FACILITY INFORMATION:
Company Name:High Purity Products, Inc.
Facility Name:Front Avenue
Physical Address:5740 NW Front Avenue
Portland, OR 97210
Phone Number:503-548-6355
Latitude / Longitude: (45.56430, -122.516788)
RMP Facility ID #1000 0023 9397
FRS ID #:
EJ Concerns:Yes (Above 80%)
CONTACT INFORMATION (RMP Implementation):
Name:Andrew Demos EH & S Specialist
Phone Number:925-788-7745
E-mail:andrewd@highpp.com
EMERGENCY CONTACT INFORMATION:
Name:Logan Rounsevelle
Phone (24-hr):503-548-6355
E-mail:logan@highpp.com
Website:highpurityproducts.com
TRIP DETAILS:
Inspection Date:March 17, 2023
Inspection Time:09:00 through 12:15
EPA Inspection Team:
Edward Johannes, US EPA Region 10 SEE Grantee, Lead RMP Inspector / EPCRA Inspector
Terry Garcia, US EPA Region 10 SEE Grantee, RMP Inspector
Peter Phillips, US EPA Region 10 SEE Grantee, RMP Inspector
Mhara Coffman, US EPA Region 10, RMP Inspector
Taylor Law, Weston Solutions, Inc., EPA START Contractor
May 26, 2023Page 1 of 5
DATE AND PROGRAM LEVELS OF SUBMITTED RMP:
Initial Submission Date:November 29, 2022
Date of Latest Update:November 29, 2022
Process (Program 1, 2, 3) as reported in RMP:
NAICS Progr
ProcessChemical Name
Process ID DescriptionCodeamQuantity (lbs)
Chemical IDCAS Number
Level
110,000 (37%
Hydrochloric acid
1000104726 Storage / Shipping 1000131199 325998 2concentration or
(7647-01-0)
greater)
166,000 (20%
Ammonia, Aqueous
1000104726 Storage / Shipping 1000160522 325998 2concentration or
(7664-41-7)
greater)
24,800 (37%
hydrochloric acid
1000128041 Repacking1000160553 325998 2concentration or
(7647-01-0)
greater)
21,000 (20%
Ammonia, Aqueous
1000128041 Repacking1000160554 325998 2concentration or
(7664-41-7)
greater)
24,825 (37%
Hydrochloric acid
1000128042 Bulk Transferring 1000160555 325998 2concentration or
(7647-01-0)
greater)
21,000 (20%
Ammonia, Aqueous
1000128042 Bulk Transferring 1000160556 325998 2concentration or
(7664-41-7)
greater)
PURPOSE:
The purpose of this inspection was to determine if this facility is in compliance with Section 112 (r) of the
Clean Air Act and Title 40 Code of Federal Regulations (CFR) Part 68, Chemical Accident Prevention
Provisions.
The facility has been previously inspected in the past 5 years:NoYes
If Yes, Date of Last Inspection: None
The facility is High Risk:NoYes
Joint EPCRA inspection:NoYes
CAA Title V Air Permit:
Does the facility have a CAA Title V Permit?NoYes
If Yes, Permit Number:
RELEASE / ACCIDENT HISTORY:
Did the facility have a reportable release in the past 5 years?NoYes
If Yes, Date and Description of the Release:
EPCRA TIER II REPORTING:
Did the facility submit the [Enter Year] Tier II report to the SERC?NoYes
If Yes, Date the Tier II was submitted:2-14-2023
If No, calendar year of the most recent Tier II:
Page 2 of 5
Did the facility submit a Tier II to the LEPC and local fire department? NoYes
If Yes, Date the Tier II was submitted:2-14-23
INSPECTION ENTRY:
The EPA Inspection Team (EPA) led by Mr. Edward Johannes arrived at the premises of High Purity
Products, Inc. Front Avenue facility (facility) in Portland, Oregon, at 08:45 and was joined by the
following facility personnel:
NameTitle, Organization
Andrew DemosEH & S Specialist - High Purity Products (HPP)
Bhaskar ChoudhuryPresident - HPP
Logan RounsevelleProduction Manager - HPP
Daniel WilliamsDirector of Quality - HPP
David MarsolekDirector of Production - HPP
Paul SmithLab Manager - HPP
Was a state / county / or local emergency representative present?NoYes
If Yes, Name and Title of Representative: Bryan Profit
The facility is a first responder:NoYes
If No, Responding Agency: Portland Fire Department
Facility representatives escorted EPA to the facility's office / conference room. Lead Inspector Edward
Johannes introduced all parties present, provided a summary of the Risk Management Program (RMP),
and explained the purpose of the visit. Each EPA Inspector presented his / her credentials.
EPA then requested an explanation of the facility's operations and any additional safety measures that
should be taken during the site tour. Mr. Andrew Demos EH & S Specialist of HPP gave a brief description
of the facility, operations, and personal protective equipment required for the tour.
Prior to the inspection, EPA sent a certified notice of inspection letter to the facility on February 27, 2023,
informing them of the CAA Section 112 (r) (6) (L) requirement that facility employees and employee
representatives (such as a union representative) have the right to participate in the RMP inspection, and
that a copy of the letter must be provided to the employee representative(s) and the letter posted in a
manner accessible to employees in the facility. A corrected second notice was sent out on March 14,
2023, informing the facility that the inspection was for Program Level 2 requirements, not for Program
Level 3 requirements as was stated in the original notice.
The facility is unionized:NoYes
If Yes, Name of Union:
An employee representative present during the facility visit:NoYes
If Yes, Name / Title: Mr. Andrew Demos EH & S Specialist
Page 3 of 5
GENERAL INFORMATION:
The facility is regulated under RMP rule a Program Level 2 facility and is owned and operated by High
Purity Products, Inc. (HHP) whose parent company is Cascade Columbia Distribution. Operations at the
facility began in 2003. HPP is a full line supplier of the highest purity acids, bases, solvents, and etchants
used for semiconductor applications. The facility receives ISO tank containers (ISOtainers) of bulk
product, which it repackages to into gallon bottles, pails, carboys, drums, and totes for the semiconductor
industry. The ISOtainers are offloaded at a dock, where the bulk product is repackaged after going through
a filtration transfer system. The facility stores the bottles of repackaged product in specified storage rooms
inside the main facility building. HHP has 18 full - time employees on site, 14 of whom are trained as
Operators.
ON-SITE OBSERVATIONS:
EPA toured the facility from approximately 0930 hours to 1015 hours, escorted by facility representatives
Mr. Andrew Demos, Mr. Bhaskar Choudhury, Mr. Logan Rounsevelle, Mr. Daniel Williams, Mr. David
Marsolek, and Mr. Paul Smith. EPA observed the covered chemical storage facility process and
repackaging of product for the semiconductor industry. Photographs taken during the inspection are
included in Attachment A to this report.
EPA observed operations in the Clean Room Lab and Shipping / Receiving Area, which comprise the
majority of the facility interior. The Clean Room Lab serves as a lab and staging area for chemical
repackaging (Photo 1) and is adjacent to the Shipping / Receiving Area. The facility receives bulk chemical
product from delivery trucks in the Shipping / Receiving Area (Photos 2 and 3). EPA observed a filtration
system dedicated to processing ammonium hydroxide between the receiving doors (Photos 4 and 5),
hydrochloric acid (HCL) repackaging operations in the Clean Room Lab (Photos 6 and 8). Process safety
practices observed in the Clean Room Lab and Shipping / Receiving Area include an eyewash station and
hazard communication signage posted on the access door leading to the Scrubber Room (Photos 9 and
10).
EPA observed exhaust system components housed in the Scrubber Room, including a dual unit exhaust
system, ventilation pipe, control panels, pumps, and compressors (Photos 11-20).
EPA observed exterior areas of the facility, including a parking / storage area for ISOtainers (Photos 21-
25), and nitrogen storage tank (Photos 26 and 27).
Storage rooms in the facility interior provide separate, dedicated storage areas for a variety of chemicals
including ammonia, HCL, flammable products, and corrosives. EPA observed the Flammables and
Corrosives Rooms which included fire extinguishers, emergency shower / eyewash stations, and hazcom
signage (Photos 28-36).
After touring the RMP-covered process areas at the facility, EPA returned to the conference room to
review the RMP documentation. Upon completion of the document review, EPA provided a debriefing
to Mr. Andrew Demos, Mr. Bhaskar Choudhury, Mr. Logan Rounsevelle, Mr. Daniel Williams, Mr. David
Marsolek, and Mr. Paul Smith.
Page 4 of 5
INFORMATION COLLECTED FROM FACILITY:
1. Safety Data Sheet for Ammonium Hydroxide
2. Safety Data Sheet for Hydrochloric Acid
3. List of Trained of Employees for Container Drum disposal process
4. Example of empty container disposition training quiz
5. Facility Compliance and Audit Report package
6. Visitor Conduct Guide
7. Copy of Emergency Response Plan package with Site Figures
AREAS OF CONCERNS ADDRESSED IN CLOSING CONFERENCE:
No areas of concern were identified during the inspection.
DOCUMENTS REQUESTED NOT INCLUDED IN REPORT:
The following documents were requested during the inspection but are not included in this report. These
documents will still be reviewed to determine compliance with Section 112 (r) of the Clean Air Act.
During the inspection, no follow - up document requests were made requiring further review.
INSPECTION REPORT CERTIFICATION:
This is to certify that I, Edward Johannes, was the lead inspector at this facility and that I have verified
the accuracy of the observations in this inspection report:
EDWARD JOHANNES Digitally signed by EDWARD
JOHANNES (Affiliate)
(Affiliate)Date: 2023.07.07 13:14:33 -07'00 '
Inspector Signature
Digitally signed by JAVIER
JAVIER MORALES MORALES
Date: 2023.07.10 11:08:19 -07'00 '
RMP Coordinator / Approval
Digitally signed by ERIN
ERIN WILLIAMS WILLIAMS
Date: 2023.07.12 15: 07: 50-07'00 '
EPCRA Coordinator / Approval
MATTHEWDigitally signed by MATTHEW
QUARTERMAN
QUARTERMANDate: 2023.07.17 15:25:19 -07'00 '
Land Enforcement Section Chief / Approval
Page 5 of 5
Attachment A-Photo Log
Site Name:
Front Ave RMP Inspection
City, State:
Portland, Oregon
Photographer:
Taylor Law
File
Photo Layout ID
Date
Time
1
1.jpg 3/17/2023 09:41 am
2
2.jpg 3/17/2023 09:41 am
3
3.jpg 3/17/2023 09:41 am
4
4.jpg 3/17/2023 09:43 am
5
5.jpg 3/17/2023 09:46 am
6
6.jpg 3/17/2023 09:47 am
7
7.jpg 3/17/2023 09:50 am
8
8.jpg 3/17/2023 09:50 am
9
9.jpg 3/17/2023 09:50 am
10 10.jpg 3/17/2023 09:50 am
11
11.jpg 3/17/2023 09:50 am
12
12.jpg 3/17/2023 09:50 am
13
13.jpg 3/17/2023 09:51 am
14
14.jpg 3/17/2023 09:51 am
15
15.jpg 3/17/2023 09:51 am
16
16.jpg 3/17/2023 09:52 am
17
17.jpg 3/17/2023 09:52 am
18
18.jpg 3/17/2023 09:52 am
19
19.jpg 3/17/2023 09:53 am
20
20.jpg 3/17/2023 09:53 am
21 21.jpg 3/17/2023 09:55 am
22
22.jpg 3/17/2023 09:55 am
23
23.jpg 3/17/2023 09:55 am
24
24.jpg 3/17/2023 09:56 am
25
25.jpg 3/17/2023 09:58 am
26
26.jpg 3/17/2023 09:58 am
27
27.jpg 3/17/2023 09:58 am
28
28.jpg 3/17/2023 09:59 am
29
29.jpg 3/17/2023 10:00 am
30
30.jpg 3/17/2023 10:00 am
31
31.jpg 3/17/2023 10:00 am
32
32.jpg 3/17/2023 10:00 am
33
33.jpg 3/17/2023 10:00 am
34
34.jpg 3/17/2023 10:01 am
35
35.jpg 3/17/2023 10:02 am
36
36.jpg 3/17/2023 10:03 am
Description
Overview of Clean Room, Lab, and Staging / Receiving area.
Overview of Dock / Shipping receiving down - downpack area with Ammonium Hydroxide transfer system.
Exit doorway adjacent to Docks / Shipping receiving area.
Ammonium Hydroxide transfer and filtration system.
Ammonium Hydroxide transfer and filtration system.
Clean Room Lab, HCL downpack operations
Clean Room Lab, HCL downpack operations
Clean Room Lab, HCL downpack operations
Clean Room Lab, eyewash station adjacent to scrubber / exhaust system
Shipping / Receiving Area, hazard communication (hazcom) signage at access door to Scrubber Room
Scrubber Room, dual unit exhaust system
Scrubber Room, dual unit exhaust system
Scrubber Room, ceiling mounted pipe ventilation of the dual unit exhaust system
Scrubber Room, overview
Scrubber Room, overview
Scrubber Room, exhaust system control panel with calibration information
Scrubber Room, exhaust system piping and pumps
Scrubber Room, overview of exhaust system manufacturer label
Scrubber Room, exhaust system control panel with calibration information
Scrubber Room, air compressors for the exhaust system
Facility Exterior, ISOtainer receiving area
Facility Exterior, ISOtainer receiving area adjacent to the Willamette River
Facility Exterior, ISOtainer receiving area
Facility Exterior, ISOtainer receiving area
Facility Exterior, ISOtainer receiving area
Facility Exterior, nitrogen storage tank
Facility Exterior, nitrogen storage tank
Fire extinguisher overview near facility exterior exit.
Clean Lab Room, view of Flammable Room access door with fire extinguisher and hazcom signage
Flammables Room, chemical storage
Flammables Room, chemical storage
Flammables Room, chemical storage
Clean Room Lab, access door to Corrosives Storage Room with fire extinguisher, eyewash / shower, and hazcom signage
Corrosives Room, overview of chemical storage
Corrosives Room, overview of chemical storage
Corrosives Room, overview of chemical storage