Document xznenOd2RNj34mO8RonM2eZO0
STANDARD OIL COM! I OF TEXAS ENGINEERING DEPARx.xENT - EL PASO, TEXAS
ADDENDUM NO. I TO SPECIFICATION =NO. EP-246-M
CONSTRUCTION OF THE EAST AND SOUTH OFF-PLOT PIPEWAY STRUCTURES January 13, 1971 Page 1
Specification No. EP-246-M has been revised as follows:
SECTION 1 - GENERAL REQUIREMENTS
1.1 SCOPE OF WORK
I.11 CONTRACTOR'S scope of work has been increased as follows:
a) This work includes but JE not limited to:
7. Constructing and completing the pipeway stanchions in the following order: E3T, E-2, E-3, E-4, E-5., E-6, S-l, S-2, S-3, S~4 and S-5. This sequence of completion is necessary in order to permit the initiation of process pipe installation at the earliest posfttble date.
8. Excavating the entire length of the dirt bank under the South Pipeway approximately 9'-0" east so that the toe of the 1.5 to 1.0 slope is at E21X7'~6" instead of E2168'-6". Reconstruct the berm at the top'Trf the slope in accordance with Section B of drawing PD-27220777
9. Repairing the sloperffirotection coating on the dirt banks
under the East and South Pipeways.
SECTION 4 -LEONSTRUCTION The following paragraph has been added to Section 4:
4.6 SLOPE PROTECTION
.
4.61 Where the existing slope protection coating is destroyed during the construction work detailed fir Specification No. EP-246-M, CONTRACTOR shall apply a new protective/eoating.
4.62 The protective coating shall_Je Chevron Asphalt Company's Texas MC-1
Penetrating Asphalt.
7?
4.63 The coating shall be sprayedfpn at a rate of 3/4 gallon per square yard.
4.64 COMPANY will furnish the Texll MC-1 Penetrating Asphalt.
THIS PAGE ENDS7ADDENDUM NO. 1
Chevron BB 015130