Document yVKOzEeD5KM2mKx1qm73J36X

UNITED STATESUNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 1 NVIRONMAGEENBCYOS5 TPOOSNT, OFMFAIC E0 S2Q1U0AR9E-, 3S9U1IT2E 100 ENTAL PROTECTION Drafted Date:12/15/21 Finalized Date:1/14/22 Subj:Inspection Report Clean Water Act - National Pollutant Discharge Elimination System (" NPDES ") Cobbler's Knoll From:Stephanie Tougas, Inspector Thru:Andrew Spejewski, Inspector To:File I. Facility Information A. Facility Name:Cobbler's Knoll B. Facility Location:Turner Farm Road Uxbridge, MA 01569 C. Facility Contacts:Frank Marinella, Owner 26 Tia Place P.O. Box 623 Franklin, MA 02038 Frankm938@aol.com D. NPDES ID No (s).: MAR1000LG II. Background Information A. Date(s) of inspection: December 15, 2021 B. Weather Conditions: 45 degrees F, partially sunny C. US EPA Representative(s): Stephanie Tougas D. State / Local Representative(s): Jack Hunter, Planning and Community Development Consultant E. Federally Enforceable Requirements Covered During the Inspection: 2017 EPA Construction General Permit ED_019088A_00020111-00001 F. Previous Enforcement Actions: 2018 Expedited Settlement Agreement (CWA-01-CWA-01-2018-0031) for $ 6,900 penalty. III. Type and Purpose of Inspection Evaluation. Inspection is the result of a citizen complaint received by EPA. IV. Facility Description The site is a residential development, lying northwest of Chocolog Road, just west of Chestnut Street. On the west side of the entrance, there lies a detention basin. Three retention basins have been constructed, all downslope from Turner Farm Road. According to the NPDES permit, the site will have a disturbed area of 35 acres. At the time of the inspection, a road (now named Turner Farm Road), had been built and paved, running about 0.5 miles to the northwest from Chocolog Road. The road then becomes unpaved but cleared and graded. The road then loops back on itself. The road area is fairly flat, slightly higher to the southwest of the road and sloping down on the northeast side, with the road rising slightly toward the northwest end. Emerson Brook, which is a tributary to the Blackstone River, is located downslope of the site to the north. V. Inspection On 12/13/21, I spoke with Jack Hunter, a planning consultant for the town, who agreed to meet me on site. On 12/13/21, Mr. Hunter spoke with Mr. Frank Marinella informing him that he and EPA would be on site. I arrived at approximately 2pm on 12/15/21. A. Opening Conference I tried calling Mr. Frank Marinella to confirm access to the site, but he did not answer his phone. On site, I approached a man who was working on grading the sidewalk. He informed me that he was Anthony Marinella, brother to Frank Marinella. I presented my credentials and he granted me permission to access the site. I explained I would walk around the site and inspect the erosion controls and compliance with the Construction Stormwater General Permit. B. Facility Tour Mr. Hunter and I began walking up the road. All of the homes except for one home were completed, and the front lawns had all been seeded. A drainage swale had been dug out along the southwest side of the road. At the time of the inspection, there was a steady flow of water through the swales / drainage system. I observed areas where it appeared there was some sediment building up in the drainage areas. Mr. Hunter and I continued walking up the road to where the paved portion ended, and the stumped and grubbed part began. Mr. Hunter explained that he thinks a cistern for the fire department to access was going to be built somewhere in this general area. At this time, Mr. Hunter had to make another appointment, so he departed. 2 ED_019088A_00020111-00002 I walked back downslope to where I noted a downslope path that led to a retention pond. I followed the path, noting a drainage ditch along the south side of the path that leads to the pond. I walked the perimeter of the pond, noting some down silt fences. I observed a spillway on the downslope side of the pond. I noted a path where it appeared water may have discharged from the retention basin. I followed this path about 50 feet downslope. I noted on the map that Lee Pond is north and downslope of this retention pond. I then walked back to Turner Farm Road and continued walking northwest and upslope. I reached the unpaved portion of the road and not much further up I found another path to another retention pond. I followed this path to the pond and documented areas where some silt fences were down. On the map, this retention pond is upslope from Emerson Brook before it flows into Lee Pond. I walked back up the path from the detention pond to Turner Farm Road, turned around and walked back downslope towards the entrance. When I reached the junction where Turner Farm Road loops around on itself, I noted a stockpile in the unpaved portion of the road. The stockpile did not appear to be stabilized. Water was flowing around the stockpile and downslope from the unpaved muddy portion into the drainage swale along Turner Farm Road. I followed the drainage until it reached an inlet into which the water was flowing. I followed the downslope path where I believed the inlet led to and came upon the outlet to another retention pond. I walked the perimeter of the pond and came to the gravel spillway. I noted a few instances of down silt fences and observed a silt fence that had sediment accumulated over one half its height and also was breached. I followed the flow path until I could not see water. I then continued walking downslope, noting stained leaves. I came upon a stream flowing eastward. I consulted the map and confirmed that this stream is a tributary to Emerson Brook. I walked back upslope to the retention pond. I observed an area of the pond that appeared to have some erosion, with a down silt fence downslope of the eroded area. I then walked towards the entrance of the site. I documented the detention basin at the entrance. I noted a catch basin at the south side of the road and an outlet into the detention basin. C. Closing Conference I could not find Mr. Anthony Marinella, so I departed at approximately 3:30 PM. I followed up on 12/16/21 with an email to Mr. Frank Marinella letting him know I had concluded the inspection and informed him that I would follow up with an inspection report and any additional information requests. Unless otherwise noted, this report describes conditions at the facility / property as observed by EPA inspector(s), and / or through records provided to and / or information reported to EPA inspector(s) by facility representatives and as understood by the inspector(s). This report may not capture all operations or activities ongoing at the time of the inspection. This report does not make final determinations on potential areas of concern. Nothing in this report affects EPA's authorities under federal statutes and regulations to pursue further investigation or action. 3 ED_019088A_00020111-00003 Photo log. See attached map for location of photos. RIMG0225.JPG-blank RIMG0226.JPG-grading the sidewalk RIMG0227.JPG-drainage swale with silt sock RIMG0228.JPG-drainage swale RIMG0229.JPG-inlet leading to a basin RIMG0230.JPG-inlet RIMG0231.JPG-area with stockpile where Turner Farm Road turns back on itself RIMG0232.JPG-stockpile in that area RIMG0233.JPG-inlet RIMG0234.JPG-breached silt fence RIMG0235.JPG-breached silt fence RIMG0236.JPG-detention basin RIMG0237.JPG-drainage ditch leading towards detention basin RIMG0238.JPG-detention basin RIMG0239.JPG-down silt fence RIMG0240.JPG - - spillway on detention basin RIMG0241.JPG-silt fence downslope of spillway RIMG0242.JPG-detention basin RIMG0243.JPG-downslope of detention basin RIMG0244.JPG-accumulation of sediment by silt fence RIMG0245.JPG-flow from outlet of detention basin RIMG0246.JPG-down silt fence at next detention basin RIMG0247.JPG-detention basin RIMG0248.JPG-detention basin RIMG0249.JPG-inlet to basin RIMG0250.JPG-outlet from basin RIMG0251.JPG-evidence of some slow around the bottom of the slope of the basin RIMG0252.JPG-spillway RIMG0253.JPG-spillway RIMG0254.JPG-unpaved area at end of paved Turner Farm Rd RIMG0255.JPG-unpaved area at end of paved Turner Farm Rd RIMG0256.JPG-stockpile not stabilized RIMG0257.JPG-area next to stockpile RIMG0258.JPG-area next to stockpile RIMG0259.JPG-area just upslope from stockpile on unpaved area of Turner Farm Rd RIMG0260.JPG-drainage area RIMG0261.JPG-drainage area, sediment appears to be accumulated RIMG0262.JPG-drainage inlet RIMG0263.JPG-path to detention basin (1st basin as you walk east on Turner Farm Rd.) RIMG0264.JPG-detention basin RIMG0265.JPG-inlet to detention basin RIMG0266.JPG-inlet ot detention basin RIMG0267.JPG-detention basin 4 ED_019088A_00020111-00004 RIMG0268.JPG-detention basin RIMG0269.JPG-spillway on bottom of slope of basin in woods with silt fences RIMG0270.JPG-silt fence RIMG0271.JPG-silt fence breached RIMG0272.JPG-down silt fence RIMG0273.JPG-outlet RIMG0274.JPG-silt fence downslope of basin with accumulated sediment and breached RIMG0275.JPG-following flow path downslope RIMG0276.JPG-flowing stream RIMG0277.JPG-flowing stream RIMG0278.JPG-flowing stream RIMG0279.JPG-flowing stream RIMG0280.JPG-down silt fence RIMG0281.JPG-down silt fence RIMG0282.JPG-entrance sign RIMG0283.JPG-detention area by entrance to site RIMG0284.JPG-inlet ot the detention area RIMG0285.JPG-catch basin that leads to detention area by entrance End report. 50 ED_019088A_00020111-00005