H. W. Shahan J. E. Kennedy J. H. Strauss - MRS Investment Recovery 530 File 17-4-5 September 13, 1984 TO: B. A. KAISER FROM: J. E. HILSCHER SUBJECT: DISMANTLEMENT CONTRACT D-3558 CONTRACTOR:___LEVY WRECKING CO. Safety Safety attitude of Levy Wrecking are taking extra time and steps to handle scrap material safely. They continue to hold safety meetings every Monday morning. Any unusual condition is reported to Du Pont personnel immediately. All weights of equipment are reviewed before crane lifts are made. Their safety performance is better than any D&R contrac tors who have worked on this plant. It appears to be much better than any D&R contractor witnessed on other plant sites. We continue to emphasize an injury free job is a job well done. Housekeeping Levy does a very good job in maintaining the buildings being demolished. All asbestos material is kept within a curbed area and cleaned up daily. There are problems at times with scrap materials building up in the processing area for shipment, but a reminder normally corrects this. Their housekeeping is very good for the type of work they are doing. Injuries To date 15 minor injuries have been recorded with two exceptions. One involved piping striking their foreman on the hip and thigh. No loss time, but high potential. The other involved explosion of vapors in an inert gas header being removed. Levy employee was knocked down by blast. No injury DUP 0840911 2 resulted but again high potential. (H,, gas is believed to have been trapped in inert header.) All other piping in all buildings was reviewed to insure this condition did not exist elsewhere. All incidents and injuries are reviewed with Levy supervision. Modifications to working procedures are made as needed to improve safety conditions. Levy supervision also notify us of off plant injuries. They have had five off plant injuries. Three resulting in lost time, two restricted work injuries. Equipment PM and Safety Contractor equipment is maintained and inspected daily. They will not make any lifts with their cranes unless the hydraulic systems, cable, etc. are checked for defects. Levy equipment is kept up appearance wise also. This is unusual for most D&R contractors. Work Progress To date 1.6 MM lbs. of carbon/steel scrap has been processed and shipped to a smelter. Tons of S/S and exotic metals have been shipped for processing. All piping has been removed from two of the four process buildings. All asbestos insulated piping in the processing area has been cleaned. The only asbestos removal is confined within building boundaries. Approximately 25 to 30% of the D&R project is complete. MRS Equipment Sales Over 50% of the 28 items purchased by MRS has been sold or sent to their hold yard in Orange, Texas. Summary The project is progressing on schedule. Levy's safety attitude is very good. To date they are doing a good job. JEH:fc