Document xzGQxvn8XvzLwG0MbEQMQzOKJ
M'oncuto
U W. a. Krummrlch Plant
oat i September 29, 1969
Messrs. B. L. Blgge
Confidential
C. F. Buckley
(1) Current Slse of Aroclor
J. W. Molloy
Sewer Losses
M. Plerle
(2) Proposal to Reduce Losses
L. H. Sprandel
0. L. Bratsch
TO : Tour copy of memo from BLB to BM, 9/9/69
Kuhn B-240-N
(1) Maximum Aroclor losses to the sewer from Department 246 are estimated to be 50,000#/yr.t or 10-12 gallons/day.
Basis: (a) 0.6# yield loss from production facilities
on 4o S #/yr. production (Biphenyl yield
YTD Is 99.32#).
240,000#/yr.
Montars In drums -
less
160,000
Waste Aroclor In drums
less40,000
Net Production Facility Losses - 4o,000#/yr.
(b) Net Blending Facility Losses - 10,000
Total Maximum Aroclor Losses to Sewer 50,000#/yr. (Some of this loss soakB Into the ground and
never reaches the sewer).
(2) The referenced memo outlines suggested pollution control work, housekeeping work, and costs for the following areas In Dept. 246-
a Main process area b Tank car loading area north of department
c Truck loading area and roadway area d Tank farm area e Tank car loading area west of Dept. 254 -
$6,000
14.000
18.000 6,000 7,000
Total - $51,000
In discussing this proposal with those receiving a copy of this memo, two additional Items should be Included to make this a comprehensive pollution control/plant Improvement plan. They are:
(f) Roadway north of department (Design work $15,000 had begun on this project but Is now holding because of tight money for plant Improvement
work.)
(g) Permanently Installed sump pumps In the three proposed settling basins contingent upon loss volume. (3 x $5,000)
$15,000
grand Total -$81,000
MONS 097281
1u
)
2
The housekeeping (plant Improvement) and pollution control portions of the above proposal are related to each other. Better house keeping Is desirable, and for total pollution control, necessary. On the other hand, paving roadways and tank farms Increases the sewer load.
Another alternative is to do only part (a) above, putting In a settling basin for the existing sewers In the old and new process areas. Including a permanently installed pump the cost would be 411,000, all pollution control money. I would estimate that this basin would collect 500 of the 50,000#/yr. estimated losses. It would also give us a much better fix on the actual losses in the various areas.
Tour guidance Is needed on where we go from here. Can the entire proposal or any part of it be Justified at this time?
R. M. McCutchan ghw
HONS 097282