SYM 781206 ROUTINE SHIFT
ECOP
78-447-283
1.360
PPM
425
ECVC
SVM 781206 ROUTINE SHIFT
LEADOP
78-444-280
.630
PPM
425
ECVC
SYM 781206 ROUTINE SHIFT
OPERVF
78-445-281
.810
PPM
425
ECVC
SYM 781206 ROUTINE SHIFT
OPERVP
78-446-282
.830
PPM
425
SL 016724
LAh|hARLES (254) PLANT B SAMmNG RESULTS THRU 1964
DEPT ECVC
COMPOUND
DATE
SYM 790105 ROUTINE SHIFT
JOB TITLE SAMPLE#
LEADOP
79-015-010
RESULT .000
UNIT DURATION PPM 405
ECVC
SYM
790306
INSTRU
79-117-072
ROUTINE SHIFT WORKING LOGBOOK
INSTRUMENT MAN'S JOB
ECVC
* ECVC
SYM
790509
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
SYM
790509
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-251-133 79-252-134
ECVC
SYM
790621
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-342-190
ECVC
SYM
790621
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-343-191
ECVC
SYM
790806
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING EC/VC TAR BUGGIES
79-386-223
ECVC
SYM
790806
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING EC/VC TAR BUGGIES
79-387-224
ECVC
SYM
791031
GEWORK
DISCHARGING VC TAR BUGGY TO
WASTE POND
79-625-395
ECVC
SYM 791108 ROUTINE SHIFT
ECOP
79-645-415
.120
PPM
420
.000
PPM
455
.160
PPM
455
.800
PPM
430
1.120
PPM
430
.050
PPM
385
.090
PPM
375
.100
PPM
6
.320
PPM
360
ECVC
SYM
791108
ROUTINE SHIFT
LEADOP
79-642-412
.290
PPM
380
1/19/93
LAI^HhARLES (254) PLANT B SAfWlNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
SYM 791108 ROUTINE SHIFT
JOB TITLE SAMPLE#
OPERVF
79-644-414
RESULT .090
UNIT DURATION PPM 380
ECVC
SYM 791108 ROUTING SHIFT
OPERVP
79-643-413
.250
PPM
380
ECVC
* ECVC
SYM 791113
79-664-434
4FT N-NE OF VENT OFF LIFT STA
1,CLEAR, 41F,N,7MPH
SYM 791113
79-665-435
7FT SW OF VENT OFF LIFT STA 1
CLEAR,41F,N,7MPH
ECVC
SYM 791113
79-666-436
6FT OF VCM DOPP KETTLE SEALd
,CLEAR,41F,H,7MPH
ECVC
SYM 791113 5FT S-SW OF VCM DOPP KETTLE SEALt1),CLEAR,41F,N,7MPH
79-667-437
ECVC
SYM
791113
79-668-438
5FT S OF VCM DOPP KETTLE SEAL
(2),CLEAR,41F,N,7MPH
ECVC
TCE
780516
ECOP
78-173-114
ROUTINE SHIFT-LEAK UNDER NO 2
NEUTRALIZER
ECVC TCE
780526
GEWORK
ADDING NAOH TO NEUTRALIZER
78-188-116
.000
PPM
297
.000
PPM
297
.000
PPM
298
.000
PPM
298
.000
PPM
295
.000
PPM
425
.000
PPM
33
ECVC
TCE 780601 ROUTINE SHIFT
LEADOP
78-204-117
.000
PPM
404
ECVC
TCE 780601 ROUTINE SHIFT
OPERVF
78-205-118
.000
PPM
240
PAGE
SL 016726
1/19/93
LAl4HARLES (254) PLANT B SAMHFiNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
TCE 780612 ROUTINE SHIFT
JOB TITLE SAMPLE#
ECOP
78-212-125
RESULT .000
UNIT DURATION
PPM
411
ECVC
TCE 780612 ROUTINE SHIFT
OPERVP
78-213-126
.000
PPM
411
ECVC
TCE 780710 ROUTINE SHIFT
* ECVC
TCE 780710 ROUTINE SHIFT
ECOP LEADOP
78-261-158 78-262-159
.090
PPM
473
.000
PPM
472
ECVC
TCE 780710 ROUTINE SHIFT
OPERVF
78-237-157
.090
PPM
473
ECVC
TCE 780710 ROUTINE SHIFT
OPERVP
78-236-156
.000
PPM
473
ECVC
TCE 780907 ROUTINE SHIFT
ECOP
78-339-207
.000
PPM
401
ECVC
TCE 780907 ROUTINE SHIFT
LEADOP
78-336-204
.000
PPM
401
ECVC
TCE 780907 ROUTINE SHIFT
OPERVF
78-338-206
.000
PPM
401
ECVC
TCE 780907 ROUTINE SHIFT
OPERVP
78-337-205
.000
PPM
401
ECVC
TCE 781003 ROUTINE SHIFT
ECOP
78-304-194
.000
PPM
435
^ OI6727
PAGE
1/19/93
LAfSCharles (254) PLANT B SAfWltNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
TCE 781003 ROUTINE SHIFT
JOB TITLE SAMPLE#
LEADOP
78-301-191
RESULT .000
UNIT DURATION PPM 435
PAGE
ECVC
TCE 781003 ROUTINE SHIFT
OPERVF
78-303-193
.000
PPM
435
ECVC
TCE 781003 ROUTINE SHIFT
* ECVC
TCE 78111A ROUTINE SHIFT
OPERVP ECOP
78-302-192 78-426-264
.000
PPM
435
.000
PPM
410
ECVC
TCE 781114 ROUTINE SHIFT
LEADOP
78-424-262
.000
PPM
410
ECVC
TCE 781128 ROUTINE SHIFT
OPERVP
78-427-265
.000
PPM
430
ECVC
TCE 781206 ROUTINE SHIFT
ECOP
78-447-283
.150
PPM
425
ECVC
TCE 781206 ROUTINE SHIFT
LEADOP
78-444-280
.000
PPM
425
ECVC
TCE 781206 ROUTINE SHIFT
OPERVF
78-445-281
.000
PPM
425
ECVC
TCE 781206 ROUTINE SHIFT
OPERVP
78-446-282
ECVC
TCE 790105 ROUTINE SHIFT
LEADOP
79-015-010
.000
PPM
425
.000
PPM
405
SL 016728
1/19/93
LAI^1ARLES (254) PLANT B SAlfflNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
TCE 790105 ROUTINE SHIFT
JOB TITLE OPERVF
SAMPLE# 79-016-011
RESULT .000
UNIT DURATION
PPM
405
PAGE
ECVC
TCE 790110 ROUTINE SHIFT
ECOP
79-023-018
.000
PPM
370
ECVC
TCE 790110 ROUTINE SHIFT
LEADOP
79-021-016
.000
PPM
370
ECVC TCE
790110
ROUTINE SHIFT
OPERVP
79-022-017
.000
PPM
370
ECVC
TCE 790306 ROUTINE SHIFT
ECOP
79-116-071
.000
PPM
420
ECVC
TCE
790306
INSTRU
79-117-072
ROUTINE SHIFT WORKING LOGBOOK
INSTRUMENT MAN'S JOB
ECVC TCE
790306
ROUTINE SHIFT
LEADOP
79-114-069
.000
PPM
420
.000
PPM
420
ECVC
TCE 790306 ROUTINE SHIFT
OPERVF
79-115-070
.000
PPM
420
ECVC TCE
790322
ROUTINE SHIFT
OPERVP
79-157-093
.280
PPM
410
ECVC
TCE
790424
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAN
ECVC
TCE
790424
PIPEFI
ROUTINE SHIFT WORKING AS
LOGBOOK MECHANIC
79-246-128 79-235-124
.110
PPM
435
.130
PPM
435
SL 016729
1/19/93
LAlfHHARLES (254) PLANT b samWing RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
TCE 790502 ROUTINE SHIFT
JOB TITLE SAMPLE#
ECOP
79-247-129
RESULT .090
UNIT DURATION PPM 435
PAGE
ECVC
TCE 790502 ROUTINE SHIFT
LEADOP
79-244-126
.090
PPM
435
ECVC
TCE 790502 ROUTINE SHIFT
OPERVP
79-245-127
ECVC
TCE
790509
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-251-133
ECVC
TCE
790509
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-252-134
ECVC
TCE 790524 ROUTINE SHIFT
OPERVF
79-277-155
.120
PPM
435
.060
PPM
455
.890
PPM
455
.000
PPM
420
ECVC
TCE
790530
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAN.
79-302-164
ECVC
TCE
790530
PIPEFI
ROUTINE SHIFT WORKING AS
LOGBOOK MECHANIC
79-301-163
ECVC
TCE
79061A
INSTRU
79-315-178
ROUTINE SHIFT WORKING AS LOG
BOOK INSTRUMENT MAN
ECVC
TCE
79061A
PIPEFI
79-316-179
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC
ECVC
TCE
790621
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-342-190
.810
PPM
405
.230
PPM
405
.230
PPM
440
.140
PPM
.720
PPM
440
SL 016730
430
1/19/93
LAH^KHARLES (259) PLANT B SAMPLING RESULTS THRU 1989
DEPT ECVC
COMPOUND
DATE
JOB TITLE
TCE
790621
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
SAMPLE# 79-393-191
RESULT .930
UNIT DURATION PPM 930
ECVC
TCE 790710 ROUTINE SHIFT
LEADOP
79-368-211
.050
PPM
905
PAGE
ECVC
TCE 790710 ROUTINE SHIFT
* ECVC
TCE 790710 ROUTINE SHIFT
OPERVF OPERVP
79-369-212 79-370-213
.050
PPM
905
.050
PPM
905
ECVC
TCE
790806
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING EC/VC TAR BUGGIES
79-386-223
ECVC
TCE
790806
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING EC/VC TAR BUGGIES
79-387-229
ECVC
TCE 791008 ROUTINE SHIFT
LEADOP
79-995-292
.660
PPM
385
.180
PPM
375
.050
PPM
915
ECVC
TCE 791008 ROUTINE SHIFT
OPERVF
79-997-299
,050
PPM
915
ECVC
TCE 791008 ROUTINE SHIFT
OPERVP
79-996-293
.000
PPM
915
ECVC
TCE
791017
ECOP
FECL3 ADDITION JOB
79-552-328
.000
PPM
15
ECVC
TCE
791031
GEWORK
DISCHARGING VC TAR BUGGY TO
WASTE POND
79-625-395
22.700
PPM
6
SL 016731
1/19/93
LAI^BhARLES (254) PLANT 6 SAMHTiHG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE SAMPLE#
TCE 791113
79-664-434
4FT N-NE OF VENT OFF LIFT STA
1, CLEAR, 41F,N,7MPH
RESULT .000
UNIT DURATION PPM 297
ECVC
TCE 791113
79-665-435
7FT SW OF VENT OFF LIFT STA 1,
CLEAR,41F,N,7MPH
.000
PPM
297
ECVC
* ECVC
TCE 791113
79-666-436
6FT OF VCM DOPP KETTLE SEAL(l)
,CLEAR,41F,N,7MPH
TCE 791113 5FT S-SW OF VCM DOPP KETTLE
SEAL(l), CLEAR,41F,N,7MPH
79-667-437
.000
PPM
298
.000
PPM
298
ECVC
TCE
791113
79-668-438
5FT S OF VCM DOPP KETTLE SEAL
C2),CLEAR,41F,N,7MPH
.000
PPM
295
ECVC
TCE
800214
OPERVF
MORNING SAMPLE ROUND
80-031-016
.190
PPM
15
PAGE
ECVC
TCE 800305 ROUTBNE SHIFT
OPERVF
80-149-068
.090
PPM
428
ECVC
TCE
800311
PIPEFI
80-168-078
REMOVING HEAVY STILL REBOILER
.300
PPM
55
ECVC
TCE
800311
PIPEFI
80-241-114
REMOVING HEAVY STILL REBOILER
.300
PPM
55
ECVC
TCE
800311
WELDER
80-170-080
REMOVING HEAVY STILL REBOILERS
ECVC
TCE
800311
WELDER
80-243-116
REMOVING HEAVY STILL REBOILERS
.070
PPM
.070
PPM
55
SL 016732
55
1/19/93
LAI^BtHARLES (254) PLANT B SAMnTiNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
TCE
800423
MACHIN
ROUTINE SHIFT AS LOG BOOK
MECHANIC
SAMPLE# 80-218-101
RESULT .140
UNIT DURATION PPM 380
ECVC
TCE 800527 ROUTINE SHIFT
OPERVF
80-303-149
.450
PPM
440
ECVC TCE
800623
ROUTINE SHIFT
t ECVC
TCE 801001 ROUTINE SHIFT
ECOP OPERVP
80-338-168 80-510-243
.750
PPM
421
.070
PPM
434
ECVC
TCE 801023 ROUTINE SHIFT
ECOP
80-553-276
.030
PPM
445
ECVC ECVC
TCE
811013
OPERVF
81-537-303
COLLECTING SAMPLES AND WASHED-
DOWN HEAVY BOTTOMS AND FURNACE
FEED AREA
TCE 840410 PLACED ON TOP COKE MACHINE.
84-201-139
.580
PPM
15
.230
PPM
266
ECVC
TRANS
780516
ECOP
78-173-114
ROUTINE SHIFT-LEAK UNDER NO 2
NEUTRALIZER
ECVC
TRANS
780526
GEWORK
ADDING NAOH TO NEUTRALIZER
78-188-116
.000
PPM
425
.000
PPM
33
ECVC
TRANS
780601
ROUTINE SHIFT
LEADOP
78-204-117
.000
PPM
404
ECVC TRANS
780601
ROUTINE SHIFT
OPERVF
78-205-118
.000
PPM
240
SL 016733
PAGE
1/19/93 1
LAIMCharles (254> PLANT B SAMffrENG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
TRANS
780710
ROUTINE SHIFT
JOB TITLE SAMPLE#
ECOP
78-261-158
RESULT .000
UNIT DURATION PPM 473
1
PAGE
ECVC
TRANS
780710
ROUTINE SHIFT
OPERVF
78-237-157
.000
PPM
473
ECVC
TRANS
780710
ROUTINE SHIFT
* ECVC
TRANS
780907
ROUTINE SHIFT
OPERVP ECOP
78-236-156 78-339-207
.000
PPM
473
.000
PPM
401
ECVC
TRANS
780907
ROUTINE SHIFT
LEADOP
78-336-204
.000
PPM
401
ECVC
TRANS
780907
ROUTINE SHIFT
OPERVF
78-338-206
.000
PPM
401
ECVC
TRANS
780907
ROUTINE SHIFT
OPERVP
78-337-205
.000
PPM
401
ECVC
TRANS
781003
ROUTINE SHIFT
ECOP
78-304-194
.000
PPM
435
ECVC
TRANS
781003
ROUTINE SHIFT
OPERVF
78-303-193
.000
PPM
435
ECVC
TRANS
781003
ROUTINE SHIFT
OPERVP
78-302-192
ECVC
TRANS
781114
ROUTINE SHIFT
ECOP
78-426-264
.000
PPM
435
.000
PPM
410 SL 016734
1/19/93
LAli^^HARLES (254) PLANT B SAMPPiNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
TRANS
781114
ROUTINE SHIFT
JOB TITLE SAMPLE#
LEADOP
78-424-262
RESULT .000
UNIT DURATION PPM 410
PAGE
ECVC
TRANS
781206
ROUTINE SHIFT
ECOP
78-447-283
.000
PPM
425
ECVC
TRANS
781206
ROUTINE SHIFT
* ECVC
TRANS
781206
ROUTINE SHIFT
LEADOP OPERVF
78-444-280 78-445-281
.000
PPM
425
.000
PPM
425
ECVC
TRANS
781206
ROUTINE SHIFT
OPERVP
78-446-282
.000
PPM
425
ECVC
TRANS
790105
ROUTINE SHIFT
OPERVF
79-016-011
.000
PPM
405
ECVC
TRANS
790110
ROUTINE SHIFT
ECOP
79-023-018
.000
PPM
370
ECVC
TRANS
790110
ROUTINE SHIFT
LEADOP
79-021-016
. 000
PPM
370
ECVC
TRANS
790110
ROUTINE SHIFT
OPERVP
79-022-017
. 000
PPM
37 0
ECVC
TRANS
790306
INSTRU
79-117-072
ROUTINE SHIFT WORKING LOGBOOK
INSTRUMENT MAN'S JOB
ECVC
TRANS
790306
ROUTINE SHIFT
LEADOP
79-114-069
.000
PPM
420
. 000
PPM
420
SL 016735
1/19/93
#LAI HARLES (259)
PLANT B SAMmI hTiING RESULTS THRU 1989
DEPT ECVC
COMPOUND
DATE
TRANS
790306
ROUTINE SHIFT
JOB TITLE SAMPLE#
OPERVF
79-115-070
RESULT .000
UNIT DURATION
PPM
920
PAGE
ECVC
TRANS
790322
ROUTINE SHIFT
OPERVP
79-157-093
000 PPM
910
ECVC
t
ECVC
TRANS
790929
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAN
TRANS
790929
PIPEFI
ROUTINE SHIFT WORKING AS
LOGBOOK MECHANIC
ECVC
TRANS
790502
ROUTINE SHIFT
LEADOP
79-296-128 79-235-129 79-299-126
.000
PPM
935
.000
PPM
935
.000
PPM
935
ECVC
TRANS
790502
ROUTINE SHIFT
OPERVP
79-295-127
.000
PPM
935
ECVC
TRANS
790529
ROUTINE SHIFT
OPERVF
79-277-155
.000
PPM
920
ECVC
TRANS
790530
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAH.
79-302-169
ECVC
TRANS
790530
PIPEFI
ROUTINE SHIFT WORKING AS
LOGBOOK MECHANIC
79-301-163
ECVC
TRANS
790619
INSTRU
79-315-178
ROUTINE SHIFT WORKING AS LOG
BOOK INSTRUMENT MAH
ECVC
TRANS
790619
PIPEFI
79-316-179
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC
.000
PPM
905
.000
PPM
905
.000
PPM
990
.000
PPM
990
SL 016736
1/19/93
LAI^BHARLES (254) PLANT B SAMTCING RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
TRANS
790621
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
SAMPLE# 79-342-190
RESULT .000
UNIT DURATION PPM 430
ECVC
TRANS
790621
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-343-191
.000
PPM
430
ECVC
TRANS
790710
ROUTINE SHIFT
* ECVC
TRANS
790710
ROUTINE SHIFT
LEADOP OPERVF
79-368-211 79-369-212
.000
PPM
405
.000
PPM
405
PAGE
ECVC
TRANS
790710
ROUTINE SHIFT
OPERVP
79-370-213
.000
PPM
405
ECVC
TRANS
790806
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING EC/VC TAR BUGGIES
79-387-224
ECVC
TRANS
791008
ROUTINE SHIFT
LEADOP
79-445-242
.000
PPM
375
.050
PPM
415
ECVC
TRANS
791008
ROUTINE SHIFT
OPERVF
79-447-244
.050
PPM
415
ECVC
TRANS
791008
ROUTINE SHIFT
OPERVP
79-446-243
.000
PPM
415
ECVC
TRANS
791015
79-519-316
5FT SE OF SUMP/5FT ABV GRND/
NE WND/6MPH/50F/86RH/CLEAR
ECVC
TRANS
791015
4FT NE OF SUMP/4FT ABV GRND/
NE WND/6MPH/50F/86RH/CLEAR
79-520-317
.050
PPM
276
.050
PPM
276
SL 016737
1/19/93
LAI^PHARLES (25A) PLANT B SAMWiNG RESULTS THRU 198A
DEPT ECVC
COMPOUND
DATE
JOB TITLE
TRANS
791017
ECOP
FECL3 ADDITION JOB
SAMPLE# 79-552-328
RESULT .500
UNIT DURATION PPM 15
PAGE
ECVC
TRANS
791018
OPERVF
79-55A-330
LOADING TAR BUGGY AT DOPP KETL
1 AT VC/NE/AMPH/62F/97RH/FAIR
ECVC
*
ECVC
TRANS
791113
79-66A-A3A
AFT N-HE OF VENT OFF LIFT STA
1,CLEAR,A1F,N,7MPH
TRANS
791113
79-665-A35
7FT SW OF VENT OFF LIFT STA 1,
CLEAR,A1F,N,7MPH
ECVC
TRANS
791113
79-666-A36
6FT OF VCM DOPP KETTLE SEAL(l)
,CLEAR,A1F,N,7MPH
ECVC
TRANS
791113
5FT S-SW OF VCM DOPP KETTLE
SEAL(l),CLEAR,A1F, N,7MPH
79-667-A37
ECVC
TRANS
791113
79-668-A38
5FT S OF VCM DOPP KETTLE SEAL
(2),CLEAR,A1F,N,7MPH
ECVC
TRANS
60 021A
OPERVF
MORNING SAMPLE ROUND
80-031-016
.050
PPM
15
.050
PPM
297
.050
PPM
297
.050
PPM
298
.050
PPM
298
.000
PPM
295
2.330
PPM
15
ECVC
TRANS
80021A
OPERVP
TAKING VALVE READINGS
80-113-055
.200
PPM
18
ECVC
TRANS
820603
LGINM
WORKED IN CONTROL ROOM
82-123-078
ECVC
TRANS
820603
OPERVP
82-195-099
REPAIRED VINYL PROCESS PUMP;
LEAKING HOSE, 6 MINUTES. 77 F
PC WINDS E 6MPH 93X RH
.820
PPM
A23
16.500
PPM
16
SL 016738
1/19/93
LAI^fc HARLES (254) PLANT B SAMm NG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE SAMPLE#
TRANS
820625
LGMC
82-241-130
ROUTINE SHIFT- WORKED THROUGH
OUT UNIT
RESULT 2.050
UNIT DURATION PPM 447
ECVC
TRANS
821103
OPERVP
ROUTINE SHIFT. VC/HCL UNITS
DOWN.
82-479-320
.380
PPM
420
ECVC ECVC
TRANS
821118
LGMC
82-517-342
REPAIRED RELEIF VALVE ON COM
PRESSOR 8 WORKED ON RUBBER
LINE STG. TK. WINDS E-6.
TRANS
830610
ECOP
ROUTINE SHIFT. SOME EXTRA
SAMPLING. NORMAL OPERATIONS.
83-282-194
.080
PPM
435
1.320
PPM
449
ECVC
TRANS
830610
LGINM
ROUTE WORK IN UNIT. NORMAL
OPERATIONS.
83-284-196
.960
PPM
446
ECVC
TRANS
840502
PSOP
LEAK PATROL WITH HNU. UNIT
DOWN.
84-245-183
.280
PPM
325
ECVC
TRANS
840516
PSOP
LEAK ^PATROL WITH HNU. VINYL
UNIT DOWN.
84-281-205
.400
PPM
300
ECVC
TRI
780516
ECOP
78-173-114
ROUTINE SHIFT-LEAK UNDER NO 2
NEUTRALIZER
.000
PPM
425
ECVC
TRI
780526
GEWORK
ADDING NAOH TO NEUTRALIZER
78-188-116
.000
PPM
33
PAGE
ECVC
TRI 780601 ROUTINE SHIFT
LEADOP
78-204-117
.000
PPM
404
ECVC
TRI 780601 ROUTINE SHIFT
OPERVF
78-205-118
.000
PPM
240
SL 016739
1/19/93
LAI^BhARLES (254) PLAHT B SAlWlHG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
TRI 780612 ROUTINE SHIFT
JOB TITLE ECOP
SAMPLE# 78-212-125
RESULT .170
UNIT DURATION PPM 411
ECVC
TRI 780710 ROUTINE SHIFT
ECOP
78-261-158
.000
PPM
473
ECVC
TRI 780710 ROUTINE SHIFT
* ECVC
TRI 780710 ROUTINE SHIFT
OPERVF OPERVP
78-237-157 78-236-156
.000
PPM
473
.000
PPM
473
ECVC
TRI 780907 ROUTINE SHIFT
ECOP
78-339-207
.000
PPM
401
ECVC
TRI 780907 ROUTINE SHIFT
LEADOP
78-336-204
.000
PPM
401
ECVC
TRI 780907 ROUTINE SHIFT
OPERVF
78-338-206
.000
PPM
401
ECVC
TRI 780907 ROUTINE SHIFT
OPERVP
78-337-205
.000
PPM
401
ECVC
TRI 781003 ROUTINE SHIFT
ECOP
78-304-194
.000
PPM
435
ECVC
TRI 781003 ROUTINE SHIFT
LEADOP
78-301-191
.100
PPM
435
ECVC
TRI 781003 ROUTINE SHIFT
OPERVF
78-303-193
.000
PPM
435
PAGE
SL 016740
1/19/93
LAI^^HARLES C254) PLANT B SAMfflNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
TRI 781003 ROUTINE SHIFT
JOB TITLE SAMPLE#
OPERVP
78-302-192
RESULT .000
UNIT DURATION
PPM
435
PAGE
ECVC
TRI 78111A ROUTINE SHIFT
ECOP
78-426-264
.090
PPM
410
ECVC
TRI 781114 ROUTINE SHIFT
LEADOP
78-A2A-262
.150
PPM
410
ECVC
TRI 781128 ROUTINE SHIFT
OPERVP
78-A27-265
.220
PPM
430
ECVC
TRI 781206 ROUTINE SHIFT
ECOP
78-447-283
.220
PPM
425
ECVC
TRI 781206 ROUTINE SHIFT
LEADOP
78-444-280
.000
PPM
425
ECVC
TRI 781206 ROUTINE SHIFT
OPERVF
78-445-281
.000
PPM
425
ECVC
TRI 781206 ROUTINE SHIFT
OPERVP
78-446-282
.000
PPM
425
ECVC
TRI 790105 ROUTINE SHIFT
LEADOP
79-015-010
.220
PPM
405
ECVC
TRI 790105 ROUTINE SHIFT
OPERVF
79-016-011
.000
PPM
405
ECVC
TRI 790110 ROUTINE SHIFT
ECOP
79-023-018
.150
PPM
370
SL 016741
1/19/93
IDLA
PLANT B SAL
HARLES (259) NG RESULTS THRU 1989
DEPT ECVC
COMPOUND
DATE
TRI 790110 ROUTINE SHIFT
JOB TITLE SAMPLE#
LEADOP
79-021-016
RESULT .000
UNIT DURATION PPM 370
PAGE
ECVC
TRI 790110 ROUTINE SHIFT
OPERVP
79-022-017
.000
PPM
370
ECVC
* ECVC
TRI
790306
IMSTRU
79-117-072
ROUTINE SHIFT WORKING LOGBOOK
INSTRUMENT MAN'S JOB
TRI 790306 ROUTINE SHIFT
LEADOP
79-119-069
.000
PPM
920
.000
PPM
920
ECVC
TRI 790306 ROUTINE SHIFT
OPERVF
79-115-070
.000
PPM
920
ECVC
TRI 790322 ROUTINE SHIFT
OPERVP
79-157-093
.120
PPM
910
ECVC
TRI
790929
INSTRU
ROUTI-NE WORKDAY AS LOGBOOK
INSTRUMENT MAN
ECVC
TRI
790929
PIPEFI
ROUTINE SHIFT WORKING AS
LOGBOOK MECHANIC
ECVC TRI
790502
ROUTINE SHIFT
ECOP
79-296-128 79-235-129 79-297-129
.000
PPM
935
.000
PPM
935
.070
PPM
935
ECVC TRI
790502
ROUTINE SHIFT
LEADOP
79-299-126
ECVC TRI
790502
ROUTINE SHIFT
OPERVP
79-295-127
.080
PPM
935
.080
PPM
935
SL 016742
1/19/93
LAMHHARLES C254) PLANT B SAMPLING RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
TRI
790509
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
SAMPLE# 79-251-133
RESULT .100
UNIT DURATION
PPM
455
ECVC
TRI
790509
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-252-134
.080
PPM
455
ECVC
TRI 790524 ROUTINE SHIFT
OPERVF
* ECVC
TRI
790530
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAN.
79-277-155 79-302-164
.000
PPM
42Q
.000
PPM
405
ECVC
TRI
790530
PIPEFI
ROUTINE SHIFT WORKING AS
LOGBOOK MECHANIC
79-301-163
.000
PPM
405
ECVC
TRI
790614
INSTRU
79-315-178
ROUTINE SHIFT WORKING AS LOG
BOOK INSTRUMENT MAN
.740
PPM
440
ECVC
TRI
790614
PIPEFI
79-316-179
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC
.000
PPM
440
ECVC
TRI
790621
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-342-190
.060
PPM
430
ECVC
TRI
790621
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-343-191
.100
PPM
430
ECVC
TRI 790710 ROUTINE SHIFT
LEADOP
79-368-211
.050
PPM
405
PAGE
ECVC TRI
790710
ROUTINE SHIFT
OPERVF
79-369-212
.050
PPM
405
SL 016^43
1/19/93
LAf^KHARLES (254) PLANT B SAMmNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
TRI 790710 ROUTINE SHIFT
JOB TITLE SAMPLE#
OPERVP
79-370-213
RESULT .050
UNIT DURATION
PPM
405
PAGE
ECVC
TRI
790806
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING EC/VC TAR BUGGIES
79-386-223
ECVC
* ECVC
TRI
790806
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING EC/VC TAR BUGGIES
TRI 791008 ROUTINE SHIFT
LEADOP
79-387-224 79-445-242
.080
PPM
385
.050
PPM
375
.000
PPM
415
ECVC
TRI 791008 ROUTINE SHIFT
OPERVF
79-447-244
.050
PPM
415
ECVC
TRI 791008 ROUTINE SHIFT
OPERVP
79-446-243
.050
PPM
415
ECVC
TRI 791011
79-506-303
3FT H OF KETTLE/4FT ABV PLTFRM
SW WND/8MPH/73F/43RH/FAIR
ECVC
TRI 791015
79-519-316
5FT SE OF SUMP/5FT ABV GRND/
HE WND/6MPH/50F/86RH/CLEAR
ECVC
TRI 791015
79-520-317
4FT NE OF SUMP/4FT ABV GRND/
NE WND/6MPH/50F/86RH/CLEAR
ECVC
TRI
791017
ECOP
FECL3 ADDITION JOB
79-552-328
.050
PPM
259
.050
PPM
276
.060
PPM
276
.000
PPM
15
ECVC
TRI
791024
OPERVF
MAKING SAMPLE ROUNDS IN VCM
UNIT
79-590-366
.500
PPM
15 cr 01674* 3
1/19/93
LA^RhARLES (254) PLANT B SAMmHG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
TRI
791031
GEWQRK
DISCHARGING VC TAR BUGGY TO
WASTE POND
SAMPLE# 79-625-395
RESULT .100
UNIT DURATION PPM 6
ECVC
TRI 791108 ROUTINE SHIFT
ECOP
79-645-415
.090
PPM
380
ECVC
TRI 791108 ROUTINE SHIFT
* ECVC
TRI 791108 ROUTINE SHIFT
LEADOP OPERVF
79-642-412 79-644-414
.110
PPM
380
.070
PPM
380
ECVC
TRI 791108 ROUTING SHIFT
OPERVP
79-643-413
.090
PPM
380
ECVC
TRI 791108 ROUTINE SHIFT
VCAXOP
79-646-416
.050
PPM
400
ECVC
TRI 791113
79-664-434
AFT W-HE OF VENT OFF LIFT STA
1,CLEAR, 41F,N,7MPH
ECVC
TRI 791113
79-665-435
7FT SW OF VENT OFF LIFT STA 1,
CLEAR,41F,N,7MPH
ECVC
TRI 791113
79-666-436
6FT OF VCM DOPP KETTLE SEAL(l)
,CLEAR,41F,N,7MPH
ECVC
TRI 791113 5FT S-SW OF VCM DOPP KETTLE SEAL(l), CLEAR,41F,N,7MPH
79-667-437
ECVC
TRI 791113
79-668-438
5FT S OF VCM DOPP KETTLE SEAL
(2),CLEAR,41F,N,7MPH
.000
PPM
297
.000
PPM
297
.000
PPM
298
.050
PPM
296
.000
PPM
295
SL 016745
PAGE
1/19/93
LAt^WIARLES (254)
PLANT B SAMWiNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE SAMPLE#
TRI
800425
OPERVF
80-253-121
MORNING SAMPLE ROUND CATCHING
VCM BOMB
RESULT .130
UNIT DURATION PPM 15
ECVC
TRI
800425
PIPEFI
80-254-122
INSTALLING SRV ON VCM #4 DAY
TANK
.100
PPM
40
ECVC
* ECVC
TRI
800527
INSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAN
TRI
800527
MACHIN
ROUTINE SHIFT AS LOG BOOK
MECHANIC
80-306-152 80-305-151
.110
PPM
437
.090
PPM
451
ECVC
TRI 800527 ROUTINE SHIFT
OPERVF
80-303-149
.060
PPM
440
PAGE
ECVC
TRI 800527 ROUTINE SHIFT
OPERVP
80-302-148
.080
PPM
440
ECVC
TRI 800623 ROUTINE SHIFT
ECOP
80-338-168
.050
PPM
421
ECVC
TRI 800714 ROUTINE SHIFT
VCAXOP
80-392-198
.050
PPM
433
ECVC
TRI 800923 ROUTINE SHIFT
INSTRU
80-492-234
.070
PPM
440
ECVC TRI
800923
ROUTINE SHIFT
VCAXOP
80-488-230
.090
PPM
457
ECVC
TRI 801001 ROUTINE SHIFT
LEADOP
80-455-224
.050
PPM
399
SL 016746
1/19/93
LANHhARLES (254) PLANT B SAMPTING RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
TRI 801001 ROUTINE SHIFT
JOB TITLE SAMPLE#
VCAXOP
80-454-223
RESULT .110
UNIT DURATION PPM 423
I
PAGE
ECVC
TRI 801023 ROUTINE SHIFT
ECOP
80-553-276
.010
PPM
445
ECVC
* ECVC
TRI
820603
OPERVP
82-195-099
REPAIRED VINYL PROCESS PUMP;
LEAKING HOSE, 6 MINUTES. 77 F
PC WINDS E 6MPH 93X RH
TRI
820625
LGMC
82-241-130
ROUTINE SHIFT- WORKED THROUGH
OUT UNIT
ECVC TRI
820820
LGINM
ROUTINE SHIFT. ROUTE WORK.
82-354-220
1.710
PPM
16
.250 PPM
447
.140
PPM
416
ECVC
TRI
830610
ECOP
ROUTINE SHIFT. SOME EXTRA
SAMPLING. NORMAL OPERATIONS.
83-282-194
ECVC
TRI
830610
LGINM
ROUTG WORK IN UNIT. NORMAL
OPERATIONS.
83-284-196
ECVC
TRI 840410 WINDS SE-12/S-10. NORMAL OP.
UPSTAIRS WEST SIDE
84-199-137
ECVC
TRI 840410 WINDS SE-12/S-10. NORMAL OP.
WEST SIDE GROUND LEVEL
84-202-140
ECVC
TRI 840410
84-204-142
WINDS SE-12/S-10. NORMAL OP.
N. DAY TK HEAR PUMPS 5FT HIGH
ECVC
TRI
840606
ECOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
84-309-226
.520
PPM
449
.280
PPM
446
.160
PPM
269
.670
PPM
59
.160
PPM
263
.100
PPM
413
SL 016747
1/19/93
HLA
PLANT B SAI
HARLES f259) MG RESULTS THRU 1989
DEPT ECVC
COMPOUND
DATE
JOB TITLE SAMPLE#
TRI
891101
ECOP
89-575-937
NORMAL OP. EC/HCL UNIT. ROUTI -
NE SHIFT.
RESULT .100
UNIT DURATION PPM 903
ECVC
VCM
780206
LEADOP
ROUTINE SHIFT VCM LEAD OPER
78-028-020
.000
PPM
390
PAGE
ECVC
VCM
780319
ROUTINE SHIFT
LEADOP
78-088-099
* ECVC
VCM
780516
ECOP
78-173-119
ROUTINE SHIFT-LEAK UNDER NO 2
NEUTRALIZER
ECVC
VCM
780526
GEWORK
ADDING 1NAOH TO NEUTRALIZER
78-188-116
.290
PPM
329
.320
PPM
925
.000
PPM
33
ECVC
VCM
780601
ROUTINE SHIFT
LEADOP
78-209-117
.000
PPM
909
ECVC
VCM 780601 ROUTINE SHIFT
OPERVF
78-205-118
.000
PPM
290
ECVC
VCM 780612 ROUTINE SHIFT
ECOP
78-212-125
.210
PPM
911
ECVC
VCM 780612 ROUTINE SHIFT
OPERVP
78-213-126
.980
PPM
911
ECVC
VCM 780710 ROUTINE SHIFT
ECOP
78-261-158
.000
PPM
973
ECVC
VCM
780710
ROUTINE SHIFT
LEADOP
78-262-159
.000
PPM
972
SL 016748
1/19/93
LAI^^HARLES C254) PLANT B SAMWRnG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
VCM 780710 ROUTINE SHIFT
JOB TITLE SAMPLE#
OPERVF
78-237-157
RESULT .000
UNIT DURATION PPM 473
ECVC
VCM 780710 ROUTINE SHIFT
OPERVP
78-236-156
.080
PPM
473
ECVC
VCM 780907 ROUTINE SHIFT
* ECVC
VCM 780907 ROUTINE SHIFT
ECOP LEADOP
78-339-207 78-336-204
.000
PPM
401
.000
PPM
401
ECVC
VCM 780907 ROUTINE SHIFT
OPERVF
78-338-206
.000
PPM
401
ECVC
VCM 780907 ROUTINE SHIFT
OPERVP
78-337-205
.060
PPM
401
ECVC
VCM 781003 ROUTINE SHIFT
ECOP
78-304-194
.000
PPM
435
ECVC VCM
781003
ROUTINE SHIFT
LEADOP
78-301-191
.000
PPM
435
ECVC
VCM 781003 ROUTINE SHIFT
OPERVF
78-303-193
.000
PPM
435
ECVC
VCM 781003 ROUTINE SHIFT
OPERVP
78-302-192
.050
PPM
435
ECVC
VCM 781114 ROUTINE SHIFT
ECOP
78-426-264
.000
PPM
410
SL 016749
PAGE
1/19/93
LAI^MARLES (254) PLANT B SAMWriNG RESULTS THRU
84
DEPT ECVC
COMPOUND
DATE
VCM 781114 ROUTINE SHIFT
JOB TITLE SAMPLE#
LEADOP
78-424-262
RESULT .000
UNIT DURATION
PPM
410
PAGE
ECVC
VCM
781128
ROUTINE SHIFT
OPERVP
78-427-265
.050
PPM
430
ECVC
VCM 781206 ROUTINE SHIFT
* ECVC
VCM 781206 ROUTINE SHIFT
ECOP LEADOP
78-447-283 78-444-280
.060
PPM
425
.050
PPM
425
ECVC
VCM 781206 ROUTINE SHIFT
OPERVF
78-445-281
.000
PPM
425
ECVC
VCM
781206
ROUTINE SHIFT
OPERVP
78-446-282
.060
PPM
425
ECVC
VCM 790105 ROUTINE SHIFT
LEADOP
79-015-010
.000
PPM
405
ECVC
VCM
790105
ROUTINE SHIFT
OPERVF
79-016-011
.000
PPM
405
ECVC
VCM 790110 ROUTINE SHIFT
ECOP
79-023-018
.000
PPM
370
ECVC
VCM 790110 ROUTINE SHIFT
LEADOP
79-021-016
ECVC
VCM 790110 ROUTINE SHIFT
OPERVP
79-022-017
.050
PPM
.000
PPM
370
SL 016750 370
1/19/93
LAI^KHARLES (254) PLANT B SAMFEING RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
VCM 790306 ROUTINE SHIFT
JOB TITLE SAMPLE#
ECOP
79-116-071
RESULT .060
UNIT DURATION PPM 420
PAGE
ECVC
VCM
790306
INSTRU
79-117-072
ROUTINE SHIFT WORKING LOGBOOK
INSTRUMENT MAN'S JOB
ECVC
VCM 790306 ROUTINE SHIFT
LEADOP
79-114-069
i ECVC
VCM 790306 ROUTINE SHIFT
OPERVF
79-115-070
.000
PPM
420
.060
PPM
420
.070
PPM
420
ECVC
VCM 790322 ROUTINE SHIFT
OPERVP
79-157-093
.060
PPM
410
ECVC
VCM
790327
ECOP
ROUTINE SHIFT
WIND-SSEi AT 9.4MPH
ECVC
VCM
790327
PIPEFI
ROUTINE SHIFT AS LOGBOOK
MECHANIC WIND SSE AT 9MPH
ECVC
VCM
790424
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAN
ECVC
VCM
790424
PIPEFI
ROUTINE SHIFT WORKING AS
LOGBOOK MECHANIC
ECVC
VCM 790502 ROUTINE SHIFT
ECOP
79-149-090 79-171-097 79-246-128 79-235-124 79-247-129
.000
PPM
425
.010
PPM
230
.000
PPM
435
.390
PPM
435
.060
PPM
435
ECVC
VCM
790502
ROUTINE SHIFT
LEADOP
79-244-126
.060
PPM
435 SL 016751
1/19/93
LAlfl|HARLES f254) PLANT B SAMTCING RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
VCM 790502 ROUTINE SHIFT
JOB TITLE SAMPLE#
OPERVP
79-245-127
RESULT .440
UNIT DURATION
PPM
435
PAGE
ECVC
VCM
790509
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-251-133
ECVC
* ECVC
VCM
790509
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
VCM
790524
ROUTINE SHIFT
OPERVF
79-252-134 79-277-155
.220
PPM
455
.400
PPM
455
. 000
PPM
420
ECVC
VCM
790530
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAN.
79-302-164
ECVC
VCM
790530
PIPEFI
ROUTINE SHIFT WORKING AS
LOGBOOK MECHANIC
79-301-163
ECVC
VCM
790614
INSTRU
79-315-178
ROUTINE SHIFT WORKING AS LOG
BOOK INSTRUMENT MAN
ECVC
VCM
790614
PIPEFI
79-316-179
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC
ECVC
VCM
790621
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-342-190
ECVC
VCM
790621
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-343-191
ECVC
VCM 790710 ROUTINE SHIFT
LEADOP
79-368-211
.050
PPM
405
.090
PPM
405
.000
PPM
440
.000
PPM
440
.000
PPM
430
.000
PPM
430
.100
PPM
405
SL 016752
1/19/93
LAlM^HARLES (254) PLANT B SAM^ING RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
VCM 790710 ROUTINE SHIFT
JOB TITLE SAMPLE#
OPERVF
79-369-212
RESULT .050
UNIT DURATION PPM 405
PAGE
ECVC
VCM
790710
ROUTINE SHIFT
OPERVP
79-370-213
.060
PPM
405
ECVC
t ECVC
VCM
790806
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING EC/VC TAR BUGGIES
VCM
790806
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING EC/VC TAR BUGGIES
79-386-223 79-387-224
ECVC
VCM 791008 ROUTINE SHIFT
LEADOP
79-445-242
.050
PPM
385
.050
PPM
375
.050
PPM
415
ECVC
VCM 791008 ROUTINE SHIFT
OPERVF
79-447-244
.380
PPM
415
ECVC
VCM 791008 ROUTINE SHIFT
OPERVP
79-446-243
.050
PPM
415
ECVC
VCM 791011
79-507-304
4FT S OF KETTLE/4FT ABV PLTFRM
SW WND/8MPH/73F/43RH/FAIR
ECVC
VCM 791011
79-508-305
3FT NE OF KETTLE/5FT ABV PLTFM
SW WND/8MPH/73F/43RH/FAIR
ECVC
VCM
791015
79-519-316
5FT SE OF SUMP/5FT ABV GRND/
NE WND/6MPH/50F/86RH/CLEAR
ECVC
VCM 791015 4FT HE OF SUMP/4FT ABV GRND/
ME WND/6MPH/50F/86RH/CLEAR
79-520-317
.270
PPM
258
.170
PPM
257
.050
PPM
276
.050
PPM
276
SL OI6753
1/19/93
LAI^^HARLES (254) PLANT B SAHnRUG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
VCM
791017
ECOP
FECL3 ADDITION JOB
SAMPLE# 79-552-328
RESULT .000
UNIT DURATION
PPM
15
PAGE
ECVC
VCM
791018
OPERVF
79-554-330
LOADING TAR BUGGY AT DOPP KETL
1 AT VC/NE/4MPH/62F/97RH/FAIR
ECVC
VCM
791024
OPERVF
MAKING SAMPLE ROUNDS IN VCM
UNIT
79-590-366
ECVC
VCM
791031
GEWORK
79-449-246
DUMPING VC TAR BUGGY AT WASTE
POND.
ECVC
VCM
791031
GEWORK
DISCHARGING VC TAR BUGGY TO
WASTE POND
79-565-341
ECVC
VCM
791108
ROUTING SHIFT
OPERVP
79-643-413
.050
PPM
15
.100
PPM
15
.400
PPM
5
.900
PPM
6
.410
PPM
380
ECVC
VCM 791108 ROUTINE SHIFT
VCAXOP
79-646-416
1.320
PPM
400
ECVC
VCM 791113
79-664-434
4FT N-NE OF VENT OFF LIFT STA
1,CLEAR,41F,N,7MPH
ECVC
VCM 791113
79-665-435
7FT SW OF VENT OFF LIFT STA 1,
CLEAR,41F,H,7MPH
ECVC
VCM
791113
79-666-436
6FT OF VCM DOPP KETTLE SEAL(l)
,CLEAR,41F,N,7MPH
ECVC
VCM 791113 5FT S-SW OF VCM DOPP KETTLE
SEAL(l),CLEAR,41F,N,7MPH
79-667-437
.230
PPM
297
.220
PPM
297
.160
PPM
298
.060
PPM
SL 016754
298
1/19/93
LAtfl^MARLES (259) PLANT B SAfTONG RESULTS THRU 1969
DEPT ECVC
COMPOUND
DATE
JOB TITLE SAMPLE#
VCM 791113
79-668-938
5FT S OF VCM DOPP KETTLE SEAL
(2>,CLEAR,91F,N, 7MPH
RESULT .020
UNIT DURATION PPM 295
ECVC
VCM
800122
IMSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAH
80-096-026
.010
PPM
920
ECVC
VCM 800122 ROUTINE SHIFT
LEADOP
80-092-022
.290
PPM
920
* ECVC
VCM
800122
MACHIN
ROUTINE SHIFT AS LOG BOOK
MECHANIC
80-091-021
.010
PPM
920
ECVC
VCM 800122 ROUTINE SHIFT
OPERVF
80-099-029
.010
PPM
920
PAGE
ECVC
VCM 800123 ROUTINE SHIFT
OPERVP
80-093-023
.010
PPM
920
ECVC
VCM 800205 ROUTINE SHIFT
LEADOP
80-190-066
.090
PPM
928
ECVC
VCM 800207 ROUTINE SHIFT
SPRAYED WITH EC
ECOP
ECVC
VCM
800207
PIPEFI
ROUTINE SHIFT AS LOG BOOK
MECHANIC
ECVC
VCM
800219
OPERVF
MORNING SAMPLE ROUND
80-098-092 80-099-093 80-031-016
.050
PPM
950
.050
PPM
935
.530
PPM
15
ECVC
VCM
800219
OPERVP
TAKING VALVE READINGS
80-113-055
.270
PPM
18
SL 016755
1/19/93
LAl^^HARLES (254) PLANT B SAtWlNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
VCM 800214 SAMPLE ,ANALYSIS
JOB TITLE SAMPLE#
VCAXOP
80-114-056
RESULT .010
UNIT DURATION PPM 15
PAGE
ECVC
VCM
800305
OPERVF
ROUTINE SHIFT, OPERATOR WAS
SPRAYED WHEN VALVE BROKE
80-148-067
ECVC
VCM 800305 ROUTINE SHIFT
OPERVF
80-149-068
2.580
PPM
428
.120
PPM
428
ECVC
VCM
800324
INSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAN
ECVC
VCM
800324
WELDER
ROUTINE SHIFT AS LOG BOOK
MECHANIC
ECVC
VCM 800325 ROUTINE SHIFT
VCAXOP
80-179-080 80-178-079 80-177-078
.030
PPM
427
1.100
PPM
429
.190
PPM
432
ECVC
VCM
800417
VCAXOP
MORNING SAMPLE ROUND
80-232-107
.070
PPM
15
ECVC
VCM
800425
OPERVF
80-253-121
MORNING SAMPLE ROUND CATCHING
VCM BOMB
ECVC
VCM
800425
PIPEFI
80-254-122
INSTALLING SRV ON VCM #4 DAY
TANK
ECVC
VCM
800425
WELDER
80-255-133
INSTALLING SRV ON VCM #4 DAY
TANK
ECVC
VCM
800527
INSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAN
80-306-152
.500
PPM
15
.060
PPM
40
.080
PPM
40
.750
PPM
437
SL 016756
1/19/93
LAI^BHARLES (259) PLANT B SAMfflnNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
VCM
800527
ROUTINE SHIFT
JOB TITLE SAMPLE#
LEADOP
80-301-147
RESULT .180
UNIT DURATION
PPM
445
ECVC
VCM
800527
MACHIN
ROUTINE SHIFT AS LOG BOOK
MECHANIC
ECVC
VCM
800527
ROUTINE SHIFT
OPERVF
* ECVC
VCM 800527 ROUTINE SHIFT
OPERVP
80-305-151 80-303-149 80-302-148
.040
PPM
451
.010
PPM
440
.550
PPM
440
ECVC VCM
800611
VCAXOP
MORNING SAMPLE ROUND
80-337-167
.290
PPM
15
ECVC
VCM 800623 ROUTINE SHIFT
ECOP
80-338-168
.930
PPM
421
ECVC
VCM
800623
ROUTINE SHIFT
INSTRU
80-358-177
.550
PPM
422
ECVC
VCM
800623
OPERVF
MORNING SAMPLE ROUND
80-360-179
.210
PPM
15
ECVC
VCM
800623
OPERVP
MORNING SAMPLE ROUND AND
ANALYSIS HOOD BROKEN
ECVC VCM
800714
ROUTINE SHIFT
LEADOP
80-359-178 80-389-195
15.200
PPM
15
.420
PPM
436
ECVC
VCM 800714 ROUTINE SHIFT
OPERVF
80-391-197
.190
PPM
435
SL 016757
PAGE
1/19/93
LAI^MARLES (254) PLANT B SAMfflHG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
VCM 800714 ROUTINE SHIFT
JOB TITLE SAMPLE#
OPERVP
80-390-196
RESULT .440
UNIT DURATION PPM 437
ECVC
VCM 800714 ROUTINE SHIFT
VCAXOP
80-392-198
.740
PPM
433
ECVC
VCM 800923 ROUTINE SHIFT
ECVC
VCM 800923 ROUTINE SHIFT
INSTRU LEADOP
80-492-234 80-487-229
3.470
PPM
440
2.090
PPM
447
ECVC
VCM
800923
MACHIN 80-491-233
ROUTINE SHIFT AS LOG BOOK MECH
.610
PPM
447
ECVC
VCM 800923 ROUTINE SHIFT
OPERVF
80-489-231
2.550
PPM
447
ECVC
VCM 800923 ROUTINE SHIFT
OPERVP
80-490-232
3.480
PPM
448
ECVC
VCM 800923 ROUTINE SHIFT
VCAXOP
80-488-230
1.500
PPM
457
ECVC
VCM
801001
INSTRU
ROUTINE SHIFT AS LOGBOOK
INSTRUMENT MAN
ECVC
VCM 801001 ROUTINE SHIFT
LEADOP
80-511-244 80-455-224
.010
PPM
433
.020
PPM
399
ECVC
VCM
801001
ROUTINE SHIFT
OPERVF
80-509-242
020 PPM
433
CT
PAGE
1/19/93
LAI^^HARLES (254) PLANT B SAMmNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
VCM
801001
ROUTINE SHIFT
JOB TITLE SAMPLE#
OPERVP
80-510-243
RESULT .010
UNIT DURATION
PPM
434
PAGE
ECVC
VCM 801001 ROUTINE SHIFT
VCAXOP
80-454-223
.330
PPM
423
ECVC
VCM
810223
ROUTINE SHIFT
* ECVC
VCM
810223
ROUTINE SHIFT
ECOP LGMC
81-059-028 81-060-029
.040
PPM
442
.060
PPM
431
ECVC
VCM 810316 ROUTINE SHIFT
LEADOP
81-100-050
.210
PPM
438
ECVC
VCM
810316
ROUTINE SHIFT
VCAXOP
81-102-052
.300
PPM
447
ECVC
VCM 810317 ROUTINE SHIFT
OPERVP
81-101-051
.910
PPM
437
ECVC VCM
810423
ROUTINE SHIFT.
ECOP
81-147-068
.050
PPM
457
ECVC
VCM 810423 ROUTINE SHIFT.
OPERVP
81-148-069
6.100
PPM
15
ECVC
VCM 810507 ROUTINE SHIFT.
OPERVP
81-175-085
.100
PPM
441
ECVC
VCM 810507 ROUTINE SHIFT.
VCAXOP
81-176-086
.100
PPM
437
SL 016759
1/19/93
LAf^MARLES (254) PLANT B SAfWlNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE SAMPLE#
VCM
810518
VCAXOP
81-195-103
CAUGHT A VCM BOMB FROM THE #7
VCM DAY TANK.
RESULT 3.900
UNIT DURATION PPM 15
ECVC
VCM
810518
VCAXOP
81-196-104
CAUGHT A VCM BOMB FROM THE #5
VCM DAY TANK.
.490
PPM
15
ECVC VCM
810625
ROUTINE SHIFT.
ECOP
81-285-156
.050
PPM
425
* ECVC
VCM 810625 ROUTINE SHIFT.
LGINM
81-287-158
.670
PPM
431
PAGE
ECVC
VCM
810625
LGMC
DID REPAIR WORK ON VALVES
AROUND THE VCM DAY TANKS.
ECVC VCM
810625
OPERVP
MORNING SAMPLE ROUND.
81-286-157 81-283-154
.110
PPM
431
.050
PPM
15
ECVC ECVC
VCM
810625
VCAXOP
81-284-155
MORNING SAMPLE ROUND.CAUGHT
FURNACE FEED,HEAVY BOTTOMS, 8
HEAVY FEED SAMPLES.
VCM
810630
VCAXOP
CLOSING OFF A VINYL SAMPLE
BOMB.
81-288-159
ECVC
VCM
810730
ROUTINE SHIFT.
OPERVF
81-338-187
3.800
PPM
15
1.400
PPM
15
.050
PPM
216
ECVC VCM
810730
ROUTINE SHIFT.
OPERVP
81-337-186
.170
PPM
458
ECVC
VCM 810730 ROUTINE SHIFT.
VCAXOP
81-339-188
.090
PPM
460
SL 016760
1/19/93
LAlfl|HARLES (254) PLANT B SAlWlNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
VCM
810918
ROUTINE SHIFT
JOB TITLE SAMPLE#
OPERVP
81-455-262
RESULT .050
UNIT DURATION PPM 432
PAGE
ECVC
VCM
810918
ROUTINE SHIFT
VCAXOP
81-456-263
.180
PPM
432
ECVC
VCM 810928 ROUTINE SHIFT
* ECVC
VCM
811012
ROUTINE SHIFT
OPERVF ECOP
81-480-269 81-533-301
.050
PPM
437
.050
PPM
426
ECVC
VCM
811012
LGINM
WORKED IN CONTROL ROOM THE
MAJORITY OF THE DAY
ECVC
VCM
811012
OPERVP
ROUTINE MORNING ROUND
81-534-302 81-530-298
.090
PPM
433
.130
PPM
15
ECVC
VCM
811012
VCAXOP
ROUTINE MORNING ROUND
81-532-300
.050
PPM
15
ECVC
VCM
811013
LGMC
81-538-304
REPAIRED EQUIPMENT IN EC AND
VC UNITS
ECVC ECVC
VCM
811013
OPERVF
81-537-303
COLLECTING SAMPLES AND WASHED-
DOWN HEAVY BOTTOMS AND FURNACE
FEED AREA
VCM
820107
LEADOP
HCL AND EC UNITS RUNNING
NORMAL RATES; VCM UNIT DOWN.
82-011-009
ECVC
VCM
820107
OPERVF
HCL AND EC UNITS RUNNING
NORMAL RATES; VCM UNIT DOWN.
82-012-010
.050
PPM
434
.050
PPM
15
.140
PPM
445
.110
PPM
457
SL 016761
1/19/93
LAf(Ht HARLES (254) PLANT B SAMPfl MG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
VCM
820107
VCAXOP
HCL AND EC UNITS RUNNING
NORMAL RATES; VCM UNIT DOWN.
SAMPLE# 82-013-011
RESULT .120
UNIT DURATION PPM 445
ECVC ECVC
VCM
820603
ECOP
OUTSIDE WORK UNDER UPSET
CONDITIONS- INSTRUMENT AIR
LOST EARLY IN MORNING
VCM
820603
LGINM
WORKED IN CONTROL ROOM
82-122-077 82-123-078
.110
PPM
440
,140
PPM
423
ECVC ECVC
VCM
820603
OPERVP
82-195-099
REPAIRED VINYL PROCESS PUMP;
LEAKING HOSE, 6 MINUTES. 77 F
PC WINDS E 6MPH 93X RH
VCM
820603
VCAXOP
MORNING SAMPLING ROUND
82-196-100
112.000
PPM
.050 PPM
16 15
ECVC
VCM
820625
LGMC
82-241-130
ROUTINE SHIFT- WORKED THROUGH
OUT UNIT
ECVC
VCM
820629
OPERVF
ROUTINE SAMPLE RUN
82-244-133
.050
PPM
447
.050
PPM
15
ECVC ECVC
VCM
820708
ECOP
RECHARGED CATALYST TANKS IN
EC/HCL UNIT ; EC BROUGHT UP
DURING MORN. TO NORMAL OP.
82-265-147
VCM
820708
LGINM
82-267-149
REPAIRED HCL VALVE TO ABSORBER
.260
PPM
435
.050
PPM
455
ECVC
VCM
820708
LGMC
REPAIRED SCRUBBERS IN HCL
UNITS.
82-266-148
ECVC
VCM
820708
OPERVF
CLEARING TANKS IN EMERGENCY
SHUT-DOWN CONDITIONS OF VC
UNIT. 87 F 61X RH W-6MPH
82-263-145
.050
PPM
456
.110
PPM
453
PAGE
, Ao SL 0lO'6
1/19/93
LAI^B:HARLES <259) PLANT B SAlWlNG RESULTS THRU 1989
DEPT ECVC
COMPOUND
DATE
JOB TITLE SAMPLE#
VCM
820708
VCAXOP
82-269-196
EC UNIT BROUGHT UF' DURING MORN
ADDED CATALYST TO EC PRODUCT.
RESULT .210
UNIT DURATION PPM 997
ECVC
VCM 820820 ROUTINE SHIFT
ECOP
82-352-218
.050
PPM
996
ECVC
VCM
820820
LGINM
ROUTINE SHIFT. ROUTE WORK.
ECVC
VCM
820820
ROUTINE SHIFT
LGMC
82-359-220 82-353-219
.050
PPM
916
.050
PPM
930
ECVC
VCM
820908
OPERVF
82-375-233
ROUTINE MORNING ROUND COLLECT -
ING EDC SAMPLES.
ECVC
VCM
820908
OPERVP
82-379-232
ROUTINE MORNING ROUND COLLECT -
ING SAMPLES IN VC UNIT.
ECVC
VCM
820908
VCAXOP
82-376-239
ROUTINE MORNING ROUND COLLECT
ING SAMPLES IN HCL UNIT.
ECVC
VCM
821011
ECOP
82-930-276
CLEARED AND ADDED CATALYST TO
REACTOR.
ECVC
VCM
821011
LGMC
WORKED THROUGHOUT UNIT.
82-931-277
.050
PPM
17
5.500
PPM
17
.050
PPM
16
.060
PPM
936
.050
PPM
929
ECVC VCM
821026
VCAXOP
ROUTINE MORNING ROUNDS
82-963-309
.050
PPM
17
ECVC
VCM
821103
OPERVF
ROUTINE SHIFT. VC/HCL UNITS
DOWN.
82-980-321
.050
PPM
919
SL 016763
PAGE
1/19/93
LAI^HHARLES (254) PLANT B SAMmNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
VCM
821103
OPERVP
ROUTINE SHIFT. VC/HCL UNITS
DOWN.
SAMPLE# 82-479-320
RESULT .050
UNIT DURATION PPM 420
ECVC
VCM
821103
VCAXOP
ROUTINE SHIFT. VC/HCL UNITS
DOWN.
82-481-322
.050
PPM
413
ECVC ECVC
VCM
821118
LGMC
REPAIRED RELEIF VALVE ON COM
PRESSOR 8 WORKED ON RUBBER
LINE STG. TK. WINDS E-6.
82-517-342
VCM
821202
ROUTINE SHIFT.
ECOP
82-540-359
.050
PPM
435
.050
PPM
438
PAGE
ECVC
VCM
821202
VCAXOP
MAINTENANCE WORK IN FURNACE
AREA
82-539-358
ECVC
VCM
830207
LGIHM
ROUTINE ROUTE WORK IN UfJIT.
NORMAL OPERATIONS.
83-088-057
ECVC ECVC
VCM
830215
ECOP
ROUTINE HCL WORK. EC UNIT
DOWN. NORMAL OPERATIONS IN
VCM AND HCL UNITS.
83-100-067
VCM
830215
OPERVF
83-099-066
ROUTINE SAMPLE ROUNDS. NORMAL
OPERATIONS.
ECVC ECVC
VCM
830215
OPERVP
CAUGHT SAMPLES AND DRAINED
NEUTRALIZER SYSTEM. NORMAL
OPERATIONS.
83-098-065
VCM
830314
OPERVF
83-157-105
UPSET OPERATING CONDITIONS /2
OHC REACTORS WENT DOWN.
ECVC
VCM
830314
OPERVP
83-156-104
UPSET OPERATING CONDITIONS/2
OHC REACTORS DOWN
.050
PPM
445
.300
PPM
440
.400
PPM
440
.100
PPM
16
3.540
PPM
32
.060 PPM
434
.180
PPM
433
SL 016764
1/19/93
LA PLANT B SA
HARLES (259) IMG RESULTS THRU 1989
DEPT ECVC
COMPOUND
DATE
JOB TITLE
VCM
830929
OPERVF
CAUGHT SAMPLES ON MORNING
ROUNDS. NORMAL OPERATIONS.
SAMPLE# 83-200-193
RESULT .930
UNIT DURATION PPM 29
ECVC ECVC
VCM
830929
OPERVP
CLEARED VINYL PUMP AND DID
MORNING ROUNDS. NORMAL OPE
RATIONS.
VCM
830517
OPERVF
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-199-192 83-228-161
51.300
PPM
21
.930
PPM
929
ECVC
VCM
830517
OPERVP
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-227-160
.130
PPM
900
ECVC
VCM
830610
ECOP
ROUTINE SHIFT. SOME EXTRA
SAMPLING. NORMAL OPERATIONS.
83-282-199
.050
PPM
999
ECVC
VCM
830610
LGIHM
ROUTE WORK IN UNIT. NORMAL
OPERATIONS.
83-289-196
.050
PPM
996
ECVC
VCM
830610
LGMC
83-283-195
ROUTINE LOG BOOK WORK IN UNIT
NORMAL OPERATIONS.
.310
PPM
963
ECVC
VCM
830616
OPERVF
ROUTINE MORNING ROUNDS.
NORMAL OPERATIONS.
83-299-206
.100
PPM
15
ECVC
VCM
830616
OPERVP
83-293-205
ROUTINE MORNING ROUNDS. NORMAL
OPERATIONS.
92.200
PPM
15
ECVC
VCM
830713
ECOP
NORMAL OPERATIONS, ROUTINE
SHIFT
83-321-229
.050
PPM
377
ECVC
VCM
830713
OPERVF
NORMAL OPERATIONS ROUTINE
SHIFT.
83-320-228
.050
PPM
397
SL 016765
PAGE
1/19/93
LAl^^HARLES (259) PLANT B SAIWTNG RESULTS THRU 1989
DEPT ECVC
COMPOUND
DATE
JOB TITLE
VCM
830713
OPERVP
NORMAL OPERATIONS, ROUTINE
SHIFT
SAMPLE# 83-319-227
RESULT .050
UNIT DURATION PPM 389
ECVC
VCM
830825
ECOP
ROUTINE SHIFT. REDUCED OPE
RATIONS- VC UNIT DOWN.
83-379-280
.090
PPM
935
ECVC
*
ECVC
ECVC
ECVC
VCM
830825
LGINM
83-380-281
PULLED ABSORBER AND PRODUCT
STILL FLOAT CHAMBERS. REDUCED
OPERATIONS- VC UNIT DOWN
VCM
830901
OPERVF
83-900-292
DECOKED FURNACE AND DEPRESSU
RIZED DEHUMIDIFIER. REDUCED
OPERATIONS. VC UNIT DOWN.
VCM
830901
OPERVP
83-399-291
RAN COOLING TOWER SAMPLE AND
CHECKED PURGE ON VC HUMIDIFIER
REDUCED OPERATIONS-VC DOWN.
VCM
830922
OPERVP
OPERATIONS DOWN, PRESSURE
CHECKS AND DOWN ACTIVITIES
83-993-312
.190
PPM
932
9.990
PPM
19
10.020
PPM
15
8.030
PPM
375
ECVC
VCM
831013
OPERVF
83-985-399
ROUTINE MORNING ROUNDS. NORMAL
OPERATIONS.
.100
PPM
22
ECVC
VCM
831013
OPERVP
83-989-393
ROUTINE MORNING ROUNDS. NORMAL
OPERATIONS.
.100
PPM
39
ECVC
VCM
831017
ECOP
ROUTINE SHIFT. NORMAL OPERA
TIONS.
83-997-395
.110
PPM
936
ECVC
VCM
831017
LGINM
LOGBOOK WORK IN VC AREA.
NORMAL OPERATIONS.
83-998-396
.080
PPM
999
ECVC
VCM
831031
ECOP
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-509-357
.050
PPM
909
PAGE
SL 016766
1/19/93
LAI^^HARLES (254) PLANT B SAMmNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
VCM
831031
OPERVF
NORMAL OPERATIONS, ROUTINE
SHIFT.
SAMPLE# 83-508-356
RESULT .080
UNIT DURATION PPM 411
ECVC
VCM
831031
OPERVP
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-507-355
.050
PPM
409
ECVC
* ECVC
VCM
831207
ECOP
ADDED CATALYST TO REACTOR.
NORMAL OPERATIONS.
VCM
840116
ECOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
83-568-404 83-041-022
.050
PPM
453
.050
PPM
397
ECVC
VCM
840116
FUOP
83-040-021
VC UNIT DOWN: SCHEDULED OUTAGE
DUTIES.
.050
PPM
393
ECVC ECVC
VCM
840125
OPERVP
DOWN OPERATIONS. LEAK PATROL
HNU IN PROCESS, DAY TK AND
SPHERES AREA. WIND NNE-13.
VCM
840201
ECOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
84-068-034 84-093-051
.950
PPM
210
.280
PPM
401
ECVC
VCM
840201
OPERVP
NORMAL START-UP OPERATIONS.
84-092-050
7.080
PPM
413
PAGE
ECVC ECVC ECVC
VCM
8402Q1
OPERVP
84-094-052
NORMAL OPERATIONS STARTING-UP
VCM PLANT. LEAK PATROL WITH
HNU.
VCM
840209
OPERVP
84-115-067
NORMAL OPERATIONS. LEAK PATROL
WITH HNU IN PROCESS, DAY TK,
SPHERES AREAS. RAINING.
VCM
840215
OPERVP
84-123-073
NORMAL OPERATIONS. LEAK PATROL
WITH HNU IN PROCESS, DAY TK,
SPHERES AREAS.
1.310
PPM
270
.390
PPM
195
.050
PPM
270
SL 016767
1/19/93
LAI^^HARLES (254) PLANT B SAMPLING RESULTS THRU 1984
PAGE
DEPT ECVC
ECVC
COMPOUND
DATE
JOB TITLE
VCM
840309
ECOP
ROUTINE SHIFT. WORKED ON
LEAKING EC PUMP. NORMAL OPE
RATIONS.
VCM
840309
OPERVF
ROUTINE SHIFT. DUMPED A TAR
BUGGY. NORMAL OPERATIONS.
SAMPLE# 84-146-090
84-145-089
RESULT .080
UNIT DURATION PPM 443
.060
PPM
443
ECVC
VCM
840309
OPERVP
ROUTINE SHIFT. NORMAL OPERA
TIONS.
84-144-088
.080
PPM
445
ECVC ECVC
VCM
840328
OPERVP
84-171-114
LEAK PATROL WITH HNU. WASHING
DOWN NO.3 NEUTRALIZER. NORMAL
OPERATIONS.
VCM
840404
FUOP
NORMAL OPERATIONS VC I UNIT
ROUTINE SHIFT.
84-183-121
.590
PPM
270
5.060
PPM
415
ECVC
VCM
640404
OPERVP
NORMAL OPERATIONS EC/VC/HCL
UNITS. LEAK PATROL WITH HNU.
84-185-123
2.380
PPM
120
ECVC
VCM
840404
PSOP
NORMAL OPERATIONS EC/VC/HCL
UNITS, ROUTINE SHIFT.
84-184-122
4.440
PPM
414
ECVC
VCM
840409
FUOP
NORMAL OPERATIONS. ROUTINE
SAMPLE ROUND AND ANALYSIS.
84-192-130
1.890
PPM
193
ECVC
VCM
840409
PSOP
NORMAL OPERATIONS. ROUTINE
SAMPLE ROUND IN VCM UNIT.
84-191-129
2.800
PPM
172
ECVC
VCM 840410 WINDS SE-12/S-10 NORMAL OP. 1 OFT ABOVE GROUND
84-198-136
.050
PPM
271
ECVC
VCM
840410
84-199-137
WINDS SE-12/S-10. NORMAL OP.
UPSTAIRS WEST SIDE
.050
PPM
269
CT
016768
1/19/93
LAI^WIARLES (254) PLANT B SAMTOhG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE JOB TITLE
VCM
840410
PLACED ON WEST WALL SHELF.
NORMAL OP.
SAMPLE# 84-200-138
RESULT .090
UNIT DURATION PPM 265
ECVC
VCM 840410 PLACED ON TOP COKE MACHINE.
84-201-139
.050
PPM
268
PAGE
ECVC
VCM
840410
WINDS SE-12/S-10. NORMAL OP.
WEST SIDE GROUND LEVEL
84-202-140
ECVC
VCM
840410
84-203-141
WINDS SE-12/S-1G. NORMAL OP.
WEST OF STACK 5FT ABOVE GROUND
ECVC
VCM
840410
84-204-142
WINDS SE-12/S-10. NORMAL OP.
N. DAY TK NEAR PUMPS 5FT HIGH
ECVC
VCM
840411
PSOP
UPSET OPERATIONS. LOST FUR
NACE AND VAPORIZER.
84-208-146
ECVC ECVC
VCM
840412
FUOP
START-UP FURNACE DUTIES ON
CONTROL BOARD. 1HR. IN UNIT;
VCI PROCESS NORMAL OP.
84-210-148
VCM
840412
PSOP
84-209-147
PROCESS UNIT NORMAL OP. HELPED
START-UP FURNACE.
ECVC
VCM
840418
PSOP
84-223-161
NORMAL OPERATIONS. EC/VC/HCL
UNITS. LEAK PATROL WITH HNU.
ECVC
VCM
840425
PSOP
84-236-174
NORMAL OPERATIONS. LEAK PATROL
WITH HNU. WINDS S-E-18.
ECVC
VCM
840502
PSOP
LEAK PATROL WITH HNU. UNIT
DOWN.
84-245-183
.050
PPM
59
.050
PPM
266
.210
PPM
263
.460
PPM
165
.050
PPM
433
.070
PPM
372
.300
PPM
155
.160
PPM
190
.230
PPM
325
SL 016769
1/19/93
LA1 PLANT B SAI
HARLES C259) MG RESULTS THRU 1989
DEPT ECVC
COMPOUND
DATE
JOB TITLE
VCM
890509
OPERVP
ROUTINE SHIFT. VINYL UNIT
DOWN.
SAMPLE# 89-260-196
RESULT .060
UNIT DURATION
PPM
396
ECVC
VCM
890516
PSOP
LEAK PATROL WITH HNU, VINYL
UNIT DOWN.
89-281-205
.050
PPM
300
ECVC
*
ECVC
VCM
890523
PSOP
LEAK PATROL WITH HNU AROUND
VINYL DAY TANKS AND SPHERES.
VC UNIT DOWN.
VCM
890530
ECOP
ROUTINE SHIFT. NORMAL OPERA
TIONS.
89-289-211 89-299-216
.790
PPM
180
.070
PPM
923
ECVC
VCM
890606
ECOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
89-309-226
.050
PPM
913
ECVC
VCM
890606
FUOP
89-310-227
DOWN OPERATIONS. LEAK PATROL
WITH HNU,
.050
PPM
125
ECVC ECVC
VCM
890606
PSOP
DOWN OPERATIONS. MORN. ROUND
UNPLUGGED BLEED LINE TO TAR
BUGGY.
VCM
890613
PSOP
DOWN OPERATIONS. LEAK PATROL
WITH HNU.
89-308-225 89-332-299
.180
PPM
18
.210
PPM
117
ECVC
VCM
890620
FUOP
89-399-261
DOWN OPERATIONS. ROUNDS DURING
DOWN OP. WIND W/SW-5.
.120
PPM
387
ECVC
VCM
890620
PSOP
89-398-260
DOWN OPERATIONS. LEAK PATROL
WITH HNU.
.120
PPM
90
ECVC
VCM
890627
PSOP
89-352-269
DOWN OPERATIONS. LEAK PATROL
WITH HNU.
.080
PPM
150
PAGE
SL 016770
1/19/93
#LA HARLES (259)
PLANT B SAMMI FtIING RESULTS THRU 1989
DEPT ECVC
COMPOUND
DATE
JOB TITLE
VCM
890711
ECOP
ROUTINE SHIFT. UNIT DOWN.
SAMPLE# 89-380-289
RESULT .050
UNIT DURATION PPM 915
PAGE
ECVC
VCM
890711
FUOP
CLEARED PRODUCT STILL FEED
TANK . UNIT DOWN.
ECVC
VCM
890711
PSOP
LEAK PATROL WITH HNU. UNIT
DOWN.
ECVC
VCM
690830
FUOP
NORMAL OP. MORN. SAMPLING
ROUND.
ECVC
VCM
890830
PSOP
NORMAL OP. ROUTINE SHIFT.
89-379-288 89-378-287 89-999-395 89-993-399
.650
PPM
915
.070
PPM
180
.170
PPM
17
.990
PPM
908
ECVC
VCM
890907
ECOP
NORMAL OP. ROUTINE SHIFT.
89-965-360
.050
PPM
915
ECVC
VCM
890907
FUOP
NORMAL OP. ROUTINE SHIFT.
89-969-359
.050
PPM
397
ECVC
VCM
890907
PSOP
89-963-358
NORMAL OP. ROUTINE MORN. SAM-
PLE ROUND. WIND E/NE-8.
ECVC
VCM
891001
FUOP
NORMAL OP. ROUTINE SHIFT.
89-525-902
.160
PPM
17
.050
PPM
920
ECUC
VCM
891001
PSOP
NORMAL OPERATIONS ROUTINE
SHIFT.
89-529-901
ECVC
VCM
891101
ECOP
89-575-937
NORMAL OP. EC/HCL UNIT. ROUTI
NE SHIFT.
.050
PPM
920
.050
PPM
903
St 1S7?1
1/19/93
LAlBitHARLES (254) PLANT B SAMPLING RESULTS THRU 1984
DEPT ECVC
ECVC
COMPOUND
DATE
JOB TITLE SAMPLE#
VCM
841101
PSOP
84-574-436
DOWN OP . VC/UNIT. DOWN OP.
DUTIES ON PROCESS AND FURNACE
JOBS.
VDC
780206
LEADOP
ROUTINE SHIFT VCM LEAD OPER
78-028-020
RESULT .050
UNIT DURATION PPM 407
.060
PPM
390
PAGE
ECVC
VDC 780314 ROUTINE SHIFT
LEADOP
78-088-049
* ECVC
VDC
780516
ECOP
78-173-114
ROUTINE SHIFT-LEAK UNDER NO 2
NEUTRALIZER
ECVC
VDC
780526
GEWORK
ADDING 1IJAOH TO NEUTRALIZER
78-188-116
.120
PPM
329
.660
PPM
425
.000
PPM
33
ECVC
VDC 780601 ROUTINE SHIFT
LEADOP
78-204-117
.920
PPM
404
ECVC
VDC 780601 ROUTINE SHIFT
OPERVF
78-205-118
1.090
PPM
240
ECVC
VDC 780612 ROUTINE SHIFT
ECOP
78-212-125
.140
PPM
411
ECVC
VDC 780612 ROUTINE SHIFT
OPERVP
78-213-126
.140
PPM
411
ECVC
VDC 780710 ROUTINE SHIFT
ECOP
78-261-158
.090
PPM
473
ECVC
VDC 780710 ROUTINE SHIFT
LEADOP
78-262-159
.130
PPM
472
SL 016772
1/19/93
LAI^BHARLES (254) PLANT B SAMPLING RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
VDC 7e0710 ROUTINE SHIFT
JOB TITLE SAMPLE#
OPERVF
78-237-157
RESULT .080
UNIT DURATION PPM 473
PAGE
ECVC
VDC 780710 ROUTINE SHIFT
OPERVP
78-236-156
.100
PPM
473
ECVC
VDC 780907 ROUTINE SHIFT
* ECVC
VDC 780907 ROUTINE SHIFT
ECOP LEADOP
78-339-207 78-336-204
.330
PPM
401
2.370
PPM
401
ECVC
VDC 780907 ROUTINE SHIFT
OPERVF
78-338-206
,470
PPM
401
ECVC
VDC 780907 ROUTINE SHIFT
OPERVP
78-337-205
.450
PPM
401
ECVC
VDC 781003 ROUTINE SHIFT
ECOP
78-304-194
1.540
PPM
435
ECVC
VDC 781003 ROUTINE SHIFT
LEADOP
78-301-191
3.000
PPM
435
ECVC
VDC 781003 ROUTINE SHIFT
OPERVF
78-303-193
1.640
PPM
435
ECVC
VDC 781003 ROUTINE SHIFT
OPERVP
78-302-192
1.660
PPM
435
ECVC
VDC 781114 ROUTINE SHIFT
ECOP
78-426-264
1.600
PPM
410
SL 016773
1/19/93
#LA HARLES (254)
PLANT B SAMMFU NG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
VDC 781114 ROUTINE SHIFT
JOB TITLE SAMPLE#
LEADOP
78-424-262
RESULT .920
UNIT DURATION
PPM
410
ECVC
VDC
781128
ROUTINE SHIFT
OPERVP
78-427-265
1 .870
PPM
430
ECVC
VDC
781206
ROUTINE SHIFT
t ECVC
VDC
781206
ROUTINE SHIFT
ECOP LEADOP
78-447-283 78-444-280
o o
PPM 425
1.010
PPM
425
ECVC
VDC 781206 ROUTINE SHIFT
OPERVF
78-445-281
.800
PPM
425
ECVC
VDC
781206
ROUTINE SHIFT
OPERVP
78-446-282
1.060
PPM
425
ECVC
VDC 790105 ROUTINE SHIFT
LEADOP
79-015-010
21.000
PPM
405
ECVC
VDC 790105 ROUTINE SHIFT
OPERVF
79-016-011
1.230
PPM
405
ECVC
VDC 790110 ROUTINE SHIFT
ECOP
79-023-018
.560
PPM
370
ECVC
VDC 790110 ROUTINE SHIFT
LEADOP
79-021-016
.390
PPM
370
ECVC
VDC 790110 ROUTINE SHIFT
OPERVP
79-022-017
.150
PPM
370
PAGE
sl 01677^
1/19/93
LAI^#HARLES C254) PLANT B SAMWlNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
VDC 790306 ROUTINE SHIFT
JOB TITLE SAMPLE#
ECOP
79-116-071
RESULT 9.900
UNIT DURATION PPM 420
PAGE
ECVC
VDC
790306
INSTRU
79-117-072
ROUTINE SHIFT WORKING LOGBOOK
INSTRUMENT MAN'S JOB
ECVC
VDC 790306 ROUTINE SHIFT
LEADOP
79-114-069
* ECVC
VDC 790306 ROUTINE SHIFT
OPERVF
79-115-070
.120
PPM
420
.050
PPM
420
.430
PPM
420
ECVC
VDC 790322 ROUTINE SHIFT
OPERVP
79-157-093
.190
PPM
410
ECVC
VDC
790327
ECOP
ROUTINE SHIFT
WIND-SSE: AT 9.4MPH
ECVC
VDC
790327
PIPEFI
ROUTINE SHIFT AS LOGBOOK
MECHANIC WIND SSE AT 9MPH
ECVC
VDC
790424
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAN
ECVC
VDC
790424
PIPEFI
ROUTINE SHIFT WORKING AS
LOGBOOK MECHANIC
ECVC
VDC 790502 ROUTINE SHIFT
ECOP
79-149-090 79-171-097 79-246-128 79-235-124 79-247-129
2.770
PPM
425
3.610
PPM
230
.180
PPM
435
.250
PPM
435
.000
PPM
435
ECVC
VDC 790502 ROUTINE SHIFT
LEADOP
79-244-126
.180
PPM
435
SL 016775
1/19/93
LAlHtHARLES (254) PLANT B SAMWlNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
VDC 790502 ROUTINE SHIFT
JOB TITLE SAMPLE#
OPERVP
79-245-127
RESULT .380
UNIT DURATION PPM 435
ECVC
VDC
790509
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-251-133
ECVC
* ECVC
VDC
790509
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
VDC 790524 ROUTINE SHIFT
OPERVF
79-252-134 79-277-155
4.490
PPM
455
7.680
PPM
455
.000
PPM
420
ECVC
VDC
790530
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAN.
79-302-164
ECVC
VDC
790530
PIPEFI
ROUTINE SHIFT WORKING AS
LOGBOOK MECHANIC
79-301-163
ECVC
VDC
790614
INSTRU
79-315-178
ROUTINE SHIFT WORKING AS LOG
BOOK INSTRUMENT MAN
ECVC
VDC
790614
PIPEFI
79-316-179
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC
ECVC
VDC
790621
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-342-190
ECVC
VDC
790621
GEWORK
ROUTINE WORKDAY HAULING AND
DUMPING TAR BUGGIES
79-343-191
ECVC
VDC 790710 ROUTINE SHIFT
LEADOP
79-368-211
.070
PPM
405
.000
PPM
405
.000
PPM
440
.000
PPM
440
.000
PPM
430
.000
PPM
430
.000
PPM
405
PAGE
SL 016776
1/19/93
LA^BhARLES (259) PLANT B SAMPLING RESULTS THRU 1989
DEPT COMPOUND DATE
ECVC VDC
790710
ROUTINE SHIFT
JOB TITLE SAMPLE#
OPERVF
79-369-212
RESULT .000
UNIT DURATION PPM 905
PAGE
ECVC VDC
790710
ROUTINE SHIFT
OPERVP
79-370-213
,000
PPM
905
ECVC
VDC
790806
GEWQRK
ROUTINE WORKDAY HAULING AND
DUMPING EC/VC TAR BUGGIES
79-387-229
ECVC
VDC 791008 ROUTINE SHIFT
LEADOP
79-995-292
.000
PPM
375
070 PPM
915
ECVC
VDC 791008 ROUTINE SHIFT
OPERVF
79-997-299
070 PPM
915
ECVC VDC
791008
ROUTINE SHIFT
OPERVP
79-996-293
050 PPM
915
ECVC
VDC 791011
79-507-309
9FT S OF KETTLE/9FT ABV PLTFRM
SW WND/8MPH/73F/93RH/FAIR
ECVC
VDC 791015
79-519-316
5FT SE OF SUMP/5FT ABV GRND/
HE WND/6MPH/50F/86RH/CLEAR
ECVC
VDC 791015
79-520-317
9FT NE OF SUMP/9FT ABV GRND/
HE WND/6MPH/5OF/86RH/CLEAR
ECVC
VDC
791017
ECOP
FECL3 ADDITION JOB
79-552-328
.050
PPM
258
.050
PPM
276
050 PPM
276
000 PPM
15
ECVC
VDC 791108 ROUTINE SHIFT
ECOP
79-695-915
090 PPM
380
SL 016777
1/19/93
LAI HARLES (259) PLANT B SA ING RESULTS THRU 1989
DEPT ECVC
COMPOUND
DATE
VDC
791108
ROUTINE SHIFT
JOB TITLE SAMPLE#
LEADOP
79-692-912
RESULT .060
UNIT DURATION
PPM
380
ECVC
VDC 791108 ROUTINE SHIFT
OPERVF
79-699-919
.060
PPM
380
ECVC
V DC 791108 ROUTING SHIFT
OPERVP
79-693-913
.060
PPM
380
ECVC
VDC 791108 ROUTINE SHIFT
VCAXOP
79-696-916
.060
PPM
900
ECVC
VDC 791113
79-669-939
9FT N-NE OF VENT OFF LIFT STA
1, CLEAR,91F,N,7MPH
ECVC
VDC
791113
79-665-935
7FT SW OF VENT OFF LIFT STA 1,
CLEAR,9 IF,N,7MPH
ECVC
VDC 791113
79-666-936
6FT OF VCM DOPP KETTLE SEAL(l)
,CLEAR,91F,N,7MPH
ECVC
VDC 791113 5FT S-SW OF VCM DOPP KETTLE SEAL(1),CLEAR,91F,N,7MPH
79-667-937
ECVC
VDC
791113
79-668-938
5FT S OF VCM DOPP KETTLE SEAL
(2),CLEAR,91F,H,7MPH
ECVC
VDC
800122
MACHIN
ROUTINE SHIFT AS LOG BOOK
MECHANIC
80-091-021
ECVC
VDC 800207 ROUTINE SHIFT
SPRAYED WITH EC
ECOP
80-098-092
.000
PPM
297
.010
PPM
297
.000
PPM
298
.000
PPM
298
.000
PPM
295
.170
PPM
920
.050
PPM
950
PAGE
SL 016778
1/19/93
LAI^BhARLES (254) PLANT B SAMPTING RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
VDC
800207
PIPEFI
ROUTINE SHIFT AS LOG BOOK
MECHANIC
SAMPLE# 80-099-043
RESULT .100
UNIT DURATION PPM 435
ECVC
VDC
800214
OPERVF
MORNING SAMPLE ROUND
80-031-016
44.430
PPM
15
I
ECVC
VDC
800423
MACHIN
ROUTINE SHIFT AS LOG BOOK
MECHANIC
ECVC VDC
800527
ROUTINE SHIFT
LEADOP
80-218-101 80-301-147
.150
PPM
380
.050
PPM
445
ECVC
VDC 800527 ROUTINE SHIFT
OPERVP
80-302-148
.060
PPM
440
ECVC VDC
800923
ROUTINE SHIFT
INSTRU
80-492-234
.420
PPM
440
ECVC
VDC 800923 ROUTINE SHIFT
LEADOP
80-487-229
.510
PPM
447
ECVC
VDC
800923
MACHIN
80-491-233
ROUTINE SHIFT AS LOG BOOK MECH
.470
PPM
447
ECVC
VDC 800923 ROUTINE SHIFT
OPERVF
80-489-231
.480
PPM
447
ECVC
VDC 800923 ROUTINE SHIFT
OPERVP
80-490-232
.490
PPM
448
ECVC
VDC 800923 ROUTINE SHIFT
VCAXOP
80-488-230
1.210
PPM
457
SL 016779
PAGE
1/19/93
LAI^PHARLES (254) PLANT B SAMFONG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
VDC
801001
ROUTINE SHIFT
JOB TITLE SAMPLE#
OPERVF
80-509-242
RESULT .370
UNIT DURATION PPM 433
PAGE
ECVC
VDC 801001 ROUTINE SHIFT
VCAXOP
80-454-223
.740
PPM
423
ECVC
VDC
801023
ROUTINE SHIFT
t ECVC
VDC
810730
ROUTINE SHIFT.
ECOP OPERVF
80-553-276 81-338-187
.370
PPM
445
.150
PPM
216
ECVC
VDC
810928
ROUTINE SHIFT
OPERVF
81-480-269
.160
PPM
437
ECVC
VDC
811012
LGINM
WORKED IN CONTROL ROOM THE
MAJORITY OF THE DAY
81-534-302
ECVC
VDC
811013
LGMC
81-538-304
REPAIRED EQUIPMENT IN EC AND
VC UNITS
ECVC
VDC
820107
OPERVF
HCL AND EC UNITS RUNNING
NORMAL RATES; VCM UNIT DOWN.
82-012-010
ECVC ECVC
VDC
820603
OPERVP
82-195-099
REPAIRED VINYL PROCESS PUMP;
LEAKING HOSE, 6 MINUTES. 77 F
PC WINDS E 6MPH 93* RH
VDC
820625
LGMC
82-241-130
ROUTINE SHIFT- WORKED THROUGH-
OUT UNIT
ECVC VDC
820820
ROUTINE SHIFT
ECOP
82-352-218
.170
PPM
433
.140
PPM
434
.310
PPM
457
1.970
PPM
16
.370
PPM
447
.130
PPM
446
SL 016780
1/19/93
LA PLANT B SA
HARLES (254) ING RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
VDC
820820
LGINM
ROUTINE SHIFT. ROUTE WORK.
SAMPLE# 82-354-220
RESULT .210
UNIT DURATION PPM 416
PAGE
ECVC
VDC 820820 ROUTINE SHIFT
LGMC
82-353-219
.120
PPM
430
ECVC +
ECVC
ECVC
VDC 821118 LGMC REPAIRED RELEIF VALVE ON COM PRESSOR 8 WORKED ON RUBBER LINE STG. TK. WINDS E-6.
82-517-342
VDC 830215 ECOP ROUTINE HCL WORK. EC UNIT
DOWN. NORMAL OPERATIONS IN VCM AND HCL UNITS.
83-100-067
VDC
830314 OPERVF
83-157-105
UPSET OPERATING CONDITIONS /2
OHC REACTORS WENT DOWN.
ECVC
VDC
830314
OPERVP
83-156-104
UPSET OPERATING CONDITIONS/2
OHC REACTORS DOWN
ECVC
VDC
830429
OPERVF
CAUGHT SAMPLES ON MORNING
ROUNDS. NORMAL OPERATIONS.
83-200-143
ECVC
VDC
830610
ECOP
ROUTINE SHIFT. SOME EXTRA
SAMPLING. NORMAL OPERATIONS.
83-282-194
ECVC
VDC
830610
LGINM
ROUTE WORK IN UNIT. NORMAL
OPERATIONS.
83-284-196
ECVC
VDC
830610
LGMC
83-283-195
ROUTINE LOG BOOK WORK IN UNIT.
NORMAL OPERATIONS.
ECVC
VDC
830616
OPERVP
83-293-205
ROUTINE MORNING ROUNDS. NORMAL
OPERATIONS.
.140
PPM
435
.380
PPM
440
.090
PPM
434
.060
PPM
433
.590
PPM
24
.830
PPM
449
.510
PPM
446
.080
PPM
463
2.440
PPM
15
SL 016781
1/19/93
LAI^mARLES (259) PLANT B SAMmHG RESULTS THRU 1989
DEPT ECVC
COMPOUND
DATE
JOB TITLE
VDC
830713
OPERVF
NORMAL OPERATIONS , ROUTINE
SHIFT.
SAMPLE# 83-320-228
RESULT .080
UNIT DURATION PPM 397
ECVC ECVC
VDC
830901
OPERVP
83-399-291
RAN COOLING TOWER SAMPLE AND
CHECKED PURGE ON VC HUMIDIFIER>
REDUCED OPERATIONS-VC DOWN.
VDC
830922
OPERVP
OPERATIONS DOWN, PRESSURE
CHECKS AND DOWN ACTIVITIES
83-993-312
.900
PPM
15
.050
PPM
375
ECVC
VDC
831017
ECOP
83-997-395
ROUTINE SHIFT. NORMAL OPERA
TIONS.
.110
PPM
936
ECVC
VDC
831017
LGINM
LOGBOOK WORK IN VC AREA.
NORMAL OPERATIONS.
83-998-396
.080
PPM
999
ECVC
VDC
831031
ECOP
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-509-357
.090
PPM
909
ECVC
VDC
831031
OPERVF
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-508-356
.110
PPM
911
ECVC
VDC
831031
OPERVP
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-507-355
.120
PPM
909
ECVC ECVC
VDC
890215
OPERVP
89-123-073
NORMAL OPERATIONS. LEAK PATROL
WITH HNU IN PROCESS, DAY TK,
SPHERES AREAS.
VDC
890309
OPERVP
89-199-088
ROUTINE SHIFT. NORMAL OPERA
TIONS.
.530
PPM
270
.100
PPM
995
ECVC
VDC
890909
FUOP
NORMAL OPERATIONS VC I UNIT
ROUTINE SHIFT.
89-183-121
.190
PPM
915
PAGE
SL 016782
1/19/93
fLA
PLANT B SA
kHARLES (254) IING RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
RESULT
ECVC
VDC
840404
QPERVP
NORMAL OPERATIONS EC/VC/HCL
UNITS. LEAK PATROL WITH HNU.
84-185-123
.180
UNIT DURATION PPM 120
PAGE
ECVC
VDC
840404
PSOP
NORMAL OPERATIONS EC/VC/HCL
UNITS. ROUTINE SHIFT.
84-184-122
.110
PPM
414
ECVC
VDC
840409
FUOP
NORMAL OPERATIONS. ROUTINE
SAMPLE ROUND AND ANALYSIS.
84-192-130
.570
PPM
193
ECVC
VDC
840409
PSOP
NORMAL OPERATIONS. ROUTINE
SAMPLE ROUND IN VCM UNIT.
84-191-129
.270
PPM
172
ECVC
VDC 84041Q
WINDS SE-12/S-10 . NORMAL OP. UPSTAIRS WEST SIDE
84-199-137
.560
PPM
269
ECVC
VDC 840410 WINDS SE-12/S-10. NORMAL DP. WEST SIDE GROUND LEVEL
84-202-140
2.580
PPM
59
ECVC
VDC 840410
84-204-142
WINDS SE-12/S-10. NORMAL OP.
N. DAY TK NEAR PUMPS 5FT HIGH
.520
PPM
263
ECVC
VDC
840411
PSOP
UPSET OPERATIONS. LOST FUR
NACE AND VAPORIZER.
84-208-146
.210
PPM
165
ECVC
VDC
840502
PSOP
LEAK PATROL WITH HNU. UNIT
DOWN.
84-245-183
.370
PPM
325
ECVC
VDC
840516
PSOP
LEAK PATROL WITH HNU. VINYL
UNIT DOWN.
84-281-205
.420
PPM
300
ECVC
VDC
840523
PSOP
LEAK PATROL WITH HNU AROUND
VINYL DAY TANKS AND SPHERES.
VC UNIT DOWN.
84-289-211
. 070
PPM
180
SL 016783
1/19/93
LAI^^HARLES (259) PLANT B SAPPPlNG RESULTS THRU 1984
DEPT ECVC
COMPOUND
DATE
JOB TITLE
VDC
840606
ECOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
SAMPLE# 84-309-226
RESULT .050
UNIT DURATION
PPM
413
ECVC
VDC
840613
PSOP
84-332-244
DOWN OPERATIONS. LEAK PATROL
WITH HNU.
.060
PPM
117
ECVC
VDC
840620
FUOP
84-349-261
DOWN OPERATIONS. ROUNDS DURING
DOWN OP. WIND W/SW- 5.
.050
PPM
387
ECVC
VDC
840620
PSOP
84-348-260
DOWN OPERATIONS. LEAK PATROL
WITH HNU.
.060
PPM
90
ECVC
VDC
840627
PSOP
84-352-264
DOWN OPERATIONS. LEAK PATROL
WITH HNU.
.050
PPM
150
ECVC
VDC
840907
PSOP
84-463-358
NORMAL OP . ROUTINE MORN. SAM-
PLE ROUND . WIND E/NE-8.
.230
PPM
17
EDC CCL4
760811
EDCOP
ROUTiNE SHIFT
76-235-159
.000
PPM
391
EDC CCL4
770118
EDCOP
ROUTINE SHIFT
77-003-003
.000
PPM
419
EDC CCL4
770307
EDCOP
ROUTINE SHIFT
77-044-021
.000
PPM
410
EDC CCL4
770318
EDCOP
ROUTINE SHIFT
77-060-033
.000
PPM
431
EDC CCL4
770404
EDCOP
ROUTINE SHIFT
77-083-047
.000
PPM
402
PAGE SL 016^
1/19/93
LA^fcHARLES (254) PLANT B SALTING RESULTS THRU 1984
DEPT EDO
COMPOUND
DATE
CCL4
770503
ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
77-110-074
RESULT .000
UNIT DURATION PPM 328
PAGE
EDC CCL4
770510
EDCOP
ROUTINE SHIFT
77-143-104
.000
PPM
390
EDC
* EDC
CCL4
770516
ROUTINE SHIFT
CCL4
771017
ROUTINE SHIFT
EDCOP EDCOP
77-152-113 77-216-154
.000
PPM
450
.610
PPM
390
EDC CCL4
771121
ROUTINE SHIFT
EDCOP
77-255-179
.000
PPM
416
EDC CCL4
771128
EDCOP
ROUTINE SHIFT
77-258-182
.000
PPM
385
EDC CCL4
780109
ROUTDUE SHIFT
EDCOP
78-002-002
.000
PPM
440
EDC CCL4
780418
EDCOP
ROUTINE SHIFT
78-135-085
.000
PPM
410
EDC
760811
EDCOP
ROUTINE SHIFT
EDC
r t <:
770118
EDCOP
ROUTINE SHIFT
76-235-159 77-003-003
.000
PPM
391
.000
PPM
419
EDC
770307
EDCOP
ROUTINE SHIFT
77-044-021
.000
PPM
410
SL 016785
1/19/93
LAl^BtHARLES C 25^t) PLANT B SAlfftHG RESULTS THRU 1984
DEPT EDC
COMPOUND
DATE
770318 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
77-060-033
RESULT .000
UNIT DURATION PPM 431
EDC
770404
EDCOP
ROUTINE SHIFT
77-083-047
.000
PPM
402
EDC
* EDC
770503 ROUTINE SHIFT
CIS
770510
ROUTINE SHIFT
EDCOP EDCOP
77-110-074 77-143-104
. 000
PPM
328
.000
PPM
390
EDC
770516
EDCOP
ROUTINE SHIFT
77-152-113
.130
PPM
450
EDC CIS
770913
EDCOP
ROUTINE SHIFT
77-207-148
.200
PPM
420
EDC CIS
771024
EDCOP
ROUTINE SHIFT
77-232-162
.000
PPM
388
EDC
771121
EDCOP
ROUTINE SHIFT
77-255-179
.000
PPM
416
EDC
771128
EDCOP
ROUTINE SHIFT
77-258-182
.000
PPM
385
EDC
780109
EDCOP
ROUTINE SHIFT
78-002-002
.000
PPM
440
EDC CIS
780410
EDCOP
ROUTINE SHIFT
78-068-047
.000
PPM
393
PAGE
SL 016786
1/19/93
LA^KHARLES (254) PLANT B SAITOHG RESULTS THRU 1984
DEPT EDC
COMPOUND
DATE
CIS 780418 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
78-135-085
RESULT .000
UNIT DURATION
PPM
410
PAGE
EDC EC
760811
EDCOP
ROUTINE SHIFT
76-235-159
.150
PPM
391
EDC EC
770118
EDCOP
ROUTINE SHIFT
77-003-003
EDC* EDC
EC
770223
EDCOP
ROUTINE SHIFT EXCEPT VDC/MC
VAPOR RELEASE ADJACENT
77-032-015
EC 770307 ROUTINE SHIFT
EDCOP
77-044-021
.160
PPM
419
.200
PPM
390
.100
PPM
410
EDC EC
770318
EDCOP
ROUTINE SHIFT
77-060-033
.400
PPM
431
EDC EC
770404
EDCOP
ROUTINE SHIFT
77-083-047
.000
PPM
402
EDC EC
770503
EDCOP
ROUTINE SHIFT
77-110-074
.210
PPM
328
EDC EC
770510
EDCOP
ROUTINE SHIFT
77-143-104
.000
PPM
390
EDC EC
770516
EDCOP
ROUTINE SHIFT
77-152-113
.130
PPM
450
EDC EC
770822
EDCOP
ROUTINE SHIFT
77-186-131
.300
PPM
340
SL 016787
1/19/93
LA^RHARLES (254) PLANT B SAM^NG RESULTS THRU 1984
DEPT EDC
COMPOUND
DATE
EC 770913 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
77-207-148
RESULT .170
UNIT DURATION PPM 420
EDC EC
771017
EDCOP
ROUTINE SHIFT
77-216-154
.000
PPM
390
EDC EC
771024
EDCOP
ROUTINE SHIFT
EDC*
EC 771121 ROUTINE SHIFT
EDCOP
77-232-162 77-255-179
.000
PPM
388
.130
PPM
416
EDC EC
771128
EDCOP
ROUTINE SHIFT
77-258-182
.000
PPM
385
EDC EC
780109
EDCOP
ROUTINE SHIFT
78-002-002
.000
PPM
440
EDC EC
780315
EDCOP
ROUTINE SHIFT
78-096-055
.170
PPM
200
EDC EC
780410
EDCOP
ROUTINE SHIFT
,
EDC EC
780418
EDCOP
ROUTINE SHIFT
78-068-047 78-135-085
.270
PPM
393
.100
PPM
410
EDC EDC
760811
EDCOP
ROUTINE SHIFT
76-235-159
5.500
PPM
391
EDC EDC
770118
EDCOP
ROUTINE SHIFT
77-003-003
8.100
PPM
419
1/19/93
LA^fccHARLES 1259) PLANT B SAWING RESULTS THRU 1989
DEPT EDC
COMPOUND
DATE
JOB TITLE
EDC
770223
EDCOP
ROUTINE SHIFT EXCEPT VDC/MC
VAPOR RELEASE ADJACENT
SAMPLE# 77-032-015
RESULT 7.000
UNIT DURATION
PPM
390
EDC EDC
770307
EDCOP
ROUTINE SHIFT
77-099-021
7.200
PPM
910
PAGE
EDC
* EDC
EDC 770318 ROUTINE SHIFT
EDC 770909 ROUTINE SHIFT
EDCOP EDCOP
77-060-033 77-083-097
7.700
PPM
931
5.100
PPM
902
EDC EDC
770503
EDCOP
ROUTINE SHIFT
77-110-079
8.900
PPM
328
EDC EDC
770510
EDCOP
ROUTINE SHIFT
77-193-109
1.000
PPM
390
EDC EDC
770516
EDCOP
ROUTINE SHIFT
77-152-113
3.300
PPM
950
EDC EDC
770822
EDCOP
ROUTINE SHIFT
77-186-131
6.600
PPM
390
EDC EDC
770913
EDCOP
ROUTINE SHIFT
77-207-198
18.900
PPM
920
EDC EDC
771017
EDCOP
ROUTINE SHIFT
77-216-159
20.300
PPM
390
EDC EDC
771029
EDCOP
ROUTINE SHIFT
77-232-162
1.700
PPM
388
SL 016789
1/19/93
LA^fccHARLES (259) PLANT 6 SAffl^ING RESULTS THRU 1989
DEPT EDC
COMPOUND
DATE
EDC 771121 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
77-255-179
RESULT .860
UNIT DURATION PPM 916
PAGE
EDO EDC
771128
EDCOP
ROUTINE SHIFT
77-258-182
8.600
PPM
385
EDC
* EDC
EDC 780109 ROUTINE SHIFT
EDC 780315 ROUTINE SHIFT
EDCOP EDCOP
78-002-002 78-096-055
1.600
PPM
990
1.590
PPM
200
EDC EDC
780910
EDCOP
ROUTINE SHIFT
78-068-097
.000
PPM
393
EDC EDC
780918
EDCOP
ROUTINE SHIFT
78-135-085
2.380
PPM
910
EDC MC
760811
ROUTINE SHIFT
EDCOP
76-235-159
1.900
PPM
391
EDC MC
770118
EDCOP
ROUTINE SHIFT
77-003-003
.000
PPM
919
EDC MC
770223
EDCOP
77-032-015
ROUTINE SHIFT EXCEPT VDC/MC
VAPOR RELEASE ADJACENT
EDC MC
770307
ROUTINE SHIFT
EDCOP
77-099-021
18.900
PPM
390
.700
PPM
910
EDC MC
770318
EDCOP
ROUTINE SHIFT
77-060-033
.390
PPM
931
Si, 0I679Q
1/19/93
LAI^fc:HARLES (254) PLANT B SAMfflHG RESULTS THRU 1984
DEPT EDC
COMPOUND
DATE
MC 770404 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
77-083-047
RESULT 4.400
UNIT DURATION
PPM
402
PAGE
EDC MC
770503
EDCOP
ROUTINE SHIFT
77-110-074
5.500
PPM
328
EDC
* EDC
MC 770510 ROUTINE SHIFT
MC 770516 ROUTINE SHIFT
EDCOP EDCOP
77-143-104 77-152-113
.280
PPM
390
1 .800
PPM
450
EDC MC
770822
EDCOP
ROUTINE SHIFT
77-186-131
2.000
PPM
340
EDC MC
770913
EDCOP
ROUTINE SHIFT
77-207-148
2.100
PPM
420
EDC MC
771017
ROUTINE SHIFT
EDCOP
77-216-154
.560
PPM
390
EDC MC
771024
EDCOP
ROUTINE SHIFT
77-232-162
2.400
PPM
388
EDC MC
771121
EDCOP
ROUTINE SHIFT
77-255-179
4.900
PPM
416
EDC MC
771128
EDCOP
ROUTINE SHIFT
77-258-182
4.100
PPM
385
EDC MC
780109
EDCOP
ROUTINE SHIFT
78-002-002
.870
PPM
440
SL 016791
l/19/93^fc ^
LA^BtHARLES (259) PLANT B SAMHriNG RESULTS THRU 1989
DEPT EDC
COMPOUND
DATE
MC 780315 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
78-096-055
RESULT 1.210
UNIT DURATION PPM 20Q
PAGE
EDC MC
780910
EDCOP
ROUTINE SHIFT
78-068-097
.790
PPM
393
EDC
* EDC
MC 780918 ROUTINE SHIFT
PER 760811 ROUTINE SHIFT
EDCOP EDCOP
78-135-085 76-235-159
1 . 150
PPM
910
. 190
PPM
391
EDC PER
770118
EDCOP
ROUTINE SHIFT
77-003-003
.000
PPM
919
EDC EDC
PER
770223
EDCOP
ROUTINE SHIFT EXCEPT VDC/MC
VAPOR RELEASE ADJACENT
77-032-015
PER 770307 ROUTINE SHIFT
EDCOP
77-099-021
.300
PPM
390
.000
PPM
910
EDC PER
770318
EDCOP
ROUTINE SHIFT
77-060-033
.100
PPM
931
EDC PER
770909
EDCOP
ROUTINE SHIFT
77-083-097
. 000
PPM
902
EDC PER
770503
EDCOP
ROUTINE SHIFT
77-110-079
.110
PPM
328
EDC PER
770510
EDCOP
ROUTINE SHIFT
77-193-109
.000
PPM
390
SL 016792
1/19/93
LAlHCHARLES (254) PLANT B SAMPLING RESULTS THRU 1984
DEPT EDC
COMPOUND
DATE
PER 770516 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
77-152-113
RESULT .310
UNIT DURATION PPM 450
PAGE
EDC PER
770822
EDCOP
ROUTINE SHIFT
77-186-131
.000
PPM
340
EDC
* EDC
PER 770913 ROUTINE SHIFT
PER 771017 ROUTINE SHIFT
EDCOP EDCOP
77-207-148 77-216-154
.230
PPM
420
.000
PPM
390
EDC PER
771024
EDCOP
ROUTINE SHIFT
77-232-162
.000
PPM
388
EDC PER
771121
EDCOP
ROUTINE SHIFT
77-255-179
.000
PPM
416
EDC PER
771128
EDCOP
ROUTINE SHIFT
77-258-182
.000
PPM
385
EDC PER
780109
EDCOP
ROUTINE SHIFT
78-002-002
. 000
PPM
440
EDC PER
780315
EDCOP
ROUTINE SHIFT
78-096-055
.140
PPM
200
EDC PER
780410
EDCOP
ROUTINE SHIFT
78-068-047
.200
PPM
393
EDC PER
780418
EDCOP
ROUTINE SHIFT
78-135-085
.000
PPM
410
SL 016793
1/19/93
LAlfl^HARLES (254) PLANT B SAlWlNG RESULTS THRU 1984
DEPT EDC
COMPOUND
DATE
SYM 760811 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
76-235-159
RESULT .000
UNIT DURATION PPM 391
EDC SYM
770118
EDCOP
ROUTINE SHIFT
77-003-003
.100
PPM
419
EDC
* EDC
SYM 770307 ROUTINE SHIFT
SYM 770318 ROUTINE SHIFT
EDCOP EDCOP
77-044-021 77-060-033
.000
PPM
410
.100
PPM
431
EDC SYM
770404
EDCOP
ROUTINE SHIFT
77-083-047
.000
PPM
402
EDC SYM
770503
EDCOP
ROUTINE SHIFT
77-110-074
.000
PPM
328
EDC SYM
770510
EDCOP
ROUTINE SHIFT
77-143-104
.000
PPM
390
EDC SYM
770516
EDCOP
ROUTINE SHIFT
77-152-113
.000
PPM
450
EDC
SYM 770913 ROUTINE SHIFT
EDCOP
77-207-148
.280
PPM
420
EDC SYM
771017
EDCOP
ROUTINE SHIFT
77-216-154
2.900
PPM
390
EDC SYM
771024
EDCOP
ROUTINE SHIFT
77-232-162
.890
PPM
388
PAGE t\
SL 016794
1/19/93
LA^fcHARLES (254) PLANT B SAlWlNG RESULTS THRU 1984
DEPT EDC
COMPOUND
DATE
SYM 771128 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
77-258-182
RESULT 1.700
UNIT DURATION
PPM
385
PAGE
EDC SYM
780315
EDCOP
ROUTINE SHIFT
78-096-055
.000
PPM
200
EDC
* EDC
SYM 780410 ROUTINE SHIFT
TCE 760811 ROUTINE SHIFT
EDCOP EDCOP
78-068-047 76-235-159
1.500
PPM
393
.740
PPM
391
EDC TCE
770118
EDCOP
ROUTINE SHIFT
77-003-003
.270
PPM
419
EDC EDC
TCE
770223
EDCOP
ROUTINE SHIFT EXCEPT VDC/MC
VAPOR RELEASE ADJACENT
77-032-015
TCE 770307 ROUTINE SHIFT
EDCOP
77-044-021
.200
PPM
390
.300
PPM
410
EDC TCE
770318
EDCOP
ROUTINE SHIFT
77-060-033
.800
PPM
431
EDC TCE
770404
EDCOP
ROUTINE SHIFT
77-083-047
.100
PPM
402
EDC TCE
770503
EDCOP
ROUTINE SHIFT
77-110-074
.480
PPM
328
EDC TCE
770510
EDCOP
ROUTINE SHIFT
77-143-104
.000
PPM
390
SL 016795
1/19/93
LA^BlHARLES (254) PLANT B SA1WING RESULTS THRU 1984
DEPT EDC
COMPOUND
DATE
TCE 770516 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
77-152-113
RESULT .130
UNIT DURATION PPM 450
PAGE
EDC TCE
770822
EDCOP
ROUTINE SHIFT
77-186-131
.130
PPM
340
EDC
* EDC
TCE 770913 ROUTINE SHIFT
TCE 771017 ROUTINE SHIFT
EDCOP EDCOP
77-207-148 77-216-154
.520
PPM
420
.130
PPM
390
EDC TCE
77102A
EDCOP
ROUTINE SHIFT
77-232-162
.000
PPM
388
EDC TCE
771121
EDCOP
ROUTINE SHIFT
77-255-179
.000
PPM
416
EDC TCE
780109
EDCOP
ROUTINE SHIFT
78-002-002
.000
PPM
440
EDC TCE
780315
EDCOP
ROUTINE SHIFT
78-096-055
.120
PPM
200
EDC TCE
780410
EDCOP
ROUTINE SHIFT
78-068-047
.000
PPM
393
EDC TCE
780418
EDCOP
ROUTINE SHIFT
78-135-085
.400
PPM
410
EDC TRANS
770318
EDCOP
ROUTINE SHIFT
77-060-033
.000
PPM
431
SL 016796
1/19/93
LAlMfcHARLES (259) PLANT B SAMfTiNG RESULTS THRU 1989
DEPT EDC
COMPOUND
DATE
TRANS
770909
ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
77-083-097
RESULT .000
UNIT DURATION
PPM
902
PAGE
EDC TRANS
770503
EDCOP
ROUTINE SHIFT
77-110-079
.000
PPM
328
EDC
* EDC
TRANS
770510
ROUTINE SHIFT
TRANS
770516
ROUTINE SHIFT
EDCOP EDCOP
77-193-109 77-152-113
.000
PPM
390
.000
PPM
950
EDC TRANS
770913
EDCOP
ROUTINE SHIFT
77-207-198
.000
PPM
920
EDC TRANS
771029
ROUTINE SHIFT
EDCOP
77-232-162
.000
PPM
388
EDC TRANS
771121
EDCOP
ROUTINE SHIFT
77-255-179
.000
PPM
916
EDC TRANS
771128
EDCOP
ROUTINE SHIFT
77-258-182
.000
PPM
385
EDC TRANS
780109
EDCOP
ROUTINE SHIFT
78-002-002
.000
PPM
990
EDC TRANS
780918
EDCOP
ROUTINE SHIFT
78-135-085
.000
PPM
910
EDC TRI
760811
ROUTINE SHIFT
EDCOP
76-235-159
.000
PPM
391
SL 016797
1/19/93
* LAI^KHARLES (254) PLANT B SAIWIIIG RESULTS THRU 1984
DEPT EDC
COMPOUND
DATE
TRI 770118 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
77-003-003
RESULT .000
UNIT DURATION PPM 419
PAGE
EDC TRI
770223
EDCOP
77-032-015
ROUTINE SHIFT EXCEPT VDC/MC
VAPOR RELEASE ADJACENT
EDC TRI
770307
EDCOP
ROUTINE SHIFT
77-044-021
EDC*
TRI 770318 ROUTINE SHIFT
EDCOP
77-060-033
.200
PPM
390
.000
PPM
410
.100
PPM
431
EDC TRI
770404
EDCOP
ROUTINE SHIFT
77-083-047
.000
PPM
402
EDC TRI
770503
EDCOP
ROUTINE SHIFT
77-110-074
.290
PPM
328
EDC TRI
770510
EDCOP
ROUTINE SHIFT
77-143-104
.000
PPM
390
EDC TRI
770516
EDCOP
ROUTINE SHIFT
77-152-113
.570
PPM
450
EDC TRI
770822
EDCOP
ROUTINE SHIFT
77-186-131
.000
PPM
340
EDC TRI
770913
EDCOP
ROUTINE SHIFT
77-207-148
.700
PPM
420
EDC TRI
771017
EDCOP
ROUTINE SHIFT
77-216-154
. 120
PPM
390
SL 016798
LAI^KHARLES (254) PLANT B SAmWtMG RESULTS THRU 1984
DEPT EDO
COMPOUND
DATE
TRI 771024 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
77-232-162
RESULT .000
UNIT DURATION PPM 388
EDC TRI
771121
EDCOP
ROUTINE SHIFT
77-255-179
.000
PPM
416
EDC
t EDC
TRI 771128 ROUTINE SHIFT
TRI 780109 ROUTINE SHIFT
EDCOP EDCOP
77-258-182 78-002-002
.000
PPM
385
.000
PPM
440
EDC TRI
780315
EDCOP
ROUTINE SHIFT
78-096-055
.000
PPM
200
EDC TRI
780410
EDCOP
ROUTINE SHIFT
78-068-047
.290
PPM
393
EDC TRI
780418
EDCOP
ROUTINE SHIFT
78-135-085
.000
PPM
410
EDC VCM
760811
EDCOP
ROUTINE SHIFT
76-235-159
.060
PPM
391
EDC VCM
770118
EDCOP
ROUTINE SHIFT
77-003-003
.000
PPM
419
EDC VCM
770307
EDCOP
ROUTINE SHIFT
77-044-021
. 000
PPM
410
EDC VCM
770318
EDCOP
ROUTINE SHIFT
77-060-033
.150
PPM
431
1/19/93
LAI^BHARLES (259) PLANT B SAIWING RESULTS THRU 1989
DEPT EDC
COMPOUND
DATE
VCM 770909 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
77-083-097
RESULT .000
UNIT DURATION PPM 902
PAGE
EDC VCM
770503
ROUTINE SHIFT
1
EDC VCM
770510
ROUTINE SHIFT
EDCOP EDCOP
EDC*
VCM
770516
ROUTINE SHIFT
EDCOP
77-110-079 77-193-109 77-152-113
.090
PPM
328
.000
PPM
390
.090
PPM
950
EDC VCM
770822
EDCOP
ROUTINE SHIFT
77-186-131
1.200
PPM
390
EDC VCM
770913
EDCOP
ROUTINE SHIFT
77-207-198
.960
PPM
920
EDC VCM
771017
EDCOP
ROUTINE SHIFT
77-216-159
.000
PPM
390
EDC VCM
771029
EDCOP
ROUTINE SHIFT
77-232-162
. 000
PPM
388
EDC VCM
771121
EDCOP
ROUTINE SHIFT
77-255-179
.000
PPM
916
EDC VCM
771128
EDCOP
ROUTINE SHIFT
77-258-182
. 000
PPM
385
EDC VCM
780109
EDCOP
ROUTINE SHIFT
78-002-002
.000
PPM
990
SL 016800
1/19/93
LAI^^HARLES (2541 PLANT B SAMmHG RESULTS THRU 1984
DEPT EDC
COMPOUND
DATE
VCM 780315 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
78-096-055
RESULT .050
UNIT DURATION
PPM
200
EDC VCM
780410
EDCOP
ROUTINE SHIFT
78-068-047
.040
PPM
393
EDC
4 EDC
VCM
780418
ROUTINE SHIFT
VDC 760811 ROUTINE SHIFT
EDCOP EDCOP
78-135-085 76-235-159
.000
PPM
410
.400
PPM
391
EDC VDC
770118
EDCOP
ROUTINE SHIFT
77-003-003
.420
PPM
419
EDC VDC
770223
EDCOP
77-032-015
ROUTINE SHIFT EXCEPT VDC/MC
VAPOR RELEASE ADJACENT
EDC VDC
770307
EDCOP
ROUTINE SHIFT
77-044-021
8.900
PPM
390
1.100
PPM
410
EDC VDC
770318
EDCOP
ROUTINE SHIFT
77-060-033
5.400
PPM
431
EDC VDC
770404
EDCOP
ROUTINE SHIFT
77-083-047
.710
PPM
402
EDC VDC
770503
EDCOP
ROUTINE SHIFT
77-110-074
9.700
PPM
328
EDC VDC
770510
EDCOP
ROUTINE SHIFT
77-143-104
.100
PPM
390
PAGE
SL 016801
LAI^BHARLES (254) PLANT B SAMWIhg RESULTS THRU 1984
DEPT EDC
COMPOUND
DATE
VDC 770516 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
77-152-113
RESULT .430
UNIT DURATION PPM 450
EDC VDC
770822
EDCOP
ROUTINE SHIFT
77-186-131
1.500
PPM
340
EDC
* EDC
VDC 770913 ROUTINE SHIFT
VDC 771017 ROUTINE SHIFT
EDCOP EDCOP
77-207-148 77-216-154
.460
PPM
420
1.100
PPM
390
EDC VDC
771024
EDCOP
ROUTINE SHIFT
77-232-162
.730
PPM
388
EDC VDC
771121
EDCOP
ROUTINE SHIFT
77-255-179
.920
PPM
416
EDC VDC
771128
EDCOP
ROUTINE SHIFT
77-258-182
.230
PPM
385
EDC VDC
771212
EDCOP
77-273-197
ROUTINE ROUNDS IN EDC UNIT
.100
PPM
15
EDC VDC
780109
EDCOP
ROUTINE SHIFT
78-002-002
.200
PPM
440
EDC VDC
780315
EDCOP
ROUTINE SHIFT
78-096-055
.690
PPM
200
EDC VDC
780410
EDCOP
ROUTINE SHIFT
78-068-047
.480
PPM
393
1/19/93
lak^Bh ARLES (254) PLANT b sahWn G RESULTS THRU 1984
DEPT EDC
COMPOUND
DATE
VDC 780418 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
78-135-085
RESULT .990
UNIT DURATION
PPM
410
PAGE
EDMC
CCL4
780503
ROUTINE SHIFT
TELOP
78-154-098
.000
PPM
420
EDMC
CCL4
780508
ROUTINE SHIFT
t EDMC
CCL4
780911
ROUTINE SHIFT
TETHOP EDCOP
78-163-104 78-341-209
.000
PPM
400
.000
PPM
364
EDMC CCL4
780911
ROUTINE SHIFT
TELOP
78-340-208
.000
PPM
364
EDMC
CCL4
780911
ROUTINE SHIFT
TETHOP
78-342-210
.000
PPM
364
EDMC
CCL4
780911
ROUTINE SHIFT
TRAUXO
78-343-211
.000
PPM
364
EDMC
CCL4
781004
ROUTINE SHIFT
EDCOP
78-381-236
.000
PPM
440
EDMC
CCL4
781004
ROUTINE SHIFT
TELOP
78-380-235
.000
PPM
440
EDMC
CCL4
781023
ROUTINE SHIFT
TETHOP
78-383-238
.000
PPM
380
EDMC
CCL4
781031
ROUTINE SHIFT
TETHOP
78-382-237
.000
PPM
930
SL 016803
1/19/93
LAW&HARLES (254) PLANT B SAMWTMG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
CCL4
781116
ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
78-432-270
RESULT .000
UNIT DURATION PPM 425
PAGE
EDMC
CCL4
781116
ROUTINE SHIFT
TELOP
78-430-268
.000
PPM
425
EDMC
CCL4
781228
ROUTINE SHIFT
* EDMC
CCL4
781228
ROUTINE SHIFT
EDCOP EDCOP
78-467-293 78-479-293
.000
PPM
387
.000
PPM
387
EDMC
CCL4
781228
ROUTINE SHIFT
TELOP
78-466-292
.000
PPM
387
EDMC CCL4
781228
ROUTINE SHIFT
TELOP
78-478-292
.000
PPM
387
EDMC
CCL4
781228
ROUTINE SHIFT
TETHOP
78-468-294
.000
PPM
375
EDMC
CCL4
781228
ROUTINE SHIFT
TETHOP
78-480-294
.000
PPM
375
EDMC CCL4
781228
ROUTINE SHIFT
TRAUXO
78-469-295
.000
PPM
375
EDMC
CCL4
781228
ROUTINE SHIFT
TRAUXO
78-481-295
.000
PPM
375
EDMC
CCL4
790109
ROUTINE SHIFT
EDCOP
79-018-013
. 000
PPM
385
SL 016804
1/19/93
LAK^MARLES ( 254) PLANT B SAMWNG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
CCL4
790109
ROUTINE SHIFT
JOB TITLE SAMPLE#
TELOP
79-017-012
RESULT .000
UNIT DURATION
PPM
385
PAGE
EDMC
CCL4
790109
ROUTINE SHIFT
TETHOP
79-019-014
.000
PPM
385
EDMC
CCL4
790219
ROUTINE SHIFT
i EDMC
CCL4
790219
ROUTINE SHIFT
EDCOP TELOP
79-082-056 79-080-054
.000
PPM
390
.000
PPM
390
EDMC
CCL4
790305
ROUTINE SHIFT
TELOP
79-096-061
.000
PPM
445
EDMC
CCL4
790305
ROUTINE SHIFT
TETHOP
79-098-063
.000
PPM
445
EDMC
CCL4
790305
ROUTINE SHIFT
TRAUXO
79-099-064
.000
PPM
445
EDMC
CCL4
790305
WELDER
ROUTINE WORKDAY-LOGBOOK
MECHANIC:'S ROUNDS
EDMC
CCL4
790309
ROUTINE SHIFT
EDCOP
79-100-065 79-097-062
.000
PPM
445
.000
PPM
445
EDMC
CCL4
790326
INSTRU
ROUTINE SHIFT AS LOGBOOK
INSTRUMENT MAN
EDMC
CCL4
790423
ROUTINE SHIFT
EDCOP
79-101-066 79-228-120
.000
PPM
455
.000
PPM
425
Si 016805
1/19/93
LAK^^ARLES (254) PLANT B SAMWInG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
CCL4
790423
ROUTINE SHIFT
JOB TITLE SAMPLE#
TELOP
79-227-119
RESULT .000
UNIT DURATION PPM 425
EDMC
CCL4
790518
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAN.
EDMC
CCL4
790521
ROUTINE SHIFT
VDCOP
t EDMC
CCL4
790530
ROUTINE SHIFT
EDCOP
79-260-142 79-264-146 79-299-161
.000
PPM
430
.000
PPM
430
.000
PPM
404
EDMC
CCL4
790530
WELDER
ROUTINE WORKDAY AS LOGBOOK
MECHANIC
EDMC
CCL4
790618
ROUTINE SHIFT
TELOP
79-300-162 79-317-180
.000
PPM
404
.000
PPM
450
EDMC
CCL4
790619
ROUTINE SHIFT
TE2S0P
79-331-186
.000
PPM
438
EDMC
CCL4
790705
INSTRU
79-357-203
ROUTINE SHIFT WORKING AS LOG
BOOK INSTRUMENT MAN
EDMC CCL4
790705
ROUTINE SHIFT
TELOP
79-354-200
.000
PPM
465
.000
PPM
465
EDMC
CCL4
790705
WELDER
79-358-204
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC.
EDMC
CCL4
791005
79-480-277
16FT NW OF SUMP/5FT ABOVE GRND
WSW/6MPH/78F/31RH/CLEAR
.000
PPM
465
.110
PPM
322
PAGE
016806
1/19/93
LAK^BhARLES (254) PLANT B SAMWTNG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
JOB TITLE SAMPLE#
CCL4
791005
79-481-278
AFT EAST OF SUMP/5FT ABV GRND
WSW/6MPH/78F/31RH/CLEAR
RESULT .160
UNIT DURATION PPM 319
EDMC
CCL4
791101
WELDER
79-627-397
RECHARGING DRYER IN VDC AREA
.100
PPM
15
EDMC
780503 ROUTINE SHIFT
TELOP
78-154-098
.000
PPM
420
EDMC
780508 ROUTINE SHIFT
TETHOP
78-163-104
. 000
PPM
400
EDMC
780508
TRAUXO
ROUTINE SHIFT-CHARGED HQMME
TANK
78-164-105
EDMC
CIS 780727 ROUTINE SHIFT
EDCOP
78-282-174
.920
PPM
400
.000
PPM
408
EDMC
CIS 780727 ROUTINE SHIFT
TELOP
78-281-173
.000
PPM
408
EDMC
CIS 780727 ROUTINE SHIFT
TETHOP
78-283-175
.000
PPM
408
EDMC
780727 ROUTINE SHIFT
TRAUXO
78-284-176
.000
PPM
408
EDMC
780911 ROUTINE SHIFT
EDCOP
78-341-209
.000
PPM
364
EDMC
780911 ROUTINE SHIFT
TELOP
78-340-208
.780
PPM
364
PAGE
SL 016807
1/19/93
lakMlHARLES <259) PLANT b smm[NG RESULTS THRU 1989
DEPT EDMC
COMPOUND
DATE
780911 ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
78-392-210
RESULT .320
UNIT DURATION PPM 369
I
PAGE
EDMC
CIS 780911 ROUTINE SHIFT
TRAUXO
78-393-211
.160
PPM
369
EDMC
781009 ROUTINE SHIFT
EDCOP
78-381-236
.000
PPM
490
EDMC
781009 ROUTINE SHIFT
TELOP
78-380-235
.000
PPM
440
EDMC
781023 ROUTINE SHIFT
TETHOP
78-383-238
.000
PPM
380
EDMC
781031 ROUTINE SHIFT
TETHOP
78-382-237
.000
PPM
430
EDMC
781116 ROUTINE SHIFT
EDCOP
78-932-270
.060
PPM
425
EDMC
781116 ROUTINE SHIFT
TELOP
78-930-268
.130
PPM
425
EDMC
781116 ROUTINE SHIFT
TETHOP
78-931-269
.990
PPM
425
EDMC
781116 ROUTINE SHIFT
TRAUXO
78-933-271
EDMC
781228 ROUTINE SHIFT
EDCOP
78-967-293
.260
PPM
425
. 000
PPM
387
SL 016808
1/19/93
LAKHlHARLES (259) PLANT B SAMWENG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
781228 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
78-479-293
RESULT .000
UNIT DURATION
PPM
387
PAGE
EDMC
CIS 781228 ROUTINE SHIFT
TELOP
78-466-292
.000
PPM
387
EDMC
CIS 781228 ROUTINE SHIFT
* EDMC
CIS 781228 ROUTINE SHIFT
TELOP TETHOP
78-478-292 78-468-294
.000
PPM
387
.000
PPM
375
EDMC
781228 ROUTINE SHIFT
TETHOP
78-480-294
.000
PPM
375
EDMC
781228 ROUTINE SHIFT
TRAUXO
78-469-295
.000
PPM
375
EDMC
781228 ROUTINE SHIFT
TRAUXO
78-481-295
.000
PPM
375
EDMC
790109 ROUTINE SHIFT
EDCOP
79-018-013
.060
PPM
385
EDMC
790109 ROUTINE SHIFT
TELOP
79-017-012
.000
PPM
385
EDMC
790109 ROUTINE SHIFT
TETHOP
79-019-014
.110
PPM
385
EDMC
CIS
790109
TRAUXO
ROUTINE SHIFT-CLOSED LOOP
SAMPLERS DOWN/USED BOTTLES
79-020-015
. 470 PPM
385
SL 016809
1/19/93
LAK^RhARLES (254) PLANT B SAMWiMG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
790122 ROUTINE SHIFT
JOB TITLE SAMPLE#
TRAUXO
79-034-029
RESULT .990
UNIT DURATION PPM 393
EDMC
790219 ROUTINE SHIFT
EDCOP
79-082-056
.000
PPM
390
EDMC
790219 ROUTINE SHIFT
* EDMC
790219 ROUTINE SHIFT
TELOP TETHOP
79-080-054 79-081-055
.000
PPM
390
.000
PPM
390
EDMC
790219 ROUTINE SHIFT
TRAUXO
79-083-057
.000
PPM
390
EDMC
790305 ROUTINE SHIFT
TELOP
79-096-061
.000
PPM
445
EDMC
CIS 790305 ROUTINE SHIFT
TETHOP
79-098-063
.000
PPM
445
EDMC
CIS 790305 ROUTINE SHIFT
TRAUXO
79-099-064
.000
PPM
445
EDMC
790305
WELDER
ROUTINE WORKDAY-LOGBOOK
MECHANIC:'S ROUNDS
EDMC
790309 ROUTINE SHIFT
EDCOP
79-100-065 79-097-062
.000
PPM
445
.000
PPM
445
EDMC
CIS
790326
INSTRIJ
ROUTINE SHIFT AS LOGBOOK
INSTRUMENT MAN
79-101-066
100 PPM
455
PAGE
SL 016810
1/19/93
LAI^MARLES (259) PLANT B SAMWThG RESULTS THRU 1989
DEPT EDMC
COMPOUND
DATE
CIS 790923 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
79-228-120
RESULT .000
UNIT DURATION
PPM
925
PAGE
EDMC
CIS 790923 ROUTINE SHIFT
TELOP
79-227-119
.000
PPM
925
EDMC
CIS 790930 ROUTINE SHIFT
VDCOP
79-232-121
.000
PPM
365
EDMC
CIS 790519 ROUTINE SHIFT
VDCOP
79-257-139
.000
PPM
390
EDMC
CIS
790518
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAN.
EDMC
CIS 790521 ROUTINE SHIFT
VDCOP
79-260-192 79-269-196
.000
PPM
930
.000
PPM
930
EDMC
CIS
790530
ROUTINE SHIFT
EDCOP
79-299-161
.000
PPM
909
EDMC
CIS
790530
WELDER
ROUTINE WORKDAY AS LOGBOOK
MECHANIC
EDMC
CIS 790618 ROUTINE SHIFT
EDCOP
79-300-162 79-318-181
.000
PPM
909
.090
PPM
950
EDMC
CIS
790618
INSTRU
79-321-189
ROUTINE SHIFT WORKING AS LOG
BOOK INSTRUMENT MAN
EDMC
CIS 790618 ROUTINE SHIFT
TELOP
79-317-180
.150
PPM
950
.000
PPM
950 SL 016811
LAI^MARLES (254) PLANT B SAMWMG RESULTS THRU 1984
DEPT EDHC
COMPOUND
DATE
CIS 790618 ROUTINE SHIFT
JOB TITLE SAMPLE#
VDCOP
79-319-182
RESULT .000
UNIT DURATION PPM 450
EDMC
CIS
790618
WELDER
79-320-183
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC
EDMC
CIS 790619 ROUTINE SHIFT
TE2S0P
79-331-186
.000
PPM
450
.000
PPM
438
EDMC
CIS 790705 ROUTINE SHIFT
EDCOP
79-355-201
.000
PPM
465
EDMC
CIS
790705
INSTRU
79-357-203
ROUTINE SHIFT WORKING AS LOG
BOOK INSTRUMENT MAN
EDMC
CIS 790705 ROUTINE SHIFT
TELOP
79-354-200
.000
PPM
465
.000
PPM
465
EDMC
CIS 790705 ROUTINE SHIFT
VDCOP
79-356-202
.000
PPM
465
EDMC
CIS
790705
WELDER
79-358-204
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC.
EDMC
CIS 791005
79-481-278
4FT EAST OF SUMP/5FT ABV GRND
WSW/6MPH/78F/31RH/CLEAR
EDMC
CIS 791005
79-482-279
6FT E OF SUMP/6FT ABOVE GRND/
WSW/6MPH/78F/31RH/CLEAR
EDMC
CIS 791005
79-483-280
8FT W. OF SUMP/5FT ABOVE GRND
WSW/6MPH/78F/31RH/CLEAR
.000
PPM
465
.050
PPM
319
.050
PPM
309
.050
PPM
309
1/19/93
!
LAI^BhaRLES (254) PLANT B SAMWiNG RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
EDMC
CIS 791012
79-512-309
5FT SW OF KETTLE TOP ON RAIL
4FT ABV PLTFRM/S/8MPH/79F/58RH
RESULT .050
UNIT DURATION
PPM
199
EDMC
CIS 791015 2FT NE OF LIFT SUMP/4FT ABV
GRND/NE/6MPH/50F/86RH/CLEAR
79-515-312
.050
PPM
291
EDMC
CIS 791015
79-516-313
2FT SW OF SUMP/5FT ABV GRND/
NE WND/6MPH/50F/86RH/CLEAR
.050
PPM
286
EDMC
CIS 791015
79-517-314
10FT SW OF SUMP/5FT ABV GRND/
NE WND/6MPH/5GF/86RH/CLEAR
.050
PPM
292
EDMC
CIS 791015
79-518-315
6FT SE OF SUMP/5FT ABV GRND/
NE WND/6MPH/50F/86RH/CLEAR
.050
PPM
282
EDMC
CIS
791101
MACHIH
79-626-396
RECHARGING DRYER IN VDC AREA
.100
PPM
15
EDMC
DCE 791005
79-481-278
4FT BAST OF SUMP/5FT ABV GRND
WSW/6MPH/78F/31RH/CLEAR
EDMC
DCE 791012
79-512-309
5FT SW OF KETTLE TOP ON RAIL
4FT ABV PLTFRM/S/8MPH/79F/58RH
EDMC
DCE 791015
79-517-314
10FT SW OF SUMP/5FT ABV GRND/
NE WHD/6MPH/50F/86RH/CLEAR
EDMC
DCE 791015
79-518-315
6FT SE OF SUMP/5FT ABV GRND/
NE WND/6MPH/50F/86RH/CLEAR
EDMC EC
780503
ROUTINE SHIFT
TELOP
78-154-098
.050
PPM
319
.050
PPM
199
.050
PPM
292
.050
PPM
282
.000
PPM
420
PAGE
0168la
1/19/93
LAK^^HARLES C254) PLANT B SAMTONG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
EC 780503 ROUTINE SHIFT
JOB TITLE SAMPLE#
TRAUXO
78-158-099
RESULT .000
UNIT DURATION PPM 420
i
PAGE
EDMC
EC 780508 ROUTINE SHIFT
TETHOP
78-163-104
.000
PPM
400
EDMC
EC 780516 ROUTINE SHIFT
i EDMC
EC 780622 ROUTINE SHIFT
TRAUXO EDCOP
78-172-113 78-222-135
.010
PPM
425
.290
PPM
410
EDMC
EC 780622 ROUTINE SHIFT
TELOP
78-225-138
.000
PPM
410
EDMC
EC 780622 ROUTINE SHIFT
TETHOP
78-223-136
.370
PPM
410
EDMC
EC 780727 ROUTINE SHIFT
EDCOP
78-282-174
.890
PPM
408
EDMC
EC 780727 ROUTINE SHIFT
TELOP
78-281-173
.480
PPM
408
EDMC
EC 780727 ROUTINE SHIFT
TETHOP
78-283-175
.880
PPM
408
EDMC
EC 780727 ROUTINE SHIFT
TRAUXO
78-284-176
.630
PPM
408
EDMC
EC 780911 ROUTINE SHIFT
EDCOP
78-341-209
.000
PPM
364
SI* 016814
1/19/93
LANShARLES (259) PLANT B SAMWnG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
EC 780911 ROUTINE SHIFT
JOB TITLE SAMPLE#
TELOP
78-340-208
RESULT .000
UNIT DURATION PPM 364
PAGE
EDMC
EC 780911 ROUTINE SHIFT
TETHOP
78-342-210
.000
PPM
364
EDMC
EC 780911 ROUTINE SHIFT
* EDMC
EC 781004 ROUTINE SHIFT
TRAUXO EDCOP
78-343-211 78-381-236
.000
PPM
364
.000
PPM
440
EDMC
EC 781004 ROUTINE SHIFT
TELOP
78-380-235
.000
PPM
440
EDMC
EC 781023 ROUTINE SHIFT
TETHOP
78-383-238
.000
PPM
360
EDMC
EC 781031 ROUTINE SHIFT
TETHOP
78-382-237
.000
PPM
430
EDMC
EC 781116 ROUTINE SHIFT
EDCOP
78-432-270
.000
PPM
425
EDMC
EC 781116 ROUTINE SHIFT
TELOP
78-430-268
.000
PPM
425
EDMC
EC 781228 ROUTINE SHIFT
EDCOP
78-467-293
.000
PPM
387
EDMC
EC 781228 ROUTINE SHIFT
EDCOP
78-479-293
.000
PPM
387
SL OI68I5
LAKHlHARLES (254) PLANT B samPI[NG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
EC 781228 ROUTINE SHIFT
JOB TITLE SAMPLE#
TELOP
78-466-292
RESULT .000
UNIT DURATION PPM 387
PAGE
EDMC
EC 781228 ROUTINE SHIFT
TELOP
78-478-292
.000
PPM
387
EDMC
EC 781228 ROUTINE SHIFT
EDMC
EC 781228 ROUTINE SHIFT
TETHOP TETHOP
78-468-294 78-480-294
.000
PPM
375
.000
PPM
375
EDMC
EC 781228 ROUTINE SHIFT
TRAUXO
78-469-295
.000
PPM
375
EDMC
EC 781228 ROUTINE SHIFT
TRAUXO
78-481-295
.000
PPM
375
EDMC
EC 790109 ROUTINE SHIFT
EDCOP
79-018-013
.000
PPM
385
EDMC
EC 790109 ROUTINE SHIFT
TELOP
79-017-012
.000
PPM
385
EDMC
EC 790109 ROUTINE SHIFT
TETHOP
79-019-014
.000
PPM
385
EDMC
EC 790219 ROUTINE SHIFT
EDCOP
79-082-056
.000
PPM
390
EDMC
EC 790219 ROUTINE SHIFT
TELOP
79-080-054
.000
PPM
390
SL 016816
1/19/93
LAK^BhARLES (254) PLANT B SAMPWtJG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
EC 790305 ROUTINE SHIFT
JOB TITLE SAMPLE#
TELOP
79-096-061
RESULT .000
UNIT DURATION PPM 445
PAGE
EDMC
EC 790305 ROUTINE SHIFT
TETHOP
79-098-063
.000
PPM
445
EDMC
EC 790305 ROUTINE SHIFT
TRAUXO
* EDMC
EC
790305
WELDER
ROUTINE WORKDAY-LOGBOOK
MECHANIC'S ROUNDS
EDMC
EC 790309 ROUTINE SHIFT
EDCOP
79-099-064 79-100-065 79-097-062
.000
PPM
445
.000
PPM
445
.000
PPM
445
EDMC
EC
790326
INSTRU
ROUTINE SHIFT AS LOGBOOK
INSTRUMENT MAH
EDMC
EC 790423 ROUTINE SHIFT
EDCOP
79-101-066 79-228-120
.000
PPM
455
.000
PPM
425
EDMC
EC 790423 ROUTINE SHIFT
TELOP
79-227-119
.000
PPM
425
EDMC
EC 790514 ROUTINE SHIFT
VDCOP
79-257-139
.000
PPM
390
EDMC
EC
790518
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAN.
EDMC
EC 790521 ROUTINE SHIFT
VDCOP
79-260-142 79-264-146
.000
PPM
430
.280
PPM
430
SL 016817
1/19/93 I
LAK^MARLES (259> PLANT B SAMWiNG RESULTS THRU 1989
DEPT EDMC
COMPOUND
DATE
EC 790530 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
79-299-161
RESULT .130
UNIT DURATION PPM 909
EDMC
EC
790530
WELDER
ROUTINE WORKDAY AS LOGBOOK
MECHANIC
79-300-162
EDMC
EC 790618 ROUTINE SHIFT
EDCOP
79-318-181
* EDMC
EC
790618
INSTRU
79-321-189
ROUTINE SHIFT WORKING AS LOG
BOOK INSTRUMENT MAN
EDMC
EC 790618 ROUTINE SHIFT
TELOP
79-317-180
.000
PPM
909
.000
PPM
950
.590
PPM
950
.310
PPM
950
EDMC
EC 790618 ROUTINE SHIFT
VDCOP
79-319-182
.390
PPM
950
EDMC
EC
790618
WELDER
79-320-183
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC
EDMC
EC 790619 ROUTINE SHIFT
TE2S0P
79-331-186
.000
PPM
950
.270
PPM
938
EDMC
EC
790705
INSTRU
79-357-203
ROUTINE SHIFT WORKING AS LOG
BOOK INSTRUMENT MAN
EDMC
EC 790705 ROUTINE SHIFT
TELOP
79-359-200
.000
PPM
965
.000
PPM
965
EDMC
EC 790705 ROUTINE SHIFT
VDCOP
79-356-202
.000
PPM
965
PAGE 0l6sia
1
1/19/93
LAK^BhARLES (259) PLANT B SAMWNG RESULTS THRU 1984
PAGE
DEPT EDHC
COMPOUND
DATE
JOB TITLE
EC
790705
WELDER
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC.
SAMPLE# 79-358-204
RESULT .080
UNIT DURATION PPM 465
EDMC
EC 791005
79-480-277
16FT NW OF SUMP/5FT ABOVE GRND
WSW/6MPH/78F/31RH/CLEAR
.450
PPM
322
EDMC
* EDMC
EC 791005
79-481-278
4FT EAST OF SUMP/5FT ABV GRND
WSW/6MPH/78F/31RH/CLEAR
EC 791005
79-482-279
6FT E OF SUMP/6FT ABOVE GRND/
WSW/6MPH/78F/31RH/CLEAR
.560
PPM
319
.110
PPM
309
EDMC
EC 791005
79-483-280
8FT W. OF SUMP/5FT ABOVE GRND
WSW/6MPH/78F/31RH/CLEAR
.200
PPM
309
EDMC
EC 791012
79-512-309
5FT SW OF KETTLE TOP ON RAIL
4FT ABV PLTFRM/S/8MPH/79F/58RH
.110
PPM
199
EDMC
EC 791015 2FT NE OF LIFT SUMP/4FT ABV GRND/NE/6MPH/50F/86RH/CLEAR
79-515-312
.100
PPM
291
EDMC
EC 791015
79-516-313
2FT SW OF SUMP/5FT ABV GRND/
NE WND/6MPH/50F/86RH/CLEAR
.090
PPM
286
EDMC
EC 791015
79-517-314
10FT SW OF SUMP/5FT ABV GRND/
NE WND/6MPH/50F/86RH/CLEAR
.210
PPM
292
EDMC
EC 791015
79-518-315
6FT SE OF SUMP/5FT ABV GRND/
NE WND/6MPH/50F/86RH/CLEAR
.100
PPM
282
EDMC
EC
791023
GEWORK
UNLOADING EDC TAR BUGGY
79-585-361
.450
PPM
8 SL 16819
1/19/93
LAK^HARLES (254) PLANT B SAMHHNG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
JOB TITLE
EC
791023
GEWORK
UNLOADING EDC TAR BUGGY
SAMPLE# 79-586-362
RESULT 12.500
UNIT DURATION PPM 8
EDMC
EC
791101
WELDER
79-627-397
RECHARGING DRYER IN VDC AREA
.100
PPM
15
EDMC
EC 791105 ROUTINE SHIFT
EDCOP
79-635-404
EDMC
EC
791105
INSTRU
79-633-406
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC
EDMC
EC 791105 ROUTINE SHIFT
TELOP
79-634-403
.060
PPM
400
. 080
PPM
400
.060
PPM
400
EDMC
EC 791105 ROUTINE SHIFT
VDCOP
79-636-405
.060
PPM
400
EDMC
EC
791106
EDCOP
79-647-417
CHARGINGi FECL3 CATALYST AT EDC
.500
PPM
15
EDMC
EDC 780503 ROUTINE SHIFT
TELOP
78-154-098
.330
PPM
420
EDMC
EDC 780503 ROUTINE SHIFT
TRAUXO
78-158-099
6.100
PPM
420
EDMC
EDC 780508 ROUTINE SHIFT
TETHOP
78-163-104
.370
PPM
400
EDMC
EDC
780508
TRAUXO
ROUTINE SHIFT-CHARGED HQMME
TANK
78-164-105
5.600
PPM
400
PAGE 016820
1/19/93
LA(BhARLES (254) PLANT B SAMPHNG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
EDC 780516 ROUTINE SHIFT
JOB TITLE SAMPLE#
TRAUXO
78-172-113
RESULT 5.400
UNIT DURATION
PPM
425
EDMC
EDC
780602
TRAUXO
ANALYZING SAMPLES IN LAB
78-206-119
.000
PPM
15
EDMC
t EDMC
EDC
780602
TRAUXO
COLLECTING SAMPLES ON 10AM
SAMPLE RUN
EDC
780602
TRAUXO
ANALYZING SAMPLES IN LAB
78-207-120 78-208-121
7.790
PPM
37.200
PPM
20 15
EDMC
EDC 780622 ROUTINE SHIFT
EDCOP
78-222-135
2.200
PPM
410
EDMC
EDC 780622 ROUTINE SHIFT
TEL OP
78-225-138
.710
PPM
410
EDMC
EDC 780622 ROUTINE SHIFT
TETHOP
78-223-136
.740
PPM
410
EDMC
EDC 780622 ROUTINE SHIFT
TRAUXO
78-224-137
19.600
PPM
410
EDMC
EDC 780628 ROUTINE SHIFT
TRAUXO
78-231-144
8.200
PPM
440
EDMC
EDC 780727 ROUTINE SHIFT
EDCOP
78-282-174
1.170
PPM
408
EDMC
EDC 780727 ROUTINE SHIFT
TELOP
78-281-173
.190
PPM
408
PAGE
l682l
1/19/93
LAK^BHARLES (254) PLANT B SAUCING RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
EDC 780727 ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
78-283-175
RESULT .400
UNIT DURATION PPM 408
EDMC
EDC 780727 ROUTINE SHIFT
TRAUXO
78-284-176
1.360
PPM
408
EDMC
EDC 780911 ROUTINE SHIFT
i EDMC
EDC 780911 ROUTINE SHIFT
EDCOP TELOP
78-341-209 78-340-208
.470
PPM
364
.640
PPM
364
EDMC
EDC 780911 ROUTINE SHIFT
TETHOP
78-342-210
1.850
PPM
364
EDMC
EDC 780911 ROUTINE SHIFT
TRAUXO
78-343-211
4.370
PPM
364
EDMC
EDC
780915
TRAUXO
78-353-221
ROUTINE DAILY SAMPLING ROUND-
EXPERIMENTAL
EDMC
EDC
780918
TRAUXO
78-354-222
ROUTINE DAILY SAMPLING ROUNDS
(EXPERIMENTAL)
EDMC
EDC
780919
TRAUXO
78-355-223
ROUTINE DAILY SAMPLING ROUNDS
(EXPERIMENTAL)
EDMC
EDC 781004 ROUTINE SHIFT
EDCOP
78-381-236
.790
PPM
22
.920
PPM
33
1.250
PPM
41
1.060
PPM
440
EDMC
EDC 781004 ROUTINE SHIFT
TELOP
78-380-235
5.460
PPM
440
PAGE Si.
1/19/93
LAK^^HARLES (259) PLANT b samWtng RESULTS THRU 1989
DEPT EDMC
COMPOUND
DATE
EDC 781023 ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
78-383-238
RESULT .590
UNIT DURATION PPM 380
EDMC
EDC 781031 ROUTINE SHIFT
TETHOP
78-382-237
1.570
PPM
930
EDMC
EDC 781116 ROUTINE SHIFT
* EDMC
EDC 781116 ROUTINE SHIFT
EDCOP TELOP
78-932-270 78-930-268
.720
PPM
925
1.090
PPM
925
EDMC
EDC 781116 ROUTINE SHIFT
TETHOP
78-931-269
.990
PPM
925
EDMC
EDC 781116 ROUTINE SHIFT
TRAUXO
78-933-271
1.860
PPM
425
EDMC
EDC 781228 ROUTINE SHIFT
EDCOP
78-967-293
12.100
PPM
387
EDMC
EDC 781228 ROUTINE SHIFT
EDCOP
78-979-293
12.100
PPM
387
EDMC
EDC 781228 ROUTINE SHIFT
TELOP
78-966-292
.610
PPM
387
EDMC
EDC 781228 ROUTINE SHIFT
TELOP
78-978-292
.610
PPM
387
EDMC
EDC 781228 ROUTINE SHIFT
TETHOP
78-968-299
.900
PPM
375
PAGE
SI- 016823
1/19/93
LAK^HARLES (254) PLANT B SAMWFnG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
EDC 781228 ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
78-480-294
RESULT .400
UNIT DURATION PPM 375
PAGE
EDHC
EDC 781228 ROUTINE SHIFT
TRAUXO
78-469-295
.740
PPM
375
EDMC
EDC 781228 ROUTINE SHIFT
* EDMC
EDC 790109 ROUTINE SHIFT
TRAUXO EDCOP
78-481-295 79-018-013
.740
PPM
375
2.000
PPM
385
EDMC
EDC 790109 ROUTINE SHIFT
TELOP
79-017-012
1.250
PPM
385
EDMC
EDC 790109 ROUTINE SHIFT
TETHOP
79-019-014
1.050
PPM
385
EDMC
EDC
790109
TRAUXO
ROUTINE SHIFT-CLOSED LOOP
SAMPLERSi DOWN/USED BOTTLES
EDMC
EDC 790122 ROUTINE SHIFT
TRAUXO
79-020-015 79-034-029
1.590
PPM
385
7.280
PPM
393
EDMC
EDC 790219 ROUTINE SHIFT
EDCOP
79-082-056
.500
PPM
390
EDMC
EDC 790219 ROUTINE SHIFT
TELOP
79-080-054
EDMC
EDC 790219 ROUTINE SHIFT
TETHOP
79-081-055
1.850
PPM
390
2.250
PPM
390
SL 016824
1/19/93
LAKIhARLES (254) PLANT B SAMmTNG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
EDC 790219 ROUTINE SHIFT
JOB TITLE SAMPLE#
TRAUXO
79-083-057
RESULT 3.570
UNIT DURATION PPM 390
PAGE
EDMC
EDC 790305 ROUTINE SHIFT
TELOP
79-096-061
.350
PPM
445
EDMC
EDC 790305 ROUTINE SHIFT
* EDMC
EDC 790305 ROUTINE SHIFT
TETHOP TRAUXO
79-096-063 79-099-064
8.900
PPM
445
9.300
PPM
445
EDMC
EDC
790305
WELDER
ROUTINE WORKDAY-LOGBOOK
MECHANIC'S ROUNDS
EDMC
EDC 790309 ROUTINE SHIFT
EDCOP
79-100-065 79-097-062
1.200
PPM
445
.000
PPM
445
EDMC
EDC
790326
INSTRU
ROUTINE SHIFT AS LOGBOOK
INSTRUMENT MAH
EDMC
EDC 790423 ROUTINE SHIFT
EDCOP
79-101-066 79-228-120
.790
PPM
455
.130
PPM
425
EDMC
EDC 790423 ROUTINE SHIFT
TELOP
79-227-119
.460
PPM
425
EDMC
EDC 790430 ROUTINE SHIFT
VDCOP
79-232-121
.200
PPM
365
EDMC
EDC 790514 ROUTINE SHIFT
TELOP
79-256-138
11.000
PPM
390
SL 016825
1/19/93
LAkAHARLES (254) PLANT B SAhWhG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
EDC 790514 ROUTINE SHIFT
JOB TITLE SAMPLE#
VDCOP
79-257-139
RESULT .300
UNIT DURATION
PPM
390
EDMC
EDC
790518
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAN.
EDMC
* EDMC
EDC 790521 ROUTINE SHIFT
EDC 790530 ROUTINE SHIFT
VDCOP EDCOP
79-260-142 79-264-146 79-299-161
.770
PPM
430
.760
PPM
430
1.930
PPM
404
EDMC
EDC
790530
WELDER
ROUTINE WORKDAY AS LOGBOOK
MECHANIC
EDMC
EDC 790618 ROUTINE SHIFT
EDCOP
79-300-162 79-318-181
3.870
PPM
404
4.160
PPM
450
EDMC
EDC
790618
INSTRU
79-321-184
ROUTINE SHIFT WORKING AS LOG
BOOK INSTRUMENT MAN
EDMC
EDC 790618 ROUTINE SHIFT
TELOP
79-317-180
.760
PPM
450
.830
PPM
450
EDMC
EDC 790618 ROUTINE SHIFT
VDCOP
79-319-182
3.960
PPM
450
EDMC
EDC
790618
WELDER
79-320-183
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC
EDMC
EDC 790619 ROUTINE SHIFT
TE2S0P
79-331-186
.640
PPM
450
.590
PPM
438
PAGE
1/19/93
LAHj^KARLES (259) PLANT B SAHmiJG RESULTS THRU 1989
DEPT EDMC
COMPOUND
DATE
EDC 790705 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
79-355-201
RESULT 9.230
UNIT DURATION PPM 965
PAGE
EDMC
EDC
790705
INSTRU
79-357-203
ROUTINE SHIFT WORKING AS LOG
BOOK INSTRUMENT MAH
EDMC EDC
790705
ROUTINE SHIFT
TELOP
79-359-200
* EDMC
EDC 790705 ROUTINE SHIFT
VDCOP
79-356-202
1.500
PPM
965
2.190
PPM
965
9.090
PPM
965
EDMC
EDC
790705
WELDER
79-358-209
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC.
EDMC
EDC 791005
79-980-277
16FT NW OF SUMP/5FT ABOVE GRND
WSW/6MPH/78F/31RH/CLEAR
EDMC
EDC 791005
79-981-278
9FT BAST OF SUMP/5FT ABV GRND
WSW/6MPH/78F/31RH/CLEAR
EDMC
EDC 791005
79-982-279
6FT E OF SUMP/6FT ABOVE GRND/
WSW/6MPH/78F/31RH/CLEAR
EDMC
EDC 791005
79-983-280
8FT W. OF SUMP/5FT ABOVE GRND
WSW/6MPH/78F/31RH/CLEAR
EDMC
EDC 791012
79-511-308
6FT NE OF KETTLE TOP ON RAIL
9FT ABV PLTFRM/S/8MPH/79F/58RH
EDMC
EDC 791012
79-512-309
5FT SW OF KETTLE TOP ON RAIL
9FT ABV PLTFRM/S/8MPH/79F/58RH
2.120
PPM
965
.160
PPM
322
.210
PPM
319
.090
PPM
309
.850
PPM
309
.050
PPM
203
1.990
PPM
199
SL 016827
1/19/93
LAKlHARLES (254) PLANT B SAmWIhG RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
EDMC
EDC 791015 2FT HE OF LIFT SUMP/4FT ABV
GRHD/NE/6MPH/50F/86RH/CLEAR
79-515-312
RESULT .460
UNIT DURATION
PPM
291
EDMC
EDC 791015
79-516-313
2FT SW OF SUMP/5FT ABV GRMD/
NE WND/6MPH/50F/86RH/CLEAR
.360
PPM
286
EDMC
EDC 791015
79-517-314
10FT SW OF SUMP/5FT ABV GRMD/
NE WND/6MPH/50F/86RH/CLEAR
.210
PPM
292
EDMC
EDC 791015
79-518-315
6FT SE OF SUMP/5FT ABV GRND/
NE WND/6MPH/50F/86RH/CLEAR
.060
PPM
282
EDMC
EDC
791023
EDCOP
79-581-357
SAMPLING ROUNDS/DRAINING NO. 2
EDC HEAVY STLL/O-TOLIDINE TEST
.500
PPM
15
EDMC
EDC
791023
EDCOP
79-582-358
SAMPLING ROUNDS/DRAINING HO. 2
EDC HEAVY STLL/O-TOLIDINE TEST
.500
PPM
15
EDMC
EDC
791023
GEWORK
UNLOADING EDC TAR BUGGY
79-585-361
.500
PPM
8
I
PAGE
EDMC
EDC
791023
GEWORK
UNLOADING EDC TAR BUGGY
79-586-362
.560
PPM
8
EDMC
EDC
791101
WELDER
79-627-397
RECHARGING DRYER IN VDC AREA
.100
PPM
15
EDMC EDC
791105
ROUTINE SHIFT
EDCOP
79-635-404
EDMC
EDC
791105
INSTRU
79-633-406
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC
1.290
PPM
400
.830 PPM
400
SL 016828
1/19/93
LAK^WARLES (2591 PLANT B SAMWWNG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
EDC 791105 ROUTINE SHIFT
JOB TITLE SAMPLE#
TELOP
79-634-403
RESULT 1.340
UNIT DURATION PPM 400
PAGE
EDMC
EDC 791105 ROUTINE SHIFT
VDCOP
79-636-405
1.310
PPM
400
EDMC
EDC
791106
EDCOP
79-647-417
CHARGING FECL3 CATALYST AT EDC
* EDMC
EDC
791106
EDCOP
79-648-418
CHARGING FECL3 CATALYST AT EDC
27.400
PPM
4.600
PPM
15 15
EDMC MC
780503
ROUTINE SHIFT
EDMC
MC 780503 ROUTINE SHIFT
TELOP TRAUXO
78-154-098
.
78-158-099
1.900
PPM
420
5.100
PPM
420
EDMC MC
780508
ROUTINE SHIFT
TETHOP
78-163-104
1.400
PPM
400
EDMC
MC
780508
TRAUXO
ROUTINE SHIFT-CHARGED HOMME
TANK
78-164-105
EDMC MC
780516
ROUTINE SHIFT
TRAUXO
78-172-113
4.000
PPM
400
9.700
PPM
425
EDMC
MC
780602
TRAUXO
ANALYZING SAMPLES IN LAB
78-206-119
8.160
PPM
15
EDMC
MC
780602
TRAUXO
COLLECTING SAMPLES ON 10AM
SAMPLE RUN
78-207-120
7.700
PPM
20
SL 016829
1/19/93
LAK^^HARLES (259) PLANT B SAMWFhG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
JOB TITLE
MC
780602
TRAUXO
ANALYZING SAMPLES IN LAB
SAMPLE# 78-208-121
RESULT .000
UNIT DURATION
PPM
15
PAGE
EDMC MC
780622
ROUTINE SHIFT
EDCOP
78-222-135
3.200
PPM
410
EDMC
MC 780622 ROUTINE SHIFT
* EDMC
MC 780622 ROUTINE SHIFT
TELOP TETHOP
78-225-138 78-223-136
1.800
PPM
410
5.200
PPM
410
EDMC MC
780622
ROUTINE SHIFT
TRAUXO
78-224-137
4.000
PPM
410
EDMC
MC 780628 ROUTINE SHIFT
TRAUXO
78-231-144
8.500
PPM
440
EDMC MC
780727
ROUTINE SHIFT
EDCOP
78-282-174
5.520
PPM
408
EDMC
MC 780727 ROUTINE SHIFT
TELOP
78-281-173
3.820
PPM
408
EDMC MC
780727
ROUTINE SHIFT
TETHOP
78-283-175
5.910
PPM
408
EDMC
MC 780727 ROUTINE SHIFT
TRAUXO
78-284-176
8.860
PPM
408
EDMC MC
780911
ROUTINE SHIFT
EDCOP
78-341-209
1.040
PPM
364
SL 016830
1/19/93
LAMARLES (254) PLANT B SAMWThG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
MC 780911 ROUTINE SHIFT
JOB TITLE SAMPLE#
TELOP
78-340-208
RESULT 2.300
UNIT DURATION PPM 364
PAGE
EDMC MC
780911
ROUTINE SHIFT
TETHOP
78-342-210
2.990
PPM
364
EDMC
MC 780911 ROUTINE SHIFT
TRAUXO
78-343-211
3.140
PPM
364
EDMC
MC
780915
TRAUXO
78-353-221
ROUTINE DAILY SAMPLING ROUND-
EXPERIMENTAL
EDMC
MC
780918
TRAUXO
78-354-222
ROUTINE DAILY SAMPLING ROUNDS
(EXPERIMENTAL)
EDMC
MC
780919
TRAUXO
78-355-223
ROUTINE DAILY SAMPLING ROUNDS
(EXPERIMENTAL)
EDMC
MC 781004 ROUTINE SHIFT
EDCOP
78-381-236
16.600
PPM
22
22.400
PPM
33
42.500
PPM
41
1.120
PPM
440
EDMC
MC 781004 ROUTINE SHIFT
TELOP
78-380-235
. 760
PPM
440
EDMC
MC 781023 ROUTINE SHIFT
TETHOP
78-383-238
3.830
PPM
380
EDMC
MC 781031 ROUTINE SHIFT
TETHOP
78-382-237
2.320
PPM
430
EDMC MC
781116
ROUTINE SHIFT
EDCOP
78-432-270
17.100
PPM
425
SL Q16831
1/19/93
LAMMARLES (254) PLANT B SAM^HNG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
MC 781116 ROUTINE SHIFT
JOB TITLE SAMPLE#
TELOP
78-430-268
RESULT 80.100
UNIT DURATION
PPM
425
PAGE
EDMC
MC 781116 ROUTINE SHIFT
TETHOP
78-431-269
444.000
PPM
425
EDMC
MC 781116 ROUTINE SHIFT
TRAUXO
78-433-271
100.000
PPM
425
EDMC
MC 781228 ROUTINE SHIFT
EDCOP
78-467-293
.480
PPM
387
EDMC
MC 781228 ROUTINE SHIFT
EDCOP
78-479-293
.480
PPM
387
EDMC
MC 781228 ROUTINE SHIFT
TELOP
78-466-292
1.150
PPM
387
EDMC
MC 781228 ROUTINE SHIFT
TELOP
78-478-292
1.150
PPM
387
EDMC
MC 781228 ROUTINE SHIFT
TETHOP
78-468-294
2.540
PPM
375
EDMC
MC 781228 ROUTINE SHIFT
TETHOP
78-480-294
2.540
PPM
375
EDMC
MC 781228 ROUTINE SHIFT
TRAUXO
78-469-295
1.320
PPM
375
EDMC
MC 781228 ROUTINE SHIFT
TRAUXO
78-481-295
1.320
PPM
375
SL 016832
1/19/93
LAK^PHARLES (254) PLANT B SAMPTING RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
MC 790109 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
79-018-013
RESULT .480
UNIT DURATION PPM 385
PAGE
EDMC
MC 790109 ROUTINE SHIFT
TELOP
79-017-012
3.640
PPM
385
EDMC
MC 790109 ROUTINE SHIFT
TETHOP
79-019-014
54.200
PPM
385
EDMC
MC
790109
TRAUXO
ROUTINE SHIFT-CLOSED LOOP
SAMPLERS DOWN/USED BOTTLES
EDMC
MC 790122 ROUTINE SHIFT
TRAUXO
79-020-015 79-034-029
2.990
PPM
385
3.940
PPM
393
EDMC
MC 790219 ROUTINE SHIFT
EDCOP
79-082-056
.120
PPM
390
EDMC
MC 790219 ROUTMJE SHIFT
TELOP
79-080-054
5.760
PPM
390
EDMC
MC 790219 ROUTINE SHIFT
TETHOP
79-081-055
5.120
PPM
390
EDMC
MC 790219 ROUTINE SHIFT
TRAUXO
79-083-057
3.810
PPM
390
EDMC
MC 790305 ROUTINE SHIFT
TELOP
79-096-061
1.500
PPM
445
EDMC
MC 790305 ROUTINE SHIFT
TETHOP
79-098-063
1.200
PPM
445
SL 016833
1/19/93
LAK^HhARLES (254) PLANT B SAHFflHG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
MC 790305 ROUTINE SHIFT
JOB TITLE SAMPLE#
TRAUXO
79-099-064
RESULT .280
UNIT DURATION PPM 445
PAGE
EDMC
MC
790305
WELDER
ROUTINE WORKDAY-LOGBOOK
MECHANIC'S ROUNDS
EDMC
MC 790309 ROUTINE SHIFT
EDCOP
i EDMC
MC
790326
INSTRU
ROUTINE SHIFT AS LOGBOOK
INSTRUMENT MAN
EDMC
MC 790423 ROUTINE SHIFT
EDCOP
79-100-065 79-097-062 79-101-066 79-228-120
1.300
PPM
445
.230
PPM
445
2.400
PPM
455
2.720
PPM
425
EDMC
MC 790423 ROUTINE SHIFT
TELOP
79-227-119
I .110
PPM
425
EDMC
MC 790430 ROUTTNE SHIFT
VDCOP
79-232-121
.000
PPM
365
EDMC
MC 790514 ROUTINE SHIFT
TELOP
79-256-138
.250
PPM
390
EDMC
MC 790514 ROUTINE SHIFT
VDCOP
79-257-139
.080
PPM
390
EDMC
MC
790518
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAN.
EDMC
MC 790521 ROUTINE SHIFT
VDCOP
79-260-142 79-264-146
.790
PPM
430
.200
PPM
430
SL 016834
1/19/93
LAK^BhARLES (259) PLANT B SAIlWlHG RESULTS THRU 1989
DEPT EDMC
COMPOUND
DATE
MC 790530 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
79-299-161
RESULT .140
UNIT DURATION PPM 404
PAGE
EDMC
MC
790530
WELDER
ROUTINE WORKDAY AS LOGBOOK
MECHANIC
79-300-162
EDMC
MC 790618 ROUTINE SHIFT
EDCOP
79-318-181
* EDMC
MC
790618
INSTRU
79-321-189
ROUTINE SHIFT WORKING AS LOG
BOOK INSTRUMENT MAN
EDMC
MC 790618 ROUTINE SHIFT
TELOP
79-317-180
.860
PPM
404
.360
PPM
450
.360
PPM
450
.360
PPM
450
EDMC
MC 790618 ROUTINE SHIFT
VDCOP
79-319-182
.330
PPM
450
EDMC
MC
790618
WELDER
79-320-183
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC
EDMC
MC 790619 ROUTINE SHIFT
TE2S0P
79-331-186
.270
PPM
450
.110
PPM
438
EDMC MC
790705
ROUTINE SHIFT
EDCOP
79-355-201
.080
PPM
465
EDMC
MC
790705
INSTRU
79-357-203
ROUTINE SHIFT WORKING AS LOG
BOOK INSTRUMENT MAN
EDMC
MC 790705 ROUTINE SHIFT
TELOP
79-359-200
.130
PPM
465
. 120
PPM
465
SL 016835
LA ARLES (254) PLANT B SAMmMnNiG RESULTS THRU 1984
DEPT COMPOUND
DATE
EDMC MC
790705
ROUTINE SHIFT
JOB TITLE SAMPLE#
VDCOP
79-356-202
RESULT .160
UNIT PPM
DURATION 465
EDMC
MC
790705
WELDER
79-358-204
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC.
EDMC
MC 791005
79-480-277
16FT NW OF SUMP/5FT ABOVE GRND
WSW/6MPH/78F/31RH/CLEAR
EDMC
MC 791005
79-481-278
4FT EAST OF SUMP/5FT ABV GRND
WSW/6MPH/78F/31RH/CLEAR
EDMC
MC 791005
79-482-279
6FT E OF SUMP/6FT ABOVE GRND/
WSW/6MPH/78F/31RH/CLEAR
EDMC
MC 791005
79-483-280
8FT W. OF SUMP/5FT ABOVE GRND
WSW/6MPH/78F/31RH/CLEAR
EDMC
MC 791012
79-512-309
5FT SW OF KETTLE TOP ON RAIL
4FT ABV PLTFRM/S/8MPH/79F/58RH
EDMC
MC 791015 2FT HE OF LIFT SUMP/4FT ABV
GRND/NE/6MPH/50F/86RH/CLEAR
79-515-312
EDMC
MC 791015
79-516-313
2FT SW OF SUMP/5FT ABV GRND/
NE WND/6MPH/5OF/86RH/CLEAR
EDMC
MC 791015
79-517-314
1 OFT SW OF SUMP/5FT ABV GRND/
NE WND/6MPH/50F/86RH/CLEAR
EDMC
MC 791015
79-518-315
6FT SE OF SUMP/5FT ABV GRND/
NE WND/6MPH/50F/86RH/CLEAR
.110
PPM
465
.180
PPM
322
.470
PPM
319
.380
PPM
309
.340
PPM
309
.080
PPM
199
.050
PPM
291
.050
PPM
286
.230
PPM
292
.120
PPM
282
1/19/93
LAK^BHARLES f 254 ) PLANT B SAMFTiNG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
MC 791105 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
79-635-404
RESULT 2.050
UNIT DURATION PPM 400
PAGE
EDMC
MC
791105
INSTRU
79-633-406
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC
EDMC
MC 791105 ROUTINE SHIFT
TELOP
79-634-403
* EDMC
MC 791105 ROUTINE SHIFT
VDCOP
79-636-405
1.970
PPM
400
2.590
PPM
400
2.520
PPM
400
EDMC
PER 780503 ROUTINE SHIFT
TELOP
78-154-098
.000
PPM
420
EDMC
PER 780508 ROUTINE SHIFT
TETHOP
78-163-104
.470
PPM
400
EDMC
PER
780508
TRAUXO
ROUTINE SHIFT-CHARGED HQMME
TANK
78-164-105
EDMC
PER 780516 ROUTINE SHIFT
TRAUXO
78-172-113
.100
PPM
400
.000
PPM
425
EDMC
PER 78Q622 ROUTINE SHIFT
EDCOP
78-222-135
.000
PPM
410
EDMC
PER 780622 ROUTINE SHIFT
TELOP
78-225-138
.000
PPM
410
EDMC
PER 780622 ROUTINE SHIFT
TETHOP
78-223-136
.000
PPM
410
SL 016837
1/19/93
LAK^HARLES (259) PLANT b samWng RESULTS THRU 1989
DEPT EDMC
COMPOUND
DATE
PER 780622 ROUTINE SHIFT
JOB TITLE SAMPLE#
TRAUXO
78-229-137
RESULT .000
UNIT DURATION PPM 910
i
PAGE
EDMC
PER 780628 ROUTINE SHIFT
TRAUXO
78-231-199
.000
PPM
990
EDMC
PER 780727 ROUTINE SHIFT
* EDMC
PER 780727 ROUTINE SHIFT
EDCOP TELOP
78-282-179 78-281-173
.110
PPM
908
.060
PPM
908
EDMC
PER 780727 ROUTINE SHIFT
TETHOP
78-283-175
.190
PPM
908
EDMC
PER 700727 ROUTINE SHIFT
TRAUXO
78-289-176
.070
PPM
908
EDMC
PER 780911 R0UT5NE SHIFT
EDCOP
78-391-209
.210
PPM
369
EDMC
PER 780911 ROUTINE SHIFT
TELOP
78-390-208
. 380
PPM
369
EDMC
PER 780911 ROUTINE SHIFT
TETHOP
78-392-210
.600
PPM
369
EDMC
PER 780911 ROUTINE SHIFT
TRAUXO
78-393-211
EDMC
PER
780915
TRAUXO
78-353-221
ROUTINE DAILY SAMPLING ROUND-
EXPERIMENTAL
.920
PPM
369
.980
PPM
22
SL 016838
1/19/93
LAkB^ARLES (254) PLANT B SAMFONG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
JOB TITLE SAMPLE#
PER
780918
TRAUXO
78-354-222
ROUTINE DAILY SAMPLING ROUNDS
(EXPERIMENTAL)
RESULT .270
UNIT DURATION PPM 33
EDMC
PER 781004 ROUTINE SHIFT
EDCOP
78-381-236
.060
PPM
440
EDMC
PER 781004 ROUTINE SHIFT
i EDMC
PER 781023 ROUTINE SHIFT
TELOP TETHOP
78-380-235 78-383-238
.000
PPM
440
.290
PPM
380
EDMC
PER 781031 ROUTINE SHIFT
TETHOP
78-382-237
.160
PPM
430
EDMC
PER 781116 ROUTINE SHIFT
EDCOP
78-432-270
1.440
PPM
425
EDMC
PER 781116 ROUTINE SHIFT
TELOP
78-430-268
5.360
PPM
425
EDMC
PER 781116 ROUTINE SHIFT
TETHOP
78-431-269
25.100
PPM
425
EDMC
PER 781116 ROUTINE SHIFT
TRAUXO
78-433-271
7.340
PPM
425
EDMC
PER 781228 ROUTINE SHIFT
EDCOP
78-467-293
.000
PPM
387
EDMC
PER 781228 ROUTINE SHIFT
EDCOP
78-479-293
.000
PPM
387
I PAGE
SL 016839
1/19/93
LAKIMhARLES (259) PLANT B SAMTONG RESULTS THRU 1989
DEPT EDMC
COMPOUND
DATE
PER 781228 ROUTINE SHIFT
JOB TITLE SAMPLE#
TELOP
78-966-292
RESULT .510
UNIT DURATION PPM 387
EDMC
PER 781228 ROUTINE SHIFT
TELOP
78-978-292
.510
PPM
387
EDMC
PER 781228 ROUTINE SHIFT
i EDMC
PER 781228 ROUTINE SHIFT
TETHOP TETHOP
78-968-299 78-980-299
.080
PPM
375
.080
PPM
375
EDMC
PER 781228 ROUTINE SHIFT
TRAUXO
78-969-295
.000
PPM
375
EDMC
PER 781228 ROUTINE SHIFT
TRAUXO
78-981-295
.000
PPM
375
EDMC
PER 790109 ROUTINE SHIFT
EDCOP
79-018-013
.000
PPM
385
EDMC
PER 790109 ROUTINE SHIFT
TELOP
79-017-012
.000
PPM
385
EDMC
PER 790109 ROUTINE SHIFT
TETHOP
79-019-019
.000
PPM
385
EDMC
PER
790109
TRAUXO
ROUTINE SHIFT-CLOSED LOOP
SAMPLERS DOWN/USED BOTTLES
EDMC
PER 790122 ROUTINE SHIFT
TRAUXO
79-020-015 79-039-029
.000
PPM
385
1.570
PPM
393
PAGE 0l68A0
1/19/93
LAK^VHARLES (254) PLANT B SAMPLING RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
PER 790219 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
79-082-056
RESULT .000
UNIT DURATION PPM 390
EDMC
PER 790219 ROUTINE SHIFT
TELOP
79-080-054
.050
PPM
390
EDMC
PER 790219 ROUTINE SHIFT
EDMC
PER 790219 ROUTINE SHIFT
TETHOP TRAUXO
79-081-055 79-083-057
.000
PPM
390
.000
PPM
390
EDMC
PER 790305 ROUTINE SHIFT
TELOP
79-096-061
.000
PPM
445
EDMC
PER 790305 ROUTINE SHIFT
TETHOP
79-098-063
.000
PPM
445
EDMC
PER 790305 ROUTINE SHIFT
TRAUXO
79-099-064
.000
PPM
445
EDMC
PER
790305
WELDER
ROUTINE WORKDAY-LOGBOOK
MECHANIC:rs ROUNDS
EDMC
PER 790309 ROUTINE SHIFT
EDCOP
79-100-065 79-097-062
.000
PPM
445
. 000
PPM
445
EDMC
PER
790326
INSTRU
ROUTINE SHIFT AS LOGBOOK
INSTRUMENT MAN
EDMC
PER 790423 ROUTINE SHIFT
EDCOP
79-101-066 79-228-120
.160
PPM
455
.000
PPM
425
PAGE
SL 016841
1/19/93
LAK^^HARLES (254) PLANT B SAWING RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
PER 790423 ROUTINE SHIFT
JOB TITLE SAMPLE#
TELOP
79-227-119
RESULT .000
UNIT DURATION
PPM
425
PAGE
EDMC
PER 790430 ROUTINE SHIFT
VDCQP
79-232-121
.000
PPM
365
EDMC
PER 790514 ROUTINE SHIFT
TELOP
79-256-138
.190
PPM
390
EDMC PER
790514
ROUTINE SHIFT
VDCOP
79-257-139
.000
PPM
390
EDMC
PER
790518
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAN.
EDMC
PER 790521 ROUTINE SHIFT
VDCOP
79-260-142 79-264-146
.210
PPM
430
.120
PPM
430
EDMC
PER 790530 ROUTINE SHIFT
EDCOP
79-299-161
.200
PPM
404
EDMC
PER
790530
WELDER
ROUTINE WORKDAY AS LOGBOOK
MECHANIC
EDMC
PER 790618 ROUTINE SHIFT
EDCOP
79-300-162 79-318-181
.200
PPM
404
.250
PPM
450
EDMC
PER
790618
INSTRU
79-321-184
ROUTINE SHIFT WORKING AS LOG
BOOK INSTRUMENT MAN
EDMC
PER 790618 ROUTINE SHIFT
TELOP
79-317-180
.200
PPM
450
SL 016842
.020
PPM
450
1/19/93
LAMMARLES (259) PLANT B SAMmNG RESULTS THRU 1989
DEPT EDMC
COMPOUND
DATE
PER 790618 ROUTINE SHIFT
JOB TITLE SAMPLE#
VDCOP
79-319-182
RESULT .220
UNIT DURATION PPM 950
EDMC
PER
790618
WELDER
79-320-183
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC
EDMC
PER 790619 ROUTINE SHIFT
TE2S0P
79-331-186
.160
PPM
450
.050
PPM
438
EDMC
PER 790705 ROUTINE SHIFT
EDCOP
79-355-201
.060
PPM
465
EDMC
PER
790705
INSTRU
79-357-203
ROUTINE SHIFT WORKING AS LOG
BOOK INSTRUMENT MAN
EDMC
PER 790705 ROUTINE SHIFT
TELOP
79-359-200
.000
PPM
465
.070
PPM
465
EDMC
PER 790705 ROUTINE SHIFT
VDCOP
79-356-202
.120
PPM
465
EDMC
PER
790705
WELDER
79-358-209
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC.
EDMC
PER 791005
79-980-277
16FT HW OF SUMP/5FT ABOVE GRND
WSW/6MPH/78F/31RH/CLEAR
EDMC
PER 791005
79-981-278
AFT EAST OF SUMP/5FT ABV GRND
WSW/6MPH/78F/31RH/CLEAR
EDMC
PER 791005
79-982-279
6FT E OF SUMP/6FT ABOVE GRND/
WSW/6MPH/78F/31RH/CLEAR
.000
PPM
465
.050
PPM
322
.050
PPM
319
.230
PPM
309
PAGE
016843
1/19/93
LAI ARLES (254)
PLANT B SAMmIWtnNG RESULTS THRU 1984
PAGE
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
EDMC
PER 791005
79-483-280
8FT W. OF SUMP/5FT ABOVE GRMD
WSW/6MPH/78F/31RH/CLEAR
RESULT .190
UNIT DURATION
PPM
309
EDMC
PER 791012
79-511-308
6FT NE OF KETTLE TOP ON RAIL
4FT ABV PLTFRM/S/8MPH/79F/58RH
.050
PPM
203
EDMC
PER 791012
79-512-309
5FT SW OF KETTLE TOP ON RAIL
4FT ABV PLTFRM/S/8MPH/79F/58RH
.400
PPM
199
EDMC
PER 791015 2FT NE OF LIFT SUMP/4FT ABV
GRND/NE/6MPH/50F/86RH/CLEAR
79-515-312
.060
PPM
291
EDMC
PER 791015
79-516-313
2FT SW OF SUMP/5FT ABV GRND/
NE WND/6MPH/50F/86RH/CLEAR
.090
PPM
286
EDMC
PER 791015
79-517-314
1 OFT SW OF SUMP/5FT ABV GRND/
NE WND/6MPH/50F/86RH/CLEAR
.160
PPM
292
EDMC
PER 791015
79-518-315
6FT SE OF SUMP/5FT ABV GRND/
NE WND/6MPH/50F/86RH/CLEAR
.070
PPM
282
EDMC
PER
791023
EDCOP
79-581-357
SAMPLING ROUNDS/DRAINING NO. 2
EDC HEAVY STLL/O-TOLIDINE TEST
.500
PPM
15
EDMC
PER
791023
EDCOP
79-582-358
SAMPLING ROUNDS/DRAINING NO. 2
EDC HEAVY STLL/O-TOLIDINE TEST
.500
PPM
15
EDMC
PER
791023
GEWORK
UNLOADING EDC TAR BUGGY
79-585-361
.500
PPM
8 SL 016844
EDMC
PER
791023
GEWORK
UNLOADING EDC TAR BUGGY
79-586-362
.500
PPM
a
1/19/93
LAKl^BHARLES (254) PLANT B SAMPTING RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
JOB TITLE
PER
791101
MACHIN
RECHARGING DRYER IN VDC AREA
SAMPLE# 79-626-396
RESULT .100
UNIT DURATION PPM 15
PAGE
EDMC
PER
791101
WELDER
79-627-397
RECHARGING DRYER IN VDC AREA
. 100
PPM
15
EDMC
PER 791105 ROUTINE SHIFT
EDCOP
79-635-404
* EDMC
PER
791105
INSTRU
79-633-406
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC
EDMC
PER 791105 ROUTINE SHIFT
TELOP
79-634-403
.090
PPM
400
.090
PPM
400
.130
PPM
400
EDMC
PER 791105 ROUTINE SHIFT
VDCOP
79-636-405
.090
PPM
400
EDMC
PER
791106
EDCOP
79-647-417
CHARGING! FECL3 CATALYST AT EDC
.100
PPM
15
EDMC
PER
791106
EDCOP
79-648-418
CHARGING! FECL3 CATALYST AT EDC
. 100
PPM
15
EDMC
SYM 780516 ROUTINE SHIFT
TRAUXO
78-172-113
.000
PPM
425
EDMC
SYM 780622 ROUTINE SHIFT
EDCOP
78-222-135
.230
PPM
410
EDMC
SYM 780622 ROUTINE SHIFT
TELOP
78-225-138
. 160
PPM
410
SL 016845
LAI^WARLES (254) PLANT B SAMmHG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
SYM 780622 ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
78-223-136
RESULT .150
UNIT DURATION PPM 410
EDMC
SYM 780622 ROUTINE SHIFT
TRAUXO
78-224-137
.150
PPM
410
EDMC
SYM 780628 ROUTINE SHIFT
TRAUXO
78-231-144
.040
PPM
440
EDMC
SYM 780727 ROUTINE SHIFT
EDCOP
78-282-174
.000
PPM
408
EDMC
SYM 780727 ROUTINE SHIFT
TELOP
78-281-173
.000
PPM
408
EDMC
SYM 780727 ROUTINE SHIFT
TETHOP
78-283-175
.000
PPM
408
EDMC
SYM 780727 ROUTINE SHIFT
TRAUXO
78-284-176
.000
PPM
408
EDMC
SYM 780911 ROUTINE SHIFT
TELOP
78-340-208
.000
PPM
364
EDMC
SYM 780911 ROUTINE SHIFT
TETHOP
78-342-210
.000
PPM
364
EDMC
SYM 780911 ROUTINE SHIFT
TRAUXO
78-343-211
.110
PPM
364
EDMC
SYM 781004 ROUTINE SHIFT
EDCOP
78-381-236
.330
PPM
440
1/19/93
LAKHHARLES (254) PLANT B SAMPLING RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
SYM 781004 ROUTINE SHIFT
JOB TITLE SAMPLE#
TELOP
78-380-235
RESULT .230
UNIT DURATION PPM 440
PAGE
EDMC
SYM 781023 ROUTINE SHIFT
TETHOP
78-383-238
.450
PPM
380
EDMC
SYM 781116 ROUTINE SHIFT
EDCOP
78-432-270
.670
PPM
425
EDMC
SYM 781116 ROUTINE SHIFT
TELOP
78-430-260
1.000
PPM
425
EDMC
SYM 781116 ROUTINE SHIFT
TETHOP
78-431-269
3.090
PPM
425
EDMC
SYM
781116
ROUTINE SHIFT
TRAUXO
78-433-271
.580
PPM
425
EDMC
SYM 781228 ROUTINE SHIFT
EDCOP
78-467-293
.000
PPM
387
EDMC
SYM 781228 ROUTINE SHIFT
EDCOP
78-479-293
.000
PPM
387
EDMC
SYM 781228 ROUTINE SHIFT
TELOP
78-466-292
.720
PPM
387
EDMC
SYM 781228 ROUTINE SHIFT
TELOP
78-478-292
.720
PPM
387
EDMC
SYM
781228
ROUTINE SHIFT
TETHOP
78-468-294
.000
PPM
375
SL 016847
LAK^PHARLES (254) PLANT B SAMPLING RESULTS THRU 1984
DEPT COMPOUND
DATE
EDMC
SYM 781228 ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
78-480-294
RESULT .000
UNIT DURATION PPM 375
EDMC
SYM 781228 ROUTINE SHIFT
TRAUXO
78-469-295
1.100
PPM
375
EDMC
SYM 781228 ROUTINE SHIFT
TRAUXO
78-481-295
1.100
PPM
375
EDMC
SYM 790122 ROUTINE SHIFT
TRAUXO
79-034-029
4.180
PPM
393
EDMC
SYM 790219 ROUTINE SHIFT
TETHOP
79-081-055
1.340
PPM
390
EDMC
SYM 790219 ROUTINE SHIFT
TRAUXO
79-083-057
.000
PPM
390
EDMC
SYM 790514 ROUTINE SHIFT
TELOP
79-256-138
.920
PPM
390
EDMC
SYM 790514 ROUTINE SHIFT
VDCOP
79-257-139
.000
PPM
390
EDMC
SYM 790618 ROUTINE SHIFT
EDCOP
79-318-181
.000
PPM
450
EDMC
SYM 790618 ROUTINE SHIFT
VDCOP
79-319-182
.000
PPM
450
EDMC
SYM 790705 ROUTINE SHIFT
VDCOP
79-356-202
. 060
PPM
465
1/19/93
LAK^HARLES (254) PLANT B SAMPONG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
SYM 791105 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
79-635-404
RESULT .050
UNIT DURATION
PPM
400
PAGE
EDMC
SYM
791105
INSTRU
79-633-406
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC
EDMC
SYM 791105 ROUTINE SHIFT
TELOP
79-634-403
.050
PPM
400
.050
PPM
400
EDMC
SYM
791105
ROUTINE SHIFT
VDCOP
79-636-405
.050
PPM
400
EDMC
TCE 780503 ROUTINE SHIFT
TELOP
78-154-098
.600
PPM
420
EDMC
TCE 780503 ROUTINE SHIFT
TRAUXO
78-158-099
.610
PPM
420
EDMC
TCE 780508 ROUTINE SHIFT
TETHOP
78-163-104
.100
PPM
400
EDMC
TCE
780508
TRAUXO
ROUTINE SHIFT-CHARGED HQMME
TANK
78-164-105
EDMC
TCE 780516 ROUTINE SHIFT
TRAUXO
78-172-113
.170
PPM
400
.140
PPM
425
EDMC
TCE
780602
TRAUXO
ANALYZING SAMPLES IN LAB
78-206-119
.000
PPM
15
EDMC
TCE
780602
TRAUXO
COLLECTING SAMPLES OH 10AM
SAMPLE RUN
78-207-120
1.930
PPM
20
SL OlfifiAQ
1/19/93
LAK^Ph ARLES (254) PLANT b samMh G RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
TCE 780622 ROUTIHE SHIFT
JOB TITLE SAMPLE#
EDCOP
78-222-135
RESULT .000
UNIT DURATION PPM 410
PAGE
EDMC
TCE 780622 ROUTINE SHIFT
TELOP
78-225-138
.070
PPM
410
EDMC
TCE 780622 ROUTINE SHIFT
EDMC
TCE 780622 ROUTINE SHIFT
TETHOP TRAUXO
78-223-136 78-224-137
.060
PPM
410
. 000
PPM
410
EDMC
TCE 780628 ROUTIHE SHIFT
TRAUXO
78-231-144
.180
PPM
440
EDMC
TCE 780727 ROUTINE SHIFT
EDCOP
78-282-174
.250
PPM
408
EDMC
TCE 780727 ROUTINE SHIFT
TELOP
78-281-173
.080
PPM
408
EDMC
TCE 780727 ROUTINE SHIFT
TETHOP
78-283-175
.250
PPM
408
EDMC
TCE 780727 ROUTINE SHIFT
TRAUXO
78-284-176
. 190
PPM
408
EDMC TCE
780911
ROUTINE SHIFT
EDCOP
78-341-209
.000
PPM
364
EDMC
TCE 780911 ROUTIHE SHIFT
TELOP
78-340-208
.070
PPM
364
SL 016850
1/19/93
LAK^PHARLES (254) PLANT B SAMPLING RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
TCE 780911 ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
78-342-210
RESULT .160
UNIT DURATION
PPM
364
EDMC
TCE 780911 ROUTINE SHIFT
TRAUXO
78-343-211
2.780
PPM
364
EDMC
* EDMC
TCE
780915
TRAUXO
78-353-221
ROUTINE DAILY SAMPLING ROUND-
EXPERIMENTAL
TCE
780918
TRAUXO
78-354-222
ROUTINE DAILY SAMPLING ROUNDS
(EXPERIMENTAL)
EDMC
TCE
780919
TRAUXO
78-355-223
ROUTINE DAILY SAMPLING ROUNDS
(EXPERIMENTAL)
EDMC
TCE 781004 ROUTINE SHIFT
EDCOP
78-381-236
1.280
PPM
22
5.980
PPM
33
.910
PPM
41
.000
PPM
440
EDMC
TCE 781004 ROUTINE SHIFT
TELOP
78-380-235
.350
PPM
440
EDMC
TCE 781023 ROUTINE SHIFT
TETHOP
78-383-238
.000
PPM
380
EDMC TCE
781031
ROUTINE SHIFT
TETHOP
78-382-237
2.330
PPM
430
EDMC
TCE 781116 ROUTINE SHIFT
EDCOP
78-432-270
1.750
PPM
425
EDMC
TCE 781116 ROUTINE SHIFT
TELOP
78-430-268
2.730
PPM
425
PAGE
SL 016851
1/19/93
LAKVHARLES (254) PLAMT B SAMFTiNG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
TCE 781116 ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
78-431-269
RESULT 3.050
UNIT DURATION PPM 425
PAGE
EDHC
TCE 781116 ROUTINE SHIFT
TRAUXO
78-433-271
1.840
PPM
425
EDMC
TCE 781228 ROUTINE SHIFT
* EDMC
TCE 781228 ROUTINE SHIFT
EDCOP EDCOP
78-467-293 78-479-293
.130
PPM
387
.130
PPM
387
EDMC TCE
781228
ROUTINE SHIFT
TELOP
78-466-292
.160
PPM
387
EDMC
TCE 781228 ROUTINE SHIFT
TELOP
78-478-292
.160
PPM
387
EDMC
TCE 781228 ROUTINE SHIFT
TETHOP
78-468-294
.250
PPM
375
EDMC
TCE 781228 ROUTINE SHIFT
TETHOP
78-480-294
.250
PPM
375
EDMC
TCE 781228 ROUTINE SHIFT
TRAUXO
78-469-295
. 000
PPM
375
EDMC
TCE 781228 ROUTINE SHIFT
TRAUXO
78-481-295
.000
PPM
375
SL 016852
EDMC
TCE 790109 ROUTINE SHIFT
EDCOP
79-018-013
.000
PPM
385
1/19/93
LAKMBHARLES (254) PLANT B SAMPLING RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
TCE 790109 ROUTINE SHIFT
JOB TITLE SAMPLE#
TELOP
79-017-012
RESULT .310
UNIT DURATION
PPM
385
EDMC
TCE 790109 ROUTINE SHIFT
TETHOP
79-019-014
5.100
PPM
385
EDMC
EDMC
TCE
790109
TRAUXO
ROUTINE SHIFT-CLOSED LOOP
SAMPLERS DOWN/USED BOTTLES
TCE 790122 ROUTINE SHIFT
TRAUXO
79-020-015 79-034-029
.260
PPM
385
2.060
PPM
393
EDMC
TCE 790219 ROUTINE SHIFT
EDCOP
79-082-056
.000
PPM
390
EDMC
TCE 790219 ROUTINE SHIFT
TELOP
79-080-054
.300
PPM
390
EDMC
TCE 790219 ROUTINE SHIFT
TETHOP
79-081-055
.310
PPM
390
EDMC
TCE 790219 ROUTINE SHIFT
TRAUXO
79-083-057
.480
PPM
390
EDMC
TCE 790305 ROUTINE SHIFT
TELOP
79-096-061
.000
PPM
445
EDMC
TCE 790305 ROUTINE SHIFT
TETHOP
79-098-063
1.400
PPM
445
EDMC
TCE 790305 ROUTINE SHIFT
TRAUXO
79-099-064
.000
PPM
445
PAGE
SL 016853
1/19/93
LAK^PHARLES (259) PLANT B SAMPLING RESULTS THRU 1989
DEPT EDMC
COMPOUND
DATE
JOB TITLE
TCE
790305
WELDER
ROUTINE WORKDAY-LOGBOOK
MECHANIC'S ROUNDS
SAMPLE# 79-100-065
RESULT .000
UNIT DURATION PPM 995
EDMC
TCE 790309 ROUTINE SHIFT
EDCOP
79-097-062
. 000
PPM
995
PAGE
EDMC
t EDMC
TCE
790326
INSTRU
ROUTINE SHIFT AS LOGBOOK
INSTRUMENT MAN
TCE 790923 ROUTINE SHIFT
EDCOP
79-101-066 79-228-120
.780
PPM
955
. 100
PPM
925
EDMC
TCE 790923 ROUTINE SHIFT
TELOP
79-227-119
.070
PPM
925
EDMC
TCE 790930 ROUTINE SHIFT
VDCOP
79-232-121
.080
PPM
365
EDMC
TCE 790519 ROUTINE SHIFT
TELOP
79-256-138
1.980
PPM
390
EDMC
TCE 790519 ROUTINE SHIFT
VDCOP
79-257-139
.220
PPM
390
EDMC
TCE
790518
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAN.
EDMC
TCE 790521 ROUTINE SHIFT
VDCOP
79-260-192 79-269-196
EDMC
TCE 790530 ROUTINE SHIFT
EDCOP
79-299-161
.130
PPM
930
.980
PPM
.310
PPM
930
SL 016854
909
1/19/93
LAMPhARLES (254) PLANT B SAMPLING RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
JOB TITLE
TCE
790530
WELDER
ROUTINE WORKDAY AS LOGBOOK
MECHANIC
SAMPLE# 79-300-162
RESULT .370
UNIT DURATION PPM 404
EDMC
TCE 790618 ROUTINE SHIFT
EDCOP
79-318-181
.270
PPM
450
PAGE
EDMC
* EDMC
TCE
790618
INSTRU
79-321-184
ROUTINE SHIFT WORKING AS LOG
BOOK INSTRUMENT MAN
TCE 790618 ROUTIHE SHIFT
TELOP
79-317-180
.110
PPM
450
.110
PPM
450
EDMC TCE
790618
ROUTINE SHIFT
VDCOP
79-319-182
.130
PPM
450
EDMC
TCE
790618
WELDER
79-320-183
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC
EDMC
TCE 790619 ROUTINE SHIFT
TE2SOP
79-331-186
. 130
PPM
450
.100
PPM
438
EDMC
TCE 790705 ROUTINE SHIFT
EDCOP
79-355-201
.160
PPM
465
EDMC
TCE
790705
INSTRU
79-357-203
ROUTINE SHIFT WORKING AS LOG
BOOK INSTRUMENT MAN
EDMC
TCE 790705 ROUTINE SHIFT
TELOP
79-354-200
.080
PPM
465
.220
PPM
465
EDMC
TCE 790705 ROUTIHE SHIFT
VDCOP
79-356-202
.500
PPM
465
SL 016855
1/19/93
LAIkMI'iHARLES (253) PLANT B SAMpPOIHG RESULTS THRU 1989
DEPT EDMC
COMPOUND
DATE
JOB TITLE
TCE
790705
WELDER
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC.
SAMPLE# 79-358-204
RESULT .100
UNIT DURATION PPM 465
EDMC
TCE 791012
79-512-309
5FT SW iOF KETTLE TOP ON RAIL
AFT ABV PLTFRM/S/8MPH/79F/58RH
.050
PPM
199
EDMC
TCE
791101
MACHIN
79-626-396
RECHARGING DRYER IN VDC AREA
t EDMC
TCE
791101
WELDER
79-627-397
RECHARGING DRYER IN VDC AREA
.100
PPM
15
.100
PPM
15
EDMC
TCE 791105 ROUTINE SHIFT
EDCOP
79-635-409
.110
PPM
400
EDMC
TCE
791105
INSTRU
79-633-406
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC
EDMC
TCE 791105 ROUTINE SHIFT
TELOP
79-634-403
.060
PPM
400
.140
PPM
400
EDMC
TCE 791105 ROUTINE SHIFT
VDCOP
79-636-405
.130
PPM
400
EDMC
TRANS
780503
ROUTINE SHIFT
TELOP
78-154-098
.000
PPM
420
EDMC
TRANS
780508
ROUTINE SHIFT
TETHOP
78-163-104
.000
PPM
400
EDMC
TRANS
780911
ROUTINE SHIFT
EDCOP
78-341-209
.000
PPM
364
PAGE SL 16856
1/19/93
LAI^BNAPLES (254)
PLANT B SAMPO NG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
TRANS
780911
ROUTINE SHIFT
JOB TITLE SAMPLE#
TELOP
78-340-208
RESULT .000
UNIT DURATION
PPM
364
PAGE
EDMC
TRANS
780911
ROUTINE SHIFT
TETHOP
78-342-210
. 000
PPM
364
EDMC
* EDMC
TRANS
780911
ROUTINE SHIFT
TRANS
781004
ROUTINE SHIFT
TRAUXO EDCOP
78-343-211 78-381-236
.000
PPM
364
.000
PPM
440
EDMC
TRANS
781004
ROUTINE SHIFT
TELOP
78-380-235
.000
PPM
440
EDMC
TRANS
781023
ROUTINE SHIFT
TETHOP
78-383-238
.000
PPM
380
EDMC
TRANS
781031
ROUTINE SHIFT
TETHOP
78-382-237
.000
PPM
430
EDMC
TRANS
781116
ROUTINE SHIFT
EDCOP
78-432-270
.000
PPM
425
EDMC
TRANS
781116
ROUTINE SHIFT
TELOP
78-430-268
.000
PPM
425
EDMC TRANS
781228
ROUTINE SHIFT
EDCOP
78-467-293
.000
PPM
387
EDMC
TRANS
781228
ROUTINE SHIFT
EDCOP
78-479-293
.000
PPM
387
SL 016857
1/19/93
LAH^BhaRLES (254) PLANT B SAMmHG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
TRANS
781228
ROUTINE SHIFT
JOB TITLE SAMPLE#
TELOP
78-466-292
RESULT .000
UNIT DURATION PPM 387
PAGE
EDMC
TRANS
781228
ROUTINE SHIFT
TELOP
78-478-292
.000
PPM
387
EDMC
TRANS
781228
ROUTINE SHIFT
EDMC
TRANS
781228
ROUTINE SHIFT
TETHOP TETHOP
78-468-294 78-480-294
.000
PPM
375
.000
PPM
375
EDMC
TRANS
781228
ROUTINE SHIFT
TRAUXO
78-469-295
.000
PPM
375
EDMC
TRANS
781228
ROUTINE SHIFT
TRAUXO
78-481-295
.000
PPM
375
EDMC
TRANS
790109
ROUTINE SHIFT
EDCOP
79-018-013
.000
PPM
385
EDMC
TRANS
790109
ROUTINE SHIFT
TELOP
79-017-012
.000
PPM
385
EDMC
TRANS
790109
ROUTINE SHIFT
TETHOP
79-019-014
. 000
PPM
385
EDMC
TRANS
790122
ROUTINE SHIFT
TRAUXO
79-034-029
EDMC
TRANS
790219
ROUTINE SHIFT
EDCOP
79-082-056
.000
PPM
.000
PPM
393
SL 016858
390
1/19/93
LAtd^mARLES C254) PLANT B SAMPPlNG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
TRANS
790219
ROUTINE SHIFT
JOB TITLE SAMPLE#
TELOP
79-080-054
RESULT .000
UNIT DURATION PPM 390
PAGE
EDMC
TRANS
790305
ROUTINE SHIFT
TELOP
79-096-061
.000
PPM
445
EDMC
TRANS
790305
ROUTINE SHIFT
t EDMC
TRANS
790305
ROUTINE SHIFT
TETHOP TRAUXO
79-098-063 79-099-064
.000
PPM
445
. 000
PPM
445
EDMC
TRANS
790305
WELDER
ROUTINE WORKDAY-LOGBOOK
MECHANIC'S ROUNDS
EDMC
TRANS
790309
ROUTINE SHIFT
EDCOP
79-100-065 79-097-062
.000
PPM
445
.000
PPM
445
EDMC
TRANS
790326
INSTRU
ROUTINE SHIFT AS LOGBOOK
INSTRUMENT MAN
EDMC
TRANS
790423
ROUTINE SHIFT
EDCOP
79-101-066 79-228-120
.000
PPM
455
.000
PPM
425
EDMC TRANS
790423
ROUTINE SHIFT
TELOP
79-227-119
.000
PPM
425
EDMC
TRANS
790514
ROUTINE SHIFT
VDCOP
79-257-139
.000
PPM
39 0
EDMC
TRANS
790518
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAN.
79-260-142
.000
PPM
430
SI* 016859
1/19/93
LAKiHhARLES (254) PLANT B SAMHmiG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
TRANS
790521
ROUTINE SHIFT
JOB TITLE SAMPLE#
VDCOP
79-264-146
RESULT .000
UNIT DURATION PPM 430
EDMC
TRANS
790530
ROUTINE SHIFT
EDCOP
79-299-161
.000
PPM
404
EDMC
TRANS
790530
WELDER
ROUTINE WORKDAY AS LOGBOOK
MECHANIC
EDMC
TRANS
790618
ROUTINE SHIFT
TELOP
79-300-162 79-317-180
.000
PPM
404
.000
PPM
450
EDMC
TRANS
790619
ROUTINE SHIFT
TE2SOP
79-331-186
.000
PPM
438
EDMC
TRANS
790705
INSTRU
79-357-203
ROUTINE SHIFT WORKING AS LOG
BOOK INSTRUMENT MAN
EDMC
TRANS
790705
ROUTINE SHIFT
TELOP
79-354-200
.000
PPM
465
.000
PPM
465
EDMC
TRANS
790705
WELDER
79-358-204
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC.
EDMC
TRANS
791005
79-481-278
AFT EAST OF SUMP/5FT ABV GRND
WSW/6MPH/78F/31RH/CLEAR
EDMC
TRANS
791005
79-482-279
6FT E OF SUMP/6FT ABOVE GRND/
WSW/6MPH/78F/31RH/CLEAR
EDMC
TRANS
791005
79-483-280
8FT W. OF SUMP/5FT ABOVE GRND
WSW/6MPH/78F/31RH/CLEAR
.000
PPM
465
. 050
PPM
319
. 050
PPM
309
.050
PPM
309
PAGE SL 016860
1/19/93
#LA HARLES (259)
PLANT B SAMMPfIlMG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
JOB TITLE SAMPLE#
TRANS
791012
79-512-309
5FT $W OF KETTLE TOP OH RAIL
4FT ABV PLTFRM/S/8MPH/79F/58RH1
RESULT .050
UNIT DURATION PPM 199
EDMC
TRANS
791015
2FT NE OF LIFT SUMP/4FT ABV
GRND/NE/6MPH/50F/86RH/CLEAR
79-515-312
.090
PPM
291
EDMC
* EDMC
TRANS
791015
79-516-313
2FT SW OF SUMP/5FT ABV GRMD/
NE WND/6MPH/50F/86RH/CLEAR
TRANS
791015
79-517-314
10FT SW OF SUMP/5FT ABV GRND/
NE WND/6MPH/50F/86RH/CLEAR
.050
PPM
286
.050
PPM
292
EDMC
TRANS
791015
79-518-315
6FT SE OF SUMP/5FT ABV GRND/
NE WND/6MPH/50F/86RH/CLEAR
.050
PPM
282
EDMC
TRANS
791023
EDCOP
79-581-357
SAMPLING ROUNDS/DRAINING NO. 2
EDC HEAVY STLL/O-TOLIDINE TEST
.500
PPM
15
EDMC
TRANS
791023
EDCOP
79-582-358
SAMPLING ROUNDS/DRAINING NO. 2
EDC HEAVY STLL/O-TOLIDINE TEST
.500
PPM
15
EDMC TRANS
791105
ROUTINE SHIFT
EDCOP
79-635-404
.050
PPM
400
PAGE
EDMC
TRANS
791105
INSTRU
79-633-406
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC
EDMC
TRANS
791105
ROUTINE SHIFT
TELOP
79-634-403
.050
PPM
400
.050
PPM
400
EDMC
TRANS
791105
ROUTINE SHIFT
VDCOP
79-636-405
.050
PPM
400
SL 016861
1/19/93
IAI^BhARLES (254) PLANT B SANDING RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
TRI 780503 ROUTINE SHIFT
JOB TITLE SAMPLE#
TELOP
78-154-098
RESULT .000
UNIT DURATION PPM 420
PAGE
EDMC
TRI 780508 ROUTINE SHIFT
TETHOP
78-163-104
.000
PPM
400
EDMC
EDMC
TRI
780508
TRAUXO
ROUTINE SHIFT-CHARGED HQMME
TANK
TRI 780516 ROUTINE SHIFT
TRAUXO
78-164-105 78-172-113
.000
PPM
400
.000
PPM
425
EDMC
TRI 780622 ROUTINE SHIFT
EDCOP
78-222-135
.000
PPM
410
EDMC
TRI 780622 ROUTINE SHIFT
TELOP
78-225-138
.000
PPM
410
EDMC
TRI 780622 ROUTINE SHIFT
TETHOP
78-223-136
.000
PPM
410
EDMC
TRI 780622 ROUTINE SHIFT
TRAUXO
78-224-137
.000
PPM
410
EDMC
TRI 780727 ROUTINE SHIFT
EDCOP
78-282-174
.110
PPM
408
EDMC
TRI 780727 ROUTINE SHIFT
TELOP
78-281-173
EDMC
TRI 780727 ROUTINE SHIFT
TETHOP
78-283-175
.040
PPM
408
SL 016862
.140
PPM
408
1/19/93
LAK^BHARLES (259) PLANT B SAMRnNG RESULTS THRU 1989
DEPT EDMC
COMPOUND
DATE
TRI 780727 ROUTINE SHIFT
JOB TITLE SAMPLE#
TRAUXO
78-289-176
RESULT .110
UNIT DURATION PPM 908
PAGE
EDMC
TRI 780911 ROUTINE SHIFT
EDCOP
78-391-209
.190
PPM
369
EDMC
TRI 780911 ROUTINE SHIFT
TELOP
78-390-208
.360
PPM
369
EDMC
TRI 780911 ROUTINE SHIFT
TETHOP
78-392-210
.530
PPM
369
EDMC
TRI 780911 ROUTINE SHIFT
TRAUXO
78-393-211
.330
PPM
369
EDMC
TRI
780915
TRAUXO
78-353-221
ROUTINE DAILY SAMPLING ROUND-
EXPERIMENTAL
EDMC
TRI
780918
TRAUXO
78-359-222
ROUTINE DAILY SAMPLING ROUNDS
(EXPERIMENTAL)
EDMC
TRI 781009 ROUTINE SHIFT
EDCOP
78-381-236
.000
PPM
22
.330
PPM
33
.000
PPM
990
EDMC
TRI 781009 ROUTINE SHIFT
TELOP
78-380-235
.000
PPM
990
EDMC TRI
781023
ROUTINE SHIFT
TETHOP
78-383-238
.090
PPM
380
EDMC
TRI 781031 ROUTINE SHIFT
TETHOP
78-382-237
.000
PPM
930
SL 016863
1/19/93
LAI^HhaRLES (254) PLANT B SAMmUG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
TRI 781116 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
78-432-270
RESULT .26 0
UNIT DURATION
PPM
425
EDMC
TRI 781116 ROUTINE SHIFT
TELOP
78-430-268
.400
PPM
425
EDMC
TRI 781116 ROUTINE SHIFT
EDMC
TRI 781116 ROUTINE SHIFT
TETHOP TRAUXO
78-431-269 78-433-271
.430
PPM
425
.380
PPM
425
EDMC
TRI 781228 ROUTINE SHIFT
EDCOP
78-467-293
.000
PPM
387
EDMC
TRI 781228 ROUTINE SHIFT
EDCOP
78-479-293
.000
PPM
387
EDMC
TRI 781228 ROUTINE SHIFT
TELOP
78-466-292
.180
PPM
387
EDMC
TRI 781228 ROUTINE SHIFT
TELOP
78-478-292
.180
PPM
387
EDMC
TRI 781228 ROUTINE SHIFT
TETHOP
78-468-294
.000
PPM
375
EDMC
TRI 781228 ROUTINE SHIFT
TETHOP
78-480-294
.000
PPM
375
EDMC
TRI 781228 ROUTINE SHIFT
TRAUXO
78-469-295
.290
PPM
375
PAGE SL 016864
1/19/93
LAKl^BHARLES (254) PLANT B SAIimtNG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
TRI 781228 ROUTINE SHIFT
JOB TITLE SAMPLE#
TRAUXO
78-481-295
RESULT .290
UNIT DURATION PPM 375
EDMC
TRI 790109 ROUTINE SHIFT
EDCOP
79-018-013
.000
PPM
385
EDMC
TRI 790109 ROUTINE SHIFT
TELOP
79-017-012
.000
PPM
385
EDMC
TRI 790109 ROUTINE SHIFT
TETHOP
79-019-014
.000
PPM
385
EDMC
TRI
790109
TRAUXO
ROUTINE SHIFT-CLOSED LOOP
SAMPLERS DOWN/USED BOTTLES
EDMC
TRI 790122 ROUTINE SHIFT
TRAUXO
79-020-015 79-034-029
.120
PPM
385
.400
PPM
393
EDMC
TRI 790219 ROUTINE SHIFT
EDCOP
79-082-056
.000
PPM
390
EDMC
TRI 790219 ROUTINE SHIFT
TELOP
79-080-054
.000
PPM
390
EDMC
TRI 790219 ROUTINE SHIFT
TETHOP
79-081-055
. 000
PPM
390
EDMC
TRI 790219 ROUTINE SHIFT
TRAUXO
79-083-057
.000
PPM
390
EDMC
TRI 790305 ROUTINE SHIFT
TELOP
79-096-061
.000
PPM
445
PAGE SL 0168&5
1/19/93
LAl^BHARLES (254) PLANT B SAMfflNG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
TRI 790305 ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
79-098-063
RESULT .000
UNIT DURATION
PPM
445
EDMC
TRI 790305 ROUTINE SHIFT
TRAUXO
79-099-064
.000
PPM
445
EDMC
* EDMC
TRI
790305
WELDER
ROUTINE WORKDAY-LOGBOOK
MECHANIC'S ROUNDS
TRI 790309 ROUTINE SHIFT
EDCOP
79-100-065 79-097-062
.000
PPM
445
.000
PPM
445
EDMC
TRI
790326
INSTRU
ROUTINE SHIFT AS LOGBOOK
INSTRUMENT MAN
EDMC
TRI 790423 ROUTINE SHIFT
EDCOP
79-101-066 79-228-120
.530
PPM
455
.060
PPM
425
EDMC
TRI 790423 ROUTTHE SHIFT
TELOP
79-227-119
.050
PPM
425
EDMC
TRI 790514 ROUTINE SHIFT
TELOP
79-256-138
.230
PPM
390
EDMC
TRI 790514 ROUTINE SHIFT
VDCOP
79-257-139
.000
PPM
390
EDMC
TRI
790518
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAN.
EDMC
TRI 790521 ROUTINE SHIFT
VDCOP
79-260-142 79-264-146
.170
PPM
430
.200
PPM
430
PAGE SL 016866
1/19/93
LAK^WARLES (254) PLANT B SAMmNG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
TRI 790530 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
79-299-161
RESULT .210
UNIT DURATION PPM 404
PAGE
EDMC
TRI
790530
WELDER
ROUTINE WORKDAY AS LOGBOOK
MECHANIC
EDMC
TRI 790618 ROUTINE SHIFT
EDCOP
79-300-162 79-318-181
.180
PPM
404
.300
PPM
450
EDMC
TRI
790618
INSTRU
79-321-184
ROUTINE SHIFT WORKING AS LOG
BOOK INSTRUMENT MAN
EDMC
TRI 790618 ROUTINE SHIFT
TELOP
79-317-180
.230
PPM
450
.250
PPM
450
EDMC
TRI 790618 ROUTINE SHIFT
VDCOP
79-319-182
.300
PPM
450
EDMC
TRI
790618
WELDER
79-320-183
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC
EDMC
TRI 790619 ROUTINE SHIFT
TE2SOP
79-331-186
.200
PPM
450
.070
PPM
438
EDMC
TRI 790705 ROUTINE SHIFT
EDCOP
79-355-201
.080
PPM
465
EDMC
TRI
790705
INSTRU
79-357-203
ROUTINE SHIFT WORKING AS LOG
BOOK INSTRUMENT MAN
EDMC
TRI 790705 ROUTINE SHIFT
TELOP
79-354-200
.140
PPM
465
.140
PPM
465
SL 016867
1/19/93
LAK^MARLES (254) PLANT B SAMTttiNG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
TRI 790705 ROUTINE SHIFT
JOB TITLE SAMPLE#
VDCOP
79-356-202
RESULT .160
UNIT DURATION
PPM
465
EDMC
TRI
790705
WELDER
79-358-204
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC.
EDMC
TRI 791005
79-480-277
16FT NW OF SUMP/5FT ABOVE GRND
WSW/6MPH/78F/31RH/CLEAR
EDMC
TRI 791005
79-481-278
4FT EAST OF SUMP/5FT ABV GRND
WSW/6MPH/78F/31RH/CLEAR
EDMC
TRI 791005
79-482-279
6FT E OF SUMP/6FT ABOVE GRND/
WSW/6MPH/78F/31RH/CLEAR
EDMC
TRI 791005
79-483-280
8FT W. OF SUMP/5FT ABOVE GRND
WSW/6MPH/78F/31RH/CLEAR
EDMC
TRI 791012
79-511-308
6FT NE OF KETTLE TOP ON RAIL
4FT ABV PLTFRM/S/BMPH/79F/58RH
EDMC
TRI 791012
79-512-309
5FT SW OF KETTLE TOP ON RAIL
4FT ABV PLTFRM/S/8MPH/79F/58RH
EDMC
TRI 791015 2FT NE OF LIFT SUMP/4FT ABV GRHD/NE/6MPH/5OF/86RH/CLEAR
79-515-312
EDMC
TRI 791015
79-516-313
2FT SW OF SUMP/5FT ABV GRND/
NE WND/6MPH/50F/86RH/CLEAR
EDMC
TRI 791015
79-517-314
1 OFT SW OF SUMP/5FT ABV GRND/
NE WND/6MPH/5OF/86RH/CLEAR
.110
PPM
465
.230
PPM
322
.660
PPM
319
.600
PPM
309
.510
PPM
309
.050
PPM
203
.260
PPM
199
.080
PPM
291
.090
PPM
286
.250
PPM
292
PAGE
1/19/93
LArfl|HARLES (259) PLANT B SAMPLING RESULTS THRU 1989
DEPT EDMC
COMPOUND
DATE
JOB TITLE
TRI 791015 6FT SE OF SUMP/5FT ABV GRND/ NE WND/6MPH/50F/86RH/CLEAR
SAMPLE# 79-518-315
RESULT .120
UNIT DURATION PPM 282
EDMC
TRI
791023
EDCOP
79-581-357
SAMPLING ROUNDS/DRAINING MO. 2
EDC HEAVY STLL/Q-TOLI DINE TEST
.500
PPM
15
EDMC
* EDMC
TRI
791023
EDCOP
79-582-358
SAMPLING ROUNDS/DRAINING NO. 2
EDC HEAVY STLL/O-TOLIDINE TEST
TRI
791023
GEWORK
UNLOADING EDC TAR BUGGY
79-585-361
.500
PPM
15
.500
PPM
8
PAGE
EDMC TRI
791023
GEWORK
UNLOADING EDC TAR BUGGY
79-586-362
.500
PPM
8
EDMC TRI
791101
WELDER
79-627-397
RECHARGING DRYER IN VDC AREA
.100
PPM
15
EDMC TRI
791105
ROUTINE SHIFT
EDCOP
79-635-909
.170
PPM
900
EDMC
TRI
791105
INSTRU
79-633-906
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC
EDMC TRI
791105
ROUTINE SHIFT
TELOP
79-639-903
.170
PPM
900
180 PPM
900
EDMC TRI
791105
ROUTINE SHIFT
VDCOP
79-636-905
180 PPM
900
EDMC TRI
791106
EDCOP
79-697-917
CHARGING FECL3 CATALYST AT EDC
,100
PPM
15
SL 016869
1/19/93
LAK^BHARLES (254) PLANT B SAMHriNG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
VCM
780503
ROUTINE SHIFT
JOB TITLE SAMPLE#
TELOP
78-154-098
RESULT .000
UNIT DURATION
PPM
420
PAGE
EDMC
VCM
780508
ROUTINE SHIFT
TETHOP
78-163-104
.000
PPM
400
EDMC
* EDMC
VCM 780516 ROUTINE SHIFT
VCM
780622
ROUTINE SHIFT
TRAUXO EDCOP
78-172-113 78-222-135
.030
PPM
425
.010
PPM
410
EDMC
VCM 780622 ROUTINE SHIFT
TELOP
78-225-138
.020
PPM
410
EDMC
VCM
780622
ROUTINE SHIFT
TETHOP
78-223-136
.000
PPM
410
EDMC
VCM
780622
ROUTINE SHIFT
TRAUXO
78-224-137
. 020
PPM
410
EDMC
VCM
780727
ROUTINE SHIFT
EDCOP
78-282-174
.000
PPM
408
EDMC
VCM 780727 ROUTINE SHIFT
TELOP
78-281-173
.000
PPM
408
EDMC
VCM 780727 ROUTINE SHIFT
TETHOP
78-283-175
EDMC
VCM 780727 ROUTINE SHIFT
TRAUXO
78-284-176
.000
PPM
408
.000
PPM
408
SL 016870
1/19/93
UKl^BHARLES C259) PLANT B SAMmNG RESULTS THRU 1989
DEPT EDMC
COMPOUND
DATE
VCM 780911 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
78-391-209
RESULT .000
UNIT DURATION PPM 369
EDMC
VCM 780911 ROUTINE SHIFT
TELOP
78-390-208
. 060
PPM
369
EDMC
VCM 780911 ROUTINE SHIFT
* EDMC
VCM 780911 ROUTINE SHIFT
TETHOP TRAUXO
78-392-210 78-393-211
.080
PPM
369
.050
PPM
369
EDMC
VCM 781009 ROUTINE SHIFT
EDCOP
78-381-236
.000
PPM
990
EDMC
VCM 781009 ROUTINE SHIFT
TELOP
78-380-235
.000
PPM
990
EDMC
VCM 781023 ROUTINE SHIFT
TETHOP
78-383-238
.000
PPM
380
EDMC
VCM 781031 ROUTINE SHIFT
TETHOP
78-382-237
.000
PPM
930
EDMC
VCM 781116 ROUTINE SHIFT
EDCOP
78-932-270
.000
PPM
925
EDMC
VCM 781116 ROUTINE SHIFT
TELOP
78-930-268
.050
PPM
925
EDMC
VCM 781116 ROUTINE SHIFT
TETHOP
78-931-269
.000
PPM
925
PAGE
016871
1/19/93
LAI^BHARLES (254) PLANT B SAMmNG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
VCM
781116
ROUTINE SHIFT
JOB TITLE SAMPLE#
TRAUXO
78-433-271
RESULT .000
UNIT DURATION
PPM
425
PAGE
EDMC
VCM
781228
ROUTINE SHIFT
EDCOP
78-467-293
.000
PPM
387
EDMC
VCM 781228 ROUTINE SHIFT
* EDMC
VCM
781228
ROUTINE SHIFT
EDCOP TELOP
78-479-293 78-466-292
.000
PPM
387
.000
PPM
387
EDMC
VCM 781228 ROUTINE SHIFT
TELOP
78-478-292
.000
PPM
387
EDMC
VCM 781228 ROUTINE SHIFT
TETHOP
78-468-294
.000
PPM
375
EDMC
VCM 781228 ROUTINE SHIFT
TETHOP
78-480-294
. 000
PPM
375
EDMC
VCM 781228 ROUTINE SHIFT
TRAUXO
78-469-295
.000
PPM
375
EDMC
VCM 781228 ROUTINE SHIFT
TRAUXO
78-481-295
.000
PPM
375
EDMC
VCM 790109 ROUTINE SHIFT
EDCOP
EDMC
VCM 790109 ROUTINE SHIFT
TELOP
79-018-013 79-017-012
.000
PPM
385
.000
PPM
385
SL 016872
1/19/93
LAI^nMRLES (254) PLANT B SfllWING RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
VCM 790109 ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
79-019-014
RESULT .000
UNIT DURATION PPM 385
PAGE
EDMC
VCM
790109
TRAUXO
ROUTINE SHIFT-CLOSED LOOP
SAMPLERS DOWN/USED BOTTLES
EDMC
VCM 790122 ROUTINE SHIFT
TRAUXO
* EDMC
VCM 790219 ROUTINE SHIFT
EDCOP
79-020-015 79-034-029 79-082-056
.000
PPM
385
.190
PPM
393
. 000
PPM
390
EDMC
VCM 790219 ROUTINE SHIFT
TELOP
79-080-054
.000
PPM
390
EDMC
VCM 790219 ROUTINE SHIFT
TETHOP
79-081-055
.000
PPM
390
EDMC
VCM 790219 ROUTINE SHIFT
TRAUXO
79-083-057
.000
PPM
390
EDMC
VCM 790305 ROUTINE SHIFT
TELOP
79-096-061
.010
PPM
445
EDMC
VCM 790305 ROUTINE SHIFT
TETHOP
79-098-063
.000
PPM
445
EDMC
VCM 790305 ROUTINE SHIFT
TRAUXO
79-099-064
.000
PPM
445
EDMC
VCM
790305
WELDER
ROUTINE WORKDAY-LOGBOOK
MECHANIC'S ROUNDS
79-100-065
.000
PPM
445
SL 016873
1/19/93
LAK^WARLES (254) PLANT B SAMmHG RESULTS THRU 1989
DEPT COMPOUND
DATE
EDMC VCM
790309
ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
79-097-062
RESULT .000
UNIT DURATION
PPM
995
PAGE
EDMC
VCM
790326
IHSTRU
ROUTINE SHIFT AS LOGBOOK
INSTRUMENT MAN
EDMC VCM
790923
ROUTINE SHIFT
EDCOP
79-101-066 79-228-120
.000
PPM
955
.000
PPM
925
EDMC VCM
790923
ROUTINE SHIFT
TELOP
79-227-119
.000
PPM
925
EDMC
VCM
790519
ROUTINE SHIFT
VDCOP
79-257-139
.000
PPM
390
EDMC
VCM
790518
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAN.
EDMC VCM
790521
ROUTINE SHIFT
VDCOP
79-260-192 79-269-196
.090
PPM
930
.150
PPM
930
EDMC VCM
790530
ROUTINE SHIFT
EDCOP
79-299-161
.110
PPM
909
EDMC
VCM
790530
WELDER
ROUTINE WORKDAY AS LOGBOOK
MECHANIC
79-300-162
EDMC VCM
790618
ROUTINE SHIFT
EDCOP
79-318-181
EDMC
VCM
790618 IHSTRU
79-321-189
ROUTINE SHIFT WORKING AS LOG
BOOK INSTRUMENT MAN
.050
PPM
909
.120
PPM
.100
PPM
950
st 01687 4 950
1/19/93
LAI^lHARLES (254) PLANT B SAMPLING RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
VCM 790618 ROUTINE SHIFT
JOB TITLE SAMPLE#
TELOP
79-317-180
RESULT .120
UNIT DURATION PPM 450
PAGE
EDMC
VCM 790618 ROUTINE SHIFT
VDCOP
79-319-182
.110
PPM
450
EDMC
* EDMC
VCM
790618
WELDER
79-320-183
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC
VCM 790619 ROUTINE SHIFT
TE2S0P
79-331-186
.070
PPM
450
.000
PPM
438
EDMC
VCM
790705
INSTRU
79-357-203
ROUTINE SHIFT WORKING AS LOG
BOOK INSTRUMENT MAN
EDMC
VCM 790705 ROUTINE SHIFT
TELOP
79-354-200
.000
PPM
465
.000
PPM
465
EDMC
VCM 790705 ROUTINE SHIFT
VDCOP
79-356-202
.000
PPM
465
EDMC
VCM
790705
WELDER
79-358-204
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC.
EDMC
VCM 791005
79-480-277
16FT HW OF SUMP/5FT ABOVE GRHD
WSW/6MPH/78F/31RH/CLEAR
EDMC
VCM
791005
79-481-278
AFT EAST OF SUMP/5FT ABV GRHD
WSW/6MPH/78F/31RH/CLEAR
EDMC
VCM 791005
79-482-279
6FT E OF SUHP/6FT ABOVE GRHD/
WSW/6MPH/78F/31RH/CLEAR
.000
PPM
465
.050
PPM
322
.050
PPM
319
.050
PPM
309
SL 016875
1/19/93
LAl^^HARLES (254) PLANT B SAMlTlNG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
JOB TITLE SAMPLE#
VCM 791005
79-483-280
8FT W. OF SUMP/5FT ABOVE GRND
WSW/6MPH/78F/31RH/CLEAR
RESULT .050
UNIT DURATION PPM 309
EDMC
VCM 791012
79-512-309
5FT SW OF KETTLE TOP ON RAIL
4FT ABV PLTFRM/S/8MPH/79F/58RH
.080
PPM
199
EDMC
* EDMC
VCM 791015 2FT NE OF LIFT SUMP/4FT ABV
GRND/NE/6MPH/50F/86RH/CLEAR
79-515-312
VCM 791015
79-516-313
2FT SW OF SUMP/5FT ABV GRND/
NE WND/6MPH/50F/86RH/CLEAR
.050
PPM
291
.050
PPM
286
EDMC
VCM 791015
79-517-314
10FT SW OF SUMP/5FT ABV GRND/
NE WND/6MPH/5QF/86RH/CLEAR
.050
PPM
292
EDMC
VCM 791015
79-518-315
6FT SE OF SUMP/5FT ABV GRND/
NE WND/6MPH/50F/86RH/CLEAR
.050
PPM
282
EDMC
VCM
791023
EDCOP
79-581-357
SAMPbING ROUNDS/DRAINING NO. 2
EDC HEAVY STLL/O-TOLIDINE TEST
.100
PPM
15
EDMC
VCM
791023
EDCOP
79-582-358
SAMPLING ROUNDS/DRAINING NO. 2
EDC HEAVY STLL/O-TOLIDINE TEST
.100
PPM
15
EDMC
VCM
791023
GEWORK
UNLOADING EDC TAR BUGGY
79-585-361
.100
PPM
8
EDMC
VCM
791023
GEWORK
UNLOADING EDC TAR BUGGY
79-586-362
EDMC
VCM
791101
WELDER
79-627-397
RECHARGING DRYER IN VDC AREA
.100
PPM
.100
PPM
8 ,,T ,
SL 016876
15
PAGE
1/19/93
LAiMEHARLES (254) PLANT B SAMPLING RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
VCM 791105 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
79-635-404
RESULT .050
UNIT DURATION PPM 400
EDMC
VCM
791105
INSTRU
79-633-406
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC
EDMC
VCM
791105
ROUTINE SHIFT
TELOP
79-634-403
*
EDMC
VCM 791105 ROUTINE SHIFT
VDCOP
79-636-405
050 PPM
400
.050
PPM
400
050 PPM
400
EDMC VDC
780503
ROUTINE SHIFT
TELOP
78-154-098
.500
PPM
420
EDMC
VDC 780503 ROUTINE SHIFT
TRAUXO
78-158-099
10.700
PPM
420
EDMC
VDC 780508 ROUTINE SHIFT
TETHOP
78-163-104
.630
PPM
400
EDMC
VDC
780508
TRAUXO
ROUTINE SHIFT-CHARGED HQMME
TANK
78-164-105
EDMC VDC
780516
ROUTINE SHIFT
TRAUXO
78-172-113
44.000
PPM
400
8.600
PPM
425
EDMC
VDC
780602
TRAUXO
ANALYZING SAMPLES IN LAB
78-206-119
10.800
PPM
15
EDMC
VDC
780602
TRAUXO
COLLECTING SAMPLES ON 10AM
SAMPLE RUN
78-207-120
17.900
PPM
20
PAGE
SL 016877
1/19/93
LAfllHARLES (254) PLANT B SAMW? I MG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
JOB TITLE
VDC
780602
TRAUXO
ANALYZING SAMPLES IN LAB
SAMPLE# 78-208-121
RESULT 48.100
UNIT DURATION PPM 15
PAGE
EDMC
VDC 780622 ROUTINE SHIFT
EDCOP
78-222-135
.470
PPM
410
EDMC
VDC 780622 ROUTINE SHIFT
TELOP
78-225-138
.450
PPM
410
EDMC VDC
780622
ROUTINE SHIFT
TETHOP
78-223-136
1.640
PPM
410
EDMC
VDC 780622 ROUTINE SHIFT
TRAUXO
78-224-137
15.400
PPM
410
EDMC
VDC 780628 ROUTINE SHIFT
TRAUXO
78-231-144
10.100
PPM
440
EDMC
VDC 780719
78-275-167
8FT UPWIND OF TEST SAMPLE LOOP
WHEN SAMPLING/IN LAB WHEN ANAL
EDMC
VDC
780719
TRAUXO
78-274-166
SAMPLINGi VDC AND ANALYZING
SAMPLE. TEST SAMPLE LOOP USED
EDMC
VDC 780727 ROUTINE SHIFT
EDCOP
78-282-174
1.700
PPM
11
3.900
PPM
11
.870
PPM
408
EDMC
VDC 780727 ROUTINE SHIFT
TELOP
78-281-173
.510
PPM
408
EDMC
VDC 780727 ROUTINE SHIFT
TETHOP
78-283-175
.920
PPM
408
SL 016878
1/19/93
LAI^^HARLES (254) PLANT B SAlWlNG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
VDC 780727 ROUTINE SHIFT
JOB TITLE SAMPLE#
TRAUXO
78-284-176
RESULT 2.650
UNIT DURATION
PPM
408
EDHC
VDC 780911 ROUTINE SHIFT
EDCOP
78-341-209
.280
PPM
364
EDMC
VDC 780911 ROUTINE SHIFT
TELOP
78-340-208
.730
PPM
364
EDMC VDC
780911
ROUTINE SHIFT
TETHOP
78-342-210
1.180
PPM
364
EDMC
VDC 780911 ROUTINE SHIFT
TRAUXO
78-343-211
1.700
PPM
364
EDMC
VDC
780915
TRAUXO
78-353-221
ROUTINE DAILY SAMPLING ROUND-
EXPERIMENTAL
EDMC
VDC
780918
TRAUXO
78-354-222
ROUTINE DAILY SAMPLING ROUNDS
(EXPERIMENTAL)
EDMC
VDC
780919
TRAUXO
78-355-223
ROUTINE DAILY SAMPLING ROUNDS
(EXPERIMENTAL)
EDMC
VDC 781004 ROUTINE SHIFT
EDCOP
78-381-236
26.900
PPM
22
22.200
PPM
33
15.600
PPM
41
.390
PPM
440
EDMC
VDC 781004 ROUTINE SHIFT
TELOP
78-380-235
.410
PPM
440
EDMC
VDC 781023 ROUTINE SHIFT
TETHOP
78-383-238
.210
PPM
380
PAGE
SL 016879
1/19/93
LAf^PHARLES (254) PLANT B SAMWiNG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
VDC 781031 ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
78-382-237
RESULT .330
UNIT DURATION PPM 430
PAGE
EDMC
VDC 781116 ROUTINE SHIFT
EDCOP
78-432-270
.310
PPM
425
EDMC
VDC 781116 ROUTINE SHIFT
t EDMC
VDC 781116 ROUTINE SHIFT
TELOP TETHOP
78-430-268 78-431-269
.480
PPM
425
1.020
PPM
425
EDMC
VDC 781116 ROUTINE SHIFT
TRAUXO
78-433-271
2.720
PPM
425
EDMC
VDC 781228 ROUTINE SHIFT
EDCOP
78-467-293
.660
PPM
387
EDMC
VDC 781228 ROUTINE SHIFT
EDCOP
78-479-293
.660
PPM
387
EDMC
VDC 781228 ROUTINE SHIFT
TELOP
78-466-292
.600
PPM
387
EDMC
VDC 781228 ROUTINE SHIFT
TELOP
78-478-292
.600
PPM
387
EDMC
VDC 781228 ROUTINE SHIFT
TETHOP
78-468-294
.540
PPM
375
EDMC
VDC 781228 ROUTINE SHIFT
TETHOP
78-480-294
.540
PPM
375
SI- 016880
1/19/93
LAH^RHARLES (259) PLANT B SAMPLING RESULTS THRU 1989
DEPT EDMC
COMPOUND
DATE
VDC 781228 ROUTINE SHIFT
JOB TITLE SAMPLE#
TRAUXO
78-969-295
RESULT .630
UNIT DURATION
PPM
375
PAGE
EDMC
VDC 781228 ROUTINE SHIFT
TRAUXO
78-981-295
.630
PPM
375
EDMC
VDC 790109 ROUTINE SHIFT
* EDMC
VDC 790109 ROUTINE SHIFT
EDCOP TELOP
79-018-013 79-017-012
1.850
PPM
385
.700
PPM
385
EDMC
VDC 790109 ROUTINE SHIFT
TETHOP
79-019-019
.500
PPM
385
EDMC
VDC
790109
TRAUXO
ROUTINE SHIFT-CLOSED LOOP
SAMPLERS DOWN/USED BOTTLES
EDMC
VDC 790122 ROUTINE SHIFT
TRAUXO
79-020-015 79-039-029
7.310
PPM
385
11.900
PPM
393
EDMC
VDC 790219 ROUTINE SHIFT
EDCOP
79-082-056
.090
PPM
390
EDMC
VDC 790219 ROUTINE SHIFT
TELOP
79-080-059
1.370
PPM
390
EDMC
VDC 790219 ROUTINE SHIFT
TETHOP
79-081-055
12.200
PPM
390
EDMC
VDC
790219
ROUTINE SHIFT
TRAUXO
79-083-057
2.580
PPM
390
SL 016881
1/19/93
LAJ^PHARLES (254) PLANT B SAMffTlHG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
VDC 790305 ROUTINE SHIFT
JOB TITLE SAMPLE#
TELOP
79-096-061
RESULT 2.000
UNIT DURATION PPM 445
EDMC
VDC 790305 ROUTINE SHIFT
TETHOP
79-098-063
.560
PPM
445
EDMC
VDC 790305 ROUTINE SHIFT
TRAUXO
* EDMC
VDC
790305
WELDER
ROUTINE WORKDAY-LOGBOOK
MECHANIC'S ROUNDS
EDMC
VDC 790309 ROUTINE SHIFT
EDCOP
79-099-064 79-100-065 79-097-062
.380
PPM
445
.160
PPM
445
.070
PPM
445
EDMC
VDC
790326
INSTRU
ROUTINE SHIFT AS LOGBOOK
INSTRUMENT MAN
EDMC
VDC 790423 ROUTINE SHIFT
EDCOP
79-101-066 79-228-120
.400
PPM
455
.000
PPM
425
EDMC
VDC 790423 ROUTINE SHIFT
TELOP
79-227-119
.000
PPM
425
EDMC VDC
790430
ROUTINE SHIFT
VDCOP
79-232-121
12.200
PPM
365
EDMC VDC
790514
ROUTINE SHIFT
TELOP
79-256-138
.000
PPM
390
EDMC
VDC 790514 ROUTINE SHIFT
VDCOP
79-257-139
.000
PPM
390
PAGE
SL 016882
1/19/93
LA #HARLES (254)
PLANT B SAMH' nn NG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
JOB TITLE
VDC
790518
INSTRU
ROUTINE WORKDAY AS LOGBOOK
INSTRUMENT MAN.
SAMPLE# 79-260-142
RESULT .340
UNIT DURATION PPM 430
EDMC
VDC 790521 ROUTINE SHIFT
VDCOP
79-264-146
.150
PPM
430
PAGE
EDMC
VDC 790530 ROUTINE SHIFT
EDCOP
* EDMC
VDC
790530
WELDER
ROUTINE WORKDAY AS LOGBOOK
MECHANIC
EDMC
VDC 790618 ROUTINE SHIFT
EDCOP
79-299-161 79-300-162 79-318-181
.190
PPM
404
.110
PPM
404
5.950
PPM
450
EDMC
VDC
790618
INSTRU
79-321-184
ROUTINE SHIFT WORKI NG AS LOG
BOOK INSTRUMENT MAN
EDMC
VDC 790618 ROUTINE SHIFT
TELOP
79-317-180
2.670
PPM
450
2.360
PPM
450
EDMC
VDC 790618 ROUTINE SHIFT
VDCOP
79-319-182
3.130
PPM
450
EDMC
VDC
790618
WELDER
79-320-183
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC
EDMC
VDC 790619 ROUTINE SHIFT
TE2S0P
79-331-186
5.010
PPM
450
.330
PPM
438
EDMC VDC
790705
ROUTINE SHIFT
EDCOP
79-355-201
2.850
PPM
465
SL 16883
1/19/93
LAI^PHARLES (254) PLANT B SAMFTIHG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE
JOB TITLE
VDC
790705
INSTRU
ROUTINE SHIFT WORKING AS LOG
BOOK INSTRUMENT MAN
SAMPLES 79-357-203
RESULT 2.230
UNIT DURATION PPM 465
EDMC
VDC 790705 ROUTINE SHIFT
TELOP
79-354-200
1.910
PPM
465
PAGE
EDMC VDC
790705
ROUTINE SHIFT
VDCOP
79-356-202
9.500
PPM
465
EDMC
VDC
790705
WELDER
79-358-204
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC.
EDMC
VDC 791005
79-480-277
16FT NW OF SUMP/5FT ABOVE GRHD
WSW/6MPH/78F/31RH/CLEAR
EDMC
VDC 791005
79-482-279
6FT E OF SUMP/6FT ABOVE GRND/
WSW/6MPH/78F/31RH/CLEAR
EDMC
VDC 791005
79-483-280
8FT W. OF SUMP/5FT ABOVE GRND
WSW/6MPH/78F/31RH/CLEAR
EDMC
VDC 791012
79-512-309
5FT SW OF KETTLE TOP ON RAIL
4FT ABV PLTFRM/S/8MPH/79F/58RH
EDMC
VDC 791015 2FT NE OF LIFT SUMP/4FT ABV
GRND/NE/6MPH/50F/86RH/CLEAR
79-515-312
EDMC
VDC 791015
79-516-313
2FT SW OF SUMP/5FT ABV GRND/
NE WHD/6MPH/50F/86RH/CLEAR
EDMC
VDC 791015
79-517-314
1 OFT SW OF SUMP/5FT ABV GRND/
NE WND/6MPH/50F/86RH/CLEAR
1.450
PPM
465
.050
PPM
322
.050
PPM
309
.050
PPM
309
.060
PPM
199
.090
PPM
291
.050
PPM
.050
PPM
286
SL 016884
292
1/19/93
t i I
LAI^RkARLES (254) PLANT B SAMlTlNG RESULTS THRU 1984
DEPT EDMC
COMPOUND
DATE JOB TITLE
VDC
791015
6FT SE OF SUMP/5FT ABV GRHD/
HE WND/6MPH/5OF/86RH/CLEAR
SAMPLE# 79-518-315
RESULT .050
UNIT DURATION
PPM
282
EDMC
VDC
791101
MACHIN
79-626-396
RECHARGING DRYER IN VDC AREA
.100
PPM
15
PAGE
EDMC
VDC
791105
ROUTINE SHIFT
EDCOP
79-635-404
.000
PPM
400
EDMC
VDC
791105
INSTRU
79-633-406
ROUTINE SHIFT WORKING AS LOG
BOOK MECHANIC
EDMC
VDC
791105
ROUTINE SHIFT
TELOP
79-634-403
2.480
PPM
400
.700
PPM
400
EDMC
VDC 791105 ROUTINE SHIFT
VDCOP
79-636-405
.650
PPM
400
EDVD
CCL4
791112
79-662-432
5FT NW OF EDC DOPP KETTLE SEAL
,FAIR,58F,N,7MPH
EDVD
CCL4
791112
79-663-433
4FT S OF EDC DOPP KETTLE SEAL,
FAIR, 58F,N,7MPH
EDVD CCL4
800414
ROUTINE SHIFT
INSTRU
80-219-102
.000
PPM
251
.000
PPM
252
.090
PPM
439
EDVD
CIS 791112
79-662-432
5FT NW OF EDC DOPP KETTLE SEAL
,FAIR,58F,N,7MPH
EDVD
CIS 791112
79-663-433
4FT S OF EDC DOPP KETTLE SEAL,
FAIR, 58F,N, 7MPH
.000
PPM
251
.050
PPM
252
SL 016885
1/19/93
LAi^WIARLES (254) PLANT B SAMmilG RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
CIS 800128 ROUTINE SHIFT
JOB TITLE SAMPLE#
LEADOP
80-033-018
RESULT .250
UNIT DURATION PPM 450
EDVD
800128 ROUTINE SHIFT
LEADOP
80-078-037
.250
PPM
450
EDVD
830303
EDVDOP
REDUCED OPERATIONS. ROUTINE
SHIFT.
83-134-086
EDVD
CIS 830310 ROUTINE WORK LOAD. NORMAL OPERATIONS.
8 -151-099
EDVD
830606
EDVDOP
83-276-190
ROUTINE SHIFT. NORMAL OPERA-
TIONS.
EDVD EDVD
CIS
830830
EDCOP
83-396-288
DID COLOR CHECKS AND RECIRCU
LATED EDC THROUGH CARBON BED.
NORMAL OPERATIONS.
830830
EDVDOP
83-397-289
BLOCKED AND REPAIRED LEAKING
TCE LINE:. NORMAL OPERATIONS.
EDVD EDVD
CIS
831010
LGMC
83-479-340
LOGBOOK WORK THROUGHOUT UNIT.
REDUCED OPERATIONS- NO.1 EDC
PLANT DOWN.
DCE 791112
79-662-432
5FT NW OF EDC DOPP KETTLE SEAL
,FAIR,58F,N,7MPH
EDVD
DCE 791112
79-663-433
4FT S OF EDC DOPP KETTLE SEAL,
FAIR,58F ,N,7MPH
EDVD
DCE
800205
MACHIN
80-081-040
ROUTINE SHIFT AS LOGBOOK MECH.
STARTUP VDC REACTOR
.140
PPM
416
.180
PPM
417
.130
PPM
451
.170
PPM
437
1.080
PPM
440
.240
PPM
432
.050
PPM
251
.000
PPM
252
.060
PPM
420
PAGE 0T.6*86
1/19/93
LAI^WIARLES (259) PLANT B SAMWING RESULTS THRU 1989
DEPT EDVD
COMPOUND
DATE
JOB TITLE
DCE
800205
VDCOP
ROUTINE SHIFT
STARTUP VDC REACTOR
SAMPLE# 80-080-039
RESULT .060
UNIT DURATION PPM 920
EDVD
DCE 800325 ROUTINE SHIFT
LEADOP
80-136-062
.650
PPM
932
PAGE
EDVD DCE
800919
ROUTINE SHIFT
LEADOP
80-216-099
.060
PPM
255
EDVD
DCE
800602
INSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAN
EDVD
DCE
800630
INSTRU
ROUTINE SHIFT AS LOGBOOK
INSTRUMENT MECH.
EDVD
DCE 800709 ROUTINE SHIFT
LEADOP
80-323-158 80-357-176 80-383-191
.190
PPM
950
.170
PPM
992
.670
PPM
380
EDVD
DCE 800812 ROUTINE SHIFT
INSTRU
80-999-218
.130
PPM
957
EDVD
DCE
801006
INSTRU
ROUTINE SHIFT AS LOGBOOK
INSTRUMENT MAN
80-513-298
EDVD
DCE
810616
EDVDAX
RAN ANALYSIS ON EXTRA VDC
STILL SAMPLES.
81-266-137
EDVD DCE
830606
LGINM
83-277-191
ROUTE WORK. NORMAL OPERATIONS.
EDVD
DCE
830705
EDVDOP
NORMAL OPERATIONS SHUT ONE
REACTOR DOWN NO. 2 REACTOR
83-307-217
.050
PPM
910
.160
PPM
998
.280
PPM
.150
PPM
992
SL 016887
990
1/19/93
LAI^HHARLES (259) PLANT B SAMTONG RESULTS THRU 1989
DEPT EDVD
COMPOUND
DATE
JOB TITLE SAMPLE#
DCE
890607
EDVDOP
89-316-229
NORMAL OPERATIONS. ROUTINE LAB
ANALYSIS.
RESULT 2.370
UNIT DURATION PPM 19
EDVD
DCE
890611
EDCOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
89-323-235
.280
PPM
917
EDVD
*
EDVD
DCE
890611
EDVDOP
NORMAL OPERATIONS. ROUTINE
SHIFT. VAREC FLOAT CHAMBER
CLEARED.
89-322-239
DCE
890706
EDVDOP
89-369-281
ROUTINE SHIFT. NORMAL OPERA
TIONS.
.900
PPM
908
.120 PPM 955
EDVD EDVD EDVD
DCE
890906
EDCOP
89-961-356
NORMAL OP. CLEARED PLUGGED
LINE DH FEED VALVE, H20 OUT OF
RX PHASE SEP.
DCE
891105
EDCOP
89-580-991
NORMAL OP. START-UP NO.3 RX AT
0830 TIME. SPRAYED WITH HEW
CATALYST.
DCE
891105
EDVDOP
UPSET OPERATIONS NO.3 PLANT,
NO.9 RX. WIND N-19.
89-581-992
.310
PPM
923
.270
PPM
933
.920
PPM
933
EDVD
EC 791112
79-662-932
5FT NW OF EDC DOPP KETTLE SEAL
,FAIR,58F,N,7MPH
.390
PPM
251
EDVD
EC 791112
79-663-933
9FT S OF EDC DOPP KETTLE SEAL,
FAIR,58F,N,7MPH
.200
PPM
252
EDVD
EC 800121 ROUTINE SHIFT
LEADOP
80-033-018
.210
PPM
930
PAGE
EDVD
EC
800121
MACHIN
ROUTINE SHIFT AS LOGBOOK
MECHANIC
80-039-019
.850
PPM
930
SL 016888
1/19/93
HLA HARLES (254)
PLANT B SAMI IJG RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
JOB TITLE
EC
800124
VDCOP
MORNING SAMPLE ROUND
SAMPLE# 80-052-028
RESULT .140
UNIT DURATION
PPM
13
PAGE
EDVD
EC
800128
EDCOP
MORNING SAMPLE ROUND
80-051-027
.090
PPM
15
EDVD
EC 800205 ROUTINE SHIFT
EDCOP
80-079-038
.050
PPM
427
EDVD
EC 800205 ROUTINE SHIFT
IHSTRU
80-082-041
.090
PPM
427
EDVD
EC
800205
MACHIN
80-081-040
ROUTINE SHIFT AS LOGBOOK MECH.
STARTUP VDC REACTOR
EDVD
EC
800205
VDCOP
ROUTINE SHIFT
STARTUP VDC REACTOR
80-080-039
EDVD
EC
801006
INSTRU
ROUTINE SHIFT AS LOGBOOK
INSTRUMENT MAN
80-513-248
EDVD EDVD EDVD EDVD
EC 810827 EDVDAX ROUTINE SHIFT.#3 EDC REACTOR WAS DOWN.ADJACENT UNIT WAS
PURGING OUT VINYL VESSELS.
81-382-212
EC
810827
LGIHM
81-384-214
ROUTINE SHIFT. #3 EDC REACTOR
WAS DOWN.ADJACENT UNIT WAS
PURGING OUT VINYL VESSELS.
EC
810904
EDVDOP
ROUTINE MORNING ROUND. EDC
COLOR CHECKS. ORGANIC BOX
CHECKS.
81-404-227
EC
811002
EDVDAX
81-498-278
ROUTINE SHIFT UNTIL EXPLOSION
IN EDC REACTOR
.110
PPM
420
.090
PPM
420
.120
PPM
410
.120
PPM
450
.120
PPM
440
1.070
PPM
15
.260
PPM
443
SL 016889
1/19/93
LA AARLES (259)
PLANT B SAMMPriNNG RESULTS THRU 1969
DEPT EDVD
COMPOUND'
DATE
JOB TITLE SAMPLE#
EC
811002
EDVDOP
81-995-275
ROUTINE SHIFT UNTIL EXPLOSION
IN EDC REACTOR
RESULT .100
UNIT DURATION PPM 939
EDVD
EC
811002
LGINM
81-997-277
ROUTINE SHIFT UNTIL EXPLOSION
IN EDC REACTOR
.100
PPM
932
EDVD
4
EDVD
EC
811002
LGMC
81-996-276
ROUTINE SHIFT UNTIL EXPLOSION
IN EDC REACTOR
EC 811203 NORMAL SHIFT
EDCOP
81-611-352
.290
PPM
990
.690
PPM
991
EDVD
EC 811203 NORMAL SHIFT
EDVDAX
81-615-356
1.270
PPM
991
EDVD
EC 811203 NORMAL SHIFT
EDVDOP
81-612-353
.890
PPM
997
EDVD
EC
811203
LGINM
81-619-355
INSTUMENT REPAIR WORK IN UNITS
ALL DAY
EDVD
EC
811203
LGMC
REPAIRED PUMPS IN MC UNIT
81-613-359
.990
PPM
928
1.000
PPM
921
EDVD
EC 820115 NORMAL SHIFT
EDCOP
82-022-018
.970
PPM
951
EDVD
EC
820115
LEADOP
TIGHTENED EDC VALVE LEAKS
DURING NORMAL DAY SHIFT.
EDVD EC
820210
LGINM
ROUTINE ROUTE WORK
82-021-017 82-053-036
1.900
PPM
951
.100
PPM
939
PAGE
SL 016890
1/19/93
LAHHHARLES (259) PLANT B SAMPLING RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
EC 820210 ROUTE WORK
JOB TITLE SAMPLE#
LGMC
82-052-035
RESULT .150
UNIT DURATION PPM 451
EDVD
EC 820602 NORMAL SHIFT
EDCOP
82-193-097
.740
PPM
444
EDVD
EC 820602 NORMAL SHIFT
* EDVD
EC 820614 ROUTINE SHIFT
EDVDOP EDVDAX
82-194-098 82-215-111
.280
PPM
444
.560
PPM
426
EDVD
EC 820614 ROUTINE SHIFT
LGINM
82-214-110
.320
PPM
424
EDVD EDVD EDVD
EC
820713
EDVDAX
82-273-155
ROUTINE SHIFT. 88 F, FAIR, 57V.
RH, 30.07BP, WINDS NW-8.
CCF RESPIRATOR WORN SAMPLING
EC
820713
LGMC
82-274-156
REPAIRED A VDCM REACTOR BOTTOM
PUMP IN EDC/VDC PIANT. 88 F,
FAIR, 57XRH, 30.07BP,WINDS 8NW
EC 820812 ROUTINE SHIFT
EDCOP
82-329-199
.490
PPM
458
.280
PPM
429
.620
PPM
447
EDVD
EC
820812
EDVDAX
82-332-202
ROUTINE SHIFT. CAUGHT SAMPLES.
.450
PPM
449
EDVD
EC 820812 ROUTINE SHIFT
EDVDOP
82-330-200
.130
PPM
449
EDVD
EC 820812 ROUTINE SHIFT
LGINM
82-331-201
.160
PPM
439
PAGE
SL 016891
1/19/93
LAtiHARLES (254) PLANT B SAMPLING RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
JOB TITLE SAMPLE#
EC
820915
EDVDAX
82-394-251
ROUTINE MORNING SAMPLING RUN t
COLLECTING EDC SAMPLES.
RESULT .820
UNIT DURATION PPM 16
EDVD
EC 821018 ROUTINE SHIFT.
EDCOP
82-448-292
.120
PPM
441
EDVD
EC 821018 ROUTINE SHIFT
* EDVD
EC 821018 ROUTINE SHIFT
EDVDAX EDVDOP
82-450-294 82-449-293
.630
PPM
439
.050
PPM
441
EDVD
EC 821104 ROUTINE SHIFT
EDCOP
82-482-323
.080
PPM
442
EDVD
EC
821118
LGMC
82-518-343
REPAIRED PUMPS IN EDC UNIT AND
WORKED IN VDCM UNIT. WINDS E-6
EDVD
EC 821220 ROUTINE SHIFT.
EDVDOP
82-570-375
.100
PPM
425
.070
PPM
445
EDVD
EC 830106 ROUTINE SHIFT.
EDCOP
83-008-006
.110
PPM
436
EDVD
EC 830106 ROUTINE SHIFT
EDVDOP
83-009-007
.060
PPM
436
EDVD EDVD
EC
830121
EDCOP
1 AND 2 PLANTS NORMAL RATES,
3 PLANT DOWN. COLLECTING
SAMPLES. TEMP 38, WINDS NW-6
EC
830208
EDVDOP
ROUTINE SHIFT. NORMAL OP-
ERATIOMS.
83-045-033 83-089-058
1.260
PPM
15
.640
PPM
448
SL 016892
PAGE
1/19/93
LAI^RHARLES (259) PLANT B SAMPLING RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
JOB TITLE
EC
830303
EDCOP
REDUCED OPERATIONS. ROUTINE
SHIFT.
SAMPLE# 83-135-087
RESULT .070
UNIT DURATION
PPM
907
EDVD
EC
830303
EDVDOP
REDUCED OPERATIONS. ROUTINE
SHIFT.
83-139-086
.090
PPM
916
EDVD
EC
830309
EDVDOP
NORMAL OPERATIONS. ROUTINE
MORNING SAMPLING ROUND.
EDVD
EC 830310
ROUTINE WORK LOAD. NORMAL OPERATIONS.
83-199-097 8 -151-099
.100
PPM
25
.060
PPM
917
EDVD EDVD
EC
830925
EDVDOP
83-187-130
ROUTINE ROUNDS. SAMPLED AND
ANALYZED EDC AND VDC. EDC UNIT
SHUTDOWN.
EC
830518
EDVDOP
83-229-162
REDUCED OPERATIONS. RECHARGED
EDC CATALYST POT.
.110
PPM
937
.110
PPM
927
EDVD EDVD
EC
830606
EDCOP
83-275-189
ROUTfHE ROUNDS. WORKED IN AREA
OF SOUTH TERMINAL TANK. NORMAL
OPERATIONS.
EC
830606
LGINM
83-277-191
ROUTE WORK. NORMAL OPERATIONS.
.190
PPM
959
1.270
PPM
992
EDVD
EC
830705
EDCOP
NORMAL OPERATIONS TOOK ONE
REACTOR DOWN NO. 2 REACTOR
83-306-216
EDVD
EC
830705
EDVDOP
NORMAL OPERATIONS SHUT ONE
REACTOR DOWN HO. 2 REACTOR
83-307-217
EDVD
EC
830830
EDCOP
83-396-288
DID COLOR CHECKS AND RECIRCU
LATED EDC THROUGH CARBON BED.
NORMAL OPERATIONS.
1.090
PPM
360
.190
PPM
990
1.310
PPM
937
PAGE SL 016893
1/19/93
#LA HARLES C 254 )
PLAtIT B SAMMPTIING RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
EDVD
EC
830830
EDVDOP
83-397-289
BLOCKED AND REPAIRED LEAKING
TCE LINE. NORMAL OPERATIONS.
RESULT .510
UNIT DURATION PPM 490
EDVD
EC
830919
EDCOP
REDUCED OPERATIONS, ROUTINE
SHIFT.
83-435-306
.050
PPM
403
EDVD
EC
831010
EDCOP
83-477-338
ROUTINE SHIFT. REDUCED OPERA
TIONS- NO.1 EDC PLANT DOWN.
.060
PPM
438
EDVD
EC
831010
EDVDOP
83-478-339
ROUTINE SHIFT. REDUCED OPERA
TIONS- HO.1 EDC PLANT DOWN.
.060
PPM
434
EDVD EDVD
EC
831010
LGMC
83-479-340
LOGBOOK WORK THROUGHOUT UNIT.
REDUCED OPERATIONS- NO.l EDC
PLANT DOWN.
EC
831114
EDCOP
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-545-385
.070
PPM
432
.110
PPM
434
EDVD
EC
831114
EDVDOP
83-546-386
NORMAL OPERATIONS, ROUTINE
SHIFT. CLEARED VAREC STORAGE
.070
PPM
435
EDVD EDVD EDVD
EC
840110
EDCOP
84-026-014
NORMAL OPERATIONS. DRAINED NO.
1 VENT HEADER AND ROUTINE
DUTIES. WIND NW-23.
EC
840110
EDVDOP
84-027-015
NORMAL OPERATIONS. STARTED-UP
TCE UNIT AND ROUTINE DUTIES.
WIND NW-23.
EC
840202
EDCOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
84-096-054
.150 PPM 433 .050 PPM 415 .370 PPM 419
EDVD
EC
840314
EDVDOP
ROUTINE SHIFT. NORMAL OPERA TIONS.
84-152-096
.050
PPM
438
PA6E SL 0168^
1/19/93
LAHflHKARLES (259) PLANT B SAMPLING RESULTS THRU 1989
DEPT EDVD
COMPOUNCI
DATE
JOB TITLE
EC 890929 NORMAL OPERATIONS. PLACED ON CENTER TABLE.
SAMPLE# 89-231-169
RESULT .060
UNIT DURATION
PPM
395
EDVD
EC
890611
EDCOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
89-323-235
1.090
PPM
917
EDVD EDVD
EC
890611
EDVDOP
NORMAL OPERATIONS. ROUTINE
SHIFT. VAREC FLOAT CHAMBER
CLEARED.
EC
890706
EDCOP
ROUTINE SHIFT. NORMAL OPERA-
TIONS.
89-322-239 89-368-280
.980
PPM
908
.110
PPM
955
EDVD
EC
890706
EDVDOP
89-369-281
ROUTINE SHIFT. NORMAL OPERA-
TIONS.
.090
PPM
955
EDVD
EC
890828
EDCOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
89-935-336
.060
PPM
913
EDVD
EC
890906
EDVDOP
89-962-357
NORMAL OP. HOSE BROKE ON EDC
LINE FROM VAC TRK, EDC SPILL.
.930
PPM
923
EDVD
EC
890911
EDCOP
NORMAL OP. ROUTINE SHIFT.
ANALYZING SAMPLES IN LAB.
89-975-367
.380
PPM
16
EDVD
EC
891002
EDCOP
NORMAL OP. ROUTINE SHIFT.
89-528-905
.080
PPM
399
EDVD
EC
891002
EDVDOP
NORMAL OP. ROUTINE SHIFT.
89-527-909
.070
PPM
397
EDVD
EC
891105
EDCOP
89-580-991
NORMAL OP. START-UP HO. 3 RX AT
0830 TIME. SPRAYED WITH NEW
CATALYST.
.150
PPM
933
PAGE SL 016895
1/19/93
PLANT
HARLES C254) SAMm NG RESULTS THRU 1989
DEPT EDVD
COMPOUND
DATE
JOB TITLE
EC
891108
EDCOP
NORMAL OP. ROUTINE MORNING
ROUND.
SAMPLE# 89-590-951
RESULT .990
UNIT DURATION PPM 19
EDVD
EC
891108
EDVDOP
NORMAL OP. ROUTINE MORNING
SAMPLE ROUND.
89-591-952
.100
PPM
18
EDVD
EC
891210
EDVDOP
89-621-978
REDUCED OP. EDC AND EDC/VDCM
PLANTS 1 AND 2 COMBINED JOB.
.170
PPM
932
EDVD
EDC 791112
79-662-932
5FT NW OF EDC DOPP KETTLE SEAL
,FAIR,58F,N,7MPH
1.870
PPM
251
EDVD
EDC 791112
79-663-933
9FT S OF EDC DOPP KETTLE SEAL,
FAIR,58F,N,7MPH
9.890
PPM
252
EDVD
EDC
791218
EDCOP
PUT FILTER INTO SERVICE
VENTED EDC TO CHECK FLOW
79-686-959
3.300
PPM
15
EDVD
EDC
800121
INSTRU
ROUTINE SHIFT AS LOGBOOK
INSTRUMENT HAN
80-035-020
.500
PPM
930
EDVD
EDC 800121 ROUTINE SHIFT
LEADOP
80-033-018
1.990
PPM
930
PAGE
EDVD
EDC
800121
MACHIN
ROUTINE SHIFT AS LOGBOOK
MECHANIC
EDVD
EDC
800129
VDCOP
MORNING SAMPLE ROUND
80-039-019 80-052-028
EDVD
EDC
800128
EDCOP
MORNING SAMPLE ROUND
80-051-027
2.000
PPM
930
1.210
PPM
12.300
PPM
13
SL 016896 15
1/19/93
LAt^iHARLES (259) PLANT B SAMPLING RESULTS THRU 1989
DEPT EDVD
COMPOUND
DATE
EDC 800128 ROUTINE SHIFT
JOB TITLE SAMPLE#
LEADOP
80-033-018
RESULT .700
UNIT DURATION PPM 950
PAGE
EDVD
EDC 800128 ROUTINE SHIFT
LEADOP
80-078-037
.700
PPM
950
EDVD
EDC 800205 ROUTINE SHIFT
* EDVD
EDC 800205 ROUTINE SHIFT
EDCOP INSTRU
80-079-038 80-082-091
1.720
PPM
927
1.710
PPM
927
EDVD
EDC
800205
MACHIH
80-081-090
ROUTINE SHIFT AS LOGBOOK MECH
STARTUP VDC REACTOR
EDVD
EDC
800205
VDCOP
ROUTINE SHIFT
STARTUP VDC REACTOR
80-080-039
EDVD
EDC
800303
INSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAN
80-139-060
EDVD
EDC
800303
LOALAB
STARTING VP #2 EDC REACTOR
80-137-063
.950
PPM
920
3.000
PPM
920
.660
PPM
920
1.860
PPM
375
EDVD
EDC
800303
MACHIN
ROUTINE SHIFT AS LOG BOOK
MECHANIC
EDVD
EDC
800303
PIPEFI
STARTING UP #2 EDC REACTOR
80-135-061 80-138-069
1.070
PPM
917
.290
PPM
385
EDVD
EDC
800303
PIPEFI
STARTING UP #2 EDC REACTOR
80-139-065
.560
PPM
385
St Olfiggj,
1/19/93
LAI^BHARLES (2591 PLANT B SAHPflNG RESULTS THRU 1989
DEPT EDVD
COMPOUND
DATE
JOB TITLE
EDC
800329
EDCOP
ROUTINE MORNING SAMPLE ROUND
SAMPLE# 80-180-081
RESULT 36.900
UNIT DURATION PPM 15
EDVD
EDC 800325 ROUTINE SHIFT
LEADOP
80-136-062
1.930
PPM
932
EDVD
EDC 800919 ROUTINE SHIFT
* EDVD
EDC 800919 ROUTINE SHIFT
INSTRU LEADOP
80-219-102 80-216-099
1.000
PPM
939
.290
PPM
255
EDVD
EDC
800507
EDCOP
MORNING SAMPLE ROUND
80-289-139
7.810
PPM
15
EDVD
EDC
800507
INSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAN
EDVD
EDC
800507
LEADOP
TAGGING OUT A PUMP
80-283-138 80-281-136
.190
PPM
928
1.980
PPM
15
EDVD
EDC
800507
MACHIN
ROUTINE SHIFT AS LOG BOOK
MECHANIC
EDVD
EDC
800507
VDCOP
MORNING SAMPLE ROUND
80-282-137 80-285-190
3.210
PPM
972
7.350
PPM
15
EDVD
EDC
800602
INSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAN
EDVD
EDC 800602 ROUTINE SHIFT
MACHIN
80-323-158 80-322-157
.520
PPM
950
1.930
PPM
993
PAGE
^ 016898
1/19/93
LA
m HARLES
(259)
PLANT B SAMMPfl NG RESULTS THRU 1989
DEPT EDVD
COMPOUND
DATE
EDC 800602 ROUTINE SHIFT
JOB TITLE SAMPLE#
VDCOP
80-321-156
RESULT 13.980
UNIT DURATION PPM 929
PAGE
EDVD
EDC 800603 ROUTINE SHIFT
EDCOP
80-320-155
1.560
PPM
933
EDVD
EDC 800630 ROUTINE SHIFT
EDCOP
80-390-170
1.720
PPM
990
EDVD
EDC
800630
INSTRU
ROUTINE SHIFT AS LOGBOOK
INSTRUMENT MECH.
EDVD
EDC 800709 ROUTINE SHIFT
LEADOP
80-357-176 80-383-191
.100
PPM
992
1.120
PPM
380
EDVD
EDC
800709
MACHIN
ROUTINE SHIFT AS LOGBOOK
MECHANIC
EDVD
EDC 800709 SAMPLE ROUND
VDCOP
80-389-192 80-385-193
8.100
PPM
993
.170
PPM
15
EDVD
EDC
800812
EDCOP
WORKING ON #2EDC REACTOR IN
#1 PLANT
80-996-215
EDVD
EDC 800812 ROUTINE SHIFT
INSTRU
80-999-218
33.600
PPM
970
.930
PPM
957
EDVD
EDC
800812
MACHIN
80-998-217
CLEARING CATALYST POT; SPRAYED
WITH EDC
EDVD
EDC 800812 ROUTINE SHIFT
VDCOP
80-997-216
6.950
PPM
965
1.080
PPM
969
SL 016899
1/19/93
LAI^^BmaRLES 1254) PLANT B SAMPONG RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
EDC 801006 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
80-559-246
RESULT 1.200
UNIT DURATION PPM 380
PAGE
EDVD
EDC
801006
INSTRU
ROUTINE SHIFT AS LOGBOOK
INSTRUMENT MAN
EDVD
EDC 801006 ROUTINE SHIFT
VDCOP
* EDVD
EDC 810212 ROUTINE SHIFT
EDVDAX
80-513-248 80-560-247 81-038-017
.990
PPM
410
1.200
PPM
409
10.400
PPM
454
EDVD
EDC
810212
EDVDOP
81-035-014
STARTUP VDC-MC RECOVERY PLANT
.400
PPM
449
EDVD
EDC 810212 ROUTINE SHIFT
LEADOP
81-034-013
1.000
PPM
448
EDVD
EDC
810212
LGINM
81-037-016
WORKING IN #2 PLANT AROUND #3
SUMP .
EDVD
EDC
810212
LGMC
WORKING ON #4 COOLING TOWER
81-036-015
1.200
PPM
440
3.000
PPM
430
EDVD EDVD
EDC
810312
EDCOP
81-094-048
RAN A ORTHO-TOLIDIHE COLOR
CHECK ON EDC PRODUCT COMING
FROM THE EDC REACTOR IN #1 PLT
EDC
810312
EDVDOP
81-095-049
RAH A ORTHO-TOLIDINE COLOR
CHECK ON EDC PRODUCT IN #3 PLT
EDVD
EDC 810505 SAMPLE ROUND.
EDCOP
81-154-074
2.700
PPM
15
1.000
PPM
15
14.600
PPM
15
SL 016900
1/19/93
Lfld^IARLES (254) PLANT B SAMmilG RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
EDC 810505 ROUTINE ROUND.
JOB TITLE SAMPLE#
EDVDOP
81-155-075
RESULT 2.300
UNIT DURATION PPM 15
EDVD
EDC
810616
EDVDAX
RAN ANALYSIS ON EXTRA VDC
STILL SAMPLES.
81-266-137
EDVD
EDC
810729
EDCOP
81-333-184
MORNING SAMPLE ROUND IN #1 EDC
PLANT.
EDVD
EDC
810729
EDVDOP
81-334-185
MORNING SAMPLE ROUND IN #3 EDC
PLANT AND VDC PLANT.
EDVD EDVD EDVD EDVD EDVD EDVD
EDC 810827 EDCOP ROUTINE SHIFT.#3 EDC REACTOR WAS DOWN.ADJACENT UNIT WAS
PURGING OUT VINYL VESSELS.
81-380-210
EDC 810827 EDVDAX ROUTINE SHIFT.#3 EDC REACTOR WAS DOWN.ADJACENT UNIT WAS
PURGING OUT VINYL VESSELS.
81-382-212
EDC 810827 EDVDOP ROUTINE SHIFT.#3 EDC REACTOR WAS DOWN.ADJACENT UNIT WAS
PURGING OUT VINYL VESSELS.
81-381-211
EDC
810827
LGINM
81-384-214
ROUTINE SHIFT. #3 EDC REACTOR
WAS DOWN.ADJACENT UNIT WAS
PURGING OUT VINYL VESSELS.
EDC
810827
LGMC
ROUTINE SHIFT.#3 EDC REACTOR
WAS DOWN.ADJACENT UNIT WAS
PURGING OUT VINYL VESSELS.
81-383-213
EDC
810904
EDCOP
81-403-226
ROUTINE MORNING ROUND. COLOR
CHECKS MADE.
EDVD
EDC
810904
EDVDOP
ROUTINE MORNING ROUND. EDC
COLOR CHECKS. ORGANIC BOX
CHECKS.
81-404-227
3.900
PPM
448
16.800
PPM
15
1.400
PPM
15
2.300
PPM
457
2.800
PPM
450
.820
PPM
450
.490
PPM
440
.340
PPM
405
4.020
PPM
15
36.700
PPM
15
PAGE SL 016901
1/19/93
LAI (ARLES (254) PLANT B SAMmpTilNG RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
JOB TITLE SAMPLE#
EDC
811002
EDCOP
81-494-274
ROUTINE: SHIFT UNTIL EXPLOSION
IN EDC REACTOR
RESULT 1.830
UNIT DURATION PPM 437
EDVD
EDC
811002
EDVDAX
81-498-278
ROUTINE SHIFT UNTIL EXPLOSION
IN EDC REACTOR
7.500
PPM
443
EDVD
* EDVD
EDC
811002
EDVDOP
81-495-275
ROUTINE SHIFT UNTIL EXPLOSION
IN EDC REACTOR
EDC
811002
LGINM
81-497-277
ROUTINE SHIFT UNTIL EXPLOSION
IN EDC REACTOR
.620
PPM
434
1.750
PPM
432
EDVD
EDC
811002
LGMC
81-496-276
ROUTINE SHIFT UNTIL EXPLOSION
IN EDC REACTOR
.220
PPM
440
EDVD
EDC
811201
EDCOP
81-595-342
ROUTINE ROUND AND REPAIRED AN
EDC PACKING LEAK
4.880
PPM
15
EDVD
EDC
811201
EDVDOP
ROUTINE MORNING ROUND
81-596-343
1.550
PPM
15
EDVD
EDC 811203 NORMAL SHIFT
EDCOP
81-611-352
.790
PPM
441
EDVD
EDC 811203 NORMAL SHIFT
EDVDAX
81-615-356
5.890
PPM
441
EDVD
EDC 811203 NORMAL SHIFT
EDVDOP
81-612-353
1.910
PPM
447
EDVD
EDC
811203
LGINM
81-614-355
IHSTUMENT REPAIR WORK IN UNITS
ALL DAY
1.460
PPM
428
PAGE SL 016902
1/19/93
LAI^BhARLES (254) PLANT B SAMmNG RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
JOB TITLE
EDC
811203
LGMC
REPAIRED PUMPS IN MC UNIT
SAMPLE# 81-613-354
RESULT 49.200
UNIT DURATION
PPM
421
PAGE
EDVD EDC
820115
NORMAL SHIFT
EDCOP
82-022-018
1.150
PPM
451
EDVD
EDVD
EDC
820115
EDVDOP
82-023-019
O-RING BLOW-OUT OH HQMME ROTO-
METER AND RELEASE FROM BLEED
VALVE-STRIPPER LIGHTS FLOW TRM
EDC
820115
LEADOP
TIGHTENED EDC VALVE LEAKS
DURING NORMAL DAV SHIFT.
82-021-017
EDVD
EDC
820210
LGINM
ROUTINE ROUTE WORK
82-053-036
1.280
PPM
450
3.620
PPM
451
1.130
PPM
439
EDVD
EDC 820210 ROUTE WORK
LGMC
82-052-035
.970
PPM
451
EDVD
EDC 820218 NORMAL SHIFT
EDVDOP
82-086-055
.730
PPM
437
EDVD
EDC
820219
EDVDAX
82-089-056
SAMPLING EDC TANK WITH COAST
GUARD-CONCERNING SPILL
EDVD EDVD
EDC
820219
SUPRVS
SAMPLING WATER WITH COAST
GUARD. ALSO HANDLED SPILLED
EDC FROM POOL IN 010 DITCH.
82-090-057
EDC
820303
EDCOP
82-097-060
ROUTINE SAMPLE RUN AND COLOR
CHECK
EDVD
EDC 820602 NORMAL SHIFT
EDCOP
82-193-097
.100
PPM
15
4.000
PPM
15
.100
PPM
17
3.080
PPM
444
SL 016903
1/19/93
LA^HARLES (254) PLANT B SAMFTING RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
EDC 820602 NORMAL SHIFT
JOB TITLE SAMPLE#
EDVDOP
82-194-098
RESULT 1.550
UNIT DURATION PPM 444
EDVD
EDC 820614 ROUTINE SHIFT
EDVDAX
82-215-111
7.050
PPM
426
EDVD
EDC 820614 ROUTINE SHIFT
* EDVD
EDC 820624 ROUTINE SHIFT
LGINM LGINM
82-214-110 82-240-129
2.890
PPM
424
2.190
PPM
457
EDVD
EDC
820713
EDCOP
ROUTINE MORNING ROUND.
82-270-152
8.800
PPM
16
EDVD EDVD
EDC
820713
EDVDAX
82-273-155
ROUTINE SHIFT. 88 F, FAIR, 577,
RH, 30.07BP, WINDS NW-8.
CCF RESPIRATOR WORN SAMPLING
EDC
820713
EDVDOP
ROUTINE MORNING ROUND.
82-262-144
8.250
PPM
458
.100
PPM
13
EDVD EDVD
EDC
820713
LGMC
82-274-156
REPAIRED A VDCM REACTOR BOTTOM
PUMP IN EDC/VDC PIANT. 88 F,
FAIR, 57XRH, 30.07BP,WINDS 8NW
EDC 820812 ROUTINE SHIFT
EDCOP
82-329-199
.350
PPM
429
6.000
PPM
447
EDVD
EDC
820812
EDVDAX
82-332-202
ROUTINE SHIFT. CAUGHT SAMPLES
5.900
PPM
449
EDVD
EDC 820812 ROUTINE SHIFT
EDVDOP
82-330-200
.960
PPM
449
PAGE
016904
1/19/93
LAKHHARLES (259) PLANT B SAMPTlNG RESULTS THRU 198A
DEPT EDVD
COMPOUND
DATE
EDC 820812 ROUTINE SHIFT
JOB TITLE SAMPLE#
LGINM
82-331-201
RESULT 1.210
UNIT DURATION PPM A39
PAGE
EDVD
EDC
820915
EDVDAX
82-39A-251
ROUTINE MORNING SAMPLING RUN,
COLLECTING EDC SAMPLES.
EDVD
EDC
820915
EDVDOP
ROUTINE MORNING ROUND
* EDVD
EDC 821018 ROUTINE SHIFT.
EDCOP
82-395-252 82-AA8-292
9.260
PPM
16
11.600
PPM
17
2.380
PPM
AA1
EDVD
EDC 821018 ROUTINE SHIFT
EDVDAX
82-A50-29A
3.510
PPM
A39
EDVD
EDC 821018 ROUTINE SHIFT
EDVDOP
82-AA9-293
.770
PPM
AA1
EDVD
EDC 82110A ROUTINE SHIFT
EDCOP
82-A82-323
1.290
PPM
AA2
EDVD
EDC 82110A ROUTINE SHIFT
EDVDAX
82-A8A-325
3.A60
PPM
A19
EDVD
EDC
82110A
EDVDOP
82-A83-32A
ROUTINE SHIFT, SAMPLED VDCM/
TCE.
EDVD EDVD
EDC
82110A
LGINM
82-A85-326
REPAIRED DH STILL LEVEL TRANS-
MITTER, WORKED IN VDC UNIT
HALF DAY
EDC
821118
LGMC
82-518-3A3
REPAIRED PUMPS IH EDC UNIT AND
WORKED IN VDCM UNIT. WINDS E-6
. ABO
PPM
AA1
A. 720
PPM
A2A
.230
PPM
A25
SL 016905
1/19/93
LAI HARLES (254) PLANT B SAMMI WtLNG RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
EDC 821208 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDVDOP
82-551-367
RESULT .690
UNIT DURATION PPM 440
PAGE
EDVD
EDC 821220 ROUTINE SHIFT.
EDVDOP
82-570-375
1.230
PPM
445
EDVD
EDC 830106 ROUTINE SHIFT.
EDVD
EDC 830106 ROUTINE SHIFT
EDCOP EDVDOP
83-008-006 83-009-007
7.190
PPM
436
1.040
PPM
436
EDVD EDVD EDVD EDVD
EDC
830121
EDCQP
1 AND 2 PLANTS NORMAL RATES,
3 PLANT REDUCED RATES. ANALY
ZING SAMPLES IN LAB.
83-043-031
EDC
830121
EDCOP
1 AND 2 PLANTS NORMAL RATES,
3 PLANT DOWN. COLLECTING
SAMPLES. TEMP 38, WINDS NW-6
83-045-033
EDC
830121
EDVDOP
1 AND 2 PLANTS NORMAL RATES,
3 PLANT DOWN. ANALYZING
SAMPLES IN LAB.
83-044-032
EDC
830208
EDVDAX
ROUTINE SHIFT. NORMAL OP
ERATIONS.
83-092-061
EDVD
EDC
830208
EDVDOP
ROUTINE SHIFT. NORMAL OP
ERATIONS.
83-089-058
EDVD EDVD
EDC
830208
LGINM
83-091-060
WORKED IN TE2 MAINTENANCE AREA
AND TRI2 STABILIZER AREA.
NORMAL OPERATIONS.
EDC
830208
LGMC
83-090-059
PIPEFITTING AND MACHINIST WORK
IN UNIT. NORMAL OPERATIONS.
14.000
PPM
15
24.100
PPM
15
4.990
PPM
15
3.960
PPM
450
6.640
PPM
448
.340
PPM
440
.280
PPM
442
SL 16906
1/19/93
LA kS|h ARLES (25A) PLANT B SAMmpHnMG RESULTS THRU 1984
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
EDVD
EDC
830303
EDCOP
REDUCED OPERATIONS. ROUTINE
SHIFT.
83-135-087
RESULT 3.450
UNIT DURATION
PPM
407
EDVD
EDC
830303
EDVDOP
REDUCED OPERATIONS. ROUTINE
SHIFT.
83-134-086
1.260
PPM
416
EDVD
EDC
830309
EDCOP
NORMAL OPERATIONS. ROUTINE
MORNING ROUND.
83-150-098
74.300
PPM
19
EDVD
EDC
830309
EDVDOP
NORMAL OPERATIONS. ROUTINE
MORNING SAMPLING ROUND.
83-149-097
7.280
PPM
25
EDVD
EDC 830310 ROUTINE WORK LOAD. NORMAL
OPERATIONS.
8 -151-099
3.480
PPM
417
EDVD EDVD
EDC
830425
EDVDOP
83-187-130
ROUTINE ROUNDS. SAMPLED AND
ANALYZED EDC AND VDC. EDC UNIT
SHUTDOWN.
EDC
830425
LGMC
83-188-131
MAINTENANCE WORK IN EDC UNIT
DURING SHUTDOWN.
5.930 PPM
437
.760
PPM
442
EDVD
EDC
830518
EDVDOP
83-229-162
REDUCED OPERATIONS. RECHARGED
EDC CATALYST POT.
3.500
PPM
427
EDVD EDVD
EDC
830606
EDCOP
83-275-189
ROUTINE ROUNDS. WORKED IN AREA
OF SOUTH TERMINAL TANK. NORMAL
OPERATIONS.
EDC
830606
EDVDOP
83-276-190
ROUTINE SHIFT. NORMAL OPERA
TIONS.
2.540
PPM
454
2.220
PPM
451
EDVD
EDC
830606
LGINM
83-277-191
ROUTE WORK. NORMAL OPERATIONS.
.480
PPM
442
PAGE
SL 016907
1/19/93
PLANT
B
LA m
SAMurn
HARLES C 259) NG RESULTS THRU
1984
I PAGE
DEPT EDVD
COMPOUND
DATE
JOB TITLE
EDC
830705
EDCOP
NORMAL OPERATIONS TOOK ONE
REACTOR DOWN HO. 2 REACTOR
SAMPLE# 83-306-216
RESULT 5,390
UNIT DURATION PPM 360
EDVD
EDC
830705
EDVDOP
NORMAL OPERATIONS SHUT ONE
REACTOR DOWN NO. 2 REACTOR
83-307-217
1.400
PPM
440
EDVD
EDVD
EDC
830830
EDCOP
83-396-288
DID COLOR CHECKS AND RECIRCU
LATED EDC THROUGH CARBON BED.
NORMAL OPERATIONS.
EDC
830830
EDVDOP
83-397-289
BLOCKED AND REPAIRED LEAKING
TCE LINE. NORMAL OPERATIONS.
5.770
PPM
437
1.560
PPM
440
EDVD
EDC
830919
EDCOP
REDUCED OPERATIONS, ROUTINE
SHIFT.
83-435-306
2.350
PPM
403
EDVD
EDC
830919
EDVDOP
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-436-307
.250
PPM
402
EDVD
EDC
830919
LGMC
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-437-308
.290
PPM
407
EDVD
EDC
831010
EDCOP
83-477-338
ROUTINE SHIFT. REDUCED OPERA
TIONS- NO.1 EDC PLANT DOWN.
.600
PPM
438
EDVD
EDC
831010
EDVDOP
83-478-339
ROUTINE SHIFT. REDUCED OPERA
TIONS- NO.1 EDC PLANT DOWN.
.630
PPM
434
EDVD EDVD
EDC
831010
LGMC
83-479-340
LOGBOOK WORK THROUGHOUT UNIT.
REDUCED OPERATIONS- NO.l EDC
PLANT DOWN.
EDC
831114
EDCOP
NORMAL OPERATIONS, ROUTINE SHIFT.
83-545-385
.310 PPM
432
3.400
PPM
434
Ol&98 SL*
1/19/93
#'LA HARLES (259)
PLANT B SAMm'pTiING RESULTS THRU 1989
DEPT COMPOUND
DATE
JOB TITLE SAMPLE#
EDVD
EDC
831119
EDVDOP
83-596-386
NORMAL OPERATIONS, ROUTINE
SHIFT. CLEARED VAREC STORAGE
RESULT 1.590
UNIT DURATION
PPM
935
EDVD
EDC
831206
EDVDAX
83-566-902
ROUTINE SHIFT. NORMAL OPERA
TIONS.
.370
PPM
995
EDVD
EDC
831208
EDVDOP
83-577-905
CLEARED VAREC AT STORAGE TANK.
NORMAL OPERATIONS.
.890
PPM
993
EDVD EDVD EDVD
EDC
890110
EDCOP
89-026-019
NORMAL OPERATIONS. DRAINED NO.
1 VENT HEADER AND ROUTINE
DUTIES. WIND NW-23.
EDC
890110
EDVDOP
89-027-015
NORMAL OPERATIONS. STARTED-UP
TCE UNIT AND ROUTINE DUTIES.
WIND NW-23.
EDC
890202
EDCOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
89-096-059
2.800
PPM
933
1.220
PPM
915
5.270
PPM
919
EDVD
EDC
890202
EDVDOP
NORMAL OPERATIONS. TRAINING
ON JOB
89-095-053
.310
PPM
919
EDVD
EDC
890319
EDCOP
ROUTINE SHIFT. NORMAL OPERA
TIONS.
89-153-097
2.550
PPM
938
EDVD
EDC
890319
EDVDOP
89-152-096
ROUTINE SHIFT. NORMAL OPERA
TIONS.
.250
PPM
938
EDVD
EDC
890917
EDCOP
NORMAL OPERATIONS ROUTINE
SHIFT.
89-221-159
2.770
PPM
908
EDVD
EDC
890917
EDVDOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
89-222-160
1.970
PPM
908
PAGE
SL 016909
1/19/93
LA mHARLES (259) PLANT B SAMMfTl NG RESULTS THRU 1989
DEPT EDVD
COMPOUND
DATE
JOB TITLE
EDC
890919
EDCOP
NORMAL OPERATIONS. ROUTINE
MORNING ROUND.
SAMPLE* 89-228-166
RESULT . 100
UNIT DURATION PPM 20
EDVD
EDC
890919
EDVDOP
NORMAL OPERATIONS. ROUTINE
MORNING ROUND.
89-227-165
. 100
PPM
15
EDVD
* EDVD
EDC 890929
89-231-169
NORMAL OPERATIONS. PLACED ON
CENTER TABLE.
EDC
890517
EDCOP
89-283-207
ROUTINE SHIFT. NORMAL OPERA
TIONS.
2.970
PPM
395
.370
PPM
922
EDVD
EDC
890517
EDVDOP
ROUTINE SHIFT. NORMAL OPERA
TIONS.
89-282-206
1.190
PPM
922
EDVD
EDC
890607
EDCOP
NORMAL OPERATIONS. ROUTINE
MORNING SAMPLING ROUND.
89-315-228
1.300
PPM
19
EDVD
EDC
890607
EDVDOP
89-316-229
NORMAL OPERATIONS. ROUTINE LAB
ANALYSIS.
3.550
PPM
19
EDVD
EDC
890611
EDCOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
89-323-235
3.890
PPM
917
EDVD EDVD
EDC
890611
EDVDOP
NORMAL OPERATIONS. ROUTINE
SHIFT. VAREC FLOAT CHAMBER
CLEARED.
89-322-239
EDC
890706 EDCOP
89-368-280
ROUTINE SHIFT. NORMAL OPERA
TIONS.
2.330
PPM
908
1.790
PPM
955
EDVD
EDC
890706 EDVDOP
89-369-281
ROUTINE SHIFT. NORMAL OPERA
TIONS.
1.550 PPM
955
PAGE
SL 016910
1/19/93
LAXl^PHARLES (259> PLANT 6 SAMPflNG RESULTS THRU 1989
DEPT EDVD
COMPOUND
DATE
JOB TITLE
EDC
890828
EDCOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
SAMPLE# 89-935-336
RESULT 2.600
UNIT DURATION
PPM
913
EDVD
EDC
890828
EDVDOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
89-936-337
.970
PPM
918
EDVD
* EDVD
EDC
890906
EDCOP
89-961-356
NORMAL OP. CLEARED PLUGGED
LINE DH FEED VALVE, H20 OUT OF
RX PHASE SEP.
EDC
890906
EDVDOP
89-962-357
NORMAL OP. HOSE BROKE ON EDC
LINE FROM VAC TRK, EDC SPILL.
5.550 PPM 923
35.600
PPM
923
EDVD
EDC
890911
EDCOP
NORMAL OP. ROUTINE SHIFT.
ANALYZING SAMPLES IN LAB.
89-975-367
13.300
PPM
16
EDVD
EDC
890911
EDVDOP
89-976-368
NORMAL OP. ROUTINE SHIFT. MORN
SAMPLING ROUND.
.500
PPM
15
EDVD EDC
891002
EDCOP
NORMAL OP. ROUTINE SHIFT.
89-528-905
2.810
PPM
399
I
EDVD
EDC
891002
EDVDOP
NORMAL OP. ROUTINE SHIFT.
89-527-909
1.160
PPM
397
EDVD EDVD
EDC
891105
EDCOP
89-580-991
NORMAL OP. START-UP NO.3 RX AT
0830 TIME. SPRAYED WITH NEW
CATALYST.
EDC
891105
EDVDOP
89-581-992
UPSET OPERATIONS HO.3 PLANT,
NO.9 RX. WIND N-19.
EDVD
EDC
891108
EDCOP
NORMAL OP. ROUTINE MORNING
ROUND.
89-590-951
6.960
PPM
933
1.690
PPM
933
19.600
PPM
19
SL 016911
PAGE
LAK^BHARLES (254) PLANT B SAMPflNG RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
JOB TITLE
EDC
841108
EDVDOP
NORMAL OP. ROUTINE MORNING
SAMPLE ROUND.
SAMPLE# 84-591-452
RESULT .500
UNIT DURATION PPM 18
EDVD
EDC
841210
EDVDOP
84-621-478
REDUCED OP. EDC AND EDC/VDCM
PLANTS 1 AND 2 COMBINED JOB.
.770
PPM
432
EDVD
MC 791112
79-662-432
5FT HW OF EDC DOPP KETTLE SEAL
,FAIR,58F,N,7MPH
.050
PPM
251
EDVD
MC 791112
79-663-433
4FT S OF EDC DOPP KETTLE SEAL f
FAIR,58F,N,7MPH
.050
PPM
252
EDVD
MC
800121
INSTRU
ROUTINE SHIFT AS LOGBOOK
INSTRUMENT MAN
80-035-020
8.340
PPM
430
EDVD
MC 800121 ROUTINE SHIFT
LEADOP
80-033-018
4.730
PPM
430
EDVD
MC
800121
MACHIN
ROUTINE SHIFT AS LOGBOOK
MECHANIC
EDVD
MC 800205 ROUTINE SHIFT
EDCOP
80-034-019 80-079-038
1.410
PPM
430
.630
PPM
427
EDVD
MC 800205 ROUTINE SHIFT
INSTRU
80-082-041
5.920
PPM
427
EDVD
MC
800205
MACHIN
80-081-040
ROUTINE SHIFT AS LOGBOOK MECH
STARTUP VDC REACTOR
EDVD
MC
800205
VDCOP
ROUTINE SHIFT
STARTUP VDC REACTOR
80-080-039
.180
PPM
420
1.200
PPM
420
1/19/93
LAI ARLES (254) PLANT B SAMmpPEnNG RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
JOB TITLE
MC
800303
INSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAN
SAMPLE# 80-134-060
RESULT 1.710
UNIT DURATION
PPM
420
EDVD
MC
800303
LOALAB
STARTING VP #2 EDC REACTOR
80-137-063
26.400
PPM
375
EDVD
* EDVD
MC
800303
MACHIN
ROUTINE SHIFT AS LOG BOOK
MECHANIC
MC
800303
PIPEFI
STARTING UP #2 EDC REACTOR
80-135-061 80-138-064
1.340
PPM
417
.230
PPM
385
EDVD
MC
800303
PIPEFI
STARTING UP #2 EDC REACTOR
80-139-065
.340
PPM
385
EDVD
MC 800325 ROUTINE SHIFT
LEADOP
80-136-062
6.570
PPM
432
LU
OSeOt:
EDVD
800414 SHIFT
VDCOP
80-217-100
.550
PPM
442
EDVD
MC
800507
INSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAN
EDVD
MC
800507
MACHIN
ROUTINE SHIFT AS LOG BOOK
MECHANIC
EDVD
MC
800602
INSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAN
EDVD
MC 800602 ROUTINE SHIFT
MACHIN
80-283-138 80-282-137 80-323-158 80-322-157
4.580
PPM
428
.280
PPM
472
13.370
PPM
450
3.050
PPM
443
PAGE
SL 016913
1/19/93
LAK^BhARLES (259) PLANT B SAMnPfNG RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
MC 800602 ROUTINE SHIFT
JOB TITLE SAMPLE#
VDCOP
80-321-156
RESULT .890
UNIT DURATION PPM 424
PAGE
EDVD
HC 800603 ROUTINE SHIFT
EDCOP
80-320-155
1.420
PPM
433
EDVD
MC 800630 ROUTINE SHIFT
EDCOP
* EDVD
MC
800630
INSTRU
ROUTINE SHIFT AS LOGBOOK
INSTRUMENT MECH.
EDVD
MC 800709 ROUTINE SHIFT
LEADOP
80-340-170 80-357-176 80-383-191
8.010
PPM
440
38.700
PPM
442
26.200
PPM
380
EDVD
MC
800709
MACHIN
ROUTINE SHIFT AS LOGBOOK
MECHANIC
80-384-192
EDVD
MC
800812
EDCOP
WORKING ON #2EDC REACTOR IN
#1 PLANT
80-446-215
EDVD
MC 800812 ROUTINE SHIFT
INSTRU
80-449-218
.360
PPM
443
2.050
PPM
470
10.900
PPM
457
EDVD
MC
800812
MACHIN
80-448-217
CLEARING CATALYST POT; SPRAYEDl
WITH EDC
EDVD
MC 800812 ROUTINE SHIFT
VDCOP
80-447-216
EDVD
MC
801006
INSTRU
ROUTINE SHIFT AS LOGBOOK
INSTRUMENT MAN
80-513-248
.430
PPM
465
2.440
PPM
464
.400
PPM
410
SL 016914
1/19/93
LAK^PHARLES (254) PLANT B SAMPTING RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
MC 801006 ROUTINE SHIFT
JOB TITLE SAMPLE#
VDCOP
80-560-247
RESULT .100
UNIT DURATION
PPM
409
PAGE
EDVD
MC 810212 ROUTINE SHIFT
EDVDAX
81-038-017
.130
PPM
454
EDVD
MC
810212
EDVDOP
81-035-014
STARTUP VDC-MC RECOVERY PLANT
2.100
PPM
449
EDVD
MC
810212
LGINM
81-037-016
WORKING IN #2 PLANT AROUND #3
SUMP.
EDVD EDVD
MC
810312
EDCOP
81-094-048
RAH A ORTHO-TOLIDINE COLOR
CHECK ON EDC PRODUCT COMING
FROM THE EDC REACTOR IN #1 PLT
MC
810616
EDVDAX
RAN ANALYSIS ON EXTRA VDC
STILL SAMPLES.
81-266-137
EDVD EDVD EDVD EDVD
MC 810827 EDVDAX ROUTINE SHIFT.#3 EDC REACTOR
WAS DOWN.ADJACENT UNIT WAS PURGING DUT VINYL VESSELS.
81-382-212
MC
810827 LGINM
81-384-214
ROUTINE SHIFT. #3 EDC REACTOR
WAS DOWN.ADJACENT UNIT WAS
PURGING OUT VINYL VESSELS.
MC 810827 LGMC ROUTINE SHIFT.#3 EDC REACTOR WAS DOWN.ADJACENT UNIT WAS
PURGING OUT VINYL VESSELS.
81-383-213
MC
811002
EDCOP
81-494-274
ROUTINE SHIFT UNTIL EXPLOSION
IN EDC REACTOR
EDVD
MC
811002
EDVDAX
81-498-278
ROUTINE SHIFT UNTIL EXPLOSION
IN EDC REACTOR
4.900
PPM
440
11.200
PPM
15
.300 PPM
448
.260
PPM
450
1.500
PPM
440
1.100
PPM
405
.270
PPM
437
.370
PPM
443
SL 016915
1/19/93
LA MHARLES (254) PLANT B SAMMPTI HG RESULTS THRU 1984
DEPT EDVD
COMPOUNDt
DATE
JOB TITLE SAMPLE#
MC
811002
EDVDOP
81-495-275
ROUTINE SHIFT UNTIL EXPLOSION
IN EDC REACTOR
RESULT .400
UNIT DURATION PPM 434
EDVD
MC
811002
LGINM
81-497-277
ROUTINE SHIFT UNTIL EXPLOSION
IN EDC REACTOR
4.850
PPM
432
EDVD
* EDVD
MC
811002
LGMC
81-496-276
ROUTINE SHIFT UNTIL EXPLOSION
IN EDC REACTOR
MC 811203 NORMAL SHIFT
EDCOP
81-611-352
.750
PPM
440
.250
PPM
441
EDVD
MC 811203 NORMAL SHIFT
EDVDAX
81-615-356
.320
PPM
441
EDVD
MC 811203 NORMAL SHIFT
EDVDOP
81-612-353
.760
PPM
447
EDVD
MC
811203
LGINM
81-614-355
INSTUMENT REPAIR WORK IN UNITS
ALL DAY
EDVD
MC
811203
LGMC
REPAIRED PUMPS IN MC UNIT
81-613-354
.530
PPM
428
2.510
PPM
421
EDVD
MC 820115 NORMAL SHIFT
EDCOP
82-022-018
.210
PPM
451
EDVD EDVD
MC
820115
EDVDOP
82-023-019
O-RING BLOW-OUT ON HQMME ROTO-
METER AND RELEASE FROM BLEED
VALVE- STRIPPER LIGHTS FLOW TRM
MC
820115
LEADOP
TIGHTENED EDC VALVE LEAKS
DURING NORMAL DAY SHIFT.
82-021-017
.270
PPM
450
1.220
PPM
451
PAGE
1/19/93
LAK^VHARLES (254) PLANT B SAMFONG RESULTS THRU 1989
DEPT EDVD
COMPOUND
DATE
JOB TITLE
MC
820210
LGINM
ROUTINE ROUTE WORK
SAMPLE# 82-053-036
RESULT .950
UNIT DURATION
PPM
939
PAGE
EDVD
MC 820210 ROUTE WORK
LGMC
82-052-035
2.910
PPM
951
EDVD
MC 820218 NORMAL SHIFT
EDVD
MC 820602 NORMAL SHIFT
EDVDOP EDCOP
82-086-055 82-193-097
1.950
PPM
937
.360
PPM
999
EDVD
MC 820602 NORMAL SHIFT
EDVDOP
82-199-098
.920
PPM
999
EDVD
MC 820619 ROUTINE SHIFT
EDVDAX
82-215-111
.950
PPM
926
EDVD
MC 820619 ROUTINE SHIFT
LGINM
82-219-110
1.920
PPM
929
EDVD
MC 820629 ROUTINE SHIFT
LGINM
82-290-129
1.960
PPM
957
EDVD EDVD EDVD
MC
820713
EDVDAX
82-273-155
ROUTINE SHIFT. 88 F, FAIR, 57X
RH, 30.07BP, WINDS NW-8.
CCF RESPIRATOR WORN SAMPLING
MC
820713
LGMC
82-279-156
REPAIRED A VDCM REACTOR BOTTOM
PUMP IN EDC/VDC PI ANT. 88 F,
FAIR, 57%RH, 30.07BP,WINDS 8NW
MC 820812 ROUTINE SHIFT
EDCOP
82-329-199
.150
PPM
958
2.010
PPM
929
.190
PPM
997
SL 016917
1/19/93
LAMMhARLES (254) PLAUT B SAMPONG RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
JOB TITLE SAMPLE#
MC
820812
EDVDAX
82-332-202
ROUTINE SHIFT. CAUGHT SAMPLES.
RESULT .300
UNIT DURATION PPM 449
EDVD MC
820812
ROUTINE SHIFT
LGINM
82-331-201
.980
PPM
439
EDVD
MC 821018 ROUTINE SHIFT.
* EDVD
MC 821018 ROUTINE SHIFT
EDCOP EDVDAX
82-448-292 82-450-294
.160
PPM
441
.250
PPM
439
EDVD
MC 821018 ROUTINE SHIFT
EDVDOP
82-449-293
.260
PPM
441
EDVD
MC 821104 ROUTINE SHIFT
EDCOP
82-482-323
36.700
PPM
442
EDVD
MC 821104 ROUTINE SHIFT
EDVDAX
82-484-325
40.500
PPM
419
EDVD
MC
821104
EDVDOP
82-483-324
ROUTINE SHIFT, SAMPLED VDCM/
TCE.
EDVD EDVD
MC
821104
LGINM
82-485-326
REPAIRED DH STILL LEVEL TRANS-
MITTER, WORKED IN VDC UNIT
HALF DAY
MC
821118
LGMC
82-518-343
REPAIRED PUMPS IN EDC UNIT AND
WORKED IN VDCM UNIT. WINDS E-6
EDVD MC
821208
ROUTINE SHIFT
EDVDOP
82-551-367
27.100
PPM
441
56.000
PPM
424
.790
PPM
425
.170
PPM
440
PAGE
016918
1/19/93
LAK^&HARLES (254) PLANT B SAHmNG RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
MC 821220 ROUTINE SHIFT.
JOB TITLE SAMPLE#
EDVDOP
82-570-375
RESULT 1.580
UNIT DURATION
PPM
445
EDVD
MC 830106 ROUTINE SHIFT.
EDCOP
83-008-006
1.020
PPM
436
EDVD
MC 830106 ROUTINE SHIFT
EDVDOP
83-009-007
.690 PPM 436
EDVD
MC
830208
EDVDAX
ROUTINE SHIFT. NORMAL OP-
ERATIONS
EDVD
MC
830208
EDVDOP
ROUTINE SHIFT. NORMAL OP-
ERATIONS
83-092-061 83-089-058
EDVD EDVD
MC
830208
LGINM
83-091-060
WORKED IN TE2 MAINTENANCE AREA
AND TRI2 STABILIZER AREA.
NORMAL OPERATIONS.
MC
830208
LGMC
83-090-059
PIPEEITTING AND MACHINIST WORK
IN UNIT. NORMAL OPERATIONS.
EDVD
MC
830303
EDVDOP
REDUCED OPERATIONS. ROUTINE
SHIFT.
83-134-086
EDVD
MC 830310
ROUTINE WORK LOAD. NORMAL OPERATIONS.
8 -151-099
EDVD EDVD
MC
830425
EDVDOP
83-187-130
ROUTINE ROUNDS. SAMPLED AND
ANALYZED EDC AND VDC. EDC UNIT
SHUTDOWN
MC
830425
LGMC
83-188-131
MAINTENANCE WORK IN EDC UNIT
DURING SHUTDOWN.
.250 PPM 450
.130
PPM 448
1.450
PPM
440
3.490
PPM
442
.210
PPM 416
.230
PPM
417
.110
PPM
437
.160
PPM 442
PAGE
SL 016919
#LAK' ARLES (253)
PLANT B SAMratMiG RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
JOB TITLE SAMPLE#
MC
830518
EDVDOP
83-229-162
REDUCED OPERATIONS. RECHARGED
EDC CATALYST POT.
RESULT .840
UNIT DURATION PPM 427
EDVD EDVD
MC
830606
EDCOP
83-275-189
ROUTINE ROUNDS. WORKED IN AREA
OF SOUTH TERMINAL TANK. NORMAL
OPERATIONS.
MC
830606
EDVDOP
83-276-190
ROUTINE SHIFT. NORMAL OPERA
TIONS.
.470
PPM
454
.550
PPM
451
EDVD
MC
830606
LGINM
83-277-191
ROUTE WORK. NORMAL OPERATIONS.
.610
PPM
442
EDVD
MC
830705
EDCOP
NORMAL OPERATIONS TOOK ONE
REACTOR DOWN NO. 2 REACTOR
83-306-216
EDVD
MC
830705
EDVDOP
NORMAL OPERATIONS SHUT ONE
REACTOR DOWN NO. 2 REACTOR
83-307-217
EDVD EDVD
MC
830830
EDCOP
83-396-288
DID GOLOR CHECKS AND RECIRCU-
LATED EDC THROUGH CARBON BED.
NORMAL OPERATIONS
MC
830830
EDVDOP
83-397-289
BLOCKED AND REPAIRED LEAKING
TCE LINE. NORMAL OPERATIONS.
EDVD
MC
830919
EDCOP
REDUCED OPERATIONS, ROUTINE
SHIFT.
83-435-306
EDVD
MC
830919
EDVDOP
NORMAL OPERATIONS , ROUTINE
SHIFT.
83-436-307
EDVD
MC
830919
LGMC
NORMAL OPERATIONS, ROUTINE
SHIFT,
83-437-308
.070
PPM
360
.250
PPM
440
.290
PPM
437
.410
PPM
440
.100
PPM
403
.110
PPM
402
2.650
PPM
407
1/19/93
#LA HARLES (259)
PLANT B SAMmpTtTNG RESULTS THRU 1989
DEPT EDVD
COMPOUND
DATE
JOB TITLE SAMPLE#
MC
831010
EDCOP
83-977-338
ROUTINE SHIFT. REDUCED OPERA
TIONS- MO.l EDC PLANT DOWN.
RESULT .560
UNIT DURATION PPM 938
EDVD
MC
831010
EDVDOP
83-978-339
ROUTINE SHIFT. REDUCED OPERA
TIONS- NO.1 EDC PLANT DOWN.
.590
PPM
939
EDVD
*
EDVD
MC
831010
LGMC
83-979-390
LOGBOOK WORK THROUGHOUT UNIT.
REDUCED OPERATIONS- NO.l EDC
PLANT DOWN.
MC
831119
EDCOP
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-595-385
.630 PPM
932
1.520
PPM
939
EDVD
MC
831119
EDVDOP
83-596-386
NORMAL OPERATIONS, ROUTINE
SHIFT. CLEARED VAREC STORAGE
5.630
PPM
935
EDVD
MC
831208
EDVDOP
83-577-905
CLEARED VAREC AT STORAGE TANK.
NORMAL OPERATIONS.
.520
PPM
993
EDVD EDVD
MC
890110
EDVDOP
89-027-015
NORMAL OPERATIONS. STARTED-UP
TCE UNIT AND ROUTINE DUTIES.
WIND NW-23.
MC
890319
EDVDOP
89-152-096
ROUTINE SHIFT. NORMAL OPERA
TIONS.
.110
PPM
915
.280
PPM
938
EDVD
MC
890917
EDCOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
89-221-159
.100
PPM
908
EDVD
MC
890917
EDVDOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
89-222-160
.100
PPM
908
EDVD
MC 890929
89-231-169
NORMAL OPERATIONS. PLACED ON
CENTER TABLE.
2.590
PPM
395
PAGE
SL 016921
LAK^niARLES (254) PLANT B SAMmJIG RESULTS THRU 1984
DEPT EDVD
COMPOUND'
DATE
JOB TITLE
MC
840611
EDCOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
SAMPLE# 84-323-235
RESULT .180
UNIT DURATION PPM 417
EDVD
EDVD t
EDVD
MC
840611
EDVDOP
NORMAL OPERATIONS. ROUTINE
SHIFT. VAREC FLOAT CHAMBER
CLEARED
MC
840706
EDVDOP
ROUTINE SHIFT. NORMAL OPERA-
TIONS.
84-322-234 84-369-281
MC
840828
EDVDOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
84-436-337
.220
PPM
408
.580
PPM
455
.160
PPM
418
EDVD
MC
841002
EDCOP
NORMAL OP. ROUTINE SHIFT.
84-528-405
1.740
PPM
394
EDVD
MC
841002
EDVDOP
NORMAL OP. ROUTINE SHIFT.
84-527-404
1.190
PPM
397
EDVD EDVD
MC
841105
EDCOP
84-580-441
NORMAL OP. START-UP NO.3 RX AT
0830 TIME. SPRAYED WITH HEW
CATALYST.
MC
841105
EDVDOP
84-581-442
UPSET OPERATIONS MO.3 PLANT,
NO.4 RX. WIND N-14.
EDVD
MC
841108
EDVDOP
NORMAL OP. ROUTINE MORNING
SAMPLE ROUND.
84-591-452
EDVD
MC
841210
EDVDOP
84-621-478
REDUCED OP. EDC AND EDC/VDCM
PLANTS 1 AND 2 COMBINED JOB.
EDVD
PER 791112
79-662-432
5FT NW OF EDO DOPP KETTLE SEAL
,FAIR,58F,N,7MPH
.170
PPM
433
.180
PPM
433
1.210
PPM
18
.180
PPM
432
.050
PPM
251
1/19/93
LAKHlHARLES (254) PLANT B SAMPLING RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
JOB TITLE SAMPLE#
PER 791112
79-663-433
4FT S OF EDC DOPP KETTLE SEAL
FAIR,58F,N,7MPH
RESULT .050
UNIT DURATION
PPM
252
EDVD
PER
791218
EDCOP
PUT FILTER INTO SERVICE
VENTED EDC TO CHECK FLOW
79-686-454
.400
PPM
15
EDVD
* EDVD
PER
800121
INSTRU
ROUTINE SHIFT AS LOGBOOK
INSTRUMENT MAN
PER 800121 ROUTINE SHIFT
LEADOP
80-035-020 80-033-018
.160
PPM
430
.220
PPM
430
EDVD
PER
800121
MACHIN
ROUTINE SHIFT AS LOGBOOK
MECHANIC
EDVD
PER
800124
VDCOP
MORNING SAMPLE ROUND
80-034-019 80-052-028
.230
PPM
430
.480
PPM
13
EDVD
PER
800128
EDCOP
MORNTNG SAMPLE ROUND
80-051-027
.490
PPM
15
EDVD
PER 800128 ROUTINE SHIFT
LEADOP
80-033-018
.100
PPM
450
EDVD
PER 800128 ROUTINE SHIFT
LEADOP
80-078-037
.100
PPM
450
EDVD
PER 800205 ROUTINE SHIFT
EDCOP
80-079-038
.200
PPM
427
EDVD
PER 800205 ROUTINE SHIFT
INSTRU
80-082-041
1.280
PPM
427
PAGE
SL 016923
1/19/93
LAIk^PiHARLES (259) PLANT B SAMMPP' TIIMI G RESULTS THRU 1989
DEPT EDVD
COMPOUND
DATE
JOB TITLE SAMPLE#
PER
800205
MACHIN
80-081-090
ROUTINE SHIFT AS LOGBOOK MECH
STARTUP VDC REACTOR
RESULT .900
UNIT DURATION PPM 920
EDVD
PER
800205
VDCOP
ROUTINE SHIFT
STARTUP VDC REACTOR
80-080-039
.390
PPM
920
EDVD
EDVD
PER
800303
INSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAN
PER
800303
LOALAB
STARTING! VP #2 EDC REACTOR
80-139-060 80-137-063
.150
PPM
920
1.130
PPM
375
EDVD
PER
800303
MACHIN
ROUTINE SHIFT AS LOG BOOK
MECHANIC
EDVD
PER
800303
PIPEFI
STARTINGi UP #2 EDC REACTOR
80-135-061 80-138-069
.170
PPM
917
.150
PPM
385
EDVD
PER
800303
PIPEFI
STARTING UP #2 EDC REACTOR
80-139-065
.230
PPM
385
EDVD
PER
800329
EDCOP
80-180-081
ROUTINE MORNING SAMPLE ROUND
.160
PPM
15
EDVD PER
800329
VDCOP
MORNING SAMPLE ROUND
80-181-082
.060
PPM
15
EDVD
PER
800507
EDCOP
MORNING SAMPLE ROUND
80-289-139
.910
PPM
15
EDVD
PER
800507
LEADOP
TAGGING OUT A PUMP
80-281-136
.970
PPM
15
i PAGE
SL fut -1L f0io7o^4/.
1/19/93
M LAK^PHARLES (254) PLANT B SAMPLING RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
JOB TITLE
PER
800507
VDCOP
MORNING SAMPLE ROUND
SAMPLE# 80-285-140
RESULT .320
UNIT DURATION PPM 15
PAGE
EDVD
PER
800602
INSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAH
EDVD
* EDVD
PER 800602 ROUTINE SHIFT
PER 800602 ROUTINE SHIFT
MACHIN VDCOP
80-323-158 80-322-157 80-321-156
.090
PPM
450
.260
PPM
443
.300
PPM
424
EDVD
PER 800603 ROUTINE SHIFT
EDCOP
80-320-155
.260
PPM
433
EDVD
PER 800709 ROUTINE SHIFT
LEADOP
80-383-191
.060
PPM
380
EDVD
PER
800812
EDCOP
WORKING ON #2EDC REACTOR IN
#1 PLANT
80-446-215
EDVD
PER 800812 ROUTINE SHIFT
INSTRU
80-449-218
.150
PPM
470
.100
PPM
457
EDVD
PER
800812
MACHIN
80-448-217
CLEARING CATALYST POT; SPRAYEDi
WITH EDC
EDVD
PER 800812 ROUTINE SHIFT
VDCOP
80-447-216
.190
PPM
465
.120
PPM
464
EDVD
PER
810827
EDCOP
ROUTINE SHIFT.#3 EDO REACTOR
WAS DOWN.ADJACENT UNIT WAS
PURGING OUT VINYL VESSELS.
81-380-210
.210
PPM
457
SL 016925
LAKHHARLES (254) PLANT B SAMPLING RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
JOB TITLE
PER
811203
LGMC
REPAIRED PUMPS IN MC UNIT
SAMPLE# 81-613-354
RESULT .130
UNIT DURATION PPM 421
EDVD EDVD
PER
820115
EDVDOP
82-023-019
O-RING BLOW-OUT ON HQMME ROTO-
METER AND RELEASE FROM BLEED
VALVE-STRIPPER LIGHTS FLOW TRM
PER 820614 ROUTINE SHIFT
EDVDAX
82-215-111
* EDVD
PER 820614 ROUTINE SHIFT
LGINM
82-214-110
.110
PPM
450
.180
PPM
426
.110
PPM
424
EDVD
PER 820624 ROUTINE SHIFT
LGINM
82-240-129
.100
PPM
457
EDVD EDVD EDVD
PER
820713
EDVDAX
82-273-155
ROUTINE SHIFT. 88 F , FAIR, 57%
RH, 30.07BP, WINDS NW-8.
CCF RESPIRATOR WORN SAMPLING
PER
820713
LGMC
82-274-156
REPAfRED A VDCM REACTOR BOTTOM
PUMP IN EDC/VDC PIANT. 88 F,
FAIR, 57%RH, 30.07BP,WINDS 8NW
PER 820812 ROUTINE SHIFT
EDCOP
82-329-199
.100
PPM
458
.130
PPM
429
.220
PPM
447
EDVD
PER
820812
EDVDAX
82-332-202
ROUTINE SHIFT. CAUGHT SAMPLES.
.240
PPM
449
EDVD
PER 820812 ROUTINE SHIFT
EDVDOP
82-330-200
. 150
PPM
449
EDVD
PER 820812 ROUTINE SHIFT
LGINM
82-331-201
.110
PPM
439
1/19/93
LA ARLES (254) PLANT B SAMmPfTiINnG RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
PER 821018 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDVDAX
82-450-294
RESULT .100
UNIT DURATION
PPM
439
EDVD
PER 821220 ROUTINE SHIFT.
EDVDOP
82-570-375
.260
PPM
445
EDVD
PER 830106 ROUTINE SHIFT.
EDCOP
83-008-006
.160
PPM
436
EDVD
PER
830208
EDVDOP
ROUTINE SHIFT. NORMAL OP-
ERATIONS.
83-089-058
EDVD
PER
830303
EDCOP
REDUCED OPERATIONS . ROUTINE
SHIFT.
83-135-087
EDVD
PER
830303
EDVDOP
REDUCED OPERATIONS . ROUTINE
SHIFT.
83-134-086
EDVD
PER 830310
ROUTINE WORK LOAD. NORMAL OPERATIONS.
8 -151-099
EDVD EDVD
PER
830425
EDVDOP
83-187-130
ROUTINE ROUNDS. SAMPLED AND
ANALYZED EDC AND VDC. EDC UNIT
SHUTDOWN.
PER
830518
EDVDOP
83-229-162
REDUCED OPERATIONS . RECHARGED
EDC CATALYST POT.
EDVD
PER
830606
EDVDOP
ROUTINE SHIFT. NORMAL OPERA-
TIONS.
83-276-190
EDVD
PER
830705
EDCOP
NORMAL OPERATIONS TOOK ONE
REACTOR DOWN NO. 2 REACTOR
83-306-216
.100
PPM
448
.210
PPM
407
.250
PPM
416
.130
PPM
417
.200
PPM
437
.160
PPM
427
.100
PPM
451
.170
PPM
360
PAGE SL 016927
1/19/93
LA!*1ARLES (254) PLANT b sampTing RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
JOB TITLE
PER
830705
EDVDOP
NORMAL OPERATIONS SHUT ONE
REACTOR DOWN NO. 2 REACTOR
SAMPLE# 83-307-217
RESULT .110
UNIT DURATION PPM 440
EDVD
PER
831114
EDCOP
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-545-385
.100
PPM
434
EDVD *
EDVD
EDVD
PER
840611
EDCOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
PER
840611
EDVDOP
NORMAL OPERATIONS. ROUTINE
SHIFT. VAREC FLOAT CHAMBER
CLEARED.
PER
840828
EDCOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
84-323-235 84-322-234 84-435-336
.140
PPM
417
. 180
PPM
408
.260
PPM
413
EDVD
PER
840828
EDVDOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
84-436-337
.360
PPM
418
EDVD
PER
841002
EDVDOP
NORMAL OP. ROUTINE SHIFT.
84-527-404
.100
PPM
397
EDVD EDVD
PER
841105
EDCOP
84-580-441
NORMAL OP. START-UP NO.3 RX AT
0830 TIME. SPRAYED WITH NEW
CATALYST.
SYM 791112
79-662-432
5FT NW OF EDC DOPP KETTLE SEAL
,FAIR,58F,N,7MPH
EDVD
SYM 791112
79-663-433
4FT S OF EDC DOPP KETTLE SEAL,
FAIR,58F,N,7MPH
EDVD
SYM
800121
MACHIN
ROUTINE SHIFT AS LOGBOOK
MECHANIC
80-034-019
.160
PPM
433
.000
PPM
251
.000
PPM
252
.300
PPM
430
PAGE
016928
1/19/93
LAK^FHARLES (254) PLANT B SAMPLING RESULTS THRU 1989
DEPT EDVD
COMPOUND
DATE
JOB TITLE SAMPLE#
SYM
811002
EDCOP
81-999-279
ROUTINE SHIFT UNTIL EXPLOSION
IN EDC REACTOR
RESULT 2.370
UNIT DURATION
PPM
937
EDVD
SYM
811002
EDVDAX
81-998-278
ROUTINE SHIFT UNTIL EXPLOSION
IN EDC REACTOR
1.920
PPM
993
EDVD
* EDVD
SYM
811002
EDVDOP
81-995-275
ROUTINE SHIFT UNTIL EXPLOSION
IN EDC REACTOR
SYM
811002
LGINM
81-997-277
ROUTINE SHIFT UNTIL EXPLOSION
IN EDC REACTOR
2.790
PPM
939
2.080
PPM
932
EDVD
SYM
811002
LGMC
81-996-276
ROUTINE SHIFT UNTIL EXPLOSION
IN EDC REACTOR
,150
PPM
990
EDVD
SYM
811201
EDCOP
81-595-392
ROUTINE ROUND AND REPAIRED AN
EDC PACKING LEAK
6.110
PPM
15
EDVD
SYM
811201
EDVDOP
ROUTINE MORNING ROUND
81-596-393
6.970
PPM
15
PAGE
EDVD EDVD
SYM
820115
EDVDOP
82-023-019
Q-RING BLOW-OUT ON HQMME ROTO-
METER AND RELEASE FROM BLEED
VALVE-STRIPPER LIGHTS FLOW TRM
SYM
820115
LEADOP
TIGHTENED EDC VALVE LEAKS
DURING NORMAL DAY SHIFT.
82-021-017
EDVD
SYM
820210
LGINM
ROUTINE ROUTE WORK
82-053-036
270 PPM
950
,280
PPM
951
.950
PPM
939
EDVD
SYM 820619 ROUTINE SHIFT
LGINM
82-219-110
.250
PPM
929
SI* 016929
1/19/93
LA ARLES C254) PLANT B SAMHPP'LTNNG RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
JOB TITLE
SYM
831206
EDVDAX
ROUTINE SHIFT. NORMAL OPERA-
TIONS.
SAMPLE# 83-566-402
RESULT .310
UNIT DURATION PPM 445
EDVD
SYM
831208
EDVDOP
83-577-405
CLEARED VAREC AT STORAGE TANK
NORMAL OPERATIONS
.510
PPM
443
EDVD
* EDVD
TCE 791112
79-662-432
5FT NW OF EDC DOPP KETTLE SEAL
,FAIR,58F,N,7MPH
TCE 791112
79-663-433
4FT S OF EDC DOPP KETTLE SEAL t
FAIR,58F,N,7MPH
.000
PPM
251
.050
PPM
252
EDVD
TCE
800121
MACHIN
ROUTINE SHIFT AS LOGBOOK
MECHANIC
80-034-019
.500
PPM
430
EDVD
TCE
800124
VDCOP
MORNING SAMPLE ROUND
80-052-028
.130
PPM
13
EDVD
TCE 800205 ROUTINE SHIFT
EDCOP
80-079-038
.050
PPM
427
EDVD
TCE 800205 ROUTINE SHIFT
INSTRU
80-082-041
2.930
PPM
427
EDVD
TCE
800205
VDCOP
ROUTINE SHIFT
STARTUP VDC REACTOR
EDVD
TCE
800303
INSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAN
EDVD
TCE
800303
LOALAB
STARTING VP #2 EDC REACTOR
80-080-039 80-134-060 80-137-063
.680
PPM
420
.110
PPM
420
.120
PPM
375
PAGE
016930
1/19/93
LAK^MARLES (254) PLANT B SAMPWtIG RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
JOB TITLE
TCE
800303
MACHIN
ROUTINE SHIFT AS LOG BOOK
MECHANIC
SAMPLE# 80-135-061
RESULT .050
UNIT DURATION
PPM
417
EDVD
TCE
800303
PIPEFI
STARTING UP #2 EDC REACTOR
80-139-065
.050
PPM
385
PAGE
EDVD
* EDVD
TCE 800325 ROUTINE SHIFT
TCE 800414 ROUTINE SHIFT
LEADOP VDCOP
80-136-062 80-217-100
.340
PPM
432
.090
PPM
442
EDVD
TCE
800507
VDCOP
MORNING SAMPLE ROUND
80-285-140
.760
PPM
15
EDVD
TCE
800602
INSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAN
EDVD
TCE 800602 ROUTINE SHIFT
MACHIN
80-323-158 80-322-157
.590
PPM
450
.130
PPM
443
EDVD
TCE 800602 ROUTINE SHIFT
VDCOP
80-321-156
.180
PPM
424
EDVD
TCE 800603 ROUTINE SHIFT
EDCOP
80-320-155
.440
PPM
433
EDVD
TCE 800630 ROUTINE SHIFT
EDCOP
80-340-170
.050
PPM
440
EDVD
TCE
800630
INSTRU
ROUTINE SHIFT AS LOGBOOK
INSTRUMENT MECH.
80-357-176
.080
PPM
442
SL 016931
1/19/93
LAKI#<ARLES C254) PLANT B SAMimruUG RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
TCE 800709 ROUTINE SHIFT
JOB TITLE SAMPLE#
LEADOP
80-383-191
RESULT 3.230
UNIT DURATION PPM 380
EDVD
TCE
800709
MACHIN
ROUTINE SHIFT AS LOGBOOK
MECHANIC
EDVD
TCE 800709 SAMPLE ROUND
VDCOP
80-384-192 80-385-193
.170 PPM 443
2.410
PPM
15
EDVD
TCE
800812
EDCOP
WORKING ON #2EDC REACTOR IN
#1 PLANT
80-446-215
EDVD
TCE 800812 ROUTINE SHIFT
INSTRU
80-449-218
.580
PPM
470
.050
PPM
457
EDVD
TCE
800812
MACHIN
80-448-217
CLEARING: CATALYST POT: SPRAYED
WITH EDC
EDVD
TCE 800812 ROUTINE SHIFT
VDCOP
80-447-216
.810
PPM 465
.140
PPM 464
EDVD
TCE
801006
INSTRU
ROUTINE SHIFT AS LOGBOOK
INSTRUMENT MAN
EDVD
TCE BO 1006 ROUTINE SHIFT
VDCOP
80-513-248 80-560-247
.060
PPM 410
.100
PPM 409
EDVD
TCE 810212 ROUTINE SHIFT
EDVDAX
81-038-017
.520
PPM 454
EDVD
TCE
810616
EDVDAX
RAN ANALYSIS ON EXTRA VDC
STILL SAMPLES.
81-266-137
.560
PPM
448
PAGE SL016932
1/19/93
LAK^HARLES (254) PLANT B SAMWtNG RESULTS THRU 1984
DEPT EDVD
EDVD
EDVD
EDVD
COMPOUND
DATE
JOB TITLE SAMPLE#
TCE
810827
EDVDAX
ROUTINE SHIFT.#3 EDC REACTOR
WAS DOWN.ADJACENT UNIT WAS
PURGING OUT VINYL VESSELS.
81-382-212
TCE
810827
LGMC
ROUTINE SHIFT.#3 EDC REACTOR
WAS DOWN.ADJACENT UNIT WAS
PURGING OUT VINYL VESSELS.
81-383-213
TCE
811002
EDVDAX
81-498-278
ROUTINE SHIFT UNTIL EXPLOSION
IN EDC REACTOR
TCE
811002
LGMC
81-496-276
ROUTINE SHIFT UNTIL EXPLOSION
IN EDC REACTOR
RESULT .210
UNIT DURATION
PPM
450
.100
PPM
405
.250
PPM
443
.140
PPM
440
EDVD
TCE 811203 NORMAL SHIFT
EDVDAX
81-615-356
.470
PPM
441
EDVD
TCE 811203 NORMAL SHIFT
EDVDOP
81-612-353
.690
PPM
447
EDVD
TCE
811203
LGINM
81-614-355
INSTUMENT REPAIR WORK IN UNITS
ALL DAY
EDVD
TCE
811203
LGMC
REPAIRED PUMPS IN MC UNIT
81-613-354
.240
PPM
428
.180
PPM
421
EDVD EDVD
TCE
820115
EDVDOP
82-023-019
O-RING BLOW-OUT ON HOMME ROTO-
METER AND RELEASE FROM BLEED
VALVE-STRIPPER LIGHTS FLOW TRM
TCE
820115
LEADOP
TIGHTENED EDC VALVE LEAKS
DURING NORMAL DAY SHIFT.
82-021-017
EDVD
TCE
820210
LGINM
ROUTINE ROUTE WORK
82-053-036
.460
PPM
450
.140
PPM
451
.150
PPM
439
PAGE SL 016933
1/19/93
LAK^^ARLES (254) PLANT B SAMhHTIG RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
TCE 820210 ROUTE WORK
JOB TITLE SAMPLE#
LGMC
82-052-035
RESULT .110
UNIT DURATION PPM 451
EDVD
TCE 820602 NORMAL SHIFT
EDCOP
82-193-097
.100
PPM
444
EDVD
TCE 820602 NORMAL SHIFT
* EDVD
TCE 820614 ROUTINE SHIFT
EDVDOP EDVDAX
82-194-098 82-215-111
.070
PPM
444
.430
PPM
426
EDVD
TCE 820614 ROUTINE SHIFT
LGINM
82-214-110
.540
PPM
424
EDVD
TCE 820624 ROUTINE SHIFT
LGINM
82-240-129
.670
PPM
457
EDVD EDVD EDVD
TCE
820713
EDVDAX
82-273-155
ROUTINE SHIFT. 88 F, FAIR, 57X
RH, 30.07BP, WINDS NW-8.
CCF RESPIRATOR WORN SAMPLING
TCE
820713
LGMC
82-274-156
REPAIRED A VDCM REACTOR BOTTOM
PUMP IN EDC/VDC PIANT. 88 F,
FAIR, 57XRH, 30.07BP,WINDS 8NW
TCE
820812
EDVDAX
82-332-202
ROUTINE SHIFT. CAUGHT SAMPLES.
.560
PPM
458
.170
PPM
429
.300
PPM
449
EDVD
TCE 821018 ROUTINE SHIFT
EDVDAX
82-450-294
.310
PPM
439
EDVD
TCE
821104
LGINM
82-485-326
REPAIRED DH STILL LEVEL TRANS-
MITTER, WORKED IN VDC UNIT
HALF DAY.
.470
PPM
424
PAGE Olt.93'*
1/19/93
LAK^WARLES (259) PLANT B SAMfWNG RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
TCE 821220 ROUTINE SHIFT.
JOB TITLE SAMPLE#
EDVDOP
82-570-375
RESULT .330
UNIT DURATION PPM 445
EDVD
TCE
830208
EDVDOP
ROUTINE SHIFT. NORMAL OP
ERATIONS.
83-089-058
EDVD EDVD
TCE
830208
LGINM
83-091-060
WORKED IN TE2 MAINTENANCE AREA
AND TRI2 STABILIZER AREA.
NORMAL OPERATIONS.
TCE
830303
EDVDOP
REDUCED OPERATIONS. ROUTINE
SHIFT.
83-134-086
EDVD
TCE
830309
EDVDOP
NORMAL OPERATIONS. ROUTINE
MORNING SAMPLING ROUND.
83-149-097
EDVD
TCE 830310 ROUTINE WORK LOAD. NORMAL OPERATIONS,
8 -151-099
EDVD
TCE
830606
EDVDOP
ROUTINE SHIFT. NORMAL OPERA
TIONS.
83-276-190
EDVD
TCE
830705
EDVDOP
NORMAL OPERATIONS SHUT ONE
REACTOR DOWN NO. 2 REACTOR
83-307-217
EDVD EDVD
TCE
830830
EDCOP
83-396-288
DID COLOR CHECKS AND RECIRCU
LATED EDC THROUGH CARBON BED.
NORMAL OPERATIONS.
TCE
830830
EDVDOP
83-397-289
BLOCKED AND REPAIRED LEAKING
TCE LINE. NORMAL OPERATIONS.
EDVD
TCE
830919
LGMC
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-437-308
.260 PPM 448
3.660 PPM 440
.160 PPM 416
1.330
PPM
25
.490 PPM 417
.510 PPM 451
.160
PPM
440
.530
PPM
437
4.640
PPM
440
.330
PPM
407
PAGE
SL016935
1/19/93
LAK^^ARLES (254) PLANT B SAMWTNG RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
JOB TITLE SAMPLE#
TCE
831010
EDVDOP
83-478-339
ROUTINE SHIFT. REDUCED OPERA
TIONS- NO.1 EDC PLANT DOWN.
RESULT .110
UNIT DURATION PPM 434
EDVD
TCE
831114
EDVDOP
83-546-386
NORMAL OPERATIONS, ROUTINE
SHIFT. CLEARED VAREC STORAGE
.240
PPM
435
EDVD
TCE
831208
EDVDOP
83-577-405
CLEARED VAREC AT STORAGE TANK.
NORMAL OPERATIONS.
.130
PPM
443
EDVD
TCE
840202
EDVDOP
NORMAL OPERATIONS. TRAINING
ON JOB
84-095-053
.120
PPM
419
EDVD
TCE
840314
EDVDOP
84-152-096
ROUTINE SHIFT. NORMAL OPERA
TIONS.
.680
PPM
438
EDVD EDVD
TCE
840611
EDVDOP
NORMAL OPERATIONS. ROUTINE
SHIFT. VAREC FLOAT CHAMBER
CLEARED.
84-322-234
TCE
840706
EDVDOP
84-369-281
ROUTINE SHIFT. NORMAL OPERA
TIONS.
.100
PPM
408
.190
PPM
455
EDVD
TCE
840828
EDVDOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
84-436-337
1.000
PPM
418
EDVD EDVD
TCE
840906
EDCOP
84-461-356
NORMAL OP. CLEARED PLUGGED
LINE DH FEED VALVE, H20 OUT OF
RX PHASE SEP.
TCE
841108
EDVDOP
NORMAL OP. ROUTINE MORNING
SAMPLE ROUND.
84-591-452
.180
PPM
423
.500
PPM
18
EDVD
TCE
841210
EDVDOP
84-621-478
REDUCED OP. EDC AND EDC/VDCM
PLANTS 1 AND 2 COMBINED JOB.
1.580
PPM
432
PAGE
SL 016936
1/19/93
LAtcfl^ARLES (259) PLANT B SAHMNG RESULTS THRU 1989
DEPT EDVD
COMPOUND
DATE
JOB TITLE SAMPLE#
TRANS
791112
79-662-932
5FT NW OF EDC DOPP KETTLE SEAL
j FAIR,58F,N,7MPH
RESULT .050
UNIT DURATION PPM 251
EDVD
TRANS
791112
79-663-933
9FT S OF EDC DOPP KETTLE SEAL >
FAIR,58F,N,7MPH
.050
PPM
252
EDVD
TRANS
800121
ROUTINE SHIFT
LEADOP
80-033-018
.160
PPM
930
EDVD
TRANS
800205
VDCOP
ROUTINE SHIFT
STARTUP VDC REACTOR
80-080-039
.060
PPM
920
EDVD
TRANS
811201
EDCOP
81-595-392
ROUTINE ROUND AND REPAIRED AN
EDC PACKING LEAK
1.990
PPM
15
EDVD EDVD
TRANS
820115
EDVDOP
82-023-019
0-RING BLOW-OUT ON HOMME ROTO-
METER AND RELEASE FROM BLEED
VALVE-STRIPPER LIGHTS FLOW TRM
TRANS
820602
NORMAL SHIFT
EDVDOP
82-199-098
.580
PPM
950
.610
PPM
999
EDVD
TRANS
820629
ROUTINE SHIFT
LGINM
82-290-129
1.770
PPM
957
EDVD
TRANS
820812
ROUTINE SHIFT
EDVDOP
82-330-200
.260
PPM
999
EDVD
TRANS
821018
ROUTINE SHIFT
EDVDAX
82-950-299
.800
PPM
939
EDVD
TRANS
830310
ROUTINE WORK LOAD. NORMAL
OPERATIONS.
8 -151-099
.980
PPM
917
PAGE SL 016937
1/19/93
1
LAWARLES (259) PLANT B SAMWTNG RESULTS THRU 1989
DEPT EDVD
COMPOUND
DATE
JOB TITLE
TRANS
830606
EDVDOP
ROUTINE SHIFT. NORMAL OPERA
TIONS.
SAMPLE# 83-276-190
RESULT .500
UNIT DURATION PPM 951
EDVD
TRANS
830705
EDVDOP
NORMAL OPERATIONS SHUT ONE
REACTOR DOWN NO. 2 REACTOR
83-307-217
.170
PPM
990
EDVD
I EDVD
TRANS
830830
EDVDOP
83-397-289
BLOCKED AND REPAIRED LEAKING
TCE LINE. NORMAL OPERATIONS.
TRANS
831208
EDVDOP
83-577-905
CLEARED VAREC AT STORAGE TANK.
NORMAL OPERATIONS.
.390
PPM
990
2.900
PPM
993
EDVD EDVD
TRANS
890611
EDVDOP
NORMAL OPERATIONS. ROUTINE
SHIFT. VAREC FLOAT CHAMBER
CLEARED.
TRANS
890706
EDVDOP
ROUTINE SHIFT. NORMAL OPERA
TIONS.
89-322-239 89-369-281
.360
PPM
908
.710
PPM
955
EDVD
TRANS
B90828
EDVDOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
89-936-337
.370
PPM
918
EDVD EDVD EDVD
TRANS
890906
EDCOP
89-961-356
NORMAL OP. CLEARED PLUGGED
LINE DH FEED VALVE, H20 OUT OF
RX PHASE SEP.
TRANS
891105
EDCOP
89-580-991
NORMAL OP. START-UP NO.3 RX AT
0830 TIME. SPRAYED WITH HEW
CATALYST.
TRANS
891105
EDVDOP
UPSET OPERATIONS NO.3 PLANT,
HO.9 RX. WIND N- 19.
89-581-992
.910
PPM
923
.150
PPM
933
.250
PPM
933
EDVD
TRI 791112
79-662-932
5FT NW OF EDC DOPP KETTLE SEAL
,FAIR,58F,N,7MPH
.000
PPM
251
PAGE
SL 016938 i
1/19/93
LAK^HARLES (259) PLANT B SAMWTNG RESULTS THRU 1989
DEPT EDVD
COMPOUND
DATE
JOB TITLE SAMPLE#
TRI 791112
79-663-933
9FT S OF EDC DOPP KETTLE SEAL,
FAIR,58F,N,7MPH
RESULT .000
UNIT DURATION
PPM
252
EDVD
TRI
791218
EDCOP
PUT FILTER INTO SERVICE
VENTED EDC TO CHECK FLOW
79-686-959
.200
PPM
15
EDVD
* EDVD
TRI
800205
MACHIN
80-081-090
ROUTINE SHIFT AS LOGBOOK MECH.
STARTUP VDC REACTOR
TRI
800303
PIPEFI
STARTING UP #2 EDC REACTOR
80-138-069
.090
PPM
920
.070
PPM
385
EDVD
TRI
800303
PIPEFI
STARTING UP #2 EDC REACTOR
80-139-065
.170
PPM
385
EDVD
TRI
800329
EDCOP
80-180-081
ROUTINE MORNING SAMPLE ROUND
.100
PPM
15
EDVD
TRI
800507
EDCOP
MORNING SAMPLE ROUND
80-289-139
.190
PPM
15
EDVD
TRI
800507
IHSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAN
EDVD
TRI
800602
INSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAN
EDVD
TRI 800602 ROUTINE SHIFT
MACHIN
80-283-138 80-323-158 80-322-157
.050
PPM
928
.910
PPM
950
.220
PPM
993
EDVD
TRI 800602 ROUTINE SHIFT
VDCOP
80-321-156
.270
PPM
929
PAGE
SL 016939
1/19/93
LAM^IARLES (259) PLANT B SAMnPTNG RESULTS THRU 1989
DEPT EDVD
COMPOUND
DATE
TRI 800603 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
80-320-155
RESULT .210
UNIT DURATION PPM 933
EDVD
TRI 800630 ROUTINE SHIFT
EDCOP
80-390-170
.250
PPM
990
EDVD
* EDVD
TRI
800630
INSTRU
ROUTINE SHIFT AS LOGBOOK
INSTRUMENT MECH.
TRI 800709 ROUTINE SHIFT
LEADOP
80-357-176 80-383-191
.190
PPM
992
.920
PPM
380
EDVD
TRI
800709
MACHIN
ROUTINE SHIFT AS LOGBOOK
MECHANIC
80-389-192
EDVD
TRI
800812
EDCOP
WORKING ON #2EDC REACTOR IN
#1 PLANT
80-996-215
EDVD
TRI 800812 ROUTINE SHIFT
INSTRU
80-999-218
.190
PPM
993
.120
PPM
970
.130
PPM
957
EDVD
TRI
800812
MACHIN
80-998-217
CLEARING CATALYST POT; SPRAYED
WITH EDC
EDVD
TRI 800812 ROUTINE SHIFT
VDCOP
80-997-216
.180
PPM
965
.090
PPM
969
EDVD EDVD
TRI
810827
EDCOP
ROUTINE SHIFT.#3 EDC REACTOR
WAS DOWN.ADJACENT UNIT WAS
PURGING OUT VINYL VESSELS.
TRI
810827
EDVDOP
ROUTINE SHIFT.#3 EDC REACTOR
WAS DOWN.ADJACENT UNIT WAS
PURGING OUT VINYL VESSELS.
81-380-210 81-381-211
2.170
PPM
957
.210
PPM
950
PAGE
Si J694o
1/19/93
LAK^HhARLES (254) PLANT B SAMH^MG RESULTS THRU 1984
DEPT EDVD
EDVD
EDVD
COMPOUND
DATE
JOB TITLE SAMPLE#
TRI
810827
LGINM
81-384-214
ROUTINE SHIFT. #3 EDC REACTOR
WAS DOWN.ADJACENT UNIT WAS
PURGING OUT VINYL VESSELS.
TRI
810827
LGMC
ROUTINE SHIFT.*3 1EDC REACTOR
WAS DOWN.ADJACENT UNIT WAS
PURGING OUT VINYL VESSELS.
81-383-213
TRI 811203 NORMAL SHIFT
EDCOP
81-611-352
RESULT .340
UNIT DURATION PPM 440
4.600
PPM
405
.110
PPM
441
* EDVD
TRI 811203 NORMAL SHIFT
EDVDAX
81-615-356
.100
PPM
441
PAGE
EDVD
TRI 811203 NORMAL SHIFT
EDVDOP
81-612-353
.100
PPM
447
EDVD
TRI
811203
LGMC
REPAIRED PUMPS IN MC UNIT
81-613-354
.250
PPM
421
EDVD
TRI 820218 NORMAL SHIFT
EDVDOP
82-086-055
.100
PPM
437
EDVD
TRI 820602 NORMAL SHIFT
EDVDOP
82-194-098
.110
PPM
444
EDVD
TRI 820624 ROUTINE SHIFT
LGINM
82-240-129
.140
PPM
457
EDVD
TRI 821018 ROUTINE SHIFT.
EDCOP
82-448-292
.190
PPM
441
EDVD
TRI 821018 ROUTINE SHIFT
EDVDAX
82-450-294
.220
PPM
439
SL 016941
1/19/93
LAf^WIARLES (259) PLANT B SAMWlNG RESULTS THRU 1989
DEPT EDVD
COMPOUND
DATE
TRI 821018 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDVDOP
82-999-293
RESULTUNIT DURATION
.250
PPM
991
PAGE
EDVD
TRI
821109
EDVDOP
82-983-329
ROUTINE SHIFT, SAMPLED VDCM/
TCE.
EDVD
TRI 830106 ROUTINE SHIFT
EDVDOP
83-009-007
i EDVD
EDVD
TRI
830208
LGINM
83-091-060
WORKED IN TE2 MAINTENANCE AREA
AND TRI2 STABILIZER AREA.
NORMAL OPERATIONS.
TRI
830303
EDCOP
REDUCED OPERATIONS. ROUTINE
SHIFT.
83-135-087
EDVD
TRI 830310
ROUTINE WORK LOAD. NORMAL OPERATIONS.
8 -151-099
EDVD
TRI
830518
EDVDOP
83-229-162
REDUGED OPERATIONS. RECHARGED
EDC CATALYST POT.
EDVD
TRI
830606
EDVDOP
83-276-190
ROUTINE SHIFT. NORMAL OPERA-
TIONS.
EDVD
TRI
830606
LGINM
83-277-191
ROUTE WORK. NORMAL OPERATIONS.
.910 PPM 991
.110 PPM 936
9.720
PPM
990
.120 PPM 907
.070 PPM 917
.150 PPM 927
.110 PPM 951
.100 PPM 992
EDVD
TRI
830705
EDVDOP
NORMAL OPERATIONS SHUT ONE
REACTOR DOWN NO. 2 REACTOR
83-307-217
EDVD
TRI
890319
EDVDOP
ROUTINE SHIFT. NORMAL OPERA
TIONS.
89-152-096
.120 PPM 990
SL 016942
.110
PPM
938
1/19/93
LAK^WARLES (254) PLANT B SAMWFtNG RESULTS THRU 1984
DEPT EDVD
COMPOUND'
DATE
JOB TITLE
TRI
840611
EDCOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
SAMPLE# 84-323-235
RESULT .100
UNIT DURATION PPM 417
EDVD EDVD
TRI
840611
EDVDOP
NORMAL OPERATIONS. ROUTINE
SHIFT. VAREC FLOAT CHAMBER
CLEARED
TRI
840828
EDVDOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
84-322-234 84-436-337
.120
PPM
408
.180
PPM
418
EDVD
VCM
791112
79-662-432
5FT NW OF EDC DOPP KETTLE SEAL
,FAIR,58F,N,7MPH
. 000
PPM
251
EDVD
VCM
791112
79-663-433
4FT S OF EDC DOPP 1KETTLE SEAL
FAIR,58F,N,7MPH
.010
PPM
252
EDVD
VCM
800121
MACHIN
ROUTINE SHIFT AS LOGBOOK
MECHANIC
80-034-019
.220
PPM
430
EDVD
VCM
800128
EDCOP
MORNING SAMPLE ROUND
80-051-027
.050
PPM
15
PAGE
EDVD
VCM
800128
ROUTINE SHIFT
LEADOP
80-033-018
.050
PPM
450
EDVD
VCM
800128
ROUTINE SHIFT
LEADOP
80-078-037
.050
PPM
450
EDVD
VCM
800324
EDCOP
80-180-081
ROUTINE MORNING SAMPLE ROUND
.180
PPM
15
EDVD
VCM 800414 ROUTINE SHIFT
LEADOP
80-216-099
.010
PPM
255
gL 0i6943
1/19/93
LAl^WIARLES (254) PLANT B SAHmilG RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
JOB TITLE
VCM
800602
1NSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAN
SAMPLE# 80-323-158
RESULT .500
UNIT DURATION PPM 450
EDVD
VCM 800602 ROUTINE SHIFT
VDCOP
80-321-156
.080
PPM
424
PAGE
EDVD
VCM 8006Q3 ROUTINE SHIFT
* EDVD
VCM 800709 ROUTINE SHIFT
EDCOP LEADOP
80-320-155 80-383-191
.050
PPM
433
.130
PPM
380
EDVD
VCM
800812
EDCOP
WORKING ON #2EDC REACTOR IN
#1 PLANT
80-446-215
EDVD
VCM 801006 ROUTINE SHIFT
EDCOP
80-559-246
.050
PPM
470
.080
PPM
380
EDVD
VCM
801006
INSTRU
ROUTINE SHIFT AS LOGBOOK
INSTRUMENT MAN
EDVD
VCM 801006 ROUTINE SHIFT
VDCOP
80-513-248 80-560-247
.210
PPM
410
.050
PPM
409
EDVD
VCM
810212
LGINM
81-037-016
WORKING IN #2 PLANT AROUND #3
SUMP.
EDVD EDVD
VCM
810827
EDCOP
ROUTINE SHIFT.#3 EDC REACTOR
WAS DOWN .ADJACENT UNIT WAS
PURGING OUT VINYL VESSELS.
VCM
810827
EDVDAX
ROUTINE SHIFT.#3 EDC REACTOR
WAS DOWN .ADJACENT UNIT WAS
PURGING OUT VINYL VESSELS.
81-380-210 81-382-212
.720
PPM
440
2.100
PPM
457
.960
PPM
450
St "16944
1/19/93
LAI^MARLES (259) PLANT B SAlfflNG RESULTS THRU 1984
DEPT EDVD
EDVD
EDVD *
EDVD
COMPOUND
DATE
JOB TITLE SAMPLE#
VCM 810827 EDVDOP ROUTINE SHIFT.#3 EDC REACTOR WAS DOWN.ADJACENT UNIT WAS
PURGING OUT VINYL VESSELS.
81-381-211
VCM
810827 LGINM
81-384-214
ROUTINE SHIFT. #3 EDC REACTOR
WAS DOWN.ADJACENT UNIT WAS
PURGING OUT VINYL VESSELS.
VCM
810827 LGMC
ROUTINE SHIFT.#3 EDC REACTOR
WAS DOWN.ADJACENT UNIT WAS
PURGING OUT VINYL VESSELS.
81-383-213
VCM
811002
EDCOP
8I-494-274
ROUTINE SHIFT UNTIL EXPLOSION
IN EDC REACTOR
RESULT 2.500
UNIT DURATION PPM 450
.750
PPM
440
.300
PPM
405
.100
PPM
437
EDVD
VCM
811002
EDVDAX
81-498-278
ROUTINE SHIFT UNTIL EXPLOSION
IN EDC REACTOR
.090
PPM
443
EDVD
VCM
811002
EDVDOP
81-495-275
ROUTINE SHIFT UNTIL EXPLOSION
IN EDC REACTOR
.120
PPM
434
EDVD
VCM
811002
LGINM
81-497-277
ROUTINE SHIFT UNTIL EXPLOSION
IN EDC REACTOR
.090
PPM
432
EDVD
VCM
811002
LGMC
81-496-276
ROUTINE SHIFT UNTIL EXPLOSION
IN EDC REACTOR
.050
PPM
440
EDVD
VCM 811203 NORMAL SHIFT
EDCOP
81-611-352
.050
PPM
441
EDVD
VCM 811203 NORMAL SHIFT
EDVDAX
81-615-356
.050
PPM
441
EDVD
VCM
811203
NORMAL SHIFT
EDVDOP
81-612-353
.050
PPM
447
PAGE
SL 016945
1/19/93
LAI^^HARLES (254) PLANT B SAMWNG RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
JOB TITLE SAMPLE#
VCM
811203
LGINM
81-614-355
INSTUMENT REPAIR WORK IN UNITS
ALL DAY
RESULT .050
UNIT DURATION PPM 428
EDVD
VCM
811203
LGMC
REPAIRED PUMPS IN MC UNIT
81-613-354
.050
PPM
421
EDVD
* EDVD
VCM
820115
LEADOP
TIGHTENED EDC VALVE LEAKS
DURING NORMAL DAY SHIFT.
82-021-017
VCM
830518
EDVDOP
83-229-162
REDUCED OPERATIONS . RECHARGED
EDC CATALYST POT.
EDVD
VCM
830919
EDCOP
REDUCED OPERATIONS , ROUTINE
SHIFT.
83-435-306
EDVD
VCM
830919
EDVDOP
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-436-307
EDVD
VCM
830919
LGMC
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-437-308
EDVD
VCM
840202
EDCOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
84-096-054
EDVD
VCM
840202
EDVDOP
NORMAL OPERATIONS. TRAINING
OH JOB
84-095-053
EDVD
VCM
840314
EDVDOP
ROUTINE SHIFT. NORMAL OPERA
TIONS.
84-152-096
EDVD
VCM
840417
EDCOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
84-221-159
.050
PPM
451
.050
PPM
427
.080
PPM
403
.080
PPM
402
.050
PPM
407
.050
PPM
419
.050
PPM
419
.050
PPM
438
2.700
PPM
408
PAGE 016946
1/19/93
m 1
LAI^BhARLES (254) PLANT B SAMTC1NG RESULTS THRU 1984
PAGE
DEPT EDVD
COMPOUND
DATE
JOB TITLE
VCM
840417
EDVDOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
SAMPLE# 84-222-160
RESULT 3.490
UNIT DURATION PPM 408
EDVD
VCM
840419
EDCOP
NORMAL OPERATIONS. ROUTINE
MORNING ROUND.
84-228-166
.050
PPM
20
EDVD
* EDVD
VCM
840419
EDVDOP
NORMAL OPERATIONS. ROUTINE
MORNING ROUND.
VCM
840607
EDCOP
NORMAL OPERATIONS. ROUTINE
MORNING SAMPLING ROUND.
84-227-165 84-315-228
.050
PPM
15
.130
PPM
14
EDVD
VCM
840607
EDVDOP
84-316-229
NORMAL OPERATIONS. ROUTINE LAB
ANALYSIS.
.400
PPM
19
EDVD
VCM
840611
EDCOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
84-323-235
.050
PPM
417
EDVD EDVD
VCM
840611
EDVDOP
NORMAL OPERATIONS. ROUTINE
SHIFT. VAREC FLOAT CHAMBER
CLEARED.
84-322-234
VCM
841210
EDVDOP
84-621-478
REDUCED OP. EDC AND EDC/VDCM
PLANTS 1 AND 2 COMBINED JOB.
.050
PPM
408
.050
PPM
432
EDVD
VDC
791112
79-662-432
5FT NW OF EDC DOPP KETTLE SEAL
,FAIR,58F,N,7MPH
.000
PPM
251
EDVD
VDC 791112
79-663-433
4FT S OF EDC DOPP KETTLE SEAL,
FAIR,58F,N,7MPH
.000
PPM
252
EDVD
VDC
791218
EDCOP
PUT FILTER INTO SERVICE
VENTED EDC TO CHECK FLOW
79-686-454
.800
PPM
15 SL 016947
i
1/19/93
LACTRHARLES (254) PLANT B SAMPLING RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
JOB TITLE
VDC
800121
INSTRU
ROUTINE SHIFT AS LOGBOOK
INSTRUMENT MAN
SAMPLE# 80-035-020
RESULT .060
UNIT DURATION PPM 430
EDVD
VDC 800121 ROUTINE SHIFT
LEADOP
80-033-018
.070
PPM
430
PAGE
EDVD
t EDVD
VDC
800121
MACHIN
ROUTINE SHIFT AS LOGBOOK
MECHANIC
VDC
800124
VDCOP
MORNING SAMPLE ROUND
80-034-019 80-052-028
.120
PPM
430
1.950
PPM
13
EDVD
VDC
800128
EDCOP
MORNING SAMPLE ROUND
80-051-027
.120
PPM
15
EDVD
VDC 800128 ROUTINE SHIFT
LEADOP
80-033-018
.060
PPM
450
EDVD
VDC 800128 ROUTINE SHIFT
LEADOP
80-078-037
.060
PPM
450
EDVD
VDC 800205 ROUTINE SHIFT
EDCOP
80-079-038
.010
PPM
427
EDVD
VDC 800205 ROUTINE SHIFT
INSTRU
80-082-041
.190
PPM
427
EDVD
VDC
800205
MACHIN
80-081-040
ROUTINE SHIFT AS LOGBOOK MECH.
STARTUP VDC REACTOR
EDVD
VDC
800205
VDCOP
ROUTINE SHIFT
STARTUP VDC REACTOR
80-080-039
10.530
PPM
420
8.500
PPM
420
SL 016948
1/19/93
LAKWCHARLES C259) PLANT B SAMPLING RESULTS THRU 1989
DEPT EDVD
COMPOUND
DATE
JOB TITLE
VDC
800303
INSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAN
SAMPLE# 80-139-060
RESULT .150
UNIT DURATION PPM 920
EDVD
VDC
800303
LOALAB
STARTING VP #2 EDC REACTOR
80-137-063
.050
PPM
375
PAGE
EDVD
* EDVD
VDC
800303
MACHIN
ROUTINE SHIFT AS LOG BOOK
MECHANIC
VDC
800303
PIPEFI
STARTING UP #2 EDC REACTOR
80-135-061 80-139-065
.050
PPM
917
.070
PPM
385
EDVD
VDC
800329
VDCOP
MORNING SAMPLE ROUND
80-181-082
.100
PPM
15
EDVD
VDC 800325 ROUTINE SHIFT
LEADOP
80-136-062
.100
PPM
932
EDVD
VDC 800919 ROUTINE SHIFT
INSTRU
80-219-102
.090
PPM
939
EDVD
VDC 800919 ROUTINE SHIFT
LEADOP
80-216-099
.070
PPM
255
EDVD
VDC 800919 ROUTINE SHIFT
VDCOP
80-217-100
2.860
PPM
992
EDVD
VDC
800507
EDCOP
MORNING SAMPLE ROUND
80-289-139
.100
PPM
15
EDVD
VDC
800507
INSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAN
80-283-138
2.210
PPM
928
SL 016949
1/19/93
-
m
1
LAI^IhARLES (254) PLANT B SAMPLING RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
JOB TITLE
VDC
800507
LEADOP
TAGGING OUT A PUMP
SAMPLE# 80-281-136
RESULT .100
UNIT DURATION
PPM 15
EDVD
VDC
800507
MACHIN
ROUTINE SHIFT AS LOG BOOK
MECHANIC
EDVD
VDC
800507
VDCOP
MORNING SAMPLE ROUND
+ EDVD
VDC
800602
INSTRU
ROUTINE SHIFT AS LOG BOOK
INSTRUMENT MAN
EDVD
VDC 800602 ROUTINE SHIFT
MACHIN
80-282-137 80-285-140 80-323-158 80-322-157
.020
PPM
472
10.200
PPM
15
.350
PPM
450
.060
PPM
443
EDVD
VDC
800602
ROUTINE SHIFT
VDCOP
80-321-156
.240
PPM
424
EDVD
VDC 800603 ROUTINE SHIFT
EDCOP
80-320-155
3.730
PPM
433
EDVD
VDC 800630 ROUTINE SHIFT
EDCOP
80-340-170
.540
PPM
440
EDVD
VDC
800630
INSTRU
ROUTINE SHIFT AS LOGBOOK
INSTRUMENT MECH.
EDVD
VDC 800709 ROUTINE SHIFT
LEADOP
80-357-176 80-383-191
1.630
PPM
442
,520
PPM
380
EDVD
VDC
800709
MACHIN
ROUTINE SHIFT AS LOGBOOK
MECHANIC
80-384-192
.050
PPM
443
PAGE
SL 016950
i
1/19/93
LAK^PHARLES (259) PLANT B SAMPLING RESULTS THRU 1989
DEPT EDVD
COMPOUND
DATE
VDC 800709 SAMPLE ROUND
JOB TITLE SAMPLE#
VDCOP
80-385-193
RESULT 1.900
UNIT DURATION PPM 15
EDVD
VDC
600812
EDCOP
WORKING ON #2EDC REACTOR IN
#1 PLANT
80-996-215
EDVD
VDC 800812 ROUTINE SHIFT
INSTRU
80-999-218
* EDVD
VDC
800812
MACHIN
80-998-217
CLEARING CATALYST POT; SPRAYED
WITH EDC
EDVD
VDC 800812 ROUTINE SHIFT
VDCOP
80-997-216
.670
PPM
970
.550
PPM
957
.150
PPM
965
.950
PPM
969
EDVD
VDC 801006 ROUTINE SHIFT
EDCOP
80-559-296
.550
PPM
380
EDVD
VDC
801006
INSTRU
ROUTINE SHIFT AS LOGBOOK
INSTRUMENT MAN
EDVD
VDC 801006 ROUTINE SHIFT
VDCOP
80-513-298 80-560-297
.980
PPM
910
.380
PPM
909
EDVD
VDC 810212 ROUTINE SHIFT
EDVDAX
81-038-017
7.900
PPM
959
EDVD
VDC 810212 ROUTINE SHIFT
LEADOP
81-039-013
.390
PPM
998
EDVD
VDC
810212
LGINM
81-037-016
WORKING IN #2 PLANT AROUND #3
SUMP.
.920
PPM
990
PAGE
1/19/93
*LAMKWPHARLES (259)
PLANT B SAMPLING RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
JOB TITLE
VDC
810212
LGMC
WORKING ON #4 COOLING TOWER
SAMPLE# 81-036-015
RESULT 2.000
UNIT DURATION PPM 430
EDVD
VDC 810505 SAMPLE ROUND.
EDCOP
81-154-074
.100
PPM
15
EDVD
VDC 810505 ROUTINE ROUND.
EDVDOP
81-155-075
* EDVD
VDC
810616
EDVDAX
RAN ANALYSIS ON EXTRA VDC
STILL SAMPLES.
81-266-137
EDVD
VDC
810729
EDCOP
81-333-184
MORNING SAMPLE ROUND IN #1 EDC
PLANT.
EDVD
VDC
810729
EDVDOP
81-334-185
MORNING SAMPLE ROUND IN #3 EDC
PLANT AND VDC PLANT.
EDVD EDVD EDVD EDVD EDVD
VDC
810827
EDCOP
ROUTINE SHIFT.#3 EDC REACTOR
WAS DOWN.ADJACENT UNIT WAS
PURGING OUT VINYL VESSELS.
81-380-210
VDC
810827
EDVDAX
ROUTINE SHIFT.#3 EDC REACTOR
WAS DOWN.ADJACENT UNIT WAS
PURGING OUT VINYL VESSELS.
81-382-212
VDC
810827
EDVDOP
ROUTINE SHIFT.#3 EDC REACTOR
WAS DOWN.ADJACENT UNIT WAS
PURGING OUT VINYL VESSELS.
81-381-211
VDC
810827
LGINM
81-384-214
ROUTINE SHIFT. #3 EDC REACTOR
WAS DOWN.ADJACENT UNIT WAS
PURGING OUT VINYL VESSELS.
VDC
810827
LGMC
ROUTINE SHIFT.#3 EDO REACTOR
WAS DOWN.ADJACENT UNIT WAS
PURGING OUT VINYL VESSELS.
81-383-213
.100
PPM
15
5.900
PPM
448
.100
PPM
15
.100
PPM
15
.160
PPM
457
2.000
PPM
450
.410
PPM
450
.400
PPM
440
.310
PPM
405
1/19/93
_
1
LAI^IhARLES (259) PLANT B SAMPLING RESULTS THRU 1989
DEPT EDVD
COMPOUND
DATE
JOB TITLE
VDC
810909
EDCOP
ROUTINE MORNING ROUND. COLOR
CHECKS MADE.
SAMPLE# 81-903-226
RESULT . 100
UNIT DURATION PPM 15
EDVD
EDVD *
EDVD
VDC
810909
EDVDOP
ROUTINE MORNING ROUND. EDC
COLOR CHECKS. ORGANIC BOX
CHECKS.
81-909-227
VDC
811002
EDCOP
81-999-279
ROUTINE SHIFT UNTIL EXPLOSION
IN EDC REACTOR
VDC
811002
EDVDAX
81-998-278
ROUTINE SHIFT UNTIL EXPLOSION
IN EDC REACTOR
3.720
PPM
15
.180
PPM
937
2.750
PPM
993
EDVD
VDC
811002
EDVDOP
81-995-275
ROUTINE SHIFT UNTIL EXPLOSION
IN EDC REACTOR
.860
PPM
939
EDVD
VDC
811002
LGINM
81-997-277
ROUTINE SHIFT UNTIL EXPLOSION
IN EDC REACTOR
.280
PPM
932
EDVD
VDC
811002
LGMC
81-996-276
ROUTINE SHIFT UNTIL EXPLOSION
IN EDC REACTOR
3.200
PPM
990
EDVD
VDC
811201
EDCOP
81-595-392
ROUTINE ROUND AND REPAIRED AN
EDC PACKING LEAK
5.970
PPM
15
EDVD
VDC
811201
EDVDOP
ROUTINE MORNING ROUND
81-596-393
.100
PPM
15
EDVD
VDC 811203 NORMAL SHIFT
EDCOP
81-611-352
.100
PPM
991
EDVD
VDC 811203 NORMAL SHIFT
EDVDAX
81-615-356
9.550
PPM
991
*
PAGE
i
1/19/93
LAI^iHARLES (254) PLANT B SAMPLING RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
VDC 811203 NORMAL SHIFT
JOB TITLE SAMPLE#
EDVDOP
81-612-353
RESULT 2.150
UNIT DURATION
PPM
447
(
PAGE
EDVD
VDC
811203
LGINM
81-614-355
INSTUMENT REPAIR WORK IN UNITS
ALL DAY
EDVD
i
EDVD
VDC
811203
LGMC
REPAIRED PUMPS IN MC UNIT
VDC
820115
NORMAL SHIFT
EDCOP
81-613-354 82-022-018
1.310
PPM
428
.100
PPM
421
.110
PPM
451
EDVD EDVD
VDC
820115
EDVDOP
82-023-019
O-RING BLOW-OUT ON HQMME ROTO-
METER AND RELEASE FROM BLEED
VALVE-STRIPPER LIGHTS FLOW TRM
VDC
820115
LEADOP
TIGHTENED EDC VALVE LEAKS
DURING NORMAL DAY SHIFT.
82-021-017
EDVD
VDC
820210
LGINM
ROUTINE ROUTE WORK
82-053-036
3.660
PPM
450
.230
PPM
451
.120
PPM
439
EDVD
VDC 820210 ROUTE WORK
LGMC
82-052-035
.100
PPM
451
EDVD
VDC
820218
NORMAL SHIFT
EDVDOP
82-086-055
EDVD
VDC
820303
EDCOP
82-097-060
ROUTINE SAMPLE RUN AND COLOR
CHECK
EDVD
VDC 820602 NORMAL SHIFT
EDCOP
82-193-097
.500
PPM
437
.100
PPM
17 SL 016954
.170
PPM
444
1/19/93
LAKJHHARLES (259) PLANT B SAMPLING RESULTS THRU 1989
DEPT EDVD
COMPOUND
DATE
VDC
820602
NORMAL SHIFT
JOB TITLE SAMPLE#
EDVDOP
82-199-098
RESULT 6.770
UNIT DURATION
PPM
999
PAGE
EDVD
VDC 820619 ROUTINE SHIFT
EDVDAX
82-215-111
3.680
PPM
926
EDVD VDC
820619
ROUTINE SHIFT
LGINM
82-219-110
.130
PPM
929
EDVD VDC
820629
ROUTINE SHIFT
LGINM
82-290-129
.210
PPM
957
EDVD VDC
820713
EDCOP
ROUTINE MORNING ROUND.
82-270-152
.100
PPM
16
EDVD EDVD
VDC
820713
EDVDAX
82-273-155
ROUTINE SHIFT. 88 F, FAIR, 57Z
RH, 30.07BP, WINDS NW-8.
CCF RESPIRATOR WORN SAMPLING
VDC
820713
EDVDOP
ROUTINE MORNING ROUND.
82-262-199
7.110 PPM
958
.100 PPM
13
EDVD EDVD
VDC
820713
LGMC
82-279-156
REPAIRED A VDCM REACTOR BOTTOM
PUMP IN EDC/VDC PIANT. 88 F,
FAIR, 57XRH, 30.07BP,WINDS 8NW
VDC 820812 ROUTINE SHIFT
EDCOP
82-329-199
.370 PPM 929 .360 PPM 997
EDVD
VDC
820812
EDVDAX
82-332-202
ROUTINE SHIFT. CAUGHT SAMPLES.
EDVD
VDC 820812 ROUTINE SHIFT
EDVDOP
82-330-200
9.200
PPM
999
3.800
PPM
999
SL 016955
1/19/93
*LAmK^THARLES (254)
PLANT B SAMPLING RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
VDC 820812 ROUTINE SHIFT
JOB TITLE SAMPLE#
LGINM
82-331-201
RESULT .530
UNIT DURATION PPM 439
EDVD
VDC
820915
EDVDAX
82-394-251
ROUTINE MORNING SAMPLING RUN,
COLLECTING EDC SAMPLES.
EDVD
VDC
820915
EDVDOP
ROUTINE MORNING ROUND
82-395-252
.050
PPM
16
1.610
PPM
17
EDVD
VDC 821018 ROUTINE SHIFT.
EDCOP
82-448-292
.470
PPM
441
EDVD
VDC 821018 ROUTINE SHIFT
EDVDAX
82-450-294
1.930
PPM
439
EDVD
VDC 821018 ROUTINE SHIFT
EDVDOP
82-449-293
.200
PPM
441
EDVD
VDC 821104 ROUTINE SHIFT
EDCOP
82-482-323
.110
PPM
442
EDVD
VDC 821104 ROUTINE SHIFT
EDVDAX
82-484-325
1.420
PPM
419
EDVD
VDC
821104
EDVDOP
82-483-324
ROUTINE SHIFT, SAMPLED VDCM/
TCE .
EDVD EDVD
VDC
821104
LGINM
82-485-326
REPAIRED DH STILL LEVEL TRANS
MITTER, WORKED IN VDC UNIT
HALF DAY
VDC
821118
LGMC
82-518-343
REPAIRED PUMPS IN EDC UNIT AND
WORKED IN VDCM UNIT. WINDS E-6
5.160
PPM
441
1.940
PPM
424
1.770
PPM
425
PAGE 016956
1/19/93
LAKWPHARLES (259) PLANT B SAMPLING RESULTS THRU 1989
DEPT EDVD
COMPOUND
DATE
VDC 821208 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDVDOP
82-551-367
RESULT .150
UNIT DURATION PPM 990
PAGE
EDVD
VDC 821220 ROUTINE SHIFT.
EDVDOP
82-570-375
2.610
PPM
995
EDVD
VDC 830106 ROUTINE SHIFT.
t EDVD
VDC 830106 ROUTINE SHIFT
EDCOP EDVDOP
83-008-006 83-009-007
1.210
PPM
936
.710
PPM
936
EDVD EDVD EDVD EDVD
VDC
830121
EDCOP
83-093-031
I AND 2 PLANTS NORMAL RATES,
3 PLANT REDUCED RATES. ANALY
ZING SAMPLES IN LAB.
VDC
830121
EDCOP
1 AND 2 PLANTS NORMAL RATES,
3 PLANT DOWN. COLLECTING
SAMPLES. TEMP 38, WINDS NW-6
83-095-033
VDC
830121
EDVDOP
1 AND 2 PLANTS NORMAL RATES,
3 PLANT DOWN. ANALYZING
SAMPLES IN LAB.
83-099-032
VDC
830208
EDVDAX
ROUTINE SHIFT. NORMAL OP-
ERATIONS
83-092-061
EDVD
VDC
830208
EDVDOP
ROUTINE SHIFT. NORMAL OP
ERATIONS.
83-089-058
EDVD EDVD
VDC
830208
LGINM
83-091-060
WORKED IN TE2 MAINTENANCE AREA
AND TRI2 STABILIZER AREA.
NORMAL OPERATIONS.
VDC
830208
LGMC
83-090-059
PIPEFITTING AND MACHINIST WORK
IN UNIT. NORMAL OPERATIONS.
1.500
PPM
15
1.730
PPM
15
2.180
PPM
15
.150
PPM
950
2.300
PPM
998
.080 PPM
990
.060 PPM
992
SL 016957
1/19/93
LAKfVeHARLES (254) PLANT B SAMPLING RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
JOB TITLE
VDC
830303
EDCOP
REDUCED OPERATIONS.. ROUTINE
SHIFT.
SAMPLE# 83-135-087
RESULT .120
UNIT DURATION PPM 407
EDVD
VDC
830303
EDVDOP
REDUCED OPERATIONS.. ROUTINE
SHIFT.
83-134-086
2.540
PPM
416
EDVD
# EDVD
VDC
830309
EDCOP
NORMAL 1OPERATIONS. ROUTINE
MORNING ROUND.
VDC
830309
EDVDOP
NORMAL OPERATIONS. ROUTINE
MORNING SAMPLING ROUND.
83-150-098 83-149-097
.100
PPM
22.300
PPM
19 25
EDVD
VDC 830310
ROUTINE WORK LOAD. NORMAL OPERATIONS.
8 -151-099
7.210
PPM
417
EDVD EDVD
VDC
830425
EDVDOP
83-187-130
ROUTINE ROUNDS. SAMPLED AND
ANALYZED EDC AND VDC. EDC UNIT
SHUTDOWN.
VDC
830425
LGMC
83-188-131
MAINTENANCE WORK IN EDC UNIT
DURING SHUTDOWN.
2.380
PPM
437
.050
PPM
442
EDVD
VDC
830518
EDVDOP
83-229-162
REDUCED OPERATIONS. RECHARGED
EDC CATALYST POT.
.050
PPM
427
EDVD EDVD
VDC
830606
EDCOP
83-275-189
ROUTINE ROUNDS. WORKED IN AREA
OF SOUTH TERMINAL TANK. NORMAL
OPERATIONS.
VDC
830606
EDVDOP
83-276-190
ROUTINE SHIFT. NORMAL OPERA
TIONS.
.390
PPM
454
21.100
PPM
451
EDVD
VDC
8306 06
LGINM
83-277-191
ROUTE WORK. NORMAL OPERATIONS.
.380
PPM
442
PAGE
cl 0169&8 3
1/19/93
1
LA^^HARLES (259) PLANT B SAMPLING RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
JOB TITLE
VDC
830705
EDCOP
NORMAL OPERATIONS TOOK ONE
REACTOR DOWN HO. 2 REACTOR
SAMPLE# 83-306-216
RESULT .390
UNIT DURATION PPM 360
EDVD
VDC
830705
EDVDOP
NORMAL OPERATIONS SHUT ONE
REACTOR DOWN NO. 2 REACTOR
83-307-217
5.300
PPM
440
EDVD EDVD
VDC
830830
EDCOP
83-396-288
DID COLOR CHECKS AND RECIRCU
LATED EDC THROUGH CARBON BED.
NORMAL OPERATIONS.
VDC
830830
EDVDOP
83-397-289
BLOCKED AND REPAIRED LEAKING
TCE LINE. NORMAL OPERATIONS.
.670
PPM
437
15.100
PPM
440
EDVD
VDC
830919
EDCOP
REDUCED OPERATIONS, ROUTINE
SHIFT.
83-435-306
.150
PPM
403
EDVD
VDC
830919
EDVDOP
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-436-307
.110
PPM
402
EDVD
VDC
830919
LGMC
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-437-308
,070
PPM
407
EDVD
VDC
831010
EDCOP
83-477-338
ROUTINE SHIFT. REDUCED OPERA
TIONS- NO.1 EDC PLANT DOWN.
.230
PPM
438
EDVD
VDC
831010
EDVDOP
83-478-339
ROUTINE SHIFT. REDUCED OPERA
TIONS- NO.1 EDC PLANT DOWN.
4.130
PPM
434
EDVD EDVD
VDC
831010
LGMC
83-479-340
LOGBOOK WORK THROUGHOUT UNIT.
REDUCED OPERATIONS- NO.l EDC
PLANT DOWN.
VDC
831114
EDCOP
NORMAL OPERATIONS, ROUTINE
SHIFT.
83-545-385
.060
PPM
432
.500
PPM
434
PAGE SL 016959
i
PLANT B SAMPLING RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
JOB TITLE
VDC
83111A
EDVDDP
NORMAL OPERATIONS, ROUTINE
SHIFT. CLEARED VAREC STORAGE
SAMPLE# 83-546-386
RESULT 5.690
UNIT DURATION PPM 435
EDVD
VDC
831206
EDVDAX
ROUTINE SHIFT. NORMAL OPERA
TIONS.
83-566-402
1.240
PPM
445
EDVD
VDC
831208
EDVDOP
83-577-405
CLEARED VAREC AT STORAGE TANK
NORMAL OPERATIONS.
1.030
PPM
443
EDVD EDVD EDVD
VDC
840110
EDCOP
84-026-014
NORMAL OPERATIONS. DRAINED HO
1 VENT HEADER AND ROUTINE
DUTIES. WIND NW-23.
VDC
840110
EDVDOP
84-027-015
NORMAL OPERATIONS. STARTED-UP
TCE UNIT AND ROUTINE DUTIES.
WIND NW-23.
VDC
840202
EDCOP
NORMAL OPERATIONS. ROUTINE
84-096-054
.070
PPM
433
1.000
PPM
415
.150
PPM
419
EDVD
VDC
840202
EDVDOP
NORMAL OPERATIONS. TRAINING
ON JOB
84-095-053
EDVD
VDC
840314
EDCOP
ROUTINE SHIFT. NORMAL OPERA
TIONS.
84-153-097
EDVD
VDC
840314
EDVDOP
ROUTINE SHIFT. NORMAL OPERA
TIONS.
84-152-096
EDVD
VDC
840417
EDCOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
84-221-159
EDVD
VDC
840417
EDVDOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
84-222-160
2.210
PPM
419
.390
PPM
438
.340
PPM
438
.440
PPM
408
1.190
PPM
408
1/19/93
LAK^HARLES (254) PLANT B SAMPLING RESULTS THRU 1989
DEPT EDVD
COMPOUND
DATE
JOB TITLE
VDC
890919
EDCOP
NORMAL OPERATIONS. ROUTINE
MORNING ROUND.
SAMPLE# 89-228-166
RESULT .050
UNIT DURATION PPM 20
EDVD
VDC
890919
EDVDOP
NORMAL OPERATIONS. ROUTINE
MORNING ROUND.
89-227-165
.050
PPM
15
EDVD
VDC 890929
89-231-169
NORMAL OPERATIONS. PLACED ON
CENTER TABLE.
5.710
PPM
395
EDVD
VDC
890517
EDCOP
89-283-207
ROUTINE SHIFT. NORMAL OPERA
TIONS.
.080
PPM
922
EDVD
VDC
890517
EDVDOP
89-282-206
ROUTINE SHIFT. NORMAL OPERA
TIONS.
.860
PPM
922
EDVD
VDC
890607
EDCOP
NORMAL OPERATIONS. ROUTINE
MORNING SAMPLING ROUND.
89-315-228
.050
PPM
19
EDVD
VDC
890607
EDVDOP
84-316-229
NORMAL OPERATIONS. ROUTINE LAB
ANALYSIS.
7.190
PPM
19
EDVD
VDC
840611
EDCOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
84-323-235
.150
PPM
417
EDVD EDVD
VDC
840611
EDVDOP
NORMAL OPERATIONS. ROUTINE
SHIFT. VAREC FLOAT CHAMBER
CLEARED.
84-322-234
VDC
840706
EDCOP
84-368-280
ROUTINE SHIFT. NORMAL OPERA
TIONS.
3.970
PPM
408
.150
PPM 455
EDVD
VDC
840706
EDVDOP
84-369-281
ROUTINE SHIFT. NORMAL OPERA
TIONS.
4.230
PPM
455
PAGE SL 016961
1/19/93
m LA HARLES (259) PLANT B SAMMPPLI NG RESULTS THRU 1989
DEPT EDVD
COMPOUND
DATE
JOB TITLE
VDC
890828
EDCOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
SAMPLE# 89-935-336
RESULT .130
UNIT DURATION
PPM
913
EDVD
VDC
890828
EDVDOP
NORMAL OPERATIONS. ROUTINE
SHIFT.
89-936-337
5.990
PPM
918
EDVD EDVD
VDC
890906
EDCOP
89-961-356
NORMAL OP. CLEARED PLUGGED
LINE DH FEED VALVE, H20 OUT OF
RX PHASE SEP.
VDC
890906
EDVDOP
89-962-357
NORMAL OP. HOSE BROKE ON EDC
LINE FROM VAC TRK, EDC SPILL.
1.720
PPM
923
.080
PPM
923
EDVD
VDC
890911
EDVDOP
89-976-368
NORMAL OP. ROUTINE SHIFT. MORN
SAMPLING ROUND.
.500
PPM
15
EDVD
VDC
891002
EDCOP
NORMAL OP. ROUTINE SHIFT.
89-528-905
.190
PPM
399
PAGE
EDVD VDC
891002
EDVDOP
NORMAL OP. ROUTINE SHIFT.
89-527-909
1.700
PPM
397
EDVD EDVD
VDC
891105
EDCOP
89-580-991
NORMAL OP. START-UP NO.3 RX AT
0830 TIME. SPRAYED WITH NEW
CATALYST.
VDC
891105
EDVDOP
89-581-992
UPSET OPERATIONS NO.3 PLANT,
NO.9 RX. WIND N-19.
EDVD
VDC
891108
EDCOP
NORMAL OP. ROUTINE MORNING
ROUND.
89-590-951
EDVD
VDC
891108
EDVDOP
NORMAL OP. ROUTINE MORNING
SAMPLE ROUND.
89-591-952
.890 PPM
933
1.980
PPM
933
.760
PPM
19
8.390
PPM
18 SL 016962
1/19/93
LAMPHARLES (254) PLANT B SAMPLING RESULTS THRU 1984
DEPT EDVD
COMPOUND
DATE
JOB TITLE
VDC
841210
EDVDOP
REDUCED OP. EDC AND EDC/VDCM
PLANTS 1 AND 2 COMBINED JOB.
SAMPLE# 84-621-478
RESULT .790
UNIT DURATION PPM 432
MC CCL4
760811
TETHOP
76-236-160
ROUTINE SHIFT
.000
PPM
390
MC t
MC
MC
CCL4
760811
ROUTINE SHIFT
TRAUXO
76-237-161
CCL4
760819
76-247-166
APPROX. 6 FT FROM CONN. DURIN
G UNLOADING OF DOL -IBL
CCL4
761004
ROUTINE SHIFT
EDCOP
76-283-186
.000
PPM
393
. 000
PPM
383
.000
PPM
415
MC CCL4
761004
TETHOP
76-286-187
ROUTINE SHIFT
.000
PPM
415
MC CCL4
761004
TRAUXO
76-287-188
ROUTINE SHIFT
.000
PPM
400
MC CCL4
761108
76-312-205
APPROX. 6 FT FROM COHN. DURIN
G UNLOADING OF NITMET TRUCK
MC CCL4
761108
TETHOP
76-305-198
ROUTINE SHIFT
. 000
PPM
47
.000
PPM
28 0
MC CCL4
761108
TRAUXO
76-306-199
ROUTINE SHIFT
.000
PPM
280
MC CCL4
761115
76-310-203
APPROX. 6FT FROM CONN. DURING
UNLOADING OF BLM TRUCK
.000
PPM
375
PAGE SL 016963
1/19/93
LA kHliHARLES (254) PLANT B SAMMPPLINI G RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
CCL4
770118
ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
77-004-004
RESULT .000
UNIT DURATION PPM 419
PAGE
MC CCL4
770118
TRAUXO
77-005-005
ROUTINE SHIFT
.000
PPM
345
MC CCL4
770307
TETHOP
77-045-022
ROUTINE SHIFT
MC *
CCL4
770318
ROUTINE SHIFT
TETHOP
77-061-034
.000
PPM
410
.000
PPM
410
MC CCL4
770318
TRAUXO
77-062-035
ROUTINE SHIFT
.000
PPM
410
MC CCL4
770404
TETHOP
77-084-048
ROUTINE SHIFT
. 000
PPM
402
MC CCL4
770404
TRAUXO
77-082-046
ROUTINE SHIFT
.000
PPM
449
MC CCL4
770429
TETHOP
77-106-070
ROUTINE SHIFT (EDC UNIT DOWN)
.000
PPM
250
MC CCL4
770502
77-107-071
ADJACENT TO CATALYST ADDITION
POT IN MC UNIT
MC CCL4
770502
77-108-072
CENTER OF MC PAD,SOUTH END,
NEAR MC REACOTR
MC CCL4
770502
77-109-073
CENTER OF PAD,NORTH END, NEAR
VDC STILL IN MC UNIT
.000
PPM
260
.000
PPM
258
.000
PPM
257
SI a1696"
1/19/93
mm m
1
LAI^^HARLES (254) PLANT B SAMPLING RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
CCL4
770503
ROUTINE SHIFT
JOB TITLE SAMPLE#
TELOP
77-113-077
RESULT .000
UNIT DURATION PPM 332
MC CCL4
770503
TETHOP
77-111-075
ROUTINE SHIFT
.000
PPM
333
MC
* MC
CCL4
770503
ROUTINE SHIFT
TRAUXO
77-112-076
CCL4
770504
77-124-087
CENTER OF PAD,SOUTH END, NEAR
MC REACTOR
MC CCL4
770504
77-125-088
CENTER OF PAD,NORTH END, NEAR
VDC STILL IN MC UNIT
MC CCL4
770504
TELOP
77-123-086
ROUTINE SHIFT
.000
PPM
331
. 000
PPM
394
.000
PPM
395
. 000
PPM
398
MC CCL4
770504
TETHOP
77-121-084
ROUTINE SHIFT
.000
PPM
396
MC CCL4
770504
TRAUXO
77-122-085
ROUTINE SHIFT
.000
PPM
402
MC CCL4
770510
TELOP
77-146-107
ROUTINE SHIFT
.000
PPM
405
MC CCL4
770510
TETHOP
77-144-105
ROUTINE SHIFT
.000
PPM
254
MC CCL4
770510
TRAUXO
77-145-106
ROUTINE SHIFT
.000
PPM
443
PAGE
SL 016965
i
1/19/93
LAt^PKHARLES (254) PLANT B SAMPLING RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
CCL4
770516
ROUTINE SHIFT
JOB TITLE SAMPLE#
TELOP
77-155-116
RESULT .000
UNIT DURATION PPM 406
PAGE
MC CCL4
770516
TETHOP
77-153-114
ROUTINE SHIFT
.000
PPM
451
MC
* MC
CCL4
770516
ROUTINE SHIFT
CCL4
770615
ROUTINE SHIFT
TRAUXO EDCOP
77-154-115 77-159-117
.000
PPM
408
.000
PPM
414
MC CCL4
770615
TETHOP
77-160-118
ROUTINE SHIFT
.000
PPM
416
MC CCL4
770822
TETHOP
77-187-132
ROUTINE SHIFT
.000
PPM
410
MC CCL4
770822
TRAUXO
77-188-133
ROUTINE SHIFT
.000
PPM
405
MC CCL4
770913
TETHOP
77-208-149
ROUTINE SHIFT
.000
PPM
413
MC CCL4
771017
TETHOP
77-217-155
ROUTINE SHIFT
.440
PPM
390
MC CCL4
771017
TRAUXO
77-218-156
ROUTINE SHIFT
MC CCL4
771121
TETHOP
77-256-180
ROUTINE SHIFT
1.200
PPM
.000
PPM
390
SL 016966
416
1/19/93
LAmK^THnARLES (254) PLANT B SAMPLING RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
CCL4
771128
ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
77-259-183
RESULT .000
UNIT DURATION PPM 417
MC CCL4
771128
TRAUXO
77-260-184
ROUTINE SHIFT
.000
PPM
417
MC
i MC
CCL4
780109
ROUTINE SHIFT
CCL4
780418
ROUTINE SHIFT
TETHOP TELOP
78-001-001 78-137-087
.000
PPM
200
.000
PPM
410
MC CCL4
780418
TETHOP
78-136-086
ROUTINE SHIFT
.000
PPM
410
MC CCL4
780501
EDCOP
78-144-091
ROUTINE SHIFT-RUPTURE DISC OH
VDC STILL BLEW
MC
760811
TETHOP
76-236-160
ROUTINE SHIFT
.000
PPM
377
.000
PPM
390
MC
760811
TRAUXO
76-237-161
ROUTINE SHIFT
.000
PPM
393
MC CIS
760819
76-247-166
APPROX. 6 FT FROM CONN. DURIN
G UNLOADING OF DOL - IBL
MC
761004
EDCOP
76-283-186
ROUTINE SHIFT
.000
PPM
383
.000
PPM
415
MC
761004
TETHOP
76-286-187
ROUTINE SHIFT
.690
PPM
415
I PAGE
SL 016967
1/19/93
1
1
LAK^IhARLES (254) PLANT B SAMPLING RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
761004 ROUTINE SHIFT
JOB TITLE SAMPLE#
TRAUXO
76-287-188
RESULT 1.100
UNIT DURATION PPM 400
1
PAGE
HC
MC
t MC
CIS 761108
76-312-205
APPROX. 6 FT FROM CONN. DURIN
G UNLOADING OF NITMET TRUCK
761108 ROUTINE SHIFT
TETHOP
76-305-198
761108 ROUTINE SHIFT
TRAUXO
76-306-199
.000
PPM
47
5.900
PPM
280
3.400
PPM
280
MC CIS
761108
TRAUXO
76-311-204
SAMPLING AND ASSISTING THE
UNLOADING OF NITMET TRUCK
.000
PPM
67
MC CIS
761115
76-310-203
APPROX. 6FT FROM CONN. DURING
UNLOADING OF BLM TRUCK
7.100
PPM
375
MC CIS
761115
TRAUXO
76-309-202
134.000
PPM
SAMPbING AND ASSISTING THE
UNLOADING OF BLM TRUCK
60
MC
770118
TETHOP
77-004-004
ROUTINE SHIFT
.000
PPM
419
MC CIS
770118
TRAUXO
77-005-005
ROUTINE SHIFT
.000
PPM
345
MC CIS
770309
TRAUXO
77-046-023
ROUTINE SHIFT-ALSO PUMPED 17
DRUMS OF NITRGMETHANE
MC Cl s
770318
TETHOP
77-061-034
ROUTINE SHIFT
.000
PPM
415
SL 016968
.000
PPM
410
i
1/19/93
LAK^BHARLES (254) PLANT B SAMPflNG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
770318 ROUTINE SHIFT
JOB TITLE SAMPLE#
TRAUXO
77-062-035
RESULT .000
UNIT DURATION PPM 410
PAGE
MC
770904
TETHOP
77-084-048
ROUTINE SHIFT
.000
PPM
402
MC
i MC
770404 ROUTINE SHIFT
TRAUXO
77-082-046
770429
TETHOP
77-106-070
ROUTINE SHIFT (EDC UNIT DOWN)
.000
PPM
449
.120
PPM
250
MC CIS
770502
77-107-071
ADJACENT TO CATALYST ADDITION
POT IN MC UNIT
MC CIS
770502
77-108-072
CENTER OF MC PAD,SOUTH END,
NEAR MC REACOTR
MC CIS
770502
77-109-073
CENTER OF PAD,NORTH END, NEAR
VDC STILL IN MC UNIT
MC
770503
TELOP
77-113-077
ROUTINE SHIFT
.000
PPM
260
.000
PPM
258
.000
PPM
257
.000
PPM
332
MC
770503
TETHOP
77-111-075
ROUTINE SHIFT
.000
PPM
333
MC
770503
TRAUXO
77-112-076
ROUTINE SHIFT
.000
PPM
331
MC CIS
77 0509
77-124-087
CENTER OF PAD,SOUTH END, NEAR
MC REACTOR
.000
PPM
394
SL 016969
1/19/93
LAK^WARLES (254) PLANT B SAMfWflG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
JOB TITLE SAMPLE#
CIS 770504
77-125-088
CENTER OF PAD,NORTH END, NEAR
VDC STILL IN MC UNIT
RESULT .390
UNIT DURATION PPM 395
MC CIS
770504
TELOP
77-123-086
ROUTINE SHIFT
.520
PPM
398
PAGE
MC CIS
770504
TETHOP
77-121-084
ROUTINE SHIFT
.650
PPM
396
MC CIS
770504
TRAUXO
77-122-085
ROUTINE SHIFT
.390
PPM
402
MC CIS
770510
TELOP
77-146-107
ROUTINE SHIFT
.000
PPM
405
MC CIS
770510
TETHOP
77-144-105
ROUTINE SHIFT
.000
PPM
254
MC CIS
770510
TRAUXO
77-145-106
ROUTINE SHIFT
.000
PPM
443
MC CIS
770516
TELOP
77-155-116
ROUTINE SHIFT
.000
PPM
406
MC CIS
770516
TETHOP
77-153-114
ROUTINE SHIFT
.140
PPM
451
MC CIS
770516
TRAUXO
77-154-115
ROUTINE SHIFT
MC CIS
770615
EDCOP
77-159-117
ROUTINE SHIFT
.000
PPM
408
.000
PPM
414
SL 016970
1/19/93
LAKfl^ARLES (254) PLANT B SAMmTNG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
CIS
770615
ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
77-160-118
RESULT .000
UNIT DURATION PPM 416
MC CIS
770720
77-178-126
NEAR DH STILL PRODUCT PUMPS
. 000
PPM
256
MC
i MC
CIS 770822 ROUTINE SHIFT
770822 ROUTINE SHIFT
TETHOP TRAUXO
77-187-132 77-188-133
.000
PPM
410
.000
PPM
405
MC
770913
TETHOP
77-208-149
ROUTINE SHIFT
.120
PPM
413
MC CIS
770913
TRAUXO
77-209-150
ROUTINE SHIFT
.130
PPM
411
MC
771017
TETHOP
77-217-155
ROUTINE SHIFT
.000
PPM
390
MC
771024
TETHOP
77-233-163
ROUTINE SHIFT
.000
PPM
389
MC
771121
TETHOP
77-256-180
ROUTINE SHIFT
.000
PPM
416
MC
771128
TETHOP
77-259-183
ROUTINE SHIFT
.000
PPM
417
MC
771128
TRAUXO
77-260-184
ROUTINE SHIFT
.000
PPM
417
PAGE
SL 016971
1/19/93
LAK^BHARLES (254) PLANT B SAMWhG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
780109 ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
78-001-001
RESULT .000
UNIT DURATION PPM 200
MC
780315
TETHOP
78-097-056
ROUTINE SHIFT
.010
PPM
404
MC
* MC
780315 ROUTINE SHIFT
780410 ROUTINE SHIFT
TRAUXO TELOP
78-098-057 78-067-046
.210
PPM
406
.000
PPM
393
MC
780410
TETHOP
78-069-048
ROUTINE SHIFT
.120
PPM
393
MC CIS
780410
TRAUXO
78-123-073
ROUTINE SHIFT
.000
PPM
393
MC CIS
780418
TELOP
78-137-087
ROUTINE SHIFT
.000
PPM
410
MC
780418
TETHOP
78-136-086
ROUTINE SHIFT
.000
PPM
410
MC CIS
780501
EDCOP
78-144-091
ROUTINE SHIFT-RUPTURE DISC OH
VDC STILL BLEW
MC EC
760811
TETHOP
76-236-160
ROUTINE SHIFT
.000
PPM
377
.000
PPM
390
MC EC
760811
TRAUXO
76-237-161
ROUTINE SHIFT
.000
PPM
393
o
PAGE
1/19/93
LAkB^ARLES (254) PLANT B SAMPflNG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
JOB TITLE SAMPLE#
EC 760819
76-247-166
APPROX. 6 FT FROM CONN. DURIN
G UNLOADING OF DOL-IBL
RESULT .000
UNIT DURATION PPM 383
MC EC
760819
TRAUXO
76-246-165
SAMPLING AND ASSISTING THE
UNLOADING OF DOL -IBL
.000
PPM
382
MC
* MC
EC 761004 ROUTINE SHIFT
EC 761004 ROUTINE SHIFT
EDCOP TETHOP
76-283-186 76-286-187
.000
PPM
415
.000
PPM
415
MC EC
761004
TRAUXO
76-287-188
ROUTINE SHIFT
.100
PPM
400
MC EC
761108
76-312-205
APPROX. 6 FT FROM CONN. DURIN
G UNLOADING OF NITMET TRUCK
MC EC
761108
TETHOP
76-305-198
ROUTINE SHIFT
.000
PPM
47
.000
PPM
280
MC EC
761108
TRAUXO
76-306-199
ROUTINE SHIFT
.000
PPM
280
MC EC
761115
76-310-203
APPROX. 6FT FROM CONN. DURING
UNLOADING OF BLM TRUCK
MC EC
770118
TETHOP
77-004-004
ROUTINE SHIFT
.000
PPM
375
. 000
PPM
419
MC EC
770118
TRAUXO
77-005-005
ROUTINE SHIFT
.000
PPM
345
PAGE Olfig?,
1/19/93
-
I
LAK^HARLES (259) PLANT B SAMWtHG RESULTS THRU 1989
DEPT MC
COMPOUND
DATE
JOB TITLE
EC
770223
TETHOP
ROUTINE SHIFT EXCEPT MC RX
VALVE BLEW OUT INTO HIS FACE
SAMPLES 77-033-016
RESULT .000
UNIT DURATION PPM 915
MC EC
770223
TRAUXO
77-039-017
ROUTINE SHIFT EXCEPT VDC/MC
VAPOR RELEASE IN UNIT
.200
PPM
915
MC EC
770307
TETHOP
77-095-022
ROUTINE SHIFT
.000
PPM
910
1 MC
EC
770309
TRAUXO
ROUTINE SHIFT-ALSO PUMPED 17
DRUMS OF NITROMETHANE
77-096-023
. 000
PPM
915
MC EC
770318
TETHOP
77-061-039
ROUTINE SHIFT
.100
PPM
910
PAGE
MC EC
770318
TRAUXO
77-062-035
ROUTINE SHIFT
.100
PPM
910
MC EC
770909
TETHOP
77-089-098
ROUTINE SHIFT
.000
PPM
902
MC EC
770909
TRAUXO
77-082-096
ROUTINE SHIFT
.000
PPM
999
MC EC
770927
77-109-068
NW CORNER OF NEW ORGANIC WASTE
PITS,67F,70RH,CALM
MC EC
770929
TETHOP
77-106-070
ROUTINE SHIFT (EDC UNIT DOWN)
.110
PPM
237
.170
PPM
250
MC EC
770502
77-107-071
ADJACENT TO CATALYST ADDITION
POT IN MC UNIT
.000
PPM
260
si* 1697`
i
1/19/93
lAK^nARLES (254) PLANT B SAHWHG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
JOB TITLE
EC 770502
CENTER OF MC PAD,SOUTH END, NEAR MC REACOTR
SAMPLE# 77-108-072
RESULT .000
UNIT DURATION PPM 258
MC EC
770502
77-109-073
CENTER OF PAD,NORTH END, NEAR
VDC STILL IN MC UNIT
.000
PPM
257
MC
t MC
EC 770503 ROUTINE SHIFT
EC 770503 ROUTINE SHIFT
TELOP TETHOP
77-113-077 77-111-075
.000
PPM
332
. 000
PPM
333
MC EC
770503
TRAUXO
77-112-076
ROUTINE SHIFT
.140
PPM
331
MC EC
770504
77-124-087
CENTER OF PAD,SOUTH END, NEAR
MC REACTOR
MC EC
770504
77-125-088
CENTER OF PAD,NORTH END, NEAR
VDC STILL IN MC UNIT
MC EC
770504
TELOP
77-123-086
ROUTINE SHIFT
.000
PPM
394
.000
PPM
395
.540
PPM
398
MC EC
770504
TETHOP
77-121-084
ROUTINE SHIFT
.530
PPM
396
MC EC
770504
TRAUXO
77-122-085
ROUTINE SHIFT
.390
PPM
402
MC EC
770510
TELOP
77-146-107
ROUTINE SHIFT
.000
PPM
405
PAGE
SL 016975
1/19/93
LAK^HARLES (259) PLANT B SAMm^JG RESULTS THRU 1989
DEPT MC
COMPOUND
DATE
EC 770510 ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
77-199-105
RESULT .000
UNIT DURATION PPM 259
PAGE
MC EC
770510
TRAUXO
77-195-106
ROUTINE SHIFT
.000
PPM
993
MC
i MC
EC 770516 ROUTINE SHIFT
EC 770516 ROUTINE SHIFT
TELOP TETHOP
77-155-116 77-153-119
.110
PPM
906
.080
PPM
951
MC EC
770516
TRAUXO
77-159-115
ROUTINE SHIFT
.110
PPM
908
MC EC
770615
EDCOP
77-159-117
ROUTINE SHIFT
.660
PPM
919
MC EC
770615
TETHOP
77-160-118
ROUTINE SHIFT
.390
PPM
916
MC EC
770615
TRAUXO
77-161-119
ROUTINE SHIFT
.200
PPM
911
MC EC
770720
77-177-125
NEAR MC STRIPPER FEED PUMPS
.150
PPM
258
MC EC
770720
77-178-126
NEAR DH STILL PRODUCT PUMPS
MC EC
770720
77-179-127
HEAR DH VENT RECOVERY TRANSFER
PUMPS
.000
PPM
256
.000
PPM
259
SL 016976
1/19/93
LAK^BhARLES (254) PLANT B SAMWHG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
EC 770822 ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
77-187-132
RESULT .000
UNIT DURATION PPM 410
PAGE
MC EC
770822
TRAUXO
77-188-133
ROUTINE SHIFT
.220
PPM
405
HC
* MC
EC 770913 ROUTINE SHIFT
EC 770913 ROUTINE SHIFT
TETHOP TRAUXO
77-208-149 77-209-150
.150
PPM
413
.190
PPM
411
MC EC
771017
TETHOP
77-217-155
ROUTINE SHIFT
.000
PPM
390
MC EC
771017
TRAUXO
77-218-156
ROUTINE SHIFT
.000
PPM
390
MC EC
771024
TETHOP
77-233-163
ROUTINE SHIFT
.000
PPM
389
MC EC
771024
TRAUXO
77-234-164
ROUTINE SHIFT, UNLOADED AND
SAMPLED MEK TANK TRUCK
MC EC
771121
TETHOP
77-256-180
ROUTINE SHIFT
.000
PPM
389
.090
PPM
416
MC EC
771121
TRAUXO
77-257-181
ROUTINE SHIFT
MC EC
771128
TETHOP
77-259-183
ROUTINE SHIFT
.210
PPM
417
.000
PPM
417
SL 016977
1/19/93
LAK|AhARLES (254) PLANT B SAMmNG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
EC 771128 ROUTINE SHIFT
JOB TITLE SAMPLE#
TRAUXO
77-260-184
RESULT .150
UNIT DURATION
PPM
417
PAGE
MC EC
780109
TETHOP
78-001-001
ROUTINE SHIFT
.000
PPM
200
MC
* MC
EC
780213
EDCOP
78-044-030
ANALYZING SAMPLES IN THE LAB
EC 780315 ROUTINE SHIFT
TELOP
78-095-054
.190
PPM
15
.090
PPM
403
MC EC
780315
TETHOP
78-097-056
ROUTINE SHIFT
.360
PPM
404
MC EC
780315
TRAUXO
78-098-057
ROUTINE SHIFT
.290
PPM
406
MC EC
780329
TRAUXO
78-120-072
ROUTINE ANALYSIS OF SAMPLES IN
LABORATORY (MC LAB)
MC EC
780410
TELOP
78-067-046
ROUTINE SHIFT
.000
PPM
15
.160
PPM
393
MC EC
780410
TETHOP
78-069-048
ROUTINE SHIFT
.300
PPM
393
MC EC
780410
TRAUXO
78-123-073
ROUTINE SHIFT
MC EC
780418
TELOP
78-137-087
ROUTINE SHIFT
.980
PPM
393
.090
PPM
410
SL 016978
1/19/93
LAK^BMARLES (254) PLANT B SAMFnNG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
EC 780418 ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
78-136-086
RESULT .060
UNIT DURATION PPM 410
MC EC
780418
TRAUXO
78-134-084
ROUTINE SHIFT
.000
PPM
410
MC
* MC
EC
7B0501
EDCOP
78-144-091
ROUTINE SHIFT-RUPTURE DISC ON
VDC STILL BLEW
EC
780501
TELOP
78-146-093
ROUTINE SHIFT-RUPTURE DISC ON
VDC STILL BLEW
MC EC
780501
TETHOP
78-145-092
ROUTINE SHIFT-RUPTURE DISC ON
VDC STILL BLEW
MC EC
780501
TRAUXO
78-147-094
ROUTINE SHIFT-RUPT DISC ON VDC
STL BLEW' AND OP RCHG HQMME TNK
MC EDC
760811
TETHOP
76-236-160
ROUTINE SHIFT
.200
PPM
377
.000
PPM
377
.000
PPM
377
. 000
PPM
385
.000
PPM
390
MC EDC
760811
TRAUXO
76-237-161
ROUTINE SHIFT
2.700
PPM
393
MC EDC
760819
76-247-166
APPROX. 6 FT FROM CONN. DURIN
G UNLOADING OF DOL -IBL
MC EDC
760819
TRAUXO
76-246-165
SAMPLING AND ASSISTING THE
UNLOADING OF DOL-IBL
MC EDC
760820
TRAUXO
76-248-167
SAMPLING AND ASSISTING THE
UNLOADING OF MEK
.100
PPM
383
.600
PPM
382
.000
PPM
257
PAGE
016979
SL
1/19/93
LA K^n ARLES C254) PLANT B SAMHI ffllNtG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
JOB TITLE
EDC
760820
TRAUXO
SAMPLING AND ASSISTING THE
UNLOADING OF TLE
SAMPLE# 76-250-169
RESULT .000
UNIT DURATION
PPM
92
MC EDC
761004
EDCOP
76-283-186
ROUTINE SHIFT
4.600
PPM
415
PAGE
MC EDC
761004
ROUTINE SHIFT
MC *
EDC 761004 ROUTINE SHIFT
TETHOP TRAUXO
76-286-187 76-287-188
.000
PPM
415
5.800
PPM
400
MC EDC
761108
76-312-205
APPROX. 6 FT FROM CONN. DURIN
G UNLOADING OF NITMET TRUCK
MC EDC
761108
TETHOP
76-305-198
ROUTINE SHIFT
.000
PPM
47
.100
PPM
280
MC EDC
761108
TRAUXO
76-306-199
ROUTINE SHIFT
8.500
PPM
280
MC EDO
761108
TRAUXO
76-311-204
SAMPLING AND ASSISTING THE
UNLOADING OF HITMET TRUCK
MC EDC
761115
76-310-203
APPROX. 6FT FROM CONN. DURING
UNLOADING OF BLM TRUCK
MC EDC
770118
TETHOP
77-004-004
ROUTINE SHIFT
MC EDC
770118
TRAUXO
77-005-005
ROUTINE SHIFT
1.800
PPM
67
.000
PPM
375
.000
PPM
.000
PPM
419
SL 016980
345
i
1/19/93
LAK^PHARLES (259) PLANT B SflMmHG RESULTS THRU 1989
DEPT MC
COMPOUND
DATE
JOB TITLE
EDC
770223
TETHOP
ROUTINE SHIFT EXCEPT MC RX
VALVE BLEW OUT INTOi HIS FACE
SAMPLE# 77-033-016
RESULT 1.200
UNIT DURATION PPM 915
MC EDC
770223
TRAUXO
77-039-017
ROUTINE SHIFT EXCEPT VDC/MC
VAPOR RELEASE IN UNIT
11.800
PPM
915
MC
* MC
EDC 770307 ROUTINE SHIFT
TETHOP
77-095-022
EDC
770309
TRAUXO
77-096-023
ROUTINE SHIFT-ALSO PUMPED 17
DRUMS OF NITROMETHANE
.000
PPM
910
2.600
PPM
915
MC EDC
770318
TETHOP
77-061-039
ROUTINE SHIFT
.100
PPM
910
PAGE
MC EDC
770318
TRAUXO
77-062-035
ROUTINE SHIFT
3.900
PPM
910
MC EDC
770909
TETHOP
77-089-098
ROUTINE SHIFT
1.500
PPM
902
MC EDC
770909
TRAUXO
77-082-096
ROUTINE SHIFT
6.900
PPM
999
MC EDO
770927
77-109-068
NW CORNER OF HEW ORGANIC WASTE
PITS,67F,70RH,CALM
MC EDC
770927
77-105-069
SW CORNER OF NEW ORGANIC WASTE
PITS, 67F,70RH,CALM
MC EDC
770929
TETHOP
77-106-070
ROUTINE SHIFT (EDC UNIT DOWN)
.580
PPM
237
.920
PPM
238
1.100
PPM
250
SL 016981
1/19/93
LAK^^HARLES (254) PLANT B SAMnVNG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
JOB TITLE SAMPLE#
EDC 770502
77-107-071
ADJACENT TO CATALYST ADDITION
POT IN MC UNIT
RESULT .000
UNIT DURATION PPM 260
HC EDC
770502
77-108-072
CENTER OF MC PAD,SOUTH END,
HEAR MC REACOTR
.000
PPM
258
MC EDC
770502
77-109-073
CENTER OF PAD,NORTH END, NEAR
VDC STILL IN MC UNIT
.000
PPM
257
MC EDC
770503
TELOP
77-113-077
ROUTINE SHIFT
1.100
PPM
332
PAGE
MC EDC
770503
TETHOP
77-111-075
ROUTINE SHIFT
.410
PPM
333
MC EDC
770503
TRAUXO
77-112-076
ROUTINE SHIFT
2.000
PPM
331
MC EDC
770504
77-124-087
CENTER OF PAD,SOUTH END, NEAR
MC REACTOR
MC EDC
770504
77-125-088
CENTER OF PAD,NORTH END, NEAR
VDC STILL IN MC UNIT
MC EDC
770504
TELOP
77-123-086
ROUTINE SHIFT
.000
PPM
394
2.200
PPM
395
2.000
PPM
398
MC EDC
770504
TETHOP
77-121-084
ROUTINE SHIFT
2.200
PPM
396
MC EDC
770504
TRAUXO
77-122-085
ROUTINE SHIFT
6.500
PPM
402
0l69* si*
1/19/93 I
LAK^BHARLES (259) PLANT B SAMWWNG RESULTS THRU 1989
DEPT MC
COMPOUND
DATE
EDC 770510 ROUTINE SHIFT
JOB TITLE SAMPLE#
TELOP
77-196-107
RESULT .000
UNIT DURATION PPM 905
MC EDC
770510
TETHOP
77-199-105
ROUTINE SHIFT
.000
PPM
259
MC
# MC
EDC 770510 ROUTINE SHIFT
EDC 770516 ROUTINE SHIFT
TRAUXO TELOP
77-195-106 77-155-116
11.500
PPM
993
1 .100
PPM
906
MC EDC
770516
TETHOP
77-153-119
ROUTINE SHIFT
.930
PPM
951
MC EDC
770516
TRAUXO
77-159-115
ROUTINE SHIFT
6.900
PPM
908
MC EDC
770615
EDCOP
ROUTINE SHIFT
77-159-117
2.900
PPM
919
MC EDC
770615
TETHOP
77-160-118
ROUTINE SHIFT
2.500
PPM
916
MC EDC
770615
TRAUXO
77-161-119
ROUTINE SHIFT
9.300
PPM
911
MC EDC
770720
77-177-125
NEAR MC STRIPPER FEED PUMPS
.820
PPM
258
MC EDC
770720
77-178-126
NEAR DH STILL PRODUCT PUMPS
5.000
PPM
256
PAGE
SL 016983
1
1/19/93
LAK^MARLES (254) PLANT B SAMflHNG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
JOB TITLE SAMPLE#
EDC 770720
77-179-127
NEAR DH VENT RECOVERY TRANSFER
PUMPS
RESULT .970
UNIT DURATION PPM 254
MC EDC
770822
TETHOP
77-187-132
ROUTINE SHIFT
.330
PPM
410
1
PAGE
MC EDC
770822
TRAUXO
77-188-133
ROUTINE SHIFT
1.900
PPM
405
MC EDC
770913
TETHOP
77-208-149
ROUTINE SHIFT
1.400
PPM
413
MC EDC
770913
TRAUXO
77-209-150
ROUTINE SHIFT
2.600
PPM
411
MC EDC
771017
TETHOP
77-217-155
ROUTINE SHIFT
15.500
PPM
390
MC EDC
771017
TRAUXO
77-218-156
ROUTINE SHIFT
26.100
PPM
390
MC EDC
771024
TETHOP
77-233-163
ROUTINE SHIFT
1.100
PPM
389
MC EDC
771024
TRAUXO
77-234-164
ROUTINE SHIFT, UNLOADED AND
SAMPLED MEK TANK TRUCK
MC EDC
771121
TETHOP
77-256-180
ROUTINE SHIFT
3.700
PPM
389
.720
PPM
416
MC EDC
771121
TRAUXO
77-257-181
ROUTINE SHIFT
6.000
PPM
417
SL 0lfi984
1/19/93
LAI^KhARLES (254) PLANT B SANDING RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
EDC 771128 ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
77-259-183
RESULT 7.400
UNIT DURATION PPM 417
PAGE
MC EDC
771128
TRAUXO
77-260-184
ROUTINE SHIFT
9.500
PPM
417
MC *
MC
MC
EDC 780109 ROUTINE SHIFT
TETHOP
78-001-001
EDC
780109
TRAUXO
78-003-003
ROUTINE SHIFT-ADDED HOMME TO
SYSTEM
EDC
780130
TELOP
SWITCHING C12 FEED HEADERS
78-017-011
.000
PPM
200
6.200
PPM
440
.000
PPM
15
MC EDC
780130
TELOP
78-019-013
OPENING LEVEL TRANSMITTER LEG
UNTIL VDC FILLED LEG
MC EDC
780130
TELOP
78-021-015
ZEROING TRANSMITTER TO A SIGHT
GLASS (IN AREA)
MC EDC
780130
TETHOP
78-015-009
ROUTINE VALVE ADJUSTMENTS
.000
PPM
15
.000
PPM
15
7.100
PPM
16
MC EDC
780130
TETHOP
78-020-014
CHARGING! REACTOR WITH CATALYST
(ANHYDROUS FERRIC CHLORIDE)
MC EDC
780130
TETHOP
78-022-016
MAKING ROUTINE ROUNDS
.000
PPM
15
.000
PPM
15
MC EDC
780130
TRAUXO
78-016-010
RECHARGING AIBN TANK
6.800
PPM
15
SL 016985
1/19/93
LAI^HjHARLES (254) PLANT B SAMrciNG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
JOB TITLE
EDC
780130
TRAUXO
COLLECTING ROUTINE SAMPLES
SAMPLE# 78-018-012
RESULT .000
UNIT DURATION
PPM
15
MC EDC
780213
EDCOP
78-044-030
ANALYZING SAMPLES IN THE LAB
59.400
PPM
15
MC EDC
780213
TETHOP
78-035-027
CHARGING REACTOR WITH CATALYST
(ANHYDROUS FERRIC CHLORIDE)
MC EDC
780213
TRAUXO
78-042-028
CATCHING SAMPLES AND RUNNING
THEM IN LAB
MC EDC
780213
TRAUXO
78-043-029
WASHING OUT A HEAT EXCHANGER
WITH MC
MC EDC
780301
TRAUXO
78-065-044
ANALYZING SAMPLES IN LAB
.000
PPM
22.900
PPM
.000
PPM
27.500
PPM
15 15 15 15
MC EDC
780301
TRAUXO
78-066-045
COLLECTING ROUTINE SAMPLES
(NOON RUN)
MC EDC
780315
TELOP
78-095-054
ROUTINE SHIFT
.000
PPM
15
.450
PPM
403
MC EDC
780315
TETHOP
78-097-056
ROUTINE SHIFT
.890
PPM
404
MC EDC
780315
TRAUXO
78-098-057
ROUTINE SHIFT
6.320
PPM
406
MC EDC
780329
EDCOP
78-119-071
ROUTINE ANALYSIS OF SAMPLES IN
LABORATORY (EDC LAB)
23.400
PPM
15
PAGE
SL 016986
1/19/93
LA^^HARLES (259) PLAMT B SA(WlNG RESULTS THRU 1989
DEPT MC
COMPOUND
DATE
JOB TITLE
EDC
780329
TRAUXO
ADDING HQMME CATALYST TO
VESSEL
SAMPLE# 78-117-069
RESULT .000
UNIT DURATION PPM 15
MC EDC
780329
TRAUXO
78-118-070
ROUTINE COLLECTION OF NOON
SAMPLES
.000
PPM
15
MC EDC
780329
TRAUXO
78-120-072
ROUTINE ANALYSIS OF SAMPLES IN
LABORATORY (MC LAB)
.000
PPM
15
MC EDC
780910
TELOP
78-067-096
ROUTINE SHIFT
.900
PPM
393
MC EDC
780910
TETHOP
78-069-098
ROUTINE SHIFT
.790
PPM
393
MC EDC
780910
TRAUXO
78-123-073
ROUTINE SHIFT
2.600
PPM
393
MC EDC
780918
TELOP
78-137-087
ROUTINE SHIFT
.000
PPM
910
MC EDC
780918
TETHOP
78-136-086
ROUTINE SHIFT
. 000
PPM
910
MC EDC
780918
TRAUXO
78-139-089
ROUTINE SHIFT
9.500
PPM
910
MC EDC
780501
EDCOP
78-199-091
ROUTINE SHIFT-RUPTURE DISC ON
VDC STILL BLEW
MC EDC
780501
TELOP
78-196-093
ROUTINE SHIFT-RUPTURE DISC ON
VDC STILL BLEW
.860
PPM
377
1.900
PPM
377
PAGE SL 016987
1/19/93
LAlfl^lARLES (254) PLANT B SAhWlNG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
JOB TITLE SAMPLE#
EDC
780501
TETHOP
78-145-092
ROUTINE SHIFT-RUPTURE DISC ON
VDC STILL BLEW
RESULT .510
UNIT DURATION PPM 377
MC EDC
780501
TRAUXO
78-147-094
ROUTINE SHIFT-RUPT DISC ON VDC
STL BLEW1 AND OP RCHG HQMME TNK
10.050
PPM
365
MC
* MC
MC 760811 ROUTINE SHIFT
MC 760811 ROUTINE SHIFT
TETHOP TRAUXO
76-236-160 76-237-161
10.900
PPM
390
4.900
PPM
393
PAGE
MC MC
760819
76-247-166
APPROX. 6 FT FROM CONN. DURIN
G UNLOADING OF DOL -IBL
MC MC
760819
TRAUXO
76-246-165
SAMPLING AND ASSISTING THE
UNLOADING OF DOL-IBL
MC MC
760820
TRAUXO
76-248-167
SAMPbING AND ASSISTING THE
UNLOADING OF HEK
MC MC
760820
TRAUXO
76-250-169
SAMPLING AND ASSISTING THE
UNLOADING OF TLE
MC MC
761004
EDCOP
76-283-186
ROUTINE SHIFT
.130
PPM
383
.550
PPM
382
.000
PPM
257
.000
PPM
92
.000
PPM
415
MC MC
761004
TETHOP
76-286-187
ROUTINE SHIFT
3.000
PPM
415
MC MC
761004
TRAUXO
76-287-188
ROUTINE SHIFT
5.700
PPM
400 SL 016988
1/19/93
LA PLANT B SA
HARLES f259) NG RESULTS THRU 1989
DEPT MC
COMPOUND
DATE
JOB TITLE SAMPLE#
MC 761108
76-312-205
APPROX. 6 FT FROM CONN. DURIN
G UNLOADING OF NITMET TRUCK
RESULT 3.000
UNIT DURATION PPM 97
MC MC
761108
TETHOP
76-305-198
ROUTINE SHIFT
2.900
PPM
280
PAGE
MC MC
761108
TRAUXO
76-306-199
ROUTINE SHIFT
5.600
PPM
280
MC MC
761108
TRAUXO
76-311-209
SAMPLING AND ASSISTING THE
UNLOADING OF NITMET TRUCK
MC MC
761115
76-310-203
APPROX. 6FT FROM COHN. DURING
UNLOADING OF BLM TRUCK
MC MC
761115
TRAUXO
76-309-202
SAMPLING AND ASSISTING THE
UNLOADING OF BLM TRUCK
MC MC
770118
TETHOP
77-009-009
ROUTINE SHIFT
2.500
PPM
67
.000
PPM
375
3.000
PPM
60
2.800
PPM
919
MC MC
770118
TRAUXO
77-005-005
ROUTINE SHIFT
7.600
PPM
395
MC MC
770223
TETHOP
77-033-016
689.000
PPM
915
ROUTINE SHIFT EXCEPT MC RX
VALVE BLEW OUT INTO HIS FACE
MC MC
770223
TRAUXO
77-039-017
ROUTINE SHIFT EXCEPT VDC/MC
VAPOR RELEASE IN UNIT
19.700
PPM
915
MC MC
770307
TETHOP
77-095-022
ROUTINE SHIFT
30.900
PPM
910
SL 016989
1/19/93
LAI^BhARLES C254) PLANT B SAffflNG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
JOB TITLE
MC
770309
TRAUXO
ROUTINE SHIFT-ALSO PUMPED 17
DRUMS OF NITROMETHANE
SAMPLE# 77-046-023
RESULT 1.400
UNIT DURATION PPM 415
MC MC
770318
TETHOP
77-061-034
ROUTINE SHIFT
2.500
PPM
410
PAGE
MC MC
770318
TRAUXO
77-062-035
ROUTINE SHIFT
MC *
MC 77 0AOA ROUTINE SHIFT
TETHOP
77-084-048
4.200
PPM
134.000
PPM
410 402
MC MC
770404
TRAUXO
77-082-046
ROUTINE SHIFT
7.000
PPM
449
MC MC
770429
TETHOP
77-106-070
ROUTINE SHIFT CEDC UNIT DOWN)
.510
PPM
250
MC MC
770502
77-107-071
ADJAGENT TO CATALYST ADDITION
POT IN MC UNIT
MC MC
770502
77-108-072
CENTER OF MC PAD,SOUTH END,
NEAR MC REACOTR
MC MC
770502
77-109-073
CENTER OF PAD,NORTH END, NEAR
VDC STILL IN MC UNIT
MC MC
770503
TELOP
77-113-077
ROUTINE SHIFT
6.300
PPM
260
.890
PPM
258
.000
PPM
257
1.400
PPM
332
MC MC
770503
TETHOP
77-111-075
ROUTINE SHIFT
2.100
PPM
333
SI< 016990
1/19/93
LAI^BHARLES (259) PLANT B SAMmNG RESULTS THRU 1989
DEPT MC
COMPOUND
DATE
MC 770503 ROUTINE SHIFT
JOB TITLE SAMPLE#
TRAUXO
77-112-076
RESULT 1.900
UNIT DURATION PPM 331
PAGE
HC
MC
i MC
MC 770509
77-129-087
CENTER OF PAD,SOUTH END, NEAR
MC REACTOR
MC 770509
77-125-088
CENTER OF PAD,NORTH END, NEAR
VDC STILL IN MC UNIT
MC 770509 ROUTINE SHIFT
TELOP
77-123-086
.970
PPM
399
.190
PPM
395
2.300
PPM
398
MC MC
770509
TETHOP
77-121-089
ROUTINE SHIFT
18.000
PPM
396
MC MC
770509
TRAUXO
77-122-085
ROUTINE SHIFT
9.700
PPM
902
MC MC
770510
TELOP
77-196-107
ROUTINE SHIFT
.870
PPM
905
MC MC
770510
TETHOP
77-199-105
ROUTINE SHIFT
3.200
PPM
259
MC MC
770510
TRAUXO
77-195-106
ROUTINE SHIFT
12.900
PPM
993
MC MC
770516
TELOP
77-155-116
ROUTINE SHIFT
3.600
PPM
906
MC MC
770516
TETHOP
77-153-119
ROUTINE SHIFT
16.500
PPM
951
SL 016991
1/19/93
LAI^BHARLES (259) PLANT B SAMmNG RESULTS THRU 1989
DEPT MC
COMPOUND
DATE
MC 770516 ROUTINE SHIFT
JOB TITLE SAMPLE#
TRAUXO
77-159-115
RESULT 5.600
UNIT DURATION PPM 908
PAGE
MC MC
770615
EDCOP
77-159-117
ROUTINE SHIFT
2.700
PPM
919
MC MC
770615
TETHOP
77-160-118
ROUTINE SHIFT
23.500
PPM
916
MC MC
770615
TRAUXO
77-161-119
ROUTINE SHIFT
9.800
PPM
911
MC MC
770720
77-177-125
NEAR MC STRIPPER FEED PUMPS
.300
PPM
258
MC MC
770720
77-178-126
NEAR DH STILL PRODUCT PUMPS
2.300
PPM
256
MC MC
770720
77-179-127
NEAR *DH VENT RECOVERY TRANSFER
PUMPS
MC MC
770822
TETHOP
77-187-132
ROUTINE SHIFT
.190
PPM
259
9.500
PPM
910
MC MC
770822
TRAUXO
77-188-133
ROUTINE SHIFT
5.100
PPM
905
MC MC
770913
TETHOP
77-208-199
ROUTINE SHIFT
MC MC
770913
TRAUXO
77-209-150
ROUTINE SHIFT
11.600
PPM
5.900
PPM
913
SL OI6992 911
1/19/93
LA|haRLES (254) PLANT B SAMmiJG RESULTS THRU 1984
DEPT HC
COMPOUND
DATE
MC 771017 ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
77-217-155
RESULT 3.800
UNIT DURATION PPM 390
MC MC
771017
TRAUXO
77-218-156
ROUTINE SHIFT
1.100
PPM
390
MC MC
771024
TETHOP
77-233-163
ROUTINE SHIFT
2.600
PPM
389
MC MC
771024
TRAUXO
77-234-164
ROUTINE SHIFT, UNLOADED AND
SAMPLED MEK TANK TRUCK
MC MC
771121
TETHOP
77-256-180
ROUTINE SHIFT
3.200
PPM
389
8.000
PPM
416
MC MC
771121
TRAUXO
77-257-181
ROUTINE SHIFT
16.100
PPM
417
MC MC
771128
TETHOP
77-259-183
ROUTINE SHIFT
3.300
PPM
417
MC MC
771128
TRAUXO
77-260-184
ROUTINE SHIFT
14.900
PPM
417
MC MC
780109
TETHOP
78-001-001
ROUTINE SHIFT
8.400
PPM
200
MC MC
780109
TRAUXO
78-003-003
ROUTINE SHIFT-ADDED HQMME TO
SYSTEM
MC MC
780130
TELOP
78-019-013
OPENING LEVEL TRANSMITTER LEG
UNTIL VDC FILLED LEG
13.000
PPM
440
.000
PPM
15
PAGE
SL 016993
1/19/93
LAJ^^HARLES (254) PLANT B SAlWItIG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
JOB TITLE SAMPLE#
MC
780130
TELOP
78-021-015
ZEROING TRANSMITTER TO A SIGHT
GLASS (IN AREA)
RESULT 2.000
UNIT DURATION PPM 15
MC MC
780130
TETHOP
78-015-009
ROUTINE VALVE ADJUSTMENTS
.000
PPM
16
HC
* MC
MC
780130
TETHOP
78-020-014
CHARGINGi REACTOR WITH CATALYST
(ANHYDROUS FERRIC CHLORIDE)
MC
780130
TRAUXO
COLLECTING ROUTINE SAMPLES
78-018-012
19.900
PPM
19.500
PPM
15 15
MC MC
780213
EDCOP
78-044-030
ANALYZING SAMPLES IN THE LAB
5.000
PPM
15
MC MC
780213
TETHOP
78-035-027
CHARGING REACTOR WITH CATALYST
(ANHYDROUS FERRIC CHLORIDE)
MC MC
780213
TRAUXO
78-042-028
CATCHING SAMPLES AND RUNNING
THEM IN LAB
MC MC
780213
TRAUXO
78-043-029
WASHING OUT A HEAT EXCHANGER
WITH MC
MC MC
780315
TELOP
78-095-054
ROUTINE SHIFT
18.800
PPM
7.800
PPM
299.000
PPM
.440
PPM
15 15 15 403
MC MC
780315
TETHOP
78-097-056
ROUTINE SHIFT
10.500
PPM
404
MC MC
780315
TRAUXO
78-098-057
ROUTINE SHIFT
6.500
PPM
406
PAGE
0i6994
1/19/93
LAt^WIARLES (254) PLANT B SAMmNG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
JOB TITLE SAMPLE#
MC
780329
EDCOP
78-119-071
ROUTINE ANALYSIS OF SAMPLES IN
LABORATORY (EDC LAB)
RESULT .000
UNIT DURATION PPM 15
MC MC
780329
TRAUXO
78-117-069
ADDING 1HOMME CATALYST TO
VESSEL
.000
PPM
15
MC
i MC
MC
780329
TRAUXO
ROUTINE COLLECTION OF NOON
SAMPLES
78-118-070
MC
780329
TRAUXO
78-120-072
ROUTINE ANALYSIS OF SAMPLES IN
LABORATORY (MC LAB)
.000
PPM
15
2.200
PPM
15
MC MC
780410
TELOP
78-067-046
ROUTINE SHIFT
.820
PPM
393
PAGE
MC MC
780410
TETHOP
78-069-048
ROUTINE SHIFT
1.900
PPM
393
MC MC
780410
TRAUXO
78-123-073
ROUTINE SHIFT
3.000
PPM
393
MC MC
780418
TELOP
78-137-087
ROUTINE SHIFT
1.660
PPM
410
MC MC
780418
TETHOP
78-136-086
ROUTINE SHIFT
1.440
PPM
410
MC MC
780418
TRAUXO
78-134-084
ROUTINE SHIFT
5.800
PPM
410
MC MC
780501
EDCOP
78-144-091
ROUTINE SHIFT-RUPTURE DISC ON
VDC STILL BLEW
1.550
PPM
377
SL 016995
1/19/93
LA1^1ARLES (254) PLANT B SAHmitG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
JOB TITLE SAMPLE#
MC
780501
TELOP
78-146-093
ROUTINE SHIFT-RUPTURE DISC ON
VDC STILL BLEW
RESULT 1.700
UNIT DURATION PPM 377
MC MC
780501
TETHOP
78-145-092
ROUTINE SHIFT-RUPTURE DISC ON
VDC STILL BLEW
7.200
PPM
377
MC
t MC
MC
780501
TRAUXO
78-147-094
ROUTINE SHIFT-RUPT DISC OH VDC
STL BLEW AND OP RCHG HQMME TNK
PER 760811 ROUTINE SHIFT
TETHOP
76-236-160
9.860
PPM
385
.210
PPM
390
PAGE
MC PER
760811
TRAUXO
76-237-161
ROUTINE SHIFT
.110
PPM
393
MC PER
760819
76-247-166
APPROX. 6 FT FROM CONN. DURIN
G UNLOADING OF DOL -IBL
MC PER
761004
EDCOP
76-283-186
ROUTINE SHIFT
.000
PPM
383
.090
PPM
415
MC PER
761004
TETHOP
76-286-187
ROUTINE SHIFT
.110
PPM
415
MC PER
761004
TRAUXO
76-287-188
ROUTINE SHIFT
.150
PPM
400
MC PER
761108
76-312-205
APPROX. 6 FT FROM CONN. DURIN
G UNLOADING OF NITMET TRUCK
MC PER
761108
TETHOP
76-305-198
ROUTINE SHIFT
. 000
PPM
47
.000
PPM
280
SL 016996
1/19/93
LA^fcnARLES (254) PLANT B SAMPPTnG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
PER 761108 ROUTINE SHIFT
JOB TITLE SAMPLE#
TRAUXO
76-306-199
RESULT .000
UNIT DURATION PPM 280
PAGE
MC
MC
t MC
PER
761108
TRAUXO
SAMPLING AND ASSISTING THE
UNLOADING OF NITMET TRUCK
76-311-204
PER 761115
76-310-203
APPROX. 6FT FROM CONN. DURING
UNLOADING OF BLM TRUCK
PER 770118 ROUTINE SHIFT
TETHOP
77-004-004
.160
PPM
67
.000
PPM
375
.000
PPM
419
MC PER
770118
TRAUXO
77-005-005
ROUTINE SHIFT
.000
PPM
345
MC PER
770223
TETHOP
77-033-016
ROUTINE SHIFT EXCEPT MC RX
VALVE BLEW OUT INTO HIS FACE
MC PER
770223
TRAUXO
77-034-017
ROUTINE SHIFT EXCEPT VDC/MC
VAPOR RELEASE IN UNIT
MC PER
770307
TETHOP
77-045-022
ROUTINE SHIFT
.200
PPM
415
.400
PPM
415
.000
PPM
410
MC PER
770309
TRAUXO
77-046-023
ROUTINE SHIFT-ALSO PUMPED 17
DRUMS OF NITROMETHANE
MC PER
770318
TETHOP
77-061-034
ROUTINE SHIFT
.100
PPM
415
.000
PPM
410
MC PER
770318
TRAUXO
77-062-035
ROUTINE SHIFT
.000
PPM
410
SL 016997
1/19/93
LAi^BHARLES (259) PLANT B samWng RESULTS THRU 1989
DEPT MC
COMPOUND
DATE
PER 770909 ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
77-089-098
RESULT .000
UNIT DURATION PPM 902
PAGE
MC PER
770909
TRAUXO
77-082-096
ROUTINE SHIFT
.000
PPM
999
MC
# MC
PER
770929
TETHOP
77-106-070
ROUTINE SHIFT (EDC UNIT DOWN)
PER 770502
77-107-071
ADJACENT TO CATALYST ADDITION
POT IN MC UNIT
MC PER
770502
77-108-072
CENTER OF MC PAD,SOUTH END,
NEAR MC REACOTR
MC PER
770502
77-109-073
CENTER OF PAD,NORTH END, NEAR
VDC STILL IN MC UNIT
MC PER
770503
TELOP
ROUTINE SHIFT
77-113-077
.190
PPM
250
.000
PPM
260
.000
PPM
258
.000
PPM
257
.170
PPM
332
MC PER
770503
TETHOP
77-111-075
ROUTINE SHIFT
.130
PPM
333
MC PER
770503
TRAUXO
77-112-076
ROUTINE SHIFT
.120
PPM
331
MC PER
770509
77-129-087
CENTER OF PAD,SOUTH END, NEAR
MC REACTOR
MC PER
770509
77-125-088
CENTER OF PAD,NORTH END, NEAR
VDC STILL IN MC UNIT
.000
PPM
399
.000
PPM
395
SL 016998
1/19/93
LAI^HARLES (254) PLANT B SAMWTNG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
PER 770504 ROUTINE SHIFT
JOB TITLE SAMPLE#
TELOP
77-123-086
RESULT .390
UNIT DURATION PPM 398
PAGE
MC PER
770504
TETHOP
77-121-084
ROUTINE SHIFT
.470
PPM
396
MC
* MC
PER 770504 ROUTINE SHIFT
PER 770510 ROUTINE SHIFT
TRAUXO TELOP
77-122-085 77-146-107
.280
PPM
402
.120
PPM
405
MC PER
770510
TETHOP
77-144-105
ROUTINE SHIFT
.110
PPM
254
MC PER
770510
TRAUXO
77-145-106
ROUTINE SHIFT
.130
PPM
443
MC PER
770516
TELOP
77-155-116
ROUTINE SHIFT
.170
PPM
406
MC PER
770516
TETHOP
77-153-114
ROUTINE SHIFT
.250
PPM
451
MC PER
770516
TRAUXO
77-154-115
ROUTINE SHIFT
.160
PPM
408
MC PER
770615
EDCOP
77-159-117
ROUTINE SHIFT
.500
PPM
414
MC PER
770615
TETHOP
77-160-118
ROUTINE SHIFT
.370
PPM
416
SL 016999
1/19/93
LAKl^BHARLES (254) PLANT B SAMrafNG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
PER 770615 ROUTINE SHIFT
JOB TITLE SAMPLE#
TRAUXO
77-161-119
RESULT .400
UNIT DURATION PPM 411
1
PAGE
MC PER
770720
77-177-125
NEAR MC STRIPPER FEED PUMPS
.000
PPM
258
MC
MC
PER 770720 NEAR DH STILL PRODUCT PUMPS
PER 770822 ROUTINE SHIFT
TETHOP
77-178-126 77-187-132
.140
PPM
256
. 000
PPM
410
MC PER
770822
TRAUXO
77-1B8-133
ROUTINE SHIFT
.000
PPM
405
MC PER
770913
TETHOP
77-208-149
ROUTINE SHIFT
.150
PPM
413
MC PER
770913
TRAUXO
77-209-150
ROUTINE SHIFT
.510
PPM
411
MC PER
771017
TETHOP
77-217-155
ROUTINE SHIFT
.180
PPM
390
MC PER
771017
TRAUXO
77-218-156
ROUTINE SHIFT
.100
PPM
390
MC PER
771024
TETHOP
77-233-163
ROUTINE SHIFT
.200
PPM
389
MC PER
771024
TRAUXO
77-234-164
ROUTINE SHIFT, UNLOADED AND
SAMPLED MEK TANK TRUCK
.000
PPM
389 SL 017000
1/19/93
I
LAK^BhARLES C254) PLANT B SAMPTING RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
PER 771121 ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
77-256-180
RESULT .000
UNIT DURATION PPM 416
MC PER
771128
TETHOP
77-259-183
ROUTINE SHIFT
.000
PPM
417
MC
* MC
PER 771128 ROUTINE SHIFT
PER 780109 ROUTINE SHIFT
TRAUXO TETHOP
77-260-184 78-001-001
.000
PPM
417
.000
PPM
200
MC PER
780315
TELOP
78-095-054
ROUTINE SHIFT
.050
PPM
403
MC PER
780315
TETHOP
78-097-056
ROUTINE SHIFT
.110
PPM
404
MC PER
780315
TRAUXO
78-098-057
ROUTINE SHIFT
.160
PPM
406
MC PER
780410
TELOP
78-067-046
ROUTINE SHIFT
.140
PPM
393
MC PER
780410
TETHOP
78-069-048
ROUTINE SHIFT
.230
PPM
393
MC PER
780410
TRAUXO
78-123-073
ROUTINE SHIFT
.160
PPM
393
MC PER
780418
TELOP
78-137-087
ROUTINE SHIFT
.000
PPM
410
' PAGE
SL 017001
i
1/19/93
LAkMPHARLES C254) PLANT B SAMFONG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
PER 780418 ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
78-136-086
RESULT .000
UNIT DURATION PPM 410
PAGE
MC PER
780418
TRAUXO
78-134-084
ROUTINE SHIFT
.000
PPM
410
MC
# MC
PER
780501
EDCOP
78-144-091
ROUTINE SHIFT-RUPTURE DISC ON
VDC STILL BLEW
PER
780501
TELOP
78-146-093
ROUTINE SHIFT-RUPTURE DISC ON
VDC STILL BLEW
MC PER
780501
TETHOP
78-145-092
ROUTINE SHIFT-RUPTURE DISC ON
VDC STILL BLEW
MC PER
780501
TRAUXO
78-147-094
ROUTINE SHIFT-RUPT DISC ON VDC
STL BLEW1 AND OP RCHG HQMME TNK
MC SYM
760811
TETHOP
76-236-160
ROUTINE SHIFT
.120
PPM
377
.110
PPM
377
.110
PPM
377
. 000
PPM
385
.000
PPM
390
MC SYM
760811
TRAUXO
76-237-161
ROUTINE SHIFT
.000
PPM
393
MC SYM
760819
76-247-166
APPROX. 6 FT FROM CONN. D.URIN
G UNLOADING OF DOL-IBL
MC SYM
761004
EDCOP
ROUTINE SHIFT
76-283-186
.000
PPM
383
.060
PPM
415
MC SYM
761004
TETHOP
76-286-187
ROUTINE SHIFT
.120
PPM
415
SL 017002
1/19/93
LAK^HARLES (254) PLANT B SAMTONG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
SYM
761004
ROUTINE SHIFT
JOB TITLE SAMPLE#
TRAUXO
76-287-188
RESULT .100
UNIT DURATION
PPM
400
PAGE
MC
MC
* MC
SYM
761108
76-312-205
APPROX. 6 FT FROM CONN. DURIN
G UNLOADING OF NITMET TRUCK
SYM
761108
ROUTINE SHIFT
TETHOP
76-305-198
SYM 7&1108 ROUTINE SHIFT
TRAUXO
76-306-199
.000
PPM
47
.130
PPM
280
.000
PPM
280
MC SYM
761108
TRAUXO
76-311-204
SAMPLING AND ASSISTING THE
UNLOADING OF NITMET TRUCK
MC SYM
761115
76-310-203
APPROX. 6FT FROM CONN. DURING
UNLOADING OF BLM TRUCK
MC SYM
770118
TETHOP
77-004-004
ROUTINE SHIFT
.220
PPM
67
.000
PPM
375
.100
PPM
419
MC SYM
770118
TRAUXO
77-005-005
ROUTINE SHIFT
.100
PPM
345
MC SYM
770307
TETHOP
77-045-022
ROUTINE SHIFT
.000
PPM
410
MC SYM
770318
TETHOP
77-061-034
ROUTINE SHIFT
.000
PPM
410
MC SYM
770318
TRAUXO
77-062-035
ROUTINE SHIFT
.000
PPM
410
SL 017003
1/19/93
mm m
1
LAK^WIARLES (254) PLANT B SAMmHG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
SYM 770404 ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
77-084-048
RESULT .000
UNIT DURATION PPM 402
MC SYM
770404
TRAUXO
77-082-046
ROUTINE SHIFT
.000
PPM
449
MC SYM
770427
77-104-068
NW CORNER OF NEW ORGANIC WASTE
PITS,67F,70RH,CALM
MC SYM
770429
TETHOP
77-106-070
ROUTINE SHIFT (EDC UNIT DOWN)
.200
PPM
237
.200
PPM
250
MC SYM
770502
77-107-071
ADJACENT TO CATALYST ADDITION
POT IN MC UNIT
MC SYM
770502
77-108-072
CENTER OF MC PAD,SOUTH END,
NEAR MC REACOTR
MC SYM
770502
77-109-073
CENTER OF PAD,NORTH END, NEAR
VDC STILL IN MC UNIT
K.
MC SYM
770503
TELOP
77-113-077
ROUTINE SHIFT
.000
PPM
260
.000
PPM
258
.000
PPM
257
.000
PPM
332
MC SYM
770503
TETHOP
77-111-075
ROUTINE SHIFT
.000
PPM
333
MC SYM
770503
TRAUXO
77-112-076
ROUTINE SHIFT
.000
PPM
331
MC SYM
770504
77-124-087
CENTER OF PAD,SOUTH END, NEAR
MC REACTOR
.000
PPM
394
1 PAGE SL <>1700*
i
1/19/93
lAK^WARLES (259) PLANT B SAMPWllG RESULTS THRU 1989
DEPT MC
COMPOUND
DATE
JOB TITLE SAMPLE#
SYM 770509
77-125-088
CENTER OF PAD,NORTH END, NEAR
VDC STILL IN MC UNIT
RESULT .000
UNIT DURATION PPM 395
MC SYM
770509
TELOP
77-123-086
ROUTINE SHIFT
.000
PPM
398
1
PAGE
MC SYM
770509
TETHOP
77-121-089
ROUTINE SHIFT
.000
PPM
396
MC SYM
770509
TRAUXO
77-122-085
ROUTINE SHIFT
.000
PPM
902
MC SYM
770510
TELOP
77-196-107
ROUTINE SHIFT
.000
PPM
905
MC SYM
770510
TETHOP
77-199-105
ROUTINE SHIFT
.000
PPM
259
MC SYM
770510
TRAUXO
77-195-106
ROUT HIE SHIFT
.000
PPM
993
MC SYM
770516
TELOP
77-155-116
ROUTINE SHIFT
.000
PPM
906
MC SYM
770516
TETHOP
77-153-119
ROUTINE SHIFT
.000
PPM
951
MC SYM
770516
TRAUXO
77-159-115
ROUTINE SHIFT
.000
PPM
908
MC SYM
770822
TETHOP
77-187-132
ROUTINE SHIFT
.000
PPM
910
SL 017005
LAK^HARLES (254) PLANT B SAMWtHG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
SYM 770822 ROUTINE SHIFT
JOB TITLE SAMPLE#
TRAUXO
77-188-133
RESULT .000
UNIT DURATION PPM 405
MC SYM
770913
TETHOP
77-208-149
ROUTINE SHIFT
.260
PPM
413
MC SYM
770913
ROUTINE SHIFT
*
MC
SYM 771017 ROUTINE SHIFT
TRAUXO TETHOP
77-209-150 77-217-155
.220
PPM
411
2.300
PPM
390
MC SYM
771017
TRAUXO
77-218-156
ROUTINE SHIFT
3.400
PPM
390
MC SYM
771024
TETHOP
77-233-163
ROUTINE SHIFT
.710
PPM
389
MC SYM
771024
TRAUXO
77-234-164
ROUTHIE SHIFT, UNLOADED AND
SAMPLED MEK TANK TRUCK
MC SYM
771128
TETHOP
77-259-183
ROUTINE SHIFT
.520
PPM
389
1.600
PPM
417
MC SYM
771128
TRAUXO
77-260-184
ROUTINE SHIFT
1.900
PPM
417
MC SYM
780315
TELOP
78-095-054
ROUTINE SHIFT
.000
PPM
403
MC SYM
780315
TETHOP
78-097-056
ROUTINE SHIFT
.100
PPM
404
PAGE SL 017006
1/19/93
1
LAI^HHARLES (254) PLANT B SAMWNG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
SYM
780315
ROUTINE SHIFT
JOB TITLE SAMPLE#
TRAUXO
78-098-057
RESULT .000
UNIT DURATION PPM 406
MC SYM
780418
TRAUXO
78-134-084
ROUTINE SHIFT
.000
PPM
410
MC TCE
760811
ROUTINE SHIFT
MC *
TCE 760811 ROUTINE SHIFT
TETHOP TRAUXO
76-236-160 76-237-161
3.400
PPM
390
. 110
PPM
393
MC TCE
760819
76-247-166
APPROX. 6 FT FROM CONN. DURIN
G UNLOADING OF DOL-IBL
MC TCE
760819
TRAUXO
76-246-165
SAMPLING AND ASSISTING THE
UNLOADING OF DOL- IBL
MC TCE
761004
EDCOP
76-283-186
ROUTINE SHIFT
.000
PPM
383
.690
PPM
382
.200
PPM
415
MC TCE
761004
TETHOP
76-286-187
ROUTINE SHIFT
. 260
PPM
415
MC TCE
761004
TRAUXO
76-287-188
ROUTINE SHIFT
.310
PPM
400
MC TCE
761108
76-312-205
APPROX. 6 FT FROM CONN. DURIN
G UNLOADING OF NITMET TRUCK
MC TCE
761108
TETHOP
76-305-198
ROUTINE SHIFT
. GOO
PPM
47
.000
PPM
280
PAGE
SL 017007
i
1/19/93
HLA
PLANT B SAM
HARLES C254) NG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
TCE 761108 ROUTINE SHIFT
JOB TITLE SAMPLE#
TRAUXO
76-306-199
RESULT .000
UNIT DURATION PPM 280
PAGE
MC MC MC *
TCE 761115
76-310-203
APPROX. 6FT FROM CONN. DURING
UNLOADING OF BLM TRUCK
TCE
761115
TRAUXO
SAMPLING AND ASSISTING THE
UNLOADING OF BLM TRUCK
76-309-202
TCE 770118 ROUTINE SHIFT
TETHOP
77-004-004
.000
PPM
375
.000
PPM
60
.160
PPM
419
MC TCE
770118
TRAUXO
77-005-005
ROUTINE SHIFT
.280
PPM
345
MC TCE
770223
TETHOP
77-033-016
ROUTINE SHIFT EXCEPT MC RX
VALVE BLEW OUT INTO HIS FACE
MC TCE
770223
TRAUXO
77-034-017
ROUTLNE SHIFT EXCEPT VDC/MC
VAPOR RELEASE IN UNIT
MC TCE
770307
TETHOP
77-045-022
ROUTINE SHIFT
1.400
PPM
415
.900
PPM
415
.200
PPM
410
MC TCE
770309
TRAUXO
77-046-023
ROUTINE SHIFT-ALSO PUMPED 17
DRUMS OF NITROMETHANE
MC TCE
770318
TETHOP
77-061-034
ROUTINE SHIFT
.100
PPM
415
.150
PPM
410
MC TCE
770318
TRAUXO
77-062-035
ROUTINE SHIFT
.360
PPM
410
SL 0l700g
1/19/93
LAt^BHARLES (259) PLANT B SAMmNG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
TCE 770404 ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
77-084-048
RESULT .160
UNIT DURATION PPM 402
PAGE
MC TCE
770404
TRAUXO
77-082-046
ROUTINE SHIFT
.560
PPM
449
MC TCE
770427
77-104-068
NW CORNER OF NEW ORGANIC WASTE
PITS ,67F , 70RH,CALM
MC TCE
770427
77-105-069
SW CORNER OF NEW ORGANIC WASTE
PITS, 67F ,7 0RH,CALM
MC TCE
770429
TETHOP
77-106-070
ROUTINE SHIFT (EDC UNIT DOWN)
.300
PPM
237
.220
PPM
238
.110
PPM
250
MC TCE
770502
77-107-071
ADJACENT TO CATALYST ADDITION
POT IN MC UNIT
MC TCE
770502
77-108-072
CENTER OF MC PAD, SOUTH END,
NEAR MC REACOTR
MC TCE
770502
77-109-073
CENTER OF PAD,NORTH END, NEAR
VDC STILL IN MC UNIT
MC TCE
770503
TELOP
77-113-077
ROUTINE SHIFT
.000
PPM
260
.000
PPM
258
.340
PPM
257
.180
PPM
332
MC TCE
770503
TETHOP
77-111-075
ROUTINE SHIFT
.180
PPM
333
MC TCE
770503
TRAUXO
77-112-076
ROUTINE SHIFT
.000
PPM
331
SL 017009
1/19/93 I
LAI PLANT B SAI
HARLES (259) NG RESULTS THRU 1989
DEPT MC
COMPOUND
DATE
JOB TITLE SAMPLE#
TCE 770509
77-129-087
CENTER OF PAD,SOUTH END, HEAR
MC REACTOR
RESULT .000
UNIT DURATION PPM 399
MC TCE
770509
77-125-088
CENTER OF PAD,NORTH END, NEAR
VDC STILL IN MC UNIT
2.200
PPM
395
MC
MC
TCE 770509 ROUTINE SHIFT
TCE 770509 ROUTINE SHIFT
TELOP TETHOP
77-123-086 77-121-089
.310
PPM
398
.920
PPM
396
PAGE
MC TCE
770509
TRAUXO
77-122-085
ROUTINE SHIFT
.900
PPM
902
MC TCE
770510
TELOP
77-196-107
ROUTINE SHIFT
.000
PPM
905
MC TCE
770510
TETHOP
77-199-105
ROUTINE SHIFT
.000
PPM
259
MC TCE
770510
TRAUXO
77-195-106
ROUTINE SHIFT
.160
PPM
993
MC TCE
770516
TELOP
77-155-116
ROUTINE SHIFT
.890
PPM
906
MC TCE
770516
TETHOP
77-153-119
ROUTINE SHIFT
. 180
PPM
951
MC TCE
770516
TRAUXO
77-159-115
ROUTINE SHIFT
.200
PPM
908
SL 017010
i
1/19/93
ARLES (259) PLANT B SAMWTnG RESULTS THRU 1989
DEPT MC
COMPOUND
DATE
TCE 770615 ROUTINE SHIFT
JOB TITLE SAMPLE#
EDCOP
77-159-117
RESULT .300
UNIT DURATION
PPM
919
PAGE
MC TCE
770615
TETHOP
77-160-118
ROUTINE SHIFT
.380
PPM
916
MC TCE
770615
TRAUXO
77-161-119
ROUTINE SHIFT
.900
PPM
911
MC TCE
770720
77-177-125
NEAR MC STRIPPER FEED PUMPS
.000
PPM
258
MC TCE
770720
77-178-126
NEAR DH STILL PRODUCT PUMPS
3.800
PPM
256
MC TCE
770720
77-179-127
NEAR DH VENT RECOVERY TRANSFER
PUMPS
MC TCE
770822
TETHOP
77-187-132
ROUTINE SHIFT
.150
PPM
259
1.800
PPM
910
MC TCE
770822
TRAUXO
77-188-133
ROUTINE SHIFT
.170
PPM
905
MC TCE
770913
TETHOP
77-208-199
ROUTINE SHIFT
1.600
PPM
913
MC TCE
770913
TRAUXO
77-209-150
ROUTINE SHIFT
1.500
PPM
911
MC TCE
771017
TETHOP
77-217-155
ROUTINE SHIFT
.590
PPM
390
SL 017011
1/19/93
LAK^^HARLES (254) PLANT B SAMWTnG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
TCE 771017 ROUTINE SHIFT
JOB TITLE SAMPLE#
TRAUXO
77-218-156
RESULT .290
UNIT DURATION PPM 390
MC TCE
771024
TETHOP
77-233-163
ROUTINE SHIFT
.370
PPM
389
MC TCE
771024
TRAUXO
77-234-164
ROUTINE SHIFT, UNLOADED AND
SAMPLED MEK TANK TRUCK
MC TCE
771121
TETHOP
77-256-180
ROUTINE SHIFT
.170
PPM
389
.150
PPM
416
MC TCE
771121
TRAUXO
77-257-181
ROUTINE SHIFT
.420
PPM
417
MC TCE
780109
TETHOP
78-001-001
ROUTINE SHIFT
.000
PPM
200
MC TCE
780109
TRAUXO
78-003-003
ROUTINE SHIFT-ADDED HQMME TO
SYSTEM
MC TCE
780130
TETHOP
78-015-009
ROUTINE VALVE ADJUSTMENTS
.590
PPM
440
4.000
PPM
16
MC TCE
780315
TELOP
78-095-054
ROUTINE SHIFT
.060
PPM
403
MC TCE
780315
TETHOP
78-097-056
ROUTINE SHIFT
.250
PPM
404
MC TCE
780315
TRAUXO
78-098-057
ROUTINE SHIFT
.140
PPM
406
PAGE SL 017012
1/19/93
LAWMARLES (259) PLANT B SAMPPlNG RESULTS THRU 1989
DEPT MC
COMPOUND
DATE
TCE 780910 ROUTINE SHIFT
JOB TITLE SAMPLE#
TELOP
78-067-096
RESULT .050
UNIT DURATION PPM 393
PAGE
MC TCE
780910
TETHOP
78-069-098
ROUTINE SHIFT
.130
PPM
393
MC TCE
780910
TRAUXO
78-123-073
ROUTINE SHIFT
.310
PPM
393
MC TCE
780918
TELOP
78-137-087
ROUTINE SHIFT
.100
PPM
910
MC TCE
780918
TETHOP
78-136-086
ROUTINE SHIFT
.380
PPM
910
MC TCE
780918
TRAUXO
78-139-089
ROUTINE SHIFT
1.200
PPM
910
MC TCE
780501
EDCOP
78-199-091
ROUTINE SHIFT-RUPTURE DISC ON
VDC STILL BLEW
MC TCE
780501
TELOP
78-196-093
ROUTINE SHIFT-RUPTURE DISC ON
VDC STILL BLEW
MC TCE
780501
TETHOP
78-195-092
ROUTINE SHIFT-RUPTURE DISC ON
VDC STILL BLEW
MC TCE
780501
TRAUXO
78-197-099
ROUTINE SH1FT-RUPT DISC ON VDC
STL BLEW' AND OP RCHG HOMME TNK
MC
TRANS
770223
TETHOP
77-033-016
ROUTINE SHIFT EXCEPT MC RX
VALVE BLEW OUT INTO HIS FACE
.120
PPM
377
.960
PPM
377
.930
PPM
377
6.820
PPM
385
5.900
PPM
915
SL 017Q13
1/19/93
LAI^MARLES (254) PLANT B SAMWlNG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
TRANS
770307
ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
77-045-022
RESULT .200
UNIT DURATION PPM 410
PAGE
MC
TRANS
770318
TETHOP
77-061-034
ROUTINE SHIFT
.000
PPM
410
MC
1 MC
TRANS
770318
ROUTINE SHIFT
TRANS
770404
ROUTINE SHIFT
TRAUXO TETHOP
77-062-035 77-084-048
.000
PPM
410
.000
PPM
402
MC
TRANS
770404
TRAUXO
77-082-046
ROUTINE SHIFT
.000
PPM
449
MC
TRANS
770429
TETHOP
77-106-070
ROUTINE SHIFT (EDC UNIT DOWN)
.000
PPM
250
MC TRANS 770502
77-107-071
ADJAGENT TO CATALYST ADDITION
POT IN MC UNIT
MC TRANS 770502
77-108-072
CENTER OF MC PAD,SOUTH END,
NEAR MC REACOTR
MC TRANS 770502
77-109-073
CENTER OF PAD,NORTH END, NEAR
VDC STILL IN MC UNIT
MC
TRANS
770503
TELOP
77-113-077
ROUTINE SHIFT
.420
PPM
260
.000
PPM
258
.000
PPM
257
.000
PPM
332
MC
TRANS
770503
TETHOP
77-111-075
ROUTINE SHIFT
.000
PPM
333
SL 017014
1/19/93
LAHCharles <254> PLANT B SAMFL IMG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
TRANS
770503
ROUTINE SHIFT
JOB TITLE TRAUXO
SAMPLE# 77-112-076
RESULT .000
UNIT DURATION PPM 331
PAGE
MC
TRANS
770509
TELOP
ROUTINE SHIFT
77-123-086
.660
PPM
398
MC
MC
TRANS
770504
ROUTINE SHIFT
TRANS
770504
ROUTINE SHIFT
TETHOP TRAUXO
77-121-084 77-122-085
.850
PPM
396
.520
PPM
402
MC
TRANS
770510
TELOP
77-146-107
ROUTINE SHIFT
.000
PPM
405
MC
TRANS
770510
TETHOP
77-144-105
ROUTINE SHIFT
.000
PPM
254
MC
TRANS
770510
TRAUXO
77-145-106
ROUTINE SHIFT
.000
PPM
443
MC
TRANS
770516
TELOP
77-155-116
ROUTINE SHIFT
.000
PPM
406
MC
TRANS
770516
TETHOP
77-153-114
ROUTINE SHIFT
.200
PPM
451
MC
TRANS
770516
TRAUXO
77-154-115
ROUTINE SHIFT
.000
PPM
408
MC
TRANS
770615
EDCOP
77-159-117
ROUTINE SHIFT
.000
PPM
414
SL 017015
1/19/93
LAt^^HARLES (254) PLANT B SAIWING RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
TRANS
770615
ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
77-160-118
RESULT .000
UNIT DURATION PPM 416
MC
TRANS
770822
TETHOP
77-187-132
ROUTINE SHIFT
.000
PPM
410
MC
TRANS
770822
TRAUXO
77-188-133
ROUTINE SHIFT
.000
PPM
405
MC
TRANS
770913
TRAUXO
77-209-150
ROUTINE SHIFT
.000
PPM
411
MC
TRANS
771024
TETHOP
77-233-163
ROUTINE SHIFT
.000
PPM
389
MC
TRANS
771024
TRAUXO
77-234-164
ROUTINE SHIFT, UNLOADED AND
SAMPLED MEK TANK TRUCK
MC
TRANS
771121
TETHOP
77-256-180
ROUTINE SHIFT
.000
PPM
389
.000
PPM
416
MC
TRANS
771128
TETHOP
77-259-183
ROUTINE SHIFT
.000
PPM
417
MC
TRANS
771128
TRAUXO
77-260-184
ROUTINE SHIFT
.000
PPM
417
MC
TRANS
780109
TETHOP
78-001-001
ROUTINE SHIFT
.000
PPM
200
MC
TRANS
780418
TELOP
ROUTINE SHIFT
78-137-087
. 000
PPM
410
PAGE O^6
1/19/93
LAI^BhARLES (254) PLANT B SAMH^ENG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
TRANS
780418
ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
78-136-086
RESULT .000
UNIT DURATION
PPM
410
PAGE
MC
MC
* MC
TRANS
780501
EDCOP
78-144-091
ROUTINE SHIFT-RUPTURE DISC ON
VDC STILL BLEW
TRI 760811 ROUTINE SHIFT
TETHOP
76-236-160
TRI 760811 ROUTINE SHIFT
TRAUXO
76-237-161
.000
PPM
377
.120
PPM
390
.100
PPM
393
MC TRI
760819
76-247-166
APPROX. 6 FT FROM CONN. DURIN
G UNLOADING OF DOL-IBL
MC TRI
760819
TRAUXO
76-246-165
SAMPLING AND ASSISTING THE
UNLOADING OF DOL-IBL
MC TRI
761004
EDCOP
76-283-186
ROUTINE SHIFT
.000
PPM
383
.360
PPM
382
.200
PPM
415
MC TRI
761004
TETHOP
76-286-187
ROUTINE SHIFT
.290
PPM
415
MC TRI
761004
TRAUXO
76-287-188
ROUTINE SHIFT
.280
PPM
400
MC TRI
761108
76-312-205
APPROX. 6 FT FROM CONN. DURIN
G UNLOADING OF NITMET TRUCK
MC TRI
761108
TETHOP
76-305-198
ROUTINE SHIFT
.090
PPM
47
.000
PPM
280
SL 017017
1/19/93
lah| HARLES (259) PLANT B SAfim NG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
TRI 761108 ROUTINE SHIFT
JOB TITLE SAMPLE#
TRAUXO
76-306-199
RESULT .000
UNIT DURATION PPM 280
PAGE
MC
MC *
MC
TRI
761108
TRAUXO
SAMPLING AND ASSISTING THE
UNLOADING OF NITMET TRUCK
76-311-204
TRI 761115
76-310-203
APPROX. 6FT FROM CONN. DURING
UNLOADING OF BLM TRUCK
TRI 770118 ROUTINE SHIFT
TETHOP
77-004-004
.080
PPM
67
.000
PPM
375
.000
PPM
419
MC TRI
770118
TRAUXO
77-005-005
ROUTINE SHIFT
. 000
PPM
345
MC TRI
770223
TETHOP
77-033-016
ROUTINE SHIFT EXCEPT MC RX
VALVE BLEW OUT INTO HIS FACE
MC TRI
770223
TRAUXO
77-034-017
ROUTINE SHIFT EXCEPT VDC/MC
VAPOR RELEASE IN UNIT
MC TRI
770307
TETHOP
77-045-022
ROUTINE SHIFT
.200
PPM
415
.200
PPM
415
.000
PPM
410
MC TRI
770309
TRAUXO
77-046-023
ROUTINE SHIFT-ALSO PUMPED 17
DRUMS OF NITROMETHANE
MC TRI
770318
TETHOP
77-061-034
ROUTINE SHIFT
.200
PPM
415
.100
PPM
410
MC TRI
770318
TRAUXO
77-062-035
ROUTINE SHIFT
.540
PPM
410
SL 017018
LAf^^HARLES (254) PLANT B SAHfflHG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
TRI 770404 ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
77-084-048
RESULT .000
UNIT DURATION PPM 402
MC TRI
770404
TRAUXO
77-082-046
ROUTINE SHIFT
.000
PPM
449
MC
* MC
TRI 770427
77-104-068
NW CORNER OF NEW ORGANIC WASTE
PITS,67F,70RH,CALM
TRI
770429
TETHOP
77-106-070
ROUTINE SHIFT (EDC UNIT DOWN)
.130
PPM
237
.240
PPM
250
MC TRI
770502
77-107-071
ADJACENT TO CATALYST ADDITION
POT IN MC UNIT
MC TRI
770502
77-108-072
CENTER OF MC PAD,SOUTH END,
NEAR MC REACOTR
MC TRI
770502
77-109-073
CENTER OF PAD,NORTH END, NEAR
VDC STILL IN MC UNIT
MC TRI
770503
TELOP
77-113-077
ROUTINE SHIFT
.000
PPM
260
.000
PPM
258
.000
PPM
257
.230
PPM
332
MC TRI
770503
TETHOP
77-111-075
ROUTINE SHIFT
.230
PPM
333
MC TRI
770503
TRAUXO
77-112-076
ROUTINE SHIFT
.340
PPM
331
MC TRI
770504
77-124-087
CENTER OF PAD,SOUTH END, NEAR
MC REACTOR
.240
PPM
394
PAGE
Si 017019
1/19/93
LAI^BhARLES (254) PLANT B SAMTONG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
JOB TITLE SAMPLE#
TRI 770504
77-125-088
CENTER OF PAD,NORTH END, NEAR
VDC STILL IN MC UNIT
RESULT .380
UNIT DURATION PPM 395
MC TRI
770504
TELOP
77-123-086
ROUTINE SHIFT
1.100
PPM
398
I
PAGE
MC
* MC
TRI 770504 ROUTINE SHIFT
TRI 770504 ROUTINE SHIFT
TETHOP TRAUXO
77-121-084 77-122-085
1.000
PPM
396
.870
PPM
402
MC TRI
770510
TELOP
77-146-107
ROUTINE SHIFT
.000
PPM
405
MC TRI
770510
TETHOP
77-144-105
ROUTINE SHIFT
.000
PPM
254
MC TRI
770510
TRAUXO
77-145-106
ROUTINE SHIFT
.000
PPM
443
MC TRI
770516
TELOP
77-155-116
ROUTINE SHIFT
.430
PPM
406
MC TRI
770516
TETHOP
77-153-114
ROUTINE SHIFT
.490
PPM
451
MC TRI
770516
TRAUXO
77-154-115
ROUTINE SHIFT
.380
PPM
408
MC TRI
770615
EDCOP
77-159-117
ROUTINE SHIFT
.210
PPM
414
SL 017020
1/19/93
#LA HARLES C25A)
PLANT B SAMmfPiING RESULTS THRU 198A
DEPT MC
COMPOUND
DATE
TRI 770615 ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
77-160-118
RESULT .190
UNIT DURATION PPM A16
PAGE
MC TRI
770615
TRAUXO
77-161-119
ROUTINE SHIFT
.200
PPM
All
MC
* MC
TRI 770720 NEAR MC STRIPPER FEED PUMPS
77-177-125
TRI 770720 NEAR DH STILL PRODUCT PUMPS
77-178-126
.110
PPM
258
.280
PPM
256
MC TRI
770822
TETHOP
77-187-132
ROUTINE SHIFT
. 1 AO
PPM
A10
MC TRI
770822
TRAUXO
77-188-133
ROUTINE SHIFT
.000
PPM
A05
MC TRI
770913
TETHOP
77-208-1A9
ROUTTHE SHIFT
.550
PPM
A13
MC TRI
770913
TRAUXO
77-209-150
ROUTINE SHIFT
.800
PPM
All
MC TRI
771017
TETHOP
77-217-155
ROUTINE SHIFT
.230
PPM
390
MC TRI
771017
TRAUXO
77-218-156
ROUTINE SHIFT
.000
PPM
390
TRI 77102A ROUTINE SHIFT
TETHOP
77-233-163
.000
PPM
389
SL 017021
1/19/93
LAI^^HARLES (254) PLANT B SAIlWlNG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
JOB TITLE
TRI
771024
TRAUXO
ROUTINE SHIFT, UNLOADED AND
SAMPLED MEK TANK TRUCK
SAMPLE# 77-234-164
RESULT .120
UNIT DURATION PPM 389
MC TRI
771121
TETHOP
77-256-180
ROUTINE SHIFT
.000
PPM
416
HC
* MC
TRI 771128 ROUTINE SHIFT
TRI 771128 ROUTINE SHIFT
TETHOP TRAUXO
77-259-183 77-260-184
.000
PPM
417
.000
PPM
417
MC TRI
780109
TETHOP
78-001-001
ROUTINE SHIFT
.000
PPM
200
MC TRI
780315
TELOP
78-095-054
ROUTINE SHIFT
.000
PPM
403
MC TRI
780315
TETHOP
78-097-056
ROUTINE SHIFT
.160
PPM
404
MC TRI
780315
TRAUXO
78-098-057
ROUTINE SHIFT
.000
PPM
406
MC TRI
780329
TRAUXO
78-117-069
ADDING HQMME CATALYST TO
VESSEL
MC TRI
780410
TELOP
78-067-046
ROUTINE SHIFT
1.400
PPM
15
.250
PPM
393
MC TRI
780410
TETHOP
78-069-048
ROUTINE SHIFT
.610
PPM
393
PAGE
017022
1/19/93
LAl^^HARLES (254) PLANT B SAMmNG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
TRI 780410 ROUTINE SHIFT
JOB TITLE SAMPLE#
TRAUXO
78-123-073
RESULT .430
UNIT DURATION PPM 393
PAGE
MC TRI
780418
TELOP
78-137-087
ROUTINE SHIFT
.000
PPM
410
MC
* MC
TRI 780418 ROUTINE SHIFT
TRI 780418 ROUTINE SHIFT
TETHOP TRAUXO
78-136-086 78-134-084
.000
PPM
410
.000
PPM
410
MC TRI
780501
EDCOP
78-144-091
ROUTINE SHIFT-RUPTURE DISC ON
VDC STILL BLEW
MC TRI
780501
TELOP
78-146-093
ROUTINE SHIFT-RUPTURE DISC ON
VDC STILL BLEW
MC TRI
780501
TETHOP
78-145-092
ROUTINE SHIFT-RUPTURE DISC ON
VDC STILL BLEW
MC TRI
780501
TRAUXO
78-147-094
ROUTINE SHIFT-RUPT DISC ON VDC
STL BLEWi AND OP RCHG HQMME TNK
MC VCM
760811
TETHOP
76-236-160
ROUTINE SHIFT
.150
PPM
377
.300
PPM
377
.240
PPM
377
.200
PPM
385
.080
PPM
390
MC VCM
760811
TRAUXO
76-237-161
ROUTINE SHIFT
.050
PPM
393
MC VCM
760819
76-247-166
APPROX. 6 FT FROM CONH. DURIH
G UNLOADING OF DOL-IBL
.000
PPM
383
SL 017023
1/19/93 I
LAl^WHARLES (254) PLANT B SAMTONG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
JOB TITLE
VCM
760819
TRAUXO
SAMPLING AND ASSISTING THE
UNLOADING OF DOL- IBL
SAMPLE# 76-246-165
RESULT .260
UNIT DURATION PPM 382
MC VCM
761004
EDCOP
ROUTINE SHIFT
76-283-186
.070
PPM
415
MC
i MC
VCM 761004 ROUTINE SHIFT
VCM 761004 ROUTINE SHIFT
TETHOP TRAUXO
76-286-187 76-287-188
.130
PPM
415
.150
PPM
400
MC VCM
761108
76-312-205
APPROX. 6 FT FROM CONN. DURIN
G UNLOADING OF HITMET TRUCK
MC VCM
761108
TETHOP
76-305-198
ROUTINE SHIFT
.000
PPM
47
.000
PPM
280
MC VCM
761108
TRAUXO
76-306-199
ROUTINE SHIFT
.000
PPM
280
MC VCM
761108
TRAUXO
76-311-204
SAMPLING AND ASSISTING THE
UNLOADING OF NITMET TRUCK
MC VCM
761115
76-310-203
APPROX. 6FT FROM COHN. DURING
UNLOADING OF BLM TRUCK
MC VCM
770118
TETHOP
77-004-004
ROUTINE SHIFT
.360
PPM
67
.000
PPM
375
.000
PPM
419
MC VCM
770118
TRAUXO
77-005-005
ROUTINE SHIFT
.000
PPM
345
PAGE
017024
1
1/19/93
LAl^WJARLES (254) PLANT B SAMmNG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
VCM 770307 ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
77-045-022
RESULT .000
UNIT DURATION PPM 410
PAGE
MC
MC
* MC
VCM
770309
TRAUXO
ROUTINE SHIFT-ALSO PUMPED 17
DRUMS OF NITROMETHANE
77-046-023
VCM 770318 ROUTINE SHIFT
TETHOP
77-061-034
VCM
770318
ROUTINE SHIFT
TRAUXO
77-062-035
. 000
PPM
415
.420
PPM
410
.250
PPM
410
MC VCM
770404
TETHOP
77-084-048
ROUTINE SHIFT
.000
PPM
402
MC VCM
770404
TRAUXO
77-082-046
ROUTINE SHIFT
.000
PPM
449
MC VCM
770429
TETHOP
77-106-070
ROUTINE SHIFT (EDC UNIT DOWN)
.060
PPM
250
MC VCM
770502
77-107-071
ADJACENT TO CATALYST ADDITION
POT IN MC UNIT
MC VCM
770502
77-108-072
CENTER OF MC PAD,SOUTH END,
NEAR MC REACOTR
MC VCM
770502
77-109-073
CENTER OF PAD,NORTH END, NEAR
VDC STILL IN MC UNIT
MC VCM
770503
TELOP
77-113-077
ROUTINE SHIFT
.230
PPM
260
.270
PPM
258
.450
PPM
257
.130
PPM
332
SL 017025
1/19/93
LAl^^HARLES (254) PLANT B SAMWlNG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
VCM 770503 ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
77-111-075
RESULT .090
UNIT DURATION PPM 333
MC VCM
770503
TRAUXO
77-112-076
ROUTINE SHIFT
.150
PPM
331
MC
# MC
MC
VCM 770504
77-124-087
CENTER OF PAD,SOUTH END, NEAR
MC REACTOR
VCM 770504
77-125-088
CENTER OF PAD,NORTH END, NEAR
VDC STILL IN MC UNIT
VCM
770504
ROUTINE SHIFT
TELOP
77-123-086
.000
PPM
394
.000
PPM
395
.220
PPM
398
MC VCM
770504
TETHOP
77-121-084
ROUTINE SHIFT
.180
PPM
396
MC VCM
770504
TRAUXO
77-122-085
ROUTINE SHIFT
.150
PPM
402
MC VCM
770510
TELOP
77-146-107
ROUTINE SHIFT
.000
PPM
405
MC VCM
770510
TETHOP
77-144-105
ROUTINE SHIFT
.000
PPM
254
MC VCM
770510
TRAUXO
77-145-106
ROUTINE SHIFT
.000
PPM
443
MC VCM
770516
TELOP
77-155-116
ROUTINE SHIFT
.090
PPM
406
PAGE
SL 017026
1/19/93 I
LAI^^HARLES (259) PLANT B SAMTOng RESULTS THRU 1989
DEPT MC
COMPOUND
DATE
VCM 770516 ROUTINE SHIFT
JOB TITLE SAMPLE#
TETHOP
77-153-119
RESULT .070
UNIT DURATION PPM 951
PAGE
MC VCM
770516
TRAUXO
77-159-115
ROUTINE SHIFT
.080
PPM
908
MC
* MC
VCM 770615 ROUTINE SHIFT
VCM
770615
ROUTINE SHIFT
EDCOP TETHOP
77-159-117 77-160-118
.120
PPM
919
. 070
PPM
916
MC VCM
770615
TRAUXO
77-161-119
ROUTINE SHIFT
.120
PPM
911
MC VCM
770720
77-177-125
NEAR MC STRIPPER FEED PUMPS
.000
PPM
258
MC VCM
770720
77-178-126
NEAR iDH STILL PRODUCT PUMPS
1.600
PPM
256
MC VCM
770720
77-179-127
NEAR DH VENT RECOVERY TRANSFER
PUMPS
MC VCM
770822
TETHOP
77-187-132
ROUTINE SHIFT
.720
PPM
259
. 000
PPM
910
MC VCM
770822
TRAUXO
77-188-133
ROUTINE SHIFT
.690
PPM
905
MC VCM
770913
TETHOP
77-208-199
ROUTINE SHIFT
.570
PPM
913
SL 017027
i
1/19/93
LAI^^HARLES (259) PLANT B SAnPRHG RESULTS THRU 1989
DEPT MC
COMPOUND
DATE
VCM 770913 ROUTINE SHIFT
JOB TITLE SAMPLE#
TRAUXO
77-209-150
RESULT .610
UNIT DURATION PPM 911
PAGE
MC VCM
771017
TETHOP
77-217-155
ROUTINE SHIFT
.000
PPM
390
MC VCM
771017
TRAUXO
77-218-156
ROUTINE SHIFT
MC *
VCM 771029 ROUTINE SHIFT
TETHOP
77-233-163
.000
PPM
390
. 000
PPM
389
MC VCM
771029
TRAUXO
77-239-169
ROUTINE SHIFT, UNLOADED AND
SAMPLED MEK TANK TRUCK
MC VCM
771121
TETHOP
77-256-180
ROUTINE SHIFT
.000
PPM
389
.060
PPM
916
MC VCM
771121
TRAUXO
77-257-181
ROUTINE SHIFT
.050
PPM
917
MC VCM
771128
TETHOP
77-259-183
ROUTINE SHIFT
.000
PPM
917
MC VCM
771128
TRAUXO
77-260-189
ROUTINE SHIFT
.000
PPM
917
MC VCM
780109
TETHOP
78-001-001
ROUTINE SHIFT
.000
PPM
200
MC VCM
780109
TRAUXO
78-003-003
ROUTINE SHIFT-ADDED HQMME TO
SYSTEM
.000
PPM
990
SL 017028
1/19/93
LAI^^HARLES (254) PLANT B SAMWiNG RESULTS THRU 1984
DEPT MC
COMPOUND
DATE
VCM
780315
ROUTINE SHIFT
JOB TITLE SAMPLE#
TELOP
78-095-054
RESULT .000
UNIT DURATION PPM 403
MC VCM
780315
TETHOP
78-097-056
ROUTINE SHIFT
.060
PPM
404
MC
* MC
VCM
780315
ROUTINE SHIFT
VCM
780410
ROUTINE SHIFT
TRAUXO TELOP
78-098-057 78-067-046
.030
PPM
406
.020
PPM
393
MC VCM
780410
TETHOP
78-069-048
ROUTINE SHIFT
.070
PPM
393
MC VCM
780410
TRAUXO
78-123-073
ROUTINE SHIFT
.040
PPM
393
MC VCM
780418
TELOP
78-137-087
ROUTINE SHIFT
.000
PPM
410
MC VCM
780418
TETHOP
78-136-086
ROUTINE SHIFT
.000
PPM
410
MC VCM
780418
TRAUXO
78-134-084
ROUTINE SHIFT
.000
PPM
410
MC VCM
780501
EDCOP
78-144-091
ROUTINE SHIFT-RUPTURE DISC ON
VDC STILL BLEW
MC VCM
780501
TETHOP
78-145-092
ROUTINE SHIFT-RUPTURE DISC ON
VDC STILL BLEW
.790
PPM
377
.120
PPM
377
t PAGE SL 017029