Document xznRQ3a2ZYdpDZx76rROo134m

i Operation Report Dept. 246 - Aroclor August - 1965 Production (Current Month) Scheduled Actual - Production (Year to Date) - 1,844,429# 1,844,429# Aroclor "12$2 " 1242 1248 1254 1260 1262 MCS-295 Current Month 0 1,030,456 231,810 113,944 468,219 0 0 1,844,429# Average Monthly Production - 2,334,690# Year to Date 47,840 6,349,622 4,244,236 4,258,087 3,654,373 54,780 68,580 l8,b77,5lB# Availabilities Repair - 100$ Process -- 10056 Other - IOO56 Total - 10056 Yields # Theory on Biphenyl - Standard 95-50# Actual 97.0856 YTD 98.4156 Quality The thermal-chemical stabilities was not reduced by using revaporized chlorine instead of the usual snift gas. Further tests are planned to confirm these results. The one lot of electrical grade 1242 produced this month had a thermalchemical stability of 0.55 ppm. The thermal-chemical chlorides were higher in June, July, and August than in the preceding months of this year. There has been no process change to account for this increase. It is planned to run a plant test in September to determine the effect on quality of chlorinating biphenyl without the iron nipples in the chlorinator. Ferric chloride will still be added. One chlorinator will be used for this test 4 The test material will be isolated and the existing tests run for electrical properties and stabilities. The test material will be shipped as non-electrical material. A process amendment to run the tests is being circulated for approval. Operations DSW 296444 All downtime this month was caused by high inventories. Three of the five chlorinators were operated instead of operating at the usual rate and shutting down completely to provide the chlorine department with a third snift gas user. The HC1 off-gas was sewered part of the time for two days due to fouling of the off-gas condenser. The problem has been corrected. STLCOPCB4066388 r / Dept. 246 2 The experimental horizontal pump on No. 2 still failed on 8/9/65 due to the mechanical seal. The old submerged pump was put back into service. The horizontal pump will be tried again after the installation of high temperature packing to replace the mechanical seal. The nuclear density gauge on No. 4 chlarinator remains to be demonstrate Dept. Stock Aroclor WliSc S LiUCK. (1242 (1248 (1254 (1260 (1262 (MSC-295 Total Whse. Stock - 1st of Month 206,970# 286,920 652,210 175,860 64,440 68,570 1,454,790# Last of Month 141,930# 297,075 435,580 198,360 4l,o4o 68,570 1,182,555# Dept.Stock (1242 (1248 (1254 (1260 Total Dept. Stock - 383,462# 212,430 98,496 228,219 922,607# 509,123# 93,900 112,176 150,876 866,075# Whse- & Dept . Stock - 2,377,397# 2,048,630# ghw D. E . Harris DSW 296445 STLCOPCB4066389