Document xzDxdwdXJO5mkEwDomY28909Q
J. C. Lake Manager. Cowmen ms:w,at*aa. Installation
and Pa.;>?nai-c^.was.Mt)
Planning and Development
Western Electric
3800 Golf Road Rolling Meadows, III. 60008 212 956-3165
HR. G. A. NAVARRO, Manager Engineering Switching Equipment and Step-by-Step PECC
Hawthorne Works
Re: Transite Cable Penetration Closures
File: IE 600.3
At a conference held on March 22, 1974 in New York City with represen tatives from AT&T, BTL, CIE and WECo Medical Director, it was decided that the Bell System approach is to eliminate, wherever possible and practical, the fabrication of transite material under uncontrolled en vironment within Central Offices. This general policy means the elimi nation of transite material used in Central Offices as cable penetra tion closures on floors and walls.
Attached is a letter from BTL giving permission to substitute steel for transite on an interim basis. Since we want to eliminate any possible
health hazards to our installers, we are requesting that you take im mediate action to substitute steel for transite on all afrecced piece part drawings. The type of steel used for floor covers shouid be of similar thickness as the present ceiling covers.
We are recommending that the wall covers be made out of 1/16" thick steel. This matter was discussed with Mr. J. Simpson, BTL on April 8, 1974 and it was stated that the testing of wall closures should be com pleted by the 1st quarter of 1975.
Att
Copy w/Att. to W. ? ford J. Simpson
R C.
R. J. Hit', sin
Whippany-BTL Whippany-BTL Hawthorne works Hawthorne Works
'.iuwxnorno Work?
003663
MR. W. PFERD
2-
JUN 05 1973
Furthermore, we feel that elimination of transite cable hole covers from the Bell System, would be one significant step toward improving the Installers' working environment.
Your prompt cooperation in expediting the resolution of this
Copy to:
J. C. Lake V. J. Meyers
- Rolling Meadows - 222 Broadway ^ { this copy tor
D. R. Chittick - Princeton, N.Y.
CONFIDENTIAL
003666