Plant and Stream Data On
Implementing 1977 (BPT) and 1983 (BAT) Requirements of Clean Water Act
CAPITAL INVESTMENT
Total Capital spent to achieve
'77 Best Practicable Technology (BPT)
(1) requirements, including all
past expenditures
$300,000
(2) Additional capital to be spent to achieve '83 Best Available Technology (BAT) requirements
600,OOP
% Present Plant Investment
ANNUAL OPERATING AND MAINTENANCE COST
(3) After 1977 requirements are met (4) After 1983 requirements are met
ENERGY USAGE
(5) After 1977 requirements are met (6) After 1983 requirements are met
POLLUTION REDUCTION *
BOD
(7) 1977, lbs./day discharged
kk
(9) (10)
1983, lbs./day discharged % removed by controls
4o
$
90,000 200,000
% of Present Cost
27.3i ___ ^____
\CoO
bbl Oil h/yr.
COD
415
50% 260
1
% Present Plant Energy l
less than 1% less than 1$>
TSS
Q1 90%
28 9-: 5.
TPS
1628 0%
1200
2vr
TKN
1
by the plant.
parameters listed may not be measured by or
GENC 19371
'1
*
*
2- -
(U)
STREAM QUALITY INFORMATION
Name of water body that plant discharges to
A) Is this water considered to meet "fishable/swimmable" standard today?
B) If answer to "A" is no, what is nature of pollutant(s) that prevents meeting this standard?
Fields Brook No Total solids, C.O.D.
c) What are the principal sources of this pollutant(s)?
Industry and water run
off from surrounding areas
D) Will standard be met when the industries and communities have installed the BPT technology-based control requirement called for by July, 1977?
Unknown
E) If answer to "D" is no, what is nature of pollutant(s) that will prevent meeting this standard?
Unknown
F) What will be the principal sources of this pollutant(s) at that time?
Unknown
G) Will standard be met when the industries have installed the BAT technology-based control requirements called for by July, 1983?
Unknown